HomeMy WebLinkAboutTIR-4091©2021 D. R. STRONG Consulting Engineers Inc. MAPLE HIGHLANDS Technical Information Report Renton, Washington TECHNICAL INFORMATION REPORT for MAPLE HIGHLANDS 16210 SE 134th Street, Renton, Washington ____________________________________________________________________________ DRS Project No. 17020 Renton File No. LUA18-000633 Owner/Applicant Harbour Homes, LLC 400 North 34th Street, Suite 300 Seattle, Washington 98103 Report Prepared by D. R. STRONG Consulting Engineers, Inc. 620 7th Avenue Kirkland, WA 98033 (425) 827-3063 Report Issue Date August 13, 2021 SURFACE WATER UTILITY krevans 10/01/2021 DEVELOPMENT ENGINEERING njanders 10/01/2021 2020 D. R. STRONG Consulting Engineers Inc. MAPLE HIGHLANDS Technical Information Report Renton, Washington TECHNICAL INFORMATION REPORT MAPLE HIGHLANDS TABLE OF CONTENTS SECTION I ...................................................................................................................... 1 Project Overview ......................................................................................................... 1 Predeveloped Site Conditions ..................................................................................... 1 Developed Site Conditions .......................................................................................... 1 SECTION II ................................................................................................................... 13 Conditions and Requirements Summary ................................................................... 13 Conditions of Approval............................................................................................... 15 SECTION III .................................................................................................................. 18 Off-Site Analysis ........................................................................................................ 18 Task 1: Define and Map Study Area ...................................................................... 18 Task 2: Resource Review ...................................................................................... 19 Task 3: Field Inspection ......................................................................................... 28 Task 4: Drainage System Description and Problem Descriptions .......................... 29 Task 5: Mitigation of Existing or Potential Problems .............................................. 30 SECTION IV .................................................................................................................. 38 Flow Control Analysis and Water Quality Design ...................................................... 38 Existing Site Hydrology .......................................................................................... 38 Developed Site Hydrology ...................................................................................... 40 Performance Standards ............................................................................................. 44 Flow Control System ................................................................................................. 45 Water Quality Treatment System ............................................................................... 46 SECTION V ................................................................................................................... 48 Conveyance System Analysis and Design ................................................................ 48 SECTION VI .................................................................................................................. 64 Special Reports and Studies ..................................................................................... 64 SECTION VII ................................................................................................................. 65 Other Permits, Variances and Adjustments ............................................................... 65 SECTION VIII ................................................................................................................ 66 CSWPPP Analysis and Design (Part A) .................................................................... 66 SWPPP Plan Design (Part B) .................................................................................... 66 SECTION IX .................................................................................................................. 68 Bond Quantities, Facility Summaries, and Declaration of Covenant .......................... 68 Stormwater Facility Summary Sheet ......................................................................... 69 2020 D. R. STRONG Consulting Engineers Inc. MAPLE HIGHLANDS Technical Information Report Renton, Washington SECTION X ................................................................................................................... 70 Operations and Maintenance Manual ........................................................................ 70 APPENDICES ............................................................................................................... 71 Appendix “A” Legal Description ................................................................................. 72 Appendix “B” Bond Quantity Worksheet .................................................................... 73 Appendix “C” CSWPPP ............................................................................................. 74 Appendix “D” WWHM Report ..................................................................................... 75 List of Figures Figure 1 TIR Worksheet .................................................................................................. 3 Figure 2 Vicinity Map ....................................................................................................... 8 Figure 3 Drainage Basins, Subbasins, and Site Characteristics ..................................... 9 Figure 4 Soils ................................................................................................................ 10 Figure 5 City of Renton Topography Map ..................................................................... 20 Figure 6 City of Renton Coal Mine Hazard Areas Map ................................................. 21 Figure 7 City of Renton Flood Hazards Map ................................................................. 22 Figure 8 City of Renton Streams and Wetlands Map .................................................... 23 Figure 9 City of Renton Landslide Hazards Map ........................................................... 24 Figure 10 City of Renton Seismic Hazard Areas Map ................................................... 25 Figure 11 FEMA Map .................................................................................................... 26 Figure 12 King County iMap Drainage Complaints Map................................................ 27 Figure 13 Offsite Analysis Downstream Map ................................................................ 31 Figure 14 Offsite Analysis Downstream Table .............................................................. 33 Figure 15 Predeveloped Area Map ............................................................................... 39 Figure 16 Developed Area Map .................................................................................... 43 Figure 17 Detention & Water Quality Facility Details ..................................................... 47 Figure 18 Backwater Analysis Map ............................................................................... 51 2020 D. R. STRONG Consulting Engineers Inc. Page 1 MAPLE HIGHLANDS Technical Information Report Renton, Washington SECTION I PROJECT OVERVIEW The Project is the proposed subdivision of the existing parcel into 13 single-family residential lots, per the City of Renton’s (City) subdivision process. The Project is located at 16210 SE 134th Street, Renton, Washington (Site) also known as Tax Parcel Number 145750-0025. The Project will meet the drainage requirements of the 2016 King County Surface Water Design Manual (Manual), as adopted by the City. PREDEVELOPED SITE CONDITIONS The total existing Site area is approximately 182,268 s.f. (4.18 acres). The Site is currently developed with one single family home, gravel driveway, one shed, and landscaping. The eastern property boundary appears to be undisturbed with heavier vegetation. The Site is contained within one Threshold Discharge Area (TDA). Runoff generated by the TDA sheet flows east towards the unopened 164th Avenue SE right of way. The Natural Discarge Area (NDA) of the Site is runoff sheet flow over the east property line. From there, runoff enters an existing drainage course and is conveyed southerly to a catch basin. Runoff continues southeasterly as pipe flow, through a series of catch basins and pipes, to a catch basin located in the ditch on the north side of SE 135 th Street. Runoff continues southerly as pipe flow to a catch basin on the south side of the SE 135th Street before it continues southeasterly through private property. The conveyance system could not be accessed past this point, but area topography indicates that it likely discharges in the ravine near the unopened portion of the SE 136th Street right of way just west of 166th Ave SE before reaching the detention facility at Liberty High School. DEVELOPED SITE CONDITIONS The applicant has gained approval to subdivide 4.18 acres into 13 single–family residential lots (Project), with lot sizes ranging from approximately 9,000 s.f. to 12,425 s.f. All existing improvements located on the Site will be demolished or removed during plat construction. The project is required to meet the City’s Flow Control Duration Standard – Matching Forested Conditions and Basic Water Quality treatment. This standard matches the developed Site flow durations to the flow durations of pre -developed rates for forested (historical) site conditions from 50% of the 2-year peak flow up to the full 50-year peak flow. Also, developed peak discharge rates shall not exceed predeveloped peak discharge rates for the 2-,10-, and 100-year return periods. The Flood Problem Flow Control Standard and Basic Water Quality requirement will be met through the use of a combined detention and wetvault. The proposed impervious surface areas are as follows: half street frontage improvements along 162nd Avenue SE and 164th Avenue SE, the proposed Road A, the 13 new single-family residences and associated driveways, and Tract A, the storm water detention facility, will generate approximately 99,430 s.f. of impervious area (2.28 acres). 2020 D. R. STRONG Consulting Engineers Inc. Page 2 MAPLE HIGHLANDS Technical Information Report Renton, Washington Per Section 1.2.9.2.1 Small Lot BMP Requirements of the CORSWDM (Manual), projects are required to mitigate for impervious surfaces by use of Flow Control Best Management Practices (BMP’s). The Project’s lots fall within the requirements for small lots, as all lots are under 22,000 square feet. This requires all lots under 11,000 square feet to apply flow control BMPs to mitigate impervious areas equal to 10% of the total lot area. Only Lot 1 is required to mitigate an impervious area equal to 20% of its total lot area. The soils investigation summarized by the project geo technical report are confined to the upper layers (up to 12 feet deep) of Site soils. The report indicates the presence of glacial till and glaciomarine deposits not conducive to infiltration. It is the recommendation of the geotechnical engineer to investigate alternative means of stormwater management. With limited native growth areas and negligible infiltration rates, the Project is proposing to utilize a combination of reduced impervious surface credits and basic dispersion to meet the small lot BMP requirements. (See Section IV). 2020 D. R. STRONG Consulting Engineers Inc. Page 3 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 1 TIR WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 1 PROJECT OWNER AND PROJECT ENGINEER Part 2 PROJECT LOCATION AND DESCRIPTION Project Owner: Harbour Homes, LLC Phone: (206) 315-8130 Address: 400 North 34th St, Suite 300 Seattle, WA 98103 Project Engineer: Yoshio L. Piediscalzi, P.E. Company: D. R. STRONG Consulting Engineers Inc. Phone: (425) 827-3063 Project Name: Maple Highlands City Permit#: LUA18-000633 Location: Township: 23 North Range: 05 East Section: 014 Site Address: 16210 SE 134th Street Renton, WA Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS Landuse Services Subdivision / Short Subdivision / UPD Building Services: M/F / Commercial / SFR Clearing and Grading Right-of-Way Other: DFW HPA Shoreline Mngmt COE 404 Structural DOE Dam Safety Rockery/Vault FEMA Floodplain ESA Section 7 COE Wetlands Other: Part 5 PLAN AND REPORT INFORMATION Technical Information Report Type of Drainage Review Full / Targeted / (circle): Large Site Date (include revision September 5, 2019 dates): Date of Final: Site Improvement Plan (Engr. Plans) Type (circle one): Full / Modified / : Small Site Date (include revision September 5, 2019 dates): Date of Final: Part 6 ADJUSTMENT APPROVALS Type (circle one): Standard / Complex / Preapplication / Experimental / Blanket Description: (include conditions in TIR Section 2) _____________________________________________________________________________________ _____________________________________________________________________________________ ____________________________________________________________________________________ Date of Approval: 2020 D. R. STRONG Consulting Engineers Inc. Page 4 MAPLE HIGHLANDS Technical Information Report Renton, Washington Part 7 MONITORING REQUIREMENTS Monitoring Required: Yes / No Start Date: TBD Completion Date Describe: Monitor discharge location during construction. Part 8 SITE COMMUNITY AND DRAINAGE BASIN Community Plan: Newcastle Special District Overlays: N/A Drainage Basin: Lower Cedar River and May Creek Stormwater Requirements: Flow Control Duration Standard – Matching Forested Conditions and Basic WQ treatment Part 9 ONSITE AND ADJACENT SENSITIVE AREAS River/ Stream Lake Wetlands Closed Depression Floodplain Other Steep Slope Erosion Hazard Landslide Hazard Coal Mine Hazard Seismic Hazard Habitat Protection Part 10 SOILS Soil Type AgC Slopes 8-15% Erosion Potential Low to Moderate High Groundwater Table Sole Source Aquifer other Seeps/Springs Additional Sheets Attached 2020 D. R. STRONG Consulting Engineers Inc. Page 5 MAPLE HIGHLANDS Technical Information Report Renton, Washington Part 11 DRAINAGE DESIGN LIMITATIONS REFERENCE Core Requirement #2 – Offsite Analysis SEPA Additional Sheet Attached LIMITATION / SITE CONSTRAINT Part 12 TIR SUMMARY SHEET Threshold Discharge Area: Site comprised of one TDA (name or description) Core Requirements (all 8 apply) Discharge of Natural Location Yes Number of Natural Discharge Locations: 1 Offsite Analysis Level: 1 / 2 / 3 dated: 06/02/18 Flow Control Level: 1 / 2 / 3 or Exemption Number (incl. facility summary sheet Small Site BMPS: Reduced Impervious Surface Credit and Basic Dispersion Conveyance System Spill containment located at: TBD Erosion and Sediment Control ESC Site Supervisor: T/B/D Contact Phone: T/B/D After Hours Phone: T/B/D Maintenance and Operation Responsibility: Private / Public If Private, Maintenance Log Required: Yes / No Financial Guarantees and Provided: Yes / No Liability Water Quality Type: Basic / Sens Lake / Enhanced Basic / Bog (include facility summary sheet) or exemption No. Landscape Management Plan: Yes / No Special Requirements (as applicable) Area Specific Drainage Type: CDA / SDO / MDP / BP / LMP / Shared / None Requirements Name: Floodplain/Floodway Delineation Type: Major / Minor / Exemption / None 100-year Base Flood Elevation (or range): Datum: Flood Protection Facilities Describe: N/A Source Control Describe Landuse: N/A (comm. / industrial landuse) Describe any structural controls: Oil Control High-use Site: Yes / No Treatment BMP: Maintenance Agreement: Yes / No 2020 D. R. STRONG Consulting Engineers Inc. Page 6 MAPLE HIGHLANDS Technical Information Report Renton, Washington with whom? Other Drainage Structures Describe: Runoff will be collected and conveyed to the storm drainage facility located in Tract A. Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION Clearing Limits Cover Measures Perimeter Protection Traffic Area Stabilization Sediment Retention Surface Water Collection Dewatering Control Dust control Flow Control MINIMUM ESC REQUIREMENTS AFTER CONSTRUCTION Stabilize Exposed Surfaces Remove and Restore Temporary ESC Facilities Clean and Remove All Silt and Debris, Ensure Operations of Permanent Facilities Flag Limits of SAO and open space Preservation areas Other Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch Flow Control Type/Description Water Quality Type/Description Detention Infiltration Regional Facility Shared Facility Flow Control BMPs Other Vault Biofiltration Wetpool Media Filtration Oil Control Spill Control Flow Control BMPs Other Wet-vault 2020 D. R. STRONG Consulting Engineers Inc. Page 7 MAPLE HIGHLANDS Technical Information Report Renton, Washington Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS Drainage Easement Covenant Native Growth Protection Covenant Tract Other: Cast in Place Vault Retaining Wall Rockery > 4’ High Structural on Steep Slope Other: Part 17 SIGNATURE OF PROFESSIONAL ENGINEER I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attached Technical Information Report. To the best of my knowledge the information provided here is accurate. Signed/Date 2020 D. R. STRONG Consulting Engineers Inc. Page 8 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 2 VICINITY MAP Site 2020 D. R. STRONG Consulting Engineers Inc. Page 9 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 3 DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS 0 GRAPHIC SCALE 906030 1 INCH = 60 FT. 2020 D. R. STRONG Consulting Engineers Inc. Page 10 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 4 SOILS 2020 D. R. STRONG Consulting Engineers Inc. Page 11 MAPLE HIGHLANDS Technical Information Report Renton, Washington King County Area, Washington AgC—Alderwood gravelly sandy loam, 8 to 15 percent slopes Map Unit Setting  National map unit symbol: 2t626  Elevation: 50 to 800 feet  Mean annual precipitation: 20 to 60 inches  Mean annual air temperature: 46 to 52 degrees F  Frost-free period: 160 to 240 days  Farmland classification: Prime farmland if irrigated Map Unit Composition  Alderwood and similar soils: 85 percent  Minor components: 15 percent  Estimates are based on observations, descriptions, and transects of the mapunit. Description of Alderwood Setting  Landform: Ridges, hills  Landform position (two-dimensional): Shoulder  Landform position (three-dimensional): Nose slope, talf  Down-slope shape: Linear, convex  Across-slope shape: Convex  Parent material: Glacial drift and/or glacial outwash over dense glaciomarine deposits Typical profile  A - 0 to 7 inches: gravelly sandy loam  Bw1 - 7 to 21 inches: very gravelly sandy loam  Bw2 - 21 to 30 inches: very gravelly sandy loam  Bg - 30 to 35 inches: very gravelly sandy loam  2Cd1 - 35 to 43 inches: very gravelly sandy loam  2Cd2 - 43 to 59 inches: very gravelly sandy loam Properties and qualities  Slope: 8 to 15 percent  Depth to restrictive feature: 20 to 39 inches to densic material  Natural drainage class: Moderately well drained  Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately low (0.00 to 0.06 in/hr)  Depth to water table: About 18 to 37 inches  Frequency of flooding: None  Frequency of ponding: None  Available water storage in profile: Very low (about 2.7 inches) Interpretive groups  Land capability classification (irrigated): None specified  Land capability classification (nonirrigated): 4s  Hydrologic Soil Group: B  Forage suitability group: Limited Depth Soils (G002XN302WA), Limited Depth Soils (G002XS301WA), Limited Depth Soils (G002XF303WA)  Hydric soil rating: No Minor Components Everett  Percent of map unit: 5 percent  Landform: Kames, eskers, moraines 2020 D. R. STRONG Consulting Engineers Inc. Page 12 MAPLE HIGHLANDS Technical Information Report Renton, Washington  Landform position (two-dimensional): Shoulder, footslope  Landform position (three-dimensional): Crest, base slope  Down-slope shape: Convex  Across-slope shape: Convex  Hydric soil rating: No Indianola  Percent of map unit: 5 percent  Landform: Eskers, kames, terraces  Landform position (three-dimensional): Tread  Down-slope shape: Linear  Across-slope shape: Linear  Hydric soil rating: No Shalcar  Percent of map unit: 3 percent  Landform: Depressions  Landform position (three-dimensional): Dip  Down-slope shape: Concave  Across-slope shape: Concave  Hydric soil rating: Yes Norma  Percent of map unit: 2 percent  Landform: Depressions, drainageways  Landform position (three-dimensional): Dip  Down-slope shape: Concave, linear  Across-slope shape: Concave  Hydric soil rating: Yes 2020 D. R. STRONG Consulting Engineers Inc. Page 13 MAPLE HIGHLANDS Technical Information Report Renton, Washington SECTION II CONDITIONS AND REQUIREMENTS SUMMARY The Project must comply with the following Core and Special Requirements:  C.R. #1 – Discharge at the Natural Location: Existing drainage discharges the Site at one location, maintaining one TDA. The topography indicates that all stormwater runoff leaves the Site as sheet flow across the eastern property line.  C.R. #2 – Offsite Analysis: Analysis is included in Section III. The Analysis describes the Site’s runoff patterns in detail.  C.R. #3 – Flow Control Facilities: The Project is required to adhere to Level 2 Flow Control Standards. A combined detention and wetvault will provide flow control as required for the new and replaced impervious and pervious surfaces. The Site is required to “match developed discharge durations to existing conditions durations for the range of predeveloped discharge rates from 50% of the two -year peak flow up to the full 50-year peak flow. Also match developed peak discharge rates to predeveloped peak discharge rates for the 2 and the 10 year return periods,” (City of Renton 2017 Surface Water Design Manual Amendment, Sec. 1.2.3.1). A combined detention and wetvault will accommodate this requirement.  C.R. #4 – Conveyance System: New pipe systems are required to be designed with sufficient capacity to convey and contain (at minimum) the 25 -year peak flow with a minimum of 6 inches of freeboard between the design water surface and structure grate, assuming developed conditions for onsite tributary areas and existing conditions for any offsite tributary areas. Pipe system structures may overtop for runoff events that exceed the 25 -year design capacity, provided the overflow from a 100-year runoff event does not create or aggravate a “severe flooding problem” or “severe erosion problem” as defined in C.R. #2. Any overflow occurring onsite for runoff events up to and including the 100 -year event must discharge at the natural location for the project site. In residential subdivisions, such overflow must be contained within an onsite drainage easement, tract, covenant or public right-of-way. The proposed conveyance system was analyzed using the KCBW program, and is capable of conveying the 100-year peak storm without overtopping any structures or channels.  