HomeMy WebLinkAboutAddendum A (with Attachments)KIWANIS PARK IMPROVEMENTS BID ADDENDUM A March 3, 2022 Addendum A - Page 1 of 3 ADDENDUM – A TO THE CONTRACT DOCUMENTS FOR City of Renton KIWANIS PARK IMPROVEMENTS Project Issued: February 9, 2022 Addendum A Issued: March 3, 2022 Bid Opening Date: March 8, 2022, 2:00 PM PST To: All Holders of Bid/Contract Documents: This addendum forms part of the Contract Documents and modifies the original Plans and Specifications, for which proposals are due on the date and time above. Acknowledge receipt of this addendum on “Addenda Received” of the Bid Documents in the Contract Documents. Failure to do so might subject the bidder to disqualification. This addendum shall clarify the Contract Documents as follows: Item No. 1 – Specification Section 00 23 00 – Supplementary Conditions Add: 1.3 BID PROTESTS: Per RCW 39.04.105: Competitive bidding—Written protests—Notice of contract execution. (1) Within two business days o1.3f the bid opening on a public works project that is the subject of competitive bids, the municipality must provide, if requested by a bidder, copies of the bids the municipality received for the project. The municipality shall then allow at least two full business days after providing bidders with copies of all bids before executing a contract for the project. Intermediate Saturdays, Sundays, and legal holidays are not counted. (2) When a municipality receives a written protest from a bidder for a public works project that is the subject of competitive bids, the municipality must not execute a contract for the project with anyone other than the protesting bidder without first providing at least two full business days' written notice of the municipality's intent to execute a contract for the project, provided that the protesting bidder submits notice in writing of its protest no later than: a) Two full business days following bid opening, if no bidder requested copies of the bids received for the project under subsection (1) of this section; or b) Two full business days following when the municipality provided copies of the bids to those bidders requesting bids under subsection (1) of this section. Intermediate Saturdays, Sundays, and legal holidays are not counted. Item No. 2 – Specification Section 00 72 00 – General Conditions Add: 2.6 Builder’s Risk – Contractor to purchase and maintain Builder’s Risk Insurance in the amount of the Contract Sum including all Change Orders for the Work on a replacement cost basis until Substantial Completion. KIWANIS PARK IMPROVEMENTS BID ADDENDUM A March 3, 2022 Addendum A - Page 2 of 3 Item No. 3 – Specification Section 00 42 10 – Bid Submittal Checklist Add: 1. Non-Collusion Affidavit submittal at time of Bid Proposal Form. 2.1.3 – Revise Subcontractor Submittal Form B to include HVAC Subcontractor. 3.1.4 – Revise Subcontractor Submittal Form C to include Rebar Subcontractor. Item No. 4 – Specification Section 00 80 00 – Forms Add: Non-Collusion Affidavit form added to specifications (See Attached). Change: SUBCONTRACTOR LISTING - FORM B and FORM C, are revised to include subcontractor’s listing per RCW 39.30.060. (See Attached). Item No. 5 – Specification Section 01 12 00 – Delegated Design Change: A. Section Includes: Requirements in this section apply to delegated design ("design- build") building systems and fabricated assemblies identified in individual specification sections: 1.Portland Loo 2. Shelter 3. Fencing 4.Playground Equipment Item No. 6 – Specification Section 02632 – Trench Drain 2.3 Products Change: C. Approved Equal: Zurn Z-886 Channel with HDP (ADA compliant grate). Trench drain will require a compatible in-line catch basin with integral trash basket also be included within the trench drain. Any adjustments that may be required to downstream pipe slope to connect to invert elevation shown at CB #201 will be contractor's responsibility. Use of Zurn product as an approved equal will be at no additional cost to Owner. Item No. 7 – Specification Section 02870 – Site Furnishings 2.7 Drinking Fountains Change: Description: D.Approved Product: MDF Model 10145SMSS with bottle filler and optional 10" stainless steel surface carrier or approved equal. Item No. 8 – Specification Section 02870 – Site Furnishings 2.11 Dugout