HomeMy WebLinkAboutWAR308996 - ESAFNotice of Intent
Construction Stormwater General Permit
Permittee
First Name: Last Name:
Organization Name:
Honorific:
Title:
Mailing Address:
City: State: Zip Code:
Primary Phone: Secondary Phone:
Email:
UBI Number:
Mr. Russ Woodruff
City of Renton Capital Project Coordinator
1055 S Grady Way
98057-3232
rwoodruff@rentonwa.gov
Renton WA
206-430-6602
177000094
Site Contact
First Name: Last Name:
Organization Name:
Honorific:
Title:
Mailing Address:
City: State: Zip Code:
Primary Phone: Secondary Phone:
Email:
UBI Number:
Mr. Russ Woodruff
City of Renton Capital Project Coordinator
1055 S Grady Way
98057-3232
rwoodruff@rentonwa.gov
Renton WA
206-430-6602
177000094
Site Owner
First Name: Last Name:
Organization Name:
Honorific:
Title:
Mailing Address:
City: State: Zip Code:
Primary Phone: Secondary Phone:
Email:
UBI Number:
Mr. Russ Woodruff
City of Renton Capital Project Coordinator
1055 S Grady Way
98057-3232
rwoodruff@rentonwa.gov
Renton WA
206-430-6602
177000094
II. Electronic Discharge Monitoring Reporting
I. Contact Information
You must submit monthly discharge monitoring reports using Ecology’s Electronic Discharge Monitoring Reporting
(WQWebDMR) system. To sign up for WQWebDMR, or to register a new site, go to ecology.wa.gov/Regulations-
Permits/Permits-certifications/Stormwater-general-permits, and click on the “Construction Stormwater” link. You will find
information on WQWebDMR under the “WQWebDMR and PARIS” link on the right-hand side. If you are unable to submit
your DMRs electronically, you may contact Ecology to request a waiver. Ecology will generally only grant waiver requests
to those permittees without internet access. Only a permittee or representative, designated in writing, may request
access to or a waiver from WQWebDMR. To have the ability to use the system immediately, you must submit the
Electronic Signature Agreement with your application. If you have questions on this process, contact Ecology’s
WQWebDMR staff at WQWebPortal@ecy.wa.gov or 360-407-7097.
NOI
:
33071New Renewal Permit Number:X WAR308996Application Type:
Page 1 of 4Submission ID: 1743843
III. Site Information
Site Project Name:Family First Community Center
Street Address or Location Description:The site is currently seeking a short plat and is located directly south of the
Cascade Elementary School located at 16022 116th Ave SE, Renton, WA.
98058
City: County: Zip Code:Renton King 98058
Latitude:-122.185089111328Longitude:47.4578704833984
X
X
Type of Construction Activity:
Residential
Industrial
Highway or Road (city, county, state)
Commercial
Utilities (specify):See previous NOI
Other (specify):
Site Acreage
Total site/project size: 2.57 acres
2.57 acres
Estimated project start date: Estimated project completion date:5/11/2020 5/11/2021
IV. Existing Site Conditions
1. Are you aware of contaminated soils on this site?XYes No
2. Are you aware of groundwater contamination located within the site boundary?XYes No
3. If you answered yes to question 1 or 2, will any contaminated soils be distrubed or will any
contaminated groundwater be discharged due to the proposed construction activity?Yes No
If yes, please provide detailed information (as known and readily available) on the nature and extent of the contamination
(concentrations, locations, and depth) as well as pollution prevention and/or treatment Best Management Practices
(BMPs) proposed to control the discharge of soil and/or groundwater contaminants in stormwater. This should include
information that would be included in related portions of the Stormwater Pollution Prevention Plan (SWPPP) that describe
how contaminated and potentially contaminated construction stormwater and dewatering water will be managed. You
may attach this information separately, if needed
V. Stormwater Pollution Prevention Plan (SWPPP)
You must develop a SWPPP prior to starting construction. Do not submit your SWPPP with your application. If you
answered yes to the questions in Part IV, please submit the information that would be included in related portions of the
SWPPP that describe how contaminated and potentially contaminated construction stormwater and dewatering water will
be managed.