C.R. #5 – Construction Stormwater Pollution Prevention: The Project will provide the thirteen minimum ESC measures.  C.R. #6 – Maintenance and Operations: Maintenance of the proposed storm drainage facilities will be the responsibility of the City. An Operation and Maintenance Manual is included in Section X.  C.R. #7 – Financial Guarantees and Liability: Prior to commencing construction, the Applicant must post a drainage facilities restoration and site stabilization financial guarantee. For any constructed or modified drainage facilities to be maintained and operated by the City, the Applicant must: 1) P ost a drainage defect and maintenance financial guarantee for a period of two years, and 2) Maintain the drainage facilities 2020 D. R. STRONG Consulting Engineers Inc. Page 14 MAPLE HIGHLANDS Technical Information Report Renton, Washington during the two-year period following posting of the drainage defect and maintenance financial guarantee.  C.R. #8 – Water Quality Facilities: The Project is required to provide basic water quality treatment. A combined detention and wetvault will accommodate this requirement.  C.R. #9 – On-Site BMPs: The Project is required to provide on-site BMPs to mitigate the impacts of storm and surface water runoff generated by new impervious surface, new pervious surface, existing impervious surfaces, and replaced impervious surface targeted for mitigation. It has been determined, using the order of preference outlined in Section 1.2.9.2.1 of the Manual that basic dispersion and reduced impervious surfaces are the most feasible options to meet the on -site BMP requirements. Also, all target pervious surfaces must be protected in accordance with the soil amendment BMP as detailed in Appendix C , Section C.2.13 of the Manual. Finally, any proposed connection of roof downspouts to the local drainage system must be via a perforated pipe connection as detailed in Appendix C, Section C.2.11 of the Manual. Full dispersion is not feasible due to the a mount of native growth that is being retained on the Site. Required native growth areas and flowpath lengths could not be met. Per the geotechnical report, it has been recommended that due to the existing soil conditions, any level of stormwater infiltrat ion feasibility is negligible. The requirements for full infiltration, limited infiltration, rain gardens, bioretention, and permeable pavement all necessitate the recommendation of infiltration from a geotechnical engineer.  S.R. #1 – Other Adopted Area-Specific Requirements: Not applicable for this Project.  S.R. #2 – Floodplain/Floodway Delineation: Not applicable for this Project.  S.R. #3 – Flood Protection Facilities: Not applicable for this Project.  S.R. #4 – Source Control: Not applicable for this Project.  S.R. #5 – Oil Control: Not applicable for this Project.  S.R. #6 – Aquifer Protection Area: Site not located within zones 1 and 2, therefore not applicable for this Project. 2020 D. R. STRONG Consulting Engineers Inc. Page 15 MAPLE HIGHLANDS Technical Information Report Renton, Washington CONDITIONS OF APPROVAL Maple Highlands LUA18-000633 As conditioned, the proposed preliminary plat complies with all applicable subdivision review criteria for the reasons identified in the Conclusions of Law above. The conditions of approval necessary to satisfy all subdivision criteria are as follows: 1. The Applicant shall comply with the mitigation measures issued as part of the Determination of Non -Significance Mitigated, dated January 11, 2019. 2. The Applicant shall obtain a demolition permit and complete all required inspections for the removal of the existing single- family residence and accessory structures prior to Final Plat recording. 3. The Applicant shall complete the Agreement to Cooperate in the Boundary Line Adjustment Recording No. 20030310002076) prior to final plat recording to ensure all boundary lines and lot dimensions are accurate in the final plat layout. 4. The Applicant shall provide a minimum of ten feet (10') of on -site landscaping along all public street frontages. A final detailed landscape plan, consistent with RMC 4-8-120 and RMC 4-4-070, shall be submitted to and approved by the Current Planning Project Manager prior to issuance of the construction permits. 5. The Applicant shall create a Homeowners' Association ("HOA") that maintains all improvements and landscaping in the Storm Tract and any and all other common improvements. A draft of the HOA documents shall be submitted to, and approved by, the City of Renton Project Manager and the City Attorney prior to Final Plat recording. Such documents shall be recorded concurrently with the Final Plat. 6. The Applicant shall retain all five (5) apple trees in the tree retention tract (Tract B). A final tree retention plan shall be submitted and approved by the Current Planning Project Manager prior to issuance of the construction permits. 7. The Applicant shall submit a final tree retention plan that is consistent with a final arborist report. The final tree retention plan shall be submitted and approved by the Current Planning Project Manager prior to issuance of the construction permits. 8. If frontage improvements on 164th Ave SE are not constructed from the intersection of SE 132nd St and 164th Ave SE to the development than the Applicant shall ensure the installation of fire sprinkler systems in all future homes located more than 500 feet from 162nd Ave SE, namely Lots 6-10. If determined to be still be applicable by the Renton Regional Fire Authority at the time of civil construction permit, the Applicant shall record this sprinkler system requirement on the face of the final plat. 9. A street lighting plan shall be submitted at the time of construction permit for review and approval by the City' s Plan Reviewer prior to issuance of a construction permit. 10. Any proposal to convert the stormwater vault within Tract A to a stormwater detention pond shall be considered a Major Plat Amendment subject to the requirements outlined under RMC 4-7-080.M.2. 2020 D. R. STRONG Consulting Engineers Inc. Page 16 MAPLE HIGHLANDS Technical Information Report Renton, Washington 11. The proposed stormwater vault within Tract A shall be located entirely below ground. Engineered construction plans showing the vault entirely be low ground shall be submitted at the time of Construction Permit review for review and approval. 12. The Applicant shall provide a plan showing existing and proposed improvements to create a safe route from the project site to the future bus stop determined by Issaquah School District or documentation from the Issaquah School District that an additional stop will be added on the project site. The proposal for a safe route to all three schools would be subject to review and approval by the Current Planning Project Manager during construction permit application review. 13. All road names shall be approved by the City and the Applicant shall install all necessary street name signs prior to final plat approval. 14. Sanitary sewers shall be provided by t he developer at no cost to the City and designed in accordance with City standards. Side sewer lines shall be installed eight feet (8) into each lot if sanitary sewer mains are available, or provided with the subdivision development. 15. Concrete permanent control monuments shall be established at each and every controlling corner of the subdivision. Interior monuments shall be located as determined by the Department. All surveys shall be per the City of Renton surveying standards. All other lot corners shall be marked per the City surveying standards. The subdivider shall install all street name signs necessary in the subdivision. 16. All utilities designed to serve the subdivision shall be placed underground. Any utilities installed in the parking strip shall be placed in such a manner and depth to permit the planting of trees. Those utilities to be located beneath paved surfaces shall be installed, including all service connections, as approved by the Public Works Department. Such installation shall be completed and approved prior to the application of any surface material. Easements may be required for the maintenance and operation of utilities as specified by the Public Works Department. 17. Any cable TV conduits shall be undergrounded at the same time as other basic utilities are installed to serve each lot. Conduit for service connections shall be laid to each lot line by subdivider as to obviate the necessity for disturbing the street area, including sidewalks, or alley improvements when such service co nnections are extended to serve any building. The cost of trenching, conduit, pedestals and/or vaults and laterals as well as easements therefore required to bring service to the development shall be borne by the developer and/or land owner. The subdivider shall be responsible only for conduit to serve his development. Conduit ends shall be elbowed to final ground elevation and capped. The cable TV company shall provide maps and specifications to the subdivider and shall inspect the conduit and certify to the City that it is properly installed. 18. All lot corners at intersections of dedicated public rights -of -way, except alleys, shall have minimum radius of fifteen feet (15'). 19. The water distribution system including the locations of fire hydrants shal l be designed and installed in accordance with City standards as defined by the Department and Fire Department requirements. 2020 D. R. STRONG Consulting Engineers Inc. Page 17 MAPLE HIGHLANDS Technical Information Report Renton, Washington 20. The Applicant would be required to install a temporary Type III barricade between City of Renton right-of-way (ROW) and King County ROW (south end of 164th Ave SE). In addition, the Applicant install a fence at the south end of 164th Ave SE (at the south property line extended) to further restrict southbound vehicular traffic on 164th Ave SE at the SE 134th St line. The fence shall include an opening as determined necessary by City staff to allow for the passage of pedestrians. The barricade and fence shall be installed prior to final plat approval. 2020 D. R. STRONG Consulting Engineers Inc. Page 18 MAPLE HIGHLANDS Technical Information Report Renton, Washington SECTION III OFF-SITE ANALYSIS LEVEL TWO DOWNSTREAM ANALYSIS TASK 1: DEFINE AND M AP STUDY AREA This Offsite Analysis was prepared in accordance with Core Requirement #2, Section 1.2.2 of the 2017 King County Surface Water Design Manual and City Amendments as adopted by the City of Renton (Manual). The Site is located at 16210 SE 134th Avenue, Renton, Washington. The Project is the subdivision of one parcel into 13 single-family lots. See Figures 1, 2, 3, and 5 for maps of the study area. 2020 D. R. STRONG Consulting Engineers Inc. Page 19 MAPLE HIGHLANDS Technical Information Report Renton, Washington TASK 2: RESOURCE REVIEW  Adopted Basin Plans: King County Department of Permitting and Environmental Review (DPER) and Department of Natural Resources and Parks (DNRP) Lower Cedar River Basin Plan Summary  Finalized Drainage Studies: No available applicable drainage studies at this time.  Basin Reconnaissance Summary Reports: Cedar River Current and Future Conditions Report (April 1993).  Comprehensive Plans: Renton’s Comprehensive Plan, adopted on June 22, 2015, effective July 1, 2015.  Floodplain/Floodway (FEMA) Map: No floodplains exist on site, See Figure 10.  Other Offsite Analysis Reports: Skyhorse Short Plat  Sensitive Areas Map Folios: See Figures 6-9.  DNRP Drainage Complaints and Studies: Per King County Water and Land Resources Division, there were no complaints within the downstream paths, within approximately one mile from the Site within the last 10 years. See figure 11.  USDA King County Soils Survey: See Figure 4  Wetlands Inventory: Vol. 2 East (1990) – No wetlands identified along the downstream paths in the KC Wetlands Inventory. The City of Renton Mapping Applications indicates there are also no wetlands along the downstream path. See Figure 8.  Migrating River Studies: The Site is not located near the channel migration zones of Cedar River, Tolt River, Raging River, Snoqualmie River, or Green River.  King County Designated Water Quality Problems: Per the Washington State Water Quality Assessment 303(d)/305(b) Integrated Report current as of 2012, there are no water quality problems within 1 mile downstream of the Site. 2020 D. R. STRONG Consulting Engineers Inc. Page 20 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 5 CITY OF RENTON TOPOGRAPHY MAP Site 2020 D. R. STRONG Consulting Engineers Inc. Page 21 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 6 CITY OF RENTON COAL MINE HAZARD AREAS MAP Site 2020 D. R. STRONG Consulting Engineers Inc. Page 22 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 7 CITY OF RENTON FLOOD HAZARDS MAP Site 2020 D. R. STRONG Consulting Engineers Inc. Page 23 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 8 CITY OF RENTON STREAMS AND WETLANDS MAP Site 2020 D. R. STRONG Consulting Engineers Inc. Page 24 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 9 CITY OF RENTON LANDSLIDE HAZARDS MAP Site 2020 D. R. STRONG Consulting Engineers Inc. Page 25 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 10 CITY OF RENTON SEISMIC HAZARD AREAS MAP Site 2020 D. R. STRONG Consulting Engineers Inc. Page 26 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 11 FEMA MAP Site (Approximate) 2020 D. R. STRONG Consulting Engineers Inc. Page 27 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 12 KING COUNTY IMAP DRAINAGE COMPLAINTS MAP Site 2020 D. R. STRONG Consulting Engineers Inc. Page 28 MAPLE HIGHLANDS Technical Information Report Renton, Washington TASK 3: FIELD INSPECTION UPSTREAM TRIBUTARY AREA Upon evaluation of the upstream area through examining COR topographic map (see Figure 5) and by conducting field reconnaissance on July 2, 2018, the upstream tributary area for the Site approximately 16,970 s.f. of forested area just to the northwest of the site. Flows are minimal, but will be considered in the sizing of the project’s detention facility. The area generally slopes from west to east at moderates grades. Runoff from the property directly west appears to head south to SE 134 th Street while a small portion flows in a northeast direction past the Site. Runoff from the unopened right of way (162nd Ave SE) may head towards the Site, however, this area will be improved and runoff captured and conveyed east. GENERAL ONSITE AND OFFSITE DRAINAGE DESCRIPTIONS The Site is contained within one Threshold Discharge Area (TDA). Runoff from the Site is captured in a drainage course and associated catch basin just east of the eastern property line and conveyed southeast to the conveyance system in SE 135 th Street. Runoff continues in a southerly direction before reaching the detention pond at Liberty High School. The downstream analysis was concluded at this location (1,350 lf). 2020 D. R. STRONG Consulting Engineers Inc. Page 29 MAPLE HIGHLANDS Technical Information Report Renton, Washington TASK 4: DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS DRAINAGE SYSTEM DESCRIPTION The downstream analysis is further illustrated and detailed in the Do wnstream Map Figure 12 and Downstream Table Figure 13. The drainage area is located within the Lower Cedar River and May Creek drainage basin. The drainage area was evaluated by reviewing available resources described in Task 2, and by conducting a field reconnaissance on July 2, 2018 under sunny conditions. EXISTING DOWNSTREAM PATH Runoff leaves the Site as sheet flow across the eastern property line into an existing drainage course. Runoff is conveyed southerly to a catch bas in at the south end of the drainage course. Runoff continues southeasterly as pipe flow, through a series of catch basins and pipes, to a catch basin located in the ditch on the north side of SE 135th Street in front of 16414 SE 135th Street (522’). Runoff continues southerly as pipe flow to a catch basin on the south side of the same street before continues southeasterly through private property (552’). The conveyance could not be accessed past this point given the private property but area topography indicates that it likely discharges in the ravine near the unopened portion of the SE 136th Street right of way just west of 166th Ave SE before reaching the detention facility at Liberty High School (1,345’). CAPACITY ANALYSIS Based on field observation, a preliminary quantitative analysis was performed. There are several reaches of the existing downstream path that consist of twelve inch pipe at two percent slope. Twelve inch pipes at a slope of two percent have sufficient capacity for approximately 5.5 cfs. Given the existing land covers of the tributary areas and proposed development, this capacity is not sufficient for this development. Additionally, several reaches cross private property with no easements for future maintenance. Anticipated backwater and ponding of the system would be classified as a Type 1 conveyance nuisance problem due to the reasons stated above. See Task 5 for mitigation. DRAINAGE COMPLAINTS A review of the King County Water and Land Resources Division – Drainage Services Section Documented Drainage Complaints within one mile of the downstream flow paths revealed no complaints within the last ten years (1995 was most recent). 2020 D. R. STRONG Consulting Engineers Inc. Page 30 MAPLE HIGHLANDS Technical Information Report Renton, Washington TASK 5: MITIGATION OF EXISTING OR POTENTIAL PROBLEMS In order to mitigate for the deficient capacity in the existing system, the Project proposes to install a new conveyance system in 164th Ave SE and rebuild a portion of the Windsor Circle downstream discharge conveyance system. See Proposed Downstream Path below. A combined detention and wetvault will provide flow control and basic water quality requirements for the entire Site. During construction, standard sediment and erosion control methods will be utilized. This will include the use of a stabilized construction entrance, perimeter silt fencing, and other necessary measures to minimize soil erosion during construction. PROPOSED DOWNSTREAM PATH Given the historic path details and the private nature of the properties downstream of the site, an accessible path for runoff was determined. The project proposes to install a conveyance system within the half right of way at the eastern boundary of the site to convey runoff due south through the 164 th Ave SE right of way. The proposed conveyance system will be extended through 164th Ave SE past SE 135th Street (380’) and continue south through 164 th Ave SE to SE 136th Street at the corner of the Windsor Circle drainage facility (709’). CB #12 and CB#13 of the Windsor Circle conveyance system (COR As Built R-361909) and associated piping will be replaced at a lower elevation and continue to discharge to the existing channel (904’, point G1 of Existing Downstream Path, See Figure 14). Runoff continues in its existing path from this point on. 2020 D. R. STRONG Consulting Engineers Inc. Page 31 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 13 OFFSITE ANALYSIS DOWNSTREAM MAP Existing Downstream Path 2020 D. R. STRONG Consulting Engineers Inc. Page 32 MAPLE HIGHLANDS Technical Information Report Renton, Washington Proposed Downstream Path 2020 D. R. STRONG Consulting Engineers Inc. Page 33 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 14 OFFSITE ANALYSIS DOWNSTREAM TABLE EXISTING DOWNSTREAM PATH Symbol Drainage Component Type, Name, and Size Drainage Component Description Slope Distance From site Discharge Existing Problems Potential Problems Observations of field inspector resource reviewer, or resident See map (Figure 13) Type: sheet flow, swale, Stream, channel, pipe, Pond; Size: diameter Surface area drainage basin, vegetation, cover, depth, type of sensitive area, volume % 1/4 mile = 1,320 feet Constrictions, under capacity, ponding, overtopping, flooding, habitat or organism destruction, scouring, bank sloughing, sedimentation, incision, other erosion Tributary area, likelihood of problem, overflow pathways, potential impacts. A1 Natural discharge area Runoff exits at the NDA along the eastern property line of the Site. 0’ None Observed None Anticipated No concentrated flow observed A1-B1 Southerly Channel Flow Runoff enters a manmade channel and heads south W=2’, D= 1’, Side Slopes=3:1 1.0% Localized Ponding Exacerbating the existing ponding No concentrated flow observed B1 Type 1 CB At southern terminus of drainage channel 146’ None Observed None Anticipated No flow observed B1-C1 Southeasterly Pipe Flow 12” CP, not observed at B1 as it is on private property; terminus at C1 observed 1.7% Exists on private property with no easement Exists on private property with no easement Not observed due to private property C1 Type 1 CB On Parcel No. 1323059023 ±182’ None Observed None Anticipated Not visited; private property C1-D1 Southeasterly Pipe Flow 8” ADS (per Skyhorse Downstream Analysis) 2.0% None Observed None Anticipated Not visited, private property D1 Type 1 CB On Parcel No. 1323059023 ±250’ None Observed None Anticipated Not visited, private property D1-E1 Southeasterly Pipe Flow 12” CP (per Skyhorse Downstream Analysis) 2.0% None Observed None Anticipated Not visited, private property E1 Type 1 CB North side of 135th ±522’ None Observed None Anticipated No flow observed E1-F1 Southerly pipe flow 12” CP 1.5% None Observed None Anticipated No flow observed F1 Type 1 CB South side of 135th ±552’ None Observed None Anticipated No flow observed 2020 D. R. STRONG Consulting Engineers Inc. Page 34 MAPLE HIGHLANDS Technical Information Report Renton, Washington PROPOSED DOWNSTREAM PATH F1-G1 Southerly Pipe Flow 12” CP 2.0% Exists on Private Property with no easement Exists on Private Property with no easement No flow observed G1-H1 Southerly Channel Flow Earth and Gravel Lined Channel W=2’, D= 1’, Side Slopes=10:1 1.0% No well defined flow path No flow observed H1-J1 Southerly Channel Flow Channelized flow through forested area W=5’, D= 1’, Side Slopes=2:1 3.0% No signs of erosion J1-K1 Southerly Pipe Flow 30” CP Culvert 3.0% ±1,095 K1-L1 Southerly Channel Flow Channelized flow through shallow ditch W=5’, D= 2’, Side Slopes=2:1 2.0% ±1,155 Forested Area L1-M1 Southeasterly Pipe Flow 30” CMP 2.0% ±1,345’ M1 Liberty High School Detention Facility Symbol Drainage Component Type, Name, and Size Drainage Component Description Slope Distance From site Discharge Existing Problems Potential Problems Observations of field inspector resource reviewer, or resident See map (Figure 13) Type: sheet flow, swale, Stream, channel, pipe, Pond; Size: diameter Surface area drainage basin, vegetation, cover, depth, type of sensitive area, volume % 1/4 mile = 1,320 feet Constrictions, under capacity, ponding, overtopping, flooding, habitat or organism destruction, scouring, bank sloughing, sedimentation, incision, other erosion Tributary area, likelihood of problem, overflow pathways, potential impacts. A2 Connection Point with existing system Intersection of SE 136th Street and 164th Ave SE. Replace existing Type 1 CB with Type 2 – 48” CB and connect new 12” LCPE on the east side of the road. 0’ None Observed None Anticipated No existing flows observed. A2-B2 Easterly Pipe Flow 12” LCPE 9.0% None Observed None Anticipated No flow observed B2 Type 2-48” CB Replace existing Type 1 CB with Type 2-48” CB 100’ None Observed None Anticipated No flow observed B2-C2 Easterly Pipe Flow 12” LCPE 13.3% Outlets into SE 136th Street unopened Right- of-Way None anticipated No flow observed. 