HomeMy WebLinkAboutT-421453I
No
E
60% SUBMITTAL
REVI;Iov
By 14PPD I BATE
.;acobs
NOTES:
1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00.
2. FOR SIGNAL POLE DETAILS SEE 1TS1.03C.
3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.05B AND 1TS1.05D.
4. FOR CONSTRUCTION NOTES SEE 1TS1.03B.
5. FOR ILLUMINATION PLANS AND DETAILS SEE XXXXX.
6. FOR ITS PLANS AND DETAILS SEE XXXXX.
7. NEW VEHICLE SIGNAL HEAD 24 AND NEW BICYCLE SIGNAL HEAD 11 SHALL BE
INSTALLED WITH NEW MOUNTING TYPE "H" ON EXISTING LIGHT POLE PER WSDOT
STANDARD PLAN J-75.10.
8. NEW COUNTDOWN PEDESTRIAN SIGNAL HEADS 29 AND 48 SHALL BE INSTALLED WITH
NEW MOUNTING TYPE 'W ON NEW TYPE I POLE PER WSDOT STANDARD PLAN J-75.10.
9. NEW COUNTDOWN PEDESTRIAN SIGNAL HEADS 28 AND 49 SHALL BE INSTALLED WITH
NEW MOUNTING TYPE "C" ON NEW TYPE I POLES PER WSDOT STANDARD PLAN
J-75.10.
J. DAMS
DRAWN
J. DANS
cxEcxeo
T
90�RFC,i�
M.WEGENER
`isYpA,Ay ECG
CHECKED
METRO PROJECT ENGINEER
PHASE DIAGRAM
5
NOT
BIKE
USED
2
6
NOT
USED
3
7
NOT
NOT
USED
USED
4
8
NOT
USED
D PROTECTED VEHICLE MOVEMENT
C—PC—> PEDESTRIAN MOVEMENT
�> BIKE MOVEMENT
PRE-EMPTION SCHEDULE
CHANNEL
PHASES
A&B
2
C
4
P. ENG
King County
METRO
PxH,E6Exo
E00558E18
��
SIGNAL HEADS
EXISTING NEW
O12" 1T
R 17
w120 1r
v 1r
OG 12" 12"
G 12"
21,22,23, 11
24
41,42
28, 29, 48, 49
APS PUSH BUTTON MESSAGES
PHASE
AUDIBLE MESSAGE
1
"WAIT"
"WAIT" "WAIT TO CROSS SECOND
2
AT SHATTUCK"
'WAIT" "WAIT TO CROSS SHATTUCK
4
AT SECOND"
CQIWK
ONE WAY No
TURN
ON RED
s1 ONLY Sa
R6-1 (L) SPECIAL pB'WX24"H) R10-11b (36" W x 36" H)
S2
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
RENTON SEGMENT
SIGNAL PLAN
S 2ND ST & SHATTUCK AVE S
N
0' 10, 20'
SCALE: 1" = 20'
NOVEMBER 2021
1 TS 1.03A
I 353 XXXX
T-421453
R-4214353