Loading...
HomeMy WebLinkAboutT-421458E ADVANCED VIDEO DETECTION PLACEMENT VIDEO ZONE OFFSET FROM STOP BAR V12, V63, V64, V65 180, V66, V67, V68 275, 60% SUBMITTAL REvrioN By 14PPD I -ATE CONSTRUCTION NOTES: Oi REMOVE EXISTING PEDESTRIAN PUSH BUTTONS AND SIGNS FROM EXISTING TYPE III SIGNAL STANDARD. PROTECT EXISTING TYPE III SIGNAL STANDARD, FOUNDATION AND ASSOCIATED EQUIPMENT IN PLACE UNLESS OTHERWISE NOTED. - HP OH 0 1A FURNISH AND INSTALL TYPE PPB SIGNAL STANDARD PER WSDOT STANDARD PLAN J-20.11. FURNISH AND INSTALL TWO AIDS PEDESTRIAN PUSH BUTTONS WITH SIGNS ON SIGNAL POLE. OPROTECT EXISTING TYPE II SIGNAL STANDARD, FOUNDATION AND ASSOCIATED EQUIPMENT IN PLACE. p OHP- O PROTECT EXISTING TYPE III SIGNAL STANDARD, FOUNDATION AND ASSOCIATED EQUIPMENT IN PLACE. 40 FURNISH AND INSTALL VIDEO DETECTION CAMERA ON EXISTING MASTARM BETWEEN HEADS 11 AND 61. PROTECT EXISTING TYPE II SIGNAL STANDARD, FOUNDATION AND ASSOCIATED EQUIPMENT IN PLACE. — 4A PROTECT EXISTING TYPE PPB SIGNAL STANDARD, FOUNDATION AND ASSOCIATED EQUIPMENT IN PLACE. V6 O FURNISH AND INSTALL A NEW TYPE B JUNCTION BOX PER WSDOT STD. PLAN J40.30. 63 —El V66 OPRIOR TO THE REMOVAL OF EXISTING CABINET FOUNDATION, CONSTRUCT JOINT CONTROLLER/SERVICE CABINET FOUNDATION PER CITY OF RENTON STANDARD PLANS 126.1 AND 126.2. INSTALL ALL RELOCATED CONTROLLER EQUIPMENT AND CONNECT FIELD WIRING. VERIFY FINAL LOCATION WITH THE ENGINEER IN THE FIELD PRIOR TO POURING THE FOUNDATION. �IVV12I - I�]_� —�Lm LJ O7 ABANDON EX. VEHICLE DETECTION LOOPS ON THE EAST LEG OF THE INTERSECTION PER WSDOT SPECIFICATIONS AND REMOVE ALL ❑ ASSOCIATED WIRING UNLESS OTHERWISE NOTED. ❑ _ O8 REMOVE EXISTING CABINET FOUNDATION. REMOVE AND RELOCATE EXISTING CONTROLLER CABINET AND ALL ASSOCIATED EQUIPMENT. ❑ REMOVE ALL WIRING AND CONDUIT. ❑ �_y_ OB REMOVE EXISTING JUNCTION BOXES, CONDUIT ELBOWS AND ALL ASSOCIATED WIRING AND CONDUITS. BACKFILL VOID. ❑ _ ❑ 10 INTERCEPT EXISTING CONDUIT AND EXTEND TO NEW JUNCTION BOX. SD 1 1 1 ��O �� METRO TRANSIT CAPITAL DIVISION W P. ENG �P¢�owa„NF�� �°�,s RAPIDRIDE I LINE p a � King County �. GnNs CHECKED PRaE*NN: METRO RENTON SEGMENT 'r o'�RFc��ISTagt<��' M. WEGENER E00558E18 DETECTION PLAN `""Km' `°"""`TN°' S GRADY WAY & LAKE AVE S METRO PROJECT ENGINEER CXX%RRRRX SCALE: 1"=40' NOVEMBER 2021 1 TS 1.04B KM:�:eecl T-421458 R-4214358