WIRING SCHEDULE
RUN NO.
QCONDUIT
SIZE
CONDUCTORS
REMARKS
1
3"PVC
1-48SMFO
2
3"PVC
2-12SMF0"
"REINSTALL
3
3" PVC
SDOT 1-288SMF0"
"REINSTALL BY SEATTLE IT
4
EX. 2"
SOOT 1-288SMF0""
"REMOVE EX. 1-288CT AND REINSTALL BY SEATTLE IT
GENERALNOTES
1. SEE SIGNAL PLANS ITS1.06 FOR ADDITIONAL WORK AT
THE INTERSECTION.
CONSTRUCTION NOTES
OREMOVE EXISTING SMALL CABLE VAULT.
O3 INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04.
4O INSTALL SMALL CABLE VAULT PER WSDOT STANDARD PLAN J-90.21.02.
rcTRENCH AND INSTALL
x O CONDUIT. ADJUST ROUTING OF TRENCH AND
CONDUIT TO AVOID UTILITIES.
d
o O INSTALL CONDUIT(S) TO EXISTING JUNCTION BOX.
rc
13 CUT EXISTING 2-12CT FIBER LATERAL CABLES FROM EXISTING FIBER
TRUNK. PULL BACK EXISTING LATERALS INTO SIGNAL CABINET FOR
X
REINSTALLATION.
17 BORE AND INSTALL CONDUIT, ADJUST BORE TO AVOID UTILITIES AS
NEEDED. RESTORE AREA DISTURBED BY CORING OPERATIONS BACK TO
PRECONSTRUCTION CONDITION.
�G
I '^ Nn ° o� _ 22 SPLICE SLACK
FIBERS
ERS IN THE TO FIBER OPTIC SPLICE DIAGRAM 112.03-11 IN
o COIL SLACK FIBERS IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN
i o'e `/ oZ Off THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02.
r /
x N5
G 0 °
d
� ssa 915460.0010
P
T T T -
T O
0� --- ---_-- — - ---- —T--
P P
T1 No sa — _ _ — — — So4 �i J
5 -
w
>I W 4 �' 10+00 ' 11+00 TALBOT RD S 12+00 _ yr e 13+00LLI
a I
2 o I 17 (TAL-B-LINE) Q Q _ 3 I
(n o 25+27 3 i O
o LEI e G G O V
rc LL1 G G G G G O.2,rQ G G
(n o G G 0 +
^-
o s5D SD
SD SD SD SD SD fig— GAG
A ® m
WN-_-W D G G G G G G G �\
a aG
LLI Z o W G ' e Q ° W G— / J
13 -RELOCA: FED F�m W G
IC
SIGNAL A11jBI1�IIINjI1�11IIIT 1N1 T
x O O _
P 3 J
Q _
x
� v I 2oz
1 4 � 11111111 O e
-- P ° /
g3 0
E>. ZI - -_ = 3 °� /Jz
J J% 11
5 / / O oQS/ oe/ 192305-9023 20' 49
01
o
S
I o0 0 2
�� / SCALE: 1"=20'
mi
MATCH LINE GRA 24+00 — SEE SHEET 111.07
x
2 aF DESIGNED. WIPIR ID DATE:
60 o METRO TRANSIT CAPITAL DIVISION
/o SUBMITTAL NOVEMBER 2021
PN aG M.POWERS P. RAPIDRIDE I LINE
sixvmd Saco s°F.,DRAW
_ ♦`��..--++�� ° �' LIU L9 King County
CHECKED : aawEcrxD: RENTON SEGMENT DBnwmD NO
boo.. A
^egece.2 °l{�p S.RJNHMAN EW588E18 METRO INTERCONNECT PLAN 111.08
AONp4 CHECKED: LIXIiMCTNJ'. SHFEi NO' OF
w < n R-, WK rA BY aPPG DATE c o n co r '`'° ` GRA 24+00 TO TAL-B 14+00
u E ENGINEERING METRO PROJECT ENGINEER C)ODDGDXX 408 XXXX
T-4214108
R-4214408