Loading...
HomeMy WebLinkAboutT-4214370 E O O 00 60%D TO BE SUBMITTED AT A LATER DATE - _ — _ — — — _ — — I i 07� 4110-0010 108TH AVE SE (SR 515) 19+00 + (108TH-LINE) 60% SUBMITTAL No. I REvrI'A By 14PPE I --TE .;acobs METRO PROJECT ENGINEER 0 22+00 23+00 - + T _ _ 322305-91 0' 20' 40' SCALE: V = 20' MPRMD: P. ENG King County PaaE6EDD METRO E00588E18 �3 GENERALNOTES 1. SEE SHEET 1C8.00 FOR GENERAL SIGNING & STRIPING NOTES. LEGEND EXISTING SIGN i PROPOSED SIGN SIGNING AND STRIPING NOTES 0 YELLOW DOUBLE CENTERLINE PER WSDOT STD PLAN M-20.10-03. QYELLOW CENTERLINE PER WSDOT STD PLAN M-20.10-03 0WHITE LANE LINE PER WSDOT STD PLAN M-20AD-03 4O YELLOW TWO-WAY LEFT -TURN CENTERLINE PER WSDOT STD PLAN M-20.10-03 OWHITE WIDE SOLID LANE LINE PER WSDOT STD PLAN M-20.10-03 O6 WHITE WIDE DOTTED LANE LINE PER WSDOT STD PLAN M-20.10-03 OEDGE LINE AND SOLID LANE LINE PER WSDOT STD PLAN M-20.10-03 (D TRAFFIC ARROW TYPE 2SL PER WSDOT STD PLAN M-24.40-02 (D TRAFFIC ARROW TYPE 2SR PER WSDOT STD PLAN M-24.40-02 10 TRAFFIC ARROW TYPE 1 S PER WSDOT STD PLAN M-24.40-02 0 THERMOPLASTIC CROSSWALK PER CITY OF RENTON STD PLAN 127 12 THERMOPLASTIC PARALLEL CROSSWALK AND STOPBAR MARKING PER CITY OF RENTON STD PLAN 128 13 TRAFFIC LETTERS PER WSDOT STD PLANS M-80.10-01 AND M-80.30-00 14 TRAFFIC ARROW TYPE 3SR PER WSDOT STD PLAN M-24AD-02 15 PAINT CURB (COLOR AS NOTED) YIELD LINE SYMBOL PER WSDOT STD PLAN M-24.60-04 17 BUS ZONE PAINTING PER DETAIL 1 ON METRO STANDARD PLAN D108 18 RED BUS LANE PAVEMENT MARKINGS PER DETAIL A ON SHEET 1CD.01 19 RAISED BIKE LANE MARKINGS PER DETAIL ON SHEET iC5.01. 20 BIKE LANE BUFFER PER DETAIL C ON SHEET 1CD.01 (D BIKE LANE DRIVEWAY CROSSINGS PER DETAIL C ON SHEET 1CD.01 22 CROSS BIKE PAVEMENT MARKINGS PER DETAIL D ON SHEET 1CD.01 23 REDUCED BIKE LANE BUFFER PER DETAIL G ON SHEET 1CD.02 24 SHARED BIKE LANE MARKING PER MUTCD FIGURE 9C-9 25 BICYCLE LANE LAYOUT AT INTERSECTIONS PER DETAIL I ON SHEET 1CD.02 26 INSTALL NEW SIGN (AS NOTED) 27 RELOCATESIGN 28 REMOVE SIGN 29 MODIFY SIGN OWHITE DIAGONAL CROSSHATCH MARKING PER WSDOT STD PLAN M-24.60-04 (D THERMOPLASTIC CROSSWALK PER WSDOT STD PLAN M-15.10-01 32 STOP LINE MARKING PER WSDOT STD PLAN M-24.60-04 33 SURFACE MOUNTED FLEXIBLE GUIDE POST (TYPE YY) PER WSDOT STD PLAN M40.10-03 METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT SIGNING & STRIPING PLAN 108TH 18+00 TO 108TH 23+00 NOVEMBER 2021 1 C8.21 A 337 XXXX T-421437 R-4214337