Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Plan_220121_v1Castro Short Plat – Construction Mitigation Description Project Address: 12727 SE Petrovitsky Road BC Job# 18.00392 Proposed construction dates (begin and end dates): Construction will begin once all permits have been approved; we anticipate starting Spring 2022, ending Summer 2022. Hours and days of operation: Commercial, multi-family, new single family and other non-residential construction activities shall be restricted to the hours between 7:00 a.m. and 8:00 p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between 9:00 a.m. and 8:00 p.m. No work shall be permitted on Sundays. Proposed hauling/transportation routes: We will be recycling and disposing of materials at: United recycling Seattle 74 S. Hudson St Seattle, WA 98134 https://goo.gl/maps/KiL4sghpj3eD5ZYu9 * 12727 SE Petrovitsky Rd, Renton, WA 98058 * Leave from SE Petrovitsky Rd * Turn left onto SE Petrovitsky Rd * Turn right onto Washington State Route 167 N/WA-167 N * Keep left at Washington State Route 167 N/WA-167 N * Take the right exit onto Interstate Highway 405 S/I-405 S * Keep left at Interstate Highway 405 S/I-405 S * Take the I-405 S freeway * Take the right exit onto Interstate Highway 5 N/I-5 N * Keep left at Interstate Highway 5 N/I-5 N toward Seattle * Take the I-5 N freeway * Take exit 156 on the right onto Washington State Route 599 N/WA-599 N toward Tukwila * Keep left at Washington State Route 599 N/WA-599 N * Follow Washington State Route 599 N/WA-599 N toward Seattle * Turn left onto Washington State Route 99 N/WA-99 N toward Seattle * Keep left at Washington State Route 99 N/WA-99 N toward 1st Ave S * Bear right at 1st Ave S * Turn left onto S Hudson St * Turn right onto Utah Ave S * 74 S Hudson St, Seattle, WA 98134 Pacific Topsoils, Inc. 9830 Renton Issaquah Rd SE Issaquah, WA 98027 https://goo.gl/maps/uRpsVfJ44B639FwNA Head east on SE Petrovitsky Rd toward 128th Ave SE Take SE 168th St and 108th Ave SE/Benson Rd S to Talbot Rd S in Renton *Turn left at the 1st cross street onto 128th Ave SE * left onto SE 168th St *Turn right onto 108th Ave SE/Benson Rd S *Turn left onto S Puget Dr *Follow I-405 N and WA-900 to your destination *Turn right at Squak Mountain Connector Trail Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics: Grading and Erosion Control Plans to be designed, reviewed and implemented in accordance with currently adopted City of Renton regulations. Vehicular traffic (both during and after construction) will contribute typical emissions, and some dust may reduce air quality during construction. Any special hours proposed for construction or hauling (i.e. weekends, late nights): No, we will only be working under the specified hours by City of Renton Preliminary traffic control plan: See page C4.0 of the Site Improvement Plan, P_Civil_Plans_211227_v1.