HomeMy WebLinkAboutPRE_PreApplication_Meeting_Notes_170209PREAPPLICATION MEETING FOR
Tang Short Plat
12727 SE Petrovitsky Rd.
PRE17-000025
CITY OF RENTON
Department of Community & Economic Development
Planning Division
February 9, 2017
Contact Information:
Planner: Matthew Herrera, 425.430.6593
Public Works Plan Reviewer: Ian Fitz -James, 425.430.7288
Fire Prevention Reviewer: Corey Thomas, 425.430.7024
Building Department Reviewer: Craig Burnell, 425.430.7290
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the project manager to have it pre-screened before
making all of the required copies.
The pre -application meeting is informal and non -binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision -makers (e.g., Hearing Examiner, Planning Director,
Development Services Director, Department of Community & Economic Development
Administrator, Public Works Administrator and City Council).
Fire & Emergency Services Department
Ren on
M E M
G R A N D U M
DATE: February 9, 2017
TO: Matt Herrera, Senior Planner
FROM: Corey Thomas, Plan Review/Inspector
SUBJECT: (Tang Short Plat) PRE17-000025
1. The fire flow requirement for a single family home is 1,000 gpm minimum for dwellings up to 3,600 square feet
(including garage and basements). If the dwelling exceeds 3,600 square feet, a minimum of 1,500 gpm fire flow would
be required. A minimum of one fire hydrant is required within 300-feet of the proposed buildings and two hydrants if
the fire flow goes up to 1,500 gpm, The existing fire hydrants are not within 300 feet of all of the proposed lots. A
minimum of one new hydrant will be required. A water availability certificate is required from Soos Creek Water and
Sewer District.
2. The fire Impact fees are currently applicable at thle rate of $718.56 per single family unit. This fee Is paid pril r to
recording the plat. Credit will be granted for the existing home that is to be removed.
3, Fire department apparatus access roadways are required to be a minimum of 20-feet wide fully paved, with 25-feet
Inside and 45-feet outside turning radius. Fire access roadways shall be constructed to support a 30-ton vehicle with
75-psi point loading. Access is required within 150-feet of all points on the buildings. Dead end streets that exceed
300-feet In length require an approved 90-foot diameter cul-de-sac turnaround. All homes on dead end streets that
exceed 500-feet long are required to be fully fire sprinklered per city ordinance.
Page 1 of 1
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: February 9, 2017
T0: Matt Herrera, Senior Planner
FROM: Ian Fitz -James, Civil Plan Reviewer
SUBJECT: Utility and Transportation Comments forTang Short Plat
PRE 17-000025
NOTE: The applicant is cautioned that Information contained In this summary Is preliminary and non-
binding and may be subject to modification and/or concurrence by official City decision -makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review of the application far Tang Short Plat. The site address is 12727
SE Petrovitsky Road, The King County Parcel Number is 0739000085. The applicant is proposing to
remove the existing home and subdivide the lot Into 4 lots.
WATER COMMENTS
1. Please obtain a water availability certificate from Soos Creek Water and Sewer District and
provide it with the construction permit submittal.
2. Review of the water plans will be conducted by Soos Creek Water and Sewer District and the
Renton Fire Authority.
3. Plans approved by Soos Creek Water and Sewer District shall be routed to the City for final
review prior to per�it issuance. �,
SEWER COMMENTS
1. Please obtain a sewer availability certificate from Soos Creek Water and Sewer District and
provide it with the construction permit submittal.
2. Review of the sewer plans will be conducted by Soos Creek Water and Sewer District,
H:\CED\Planning\Current Planning\PREAPPS\2017 Preapps\17-000025.Matt\17-0209 PRE17-000025 Civtl Pre-App
Comments.docx
Tang Short Plat — PRE17-000025
Page 2 of 4
February 9, 2017
3. Plans approved by Soos Creek Water and Sewer District shall be routed to the City for final
review prior to permit issuance.
STORM DRAINAGE COMMENTS
1. The site currently contains one single family residence with numerous trees and grassy areas.
The site slopes moderately from east to west. There is no on -site stormwater conveyance
system. There is an existing 12" piped conveyance system north of the site along the southern
frontage of SE Petrovitsky Road that flows from east to west. There is no conveyance system
along the 1281h Avenue SE frontage.
2. Refer to Figure 1.1.2.A— Flaw Chart to determine what type of drainage review is required for
this site. The site falls within the City's Flow Control Duration Standard (Forested Site
Conditions). The site falls within the Soos Creek drainage basin. Drainage plans and a drainage
report complying with the adopted 2017 Renton Surface Water Design Manual will be required.