2020 D. R. STRONG Consulting Engineers Inc. Page 35 MAPLE HIGHLANDS Technical Information Report Renton, Washington C2 – Existing 12” LCPE Outlet H1-J1 C2 12” LCPE Outlet Outlet of 12” LCPE to Stream Channel where it converges with the Existing Downstream Path (G1) ±202’ None Observed None Anticipated No flow observed 2020 D. R. STRONG Consulting Engineers Inc. Page 36 MAPLE HIGHLANDS Technical Information Report Renton, Washington H1-J1 L1-M1 2020 D. R. STRONG Consulting Engineers Inc. Page 37 MAPLE HIGHLANDS Technical Information Report Renton, Washington M1 2020 D. R. STRONG Consulting Engineers Inc. Page 38 MAPLE HIGHLANDS Technical Information Report Renton, Washington SECTION IV FLOW CONTROL ANALYSIS AND WATER QUALITY DESIGN EXISTING SITE HYDROLOGY Western Washington Hydrology Model (WWHM) 2012 was used to model runoff from the Site. The Site falls within the City’s Flow Control Duration Standard – Matching Forested Conditions area. The Site was modeled as predeveloped forested condtions for target surfaces (see Figure 15). Per Table 3.2.2.A of the 2017 CORSWDM the Soil group for Alderwood is modeled as “Till.” Inputs for the pre-developed basin in the WWHM analysis are included in this section. This area includes the minimal forested upstream area to the northwest of the project. Modeling Input for the Pre-developed Site Modeling Results Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.2456 5 year 0.4092 10 year 0.5344 25 year 0.7103 50 year 0.8537 100 year 1.0072 2020 D. R. STRONG Consulting Engineers Inc. Page 39 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 15 PREDEVELOPED AREA MAP GRAPHIC SCALE 0 40 80 120 1 INCH = 80 FT. 2020 D. R. STRONG Consulting Engineers Inc. Page 40 MAPLE HIGHLANDS Technical Information Report Renton, Washington DEVELOPED SITE HYDROLOGY Soil Type The soil types are unchanged from predeveloped conditions. Land Cover WWHM was used to model the developed peak runoff from the Site. The portions of the Site within the developable area tributary to the proposed detention facility were modeled as “Till Grass”, and “Impervious” as appropriate. In order to accurately model the developed site hydrology, considerations were made for individual lots. All lots have been modeled utilizing the proposed small lot BMP requirements; reduced impervious surface credit and basic dispersion. Lot im pervious area restrictions of 400 square feet less than the minimum assumed impervious coverage of 4,000 square feet as defined in section 3.2.2.1 of the CORSWDM (Manual). Inputs for the developed basin in the WWHM analysis are included in this section. Modeling Input for the Developed Site Modeling Input for the Bypass Area 2020 D. R. STRONG Consulting Engineers Inc. Page 41 MAPLE HIGHLANDS Technical Information Report Renton, Washington Modeling Results for the Developed Site Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 Year 1.3905 5 Year 1.8597 10 Year 2.1927 25 Year 2.6399 50 Year 2.9928 100 Year 3.3628 Modeling Results for the Bypass Area Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 Year 0.0126 5 Year 0.0163 10 Year 0.0189 25 Year 0.0222 50 Year 0.0248 100 Year 0.0275 The on-site bypass areas satisfy all the requirements set forth in the Manual, Section 1.2.3.2.E. Runoff from the bypass area and the flow control facility c onverge within a quarter-mile of the facilities project site discharge point. The flow control facility is designed to compensate for uncontrolled bypass. The 100 -year discharge from the bypass areas is 0.0275 cfs, which is less than the 0.4 cfs threshold. Also, there should be no adverse downstream impacts to the downstream drainage system created by the runoff from the bypass. 2020 D. R. STRONG Consulting Engineers Inc. Page 42 MAPLE HIGHLANDS Technical Information Report Renton, Washington Area Breakdown Lot Area Disturbed Area Undist Imp by Zoning BMP Reqd Minimum 4,000 s.f. Imp Reduced Imp Basic Dispersion BMP Credit total impervious pervious impervious pervious Lot 1 12,425 0 6,213 2,485 4,000 3,600 700 1,100 12,425 0 0 3,600 8,825 Lot 2 10,510 0 5,255 1,051 4,000 3,600 700 1,100 10,510 0 0 3,600 6,910 Lot 3 10,208 0 5,104 1,021 4,000 3,600 700 1,100 10,208 0 0 3,600 6,608 Lot 4 9,906 0 4,953 991 4,000 3,600 700 1,100 9,906 0 0 3,600 6,306 Lot 5 9,604 0 4,802 960 4,000 3,600 700 1,100 9,604 0 0 3,600 6,004 Lot 6 9,302 0 4,651 930 4,000 3,600 700 1,100 9,302 0 0 3,600 5,702 Lot 7 9,000 0 4,500 900 4,000 3,600 700 1,100 9,000 0 0 3,600 5,400 Lot 8 9,868 0 4,934 987 4,000 3,600 700 1,100 9,868 0 0 3,600 6,268 Lot 9 10,035 0 5,018 1,004 4,000 3,600 700 1,100 10,035 0 0 3,600 6,435 Lot 10 9,742 0 4,871 974 4,000 3,600 700 1,100 9,742 0 0 3,600 6,142 Lot 11 9,449 0 4,725 945 4,000 3,600 700 1,100 9,449 0 0 3,600 5,849 Lot 12 9,156 0 4,578 916 4,000 3,600 700 1,100 9,156 0 0 3,600 5,556 Lot 13 9,781 0 4,891 978 4,000 3,600 700 1,100 9,781 0 0 3,600 6,181 Total Lots 128,986 0 64,493 14,141 52,000 46,800 9,100 14,300 128,986 0 0 46,800 82,186 TRACT A 15,198 0 15,198 0 0 2,000 13,198 TRACT B 3,665 0 3,665 0 0 0 3,665 Total Tracts 18,863 0 18,863 0 0 2,000 16,863 Total Lots & Tracts 147,849 147,849 0 0 48,800 99,049 ROW On Site ROW 32,802 0 32,802 0 0 29,522 3,280 Frontage ROW 23,453 0 23,453 1,089 470 20,019 1,875 Target Area - Bypass 0 0 0 0 0 0 0 Non-Target - Trade 0 0 0 0 0 0 0 Total ROW 56,255 56,255 1,089 470 49,541 5,156 BYPASS LOT TO DETENTIONBMP 2020 D. R. STRONG Consulting Engineers Inc. Page 43 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 16 DEVELOPED AREA MAP GRAPHIC SCALE 0 40 80 120 1 INCH = 80 FT. 2020 D. R. STRONG Consulting Engineers Inc. Page 44 MAPLE HIGHLANDS Technical Information Report Renton, Washington PERFORMANCE STANDARDS The Site is required to adhere to Flow Control Duration Standard – Matching Forested Conditions of the existing site. A detention wetvault will provide flow control and basic water quality treatment. The Project is required to “match the flow duration of pre- developed rates for forested (historic) site conditions over the range of flows extending from 50% of 2-year up to the full 50-year flow and matches peaks for the 2-, 10-, and 100-year return periods.” (CORSWDM, Sec. 1.2.3.1). Detention vault and wetvault details have been provided in Figure 17. Per Section 1.2.9.1 of the CORSWDM, the project is required to supplement the flow mitigation provided by required flow control facilities by use of Best Management Practices (BMPs). Section 1.2.9.2 outlines individual lot BMP requirements and the preferred BMPs to be utilized to achieve flow mitigation. Lots that are 11,000 s.f. or less are required to mitigate 10% of the total lot size of impervious area, and lots that are greater than 11,000 s.f. are required to mitigate impervious area equal to 20% of the total lot size. Small lot BMPs were determined by the BMP requirements outlined in Section 1.2.9.2.1 of the CORSWDM. As required by the CORSWDM, small lot BMP requirements were analyzed in the order of preference listed in section 1.2.9.2.1. 1. Full Dispersion: There is an insufficient amount of native growth in order to utilize full dispersion. The required undisturbed area and flowpath lengths result in full dispersion for any of the lots to be infeasible. 2. Full Infiltration: Per geotechnical infiltration evaluation, the existing soil on the Site makes full infiltration infeasible. The full geotechnical report has been submitted in conjunction with the preliminary application. 3. Limited Infiltration: Per geotechnical infiltration evaluation, the existing soil on the Site makes any form of infiltration infeasible. The full geotechnical report has been submitted in conjunction with the preliminary application. 4. Rain Gardens: Per geotechnical evaluation, the existing soil on the Site makes any form of infiltration infeasible. The full geotechnical report has been submitted in conjunction with the preliminary application. 5. Bioretention: Per geotechnical evaluation, the existing soil on the Site makes any form of infiltration infeasible. 6. Permeable Pavement: Per geotechnical evaluation, the existing soil on the Site makes any form of infiltration infeasible. 7. Basic Dispersion: A combination of restricted impervious area and basic dispersion via splash blocks is being proposed in order to meet the BMP requirements of small lots. Also, any proposed connection of roof downspouts to the local drainage system must be via a perforated pipe connection as detailed in Appendix C, Section C.2.11 of the Manual. Per the Manual, any lots utilizing Basic Dispersion require a supplemental BMP to be implemented if the 10% lot BMP minimum for lots smaller than 11,000 s.f. and the 20% lot BMP minimum for lots greater than 11,000 s.f. cannot be met through b asic dispersion. In addition to splash blocks, the Project is proposing to implement Reduced Impervious Surface Credits and the soil amendment BMP to meet flow control BMP 2020 D. R. STRONG Consulting Engineers Inc. Page 45 MAPLE HIGHLANDS Technical Information Report Renton, Washington requirements. A restricted footprint covenant shall be recorded with each individu al building permit to assure the City of the reduced impervious area. The amount of reduced impervious surface per lot is 3,600 s.f.; the Area Breakdown table included in this section shows individual requirements for each lot. The soil moisture holding capacity of new pervious surfaces must be protected in accordance with the soil amendment BMP as detailed in Appendix C, Seciton C.2.13 of the Manual. FLOW CONTROL SYSTEM The Project will utilize an detention facility designed to control site runoff. The Western Washington Hydrology Modeling 2012 (WWHM2012) software was used to size the facility. The detention vault design information is shown below. The full WWHM report is included as Appendix D of this report. 2020 D. R. STRONG Consulting Engineers Inc. Page 46 MAPLE HIGHLANDS Technical Information Report Renton, Washington Evaluating Flow Control Performance (RSWDM 3.3.2) 1. The post-development flow duration curve lies strictly on or below the predevelopment curve at the lower limit of the range of flow control (between 50% of the 2-year and the 2-year).  Duration comparison analysis shows a negative percent chan ge for the entire duration curve. 2. At any flow value within the upper range of flow control (from the 2 -year to the 50-year), the postdevelopment duration of the flow is no more than 1.1 times the predevelopment flow duration.  At no duration is the flow exceeded by more than 10%; there is no positive excursion. 3. The target duration curve may not be exceeded along more than 50% of the range of control.  The target duration curve is not exceeded by more than 50%. 4. Where a facility or BMP is used to meet the LID Performance Standard, the post- development flow duration curve lies strictly on or below the predevelopment curve for the range of pre-developed discharge rates for the LID Performance standard (from 8% of the 2-year peak flow to 50% of the 2-year peak flow).  The Project is proposing to utilize a combination of reduced impervious surface credits and basic dispersion to meet the small lot BMP requirements; therefore, the LID Performance Standard is not applicable for the Project. WATER QUALITY TREATMENT SYSTEM The Project is required to adhere to the City of Renton’s Basic Water Quality treatment criteria. A combined detention and wetvault is proposed to accommodate this requirement. The wetvault will contain 6.25 feet of water quality depth. The water quality portion of the vault was sized using WWHM2012. The total volume required is 18,927 c.f. The total dead storage volume provided is 19,075 c.f.. See Figure 17 for the combined detention and wetvault details. 2020 D. R. STRONG Consulting Engineers Inc. Page 47 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 17 DETENTION & WATER QUALITY FACILITY DETAILS IN COMPLIANCE WITH CITY OF RENTON STANDARDS 16210 SE 134TH STREET RENTON, WASHINGTON 98059 DRS PROJECT NO. 17020 MAPLE HIGHLANDSMAPLE HIGHLANDSLUA18-000633C19004791MAPLE HIGHLANDS 8-13-21 IN COMPLIANCE WITH CITY OF RENTON STANDARDS 16210 SE 134TH STREET RENTON, WASHINGTON 98059 DRS PROJECT NO. 17020 MAPLE HIGHLANDSMAPLE HIGHLANDSLUA18-000633C19004791MAPLE HIGHLANDS 8-13-21 ©2021 D. R. STRONG Consulting Engineers Inc. Page 48 MAPLE HIGHLANDS Technical Information Report Renton, Washington SECTION V CONVEYANCE SYSTEM ANALYSIS AND DESIGN Per Core Requirement #4 of the KCSWDM, the conveyance system must be analyzed and designed for the existing tributary and developed onsite runoff. Pipe systems shall be designed with sufficient capacity to convey and contain (at minimum) the 25 -year peak flow with a minimum of 6 inches of freeboard between the design water surface and structure grate. Pipe system structures may overtop for runoff events that exceed the 25-year design capacity, provided the overflow from a 100 -year runoff event does not create or aggravate a “severe flooding problem” or “severe erosion problem” as defined in C.R. #2. The Rational Method will be used to calculate the Q -Ratio for each pipe node. A conveyance system consisting primarily of pipes and catch basins will be designed for the Project. Onsite runoff will be collected by the multiple catch basins. Pipes are typically eight-inch to twelve-inch diameter LCPE material unless noted otherwise. The downstream pipes are 12-inch PVC and DI pipes. The 100-year peak discharge from the Skyhorse detention vault is 0.968 cfs. The 100-year peak discharge from the Maple Highlands vault is 0.643 cfs. Therefore, the total 100-year peak flow entering the downstream conveyance system will be 1.611 cfs. A 18-inch PVC pipe at 0.005 ft/ft has a full flow capacity of approximately 8.8 cfs. Thus, the downstream conveyance system will have enough capacity. 2020 D. R. STRONG Consulting Engineers Inc. Page 49 MAPLE HIGHLANDS Technical Information Report Renton, Washington BACKWATER ANALYSIS Storm Water Runoff Variables: A=Total of Subasin and Tributary Areas C=Runoff Coefficient (the anticipated proportion of rainfall volume that runs off the area) see 2016 KCSWM Table 3.2.1A CC=Composite Runoff Coefficient CC=S(Cn *An )/ATotal T c=Time of Concentration (Typically 6.3 minutes which is the minimum value used in calculations)6.3 R=design return frequency iR=Unit peak rainfall intensity factor iR=(aR)(T c)^(-bR) aR,bR=coefficients from '16 KCSWM Table 3.2.1.B used to adjust the equation for the design storm IR=Peak rainfall intensity factor for a storm of return frequency 'R' IR=P R*iR P R=total precipitation (inches) for the 24-hour storm event for the given frequency. See Issopluvial Maps in 2016 KCSWM Figures 3.2.1.A - D QR=peak flow (cfs) for a storm of return frequency 'R' QR=CC*iR*A The Q-Ratio describes the ratio of the tributary flow to the main upstream flow. R=100 -year storm aR=2.61 bR=0.63 P R=4 inches Conveyance System Variables: d=pipe diameter n=Manning's Number l=length of pipe 2020 D. R. STRONG Consulting Engineers Inc. Page 50 MAPLE HIGHLANDS Technical Information Report Renton, Washington Pipe Structures Subasins &A A C CC Tc iR IR QR SQR Q - d Material n l Slope invert invert over-Q V Bend CB Tributaries subasin Ratio in out flow Full Full Dia elev.Flow Flow FROM CB To CB sf Ac Ac Min.cfs cfs in ft %ft ft ft cfs fps CB#6 TO VAULT 6 6 5 6 1280 0.03 0.90 6.3 0.82 3.27 0.09 0.09 0.00 12 LCPE 0.012 108 1.39 508.50 507 511.55 4.56 5.81 0 2 5 5 4 5 2760 0.06 0.90 6.6 0.79 3.18 0.18 0.27 2.09 12 LCPE 0.012 36 4.67 507.00 505.3 510.14 8.36 10.65 45 2 RUN 204-4 6822 0.16 0.90 4 4 3 4 1477 0.03 0.90 4 4 3 4 8299 0.19 0.90 6.7 0.79 3.16 0.54 0.81 2.02 12 LCPE 0.012 122 3.95 505.30 500.5 508.73 7.69 9.79 47 2 RUN 103-3 26118 0.60 0.53 3 3 2 3 3451 0.08 0.90 3 3 2 3 29569 0.68 0.57 6.9 0.77 3.10 1.20 2.01 1.49 12 LCPE 0.012 198 10.89 500.50 478.9 503.84 12.77 16.26 2 2 RUN 102-2 34977 0.80 0.57 2 2 1 2 33645 0.77 0.58 2 2 1 2 68622 1.58 0.58 7.1 0.76 3.04 2.77 4.78 1.37 12 LCPE 0.012 223 12.53 478.90 451 482.19 13.70 17.45 0 2 RUN 301-1 6805 0.16 0.90 RUN 201-1 39878 0.92 0.64 1 1 VAULT INLET 1 5898 0.14 0.90 1 1 VAULT INLET 1 52581 1.21 0.70 7.3 0.75 2.99 2.52 7.30 0.53 18 LCPE 0.012 25 20.35 450.50 445.5 456.64 51.47 29.13 90 4 CB#201 TO CB#1 201 201 101 201 5810 0.13 0.90 6.3 0.82 3.27 0.39 0.39 0.00 12 LCPE 0.012 35 1.01 451.60 451.25 455.11 3.89 4.95 0 2 101 101 1 101 34068 0.78 0.59 6.4 0.81 3.24 1.50 1.89 3.81 12 LCPE 0.012 25 1.00 451.25 451 456.67 3.86 4.92 82 4 39878 0.92 0.64 CB#301 TO CB#1 301 301 1 301 6805 0.16 0.90 6.3 0.82 3.27 0.46 0.46 0.00 12 LCPE 0.012 35 2.88 452.00 451 455.02 6.57 8.36 0 2 CB#102 TO CB#2 102 102 2 102 34977 0.80 0.57 6.3 0.82 3.27 1.50 1.50 0.00 12 LCPE 0.012 24 1.19 479.19 478.9 482.19 4.22 5.38 0 2 CB#103 TO CB#3 103 103 3 103 26118 0.60 0.53 6.3 0.82 3.27 1.04 1.04 0.00 12 LCPE 0.012 24 1.23 500.80 500.5 503.84 4.30 5.47 0 2 CB#204 TO CB#4 204 204 104 204 5103 0.12 0.90 6.3 0.82 3.27 0.35 0.35 0.00 12 LCPE 0.012 37 1.36 506.00 505.5 509.13 4.52 5.75 0 2 104 104 4 104 1719 0.04 0.90 6.4 0.81 3.24 0.12 0.46 0.33 12 LCPE 0.012 20 0.98 505.50 505.3 508.64 3.84 4.89 46 2 6822 0.16 0.90 2020 D. R. STRONG Consulting Engineers Inc. Page 51 MAPLE HIGHLANDS Technical Information Report Renton, Washington FIGURE 18 BACKWATER ANALYSIS M AP GRAPHIC SCALE 0 25 50 100 1 INCH = 50 FT. 2020 D. R. STRONG Consulting Engineers Inc. Page 52 MAPLE HIGHLANDS Technical Information Report Renton, Washington BACKWATER ANALYSIS RESULTS FOR 100-YEAR STORM Pipe data from file:CB#6 TO VAULT.bwp Surcharge condition at intermediate junctions Tailwater Elevation:453.66 feet Discharge Range:0.09 to 7.3 Step of 0.0721 [cfs] Overflow Elevation:511.55 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 1: 24 LF - 18"CP @ 20.35% OUTLET: 445.50 INLET: 450.50 INTYP: 5 JUNC NO. 1: OVERFLOW-EL: 456.64 BEND: 90 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.53 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 6.65 3.89 454.39 * 0.012 1.00 0.38 7.66 7.66 3.24 3.89 1.76 6.72 3.91 454.41 * 0.012 1.01 0.38 7.66 7.66 3.25 3.91 1.78 6.80 3.93 454.43 * 0.012 1.01 0.38 7.66 7.66 3.25 3.93 1.80 6.87 3.94 454.44 * 0.012 1.02 0.39 7.66 7.66 3.25 3.94 1.82 6.94 3.96 454.46 * 0.012 1.03 0.39 7.66 7.66 3.25 3.96 1.84 7.01 3.98 454.48 * 0.012 1.03 0.39 7.66 7.66 3.25 3.98 1.86 7.08 3.99 454.49 * 0.012 1.04 0.39 7.66 7.66 3.26 3.99 1.88 7.16 4.01 454.51 * 0.012 1.04 0.39 7.66 7.66 3.26 4.01 1.90 7.23 4.03 454.53 * 0.012 1.05 0.40 7.66 7.66 3.26 4.03 1.92 7.30 4.04 454.54 * 0.012 1.05 0.40 7.66 7.66 3.26 4.04 1.94 Q100 = 7.30 cfs PIPE NO. 2: 222 LF - 12"CP @ 12.53% OUTLET: 451.00 INLET: 478.90 INTYP: 5 JUNC NO. 2: OVERFLOW-EL: 482.19 BEND: 0 DEG DIA/WIDTH: 2.0 Q-RATIO: 1.37 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 4.35 1.80 480.70 * 0.012 0.88 0.39 3.39 3.39 0.88 ***** 1.80 4.40 1.83 480.73 * 0.012 0.88 0.40 3.41 3.41 0.88 ***** 1.83 4.45 1.86 480.76 * 0.012 0.89 0.40 3.43 3.43 0.89 ***** 1.86 4.49 1.88 480.78 * 0.012 0.89 0.40 3.44 3.44 0.89 ***** 1.88 4.54 1.91 480.81 * 0.012 0.89 0.40 3.46 3.46 0.89 ***** 1.91 4.59 1.94 480.84 * 0.012 0.90 0.40 3.48 3.48 0.90 ***** 1.94 4.64 1.96 480.86 * 0.012 0.90 0.41 3.49 3.49 0.90 ***** 1.96 4.68 1.99 480.89 * 0.012 0.90 0.41 3.51 3.51 0.90 ***** 1.99 4.73 2.02 480.92 * 0.012 0.91 0.41 3.53 3.53 0.91 ***** 2.02 4.78 2.05 480.95 * 0.012 0.91 0.41 3.54 3.54 0.91 ***** 2.05 Q100 = 4.78 cfs PIPE NO. 3: 198 LF - 12"CP @ 10.89% OUTLET: 478.90 INLET: 500.50 INTYP: 5 JUNC NO. 3: OVERFLOW-EL: 503.84 BEND: 2 DEG DIA/WIDTH: 2.0 Q-RATIO: 1.49 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 1.83 0.81 501.31 * 0.012 0.58 0.26 1.80 1.80 0.58 ***** 0.81 1.85 0.82 501.32 * 0.012 0.58 0.26 1.83 1.83 0.58 ***** 0.82 1.87 0.82 501.32 * 0.012 0.59 0.26 1.86 1.86 0.59 ***** 0.82 1.89 0.83 501.33 * 0.012 0.59 0.27 1.88 1.88 0.59 ***** 0.83 1.91 0.83 501.33 * 0.012 0.59 0.27 1.91 1.91 0.59 ***** 0.83 1.93 0.84 501.34 * 0.012 0.60 0.27 1.94 1.94 0.60 ***** 0.84 1.95 0.85 501.35 * 0.012 0.60 0.27 1.96 1.96 0.60 ***** 0.85 1.97 0.85 501.35 * 0.012 0.60 0.27 1.99 1.99 0.60 ***** 0.85 1.99 0.86 501.36 * 0.012 0.61 0.27 2.02 2.02 0.61 ***** 0.86 2.01 0.87 501.37 * 0.012 0.61 0.27 2.05 2.05 0.61 ***** 0.87 Q100 = 2.01 cfs 2020 D. R. STRONG Consulting Engineers Inc. Page 53 MAPLE HIGHLANDS Technical Information Report Renton, Washington PIPE NO. 4: 121 LF - 12"CP @ 3.95% OUTLET: 500.50 INLET: 505.30 INTYP: 5 JUNC NO. 4: OVERFLOW-EL: 508.73 BEND: 47 DEG DIA/WIDTH: 2.0 Q-RATIO: 2.02 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.74 0.48 505.78 * 0.012 0.36 0.21 0.81 0.81 0.36 ***** 0.48 0.75 0.48 505.78 * 0.012 0.37 0.22 0.82 0.82 0.37 ***** 0.48 0.75 0.49 505.79 * 0.012 0.37 0.22 0.82 0.82 0.37 ***** 0.49 0.76 0.49 505.79 * 0.012 0.37 0.22 0.83 0.83 0.37 ***** 0.49 0.77 0.49 505.79 * 0.012 0.37 0.22 0.83 0.83 0.37 ***** 0.49 0.78 0.49 505.79 * 0.012 0.37 0.22 0.84 0.84 0.37 ***** 0.49 0.79 0.50 505.80 * 0.012 0.38 0.22 0.85 0.85 0.38 ***** 0.50 0.79 0.50 505.80 * 0.012 0.38 0.22 0.85 0.85 0.38 ***** 0.50 0.80 0.50 505.80 * 0.012 0.38 0.22 0.86 0.86 0.38 ***** 0.50 0.81 0.51 505.81 * 0.012 0.38 0.22 0.87 0.87 0.38 ***** 0.51 Q100 = 0.81 cfs PIPE NO. 5: 36 LF - 12"CP @ 4.67% OUTLET: 505.30 INLET: 507.00 INTYP: 5 JUNC NO. 5: OVERFLOW-EL: 510.14 BEND: 45 DEG DIA/WIDTH: 2.0 Q-RATIO: 2.09 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.24 0.25 507.25 * 0.012 0.21 0.12 0.48 0.48 0.21 ***** 0.25 0.25 0.25 507.25 * 0.012 0.21 0.12 0.48 0.48 0.21 ***** 0.25 0.25 0.25 507.25 * 0.012 0.21 0.12 0.49 0.49 0.21 ***** 0.25 0.25 0.26 507.26 * 0.012 0.21 0.12 0.49 0.49 0.21 ***** 0.26 0.25 0.26 507.26 * 0.012 0.21 0.12 0.49 0.49 0.21 ***** 0.26 0.26 0.26 507.26 * 0.012 0.21 0.13 0.49 0.49 0.21 ***** 0.26 0.26 0.26 507.26 * 0.012 0.21 0.13 0.50 0.50 0.21 ***** 0.26 0.26 0.26 507.26 * 0.012 0.22 0.13 0.50 0.50 0.22 ***** 0.26 0.27 0.26 507.26 * 0.012 0.22 0.13 0.50 0.50 0.22 ***** 0.26 0.27 0.27 507.27 * 0.012 0.22 0.13 0.51 0.51 0.22 ***** 0.27 Q100 = 0.27 cfs PIPE NO. 6: 108 LF - 12"CP @ 1.39% OUTLET: 507.00 INLET: 508.50 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.08 0.15 508.65 * 0.012 0.12 0.10 0.25 0.25 0.12 ***** 0.15 0.08 0.15 508.65 * 0.012 0.12 0.10 0.25 0.25 0.12 ***** 0.15 0.08 0.15 508.65 * 0.012 0.12 0.10 0.25 0.25 0.12 ***** 0.15 0.08 0.15 508.65 * 0.012 0.12 0.10 0.26 0.26 0.12 ***** 0.15 0.08 0.15 508.65 * 0.012 0.12 0.10 0.26 0.26 0.12 ***** 0.15 0.08 0.15 508.65 * 0.012 0.12 0.10 0.26 0.26 0.12 ***** 0.15 0.08 0.15 508.65 * 0.012 0.12 0.10 0.26 0.26 0.12 ***** 0.15 0.08 0.15 508.65 * 0.012 0.12 0.10 0.26 0.26 0.12 ***** 0.15 0.09 0.15 508.65 * 0.012 0.12 0.10 0.26 0.26 0.12 ***** 0.15 0.09 0.15 508.65 * 0.012 0.12 0.10 0.27 0.27 0.12 ***** 0.15 Q100 = 0.09 cfs 2020 D. R. STRONG Consulting Engineers Inc. Page 54 MAPLE HIGHLANDS Technical Information Report Renton, Washington Pipe data from file:CB#201 TO CB#1.bwp Surcharge condition at intermediate junctions Tailwater Elevation:454.54 feet Discharge Range:0.39 to 1.89 Step of 0.15 [cfs] Overflow Elevation:455.11 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 101: 25 LF - 12"CP @ 1.00% OUTLET: 451.00 INLET: 451.25 INTYP: 5 JUNC NO. 1: OVERFLOW-EL: 456.67 BEND: 82 DEG DIA/WIDTH: 4.0 Q-RATIO: 3.81 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.39 3.31 