Benches Change: Description: 1.Dugout benches with back and storage shelf shall be aluminum, two (2) 12' long with straight legs with exposed ends capped, one (1) 18' long with three (3) supports, or one (1) 21' long with three (3) supports. Item No. 9 – Drawings Sheet G0.3 Remove: Note (2 locations): "BENCH AND CONCRETE PAD – ALTERNATE" (See Addendum Sketch ADD-A.1). KIWANIS PARK IMPROVEMENTS BID ADDENDUM A March 3, 2022 Addendum A - Page 3 of 3 Item No. 10 – Drawings Sheet D1.1 Change: Add Protection Note: PROTECTION NOTE: PROTECT EXISTING TENNIS COURT SURFACING TO REMAIN (See Addendum Sketch ADD-A.2). Item No. 11 – Drawings Sheet C4.1 Detail 34 Change: Existing curbs to be removed in the SW Parking Area are extruded curbs which should not require any asphalt saw cutting or patching to remove (See Addendum Sketch ADD-A.3). Any saw cutting or patching that may be required for installation of the new curbs shall conform to City of Renton Standard Plan 103 as applicable. Item No. 12 – Drawings Sheet C4.6 Detail 73 Change: Revised play equipment layout and note: PLAY EQUIPMENT NOTE: SEE SPEC FOR PLAY EQUIPMENT LOCATIONS, QUANTITIES, AND MODELS. (See Addendum Sketch ADD-A.4) Item No. 13 – All Pre-Bid Conference Bidder's Questions & Responses See Attached Memorandum #1 Item No. 14 – All Bidder's Questions & Responses Received through 03-01-22 See Attached Memorandum #2 End of Addendum – A DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS KIWANIS PARK IMPROVEMENTS Section 00 42 10 – Bid Submittal Checklist ADD. - A Contract No. CAG-22-013 00 42 10 - 1 Kiwanis Park Improvements February 4, 2022 1.1 FORMS BELOW MUST BE TIMELY SUBMITTED FOR A BID TO BE CONSIDERED RESPONSIVE: 1.BID PROPOSAL FORM, includes CERTIFICATION OF COMPLIANCE WITH PREVAILING WAGE PAYMENT STATUTE 2.NON-COLLUSION AFFIDAVIT, Submitted with Bid Proposal Form. 3.FORM A - PROPOSAL BID BOND 4.FORM B - LIST OF SUBCONTRACTORS, PART ONE (SUBMISSION OF HVAC, PLUMBING AND ELECTRICAL SUBCONTRACTORS) 5.FORM C – LIST OF SUBCONTRACTORS, PART TWO (SUBMISSION OF STRUCTURAL STEEL AND REBAR SUBCONTRACTORS) 6.FORM D – CONTRACTOR QUALIFICATIONS/EVALUATION 7.FORM E – QUALIFICATIONS OF PROJECT KEY PERSONNEL 8.FORM F – CONTRACT BOND FORM 1.2 Confirm Items Below Are Complete At Time of Bid Submission: 1.Have you included costs for Base Bid, and each of the Alternates as listed on the Bid Form? 2.Do written amounts in the Bid Form agree with amounts shown in figures? 3.Have you certified receipt of addenda? 4.Has the Bid Form been properly signed? 5.Have you completed the Deposit or Contract Bond Form? 6.Has a Bid Bond or certified check been enclosed with your Bid? 7.Is the amount of the Bid Bond at least 5% of the total amount of the Base Bid amount? 8.Are Bid Proposal Form and Form A listed above included in a sealed and properly endorsed envelope? 1.3 Form To Be Completed Within 1 hour of Bid Submission: 1. Form B – List of Subcontractors, Part One (Submission of HVAC, Plumbing, and Electrical Subcontractors) 1.4 Form To Be Completed Within 48 hours of Bid Submission: 1. Form C – List of Subcontractors, Part Two (Submission of Structural Steel and Rebar 1.5 Subcontractors) Forms To Be Completed By Apparent Low Bidder Within 2 Business Days of Notice by Owner of Apparent Low Bid: 1.Form D - Contractor Qualifications/Evaluation 2.Form E – Qualifications of Key Personnel END OF SECTION KIWANIS PARK IMPROVEMENTS ADDENDUM – A 03-03-22 Non-Collusion Affidavit, Assignment of Anti-Trust Claims & Minimum Wage Affidavit Kiwanis Park Improvements Page 1 of 1 Non-Collusion, Anti-Trust, and Minimum Wage Affidavit NON-COLLUSION AFFIDAVIT Being duly sworn, deposes and says, that he is the identical person who submitted the forgoing proposal or bid, and that such bid is genuine and not sham or collusive or made in the interest or on behalf of any person not therein named, and further, that the deponent has not directly induced or solicited any other Bidder on the foregoing work or equipment to put in a sham bid, or any other person or corporation to refrain from bidding, and that deponent has not in any manner sought by collusion to secure to himself or to any other person any advantage over the other Bidder or Bidders. AND CERTIFICATION RE: ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER Vendor and purchaser recognize that in actual economic practice overcharges resulting from anti-trust violations are in fact usually borne by the purchaser. Therefore, vendor hereby assigns to purchaser any and all claims for such overcharges as to goods and materials purchased in connection with this order or contract, except as to overcharges resulting from anti-trust violations commencing after the date of the bid, quotation, or other event establishing the price under this order or contract. In addition, vendor warrants and represents that such of his suppliers and subcontractors shall assign any and all such claims to purchaser, subject to the aforementioned exception. AND MINIMUM WAGE AFFIDAVIT FORM I, the undersigned, having been duly sworn, deposed, say and certify that in connection with the performance of the work of this project, I will pay each classification of laborer, workman, or mechanic employed in the performance of such work; not less than the prevailing rate of wage or not less than the minimum rate of wages as specified in the principal contract: that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. FOR: NON-COLLUSION AFFIDAVIT, ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER AND MINIMUM WAGE AFFIDAVIT Name of Project Name of Bidder's Firm Signature of Authorized Representative of Bidder Subscribed and sworn to before me on this day of , 20 . KIWANIS PARK IMPROVEMENTS List of Subcontractors, Part One – FORM B REVISED – ADDENDUM A March 2, 2022 Kiwanis Park Improvements Page 1 of 2 List of Subcontractors, Part One – FORM B CITY OF RENTON EMAIL TO: awyatt@rentonwa.gov This list must be submitted within one (1) hour of the time and date specified for Bid Submission. Bidder’s Name: Project: Kiwanis Park Improvements 815 Union Avenue North Renton, WA 98059 CAG 22-013 SUBCONTRACTOR LISTING The Project is expected to cost $1,000,000 or more. Every Bidder must list the Heating, Ventilation, and Air Conditioning (HVAC), Plumbing, and Electrical subcontractors as required per RCW 39.30.060. Subcontractor Name Work Category 1. HVAC 2. _________________________________Plumbing 3. Electrical If different from the list above, the Subcontractors we propose to use if an Alternate Bid is accepted, is described below. (RCW 39.30.060 requires, in part, that the Bidder not list more than one Subcontractor for each category of Work identified, unless a Subcontractor will vary depending on which Alternate Bids are accepted, in which case the Bidder must indicate which Subcontractor will be used depending on which Alternate is accepted.) Describe any change to list if Alternates are accepted: [SIGNATURE PAGE FOLLOWS] LIST OF SUBCONTRACTORS, PART ONE Submission of HVAC, Plumbing, and Electrical Subcontractors KIWANIS PARK IMPROVEMENTS List of Subcontractors, Part One – FORM B REVISED – ADDENDUM A March 2, 2022 Kiwanis Park Improvements Page 2 of 2 List of Subcontractors, Part One – FORM B Legal Name of Person or Entity Submitting Bid: _____ NOTE: If Bidder is a corporation, write State of Incorporation; if a partnership, give full names and addresses of all parties below. Authorized Signature: Title: Printed Name: Address: City: State: Zip Code: Date: Telephone: Fax: Washington Contractor's License No.: Federal Tax ID #: E-mail address: Washington State UBI No.: Expiration Date: End of Form KIWANIS PARK IMPROVEMENTS List of Subcontractors, Part Two – FORM C REVISED – ADDENDUM A March 2, 2022 Kiwanis Park Improvements Page 1 of 2 List of Subcontractors, Part Two – FORM C CITY OF RENTON EMAIL TO: awyatt@rentonwa.gov This list must be submitted within forty-eight (48) hours of the time and date specified for Bid Submission. Bidder’s Name: Project: Kiwanis Park Improvements 815 Union Avenue North Renton, WA 98059 CAG 22-013 SUBCONTRACTOR LISTING The Project is expected to cost $1,000,000 or more. Every Bidder must list the Heating, Ventilation, and Air Conditioning (HVAC), Plumbing, and Electrical subcontractors as required per RCW 39.30.060. Subcontractor Name Work Category 1. Structural Steel Installer 2. _________________________________Rebar Installer If different from the list above, the Subcontractors we propose to use if an Alternate Bid is accepted, is described below. (RCW 39.30.060 requires, in part, that