3. On -site BMPs satisfying Core Requirement q9 will be required for the site.
4. Storm drains a improvements along public street frontages are required to conform to the
City's street standards. New storm drain shall be designed and sized In accordance with the
standards found in Chapter 4 of the 2017 City of Renton Surface Water Design Manual.
5. A geotechnical report for the site Is required. Information on the water table and soil
permeability, with recommendations of appropriate flow control BMP options with typical
designs for the site from the geotechnical engineer, shall be submitted with the application.
6. A Construction
Stormwater
General
Permit from
the Washington Department of Ecology Is
required as site
clearing will
exceed
one acre.
7. The development is
subject to stormwater system development
charges
(SDCs). The 2017 SDC
Is $11608.00 per lot.
The SDC will be collected for each new lot.
TRANSPORTATION/STREET COMMENTS
1, The 2017 transportation impact
fee
is $5,430.85 per single
family home. Fees are payable at the
time of building permit issuance
for
each individual home.
2, SE Petrovitsky Road is classified as a principal arterial. Per RMC 4-6-060, the minimum right of
way width for a principal arterial with 5 lanes is 103'. The minimum paved roadway width is 66'
consisting of 4-11' travel lanes, 1-12' center turn lane, and 2 — 5' bike lanes. A 0.5' curb, 8'
planter, and 8' sidewalk are required along each side of the roadway. The City's Transportation
Department has determined that a single 12' shared bike / pedestrian path behind an 8' planter
would be located along the northern frontage in lieu of the 2 — 5' bike lanes in this area.
The King County Assessor's Map shows a current right of way width of approximately 108' along
the SE Petrovitsky Road frontage. The current pavement width is approximately 58'. There is a
0.5' curb and a concrete sidewalk of approximately 8' in width adjacent to the back of curb
along the southern frontage.
H:\CED\Planning\Current Planning\PREAPPS\2017 Preapps\17-000025.Matt\17-0209 PRE17-000025 Civil Pre-App
Comments.dacx
Tang Short Plat- PRE17.000025
Page 3 of 4
February 9, 2017
City staff has reviewed this section of SE Petrovitsky Road and would like to maintain the current
pavement width and curbline. An 8' planter strip and 8' sidewalk would be required behind the
existing curb to meet the principal arterial street standards. Right of way dedication to back of
the new sidewalk is required.
128t^ Avenue SE is classified as a residential access street, Per RMC 4-6-060, the minimum right
of way width for a residential access street Is 53'. The minimum paved roadway width is 26,
consisting of 2 —10' travel lanes, and a 6' parking lane on one side of the road. A 0.5' curb, 8'
planter, and 5' sidewalk are required along both sides of the pavement. The King County
Assessor's Map shows a varying right of way width increasing from 50' at the southern boundary
of the 1281h Avenue SE frontage towards the Intersection with SE Petrovitsky Road. Right of
way dedication may be required along this frontage to provide a half right of way width of 26.5'
along the 128th Avenue SE frontage. Final right of way dedication shall be determined by survey.
A 35' turning radius Is required at the corner of SE Petrovitsky Road and 1281h Avenue SE,
4. South of the site Is unimproved right of way. This portion of right of way is for an extension of
SE 17611 Street to the east. The width of the unimproved right of way is approximately 30'. The
pre -application submittal proposes to extend SE 1761h Street west for the entirety of the
project's southern frontage. SE 1761h Street is classified as a residential access street. The
requirements for a residential access street are listed in Comment #3.
A full half street will be required for the extension of SE 176rh Street. Aright of way dedication
of approximately 11.5' will be required along the southern project frontage to provide the
required half right of way width of 26.5' for SE 1761h Street. Half street Improvements include a
20' paved roadway section (13' from centerline to northern curb line), a 0.5' curb, 8' planter and
5' sidewalk, Final right of way dedication shall be determined by survey.
5. The pre -application submittal proposes a 20' access easement from the extension of SE 176th
Street to the northern most lot. All four lots are served from this access easement.
A full half street will be required along the western property line. The half street shall extend
from the extension of SE 176t Street to the northern most lot line. The half street section shall
consist of 20' pavement, a 0.5' curb, 8' planter, and 5' sidewalk. A right of way dedication of 35,
is required along the western property line to accommodate the half street.
6. Perpendicular curb ramps conforming to WSDOT and ADA standards are required at each
corner.
7. Per RMC 4-4-080,
the maximum
width of a single
loaded garage driveway is 9' and the maximum
width of a double
loaded garage
driveway is 16'.
