108TH AVE SE
LOCATION MAP
METRO TECH PYLON
METRO RAPIDRIDE
SHELTER
5 , — z— @_ 1
STATION 57260 (IB)
TIER 2
PSE SECONDARY
JUNCTION BOX
0
WIRING SCHEDULE
RUN NO.
CONDUIT SIZE
SHELTER LIGHTS
TECH TECH
PYLON
GROUND
SERVICE
PULL TAPE
REMARKS
1
2" RGS METRO SERVICE
2-#4
2' RGS METRO ELEC.
#12-3TC
248
#8G
2
2" RGS METRO ELEC.
1
SPARE
3
314" RGS METRO ELEC.
#12-3TC
LABEL CONDUCTORS WITH
"SHELTER LIGHTS"
4
1" RGS METRO ELEC.
2-#8
#8G
LABEL CONDUCTORS WITH'TECH
PYLON'
5
1.5" PVC METRO ITS
1
SPARE
6
2" P VC METRO ITS
1
SPARE
7
PER PSE
PER PSE
#12-3TC, 248, #8G
PSE SERVICE POLE
PER PSE
PSESECONDARY
JUNCTION BOX
2-N, #8G #12-3TC 244
ELECTRICAL WIRING SCHEMATIC
EXISTING PSE
SERVICE POLE
31+00
1
11 SEE ITS PLAN
111.22
60% SUBMITTAL Jacobs
V�' o4Tvggpi C$
2 ~ 92
g
REVISION
Aconcord
BY APP'N DATE �fWVAL�
ENGINEERING
J
as
as
108TH AVE SE 32+00
(108TH-LINE)
IB STATION
PANEL: #
VOLTAGE RATING: 120 VOLTS,1 PHASE, 2 WIRE
BUS RATING: 100 AMPS
MAIN BREAKER: 60 AMPS
FEED:BOTTOM
FAULT CURRENT:AMPS
INTERRUPTING CAPACITY: 22,000 AMPS
CIRCUIT DESCRIPTION
VA
CKT
BRKR
TECH PYLON
84
1
1/20
SHELTER LIGHTS
20
2
1/20
SPACE
3
SPACE
4
SPACE
5
SPACE
6
GFCI
180
7
1/20
CONNECTED LOAD = (84+20+180) = 284 VA = 2.367 AMPS
AVERAGE
CONTINUOUS LOAD = ((84+20)'1.25+180) = 310 VA = 2,583 AMPS AVERAGE
L1 King County
METRO
C()
2
00
DD
W
Cn
GENERALNOTES
1. THE 60% DESIGN REFLECTS THE ASSUMPTION THAT PSE WILL
PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A
SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT,
3. SEE 1S1.28 FOR STATION PLANS AND AMENITIES DETAILS.
CONSTRUCTION NOTES
OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
OBORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES
AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS
BACK TO PRECONSTRUCTION CONDITION.
OPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL, SEE 1E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY "F" ON THE PLANS.
O4 PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J40.10-04. LABEL JUNCTION BOX "METRO".
LEGEND
9
METRO ELECTRICAL SERVICE PEDESTAL
F
Q
JUNCTION BOX TYPE 2
-----
BURIED I CONCEALED CONDUIT
METRO BUS SHELTER
A
METRO TECHNOLOGY PYLON
-4-
0' 10, 20'
SCALE: 1' =10'
METRO TRANSIT CAPITAL DIVISION DATE.
RAPIDRIDE 1 LINE NOVEMBER 2021
RENTON SEGMENT DMWNGxo
ELECTRICAL SITE PLAN 1E1.10
ID# 57260 MEETNOOF
47 XXXX
T-4214177
R-4214477