January 28, 2022
Matthew Herrera, Planner
City of Renton
Department of Community & Economic Development
1055 South Grady Way
Renton, WA 98057
RE: Castro Preliminary Short Plat Submittal – PRE17-000025 (formerly
Tang) Beyler Project No. 18.00392
Matthew:
The purpose of this letter is to address your review comments dated October 20, 2021 for the
proposed Castro Short Plat. To expedite your review and approval of the subject plans, below
are our responses in bold, with your comments included herein for reference:
1. Response Letter, Pg 1 – Provide documentation that shows Alex Castro has
authorization to sign documents.
RESPONSE: Please find attached the State document showing that Castro
Investments LLC is the owner of the subject parcel, and that Alex Castro is an
authorized owner, see attached C_Proof_of_Ownership_211021_v1.
2. Response Letter, Pg 2 – Retained trees appear to remain in graded area, see notes on
plans.
RESPONSE: Retained trees have been updated on both civil and landscape plans,
please see page one of
P_Landscape_Planting_and_Tree_Replacement_Plan_211201_v1
3. Response Letter, Pg 2 – EVA remains within an easement on all the submitted
documents.
RESPONSE: EVA easement has been revised to be shown within a tract see attached
revised plans page 1 of P_Civil_Plans_211227_v1, page 2 of short plat map
MAP_Short_Plat_211020_v1.
4. Land Use Permit Application, Pg 2 – Provide documentation.
RESPONSE: See provided Land use Application
A_Land_Use_Permit_Master_Application_210925_v1.
18.00392 | Castro
City of Renton
Response Letter | 1.28.2022
Page 2 of 3
5. Short Plat Map, Pg 2 – This needs to be a tract not an easement. Again, the city does
not allow access easements in plats. Access is provided via public street or tract. Fire
access is typically 20-feet wide. Not sure why 25 is showing.
RESPONSE: It has been revised, please see page 2 of the short plat map,
MAP_Short_Plat_211020_v1.
6. Site Improvements, Pg 1 – This needs to be a shared driveway tract.
RESPONSE: It has been updated, see page one of P_Civil_Plans_211227_v1.
7. Site Improvements, Pg 4 – This is not consistent with your tree retention plan.
RESPONSE: It has been updated, see page four P_Civil_Plans_211227_v1.
8. Street Lighting requirements for the proposed development will be addressed under
separate cover.
RESPONSE: Understood.
9. Landscape Plans, Pg 1 – Proposed large grading slope here, how is this tree saved?
RESPONSE: Tree is proposed to be removed, please see page one of
P_Landscape_Planting_and_Tree_Replacement_Plan_211201_v1.
10. Landscape Plans, Pg 1 – Show your proposed grading contours.
RESPONSE: Grading contours are now shown on the revised plan, please see
P_Landscape_Planting_and_Tree_Replacement_Plan_211201_v1.
11. Landscape Plans, Pg 1 – This area is all graded out on your grading plan. I don’t see
how these trees can be saved.
RESPONSE: Both of the civil and landscaping plans have been revised to be
reflective of one another, please see
P_Landscape_Planting_and_Tree_Replacement_Plan_211201_v1,
P_Civil_Plans_211227_v1.
18.00392 | Castro
City of Renton
Response Letter | 1.28.2022
Page 3 of 3
12. Project Narrative, Pg 1 – I need a complete application package as noted in the short
plat submittal checklist. I don’t see an arborist report, wetland report, construction
mitigation plan, Geotech, neighborhood map. Please refer to short plat submittal
checklist I have provided previously.
RESPONSE: We have included all of the required reports for this proposed short
plat application, Arborist RS_Arborist_Report_210407_v1, Wetland,
RS_Wetland_Report_190403_v1, Construction Mitigation,
CM_Construction_Mitigation_Plan_210318_v1, Geotech,
RS_Geotech_Report_190415_v1, Neighborhood Map,
MAP_Neighborhood_Map_191023_v1.
13. Project Narrative, Pg 2 – This is inconsistent with what was provided on tree retention
sheet.
RESPONSE: The inconsistencies between plans have been revised and attached,
PN_Project_Narrative_220121_v1,
P_Landscape_Planting_and_Tree_Replacement_Plan_211201_v1.
14. Project Narrative, Pg 2 – Public sheet improvement.
RESPONSE: The narrative has been revised per redlines, see attached
PN_Project_Narrative_220121_v1.
If you have any questions or need additional information, please feel free to contact me at
(253) 984-2900 or cwashington@BeylerConsulting.com.
Respectfully,
CWashington
Camille Washington,
Beyler Consulting, LLC