If a garage is not present, the maximum
driveway width is
16'. Driveway
cuts shall not be
closer than 5' to any property line,
8. No street lighting is required for projects with four or less residential units.
9, Paving and trench restoration within the City of Renton right of way shall comply with the Clty's
Trench Restoration and Street Overlay Requirements.
H:\CED\Planning\Current Planning\PREAPPS\2017 Preapps\17-000025.Ma[t\17-0209 PRE17-000025 Civil Pre-App
[omments.docx
Tang Short Plat — PRE17.000025
Page 4 of 4
February 9, 2017
GENERAL COMMENTS
1. The SDCs listed
are for 2017. The fees that
are current at the
time of the construction permit
application will
be levied. Please see the City
of Renton website
for current SDCs.
2, Retaining walls that are 4or taller from bottom of footing will require a separate building
permit. Structural calculations and plans prepared by a licensed engineer will be required.
3. The survey
and ail civil plans
shall conform
to
the current City of Renton survey and drafting
standards.
Current drafting
standards can
be
found on the City of Renton website.
4- A final survey that is stamped and signed by the professional land surveyor of record will need
to be provided. All existing utilities need to be surveyed and shown. Please reference COR
Maps for mapping and records of existing utilities in the project vicinity.
5. A separate plan submittal will be required for a construction permit for utility work and street
improvements. All plans shall be prepared by a licensed Civil Engineer in the State of
Washington.
6. When construction plans are complete, please co tact the City to schedule an Intake meeting.
Construction permit submittal includes three copies of the plans, one copy of the drainage
report, an electronic copy of each, the permit application, an itemized cost of construction
estimate, and application fee to the counter on the sixth floor.
7. Beginning April
3,
2017, the
City
will move
towards electronic plan review. See
http://rentonwa.gov/paperless
for
more
details and
updates.
H:\CED\Planning\Current Planning\PREAPPS\2017 Preapps\17-000025.Matt\37-0209 PRE17-000025 Civil Pre-App
Comments.docx
DEPARTMENT OF COMMUNITY AND �-
ECONOMIC DEVELOPMENT Renton
M E M O R A N D U M
DATE: February 9, 2017
T0: Pre -application File No. 17-000025
FROM: Matthew Herrera, Senior Planner
SUBJECT: Teng Short Plat
General: We have completed a preliminary review of the pre -application for the referenced development development proposal. The following comments on development and permitting
Issues are based on the pre -application submittals made to the City of Renton by the applicant
and the codes In effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official
decision -makers (e.g., Hearing Examiner, Community & Economic Development Administrator,
Public Works Administrator, Planning Director, Development Services Director, and City
Council). Review comments may also need to be revised based on site planning and other design
changes required by City staff or made by the applicant. The applicant is encouraged to review
all applicable sections of the Renton Municipal Code. The Development Regulations are
available for purchase for $50.00 plus tax from the Finance Division on the first floor of City Hall
or online at www.rentanwa.gov,
Project Proposal: The subject property is addressed at 12727 SE Petrovltsky Rd (APN 073900-
0085) and located on the south side of SE Petrovltsky Rd, at the intersection of 128th Ave SE. The
southern property line abuts an unimproved 30400t wide right-of-way that extends from SE
1761h St. The project site totals 48,787 square feet (1.12 acres) in area and is zoned Residential-4
(114). The proposal is to subdivide the project site Into four (4) single family lots and construct
new single family dwellings on each lot. Access to the proposed lots is a private access easement
extending north from SE 1761h Street. City of Renton Maps identify an offsite wetland and
special flood hazard area approximately 170-feet southwest from the subject property.
Current Use: The King County Assessor's Office indicates the property as vacant. Aerial views
show a shed or garage type structure and parked vehicles.
Zoning: The property Is located within a Comprehensive Plan land use designation of Residential
Low Density (RLD) and is zoned Residential 4 (R-4). The R-4 designation serves as a transition
between rural designation zones and higher density residential zones. It is intended as an
intermediate lower density residential zone.
Density Requirements: There Is no minimum density requirement. The maximum density
permitted in the R-4 zone Is 4.0 dwelling units per net acre (du/ac). Net density is calculated
after the deduction of areas required for public right-of-way dedication, shared driveway tract,
and critical areas from the gross site area.
PRE17-OOOo25 - (R-4 Tang 4 Lot Short Plat)
The gross density was calculated to be 3.57 du/ac (4 units / 1.12 acres = 3.57 du/ac). It is
unclear exactly how much area would be required to be dedicated for right-of-way for the
half -street improvements and frontage dedication or whether there are critical areas onsite;
therefore, the net density of site could not be calculated. A Density Worksheet would be
required at the time of formal short plat application. The applicant would be required to
demonstrate compliance with the net density requirements of the zone at the time of formal
application.
