Loading...
HomeMy WebLinkAboutT-4214177A k 9 � Uj A2P A 2e $E12SU zed _� a ' 3�yy o�< N pax= 108TH AVE SE LOCATION MAP METRO TECH PYLON METRO RAPIDRIDE SHELTER 5 , — z— @_ 1 STATION 57260 (IB) TIER 2 PSE SECONDARY JUNCTION BOX 0 WIRING SCHEDULE RUN NO. CONDUIT SIZE SHELTER LIGHTS TECH TECH PYLON GROUND SERVICE PULL TAPE REMARKS 1 2" RGS METRO SERVICE 2-#4 2' RGS METRO ELEC. #12-3TC 248 #8G 2 2" RGS METRO ELEC. 1 SPARE 3 314" RGS METRO ELEC. #12-3TC LABEL CONDUCTORS WITH "SHELTER LIGHTS" 4 1" RGS METRO ELEC. 2-#8 #8G LABEL CONDUCTORS WITH'TECH PYLON' 5 1.5" PVC METRO ITS 1 SPARE 6 2" P VC METRO ITS 1 SPARE 7 PER PSE PER PSE #12-3TC, 248, #8G PSE SERVICE POLE PER PSE PSESECONDARY JUNCTION BOX 2-N, #8G #12-3TC 244 ELECTRICAL WIRING SCHEMATIC EXISTING PSE SERVICE POLE 31+00 1 11 SEE ITS PLAN 111.22 60% SUBMITTAL Jacobs V�' o4Tvggpi C$ 2 ~ 92 g REVISION Aconcord BY APP'N DATE �fWVAL� ENGINEERING J as as 108TH AVE SE 32+00 (108TH-LINE) IB STATION PANEL: # VOLTAGE RATING: 120 VOLTS,1 PHASE, 2 WIRE BUS RATING: 100 AMPS MAIN BREAKER: 60 AMPS FEED:BOTTOM FAULT CURRENT:AMPS INTERRUPTING CAPACITY: 22,000 AMPS CIRCUIT DESCRIPTION VA CKT BRKR TECH PYLON 84 1 1/20 SHELTER LIGHTS 20 2 1/20 SPACE 3 SPACE 4 SPACE 5 SPACE 6 GFCI 180 7 1/20 CONNECTED LOAD = (84+20+180) = 284 VA = 2.367 AMPS AVERAGE CONTINUOUS LOAD = ((84+20)'1.25+180) = 310 VA = 2,583 AMPS AVERAGE L1 King County METRO C() 2 00 DD W Cn GENERALNOTES 1. THE 60% DESIGN REFLECTS THE ASSUMPTION THAT PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT, 3. SEE 1S1.28 FOR STATION PLANS AND AMENITIES DETAILS. CONSTRUCTION NOTES OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. OBORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION. OPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL SERVICE PEDESTAL, SEE 1E2.01 FOR MOUNTING AND FOUNDATION DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN BY "F" ON THE PLANS. O4 PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J40.10-04. LABEL JUNCTION BOX "METRO". LEGEND 9 METRO ELECTRICAL SERVICE PEDESTAL F Q JUNCTION BOX TYPE 2 ----- BURIED I CONCEALED CONDUIT METRO BUS SHELTER A METRO TECHNOLOGY PYLON -4- 0' 10, 20' SCALE: 1' =10' METRO TRANSIT CAPITAL DIVISION DATE. RAPIDRIDE 1 LINE NOVEMBER 2021 RENTON SEGMENT DMWNGxo ELECTRICAL SITE PLAN 1E1.10 ID# 57260 MEETNOOF 47 XXXX T-4214177 R-4214477