454.56 * 0.012 0.26 0.22 3.54 3.54 3.30 3.31 0.35 0.54 3.31 454.56 * 0.012 0.31 0.26 3.54 3.54 3.29 3.31 0.42 0.69 3.32 454.57 * 0.012 0.35 0.29 3.54 3.54 3.30 3.32 0.48 0.84 3.33 454.58 * 0.012 0.39 0.32 3.54 3.54 3.30 3.33 0.53 0.99 3.34 454.59 * 0.012 0.42 0.35 3.54 3.54 3.31 3.34 0.59 1.14 3.36 454.61 * 0.012 0.45 0.38 3.54 3.54 3.31 3.36 0.64 1.29 3.38 454.63 * 0.012 0.48 0.40 3.54 3.54 3.32 3.38 0.69 1.44 3.41 454.66 * 0.012 0.51 0.43 3.54 3.54 3.32 3.41 0.74 1.59 3.43 454.68 * 0.012 0.54 0.45 3.54 3.54 3.33 3.43 0.79 1.74 3.46 454.71 * 0.012 0.57 0.48 3.54 3.54 3.34 3.46 0.84 1.89 3.49 454.74 * 0.012 0.59 0.50 3.54 3.54 3.35 3.49 0.89 1.89 3.49 454.74 * 0.012 0.59 0.50 3.54 3.54 3.35 3.49 0.89 Q100 = 1.89 cfs PIPE NO. 201: 34 LF - 12"CP @ 1.01% OUTLET: 451.25 INLET: 451.60 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.08 2.96 454.56 * 0.012 0.12 0.11 3.31 3.31 2.96 2.96 0.15 0.11 2.96 454.56 * 0.012 0.14 0.12 3.31 3.31 2.96 2.96 0.18 0.14 2.97 454.57 * 0.012 0.16 0.14 3.32 3.32 2.97 2.97 0.20 0.17 2.98 454.58 * 0.012 0.18 0.15 3.33 3.33 2.98 2.98 0.23 0.21 3.00 454.60 * 0.012 0.19 0.16 3.34 3.34 3.00 3.00 0.25 0.24 3.02 454.62 * 0.012 0.20 0.17 3.36 3.36 3.01 3.02 0.27 0.27 3.04 454.64 * 0.012 0.22 0.18 3.38 3.38 3.03 3.04 0.28 0.30 3.06 454.66 * 0.012 0.23 0.19 3.41 3.41 3.06 3.06 0.30 0.33 3.09 454.69 * 0.012 0.24 0.20 3.43 3.43 3.08 3.09 0.32 0.36 3.12 454.72 * 0.012 0.25 0.21 3.46 3.46 3.11 3.12 0.33 0.39 3.15 454.75 * 0.012 0.26 0.22 3.49 3.49 3.14 3.15 0.35 0.39 3.15 454.75 * 0.012 0.26 0.22 3.49 3.49 3.14 3.15 0.35 Q100 = 0.39 cfs 2020 D. R. STRONG Consulting Engineers Inc. Page 55 MAPLE HIGHLANDS Technical Information Report Renton, Washington Pipe data from file:CB#301 TO CB#1.bwp Surcharge condition at intermediate junctions Tailwater Elevation:454.54 feet Discharge Range:0.046 to 0.46 Step of 0.046 [cfs] Overflow Elevation:455.02 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 301: 34 LF - 12"CP @ 2.88% OUTLET: 451.00 INLET: 452.00 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.05 2.55 454.55 * 0.012 0.09 0.06 3.54 3.54 2.55 2.55 0.10 0.09 2.54 454.54 * 0.012 0.13 0.09 3.54 3.54 2.54 2.54 0.15 0.14 2.54 454.54 * 0.012 0.16 0.11 3.54 3.54 2.54 2.54 0.19 0.18 2.54 454.54 * 0.012 0.18 0.12 3.54 3.54 2.54 2.54 0.22 0.23 2.54 454.54 * 0.012 0.20 0.13 3.54 3.54 2.54 2.54 0.25 0.28 2.54 454.54 * 0.012 0.22 0.14 3.54 3.54 2.54 2.54 0.28 0.32 2.55 454.55 * 0.012 0.24 0.16 3.54 3.54 2.54 2.55 0.30 0.37 2.55 454.55 * 0.012 0.26 0.17 3.54 3.54 2.54 2.55 0.33 0.41 2.55 454.55 * 0.012 0.27 0.18 3.54 3.54 2.54 2.55 0.35 0.46 2.55 454.55 * 0.012 0.29 0.18 3.54 3.54 2.54 2.55 0.37 Q100 = 0.46 cfs Pipe data from file:CB#102 TO CB#2.bwp Surcharge condition at intermediate junctions Tailwater Elevation:480.95 feet Discharge Range:0.15 to 1.5 Step of 0.15 [cfs] Overflow Elevation:482.19 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 102: 24 LF - 12"CP @ 1.19% OUTLET: 478.90 INLET: 479.19 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.15 1.77 480.96 * 0.012 0.16 0.13 2.05 2.05 1.77 1.77 0.21 0.30 1.76 480.95 * 0.012 0.23 0.19 2.05 2.05 1.76 1.76 0.30 0.45 1.77 480.96 * 0.012 0.28 0.23 2.05 2.05 1.76 1.77 0.37 0.60 1.78 480.97 * 0.012 0.33 0.26 2.05 2.05 1.77 1.78 0.44 0.75 1.79 480.98 * 0.012 0.37 0.29 2.05 2.05 1.77 1.79 0.50 0.90 1.80 480.99 * 0.012 0.40 0.32 2.05 2.05 1.77 1.80 0.55 1.05 1.82 481.01 * 0.012 0.44 0.35 2.05 2.05 1.78 1.82 0.61 1.20 1.84 481.03 * 0.012 0.47 0.37 2.05 2.05 1.78 1.84 0.66 1.35 1.86 481.05 * 0.012 0.50 0.39 2.05 2.05 1.79 1.86 0.71 1.50 1.88 481.07 * 0.012 0.52 0.42 2.05 2.05 1.80 1.88 0.76 1.50 1.88 481.07 * 0.012 0.52 0.42 2.05 2.05 1.80 1.88 0.76 Q100 = 1.50 cfs 2020 D. R. STRONG Consulting Engineers Inc. Page 56 MAPLE HIGHLANDS Technical Information Report Renton, Washington Pipe data from file:CB#103 TO CB#3.bwp Surcharge condition at intermediate junctions Tailwater Elevation:501.37 feet Discharge Range:0.104 to 1.04 Step of 0.104 [cfs] Overflow Elevation:503.84 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 103: 24 LF - 12"CP @ 1.23% OUTLET: 500.50 INLET: 500.80 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.10 0.57 501.37 * 0.012 0.14 0.11 0.87 0.87 0.57 0.57 0.17 0.21 0.57 501.37 * 0.012 0.19 0.15 0.87 0.87 0.57 0.57 0.25 0.31 0.58 501.38 * 0.012 0.24 0.19 0.87 0.87 0.57 0.58 0.31 0.42 0.59 501.39 * 0.012 0.27 0.22 0.87 0.87 0.57 0.59 0.36 0.52 0.60 501.40 * 0.012 0.30 0.24 0.87 0.87 0.57 0.60 0.41 0.62 0.61 501.41 * 0.012 0.33 0.26 0.87 0.87 0.57 0.61 0.45 0.73 0.63 501.43 * 0.012 0.36 0.28 0.87 0.87 0.57 0.63 0.49 0.83 0.64 501.44 * 0.012 0.39 0.30 0.87 0.87 0.56 0.64 0.53 0.94 0.66 501.46 * 0.012 0.41 0.32 0.87 0.87 0.56 0.66 0.57 1.04 0.68 501.48 * 0.012 0.43 0.34 0.87 0.87 0.55 0.68 0.60 1.04 0.68 501.48 * 0.012 0.43 0.34 0.87 0.87 0.55 0.68 0.60 Q100 = 1.04 cfs Pipe data from file:CB#204 TO CB#4.bwp Surcharge condition at intermediate junctions Tailwater Elevation:505.81 feet Discharge Range:0.35 to 0.46 Step of 0.011 [cfs] Overflow Elevation:509.13 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 104: 20 LF - 12"CP @ 0.98% OUTLET: 505.30 INLET: 505.50 INTYP: 5 JUNC NO. 1: OVERFLOW-EL: 508.64 BEND: 46 DEG DIA/WIDTH: 2.0 Q-RATIO: 0.33 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.35 0.37 505.87 * 0.012 0.25 0.21 0.51 0.51 0.30 0.37 0.33 0.36 0.38 505.88 * 0.012 0.25 0.21 0.51 0.51 0.30 0.38 0.33 0.37 0.38 505.88 * 0.012 0.26 0.22 0.51 0.51 0.30 0.38 0.34 0.38 0.39 505.89 * 0.012 0.26 0.22 0.51 0.51 0.30 0.39 0.34 0.39 0.39 505.89 * 0.012 0.26 0.22 0.51 0.51 0.30 0.39 0.35 0.41 0.40 505.90 * 0.012 0.27 0.22 0.51 0.51 0.30 0.40 0.35 0.42 0.40 505.90 * 0.012 0.27 0.23 0.51 0.51 0.30 0.40 0.36 0.43 0.41 505.91 * 0.012 0.28 0.23 0.51 0.51 0.29 0.41 0.36 0.44 0.41 505.91 * 0.012 0.28 0.23 0.51 0.51 0.29 0.41 0.37 0.45 0.42 505.92 * 0.012 0.28 0.24 0.51 0.51 0.29 0.42 0.37 0.46 0.38 505.88 * 0.012 0.29 0.24 0.51 0.51 0.29 ***** 0.38 Q100 = 0.46 cfs 2020 D. R. STRONG Consulting Engineers Inc. Page 57 MAPLE HIGHLANDS Technical Information Report Renton, Washington PIPE NO. 204: 36 LF - 12"CP @ 1.36% OUTLET: 505.50 INLET: 506.00 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.26 0.28 506.28 * 0.012 0.22 0.17 0.37 0.37 0.22 ***** 0.28 0.27 0.28 506.28 * 0.012 0.22 0.17 0.38 0.38 0.22 ***** 0.28 0.28 0.29 506.29 * 0.012 0.22 0.17 0.38 0.38 0.22 ***** 0.29 0.29 0.29 506.29 * 0.012 0.23 0.18 0.39 0.39 0.23 ***** 0.29 0.30 0.30 506.30 * 0.012 0.23 0.18 0.39 0.39 0.23 ***** 0.30 0.30 0.30 506.30 * 0.012 0.23 0.18 0.40 0.40 0.23 ***** 0.30 0.31 0.31 506.31 * 0.012 0.24 0.18 0.40 0.40 0.24 ***** 0.31 0.32 0.31 506.31 * 0.012 0.24 0.19 0.41 0.41 0.24 ***** 0.31 0.33 0.31 506.31 * 0.012 0.24 0.19 0.41 0.41 0.24 ***** 0.31 0.34 0.32 506.32 * 0.012 0.24 0.19 0.42 0.42 0.24 ***** 0.32 0.35 0.32 506.32 * 0.012 0.25 0.19 0.38 0.38 0.25 ***** 0.32 Q100 = 0.35 cfs 2020 D. R. STRONG Consulting Engineers Inc. Page 58 MAPLE HIGHLANDS Technical Information Report Renton, Washington BACKWATER ANALYSIS RESULTS FOR 25-YEAR STORM Pipe data from file:CB#6 TO VAULT.bwp Surcharge condition at intermediate junctions Tailwater Elevation:453.66 feet Discharge Range:0.07 to 6.26 Step of 0.0619 [cfs] Overflow Elevation:511.55 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 1: 24 LF - 18"CP @ 20.35% OUTLET: 445.50 INLET: 450.50 INTYP: 5 JUNC NO. 1: OVERFLOW-EL: 456.64 BEND: 90 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.53 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 5.70 3.70 454.20 * 0.012 0.93 0.35 7.66 7.66 3.22 3.70 1.51 5.76 3.71 454.21 * 0.012 0.93 0.35 7.66 7.66 3.22 3.71 1.53 5.83 3.72 454.22 * 0.012 0.94 0.36 7.66 7.66 3.22 3.72 1.54 5.89 3.74 454.24 * 0.012 0.94 0.36 7.66 7.66 3.23 3.74 1.56 5.95 3.75 454.25 * 0.012 0.95 0.36 7.66 7.66 3.23 3.75 1.57 6.01 3.76 454.26 * 0.012 0.95 0.36 7.66 7.66 3.23 3.76 1.59 6.07 3.77 454.27 * 0.012 0.96 0.36 7.66 7.66 3.23 3.77 1.61 6.14 3.78 454.28 * 0.012 0.96 0.36 7.66 7.66 3.23 3.78 1.62 6.20 3.80 454.30 * 0.012 0.97 0.37 7.66 7.66 3.23 3.80 1.64 6.26 3.81 454.31 * 0.012 0.97 0.37 7.66 7.66 3.23 3.81 1.66 Q25 = 6.26 cfs PIPE NO. 2: 222 LF - 12"CP @ 12.53% OUTLET: 451.00 INLET: 478.90 INTYP: 5 JUNC NO. 2: OVERFLOW-EL: 482.19 BEND: 0 DEG DIA/WIDTH: 2.0 Q-RATIO: 1.37 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 3.73 1.49 480.39 * 0.012 0.83 0.36 3.20 3.20 0.83 ***** 1.49 3.77 1.51 480.41 * 0.012 0.83 0.36 3.21 3.21 0.83 ***** 1.51 3.81 1.53 480.43 * 0.012 0.84 0.37 3.22 3.22 0.84 ***** 1.53 3.85 1.55 480.45 * 0.012 0.84 0.37 3.24 3.24 0.84 ***** 1.55 3.89 1.57 480.47 * 0.012 0.84 0.37 3.25 3.25 0.84 ***** 1.57 3.94 1.59 480.49 * 0.012 0.85 0.37 3.26 3.26 0.85 ***** 1.59 3.98 1.61 480.51 * 0.012 0.85 0.37 3.27 3.27 0.85 ***** 1.61 4.02 1.63 480.53 * 0.012 0.85 0.38 3.28 3.28 0.85 ***** 1.63 4.06 1.65 480.55 * 0.012 0.86 0.38 3.30 3.30 0.86 ***** 1.65 4.10 1.67 480.57 * 0.012 0.86 0.38 3.31 3.31 0.86 ***** 1.67 Q25 = 4.10 cfs PIPE NO. 3: 198 LF - 12"CP @ 10.89% OUTLET: 478.90 INLET: 500.50 INTYP: 5 JUNC NO. 3: OVERFLOW-EL: 503.84 BEND: 2 DEG DIA/WIDTH: 2.0 Q-RATIO: 1.48 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 1.57 0.73 501.23 * 0.012 0.54 0.24 1.49 1.49 0.54 ***** 0.73 1.59 0.73 501.23 * 0.012 0.54 0.24 1.51 1.51 0.54 ***** 0.73 1.61 0.74 501.24 * 0.012 0.54 0.24 1.53 1.53 0.54 ***** 0.74 1.62 0.74 501.24 * 0.012 0.55 0.25 1.55 1.55 0.55 ***** 0.74 1.64 0.75 501.25 * 0.012 0.55 0.25 1.57 1.57 0.55 ***** 0.75 1.66 0.75 501.25 * 0.012 0.55 0.25 1.59 1.59 0.55 ***** 0.75 1.68 0.76 501.26 * 0.012 0.56 0.25 1.61 1.61 0.56 ***** 0.76 1.69 0.77 501.27 * 0.012 0.56 0.25 1.63 1.63 0.56 ***** 0.77 1.71 0.77 501.27 * 0.012 0.56 0.25 1.65 1.65 0.56 ***** 0.77 1.73 0.78 501.28 * 0.012 0.56 0.25 1.67 1.67 0.56 ***** 0.78 Q25 = 1.73 cfs 2020 D. R. STRONG Consulting Engineers Inc. Page 59 MAPLE HIGHLANDS Technical Information Report Renton, Washington PIPE NO. 4: 121 LF - 12"CP @ 3.95% OUTLET: 500.50 INLET: 505.30 INTYP: 5 JUNC NO. 4: OVERFLOW-EL: 508.73 BEND: 47 DEG DIA/WIDTH: 2.0 Q-RATIO: 2.02 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.63 0.44 505.74 * 0.012 0.34 0.20 0.73 0.73 0.34 ***** 0.44 0.64 0.44 505.74 * 0.012 0.34 0.20 0.73 0.73 0.34 ***** 0.44 0.65 0.44 505.74 * 0.012 0.34 0.20 0.74 0.74 0.34 ***** 0.44 0.65 0.45 505.75 * 0.012 0.34 0.20 0.74 0.74 0.34 ***** 0.45 0.66 0.45 505.75 * 0.012 0.34 0.20 0.75 0.75 0.34 ***** 0.45 0.67 0.45 505.75 * 0.012 0.35 0.20 0.75 0.75 0.35 ***** 0.45 0.67 0.46 505.76 * 0.012 0.35 0.21 0.76 0.76 0.35 ***** 0.46 0.68 0.46 505.76 * 0.012 0.35 0.21 0.77 0.77 0.35 ***** 0.46 0.69 0.46 505.76 * 0.012 0.35 0.21 0.77 0.77 0.35 ***** 0.46 0.69 0.46 505.76 * 0.012 0.35 0.21 0.78 0.78 0.35 ***** 0.46 Q25 = 0.69 cfs PIPE NO. 5: 36 LF - 12"CP @ 4.67% OUTLET: 505.30 INLET: 507.00 INTYP: 5 JUNC NO. 5: OVERFLOW-EL: 510.14 BEND: 45 DEG DIA/WIDTH: 2.0 Q-RATIO: 2.09 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.21 0.23 507.23 * 0.012 0.19 0.11 0.44 0.44 0.19 ***** 0.23 0.21 0.23 507.23 * 0.012 0.19 0.11 0.44 0.44 0.19 ***** 0.23 0.21 0.23 507.23 * 0.012 0.19 0.12 0.44 0.44 0.19 ***** 0.23 0.22 0.24 507.24 * 0.012 0.20 0.12 0.45 0.45 0.20 ***** 0.24 0.22 0.24 507.24 * 0.012 0.20 0.12 0.45 0.45 0.20 ***** 0.24 0.22 0.24 507.24 * 0.012 0.20 0.12 0.45 0.45 0.20 ***** 0.24 0.22 0.24 507.24 * 0.012 0.20 0.12 0.46 0.46 0.20 ***** 0.24 0.23 0.24 507.24 * 0.012 0.20 0.12 0.46 0.46 0.20 ***** 0.24 0.23 0.24 507.24 * 0.012 0.20 0.12 0.46 0.46 0.20 ***** 0.24 0.23 0.24 507.24 * 0.012 0.20 0.12 0.46 0.46 0.20 ***** 0.24 Q25 = 0.23 cfs PIPE NO. 6: 108 LF - 12"CP @ 1.39% OUTLET: 507.00 INLET: 508.50 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.07 0.14 508.64 * 0.012 0.11 0.09 0.23 0.23 0.11 ***** 0.14 0.07 0.14 508.64 * 0.012 0.11 0.09 0.23 0.23 0.11 ***** 0.14 0.07 0.14 508.64 * 0.012 0.11 0.09 0.23 0.23 0.11 ***** 0.14 0.07 0.14 508.64 * 0.012 0.11 0.09 0.24 0.24 0.11 ***** 0.14 0.07 0.14 508.64 * 0.012 0.11 0.09 0.24 0.24 0.11 ***** 0.14 0.07 0.14 508.64 * 0.012 0.11 0.09 0.24 0.24 0.11 ***** 0.14 0.07 0.14 508.64 * 0.012 0.11 0.09 0.24 0.24 0.11 ***** 0.14 0.07 0.14 508.64 * 0.012 0.11 0.09 0.24 0.24 0.11 ***** 0.14 0.07 0.14 508.64 * 0.012 0.12 0.09 0.24 0.24 0.12 ***** 0.14 0.07 0.14 508.64 * 0.012 0.12 0.09 0.24 0.24 0.12 ***** 0.14 Q25 = 0.07 cfs 2020 D. R. STRONG Consulting Engineers Inc. Page 60 MAPLE HIGHLANDS Technical Information Report Renton, Washington Pipe data from file:CB#201 TO CB#1.bwp Surcharge condition at intermediate junctions Tailwater Elevation:454.31 feet Discharge Range:0.34 to 1.62 Step of 0.128 [cfs] Overflow Elevation:455.11 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 101: 25 LF - 12"CP @ 1.00% OUTLET: 451.00 INLET: 451.25 INTYP: 5 JUNC NO. 1: OVERFLOW-EL: 456.67 BEND: 82 DEG DIA/WIDTH: 4.0 Q-RATIO: 3.81 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.34 3.07 454.32 * 0.012 0.25 0.21 3.31 3.31 3.07 3.07 0.32 0.47 3.07 454.32 * 0.012 0.29 0.24 3.31 3.31 3.06 3.07 0.38 0.60 3.08 454.33 * 0.012 0.33 0.27 3.31 3.31 3.07 3.08 0.44 0.72 3.09 454.34 * 0.012 0.36 0.30 3.31 3.31 3.07 3.09 0.49 0.85 3.10 454.35 * 0.012 0.39 0.32 3.31 3.31 3.07 3.10 0.54 0.98 3.11 454.36 * 0.012 0.42 0.35 3.31 3.31 3.08 3.11 0.58 1.11 3.13 454.38 * 0.012 0.45 0.37 3.31 3.31 3.08 3.13 0.63 1.24 3.15 454.40 * 0.012 0.47 0.39 3.31 3.31 3.09 3.15 0.67 1.36 3.16 454.41 * 0.012 0.50 0.42 3.31 3.31 3.09 3.16 0.71 1.49 3.18 454.43 * 0.012 0.52 0.44 3.31 3.31 3.10 3.18 0.76 1.62 3.21 454.46 * 0.012 0.55 0.46 3.31 3.31 3.10 3.21 0.80 Q25 = 1.62 cfs PIPE NO. 201: 34 LF - 12"CP @ 1.01% OUTLET: 451.25 INLET: 451.60 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.07 2.73 454.33 * 0.012 0.11 0.10 3.07 3.07 2.73 2.73 0.14 0.10 2.72 454.32 * 0.012 0.13 0.11 3.07 3.07 2.72 2.72 0.17 0.12 2.73 454.33 * 0.012 0.15 0.13 3.08 3.08 2.73 2.73 0.19 0.15 2.74 454.34 * 0.012 0.16 0.14 3.09 3.09 2.74 2.74 0.21 0.18 2.75 454.35 * 0.012 0.18 0.15 3.10 3.10 2.75 2.75 0.23 0.20 2.77 454.37 * 0.012 0.19 0.16 3.11 3.11 2.76 2.77 0.25 0.23 2.78 454.38 * 0.012 0.20 0.17 3.13 3.13 2.78 2.78 0.26 0.26 2.80 454.40 * 0.012 0.21 0.18 3.15 3.15 2.80 2.80 0.28 0.28 2.82 454.42 * 0.012 0.22 0.19 3.16 3.16 2.82 2.82 0.29 0.31 2.84 454.44 * 0.012 0.23 0.20 3.18 3.18 2.84 2.84 0.31 0.34 2.86 454.46 * 0.012 0.24 0.20 3.21 3.21 2.86 2.86 0.32 Q25 = 0.34 cfs 2020 D. R. STRONG Consulting Engineers Inc. Page 61 MAPLE HIGHLANDS Technical Information Report Renton, Washington Pipe data from file:CB#301 TO CB#1.bwp Surcharge condition at intermediate junctions Tailwater Elevation:454.31 feet Discharge Range:0.04 to 0.4 Step of 0.04 [cfs] Overflow Elevation:455.02 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 301: 34 LF - 12"CP @ 2.88% OUTLET: 451.00 INLET: 452.00 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.04 2.32 454.32 * 0.012 0.09 0.06 3.31 3.31 2.32 2.32 0.10 0.08 2.31 454.31 * 0.012 0.12 0.08 3.31 3.31 2.31 2.31 0.14 0.12 2.31 454.31 * 0.012 0.15 0.10 3.31 3.31 2.31 2.31 0.18 0.16 2.31 454.31 * 0.012 0.17 0.11 3.31 3.31 2.31 2.31 0.21 0.20 2.31 454.31 * 0.012 0.19 0.12 3.31 3.31 2.31 2.31 0.23 0.24 2.31 454.31 * 0.012 0.21 0.14 3.31 3.31 2.31 2.31 0.26 0.28 2.31 454.31 * 0.012 0.22 0.15 3.31 3.31 2.31 2.31 0.28 0.32 2.32 454.32 * 0.012 0.24 0.16 3.31 3.31 2.31 2.32 0.30 0.36 2.32 454.32 * 0.012 0.25 0.16 3.31 3.31 2.31 2.32 0.32 0.40 2.32 454.32 * 0.012 0.27 0.17 3.31 3.31 2.31 2.32 0.34 0.44 2.32 454.32 * 0.012 0.28 0.18 3.31 3.31 2.31 2.32 0.36 Q25 = 0.40 cfs Pipe data from file:CB#102 TO CB#2.bwp Surcharge condition at intermediate junctions Tailwater Elevation:480.57 feet Discharge Range:0.129 to 1.29 Step of 0.129 [cfs] Overflow Elevation:482.19 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 102: 24 LF - 12"CP @ 1.19% OUTLET: 478.90 INLET: 479.19 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.13 1.39 480.58 * 0.012 0.15 0.13 1.67 1.67 1.39 1.39 0.19 0.26 1.38 480.57 * 0.012 0.21 0.17 1.67 1.67 1.38 1.38 0.28 0.39 1.39 480.58 * 0.012 0.26 0.21 1.67 1.67 1.38 1.39 0.34 0.52 1.39 480.58 * 0.012 0.30 0.24 1.67 1.67 1.38 1.39 0.40 0.64 1.40 480.59 * 0.012 0.34 0.27 1.67 1.67 1.39 1.40 0.46 0.77 1.41 480.60 * 0.012 0.37 0.30 1.67 1.67 1.39 1.41 0.51 0.90 1.42 480.61 * 0.012 0.40 0.32 1.67 1.67 1.39 1.42 0.55 1.03 1.44 480.63 * 0.012 0.43 0.34 1.67 1.67 1.40 1.44 0.60 1.16 1.45 480.64 * 0.012 0.46 0.36 1.67 1.67 1.40 1.45 0.64 1.29 1.47 480.66 * 0.012 0.48 0.38 1.67 1.67 1.41 1.47 0.69 1.42 1.49 480.68 * 0.012 0.51 0.40 1.67 1.67 1.41 1.49 0.73 Q25 = 1.29 cfs 2020 D. R. STRONG Consulting Engineers Inc. Page 62 MAPLE HIGHLANDS Technical Information Report Renton, Washington Pipe data from file:CB#103 TO CB#3.bwp Surcharge condition at intermediate junctions Tailwater Elevation:501.28 feet Discharge Range:0.089 to 0.89 Step of 0.089 [cfs] Overflow Elevation:503.84 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 103: 24 LF - 12"CP @ 1.23% OUTLET: 500.50 INLET: 500.80 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.09 0.48 501.28 * 0.012 0.13 0.10 0.78 0.78 0.48 0.48 0.16 0.18 0.49 501.29 * 0.012 0.18 0.14 0.78 0.78 0.48 0.49 0.23 0.27 0.49 501.29 * 0.012 0.22 0.17 0.78 0.78 0.48 0.49 0.28 0.36 0.50 501.30 * 0.012 0.25 0.20 0.78 0.78 0.48 0.50 0.33 0.44 0.51 501.31 * 0.012 0.28 0.22 0.78 0.78 0.48 0.51 0.37 0.53 0.53 501.33 * 0.012 0.31 0.24 0.78 0.78 0.48 0.53 0.41 0.62 0.54 501.34 * 0.012 0.33 0.26 0.78 0.78 0.47 0.54 0.45 0.71 0.56 501.36 * 0.012 0.36 0.28 0.78 0.78 0.47 0.56 0.48 0.80 0.58 501.38 * 0.012 0.38 0.30 0.78 0.78 0.46 0.58 0.52 0.89 0.61 501.41 * 0.012 0.40 0.31 0.78 0.78 0.45 0.61 0.55 0.89 0.61 501.41 * 0.012 0.40 0.31 0.78 0.78 0.45 0.61 0.55 Q25 = 0.89 cfs Pipe data from file:CB#204 TO CB#4.bwp Surcharge condition at intermediate junctions Tailwater Elevation:505.76 feet Discharge Range:0.3 to 0.4 Step of 0.01 [cfs] Overflow Elevation:509.13 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 104: 20 LF - 12"CP @ 0.98% OUTLET: 505.30 INLET: 505.50 INTYP: 5 JUNC NO. 1: OVERFLOW-EL: 508.64 BEND: 46 DEG DIA/WIDTH: 2.0 Q-RATIO: 0.33 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.30 0.34 505.84 * 0.012 0.23 0.19 0.46 0.46 0.25 0.34 0.30 0.31 0.34 505.84 * 0.012 0.23 0.20 0.46 0.46 0.25 0.34 0.31 0.32 0.35 505.85 * 0.012 0.24 0.20 0.46 0.46 0.25 0.35 0.31 0.33 0.36 505.86 * 0.012 0.24 0.20 0.46 0.46 0.25 0.36 0.32 0.34 0.32 505.82 * 0.012 0.25 0.21 0.46 0.46 0.25 ***** 0.32 0.35 0.33 505.83 * 0.012 0.25 0.21 0.46 0.46 0.25 ***** 0.33 0.36 0.33 505.83 * 0.012 0.25 0.21 0.46 0.46 0.25 ***** 0.33 0.37 0.34 505.84 * 0.012 0.26 0.22 0.46 0.46 0.26 ***** 0.34 0.38 0.34 505.84 * 0.012 0.26 0.22 0.46 0.46 0.26 ***** 0.34 0.39 0.35 505.85 * 0.012 0.26 0.22 0.46 0.46 0.26 ***** 0.35 0.40 0.35 505.85 * 0.012 0.27 0.22 0.46 0.46 0.27 ***** 0.35 0.40 0.35 505.85 * 0.012 0.27 0.22 0.46 0.46 0.27 ***** 0.35 Q25 = 0.40 cfs 2020 D. R. STRONG Consulting Engineers Inc. Page 63 MAPLE HIGHLANDS Technical Information Report Renton, Washington PIPE NO. 204: 36 LF - 12"CP @ 1.36% OUTLET: 505.50 INLET: 506.00 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.23 0.26 506.26 * 0.012 0.20 0.16 0.34 0.34 0.20 ***** 0.26 0.23 0.26 506.26 * 0.012 0.20 0.16 0.34 0.34 0.20 ***** 0.26 0.24 0.27 506.27 * 0.012 0.21 0.16 0.35 0.35 0.21 ***** 0.27 0.25 0.27 506.27 * 0.012 0.21 0.16 0.36 0.36 0.21 ***** 0.27 0.26 0.27 506.27 * 0.012 0.21 0.17 0.32 0.32 0.21 ***** 0.27 0.26 0.28 506.28 * 0.012 0.22 0.17 0.33 0.33 0.22 ***** 0.28 0.27 0.28 506.28 * 0.012 0.22 0.17 0.33 0.33 0.22 ***** 0.28 0.28 0.29 506.29 * 0.012 0.22 0.17 0.34 0.34 0.22 ***** 0.29 0.29 0.29 506.29 * 0.012 0.22 0.18 0.34 0.34 0.22 ***** 0.29 0.29 0.30 506.30 * 0.012 0.23 0.18 0.35 0.35 0.23 ***** 0.30 0.30 0.30 506.30 * 0.012 0.23 0.18 0.35 0.35 0.23 ***** 0.30 0.30 0.30 506.30 * 0.012 0.23 0.18 0.35 0.35 0.23 ***** 0.30 Q25 = 0.30 cfs 2020 D. R. STRONG Consulting Engineers Inc. Page 64 MAPLE HIGHLANDS Technical Information Report Renton, Washington SECTION VI SPECIAL REPORTS AND STUDIES The following report and studies have been provided with this submittal. Critical Area Memo: Soundview Consultants – May 29th, 2018 Geotechnical Engineering Study: Earth Solutions NW , LLC – June 21, 2018 Traffic Memorandum: Traffex, Inc. – August 27, 2018 Arborist Report: Creative Landscape Solutions – July 28, 2018 2020 D. R. STRONG Consulting Engineers Inc. Page 65 MAPLE HIGHLANDS Technical Information Report Renton, Washington SECTION VII OTHER PERMITS, VARIANCES AND ADJUSTMENTS  NPDES Permit  King County Right-of-Way Permit  King County Water District 90 Water permit 2020 D. R. STRONG Consulting Engineers Inc. Page 66 MAPLE HIGHLANDS Technical Information Report Renton, Washington SECTION VIII CSWPPP ANALYSIS AND DESIGN (PART A) The Erosion and Sedimentation Control Design will meet the seven minimum King County requirements: 1. Areas to remain undisturbed shall be delineated with a high visibility plastic fence prior to any site clearing or grading. 2. Site disturbed areas shall be covered with mulch and seeded, as appropriate, for temporary or permanent measures. 3. Perimeter protection shall consist of a silt fence down slope of any disturbed areas or stockpiles. 4. A stabilized construction entrance will be located at the point of ingress/egress (i.e. onsite access road). 5. The detention vault will act as a sediment pond for sediment retention. Perimeter silt fences will provide sediment retention within the bypass areas. 6. Surface water from disturbed areas will sheet flow to the sediment pond for treatment. 7. Dust control shall be provided by spraying exposed soils with water until wet. This is required when exposed soils are dry to the point that wind transport is possible which would impact roadways, drainage ways, surface waters, or neighboring residences. SWPPP PLAN DESIGN (PART B) Construction activities that could contribute pollutants to surface and storm water include the following, with applicable BMP’s listed for each item: 1. Storage and use of chemicals: Utilize source control, and soil erosion and sedimentation control practices, such as using only recommended amo unts of chemical materials applied in the proper manner; neutralizing concrete wash water, and disposing of excess concrete material only in areas prepared for concrete placement, or return to batch plant; disposing of wash -up waters from water-based paints in sanitary sewer; disposing of wastes from oil-based paints, solvents, thinners, and mineral spirits only through a licensed waste management firm, or treatment, storage, and disposal (TSD) facility. 2. Material delivery and storage: Locate temporary storage areas away from vehicular traffic, near the construction entrance, and away from storm drains. Material Safety Data Sheets (MSDS) should be supplied for all materials stored, and chemicals kept in their original labeled containers. Maintenance, f ueling, and repair of heavy equipment and vehicles shall be conducted using spill prevention and control measures. Contaminated surfaces shall be cleaned immediately following any spill incident. Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum products, and other potentially hazardous materials. 2020 D. R. STRONG Consulting Engineers Inc. Page 67 MAPLE HIGHLANDS Technical Information Report Renton, Washington 3. Building demolition: Protect stormwater drainage system from sediment -laden runoff and loose particles. To the extent possible, use dikes, berms, or other methods to protect overland discharge paths from runoff. Street gutter, sidewalks, driveways, and other paved surfaces in the immediate area of demolition must be swept daily to collect and properly dispose of loose debris and garbage. Spray the minimum amount of water to help control windblown fine particles such as concrete, dust, and paint chips. Avoid excessive spraying so that runoff from the site does not occur, yet dust control is achieved. Oils must never be used for dust control. 