Loading...
HomeMy WebLinkAboutT-4214111do I I I dy0 , � \dyo 202305-9008 — — — I,r O 0y0 \ d W LLI 2 N w w w Ed Ed Ln 19+00 -- O Ul r-� 17 +00 , m --/ = 00 I HO 0 dHO W W W w f- — I — a I (IS as a5 as as 0� Ia dH0 Ho dHa dH0 dH0 ddHO'dD^— .Iun- SQ 33*00 LINE) I m N EXISTING TRAFFIC SIGNAL - L wN m _wow TRH U x I mBII� - E 60% SUBMITTAL �v\ 'aHO� 00 O 5 fi b p < No. REVISION BY APED DATE a I I, y R L p it _as as G I _ ss FAiW=/ �; I �I Ilil I �Illill� i I!Illllf - 0 0 irl as as qIs asp UO IE us -j 305,-9001 I \ a > ,. ®p Z io I', dHo�T�d. l� 1178 �q@ ELIO 44 O i. II Z W BENSON RD S F (TAL-B-LINE) 54+00 0 0 MISTING TRAFFIC SIGNAL c cn U) I CV (n .oacobs PN po M.RS G 0 wa °Hi Y DRAWN: hw 0 '$ z N X. LIU CHECKED: 9F A4]28 4p concord e9°10NAL G BR�NN SI ONpL 0 S RAHI): AENGINEERING METRO PROJECT ENGINEER AgM EW588E18 CaNmAci Na Cxxxxxxxx GENERALNOTES 1. SEE SIGNAL PLANS ITS1.07 FOR ADDITIONAL WORK AT THE INTERSECTION. CONSTRUCTION NOTES OREMOVE EXISTING SMALL CABLE VAULT. OINSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J40.10-04. 4O INSTALL SMALL CABLE VAULT PER WSDOT STANDARD PLAN J-90.21.02. OS TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CON DU IT TO AVOID UTILITIES. O7 INTERCEPT EXISTING CONDUIT AND EXTENDED TO NEW JUNCTION BOX. 17 BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY CORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION. 19 PULL BACK EXISTING 1-12CT WSDOT FIBER BACK TO EXISTING CABLE VAULT AND REINSTALLATION TO NORTH THROUGH NEW CONDUIT ROUTE. REMOVE EXISTING 1-25PR CUT COPPER CABLE TO THE NORTH. 30 REPLACE EXISTING TRAFFIC SIGNAL CONTROLLER WITH NEW SEPAC M60 CONTROLLER. WIRING SCHEDULE RUN NO. zCONDUITSIZE X CONDUCTORS REMARKS 1 3" PVC WSDOT 1-12SMFO*,SDOT 1-288SMFO*' *REINSTALL, "REINSTALL BY SEATTLE IT 4" PVC SCOT 1-288SMFO** "REINSTALL BY SEATTLE IT 2 2"PVC WSDOT 1-12SMF0* 'REINSTALL 4"PVC SPARE EX. 4" SOOT 1-288SMFO** **REINSTALL BY SEATTLE IT 3 EX. 2" WSDOT 1-12SMF0' *REINSTALL EX. 4" 1 REMOVE EX.1-25R COPPER (CUT) kg King County METRO 0' 20' 40' SCALE: � METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT INTERCONNECT PLAN TAL-B 18+50 TO TAL-B 23+50 NOVEMBER 2021 SHEETND DE all xxxx T-4214111 R-4214411