HomeMy WebLinkAboutT-421449r
No
E
60% SUBMITTAL ON
RE Ll;iA
By I RPc'D I --TE
NOTES:
1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00.
2. FOR SIGNAL POLE DETAILS SEE 1TS1.02C.
3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.02D.
4. FOR CONSTRUCTION NOTES SEE ITS1.02B.
S. FOR ILLUMINATION PLANS, SERVICE BREAKER PANEL SCHEDULE AND DETAILS SEE
XXXXX
6. FOR ITS PLANS AND DETAILS SEE XXXXX.
7. FOR TREE PROTECTION PLAN SEE XXXXX.
8. NEW BIKE SIGNAL HEAD 11 AND VEHICLE SIGNAL HEAD 21 SHALL BE INSTALLED WITH
NEW MOUNTING TYPE "F" ON NEW TYPE I POLE PER WSDOT STANDARD PLAN J-75.10.
9. NEW COUNTDOWN PEDESTRIAN HEAD 29 SHALL BE INSTALLED WITH NEW MOUNTING
TYPE "E" ON NEW TYPE I POLE PER WSDOT STD. PLAN J-75.10.
10. NEW COUNTDOWN PEDESTRIAN HEADS 28 AND 49 SHALL BE INSTALLED WITH NEW
MOUNTING TYPE "C" ON NEW PS POLE PER WSDOT STD. PLAN J-75.10.
11. NEW BIKE SIGNAL HEAD 12 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "K" ON
EXISTING LIGHT POLE PER WSDOT STANDARD PLAN J-75.10.
APS PUSH BUTTON MESSAGES
PHASE
AUDIBLE MESSAGE
1&2
'WAIT""WAIT TO CROSS 2ND AT
MORRIS"
4
'WAIT""WAIT TO CROSS MORRIS AT
2ND"
SIGNS
NO
TURN
ON RED
S1
R10.11b (36" W x 36" H)
SIGNAL HEADS
EXISTING NEW
O 12 O 12" �� R 9 012
72 72 48 Y 8 12 28,29,49
12' 12' G 8" 12"
22,23,24 41,42 11,12 21
PRE-EMPTION SCHEDULE
CHANNEL
PHASES
A&C
2
B
4
PHASE DIAGRAM
1
5
NOT
BIKE
►
USED
2
6
NOT
USED
3
7
NOT
NOT
USED
USED
4
8
NOT
USED
—Ir PROTECTED VEHICLE MOVEMENT
e--0—s PEDESTRIAN MOVEMENT
mmmmm► BIKE MOVEMENT
J. DAMS P. ENG
H/
Q4R�,0 ,y�Tay�� wDAM King County
J. DAMS
CHECKE
M.WEG PxaE6Exo 18 METRO
p'$'RFc�11,TTgF� CHECKED E005 TN
`isYpA,Ay E15G cxmxm� coxrvAcixo.
METRO PROJECT ENGINEER CXX%RRRRX
N
0' 10, 20'
SCALE: 1" = 20'
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
RENTON SEGMENT
SIGNAL PLAN
S 2ND ST & MORRIS AVE S
NOVEMBER 2021
1 TS 1.02A
IUS XXXX�Xxxxx
T-421449
R-4214349