HomeMy WebLinkAboutT-4214122N
S
I
�
�I
I
U
=
U
N
p
—
W
N
H
W
W
--
2
1n
W
W
N
I
000
0 --
ao
2
00
O
W �tl
Z
J
701662EPLE
k3160784
Q
60% SUBMITTAL
RSN010N
662340-0111
322305-9059
— - - - - - - - - - - - - - - - - -
M M M M M M M M-M- MOB M M M
Sig Had tl31V
108TH AVE SE (SR 515)
49+00 50+0051+00
- - - - (108THLINE)
BY I APPD I DATE
DDO _
�—
ONd OM .9
662340-0094
662340-0091
IlVd OWN
rn
o i6 4316031 166284
0 0
� o s
rn
� a o
0
DID N p
O V
G) f7
O
OD
WIRING SCHEDULE
RUN NO.
QCONDUIT
SIZE
CONDUCTORS
REMARKS
1
AERIAL
1-48SMFO
.Jacobs PO PG DRAWN M. S PENGcV
m`'E
� �M X. LIO
CHECKED: PROJECTNO:
^ey Ec AL ti p S. RAHMPN E00588E18
concord 70
E N G IN EERI N G METRO PROJECT ENGINEER CXXXXXXXX
R
7
n
w
T
0
0
N
In
00
0
¢W
Z
J
S
H
cQ
L
L9 King County
METRO
CONSTRUCTION NOTES
i6 INSTALL NEW MESSENGER CABLE TO EXISTING UTILITY POLE AT HEIGHT
SPECIFIED ON THE POLE SCHEDULE ON DRAWING 112.15. ATTACH NEW AERIAL
FIBER OPTIC CABLE TO MESSENGER BY LASHING. SEE DETAILS ON DRAWING
112.14.
24 INSTALL FIBER SNOWSHOES FOR CABLE SLACK STORAGE AS INDICATED ON
THE FIBER ROUTE SCHEMATIC ON DRAWING 212.01-212.03. SEE DETAILS ON
DRAWING 112.14.
0' 20' 40'
SCALE: 1"=20'
METRO TRANSIT CAPITAL DIVISION OATS
RAPIDRIDE I LINE NOVEMBER 2021
RENTON SEGMENT DMWING NO.
INTERCONNECT PLAN 111.22D
108TH 48+00 TO 108TH 52+00 5H��N OOF
422 XXXX
T-4214122
R-4214422