HomeMy WebLinkAboutT-421494NOTES:
-..-
—, 1 4 1A 5 3 4 = 1. FOR GENERAL NOTES AND SYMBOLOGY SEE ITS1.00.
CO 2. FOR SIGNAL POLE DETAILS SEE ITS1.12C.
--- - W
- 3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.05B AND 1TS1.12D.
` LLI
4. FOR CONSTRUCTION NOTES SEE 1TS1.12B.
nq as as 5. FOR ILLUMINATION PLANS AND SERVICE BREAKER PANEL SCHEDULE DETAILS SEE
29 \ )O=X AND XXXXX.
\
1
14 \ 6. FOR ITS PLANS AND DETAILS SEE XXXXX.
a 1 Dy
EVP — 7. NEW VEHICLE SIGNAL HEADS 11, 12,13 AND 14 SHALL BE INSTALLED WITH NEW
MOUNTING TYPE "M" ON NEW MAST ARMS PER WSDOT STANDARD PLAN J-75.20.
S2
13 I 11 8. NEW COUNTDOWN PEDESTRIAN SIGNAL HEAD 28 AND 29 SHALL BE INSTALLED WITH
NEW MOUNTING TYPE' ON NEW POLE PER WSDOT STD. PLAN J-75.10.
u, 1
® 31.00 \, `\ � 108TH AVE SE (SR 515) 3zt
° (108TH-LINE)
1
1 d
12 \ yo
Ptl
G G pi G G G °'
G-
28
Ub Am INS
as as as as
d -
-M M M N/ W W W ____lY__ W W N NI
9
w
TA 2 ale eyo\
SIGNAL HEADS SIGNS
NEW CROSSWALK PRE-EMPTION SCHEDULE
STOP sroPory CHANNEL PHASES
H R 2 RASHINGj
ON RED A&B 1
• of
ip^ rHEry PROCEED
28, 29 11, 12, 13, 14
$1 S2
R10-23 MOD (30' W x 48" H)
0' 10, 20'
SCALE: 1"=20'
O DESIGNED. PPPRWED: METRO TRANSIT CAPITAL DIVISION DATE:
60 /o SUBMITTAL ' NOVEMBER 2021
O a co W P. ENG
�P¢�o WA � �°�,s RAPIDRIDE I LINE
�p �� a J. DnNs LQ King County
CHECKED: PROAECrND: DRAWING NO
METRO RENTON SEGMENT
C„E KGmENER `w�se�eETNO HAWK SIGNAL PLAN 1TS1.12A
G"� REvriov BY 4PPE -ATE ' 108TH AVE SE & SE 186TH ST 39 °P
METRO PROJECT ENGINEER CXX%%%%%X 94 XXXX
T-421494
R-4214394