HomeMy WebLinkAboutCM_Construction_Mitigation_Plan_220121_v1Castro Short Plat – Construction Mitigation Description
Project Address: 12727 SE Petrovitsky Road
BC Job# 18.00392
Proposed construction dates (begin and end dates): Construction will begin once
all permits have been approved; we anticipate starting Spring 2022, ending Summer
2022.
Hours and days of operation: Commercial, multi-family, new single family and other
non-residential construction activities shall be restricted to the hours between 7:00 a.m.
and 8:00 p.m., Monday through Friday. Work on Saturdays shall be restricted to the
hours between 9:00 a.m. and 8:00 p.m. No work shall be permitted on Sundays.
Proposed hauling/transportation routes: We will be recycling and disposing of
materials at:
United recycling Seattle
74 S. Hudson St
Seattle, WA 98134
https://goo.gl/maps/KiL4sghpj3eD5ZYu9
* 12727 SE Petrovitsky Rd, Renton, WA 98058
* Leave from SE Petrovitsky Rd
* Turn left onto SE Petrovitsky Rd
* Turn right onto Washington State Route 167 N/WA-167 N
* Keep left at Washington State Route 167 N/WA-167 N
* Take the right exit onto Interstate Highway 405 S/I-405 S
* Keep left at Interstate Highway 405 S/I-405 S
* Take the I-405 S freeway
* Take the right exit onto Interstate Highway 5 N/I-5 N
* Keep left at Interstate Highway 5 N/I-5 N toward Seattle
* Take the I-5 N freeway
* Take exit 156 on the right onto Washington State Route 599 N/WA-599 N toward
Tukwila
* Keep left at Washington State Route 599 N/WA-599 N
* Follow Washington State Route 599 N/WA-599 N toward Seattle
* Turn left onto Washington State Route 99 N/WA-99 N toward Seattle
* Keep left at Washington State Route 99 N/WA-99 N toward 1st Ave S
* Bear right at 1st Ave S
* Turn left onto S Hudson St
* Turn right onto Utah Ave S
* 74 S Hudson St, Seattle, WA 98134
Pacific Topsoils, Inc.
9830 Renton Issaquah Rd SE
Issaquah, WA 98027
https://goo.gl/maps/uRpsVfJ44B639FwNA
Head east on SE Petrovitsky Rd toward 128th Ave SE
Take SE 168th St and 108th Ave SE/Benson Rd S to Talbot Rd S in Renton
*Turn left at the 1st cross street onto 128th Ave SE
* left onto SE 168th St
*Turn right onto 108th Ave SE/Benson Rd S
*Turn left onto S Puget Dr
*Follow I-405 N and WA-900 to your destination
*Turn right at Squak Mountain Connector Trail
Measures to be implemented to minimize dust, traffic and transportation
impacts, erosion, mud, noise, and other noxious characteristics:
Grading and Erosion Control Plans to be designed, reviewed and implemented in
accordance with currently adopted City of Renton regulations. Vehicular traffic (both
during and after construction) will contribute typical emissions, and some dust may
reduce air quality during construction.
Any special hours proposed for construction or hauling (i.e. weekends, late
nights): No, we will only be working under the specified hours by City of Renton
Preliminary traffic control plan:
See page C4.0 of the Site Improvement Plan, P_Civil_Plans_211227_v1.