Loading...
HomeMy WebLinkAboutApproved Permit C21004477DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Construction Permit: C21004477 IVR Number: 21004477 Permit Information Permit Name: Hardy Short Plat Address/Location:09/15/2021Application Date:1437650040Parcel Number: 857 FIELD AVE NE Permit Type:02/23/2022Issue Date:Engineering Permit Work Class:02/23/2023Expiration Date:Construction Plan Reviewer: Yong Qi 425-430-7439 Description: Civil construction permit for installation of utilities (stormwater, sewer) and street frontage improvements. Approved traffic control plan required for work within or disrupting the ROW. Contacts Name Address PhoneTypeBilling Andrew Wenzl Andrew Michael Construction LLC PO Box 6127 Bellevue, WA 98008-0127 B: (206) 714-6707 C: (206) 330-5645 ApplicantX Sheri Murata Core Design 12100 NE 195th St, 300 Bothell, WA 98011 B: (425) 885-7877Engineer Alexander Wenzl 857 Field Ave NE Renton, WA 98059 OwnerX General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEVELOPMENT ENGINEERING YQI 02/23/2022