the Bidder not list more than one Subcontractor for each category of Work identified, unless a Subcontractor will vary depending on which Alternate Bids are accepted, in which case the Bidder must indicate which Subcontractor will be used depending on which Alternate is accepted.) Describe any change to list if Alternates are accepted: [SIGNATURE PAGE FOLLOWS] LIST OF SUBCONTRACTORS, PART TWO Submission of Structural Steel & Rebar Subcontractors KIWANIS PARK IMPROVEMENTS List of Subcontractors, Part Two – FORM C REVISED – ADDENDUM A March 2, 2022 Kiwanis Park Improvements Page 2 of 2 List of Subcontractors, Part Two – FORM C Legal Name of Person or Entity Submitting Bid: _____ NOTE: If Bidder is a corporation, write State of Incorporation; if a partnership, give full names and addresses of all parties below. Authorized Signature: Title: Printed Name: Address: City: State: Zip Code: Date: Telephone: Fax: Washington Contractor's License No.: Federal Tax ID #: E-mail address: Washington State UBI No.: Expiration Date: End of Form 2 3 1BRUCE DEES& ASSOCIATES COMPOSITE SITE PLAN ADD-A.1 1 of 1 / G0.3Kiwanis Park Improvements City of Renton, WA ADDENDUM: "BENCH AND CONCRETE PAD - ALTERNATE" NOTES REMOVED BRUCE DEES& ASSOCIATES DEMOLITION , CLEARING & T.E.S.C PLAN ADD-A.2 1 of 1 / D1.3Kiwanis Park Improvements City of Renton, WA ADDENDUM: "PROTECT EXISTING TENNIS COURT SURFACING TO REMAIN" NOTE ADDED BRUCE DEES& ASSOCIATES SITE SECTIONS & DETAILS SECTION AT PARKING LOT ADD-A.3 1 of 1 / C4.1Kiwanis Park Improvements City of Renton, WA ADDENDUM: "EXIST. EXTRUDED CURBS TO BE REMOVED (TYP)" NOTE ADDED BRUCE DEES& ASSOCIATES SITE SECTIONS & DETAILS PLAY AREA REVISONS ADD-A.4 1 of 1 / C4.6Kiwanis Park Improvements City of Renton, WA ADDENDUM: PLAY EQUIPMENT LAYOUT & NOTE REVISED Kiwanis Park Improvements CAG-22-013 Bidder Questions and Response PARKS and RECREATION DEPARTMENT M E M O R A N D U M #1 DATE: March 3, 2022 TO: Bidders CC: Bruce Dees & Associates FROM: Alan J. Wyatt, Capital Projects Manager SUBJECT: Kiwanis Park Improvements – Pre-Bid Conference Bidder’s Questions & Responses (CAG-22-013) 1.Bidder’s Question: (Jon Kirk, Terra Dynamics Inc.) •What is the availability or lead time of the Play Equipment? Many of the Vendors are experiencing delays in delivery. Response: (Alan J. Wyatt, PPNR) •Lead time is about 8-10 weeks. 2.Bidder’s Question: (Ohno Construction) •Is the sidewalk along Union Ave NE part of Rule 171?? Response: (Alan J. Wyatt, PPNR) •City of Renton is considered the consumer/customer of the products and services for the project. The City of Renton does not provide tax or legal advice. Therefore, Bidders/Contractor should seek guidance from their own tax and/or legal consultants regarding the application of WAC 458-20-171 (Rule 171) to this project and if needed rulings for the application of Rule 171 from the Washington State Department of Revenue. 3.Bidder’s Question: (Vernon Orr, Terra Dynamics Inc.) •Section 01 12 00 delegated design lists Portland Loo, Shelter, Fencing, and playground equipment. Can you clarify what will be required for these items? •Does the fence include backstop? •Are we to hire structural engineers and submit design and calcs for permits? Response: (Bruce Dees & Associates) •Fencing has been removed from Section 01 12 00 Delegated Design (See Addendum - A). •See Appendices and confirm with vendors regarding design information available. Any information required for permits and construction, that is not supplied by the vendor(s), will be the contractor’s responsibility. End of Pre-Bid Conference Bidder's Questions & Responses. Kiwanis Park Improvements CAG-22-013 Bidder Questions and Response PARKS and RECREATION DEPARTMENT M E M O R A N D U M #2 DATE: March 3, 2022 TO: Bidders CC: Bruce Dees & Associates FROM: Alan J. Wyatt, Capital Projects Manager SUBJECT: Kiwanis Park Improvements – Bidder's Questions & Responses Received through 03-01-22 (CAG-22-013) 1. Bidder’s Question: (Thomas Hawken, Tunista Construction LLC.) • In the existing SW Parking Area – it is noted to remove the existing curb in the southwest parking area, and replace it with – cast-in-place traffic curb. This will require saw-cutting on both sides of the inset curb, excavation, and patching on both sides of the curb. Please provide a detail indicating the patching requirements. Response: (Bruce Dees & Associates) • Existing curbs to be removed in the SW Parking Area are extruded curbs which should not require any asphalt saw cutting or patching to remove (see Addendum Sketch ADD-A.3). Any saw cutting or patching that may be required for installation of the new curbs should conform to City of Renton Standard Plan 103 as applicable. 