HomeMy WebLinkAboutNOA_Project Acceptance_220216DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION: February 17, 2022
PROJECT NAME/NUMBER: PR20-000322 Chevron Fuel System Replacement /
LUA22-000048, ECF
PROJECT LOCATION: 1419 NE 30th St (APN 3342103271)
APPLICANT/PROJECT CONTACT
PERSON: Sean Anderson, Barghausen Consulting Engineers, Inc. / 18215 72nd Ave S, Kent,
WA 98032/ sanderson@barghausen.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also https://cutt.ly/DPjYGoS
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the removal and
replacement of Underground Storage Tanks (UST) at the Chevron Gas Station. The project site totals 1.73-acre (75,172
square feet) and is located within the Commercial Neighborhood (CN) zone and Urban Design District D. The existing
development includes a 1,800-square-foot convenience store, a 2,000-square-foot fuel dispenser canopy, four (4) fuel
dispensers, and four (4) 10,000-gallon gasoline Underground Storage Tanks (USTs). The project will include the removal
of the four (4) USTs and installation of one (1) 20,000-gallon Regular Gasoline UST, one (1) 15,000-gallon Supreme
Gasoline UST, and one (1) 12,000-gallon Diesel UST, along with four (4) new dispensers and associated product and vapor
piping. The purpose of the project is to modernize the existing fuel system, including replacing USTs that are beyond
their warranty period and to ensure the compliance with the latest environmental standards for retail gas stations. No
changes in access to the project site are proposed. The project site is mapped with a Wellhead Protection Area, Zone 2..
DATE OF APPLICATION: February 15, 2022
NOTICE OF COMPLETE APPLICATION: February 17, 2022
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that probable significant environmental impacts from the proposed project can be mitigated. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Buildng Permit
REQUESTED STUDIES: Drainage Report
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of
Renton Comprehensive Land Use Map and Commercial Neighborhood (CN) on
the City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must
fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning
Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR# Name / LUA#
Name: __________________________________ Email: _______________________ Phone No. ___________________
Mailing Address: __________________________________City/State/Zip: _____________________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2-120 and other
applicable codes and regulations as appropriate.
Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed
project. These recommended Mitigation Measures address project impacts not
covered by existing codes and regulations as cited above.
1. If any Native American grave(s) or archaeological/cultural resources (Indian artifacts) are found, all
construction activity shall stop and the owner/developer shall immediately notify the City of Renton
planning department, concerned Tribes’ cultural committees, and the Washington State Department of
Archaeological and Historic Preservation
Comments on the above application must be submitted in writing by 5:00 PM on March 3, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton,
CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA)
or project address in your comments. Anyone who submits written comments will automatically become a party of
record and will be notified of any decision on this project.
CONTACT PROJECT PLANNER: Jill Ding, Senior Planner; Tel: (425) 430-6598; Email: jding@rentonwa.gov
N 30th St Park Ave N N 29th St