Development Standards: The project is subject to RMC 4-2-110A, "Development Standards for
Residential Zoning Designations" effective at the time of complete application (noted as "R-4
standards" herein).
Minimum Lot Size. Width and Depth —The minimum lot size permitted in the R-4 Is 9,000 square
feet. A minimum lot width of 70 feet is required for interior lots and 80 feet for corner lots. A lot
depth of 100 feet is required. it Is the applicant's responsibility to demonstrate compliance
with the minimum lot size, width and depth criteria of the zone at the time of formal
application.
Building Setbacks — Setbacks are the minimum required distance between the building footprint
and the property line and any private access easement. The required setbacks in the R-4 zone
are 30 feet for the front yard, 25 feet for the rear yards, side yards along -a -street would be
required to have a 30 foot setb ck, and interior side yards are required to have a combined 20-
foot setback with not less than 7.5 feet on either side. The setbacks for the new residences
would be reviewed at the time of building permit.
Building Height — The maximum wall plate height is 32 feet with 3 stories. Roofs with a pitch
equal to or greater than 4:12 may project an additional six (6) vertical feet from the maximum
wall plate height; common rooftop features, such as chimneys, may project an additional four
(4) vertical feet from the roof surface. Non-exempt vertical projections (e.g., decks, railings, etc.)
shall not extend above the maximum wall plate height unless the projection is stepped back
one -and -a -half (1.5) horizontal feet from each fayade for each one (1) vertical foot above the
maximum wall plate height. Building height would be verified at the time of building permit
review.
Building Coverage — R-4 zone allows a maximum building coverage of 35% of the lot area.
Building coverage requirements would be verified at the time of building permit review.
Impervious Surface Area — The maximum impervious surface would be limited to 50%.
impervious surface requirements would be verified at the time of building permit review.
Residential Design and Open Space Standards: All single family residences would be subject to
the Residential Design Standards outlined in RMC 4-2-115, Residential Design Review occurs as
part of the Building Permit Review.
landscaping: The development standards require that all pervious areas within the property
boundaries be landscaped. Therefore, all areas of the site not covered by structures, required
parking, access, circulation or patios, must be landscaped with native, drought -resistant
vegetative cover. Ten feet (10') of on -site landscaping is required along all public street
frontages, with the exception of areas for required walkways and driveways. Street trees in the
ROW planter will also be required. Any additional undeveloped right-of-way areas shall be
landscaped
PRE17-000025 - (R-4 Tang 4 Lot Short Plat)
Please refer to landscape regulations (RMC 4-4-070) for further general and specific landscape
requirements. A conceptual landscape plan would be required at the time of formal land use
application.
Significant Tree Retention: If significant trees (greater than 6-inch caliper or 8-caliper inches for
alders and cottonwoods) are proposed to be removed, a tree inventory, tree retention plan, and
arborist report shall be provided with the formal land use application as defined in RMC 4-8-120.
The tree retention plan must show preservation of at least 30% of significant trees, and indicate
how proposed building footprints would be sited to accommodate preservation of significant
trees that would be retained (RMC 44-130111.a). When the required number of protected trees
cannot be retained, replacement trees, with at least a two-inch (2") caliper or an evergreen at
least six feet (6') tall, shall be planted at a rate of twelve (12) caliper inches of new trees to
replace each protected tree removed. The Administrator may authorize the planting of
replacement trees on the site If It can be demonstrated to the Administrator's satisfaction that
an Insufficient number of trees can be retained.
In addition to retaining 30 percent of existing significant trees, each new lot would be required
to provide a minimum tree density of 2 trees per 5,000 square feet of lot area onsite.
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees
on slopes greater than twenty per ent (20%); Significant trees adjacent to critical areas and their
associated buffers; and Significant trees over sixty feet (60') in height or greater than eighteen
inches ( 18") caliper.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; Other
significant native evergreen or deciduous trees; and Other significant non- native trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have been
evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods
are used as part of an approved enhancement project within a critical area or its buffer.
The Administrator may require independent review of any land use application that Involves
tree removal and land clearing at the City's discretion. A formal tree retention plan would be
reviewed at the time of Short Plat application.
Fences/Retaining Walls: If the applicant intends to install any fences as part of this project, the
location must be designated on the landscape plan. A wall taller than four feet requires a
building. Fences up to six -feet in height are permitted in the rear yard and side yard; fences up
to four feet are permitted in the front yard. Any part of a yard that is within a clear vision area
has a limited fence height of 42-inchese. A fence shall not be constructed on top of a retaining
wall unless the total combined height of the retaining wall and the fence does not exceed the
allowed height of a standalone fence. New or existing fencing would need to comply with the
fence requirements of the code (RMC 4-4-040).
