Loading...
HomeMy WebLinkAboutT-421449r No E 60% SUBMITTAL ON RE Ll;iA By I RPc'D I --TE NOTES: 1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00. 2. FOR SIGNAL POLE DETAILS SEE 1TS1.02C. 3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.02D. 4. FOR CONSTRUCTION NOTES SEE ITS1.02B. S. FOR ILLUMINATION PLANS, SERVICE BREAKER PANEL SCHEDULE AND DETAILS SEE XXXXX 6. FOR ITS PLANS AND DETAILS SEE XXXXX. 7. FOR TREE PROTECTION PLAN SEE XXXXX. 8. NEW BIKE SIGNAL HEAD 11 AND VEHICLE SIGNAL HEAD 21 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "F" ON NEW TYPE I POLE PER WSDOT STANDARD PLAN J-75.10. 9. NEW COUNTDOWN PEDESTRIAN HEAD 29 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "E" ON NEW TYPE I POLE PER WSDOT STD. PLAN J-75.10. 10. NEW COUNTDOWN PEDESTRIAN HEADS 28 AND 49 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "C" ON NEW PS POLE PER WSDOT STD. PLAN J-75.10. 11. NEW BIKE SIGNAL HEAD 12 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "K" ON EXISTING LIGHT POLE PER WSDOT STANDARD PLAN J-75.10. APS PUSH BUTTON MESSAGES PHASE AUDIBLE MESSAGE 1&2 'WAIT""WAIT TO CROSS 2ND AT MORRIS" 4 'WAIT""WAIT TO CROSS MORRIS AT 2ND" SIGNS NO TURN ON RED S1 R10.11b (36" W x 36" H) SIGNAL HEADS EXISTING NEW O 12 O 12" �� R 9 012 72 72 48 Y 8 12 28,29,49 12' 12' G 8" 12" 22,23,24 41,42 11,12 21 PRE-EMPTION SCHEDULE CHANNEL PHASES A&C 2 B 4 PHASE DIAGRAM 1 5 NOT BIKE ► USED 2 6 NOT USED 3 7 NOT NOT USED USED 4 8 NOT USED —Ir PROTECTED VEHICLE MOVEMENT e--0—s PEDESTRIAN MOVEMENT mmmmm► BIKE MOVEMENT J. DAMS P. ENG H/ Q4R�,0 ,y�Tay�� wDAM King County J. DAMS CHECKE M.WEG PxaE6Exo 18 METRO p'$'RFc�11,TTgF� CHECKED E005 TN `isYpA,Ay E15G cxmxm� coxrvAcixo. METRO PROJECT ENGINEER CXX%RRRRX N 0' 10, 20' SCALE: 1" = 20' METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT SIGNAL PLAN S 2ND ST & MORRIS AVE S NOVEMBER 2021 1 TS 1.02A IUS XXXX�Xxxxx T-421449 R-4214349