4. Sawcutting: Slurry and cuttings shall be vacuumed during the activity to prevent migration offsite and must not remain on permanent concrete or asphalt paving overnight. Collected slurry and cuttings shall be disposed of in a manner that does not violate ground water or surface water quality standards. The complete CSWPPP has been included as Appendix C of this report. 2020 D. R. STRONG Consulting Engineers Inc. Page 68 MAPLE HIGHLANDS Technical Information Report Renton, Washington SECTION IX BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT 1. Bond Quantity Worksheet – The BQW has been included as Appendix B of this report. 2. The Stormwater Facility Summary Sheet is included in this section 2020 D. R. STRONG Consulting Engineers Inc. Page 69 MAPLE HIGHLANDS Technical Information Report Renton, Washington STORMWATER FACILITY SUMMARY SHEET STORMWATER FACILITY SUMMARY SHEET Parcel No. Project Location Retired Parcel No. Detention Infiltration Type # of Type # of Ponds ____Ponds ____Ponds ______ Vaults _____ Vaults _____ Vaults ________ Tanks _____ Tanks _____ Tanks ________ TREATMENT SUMMARY FOR TOTAL IMPERVIOUS SURFACES Area % of Total ________________________________________________ Page 1 Water Quality Flow Control Performance StdType # of Facilities Clearing Limit Basic GENERAL FACILITY INFORMATION: Project includes Landscape Management Plan? yes (include copy with TIR as Appendix) no Declarations of Covenant Leachable Metals Impervious Surface Limit Recording No. DPER Permit No. __________________ Date __________________ NPDES Permit No. __________________ __________________________ __________________________ ( provide one Stormwater Facility Summary Sheet per Natural Discharge Location ) Downstream Drainage Basins: Major Basin Name Immediate Basin Name ________________________________________ _________________________________________ OVERVIEW: Project Name Redevelopment projects Drainage Facility Landscape Management Plan Conservation Flood Problem (Applies to Commercial parcels only) Total Acreage (ac) If no flow control facility, check one: Project qualifies of KCSWDM Exemption (KCSWDM 1.2.3): Basic Exemption Impervious Surface Exemption for Transportation __________________________________________________ Flow control provided in regional/shared facility per approved approved KCSWDM Adjustment No. ______________________ Shared Facility Name/ Location: __________________________ No flow control required (other, provide justification): Cost Exemption for Parcel Redevelopment projects Direct Discharge Exemption Other Project qualifies for 0.1 cfs Exception per KCSWDM 1.2.3 No flow control required per approved water quality facility(ies) (sq ft) Total Impervious Acreage (ac) Total impervious surface served by KCSWDM Adjustment No. _____________________ Flow Control BMPs flow control facility(ies) (sq ft) PROVIDE FACILITY DETAILS AND FACILITY SKETCH FOR EACH FACILITY ON REVERSE. USE ADDITIONAL SHEET AS NEEDED FOR ADDITIONAL FACILITIES control facility(ies) designed 1990 or later (sq ft) Impervious surface served by pervious surface absorption (sq ft) Impervious surface served by approved Impervious surface served by flow 1457500025Maple Highlands Subdivision 16210 SE 134th Street Renton, WA 98056 East Lake Washington Renton 1 1 09-11-18 Facility Name/Number _______________________________________ Facility Location ___________________________________________ cu.ft. ac.ft. WATER QUALITY FACILITIES Indicate no. of water quality facilities/BMPs for each type: regular, wet or continuous inflow yes no ______ Oil/water separator baffle coalescing plate ______ Storm filter Facility Summary Sheet Sketch: All detention, infiltration and water quality facilities must include a detailed sketch (11"x17" reduced size plan sheets preferred). Combined w/detention ______ Source controls___________________________________ Sand bed depth • Is facility lined? regular linear vault (inches) __________ If so, what marker issued above liner?______________________________________________________ ______ Pre-settling structure (manufacturer:__________________) ______ Catch basin inserts (Manufacturer:___________________) _____ Pre-settling pond _____ Stormwater wetland _____ Sand Filter basic large _____ Wetpond basic large combined w/detention Design Information Water Quality design flow (cfs) Water Quality treated volume (sandfilter) (cu.ft.) Water Quality storage volume (wetpool) (cu.ft.) Landscape management plan Farm management plan _____ Flow dispersion _____ Filter strip _____ Biofiltration swale ______ High flow bypass structure (e.g., flow-splitter catch basin)_____ Wetvault (numbered starting with lowest orifice): Project Impervious Acres Served _______ % of Total Project Impervious Acres served _______ No. of Lots Served _______ (ft) (inches in decimal format) No. 1 _____ No. 2 _____ No. 3 _____ No. 4 _____ UIC? yes no UIC Site ID: Volume ______________ ac.ft. Live Storage DPER Permit No.__________________ Downstream Drainage Basins: Major Basin Name____________________________________________ Immediate Basin Name________________________________________ STORMWATER FACILITY SUMMARY SHEET Project Name Project Location (provide one Stormwater Facility Summary Sheet per Natural Discharge Location) Depth (ft) ________ Reservoir Volume FLOW CONTROL FACILITY:Basin: No. of Orifices/Restrictions _________ Size of Orifice/Restriction (in.) above natural grade Depth of Reservoir above natural grade New Facility Existing Facility Volume Factor of Safety _______ Dam Safety Regulation (WA State Dept of Ecology): Control Structure location: ______________________________________________ Type of Control Structure: Riser in vault Riser in Type II CB Weir in Type II CB Live Storage cu.ft. Renton East Lake WashingtonMaple Highlands Subdivision 16210 SE 134th Street Renton, WA 98056 TBD Tract A Vault 1.60 2.00 1.75 3 161.21 2.26 100% 13 1 0.4529 18,927 2020 D. R. STRONG Consulting Engineers Inc. Page 70 MAPLE HIGHLANDS Technical Information Report Renton, Washington SECTION X OPERATIONS AND MAINTENANCE MANUAL The Home Owners Association will be responsible for maintenance of several private catch basins on various lots as depicted on the plans. Maintenance guidelines s et forth in the 2017 CORSWDM are included in this section. All other drainage elements are to be publicly maintained. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-6 NO. 3 –DETENTION TANKS AND VAULTS MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Site Trash and debris Any trash and debris which exceed 1 cubic foot per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size office garbage can).In general, there should be no visual evidence of dumping. Trash and debris cleared from site. Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to City personnel or the public. Noxious and nuisance vegetation removed according to applicable regulations.No danger of noxious vegetation where City personnel or the public might normally be. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Excessive growth of grass/groundcover Grass or groundcover exceeds 18 inches in height. Grass or groundcover mowed to a height no greater than 6 inches. Tank or Vault Storage Area Trash and debris Any trash and debris accumulated in vault or tank (includes floatables and non- floatables). No trash or debris in vault. Sediment accumulation Accumulated sediment depth exceeds 10% of the diameter of the storage area for ½ length of storage vault or any point depth exceeds 15% of diameter.Example: 72-inch storage tank would require cleaning when sediment reaches depth of 7 inches for more than ½ length of tank. All sediment removed from storage area. Tank Structure Plugged air vent Any blockage of the vent.Tank or vault freely vents. Tank bent out of shape Any part of tank/pipe is bent out of shape more than 10% of its design shape. Tank repaired or replaced to design. Gaps between sections, damaged joints or cracks or tears in wall A gap wider than ½-inch at the joint of any tank sections or any evidence of soil particles entering the tank at a joint or through a wall. No water or soil entering tank through joints or walls. Vault Structure Damage to wall, frame, bottom, and/or top slab Cracks wider than ½-inch, any evidence of soil entering the structure through cracks or qualified inspection personnel determines that the vault is not structurally sound. Vault is sealed and structurally sound. Inlet/Outlet Pipes Sediment accumulation Sediment filling 20% or more of the pipe.Inlet/outlet pipes clear of sediment. Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables). No trash or debris in pipes. Damaged inlet/outlet pipes Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes. No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe. Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place.Any open manhole requires immediate maintenance. Manhole access covered. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 2017 City of Renton Surface Water Design Manual 12/12/2016 A-7 NO. 3 –DETENTION TANKS AND VAULTS MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Access Manhole (cont.) Locking mechanism not working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated.Self-locking cover/lid does not work. Mechanism opens with proper tools. Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs of lift. Cover/lid can be removed and reinstalled by one maintenance person. Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards. Allows maintenance person safe access. Large access doors/plate Damaged or difficult to open Large access doors or plates cannot be opened/removed using normal equipment. Replace or repair access door so it can opened as designed. Gaps, doesn't cover completely Large access doors not flat and/or access opening not completely covered. Doors close flat;covers access opening completely. Lifting rings missing, rusted Lifting rings not capable of lifting weight of door or plate. Lifting rings sufficient to lift or remove door or plate. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-8 NO. 4 –CONTROL STRUCTURE/FLOW RESTRICTOR MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Structure Trash and debris Trash or debris of more than ½ cubic foot which is located immediately in front of the structure opening or is blocking capacity of the structure by more than 10%. No Trash or debris blocking or potentially blocking entrance to structure. Trash or debris in the structure that exceeds 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin. No trash or debris in the structure. Deposits of garbage exceeding 1 cubic foot in volume. No condition present which would attract or support the breeding of insects or rodents. Sediment accumulation Sediment exceeds 60% of the depth from the bottom of the structure to the invert of the lowest pipe into or out of the structure or the bottom of the FROP-T section or is within 6 inches of the invert of the lowest pipe into or out of the structure or the bottom of the FROP-T section. Sump of structure contains no sediment. Damage to frame and/or top slab Corner of frame extends more than ¾ inch past curb face into the street (If applicable). Frame is even with curb. Top slab has holes larger than 2 square inches or cracks wider than ¼ inch. Top slab is free of holes and cracks. Frame not sitting flush on top slab, i.e., separation of more than ¾ inch of the frame from the top slab. Frame is sitting flush on top slab. Cracks in walls or bottom Cracks wider than ½ inch and longer than 3 feet, any evidence of soil particles entering structure through cracks, or maintenance person judges that structure is unsound. Structure is sealed and structurally sound. Cracks wider than ½ inch and longer than 1 foot at the joint of any inlet/outlet pipe or any evidence of soil particles entering structure through cracks. No cracks more than 1/4 inch wide at the joint of inlet/outlet pipe. Settlement/ misalignment Structure has settled more than 1 inch or has rotated more than 2 inches out of alignment. Basin replaced or repaired to design standards. Damaged pipe joints Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the structure at the joint of the inlet/outlet pipes. No cracks more than ¼-inch wide at the joint of inlet/outlet pipes. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Ladder rungs missing or unsafe Ladder is unsafe due to missing rungs, misalignment, rust, cracks, or sharp edges. Ladder meets design standards and allows maintenance person safe access. FROP-T Section Damaged FROP-T T section is not securely attached to structure wall and outlet pipe structure should support at least 1,000 lbs of up or down pressure. T section securely attached to wall and outlet pipe. Structure is not in upright position (allow up to 10% from plumb). Structure in correct position. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 2017 City of Renton Surface Water Design Manual 12/12/2016 A-9 NO. 4 –CONTROL STRUCTURE/FLOW RESTRICTOR MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED FROP-T Section (cont.) Damaged FROP-T (cont.) Connections to outlet pipe are not watertight or show signs of deteriorated grout. Connections to outlet pipe are water tight; structure repaired or replaced and works as designed. Any holes—other than designed holes—in the structure. Structure has no holes other than designed holes. Cleanout Gate Damaged or missing cleanout gate Cleanout gate is missing.Replace cleanout gate. Cleanout gate is not watertight.Gate is watertight and works as designed. Gate cannot be moved up and down by one maintenance person. Gate moves up and down easily and is watertight. Chain/rod leading to gate is missing or damaged. Chain is in place and works as designed. Orifice Plate Damaged or missing orifice plate Control device is not working properly due to missing, out of place, or bent orifice plate. Plate is in place and works as designed. Obstructions to orifice plate Any trash, debris, sediment, or vegetation blocking the plate. Plate is free of all obstructions and works as designed. Overflow Pipe Obstructions to overflow pipe Any trash or debris blocking (or having the potential of blocking) the overflow pipe. Pipe is free of all obstructions and works as designed. Deformed or damaged lip of overflow pipe Lip of overflow pipe is bent or deformed.Overflow pipe does not allow overflow at an elevation lower than design Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe.Inlet/outlet pipes clear of sediment. Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables). No trash or debris in pipes. Damaged inlet/outlet pipe Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes. No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe. Metal Grates (If applicable) Unsafe grate opening Grate with opening wider than 7/8 inch.Grate opening meets design standards. Trash and debris Trash and debris that is blocking more than 20% of grate surface. Grate free of trash and debris.footnote to guidelines for disposal Damaged or missing grate Grate missing or broken member(s) of the grate. Grate is in place and meets design standards. Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place.Any open structure requires urgent maintenance. Cover/lid protects opening to structure. Locking mechanism not working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated.Self-locking cover/lid does not work. Mechanism opens with proper tools. Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs. of lift. Cover/lid can be removed and reinstalled by one maintenance person. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-10 NO. 5 –CATCH BASINS AND MANHOLES MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Structure Sediment accumulation Sediment exceeds 60% of the depth from the bottom of the catch basin to the invert of the lowest pipe into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin. Sump of catch basin contains no sediment. Trash and debris Trash or debris of more than ½ cubic foot which is located immediately in front of the catch basin opening or is blocking capacity of the catch basin by more than 10%. No Trash or debris blocking or potentially blocking entrance to catch basin. Trash or debris in the catch basin that exceeds 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin. No trash or debris in the catch basin. Dead animals or vegetation that could generate odors that could cause complaints or dangerous gases (e.g., methane). No dead animals or vegetation present within catch basin. Deposits of garbage exceeding 1 cubic foot in volume. No condition present which would attract or support the breeding of insects or rodents. Damage to frame and/or top slab Corner of frame extends more than ¾ inch past curb face into the street (If applicable). Frame is even with curb. Top slab has holes larger than 2 square inches or cracks wider than ¼ inch. Top slab is free of holes and cracks. Frame not sitting flush on top slab, i.e., separation of more than ¾ inch of the frame from the top slab. Frame is sitting flush on top slab. Cracks in walls or bottom Cracks wider than ½ inch and longer than 3 feet, any evidence of soil particles entering catch basin through cracks, or maintenance person judges that catch basin is unsound. Catch basin is sealed and is structurally sound. Cracks wider than ½ inch and longer than 1 foot at the joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks. No cracks more than 1/4 inch wide at the joint of inlet/outlet pipe. Settlement/ misalignment Catch basin has settled more than 1 inch or has rotated more than 2 inches out of alignment. Basin replaced or repaired to design standards. Damaged pipe joints Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the catch basin at the joint of the inlet/outlet pipes. No cracks more than ¼-inch wide at the joint of inlet/outlet pipes. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe.Inlet/outlet pipes clear of sediment. Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables). No trash or debris in pipes. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 2017 City of Renton Surface Water Design Manual 12/12/2016 A-11 NO. 5 –CATCH BASINS AND MANHOLES MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Inlet/Outlet Pipe (cont.) Damaged inlet/outlet pipe Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes. No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe. Metal Grates (Catch Basins) Unsafe grate opening Grate with opening wider than 7/8 inch.Grate opening meets design standards. Trash and debris Trash and debris that is blocking more than 20% of grate surface. Grate free of trash and debris.footnote to guidelines for disposal Damaged or missing grate Grate missing or broken member(s) of the grate. Any open structure requires urgent maintenance. Grate is in place and meets design standards. Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place.Any open structure requires urgent maintenance. Cover/lid protects opening to structure. Locking mechanism not working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated.Self-locking cover/lid does not work. Mechanism opens with proper tools. Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs. of lift. Cover/lid can be removed and reinstalled by one maintenance person. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-12 NO. 6 –CONVEYANCE PIPES AND DITCHES MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Pipes Sediment & debris accumulation Accumulated sediment or debris that exceeds 20% of the diameter of the pipe. Water flows freely through pipes. Vegetation/root growth in pipe Vegetation/roots that reduce free movement of water through pipes. Water flows freely through pipes. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Damage to protective coating or corrosion Protective coating is damaged; rust or corrosion is weakening the structural integrity of any part of pipe. Pipe repaired or replaced. Damaged pipes Any dent that decreases the cross section area of pipe by more than 20% or is determined to have weakened structural integrity of the pipe. Pipe repaired or replaced. Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 square feet of ditch and slopes. Trash and debris cleared from ditches. Sediment accumulation Accumulated sediment that exceeds 20% of the design depth. Ditch cleaned/flushed of all sediment and debris so that it matches design. Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to City personnel or the public. Noxious and nuisance vegetation removed according to applicable regulations.No danger of noxious vegetation where City personnel or the public might normally be. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Excessive vegetation growth Vegetation that reduces free movement of water through ditches. Water flows freely through ditches. Erosion damage to slopes Any erosion observed on a ditch slope.Slopes are not eroding. Rock lining out of place or missing (If applicable) One layer or less of rock exists above native soil area 5 square feet or more, any exposed native soil. Replace rocks to design standards. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 2017 City of Renton Surface Water Design Manual 12/12/2016 A-13 NO. 7 –DEBRIS BARRIERS (E.G., TRASH RACKS) MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED. Site Trash and debris Trash or debris plugging more than 20% of the area of the barrier. Barrier clear to receive capacity flow. Sediment accumulation Sediment accumulation of greater than 20% of the area of the barrier Barrier clear to receive capacity flow. Structure Cracked,broken,or loose pipe or structure Structure which bars attached to is damaged –pipe is loose or cracked or concrete structure is cracked, broken,or loose. Structure barrier attached to is sound. Bars Incorrect bar spacing Bar spacing exceeds 6 inches.Bars have at most 6 inches spacing. Damaged or missing bars Bars are bent out of shape more than 3 inches. Bars in place with no bends more than ¾ inch. Bars are missing or entire barrier missing.Bars in place according to design. Bars are loose and rust is causing 50% deterioration to any part of barrier. Repair or replace barrier to design standards. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-14 NO. 8 –ENERGY DISSIPATERS MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED. Site Trash and debris Trash and/or debris accumulation.Dissipater clear of trash and/or debris. