Loading...
HomeMy WebLinkAboutT-421418312" IN 0 2° 1„(TYP) WED( BOLT 11 I I II I III s �I II III \�\L \, �,\ , J °\ _ I \ \\ CONCRETE � i- 11 d � � 4it4 VERTICAL AND FOUNDATION \\ \�\ / / /a I '.`�" 344 HORIZONTAL (CLASS 3000) EBARS i1\\'X( SERVICE r ,,.�„ \LOAD CONDUIT J CONDUITS GROUND ROD 3/4" X 120" COPPER -CLAD WITH GROUND CLAMP. A SECOND GROUND ROD SHALL BE INSTALLED A MINIMUM OF 8'1 AWAY IN A GROUND ROD HANDHOLE AS PER CITY OF SEATTLE STANDARD PLAN NO 550b. COORDINATE WITH ELECTRICAL INSPECTOR FOR LOCATION. INSTALL 3/4" RGS CONDUIT WITH #6 GROUND CONDUCTOR BETWEEN CABINET FOUNDATION AND GROUND ROD HANDHOLE. FRONT VIEW EDGE OF POWER PEDESTAL FOUNDATION 4� LINE LOAD DEAD FRONT 131111111111115 MIIII _ III eu SIDE VIEW GENERALNOTES 1. ANCHOR BOLT SPACING PROVIDED BY MANUFACTURER. 2. SERVICE ENTRANCE CONDUIT SHALL BE 21NCHES OR SMALLER AS REQUIRED BY SERVICE CONDUCTORS. 120 VAC 1 Q 2W POWER PEDESTAL I I I I MAIN 60A CINT #1 N;:F TECH PYLON CKT #2 SHELTER LIGHTING CKT #3 SHELTER LIGHTING (TIER 1 L STATION)/SPARE CKT#4 SPARE CKT#5 SPARE CINT#6 SPARE 20A I I CKT#7 GFCI I I I I N I I G ONE LINE DIAGRAM DETAIL SCALE: NITS POWER PEDESTAL DETAIL %11 SCALE: NITS of DESIGNED. PPPRONED: METRO TRANSIT CAPITAL DIVISION DATE: 60 /o SUBMITTAL ' NOVEMBER 2021 Jacobs (*A.°""""�PENG RAPIDRIDE I LINEKing County KINGcnRCKSD: PRascTxD: RENTON SEGMENT wuwwO Noconcord M.MONGRPIN E00588E18 METRO METRO POWER PEDESTAL 1E2.01 No. R[VrIOV By APPD -ATE CHECKED CONTRACTING DETAILS snEr:•xD: OF E N G I N E E R I N G METRO PROJECT ENGINEER CXXKRRKRX 483 XXXX T-4214183 R-4214483