Loading...
HomeMy WebLinkAboutNOA_Project Acceptance_220216DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE - MITIGATED (DNS-M) A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 17, 2022 PROJECT NAME/NUMBER: PR20-000322 Chevron Fuel System Replacement / LUA22-000048, ECF PROJECT LOCATION: 1419 NE 30th St (APN 3342103271) APPLICANT/PROJECT CONTACT PERSON: Sean Anderson, Barghausen Consulting Engineers, Inc. / 18215 72nd Ave S, Kent, WA 98032/ sanderson@barghausen.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/DPjYGoS PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the removal and replacement of Underground Storage Tanks (UST) at the Chevron Gas Station. The project site totals 1.73-acre (75,172 square feet) and is located within the Commercial Neighborhood (CN) zone and Urban Design District D. The existing development includes a 1,800-square-foot convenience store, a 2,000-square-foot fuel dispenser canopy, four (4) fuel dispensers, and four (4) 10,000-gallon gasoline Underground Storage Tanks (USTs). The project will include the removal of the four (4) USTs and installation of one (1) 20,000-gallon Regular Gasoline UST, one (1) 15,000-gallon Supreme Gasoline UST, and one (1) 12,000-gallon Diesel UST, along with four (4) new dispensers and associated product and vapor piping. The purpose of the project is to modernize the existing fuel system, including replacing USTs that are beyond their warranty period and to ensure the compliance with the latest environmental standards for retail gas stations. No changes in access to the project site are proposed. The project site is mapped with a Wellhead Protection Area, Zone 2.. DATE OF APPLICATION: February 15, 2022 NOTICE OF COMPLETE APPLICATION: February 17, 2022 OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has determined that probable significant environmental impacts from the proposed project can be mitigated. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS- M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance- Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14- day appeal period will follow the issuance of the DNS-M. PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Buildng Permit REQUESTED STUDIES: Drainage Report CONSISTENCY OVERVIEW: Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Commercial Neighborhood (CN) on the City’s Zoning Map. Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR20-000322 Chevron Fuel System Replacement / LUA22-000048, ECF Name: __________________________________ Email: _______________________ Phone No. ___________________ Mailing Address: __________________________________City/State/Zip: _____________________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-2-120 and other applicable codes and regulations as appropriate. Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed project. These recommended Mitigation Measures address project impacts not covered by existing codes and regulations as cited above. 1. If any Native American grave(s) or archaeological/cultural resources (Indian artifacts) are found, all construction activity shall stop and the owner/developer shall immediately notify the City of Renton planning department, concerned Tribes’ cultural committees, and the Washington State Department of Archaeological and Historic Preservation Comments on the above application must be submitted in writing by 5:00 PM on March 3, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PROJECT PLANNER: Jill Ding, Senior Planner; Tel: (425) 430-6598; Email: jding@rentonwa.gov N 30th St Park Ave N N 29th St