HomeMy WebLinkAboutR-4214475A
r
r
G
TO
Y
—W
W
W�
G
w
Tn
0
60% TO BE SUBMITTED AT A LATER DATE
llhlk4wz
ONO3
15+00
— I —
108TH AVE SE
dHO
dH0 dH0 dHO
GENERALNOTES
1. THE 60% DESIGN REFLECTS THE ASSUMPTION THAT PSE WILL
PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A
SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT.
CONSTRUCTION NOTES
OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
OBORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES
AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS
BACK TO PRECONSTRUCTION CONDITION.
OPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL, SEE 1E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY "F" ON THE PLANS.
O4 PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J40.10-04. LABEL JUNCTION BOX "METRO".
LEGEND
9
METRO ELECTRICAL SERVICE PEDESTAL
F
Q
JUNCTION BOX TYPE 2
-----
BURIED I CONCEALED CONDUIT
METRO BUS SHELTER
A
METRO TECHNOLOGY PYLON
-4-
0' 10' 20'
SCALE: 1' =10'
7 Y P.. .. METRO TRANSIT CAPITAL DIVISION
60% SUBMITTAL NOVEMBER2021
.Jacobs :��°.�'°c� °���EN PENG RAPIDRIDE 1 LINE
9� g A KING L9 King County
q CHECIQD. PROJECT NO. RENTON SEGMENT DHAunNCND:
concord %�'BT � A.MGHGRAIN E00536EI8 METRO ELECTRICAL SITE PLAN 1E1.08
N[ REVISION BY APP'0 NATE ONpL CHECKED'. CONTM TNO: ID# p 290 SHEETNO'. OF
E N G IN EER ING MFTRn NRniFCT FNAINFFR tf JI LJ 475 XXXX
I —&"FL I &+ I / : a
R-4214475