Loading...
HomeMy WebLinkAboutC_Duwamish_City ResponseFrom: Jill Ding Sent: Wednesday, February 9, 2022 9:58 AM To: preservationdept@duwamishtribe.org Subject: KP Development Short Plat Comments (LUA22-000022) Attachments: ERC_Report_Exhibits_Sig_Sheet_38th Street Short Plat_190621.pdf Thank you for your comments on the above referenced short plat application. You have been added as a party of record and your comments have been included in the official file for consideration by the decision maker. To provide further clarification, this application is for the extension of an existing short plat (LUA18-000683) that is currently under construction, a SEPA DNS-M was issued on June 21, 2019 and included two mitigation measures. The current application would reuse the existing SEPA DNS-M (see attached) via the SEPA Addendum process; therefore a new SEPA threshold determination is not anticipated to be issued for this proposal. Thank you, JILL DING, Senior Planner City of Renton | CED | [Planning/Building/Economic Development] Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-6598 | jding@rentonwa.gov