S GRADY WAY --
D_
E-
m
H
I Or.ATION MAP
IB STATION
PANEL:#
VOLTAGE RATING: 120 VOLTS,1 PHASE, 2 WIRE
BUS RATING: 100 AMPS
MAIN BREAKER: 60 AMPS
FEED: BOTTOM
FAULT CURRENT: _AMPS
INTERRUPTING CAPACITY: 22,000 AMPS
CIRCUIT DESCRIPTION
VA
CKT
BRKR
TECH PYLON
84
1
ti20
SHELTER LIGHTS
20
2
1;28
SPACE
3
SPACE
4
SPACE
5
SPACE
6
GFCI
1 180
7
1/20
CONNECTED LOAD = (84+20+180) = 284 VA= 2.367 AMPS AVERAGE
CONTINUOUS LOAD = ((84+20)*1.25+180) = 310 VA = 2.583 AMPS AVERAGE
WIRING SCHEDULE
RUN NO.
X
CONDUIT SIZE
SHELTER LIGHTS
TECH PYLON
GROUND
SERVICE
PULLTAPE
REMARKS
1
2" RGS METRO SERVICE
244
2" RGS METRO ELEC.
#12-3TC
248
#8G
2
2" RGS METRO ELEC.
1
SPARE
LABEL CONDUCTORS WITH "SHELTER
3
3/4" RGS METRO ELEC.
#12-3TC
LIGHTS"
LABEL CONDUCTORS WITH'TECH
4
1" RGS METRO ELEC.
248
#BG
PYLON"
5
1.5" PVC METRO ITS
1
SPARE
0
2"PVC METRO ITS
1
SPARE
60% SUBMITTAL TP Jacobs
V�' o4'vggpi C,Y,
2 ~ 92
g
��concord
Nc. REVISION BY APP'N DATE �fONAL
ENGINEERING
248, #8G
EXISTING PSE
UNDERGROUND
#12-3TC
2-#8, #8G
ELECTRICAL WIRING SCHEMATIC
PSEUNDERGROUND
TRANSFORMER VAULT
v
EXISTING UNDERGROUND
POWER
�I
2-#4
L1 King County
METRO
PSESECONDARY
JUNCTION BOX
GENERAL NOTES
1. THE 60% DESIGN REFLECTS THE ASSUMPTION THAT PSE WILL
PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A
SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT,
3. SEE 1S1.09 FOR STATION PLANS AND AMENITIES DETAILS.
CONSTRUCTION NOTES
OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
OBORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES
AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS
BACK TO PRECONSTRUCTION CONDITION.
OPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL, SEE 1E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY "F" ON THE PLANS.
O4 PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J40.10-04. LABEL JUNCTION BOX "METRO".
LEGEND
9 METRO ELECTRICAL SERVICE PEDESTAL
10 JUNCTION BOX TYPE 2
BURIED I CONCEALED CONDUIT
METRO BUS SHELTER
A METRO TECHNOLOGY PYLON
0' 10, 20'
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE 1 LINE
RENTON SEGMENT
ELECTRICAL SITE PLAN
ID# 59841
SCALE: 1"=10'
dhPJ4A1.1411�004
DRAWNGNO
1E1.01
SHEETNO'. OF
467 Xxxx
T-4214167
R-4214467