Retaining walls shall be composed of brick, rock, textured or patterned concrete, or other
masonry product that complements the proposed building and site development. There shall be
a minimum three-foot (3') landscaped setback at the base of retaining walls abutting public
rights -of -way. Please refer to retaining wall standards (RMC 44-040) for additional information
about fences and retaining walls.
Access: The proposal shows a 20-foot wide paved private access easement extending north
from the SE 1761h Street. The applicant has also inquired about gaining access from SE
Petrovitsky for the northernmost lot (Lot 4). SE Petrovitsky Rd. is identified as a principal
PRE17-000025 - (R-4 Tang 4 Lo[ Short Plat)
arterial and therefore new single lot access would not be permitted as access can be provided
vla SE 176th St,
The City does not allow private access easements far residential subdivisions and allows
shared driveway tracts In limited circumstances (see RMC 4-6-060J). Access to the proposed
subdivlslon should be via a new public residential access street constructed to half -street
standards as the proposal likely does not meet approval criteria for shared driveway,
specifically RMC 4-6-060J.I.c which allows a shared driveway if a public street is not
anticipated by the City to be necessary for existing or future traffic and/ar pedestrian
circulation through the short subdivision or to serve adjacent property. Adjacent properties to
the west are currently underdeveloped and constructing public streets instead numerous
shared driveways extending from SE 176th Street is appropriate.
Driveways: The maximum driveway slopes cannot exceed 15%. If the grade exceeds 154/0, a
variance is required. Driveways exceeding 8-percent shall provide slotted drains at the lower
end with positive drainage discharge to restrict runoff from entering the garage/residence or
crossing any public sidewalk. The maximum width of single loaded garage driveways shall not
exceed 9 feet and double loaded garage driveways shall not exceed 16 feet. Each lot is required
to accommodate off street parking for a minimum of two vehicles.
Critical Areas: The City's COR mapping system has identified a potential wetland in the vicinity A
wetland reconnaissance would be required to determine if there aile wetlands within 200-feet
of the site. If wetlands are determined to be located on or near the subject site, a wetland
assessment and delineation would also be required. Secondary review of any of the studies
provided to the City may be required at the applicant's expense.
/t is the applicant's responsibility to ascertain whether any additlonai critical areas or
environmental concerns are present on the site during development or building construction.
Environmental Review: Short Plats of 9 or fewer lots are categorically exempt from State
Environmental Policy Act (SEPA) Review per WAC 197-11. However, if critical areas are found, an
environmental checklist and threshold determination will be required.
Permit Requirements: The proposed subdivision would require administrative short plat
approval. The preliminary short plat application would be processed within an estimated time
frame of 6-8 weeks. The short plat fee would be $5,150 ($5,000 Short Plat fee + $150,00 3
percent technology fee = $5,150). A SEPA checklist fee of $1,500.00 plus 3-percent technology
fee will apply if the environmental review is required. Detailed information regarding the land
use application submittal items have been provided In the attached handouts or are also
avallable online.
The applicant will be required to install a public information sign on the property. Once
Preliminary Short Plat approval is obtained, the applicant must complete the required
Improvements and dedications, as well as satisfy any conditions of the preliminary approval
before submitting for Final Short Plat review. Once final approval is received, the plat may be
recorded. The newly created lots may only be sold after the plat has been recorded.
Fees: In addition to the applicable building and construction fees, impact fees would be required
for new single family homes. Such fees would apply to all projects and would be calculated at
the time of building permit application and payable prior to building permit issuance, The 2017
application fees are as follows:
• A Transportation Impact Fee based on $5,430.85 per each new single family residence;
• A Parks Impact Fee based on $2,740.07 per each new single family residence;
PRE17-000025 - (R--0 Tang 4 Lot Short Plat)
• A Fire Impact fee of $718.56 per each new single family residence; and
• Renton School District Impact Fee is $6,432.00 per each new single family residence.
A handout listing Renton development -related fees is available on the City of Renton website
for your review.
Note: When the formal application materials are complete, the applicant is strongly
encouraged to have one copy of the application materials pre-screened at the 6th floor front
counter prior to submitting the complete application package. Please call Matthew Herrera,
Senior Planner at 425430-6593 for an appointment.
Expiration: Upon approval, the short plat is valid for two (2) years with a possible one (1) year
extension (RMC 4-7-070M).