2. Bidder’s Question: (Sonja Sommerfeldt, James W. Fowler Co.) • Section 10.11 Diverse Business Participation states a voluntary Diverse Business goal of 26%. Later in the section it states Contractors are encouraged to meet or exceed the project goals in the advertisement by any level of participation, regardless of category. • Can you please clarify if this is a voluntary goal or required 26% goal? • Is there any documentation we will be required to turn in with our bid showing our outreach efforts? Response: (Alan J. Wyatt, PPNR) • Please refer to the Bid/Contract Documents: • Section 00 11 13 Advertisement for Bids notes a Mandatory 15% apprenticeship labor hours of the total labor hours are a requirement of the construction contract. • Section 00 21 00 Instructions to Bidders, 1.1 B, C, & D provides information regarding the encouragement participation of MWBE firms, Veteran-owned firms, and Small, Mini and Macro Businesses. Bidders Questions – Kiwanis Park Improvements (CAG-22-013) Page 2 of 5 March 3, 2022 Kiwanis Park Improvements CAG-22-013 Bidder Questions and Response •The City of Renton encourages Diverse Business Participation and contractors are urged to meet or exceed the project goals. •Section 00 21 00 Instructions to Bidders, Participation may be either on a direct basis in response to this invitation or as a subcontractor to a bidder. However, unless required by federal statues, regulations, grants or contract terms referenced in the contract documents, no preference will be included in the evaluation of bids, no minimum level of MWBE participation shall be required as a condition for receiving an award, and bids will not be rejected or considered nonresponsive on that basis. Any affirmative action requirements set forth in federal regulations or statues included or reference in the contract documents will apply. •No documentation is required with bid submittal for participation effort. 3.Bidder’s Question: (Thomas Hawken, Tunista Construction LLC.) •Is there anything on the project that the owner is providing; such as site furnishings or items needed to be salvaged? Response: (Bruce Dees & Associates) •No, any items would be noted on the plans and specs. 4.Bidder’s Question: (Connie Meyer, Active Construction Inc.) •It’s not clear what is happening to the tennis court, is it being removed or saved? Response: (Bruce Dees & Associates) •The existing tennis court surfacing is to remain (see Addendum Sketch ADD-A.2). The only work at the tennis courts is related to the perimeter fencing as shown on the plans the contractor shall protect the existing tennis court surfacing to remain. 5.Bidder’s Question: (John Ivary, Ivary Enterprises Inc.) •The Dugout Benches in 2.11 are a little confusing. They say there will be two 12’ long benches or one 18’ long bench with three leg supports. I spoke to Bruce Dees and sent him the specifications and drawing for a 21’ bench with back which I have attached. Bruce said he would make the change. I did not send in a substitution request as National Recreation Systems was listed as an approved equal. Since the dugout is 30’ long, the bench could be 24’ and still accommodate the trash receptacle. The model number would be BE-DGS24. The bench on detail 51 on C4.4 scales out to 21’. Response: (Bruce Dees & Associates) •An 18’ long bench was added as an option via Addendum – A: Item No. 8. Bidders Questions – Kiwanis Park Improvements (CAG-22-013) Page 3 of 5 March 3, 2022 Kiwanis Park Improvements CAG-22-013 Bidder Questions and Response 6.Bidder’s Question: (John Ivary, Ivary Enterprises Inc.) •I was hoping to send in substitution requests for the picnic tables, benches but was having trouble with the specifications. I was a Wabash sales dealer for several years before switching over to Webcoat which has been purchased by Superior Recreation. •I have attached a list of items that I sent to Superior requesting pricing and substitution drawings and specifications but have not received a reply. The bench is a ribbed bench and the trash receptacle is listed as a perforated model but the detail 75 on drawing C4.6 shows a ribbed receptacle and has a comment that the mounting is typical of 4. I count 8 receptacles on the plans. Response: (Bruce Dees & Associates) •Product substitution request deadline was 02-26-22 •Detail 75 on Sheet C4.6 is for mounting instructions and is not specific to the model specified under Section 02870. •There are 9 waste receptacles shown on the plans. 