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Rock Pad Missing or moved rock Only one layer of rock exists above native soil in area five square feet or larger or any exposure of native soil. Rock pad prevents erosion. Dispersion Trench Pipe plugged with sediment Accumulated sediment that exceeds 20% of the design depth. Pipe cleaned/flushed so that it matches design. Not discharging water properly Visual evidence of water discharging at concentrated points along trench (normal condition is a “sheet flow” of water along trench). Water discharges from feature by sheet flow. Perforations plugged Over 1/4 of perforations in pipe are plugged with debris or sediment. Perforations freely discharge flow. Water flows out top of “distributor” catch basin. Water flows out of distributor catch basin during any storm less than the design storm. No flow discharges from distributor catch basin. Receiving area over- saturated Water in receiving area is causing or has potential of causing landslide problems. No danger of landslides. Gabions Damaged mesh Mesh of gabion broken, twisted or deformed so structure is weakened or rock may fall out. Mesh is intact, no rock missing. Corroded mesh Gabion mesh shows corrosion through more than ¼ of its gage. All gabion mesh capable of containing rock and retaining designed form. Collapsed or deformed baskets Gabion basket shape deformed due to any cause. All gabion baskets intact, structure stands as designed. Missing rock Any rock missing that could cause gabion to loose structural integrity. No rock missing. Manhole/Chamber Worn or damaged post, baffles or side of chamber Structure dissipating flow deteriorates to ½ or original size or any concentrated worn spot exceeding one square foot which would make structure unsound. Structure is in no danger of failing. Damage to wall, frame, bottom, and/or top slab Cracks wider than ½-inch or any evidence of soil entering the structure through cracks, or maintenance inspection personnel determines that the structure is not structurally sound. Manhole/chamber is sealed and structurally sound. Damaged pipe joints Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the structure at the joint of the inlet/outlet pipes. No soil or water enters and no water discharges at the joint of inlet/outlet pipes. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 2017 City of Renton Surface Water Design Manual 12/12/2016 A-15 NO. 9 –FENCING MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Site Erosion or holes under fence Erosion or holes more than 4 inches high and 12-18 inches wide permitting access through an opening under a fence. No access under the fence. Wood Posts, Boards and Cross Members Missing or damaged parts Missing or broken boards, post out of plumb by more than 6 inches or cross members broken No gaps on fence due to missing or broken boards, post plumb to within 1½ inches, cross members sound. Weakened by rotting or insects Any part showing structural deterioration due to rotting or insect damage All parts of fence are structurally sound. Damaged or failed post foundation Concrete or metal attachments deteriorated or unable to support posts. Post foundation capable of supporting posts even in strong wind. Metal Posts, Rails and Fabric Damaged parts Post out of plumb more than 6 inches.Post plumb to within 1½ inches. Top rails bent more than 6 inches.Top rail free of bends greater than 1 inch. Any part of fence (including post, top rails, and fabric) more than 1 foot out of design alignment. Fence is aligned and meets design standards. Missing or loose tension wire.Tension wire in place and holding fabric. Deteriorated paint or protective coating Part or parts that have a rusting or scaling condition that has affected structural adequacy. Structurally adequate posts or parts with a uniform protective coating. Openings in fabric Openings in fabric are such that an 8-inch diameter ball could fit through. Fabric mesh openings within 50% of grid size. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-16 NO.10 –GATES/BOLLARDS/ACCESS BARRIERS MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Chain Link Fencing Gate Damaged or missing members Missing gate.Gates in place. Broken or missing hinges such that gate cannot be easily opened and closed by a maintenance person. Hinges intact and lubed. Gate is working freely. Gate is out of plumb more than 6 inches and more than 1 foot out of design alignment. Gate is aligned and vertical. Missing stretcher bar, stretcher bands, and ties. Stretcher bar, bands, and ties in place. Locking mechanism does not lock gate Locking device missing, no-functioning or does not link to all parts. Locking mechanism prevents opening of gate. Openings in fabric Openings in fabric are such that an 8-inch diameter ball could fit through. Fabric mesh openings within 50% of grid size. Bar Gate Damaged or missing cross bar Cross bar does not swing open or closed, is missing or is bent to where it does not prevent vehicle access. Cross bar swings fully open and closed and prevents vehicle access. Locking mechanism does not lock gate Locking device missing, no-functioning or does not link to all parts. Locking mechanism prevents opening of gate. Support post damaged Support post does not hold cross bar up.Cross bar held up preventing vehicle access into facility. Bollards Damaged or missing bollards Bollard broken, missing, does not fit into support hole or hinge broken or missing. No access for motorized vehicles to get into facility. Bollards do not lock Locking assembly or lock missing or cannot be attached to lock bollard in place. No access for motorized vehicles to get into facility. Boulders Dislodged boulders Boulders not located to prevent motorized vehicle access. No access for motorized vehicles to get into facility. Evidence of vehicles circumventing boulders Motorized vehicles going around or between boulders. No access for motorized vehicles to get into facility. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 2017 City of Renton Surface Water Design Manual 12/12/2016 A-17 NO. 11 –GROUNDS (LANDSCAPING) MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Site Trash and debris Any trash and debris which exceed 1 cubic foot per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size office garbage can).In general, there should be no visual evidence of dumping. Trash and debris cleared from site. Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to City personnel or the public. Noxious and nuisance vegetation removed according to applicable regulations.No danger of noxious vegetation where City personnel or the public might normally be. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Excessive growth of grass/groundcover Grass or groundcover exceeds 18 inches in height. Grass or groundcover mowed to a height no greater than 6 inches. Trees and Shrubs Hazard tree identified Any tree or limb of a tree identified as having a potential to fall and cause property damage or threaten human life.A hazard tree identified by a qualified arborist must be removed as soon as possible. No hazard trees in facility. Damaged tree or shrub identified Limbs or parts of trees or shrubs that are split or broken which affect more than 25% of the total foliage of the tree or shrub. Trees and shrubs with less than 5% of total foliage with split or broken limbs. Trees or shrubs that have been blown down or knocked over. No blown down vegetation or knocked over vegetation.Trees or shrubs free of injury. Trees or shrubs which are not adequately supported or are leaning over, causing exposure of the roots. Tree or shrub in place and adequately supported; dead or diseased trees removed. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-18 NO. 12 –ACCESS ROADS MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Site Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 square feet (i.e., trash and debris would fill up one standards size garbage can). Roadway drivable by maintenance vehicles. Debris which could damage vehicle tires or prohibit use of road. Roadway drivable by maintenance vehicles. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Blocked roadway Any obstruction which reduces clearance above road surface to less than 14 feet. Roadway overhead clear to 14 feet high. Any obstruction restricting the access to a 10-to 12 foot width for a distance of more than 12 feet or any point restricting access to less than a 10 foot width. At least 12-foot of width on access road. Road Surface Erosion, settlement, potholes, soft spots, ruts Any surface defect which hinders or prevents maintenance access. Road drivable by maintenance vehicles. Vegetation on road surface Trees or other vegetation prevent access to facility by maintenance vehicles. Maintenance vehicles can access facility. Shoulders and Ditches Erosion Erosion within 1 foot of the roadway more than 8 inches wide and 6 inches deep. Shoulder free of erosion and matching the surrounding road. Weeds and brush Weeds and brush exceed 18 inches in height or hinder maintenance access. Weeds and brush cut to 2 inches in height or cleared in such a way as to allow maintenance access. Modular Grid Pavement Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Damaged or missing blocks/grids Access surface compacted because of broken on missing modular block. Access road surface restored so road infiltrates. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-24 NO. 17 –WETVAULT MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Site Trash and debris Trash and debris accumulated on facility site. Trash and debris removed from facility site. Treatment Area Trash and debris Any trash and debris accumulated in vault (includes floatables and non-floatables). No trash or debris in vault. Sediment accumulation Sediment accumulation in vault bottom exceeds the depth of the sediment zone plus 6 inches. No sediment in vault. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Vault Structure Damage to wall, frame, bottom, and/or top slab Cracks wider than ½-inch, any evidence of soil entering the structure through cracks, vault does not retain water or qualified inspection personnel determines that the vault is not structurally sound. Vault is sealed and structurally sound. Baffles damaged Baffles corroding, cracking, warping and/or showing signs of failure or baffle cannot be removed. Repair or replace baffles or walls to specifications. Ventilation area blocked/plugged Ventilation area blocked or plugged.No reduction of ventilation area exists. Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe.Inlet/outlet pipes clear of sediment. Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables). No trash or debris in pipes. Damaged inlet/outlet pipe Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes. No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe. Gravity Drain Inoperable valve Valve will not open and close.Valve opens and closes normally. Valve won’t seal Valve does not seal completely.Valve completely seals closed. Access Manhole Access cover/lid damaged or difficult to open Access cover/lid cannot be easily opened by one person.Corrosion/deformation of cover/lid. Access cover/lid can be opened by one person. Locking mechanism not working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated.Self-locking cover/lid does not work. Mechanism opens with proper tools. Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs of lift. Cover/lid can be removed and reinstalled by one maintenance person. Access doors/plate has gaps, doesn't cover completely Large access doors not flat and/or access opening not completely covered. Doors close flat;covers access opening completely. Lifting rings missing, rusted Lifting rings not capable of lifting weight of door or plate. Lifting rings sufficient to lift or remove door or plate. Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards. Allows maintenance person safe access. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-40 NO. 28 –NATIVE VEGETATED SURFACE/NATIVE VEGETATED LANDSCAPE BMP MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Site Trash and debris Trash and debris accumulated on the native vegetated surface/native vegetated landscape site. Native vegetated surface site free of any trash or debris. Vegetation Insufficient vegetation Less than two species each of native trees, shrubs, and groundcover occur in the design area. A minimum of two species each of native trees, shrubs, and groundcover is established and healthy. Poor vegetation coverage Less than 90% if the required vegetated area has healthy growth. A minimum of 90% of the required vegetated area has healthy growth. Undesirable vegetation present Weeds, blackberry, and other undesirable plants are invading more than 10% of vegetated area. Less than 10% undesirable vegetation occurs in the required native vegetated surface area. Vegetated Area Soil compaction Soil in the native vegetation area compacted. Less than 8% of native vegetation area is compacted. Insufficient vegetation Less than 3.5 square feet of native vegetation area for every 1 square foot of impervious surface. A minimum of 3.5 square feet of native vegetation area for every 1 square foot of impervious surface. Excess slope Slope of native vegetation area greater than 15%. Slope of native growth area does not exceed 15%. NO. 29 –PERFORATED PIPE CONNECTIONS BMP MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Preventive Blocking, obstructions Debris or trash limiting flow into perforated pipe system or outfall of BMP is plugged or otherwise nonfunctioning. Outfall of BMP is receiving designed flows from perforated pipe connection. Inflow Inflow impeded Inflow into the perforated pipe is partially or fully blocked or altered to prevent flow from getting into the pipe. Inflow to the perforated pipe is unimpeded. Pipe Trench Area Surface compacted Ground surface over the perforated pipe trench is compacted or covered with impermeable material. Ground surface over the perforated pipe is not compacted and free of any impervious cover. Outflow Outflow impeded Outflow from the perforated pipe into the public drainage system is blocked. Outflow to the public drainage system is unimpeded. Outfall Area Erosion or landslides Existence of the perforated pipe is causing or exasperating erosion or landslides. Perforated pipe system is sealed off and an alternative BMP is implemented. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 2017 City of Renton Surface Water Design Manual 12/12/2016 A-43 NO. 32 –RAINWATER HARVESTING BMP MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Preventive Insufficient storage volume No rain water in storage unit at the beginning of the rain season. Maximum storage available at the beginning of the rain season (Oct.1). Collection Area Trash and debris Trash of debris on collection area may plug filter system Collection area clear of trash and debris. Filter Restricted or plugged filter Filter is partially or fully plugged preventing water from getting in to the storage unit. Filter is allowing collection water into storage unit. NO. 33 –ROCK PAD BMP MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Site Trash and debris Trash and debris accumulated on rock pad site. Rock pad site free of any trash or debris. Rock Pad Area Insufficient rock pad size Rock pad is not 2 feet by 3 feet by 6 inches thick or as designed. Rock pad is 2 feet by 3 feet by 6 inches thick or as designed. Vegetation growth Vegetation is seen growing in or through rock pad. No vegetation within rock pad area. Rock Exposed soil Soil can be seen through the rock pad.Full thickness of the rock pad is in place, no soil visible through rock pad. NO. 34 –SHEET FLOW BMP MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Site Trash and debris Trash and debris accumulated on the sheet flow site. Sheet flow site free of any trash or debris. Sheet flow area Erosion Soil erosion occurring in sheet flow zone.Soil erosion is not occurring and rills and channels have been repaired. Concentrated flow Sheet flow is not occurring in the sheet flow zone. Sheet flow area is regraded to provide sheet flow. NO. 35 –SPLASH BLOCK BMP MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Site Trash and debris Trash and debris accumulated on the splash block. Splash block site free of any trash or debris. Splash Block Dislodged splash block Splash block moved from outlet of downspout. Splash block correctly positioned to catch discharge from downspout. Channeling Water coming off the splash block causing erosion. No erosion occurs from the splash block. Downspout water misdirected Water coming from the downspout is not discharging to the dispersal area. Water is discharging normally to the dispersal area. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 2017 City of Renton Surface Water Design Manual 12/12/2016 A-47 NO. 38 –SOIL AMENDMENT BMP MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Soil Media Unhealthy vegetation Vegetation not fully covering ground surface or vegetation health is poor. Yellowing: possible Nitrogen (N) deficiency.Poor growth: possible Phosphorous (P) deficiency.Poor flowering, spotting or curled leaves, or weak roots or stems: possible Potassium (K) deficiency. Plants are healthy and appropriate for site conditions Inadequate soil nutrients and structure In the fall, return leaf fall and shredded woody materials from the landscape to the site when possible Soil providing plant nutrients and structure Excessive vegetation growth Grass becomes excessively tall (greater than 10 inches); nuisance weeds and other vegetation start to take over. Healthy turf-“grasscycle” (mulch-mow or leave the clippings) to build turf health Weeds Preventive maintenance Avoid use of pesticides (bug and weed killers), like “weed & feed,”which damage the soil Fertilizer needed Where fertilization is needed (mainly turf and annual flower beds), a moderate fertilization program should be used which relies on compost, natural fertilizers or slow-release synthetic balanced fertilizers Integrated Pest Management (IPM) protocols for fertilization followed Bare spots Bare spots on soil No bare spots, area covered with vegetation or mulch mixed into the underlying soil. Compaction Poor infiltration due to soil compaction To remediate compaction,aerate soil, till to at least 8-inch depth, or further amend soil with compost and re-till If areas are turf, aerate compacted areas and top dress them with 1/4 to 1/2 inch of compost to renovate them If drainage is still slow, consider investigating alternative causes (e.g., high wet season groundwater levels, low permeability soils) Also consider site use and protection from compacting activities No soil compaction Poor infiltration Soils become waterlogged, do not appear to be infiltrating. Facility infiltrating properly Erosion/Scouring Erosion Areas of potential erosion are visible Causes of erosion (e.g., concentrate flow entering area, channelization of runoff) identified and damaged area stabilized (regrade, rock, vegetation, erosion control matting).For deep channels or cuts (over 3 inches in ponding depth), temporary erosion control measures in place until permanent repairs can be made Grass/Vegetation Unhealthy vegetation Less than 75% of planted vegetation is healthy with a generally good appearance. Healthy vegetation. Unhealthy plants removed/replaced. Appropriate vegetation planted in terms of exposure, soil and soil moisture. Noxious Weeds Noxious weeds Listed noxious vegetation is present (refer to current County noxious weed list). No noxious weeds present. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-48 NO. 39 –RETAINED TREES MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Tree Dead or declining Dead, damaged, or declining Tree replaced per planting plan or acceptable substitute NO. 40 –FILTERRA SYSTEM MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED In addition to the specific maintenance criteria provided below, all manufacturer’s requirements shall be followed. Facility –General Requirements Life cycle Once per year, except mulch and trash removal twice per year Facility is re-inspected and any needed maintenance performed Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries, or paint Materials removed and disposed of according to applicable regulations.Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Inlet Excessive sediment or trash accumulation Accumulated sediments or trash impair free flow of water into system Inlet should be free of obstructions allowing free distributed flow of water into system Mulch Cover Trash and floatable debris accumulation Excessive trash and/or debris accumulation Minimal trash or other debris on mulch cover.Mulch cover raked level. “Ponding” of water on mulch cover “Ponding” in unit could be indicative of clogging due to excessive fine sediment accumulation or spill of petroleum oils Stormwater should drain freely and evenly through mulch cover Proprietary Filter Media/ Vegetation Substrate “Ponding” of water on mulch cover after mulch cover has been maintained Excessive fine sediment passes the mulch cover and clogs the filter media/vegetative substrate Stormwater should drain freely and evenly through mulch cover.Replace substrate and vegetation when needed Vegetation Plants not growing or in poor condition Soil/mulch too wet, evidence of spill, incorrect plant selection, pest infestation, and/or vandalism to plants Plants should be healthy and pest free Media/mulch too dry Irrigation is required Plants absent Plants absent Appropriate plants are present Excessive plant growth Excessive plant growth inhibits facility function or becomes a hazard for pedestrian and vehicular circulation and safety Pruning and/or thinning vegetation maintains proper plant density.Appropriate plants are present. Structure Structure has visible cracks Cracks wider than ½inch Evidence of soil particles entering the structure through the cracks Structure is sealed and structurally sound 2020 D. R. STRONG Consulting Engineers Inc. Page 71 MAPLE HIGHLANDS Technical Information Report Renton, Washington APPENDICES 2020 D. R. STRONG Consulting Engineers Inc. Page 72 MAPLE HIGHLANDS Technical Information Report Renton, Washington APPENDIX “A” LEGAL DESCRIPTION LOT 6, BLOCK 1, CEDAR PARK FIVE ACRE TRACTS, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 15 OF PLATS, PAGE 91, IN KING COUNTY,WASHINGTON; EXCEPT THE FOLLOWING DESCRIBED PROPERTY: BEGINNING AT THE SOUTHWEST CORNER OF SAID LOT 6; THENCE NORTH 30 FEET TO THE TRUE POINT OF BEGINNING; THENCE CONTINUING NORTH 75 FEET; THENCE EAST 122 FEET; THENCE SOUTH 75 FEET; THENCE WEST 122 FEET TO THE TRUE POINT OF BEGINNING. SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON. 2020 D. R. STRONG Consulting Engineers Inc. Page 73 MAPLE HIGHLANDS Technical Information Report Renton, Washington APPENDIX “B” BOND QUANTITY WORKSHEET Planning Division |1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200 • • Section I: Project Information • • • Section II: Bond Quantities Worksheets • •Section II.a EROSION CONTROL (Stabilization/Erosion Sediment Control (ESC)) •Section II.b TRANSPORTATION (Street and Site Improvements) •Section II.c DRAINAGE (Drainage and Stormwater Facilities): •Section II.d WATER - ONLY APPLICABLE IF WATER SERVICE IS PROVIDED BY CITY OF RENTON •Section II.e SANITARY SEWER - ONLY APPLICABLE IF SEWER SERVICE IS PROVIDED BY CITY OF RENTON • • • • • • Section III. Bond Worksheet •This section calculates the required Permit Bond for construction permit issuance as well as the required Maintenance Bond for project close-out submittals to release the permit bond on a project. All unit prices include labor, equipment, materials, overhead and profit. Complete the 'Quantity' columns for each of the appropriate section(s). Include existing Right-of-Way (ROW), Future Public Improvements and Private Improvements. The 'Quantity Remaining' column is only to be used when a project is under construction. The City allows one (1) bond reduction during the life of the project with the exception of the maintenance period reduction. Excel will auto-calculate and auto-populate the relevant fields and subtotals throughout the document. Only the 'Quantity' columns should need completing. Additional items not included in the lists can be added under the "write-in" sections. Provide a complete description, cost estimate and unit of measure for each write-in item. Note: Private improvements, with the exception of stormwater facilities, are not included in the bond amount calculation, but must be entered on the form. Stormwater facilities (public and private) are required to be included in the bond amount. BOND QUANTITY WORKSHEET INSTRUCTIONS This worksheet is intended to be a "working" copy of the bond quantity worksheet, which will be used throughout all phases of the project, from initial submittal to project close-out approval. Submit this workbook, in its entirety, as follows: The following forms are to be completed by the engineer/developer/applicant as applicable to the project: The Bond Worksheet form will auto-calculate and auto-populate from the information provided in Section I and Section II. This section includes all pertinent information for the project Section II contains a separate spreadsheet TAB for each of the following specialties: (1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for civil construction permit submittal. Hard copies are to be included as part of the Technical Information Report (TIR). (1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for final close-out submittal. This section must be completed in its entirety Information from this section auto-populates to all other relevant areas of the workbook Page 1 of 14 Ref 8-H Bond Quantity Worksheet INSTRUCTIONS Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 Planning Division |1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200 Date Prepared: Name: PE Registration No: Firm Name: Firm Address: Phone No. Email Address: Project Name: Project Owner: CED Plan # (LUA):Phone: CED Permit # (U):Address: Site Address: Street Intersection:Addt'l Project Owner: Parcel #(s):Phone: Address: Clearing and grading greater than or equal to 5,000 board feet of timber? Yes/No:NO Water Service Provided by: If Yes, Provide Forest Practice Permit #:Sewer Service Provided by: SITE IMPROVEMENT BOND QUANTITY WORKSHEET PROJECT INFORMATION KC WATER DISTRICT 90 CITY OF RENTON 1 Select the current project status/phase from the following options: For Approval - Preliminary Data Enclosed, pending approval from the City; For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City; Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal Engineer Stamp Required (all cost estimates must have original wet stamp and signature) Clearing and Grading Utility Providers N/A Project Location and Description Project Owner Information Maple Highlands Seattle, WA 98103 145750-0025 Harbour Homes, LLC LUA-18-000633 (206) 315-8130 2/14/2020 Prepared by: FOR APPROVALProject Phase 1 yoshio.piediscalzi@drstrong.com Yoshio L. Piediscalzi 53232 DR Strong Consulting Engineers 620 7th Avenue, Kirkland, WA 98033 (425) 827-3063 16210 SE 134th Street, Renton, WA 98059 400 N 34th Street, Suite 300 Approx. 