Loading...
HomeMy WebLinkAboutT-4214118N S u rm wT T H • t v Yam/ n ii t 2 U Q No WIRING SCHEDULE RUN NO. XQ CONDUIT SIZE CONDUCTORS REMARKS 1 AERIAL 1 -48 SMFO 2 3"PVC 1-12SMFO 3 31,PVC 2-48SMFO 60% SUBMITTAL JacobsPN Pp M.PGWERS P. ENG V O4 WA`SHI � MNWN: „F °a� L9 King County � $� x.uu .WM PaaE6EI METRO t�concord ^eyEcere°tip SRAHM: E00588E18 9(ONAL @� CHECKED: LIXITMCTNJ'. RSvlo'i0N BY APPD DATE E N G I N E E R I N G METRO PROJECT ENGINEER CX%%%%%XX GENERALNOTES 1. SEE SIGNAL PLANS 1TS1.12A FOR ADDITIONAL WORK AT THE INTERSECTION. CONSTRUCTION NOTES O3 INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN 140.10-04. OINSTALL SMALL CABLE VAULT PER WSDOT STANDARD PLAN J-90.21.02. O TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. OSPLICE FIBERS TO PRE -TERMINATED PIGTAIL IN THE NEW FIBER PATCH PANEL BY CORRESPONDING COLORINUMBER. 15 INSTALL ONE T PVC CONDUIT RISER ON EXISTING UTILITY POLE. SEE DETAILS ON DRAWING 112.14. SEE POLE SCHEDULE ON DRAWING 112.15 FOR HEIGHT OF RISER. 16 INSTALL NEW MESSENGER CABLE TO EXISTING UTILITY POLE AT HEIGHT SPECIFIED ON THE POLE SCHEDULE ON DRAWING 112.15. ATTACH NEW AERIAL FIBER OPTIC CABLE TO MESSENGER BY LASHING. SEE DETAILS ON DRAWING 112.14. 17 BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY CORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION. 22 SPLICE FIBERS ACCORDING TO FIBER OPTIC SPLICE DIAGRAM 112.03-112.07. COIL SLACK FIBERS IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02. r n w T H Al' W Yr METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT INTERCONNECT PLAN 108TH 28+00 TO 108TH 33+00 0' 20' 40' SCALE: 1"=20' NOVEMBER 2021 111.22 1 418 XXXX 1 T-4214118 R-4214418