Loading...
HomeMy WebLinkAboutR-4214474A Cn H O O 60% SUBMITTAL REVISION SS (IS 14+00 BY I ABED I DATE GENERALNOTES 1. THE 60% DESIGN REFLECTS THE ASSUMPTION THAT PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT. 60% TO BE SUBMITTED AT A LATER DATE CONSTRUCTION NOTES OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. OBORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION. OPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL SERVICE PEDESTAL, SEE 1E2.01 FOR MOUNTING AND FOUNDATION DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN BY "F" ON THE PLANS. O4 PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT 01 I STANDARD PLAN J40.10-04. LABEL JUNCTION BOX "METRO". 0 0 DraovoaisD 3 0 _M I M M M p M n! "ONOO SS SS SS S S SS SS SS SS OS OS SD SD SD SD SD 0 LEGEND 15+00 _ _ 08 HAVE (108TH-LINE) O METRO ELECTRICAL SERVICE PEDESTAL Q JUNCTION BOX TYPE 2 --- BURIED I CONCEALED CONDUIT METRO BUS SHELTER A METRO TECHNOLOGY PYLON Jacobs V�' o4'vggpi C$ concord�� ENGINEERING -4- 0' 10' 20' SCALE: 1' =10' DATE METRO TRANSIT CAPITAL DIVISION RAPIDRIDE 1 LINE NOVEMBER 2021 King County RENTON SEGMENT DRAWNGNO METRO ELECTRICAL SITE PLAN 1E1.07 ID# 57270 SEETNO OF 474 XXXX T-4214174 R-4214474