162nd Ave SE and SE 134th St Abbreviated Legal Description: LOT 6, BLOCK 1, CEDAR PARK FIVE ACRE TRACTS, ACCORDING TO PLAT THEREOF RECORDED IN VOLUME 15 OF PLATS, PAGE 91, RECORDS OF KING COUNTY, WASHINGTON. Page 2 of 14 Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 CED Permit #: Unit Reference #Price Unit Quantity Cost Backfill & compaction-embankment ESC-1 6.50$ CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 80.00$ Each 20 1,600.00 Catch Basin Protection ESC-3 35.50$ Each 25 887.50 Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)95.00$ CY Ditching ESC-5 9.00$ CY Excavation-bulk ESC-6 2.00$ CY Fence, silt ESC-7 SWDM 5.4.3.1 1.50$ LF 3554 5,331.00 Fence, Temporary (NGPE)ESC-8 1.50$ LF 313 469.50 Geotextile Fabric ESC-9 2.50$ SY 375 937.50 Hay Bale Silt Trap ESC-10 0.50$ Each Hydroseeding ESC-11 SWDM 5.4.2.4 0.80$ SY 14332 11,465.60 Interceptor Swale / Dike ESC-12 1.00$ LF 1016 1,016.00 Jute Mesh ESC-13 SWDM 5.4.2.2 3.50$ SY Level Spreader ESC-14 1.75$ LF Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.50$ SY Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.00$ SY Piping, temporary, CPP, 6"ESC-17 12.00$ LF Piping, temporary, CPP, 8"ESC-18 14.00$ LF Piping, temporary, CPP, 12"ESC-19 18.00$ LF 70 1,260.00 Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.00$ SY 375 1,500.00 Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)45.00$ CY 8 360.00 Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 1,800.00$ Each Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,200.00$ Each 1 3,200.00 Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,200.00$ Each Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 19.00$ LF Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 70.00$ LF Seeding, by hand ESC-27 SWDM 5.4.2.4 1.00$ SY Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 8.00$ SY Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 10.00$ SY TESC Supervisor ESC-30 110.00$ HR 80 8,800.00 Water truck, dust control ESC-31 SWDM 5.4.7 140.00$ HR 16 2,240.00 Unit Reference #Price Unit Quantity Cost EROSION/SEDIMENT SUBTOTAL:39,067.10 SALES TAX @ 10%3,906.71 EROSION/SEDIMENT TOTAL:42,973.81 (A) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR EROSION & SEDIMENT CONTROL Description No. (A) WRITE-IN-ITEMS Page 3 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost GENERAL ITEMS Backfill & Compaction- embankment GI-1 6.00$ CY Backfill & Compaction- trench GI-2 9.00$ CY 5844 52,596.00 1075 9,675.00 Clear/Remove Brush, by hand (SY)GI-3 1.00$ SY Bollards - fixed GI-4 240.74$ Each Bollards - removable GI-5 452.34$ Each Clearing/Grubbing/Tree Removal GI-6 10,000.00$ Acre 1.172 11,720.00 0.753 7,530.00 3.229 32,290.00 Excavation - bulk GI-7 2.00$ CY 8050 16,100.00 Excavation - Trench GI-8 5.00$ CY 5844 29,220.00 1075 5,375.00 Fencing, cedar, 6' high GI-9 20.00$ LF 285 5,700.00 Fencing, chain link, 4'GI-10 38.31$ LF Fencing, chain link, vinyl coated, 6' high GI-11 20.00$ LF 460 9,200.00 Fencing, chain link, gate, vinyl coated, 20' GI-12 1,400.00$ Each Fill & compact - common barrow GI-13 25.00$ CY 9206 230,150.00 Fill & compact - gravel base GI-14 27.00$ CY Fill & compact - screened topsoil GI-15 39.00$ CY Gabion, 12" deep, stone filled mesh GI-16 65.00$ SY Gabion, 18" deep, stone filled mesh GI-17 90.00$ SY Gabion, 36" deep, stone filled mesh GI-18 150.00$ SY Grading, fine, by hand GI-19 2.50$ SY Grading, fine, with grader GI-20 2.00$ SY Monuments, 3' Long GI-21 250.00$ Each 2 500.00 Sensitive Areas Sign GI-22 7.00$ Each Sodding, 1" deep, sloped ground GI-23 8.00$ SY Surveying, line & grade GI-24 850.00$ Day 4 3,400.00 4 3,400.00 Surveying, lot location/lines GI-25 1,800.00$ Acre 4 7,200.00 Topsoil Type A (imported)GI-26 28.50$ CY Traffic control crew ( 2 flaggers )GI-27 120.00$ HR 48 5,760.00 Trail, 4" chipped wood GI-28 8.00$ SY Trail, 4" crushed cinder GI-29 9.00$ SY Trail, 4" top course GI-30 12.00$ SY Conduit, 2"GI-31 5.00$ LF Wall, retaining, concrete GI-32 55.00$ SF Wall, rockery GI-33 15.00$ SF SUBTOTAL THIS PAGE:99,796.00 25,980.00 304,040.00 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B)(C) Page 4 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B)(C) ROAD IMPROVEMENT/PAVEMENT/SURFACING AC Grinding, 4' wide machine < 1000sy RI-1 30.00$ SY 1000 30,000.00 AC Grinding, 4' wide machine 1000-2000sy RI-2 16.00$ SY 1000 16,000.00 AC Grinding, 4' wide machine > 2000sy RI-3 10.00$ SY 1073 10,730.00 AC Removal/Disposal RI-4 35.00$ SY Barricade, Type III ( Permanent )RI-5 56.00$ LF Guard Rail RI-6 30.00$ LF Curb & Gutter, rolled RI-7 17.00$ LF Curb & Gutter, vertical RI-8 12.50$ LF 604 7,550.00 1177 14,712.50 Curb and Gutter, demolition and disposal RI-9 18.00$ LF Curb, extruded asphalt RI-10 5.50$ LF Curb, extruded concrete RI-11 7.00$ LF Sawcut, asphalt, 3" depth RI-12 1.85$ LF 450 832.50 Sawcut, concrete, per 1" depth RI-13 3.00$ LF Sealant, asphalt RI-14 2.00$ LF 450 900.00 Shoulder, gravel, 4" thick RI-15 15.00$ SY Sidewalk, 4" thick RI-16 38.00$ SY 157 5,966.00 802 30,476.00 Sidewalk, 4" thick, demolition and disposal RI-17 32.00$ SY Sidewalk, 5" thick RI-18 41.00$ SY Sidewalk, 5" thick, demolition and disposal RI-19 40.00$ SY Sign, Handicap RI-20 85.00$ Each Striping, per stall RI-21 7.00$ Each Striping, thermoplastic, ( for crosswalk )RI-22 3.00$ SF 133 399.00 Striping, 4" reflectorized line RI-23 0.50$ LF Additional 2.5" Crushed Surfacing RI-24 3.60$ SY HMA 1/2" Overlay 1.5" RI-25 14.00$ SY HMA 1/2" Overlay 2"RI-26 18.00$ SY 3073 55,314.00 HMA Road, 2", 4" rock, First 2500 SY RI-27 28.00$ SY 300 8,400.00 HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 21.00$ SY HMA Road, 4", 6" rock, First 2500 SY RI-29 45.00$ SY 732 32,940.00 1551 69,795.00 HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 37.00$ SY HMA Road, 4", 4.5" ATB RI-31 38.00$ SY Gravel Road, 4" rock, First 2500 SY RI-32 15.00$ SY Gravel Road, 4" rock, Qty. over 2500 SY RI-33 10.00$ SY Thickened Edge RI-34 8.60$ LF SUBTOTAL THIS PAGE:168,632.50 115,382.50 (B)(C)(D)(E) Page 5 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B)(C) PARKING LOT SURFACING No. 2" AC, 2" top course rock & 4" borrow PL-1 21.00$ SY 2" AC, 1.5" top course & 2.5" base course PL-2 28.00$ SY 4" select borrow PL-3 5.00$ SY 1.5" top course rock & 2.5" base course PL-4 14.00$ SY SUBTOTAL PARKING LOT SURFACING: (B)(C)(D)(E) LANDSCAPING & VEGETATION No. Street Trees LA-1 200.00$ 11 2,200.00 16 3,200.00 Median Landscaping LA-2 Right-of-Way Landscaping LA-3 Wetland Landscaping LA-4 SUBTOTAL LANDSCAPING & VEGETATION:2,200.00 3,200.00 (B)(C)(D)(E) TRAFFIC & LIGHTING No. Signs TR-1 200.00$ 4 800.00 Street Light System ( # of Poles)TR-2 3,000.00$ 8 24,000.00 11 33,000.00 Traffic Signal TR-3 Traffic Signal Modification TR-4 SUBTOTAL TRAFFIC & LIGHTING:24,000.00 33,800.00 (B)(C)(D)(E) WRITE-IN-ITEMS SUBTOTAL WRITE-IN ITEMS: STREET AND SITE IMPROVEMENTS SUBTOTAL:294,628.50 178,362.50 304,040.00 SALES TAX @ 10%29,462.85 17,836.25 30,404.00 STREET AND SITE IMPROVEMENTS TOTAL:324,091.35 196,198.75 334,444.00 (B)(C)(D)(E) Page 6 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/D D-1 26.00$ SY 35 910.00 * (CBs include frame and lid) Beehive D-2 90.00$ Each Through-curb Inlet Framework D-3 400.00$ Each 2 800.00 CB Type I D-4 1,500.00$ Each 1 1,500.00 6 9,000.00 5 7,500.00 CB Type IL D-5 1,750.00$ Each 2 3,500.00 2 3,500.00 CB Type II, 48" diameter D-6 2,300.00$ Each 7 16,100.00 2 4,600.00 for additional depth over 4' D-7 480.00$ FT 65 31,200.00 3 1,440.00 CB Type II, 54" diameter D-8 2,500.00$ Each for additional depth over 4'D-9 495.00$ FT CB Type II, 60" diameter D-10 2,800.00$ Each for additional depth over 4'D-11 600.00$ FT CB Type II, 72" diameter D-12 6,000.00$ Each for additional depth over 4'D-13 850.00$ FT CB Type II, 96" diameter D-14 14,000.00$ Each for additional depth over 4'D-15 925.00$ FT Trash Rack, 12"D-16 350.00$ Each Trash Rack, 15"D-17 410.00$ Each Trash Rack, 18"D-18 480.00$ Each Trash Rack, 21"D-19 550.00$ Each Cleanout, PVC, 4"D-20 150.00$ Each Cleanout, PVC, 6"D-21 170.00$ Each 28 4,760.00 Cleanout, PVC, 8"D-22 200.00$ Each Culvert, PVC, 4" D-23 10.00$ LF Culvert, PVC, 6" D-24 13.00$ LF 1342 17,446.00 Culvert, PVC, 8" D-25 15.00$ LF Culvert, PVC, 12" D-26 23.00$ LF 298 6,854.00 Culvert, PVC, 15" D-27 35.00$ LF Culvert, PVC, 18" D-28 41.00$ LF 889 36,449.00 Culvert, PVC, 24"D-29 56.00$ LF Culvert, PVC, 30" D-30 78.00$ LF Culvert, PVC, 36" D-31 130.00$ LF Culvert, CMP, 8"D-32 19.00$ LF Culvert, CMP, 12"D-33 29.00$ LF SUBTOTAL THIS PAGE:95,603.00 20,250.00 29,706.00 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) Page 7 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) DRAINAGE (Continued) Culvert, CMP, 15"D-34 35.00$ LF Culvert, CMP, 18"D-35 41.00$ LF Culvert, CMP, 24"D-36 56.00$ LF Culvert, CMP, 30"D-37 78.00$ LF Culvert, CMP, 36"D-38 130.00$ LF Culvert, CMP, 48"D-39 190.00$ LF Culvert, CMP, 60"D-40 270.00$ LF Culvert, CMP, 72"D-41 350.00$ LF Culvert, Concrete, 8"D-42 42.00$ LF Culvert, Concrete, 12"D-43 48.00$ LF Culvert, Concrete, 15"D-44 78.00$ LF Culvert, Concrete, 18"D-45 48.00$ LF Culvert, Concrete, 24"D-46 78.00$ LF Culvert, Concrete, 30"D-47 125.00$ LF Culvert, Concrete, 36"D-48 150.00$ LF Culvert, Concrete, 42"D-49 175.00$ LF Culvert, Concrete, 48"D-50 205.00$ LF Culvert, CPE Triple Wall, 6" D-51 14.00$ LF Culvert, CPE Triple Wall, 8" D-52 16.00$ LF Culvert, CPE Triple Wall, 12" D-53 24.00$ LF Culvert, CPE Triple Wall, 15" D-54 35.00$ LF Culvert, CPE Triple Wall, 18" D-55 41.00$ LF Culvert, CPE Triple Wall, 24" D-56 56.00$ LF Culvert, CPE Triple Wall, 30" D-57 78.00$ LF Culvert, CPE Triple Wall, 36" D-58 130.00$ LF Culvert, LCPE, 6"D-59 60.00$ LF Culvert, LCPE, 8"D-60 72.00$ LF Culvert, LCPE, 12"D-61 84.00$ LF 181 15,204.00 705 59,220.00 Culvert, LCPE, 15"D-62 96.00$ LF Culvert, LCPE, 18"D-63 108.00$ LF 25 2,700.00 Culvert, LCPE, 24"D-64 120.00$ LF Culvert, LCPE, 30"D-65 132.00$ LF Culvert, LCPE, 36"D-66 144.00$ LF Culvert, LCPE, 48"D-67 156.00$ LF Culvert, LCPE, 54"D-68 168.00$ LF SUBTOTAL THIS PAGE:15,204.00 61,920.00 (B)(C)(D)(E) Page 8 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) DRAINAGE (Continued) Culvert, LCPE, 60"D-69 180.00$ LF Culvert, LCPE, 72"D-70 192.00$ LF Culvert, HDPE, 6"D-71 42.00$ LF Culvert, HDPE, 8"D-72 42.00$ LF Culvert, HDPE, 12"D-73 74.00$ LF Culvert, HDPE, 15"D-74 106.00$ LF Culvert, HDPE, 18"D-75 138.00$ LF Culvert, HDPE, 24"D-76 221.00$ LF Culvert, HDPE, 30"D-77 276.00$ LF Culvert, HDPE, 36"D-78 331.00$ LF Culvert, HDPE, 48"D-79 386.00$ LF Culvert, HDPE, 54"D-80 441.00$ LF Culvert, HDPE, 60"D-81 496.00$ LF Culvert, HDPE, 72"D-82 551.00$ LF Pipe, Polypropylene, 6"D-83 84.00$ LF Pipe, Polypropylene, 8"D-84 89.00$ LF Pipe, Polypropylene, 12"D-85 95.00$ LF Pipe, Polypropylene, 15"D-86 100.00$ LF Pipe, Polypropylene, 18"D-87 106.00$ LF Pipe, Polypropylene, 24"D-88 111.00$ LF Pipe, Polypropylene, 30"D-89 119.00$ LF Pipe, Polypropylene, 36"D-90 154.00$ LF Pipe, Polypropylene, 48"D-91 226.00$ LF Pipe, Polypropylene, 54"D-92 332.00$ LF Pipe, Polypropylene, 60"D-93 439.00$ LF Pipe, Polypropylene, 72"D-94 545.00$ LF Culvert, DI, 6"D-95 61.00$ LF Culvert, DI, 8"D-96 84.00$ LF Culvert, DI, 12"D-97 106.00$ LF Culvert, DI, 15"D-98 129.00$ LF Culvert, DI, 18"D-99 152.00$ LF Culvert, DI, 24"D-100 175.00$ LF Culvert, DI, 30"D-101 198.00$ LF Culvert, DI, 36"D-102 220.00$ LF Culvert, DI, 48"D-103 243.00$ LF Culvert, DI, 54"D-104 266.00$ LF Culvert, DI, 60"D-105 289.00$ LF Culvert, DI, 72"D-106 311.00$ LF SUBTOTAL THIS PAGE: (B)(C)(D)(E) Page 9 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) Specialty Drainage Items Ditching SD-1 9.50$ CY Flow Dispersal Trench (1,436 base+)SD-3 28.00$ LF French Drain (3' depth)SD-4 26.00$ LF 1415 36,790.00 Geotextile, laid in trench, polypropylene SD-5 3.00$ SY Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,000.00$ Each Pond Overflow Spillway SD-7 16.00$ SY Restrictor/Oil Separator, 12"SD-8 1,150.00$ Each Restrictor/Oil Separator, 15"SD-9 1,350.00$ Each Restrictor/Oil Separator, 18"SD-10 1,700.00$ Each Riprap, placed SD-11 42.00$ CY 8 336.00 Tank End Reducer (36" diameter)SD-12 1,200.00$ Each Infiltration pond testing SD-13 125.00$ HR Permeable Pavement SD-14 Permeable Concrete Sidewalk SD-15 Culvert, Box __ ft x __ ft SD-16 SUBTOTAL SPECIALTY DRAINAGE ITEMS:336.00 36,790.00 (B)(C)(D)(E) STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch) Detention Pond SF-1 Each Detention Tank SF-2 Each Detention Vault SF-3 400,000.00$ Each 1 400,000.00 Infiltration Pond SF-4 Each Infiltration Tank SF-5 Each Infiltration Vault SF-6 Each Infiltration Trenches SF-7 Each Basic Biofiltration Swale SF-8 Each Wet Biofiltration Swale SF-9 Each Wetpond SF-10 Each Wetvault SF-11 Each Sand Filter SF-12 Each Sand Filter Vault SF-13 Each Linear Sand Filter SF-14 Each Proprietary Facility SF-15 Each Bioretention Facility SF-16 Each SUBTOTAL STORMWATER FACILITIES:400,000.00 (B)(C)(D)(E) Page 10 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs) Yard Drain WI-1 950.00$ EA 5 4,750.00 WI-2 WI-3 WI-4 WI-5 WI-6 WI-7 WI-8 WI-9 WI-10 WI-11 WI-12 WI-13 WI-14 WI-15 SUBTOTAL WRITE-IN ITEMS:4,750.00 DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:111,143.00 482,170.00 71,246.00 SALES TAX @ 10%11,114.30 48,217.00 7,124.60 DRAINAGE AND STORMWATER FACILITIES TOTAL:122,257.30 530,387.00 78,370.60 (B)(C)(D)(E) Page 11 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Connection to Existing Watermain W-1 2,000.00$ Each Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 50.00$ LF Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 56.00$ LF Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 60.00$ LF Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 70.00$ LF Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 80.00$ LF Gate Valve, 4 inch Diameter W-7 500.00$ Each Gate Valve, 6 inch Diameter W-8 700.00$ Each Gate Valve, 8 Inch Diameter W-9 800.00$ Each Gate Valve, 10 Inch Diameter W-10 1,000.00$ Each Gate Valve, 12 Inch Diameter W-11 1,200.00$ Each Fire Hydrant Assembly W-12 4,000.00$ Each Permanent Blow-Off Assembly W-13 1,800.00$ Each Air-Vac Assembly, 2-Inch Diameter W-14 2,000.00$ Each Air-Vac Assembly, 1-Inch Diameter W-15 1,500.00$ Each Compound Meter Assembly 3-inch Diameter W-16 8,000.00$ Each Compound Meter Assembly 4-inch Diameter W-17 9,000.00$ Each Compound Meter Assembly 6-inch Diameter W-18 10,000.00$ Each Pressure Reducing Valve Station 8-inch to 10-inch W-19 20,000.00$ Each WATER SUBTOTAL: SALES TAX @ 10% WATER TOTAL: (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR WATER Quantity Remaining (Bond Reduction) (B)(C) Page 12 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.d WATER Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Clean Outs SS-1 1,000.00$ Each 14 14,000.00 Grease Interceptor, 500 gallon SS-2 8,000.00$ Each Grease Interceptor, 1000 gallon SS-3 10,000.00$ Each Grease Interceptor, 1500 gallon SS-4 15,000.00$ Each Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 80.00$ LF Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 95.00$ LF 748 71,060.00 Sewer Pipe, PVC, 8 inch Diameter SS-7 105.00$ LF 435 45,675.00 462 48,510.00 Sewer Pipe, PVC, 12 Inch Diameter SS-8 120.00$ LF Sewer Pipe, DI, 8 inch Diameter SS-9 115.00$ LF Sewer Pipe, DI, 12 Inch Diameter SS-10 130.00$ LF Manhole, 48 Inch Diameter SS-11 6,000.00$ Each 10 60,000.00 3 18,000.00 Manhole, 54 Inch Diameter SS-13 6,500.00$ Each Manhole, 60 Inch Diameter SS-15 7,500.00$ Each 1 7,500.00 Manhole, 72 Inch Diameter SS-17 8,500.00$ Each Manhole, 96 Inch Diameter SS-19 14,000.00$ Each Pipe, C-900, 12 Inch Diameter SS-21 180.00$ LF 872 156,960.00 Outside Drop SS-24 1,500.00$ LS Inside Drop SS-25 1,000.00$ LS Sewer Pipe, PVC, _10 Inch Diameter SS-26 115.00$ LF 977 112,355.00 Lift Station (Entire System)SS-27 LS SANITARY SEWER SUBTOTAL:382,490.00 66,510.00 85,060.00 SALES TAX @ 10%38,249.00 6,651.00 8,506.00 SANITARY SEWER TOTAL:420,739.00 73,161.00 93,566.00 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR SANITARY SEWER Quantity Remaining (Bond Reduction) (B)(C) Page 13 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 Planning Division |1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200 Date: Name:Project Name: PE Registration No:CED Plan # (LUA): Firm Name:CED Permit # (U): Firm Address:Site Address: Phone No.Parcel #(s): Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a) Existing Right-of-Way Improvements Subtotal (b)(b)744,830.35$ Future Public Improvements Subtotal (c)269,359.75$ Stormwater & Drainage Facilities (Public & Private) Subtotal (d)(d)731,014.90$ (e) (f) Site Restoration Civil Construction Permit Maintenance Bond 349,041.00$ Bond Reduction 2 Construction Permit Bond Amount 3 Minimum Bond Amount is $10,000.00 1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering. 2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will cover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering. * Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton. ** Note: All prices include labor, equipment, materials, overhead and profit. (425) 827-3063 yoshio.piediscalzi@drstrong.com Maple Highlands LUA-18-000633 16210 SE 134th Street, Renton, WA 98059 145750-0025 FOR APPROVAL 620 7th Avenue, Kirkland, WA 98033 1,891,234.24$ P (a) x 100% SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS 2/14/2020 Yoshio L. Piediscalzi 53232 DR Strong Consulting Engineers R ((b x 150%) + (d x 100%)) S (e) x 150% + (f) x 100% Bond Reduction: Existing Right-of-Way Improvements (Quantity Remaining)2 Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2 T (P +R - S) Prepared by:Project Information CONSTRUCTION BOND AMOUNT */** (prior to permit issuance) EST1 ((b) + (c) + (d)) x 20% -$ MAINTENANCE BOND */** (after final acceptance of construction) 42,973.81$ 744,830.35$ 1,848,260.43$ 42,973.81$ -$ 731,014.90$ -$ Page 14 of 14 Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 8/13/2021 2020 D. R. STRONG Consulting Engineers Inc. Page 74 MAPLE HIGHLANDS Technical Information Report Renton, Washington APPENDIX “C” CSWPPP Construction Stormwater General Permit (CSWGP) Stormwater Pollution Prevention Plan (SWPPP) for Maple Highlands Prepared for: The Washington State Department of Ecology Northwest Regional Office 3190 160th Avenue SE Bellevue, WA 98008-5452 Permittee / Owner Developer Operator / Contractor Harbour Homes, LLC 400 N. 34th Street, Suite 300 Seattle, WA 98103 Harbour Homes, LLC 400 N. 34th Street, Suite 300 Seattle, WA 98103 TBD 16210 SE 134th Street, Renton, WA 98059 Certified Erosion and Sediment Control Lead (CESCL) Name Organization Contact Phone Number TBD Earth Solutions NW (425) 449-4704 SWPPP Prepared By Name Organization Contact Phone Number Yoshio L. Piediscalzi D.R. STRONG Consulting Engineers Inc. (425) 827-3063 SWPPP Preparation Date 09/04/2019 Project Construction Dates Activity / Phase Start Date End Date Site Development TBD TBD Page | 1 Table of Contents 1 Project Information .............................................................................................................. 4 1.1 Existing Conditions ....................................................................................................... 4 1.2 Proposed Construction Activities ................................................................................... 5 2.0 Construction Stormwater Best Management Practices (BMPs) ........................................... 6 2.1 The 12 Elements ........................................................................................................... 6 2.1.1 Element 1: Preserve Vegetation / Mark Clearing Limits ........................................ 6 2.1.2 Element 2: Establish Construction Access ............................................................ 7 2.1.3 Element 3: Control Flow Rates ............................................................................. 8 2.1.4 Element 4: Install Sediment Controls (2.1.4) ......................................................... 