You must use the BMPs listed in the Stormwater Management Manual for Western Washington or the Stormwater
Management Manual for Eastern Washington or other manuals approved by Ecology. Alternatively, you may use
demonstrably equivalent BMPs on the basis of permit condition S9.C.4. If you intend to use a BMP at your site that is not
included in these manuals, but that you believe meets the definition of a demonstrably equivalent BMP, you must notify
the appropriate regional office. (See Definitions in the Construction Stormwater General Permit).*
http://ecology.wa.gov/Regulations-Permits/Permits-certifications/Stormwater-general-permits/Construction-stormwater-
permit#contacts
VI. Best Management Practices (BMPs)
Other Permits
None
Total disturbed area:
Total area of soil disturbance for your site/project over the life of the project. Include grading, equipment staging, excavation, borrow pit, material storage areas, dump areas, haul roads, side-cast areas, off-site construction support areas, and all other soil disturbance acreage associated with the project.
Will 1,000 cubic yards or more of poured concrete or recycled concrete be used over the
life of the project? X Yes No
Page 2 of 4Submission ID: 1743843
*Note that if you receive permit coverage without indicating the preference for a demonstrably equivalent BMP and later decide to use one, you must
provide Ecology with notice of the selection of an equivalent BMP no less than 60 days before the intended use of the equivalent BMP.
VII. Discharge/Receiving Water Information
Indicate whether your site’s stormwater and/or dewatering water could enter surface waters, directly and/or indirectly:
Water will discharge directly or indirectly (through a storm drain system or roadside ditch) into one or more surface
waterbodies (wetlands, creeks, lakes, and all other surface waters and water courses).
If your discharge is to a storm sewer system, provide the name of the operator of the storm sewer
system:
Water will discharge to ground with 100% infiltration, with no potential to reach surface waters under any conditions.
If your project includes dewatering, you must include dewatering plans and discharge locations in your site Stormwater
Pollution Prevention Plan.
Location of Discharge into Surface Waterbody
Outfall
Number
Outfall Description Surface Waterbody Name Outfall Type Latitude Longitude
1 Site Outfall Site Outfall Ground 47.45786666
87012
-
122.1850814
81934
VIII. State Environmental Policy Act (SEPA)
This Notice of Intent (NOI) is incomplete and cannot be approved until the applicable SEPA requirements under Chapter
197-11 WAC are met.
Who is the SEPA lead agency on your site?
Has the SEPA lead agency issued a final decision on your checklist?
If No: The NOI is incomplete. Ecology will hold the application until a final SEPA decision is made or the
Construction Stormwater NOI public comment period ends, whichever is later. You must notify Ecology once the
lead agency has issued a determination.
If Yes: Type of SEPA decision issued:
Date of final SEPA decision:
Date when all SEPA-related comment & appeal periods ended or will end:
Yes No Exempt
If Exempt:
Watershed Restoration & Fish Habitat Enhancement Exemption (RCW 43.21C.0382).
Planned Action Exemption (RCW 43.21C.031).
Categorical Exemption. Under what section of the SEPA Rule (WAC 197-11-800) is it exempt?
Infill Development Exemption (RCW 43.21C.229).
Section:
IX. Public Notice
Newspaper Name First Public Notice Date Second Public Notice Date
You must publish a public notice at least once a week for two consecutive weeks with seven days between
publications, in at least a single newspaper of general circulation in the county in which the facility is located. Ecology
cannot grant permit coverage sooner than the end of the 30-day public comment period, which begins on the date of the
second public notice.
Page 3 of 4Submission ID: 1743843
X. Certification of Permittees
“I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or
those directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for knowing violations.”
10/13/2020
Permittee Signature Date
Page 4 of 4Submission ID: 1743843