Loading...
HomeMy WebLinkAboutRE_ Approach_Hi Jason, the limits shown in the attached are acceptable. Please capture this in the as-builds. Thank you, NATHAN JANDERS, P.E., Civil Engineer III City of Renton | CED | Planning Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=17625638> | Online Applications and Inspections <https://permitting.rentonwa.gov/#/home> (425) 430-7382 | NJanders@rentonwa.gov From: Jason Green <jgreen@navixeng.com> Sent: Friday, February 25, 2022 12:11 PM To: Nathan Janders <NJanders@Rentonwa.gov> Cc: Jenelle Taflin <jtaflin@navixeng.com> Subject: FW: Approach. CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Good afternoon, Nathan. Please see the email thread below regarding the Topgolf project. The field inspector has informed the contractor that our Logan entrances cannot be medium duty asphalt as per the approved plans and must be a 10-inch section of concrete. I have marked up the attached plan to show the location where we believe the extent of the concrete paving would be (up to the right-of-way line). Please review and let me know if these limits of concrete are acceptable. If you prefer to proceed with the medium duty asphalt to be installed as per the approved plans, please confirm via email so I can share with the contractor/inspector. Thank you in advance for your feedback. Jason Green Navix Engineering d: 425.458.7934 | c: 425.269.4552 From: Josh Bowen <joshb@mckeeenterprisesllc.com <mailto:joshb@mckeeenterprisesllc.com> > Sent: Friday, February 25, 2022 9:12 AM To: Jason Green <jgreen@navixeng.com <mailto:jgreen@navixeng.com> > Cc: Mgalindo <mgalindo@arcomurray.com <mailto:mgalindo@arcomurray.com> >; Erik Silvis <esilvis@arcomurray.com <mailto:esilvis@arcomurray.com> >; Derek Mckee <derekm@mckeeenterprisesllc.com <mailto:derekm@mckeeenterprisesllc.com> > Subject: RE: Approach. According to Brad the inspector. The asphalt entrances should have never been approved. So both entrances off of Logan will need to be concrete. ---- On Fri, 25 Feb 2022 17:08:50 +0000 Jason Green<jgreen@navixeng.com <mailto:jgreen@navixeng.com> > wrote ---- Mark, The approved plans show medium duty asphalt at the two driveways off Logan. Please clarify where you are proposing to install a concrete approach and I’ll discuss this with the City Engineer to ensure they are okay deviating from the approved plans. Thank you. Jason Green Navix Engineering d: 425.458.7934 | c: 425.269.4552 From: Galindo, Mark <mgalindo@arcomurray.com <mailto:mgalindo@arcomurray.com> > Sent: Friday, February 25, 2022 9:01 AM To: Silvis, Erik <esilvis@arcomurray.com <mailto:esilvis@arcomurray.com> >; Jason Green <jgreen@navixeng.com <mailto:jgreen@navixeng.com> >; joshb@mckeeenterprisesllc.com <mailto:joshb@mckeeenterpri sesllc.com> ; derekm@mckeeenterprisesllc.com <mailto:derekm@mckeeenterprisesllc.com> Subject: Fwd: Approach. Mark Galindo| Project Superintendent ARCO MURRAY | DESIGN BUILD M: 469.834.4279 | F: 214.377.6679 vCard <https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.arcomurray.com%2Fgalindor.vcf&data=04%7C01%7CNJanders%40Rentonwa.gov%7Ce4f24ad3036647af7f0708d9f89ae384%7C7101414106114885 8e98cc96a05e1675%7C1%7C0%7C637814166533641989%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=LUwmugPVyY1%2FPTp%2BHx%2Fh0wiVjhQNAMrYjZdlA8d0Vvg %3D&reserved=0> | www.arcomurraydb.com <https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.arcomurraydb.com%2F&data=04%7C01%7CNJanders%40Rentonwa.gov%7Ce4f24ad3036647af7f0708d9f89a e384%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C637814166533641989%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=uBgEwyaczRte0pyORrLsgWM081 ieBV25XCAKOBvK%2BfE%3D&reserved=0> Begin forwarded message: From: Josh Bowen <joshb@mckeeenterprisesllc.com <mailto:joshb@mckeeenterprisesllc.com> > Date: February 25, 2022 at 8:01:52 AM PST To: "Galindo, Mark" <mgalindo@arcomurray.com <mailto:mgalindo@arcomurray.com> > Subject: Approach.  Mark brad has asked that the engineer submit a concrete approach detail to the city for approval. Approach needs to be 10” thick. Thank you Caution: This e-mail is from an external sender. Caution: This e-mail is from an external sender.