7.Bidder’s Question: (Jill Agnelli, Ohno Construction) •Reference: Builder’s Risk: Reference: 00 72 00 – Part 2, 2.6 – “Contractor to buy Builder’s Risk Insurance when the project involves substantial new building construction, as determined by the owner”… •Will Builder’s Risk coverage be required for this project? Response: (Alan J. Wyatt, PPNR) •Section 00 72 00, GENERAL CONDITIONS, 2.6 Builder’s Risk – Contractor to purchase and maintain Builder’s Risk Insurance in the amount of the Contract Sum including all Change Orders for the Work on a replacement cost basis until Substantial Completion. 8.Bidder’s Question: (Jill Agnelli, Ohno Construction) •What is the deadline and procedure to file a bid protest? Response: (Alan J. Wyatt, PPNR) •Per RCW 39.04.105 See Addendum-A item No. 1 for update to section 00 23 00 Supplementary Conditions. 9.Bidder’s Question: (Jill Agnelli, Ohno Construction) •Is a non-collusion affidavit required? Response: (Bruce Dees & Associates) •Non-Collusion Affidavit form added to specifications via Addendum – A: Item No. 4. Bidders Questions – Kiwanis Park Improvements (CAG-22-013) Page 4 of 5 March 3, 2022 Kiwanis Park Improvements CAG-22-013 Bidder Questions and Response 10.Bidder’s Question: (Jill Agnelli, Ohno Construction) •Reference: Drawing 71/C4.6 •There is no TC or TB grading elevation noted in drawing plan 71/C4.6 for the concrete band. Please confirm if it is decorative band/pattern only to concrete paving or provide details if it is Seatwall or Curb Ribbon. Response: (Bruce Dees & Associates) •The concrete band is a decorative band only. 11.Bidder’s Question: (Jill Agnelli, Ohno Construction) •Reference: Bid Form •Which part of the Bid Form are the Benches and Pad (2 Locations) Alternate? Response: (Bruce Dees & Associates) •The Benches and Concrete Pad (2 locations) are included in the base bid (see Addendum Sketch ADD-A.1). The only alternate is the picnic shelter. 12.Bidder’s Question: (Chris Bennis, Terra Dynamics Inc.) •The sod spec calls for 100% Kentucky Bluegrass, no net. I can’t find a supplier with 100% Kentucky Bluegrass, no net in a big roll as indicated in 02920. Will the attached grass blend be acceptable? Response: (Bruce Dees & Associates) •Only no-net sod will be considered. 13.Bidder’s Question: (Mark Haskey, Buckley Nursery Co., Inc.) •We are a landscape contractor interested in the above referenced project. In section 02920 – Sodding, it calls for no-net sod. I’ve contacted every sod grower on the West side of the Cascades and no one sells sod anymore with no net. They all use it to keep the sod intact during shipment. Is there any consideration to use netted sod on this project? The project calls for over 4 acres of sod to be installed so it’s a important consideration with that much sod to install. Response: (Bruce Dees & Associates) •Only no-net sod will be considered. Our research found that the specified sod can be provided by suppliers outside of Western Washington. 14.Bidder’s Question: (Chris Bennis, Terra Dynamics Inc.) •What is the soil depth in the NW and SW planting areas adjacent to the parking lot? Detail 7 on L3.2 shows the depth along Union Ave. Detail 1 on L3.1 for lawn areas outside ballfield. Spec 02910 Page 3 Topsoil Placement refers to the details on plans. There is not detail for the planting beds adjacent to the parking lot. Bidders Questions – Kiwanis Park Improvements (CAG-22-013) Page 5 of 5 March 3, 2022 Kiwanis Park Improvements CAG-22-013 Bidder Questions and Response Response: (Bruce Dees & Associates) •12" Import Topsoil per sheet C1.1 Layout & Materials Plan. End of Bidder's Questions & Responses Received through 03-01-22.