9 2.1.5 Element 5: Stabilize Soils ....................................................................................10 2.1.6 Element 6: Protect Slopes....................................................................................11 2.1.9 Element 9: Control Pollutants ...............................................................................14 2.1.10 Element 10: Control Dewatering ..........................................................................17 2.1.11 Element 11: Maintain BMPs (2.1.11) ....................................................................18 2.1.12 Element 12: Manage the Project ..........................................................................19 2.1.13 Element 13: Protect Low Impact Development (LID) BMPs .................................23 3.0 Pollution Prevention Team .................................................................................................23 4.0 Monitoring and Sampling Requirements ............................................................................24 4.1 Site Inspection ............................................................................................................ 24 4.2.1 Turbidity Sampling ...............................................................................................24 4.2.2 pH Sampling ........................................................................................................27 5.0 Discharges to 303(d) or Total Maximum Daily Load (TMDL) Waterbodies (5.0) .................28 5.1 303(d) Listed Waterbodies .......................................................................................... 28 5.2 TMDL Waterbodies ..................................................................................................... 28 6.0 Reporting and Record Keeping (6.0) ..................................................................................30 6.1 Record Keeping .......................................................................................................... 30 6.1.1 Site Log Book ......................................................................................................30 6.1.2 Records Retention ...............................................................................................30 6.1.3 Updating the SWPPP ...........................................................................................30 6.2 Reporting .................................................................................................................... 31 6.2.1 Discharge Monitoring Reports ..............................................................................31 6.2.2 Notification of Noncompliance ..............................................................................31 Page | 2 List of Tables Table 1 – Summary of Site Pollutant Constituents ..................................................... 4 Table 2 – Pollutants ..................................................................................................... 14 Table 3 – pH-Modifying Sources ................................................................................ 16 Table 4 – Dewatering BMPs ........................................................................................ 17 Table 5 – Management ................................................................................................ 19 Table 6 – BMP Implementation Schedule .................................................................. 21 Table 7 – Team Information ........................................................................................ 23 Table 8 – Turbidity Sampling Method ........................................................................ 25 Table 9 – pH Sampling Method .................................................................................. 27 List of Appendices A. Site Map B. BMP Detail C. Correspondence D. Site Inspection Form E. Construction Stormwater General Permit (CSWGP) F. 303(d) List Waterbodies / TMDL Waterbodies Information G. Contaminated Site Information H. Engineering Calculations Page | 3 List of Acronyms and Abbreviations Acronym / Abbreviation Explanation 303(d) Section of the Clean Water Act pertaining to Impaired Waterbodies BFO Bellingham Field Office of the Department of Ecology BMP(s) Best Management Practice(s) CESCL Certified Erosion and Sediment Control Lead CO2 Carbon Dioxide CRO Central Regional Office of the Department of Ecology CSWGP Construction Stormwater General Permit CWA Clean Water Act DMR Discharge Monitoring Report DO Dissolved Oxygen Ecology Washington State Department of Ecology EPA United States Environmental Protection Agency ERO Eastern Regional Office of the Department of Ecology ERTS Environmental Report Tracking System ESC Erosion and Sediment Control GULD General Use Level Designation NPDES National Pollutant Discharge Elimination System NTU Nephelometric Turbidity Units NWRO Northwest Regional Office of the Department of Ecology pH Power of Hydrogen RCW Revised Code of Washington SPCC Spill Prevention, Control, and Countermeasure su Standard Units SWMMEW Stormwater Management Manual for Eastern Washington SWMMWW Stormwater Management Manual for Western Washington SWPPP Stormwater Pollution Prevention Plan TESC Temporary Erosion and Sediment Control SWRO Southwest Regional Office of the Department of Ecology TMDL Total Maximum Daily Load VFO Vancouver Field Office of the Department of Ecology WAC Washington Administrative Code WSDOT Washington Department of Transportation WWHM Western Washington Hydrology Model Page | 4 1 Project Information Project/Site Name: Cedars at the Highlands Street/Location: 16120 SE 134th Street City: Renton State: WA Zip code: 98059 Subdivision: 13 Lot Subdivision Receiving waterbody: Lower Cedar River 1.1 Existing Conditions Total acreage (including support activities such as off-site equipment staging yards, material storage areas, borrow areas). Total acreage: 4.184 ac Disturbed acreage: 5.120 ac Existing structures: Site is currently developed with a single family residence and a barn. Landscape topography: Site slopes from the west to east with grades up to 25%. The site is less steep as you move across the Site from west to east. Drainage patterns: A small upstream tributary area flows onto the Site over the western property line. A large portion of the runoff reaches the drainage ditch on the west side of 162nd Avenue SE, but a small part of it sheet flows to the east over the 162nd Avenue right of way onto the Site. Existing Vegetation: Isolated tree canopy of evergreens and deciduous trees with mostly open pasture area . Critical Areas (wetlands, streams, high erosion risk, steep or difficult to stabilize slopes): There are no critical areas on Site. List of known impairments for 303(d) listed or Total Maximum Daily Load (TMDL) for the receiving waterbody: Cedar River has the following known Category 5 impairments: pH, Temperature, Dissolved Oxygen Table 1 includes a list of suspected and/or known contaminants associated with the construction activity. Table 1 – Summary of Site Pollutant Constituents Constituent (Pollutant) Location Depth Concentration Page | 5 None Known N/A N/A N/A 1.2 Proposed Construction Activities Description of site development (example: subdivision): Subdivision of the existing 4.184 acres into 13 single-family residential lots. Description of construction activities (example: site preparation, demolition, excavation): Clearing, grading, and demolition. Description of site drainage including flow from and onto adjacent properties. Must be consistent with Site Map in Appendix A: Runoff sheet flows from west to east acros the Site before flowing onto the adjacent property. Description of final stabilization (example: extent of revegetation, paving, landscaping): Paving, landscaping, and revegetation. Contaminated Site Information: Proposed activities regarding contaminated soils or groundwater (example: on-site treatment system, authorized sanitary sewer discharge): No contaminants will be discharged to the groundwater. Page | 6 2.0 Construction Stormwater Best Management Practices (BMPs) The SWPPP is a living document reflecting current conditions and changes throughout the life of the project. These changes may be informal (i.e. hand-written notes and deletions). Update the SWPPP when the CESCL has noted a deficiency in BMPs or deviation from original design. 2.1 The 12 Elements 2.1.1 Element 1: Preserve Vegetation / Mark Clearing Limits To protect adjacent properties and reduce the area of soil exposed to construction, the limits of construction will be clearly marked before land-disturbing activities begin. Trees that are to be preserved, as well as all sensitive areas and their buffers, shall be clearly delineated, both in the field and on the plans. In general, natural vegetation and native topsoil shall be retained in an undisturbed state to the maximum extent possible. The BMPs relevant to marking the clearing limits that will be applied for this project include: The silt fence placed around the perimeter of the developable area of the Site. This BMP will be implemented at the start of construction. Alternate BMPs for marking clearing limits are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the CESCL will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. List and describe BMPs: High Visibility Plastic or Metal Fence (BMP C103); Silt Fence (BMP C223) Installation Schedules: Installation will occur before all other activity Inspection and Maintenance plan: Weekly Responsible Staff: CESCL Page | 7 2.1.2 Element 2: Establish Construction Access Construction access or activities occurring on unpaved areas will be minimized, yet where necessary, access points shall be stabilized to minimize the tracking of sediment onto public roads, and wheel washing, street sweeping, and street cleaning shall be employed to prevent sediment from entering state waters. All wash wastewater shall be controlled on site. A stabilized construction entrance will be placed along the proposed Road A and 162nd Avenue SE right-of-way. List and describe BMPs: Stabilized Construction Entrance (BMP C105); Construction Road/Parking Area Stabilization (BMP C107) Installation Schedules: Installation will occur after clearing limits are marked. Inspection and Maintenance plan: Weekly Responsible Staff: CESCL Page | 8 2.1.3 Element 3: Control Flow Rates In order to protect the properties and waterways downstream of the project site, stormwater discharges from the site will be controlled. The specific BMPs for flow control that shall be used on this project include:  Detention vault The proposed detention vault will be utilized during construction as a flow control and sedimentation device. Alternate flow control BMPs are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. The project site is located west of the Cascade Mountain Crest. As such, the project must comply with Minimum Requirement 7 (Ecology 2005). In general, discharge rates of stormwater from the site will be controlled where increases in impervious area or soil compaction during construction could lead to downstream erosion, or where necessary to meet local agency stormwater discharge requirements (e.g. discharge to combined sewer systems). Will you construct stormwater retention and/or detention facilities? Yes No Will you use permanent infiltration ponds or other low impact development (example: rain gardens, bio-retention, porous pavement) to control flow during construction? Yes No Baker Tanks (As necessary) Installation Schedules: Installation will occur before any grading. Inspection and Maintenance plan: Weekly Responsible Staff: CESCL Page | 9 2.1.4 Element 4: Install Sediment Controls (2.1.4) Silt fence will be installed around the perimeter of the Site in areas where runoff could sheet - flow offsite. This BMP will be installed at the start of construction. The interceptor swales will be installed during site grading. The interceptor swales will be directed towards the detention vault. In addition, sediment will be removed from paved areas in and adjacent to construction work areas manually or using mechanical sweepers, as needed, to minimize tracking of sediments on vehicle tires away from the site and to minimize washoff of sediments from adjacent streets in runoff. Whenever possible, sediment laden water shall be discharged into onsite, relatively level, vegetated areas (BMP C240 paragraph 5, page 4-102). In some cases, sediment discharge in concentrated runoff can be controlled using permanent stormwater BMPs (e.g., infiltration swales, ponds, trenches). Sediment loads can limit the effectiveness of some permanent stormwater BMPs, such as those used for infiltration or biofiltration; however, those BMPs designed to remove solids by settling (wet ponds or detention ponds) can be used during the construction phase. W hen permanent stormwater BMPs will be used to control sediment discharge during construction, the structure will be protected from excessive sedimentation with adequate erosion and sediment control BMPs. Any accumulated sediment shall be removed after construction is complete and the permanent stormwater BMP will be restabilized with vegetation per applicable design requirements once the remainder of the site has been stabilized. List and describe BMPs: Baker Tank (As necessary); Silt Fence (BMP C233); Interceptor Swale (BMP C200) Installation Schedules: These will all be installed before any grading occurs. Inspection and Maintenance plan: Weekly Responsible Staff: CESCL See Appendix H for Sediment Pond Calculations Page | 10 2.1.5 Element 5: Stabilize Soils West of the Cascade Mountains Crest Season Dates Number of Days Soils Can be Left Exposed During the Dry Season May 1 – September 30 7 days During the Wet Season October 1 – April 30 2 days Soils must be stabilized at the end of the shift before a holiday or weekend if needed based on the weather forecast. Anticipated project dates: Start date: TBD End date: TBD Will you construct during the wet season? Yes No List and describe BMPs: Temporary and Permanent Seeding (BMPC120); Nets and Blankets (BMP C122); Plastic Covering (BMP C123); Dust Control (BMP C140) Installation Schedules: These will all be installed before any grading occurs. Inspection and Maintenance plan: Weekly Responsible Staff: CESCL Page | 11 2.1.6 Element 6: Protect Slopes Temporary slope protection measures may be required for interim grading activity and at soil stockpiles and the Temporary Sediment Trap. Permanent Seeding will occur throughout the site as slopes are stabilized. Nets and Blankets along with Plastic Covering will be used on all slopes of 2:1. Alternate slope protection BMPs are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisf y the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. Will steep slopes be present at the site during construction? Yes No List and describe BMPs: Temporary and Permanent Seeding (BMP C120) Nets and Blankets (BMP C122) Plastic Covering (BMP C123) Check Dams (BMP C207) Installation Schedules: In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be temporarily covered with plastic sheeting. Inspection and Maintenance plan: Weekly Responsible Staff: CESCL Page | 12 2.1.7 Element 7: Protect Drain Inlets All storm drain inlets and culverts made operable during construction shall be protected to prevent unfiltered or untreated water from entering the drainage conveyance system. However, the first priority is to keep all access roads clean of sediment and keep street wash water separate from entering storm drains until treatment can be provided. Storm Drain Inlet Protection (BMP C220) will be implemented for all drainage inlets and culverts that could potentially be impacted by sediment-laden runoff on and near the project site. The following inlet protection measures will be applied on this project: List and describe BMPs: Storm Drain Inlet Protection (BMP C220) Installation Schedules: Inlet Protection filters will be installed before any grading in all existing catch basins. The filters will be installed in new catch basins after they are constructed. Inspection and Maintenance plan: Weekly Responsible Staff: CESCL Page | 13 2.1.8 Element 8: Stabilize Channels and Outlets The project is proposing to discharge via an existing 12” pipe outfall for both sediment retention during construction and after construction. This outlet will be protected via rip rap protection, engineered to adequately dissipate discharge energy in order to protect downstream channels and conveyance structures. The rip rap pad will be 8.5’x12’x2’ at a minimum. Provide stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent stream banks, slopes, and downstream reaches, will be installed at the outlets of all conveyance systems. List and describe BMPs: BMP C209: Outlet Protection Installation Schedules: Rip rap pad will be installed simultaneously with downstream discharge conveyance network. Inspection and Maintenance plan: Weekly Responsible Staff: CESCL Page | 14 2.1.9 Element 9: Control Pollutants The following pollutants are anticipated to be present on-site: Table 2 – Pollutants Pollutant (and source, if applicable) Construction Debris Fertilizers Chemicals Fuel Contamination from heavy equipment pH modified water from concrete placement and equipment washout Stormwater All pollutants, including waste materials and demolition debris, that occur onsite shall be handled and disposed of in a manner that does not cause contamination of stormwater. Good housekeeping and preventative measures will be taken to ensure that the site will be kept clean, well-organized, and free of debris. If required, BMPs to be implemented to control specific sources of pollutants are discussed below. Vehicles, construction equipment, and/or petroleum product storage/dispensing:  All vehicles, equipment, and petroleum product storage/dispensing areas will be inspected regularly to detect any leaks or spills, and to identify maintenance needs to prevent leaks or spills.  On-site fueling tanks and petroleum product storage containers shall include secondary containment.  Spill prevention measures, such as drip pans, will be used when conducting maintenance and repair of vehicles or equipment.  In order to perform emergency repairs on site, temporary plastic will be placed beneath and, if raining, over the vehicle.  Contaminated surfaces shall be cleaned immediately following any discharge or spill incident. Demolition:  Dust released from demolished sidewalks, buildings, or structures will be controlled using Dust Control measures (BMP C140).  Storm drain inlets vulnerable to stormwater discharge carrying dust, soil, or debris will be protected using Storm Drain Inlet Protection (BMP C220 as described above for Element 7).  Process water and slurry resulting from sawcutting and surfacing operations will be prevented from entering the waters of the State by implementing Sawcutting and Surfacing Pollution Prevention measures (BMP C152). Page | 15 Concrete and grout:  Process water and slurry resulting from concrete work will be prevented from entering the waters of the State by implementing Concrete Handling measures (BMP C151). Sanitary wastewater:  Portable sanitation facilities will be firmly secured, regularly maintained, and emptied when necessary. Solid Waste:  Solid waste will be stored in secure, clearly marked containers. Other:  Other BMPs will be administered as necessary to address any additional pollutant sources on site. The project is not expected to exceed the 1,320 gallon stored-fuel threshold that requires developing a Spill Prevention, Control, and Countermeasure (SPCC) Plan under the Federal regulations of the Clean Water Act (CWA). List and describe BMPs: Dust Control Measures (BMP C140) Concrete Handling measures (BMP C151) Sawcutting Surfacing Pollution Prevention measures (BMP C152) Storm Drain Inlet Protection (BMP C220) Installation Schedules: Immediately following or in conjunction with activities Inspection and Maintenance plan: Weekly Responsible Staff: CESCL Will maintenance, fueling, and/or repair of heavy equipment and vehicles occur on-site? Yes No List and describe BMPs: N/A Installation Schedules: N/A Inspection and Maintenance plan: N/A Responsible Staff: N/A Will wheel wash or tire bath system BMPs be used during construction? Yes No List and describe BMPs: Currently not anticipated. SWPPP to be amended if wheel wash proves necessary. Page | 16 Installation Schedules: TBD Inspection and Maintenance plan: Weekly Responsible Staff: CESCL Will pH-modifying sources be present on-site? Yes No If yes, check the source(s). Table 3 – pH-Modifying Sources ☐ None ☐ Bulk cement ☐ Cement kiln dust ☐ Fly ash ☐ Other cementitious materials ☒ New concrete washing or curing waters ☐ Waste streams generated from concrete grinding and sawing ☐ Exposed aggregate processes ☐ Dewatering concrete vaults ☒ Concrete pumping and mixer washout waters ☐ Recycled concrete ☐ Other (i.e. calcium lignosulfate) [please describe] List and describe BMPs: Wash water to be contained and routed to Baker Tank. Specific pH treatment measures to be determined by contractor and CESCL. Presently, CO2 sparging or dry ice anticipated approach if pH must be altered. Installation Schedules: prior to placement of concrete Inspection and Maintenance plan: Weekly Responsible Staff: CESCL Adjust pH of stormwater if outside the range of 6.5 to 8.5 su. Obtain written approval from Ecology before using chemical treatment with the exception of CO2 or dry ice to modify pH. Concrete trucks must not be washed out onto the ground, or into storm drains, open ditches, streets, or streams. Excess concrete must not be dumped on-site, except in designated concrete washout areas with appropriate BMPs installed. Page | 17 2.1.10 Element 10: Control Dewatering Although groundwater is not anticipated, if groundwater is encountered during vault excavation, contractor to utilize sump pumps to dewater unit floor and walls have been constructed. If groundwater is found to be more substantial, contractor to contact propject geotechnical engineer for formal dewatering system design. Table 4 – Dewatering BMPs Infiltration Transport off-site in a vehicle (vacuum truck for legal disposal) Ecology-approved on-site chemical treatment or other suitable treatment technologies Sanitary or combined sewer discharge with local sewer district approval (last resort) Use of sedimentation bag with discharge to ditch or swale (small volumes of localized dewatering) List and describe BMPs: N/A Installation Schedules: N/A Inspection and Maintenance plan: N/A Responsible Staff: N/A Page | 18 2.1.11 Element 11: Maintain BMPs (2.1.11) All temporary and permanent Erosion and Sediment Control (ESC) BMPs shall be maintained and repaired as needed to ensure continued performance of their intended function. Maintenance and repair shall be conducted in accordance with each particular BMP specification (see Volume II of the SWMMWW or Chapter 7 of the SWMMEW). Visual monitoring of all BMPs installed at the site will be conducted at least once every calendar week and within 24 hours of any stormwater or non-stormwater discharge from the site. If the site becomes inactive and is temporarily stabilized, the inspection frequency may be reduced to once every calendar month. All temporary ESC BMPs shall be removed within 30 days after final site stabilization is achieved or after the temporary BMPs are no longer needed. Trapped sediment shall be stabilized on-site or removed. Disturbed soil resulting from removal of either BMPs or vegetation shall be permanently stabilized. Additionally, protection must be provided for all BMPs installed for the permanent control of stormwater from sediment and compaction. BMPs that are to remain in place following completion of construction shall be examined and restored to full operating condition. If sediment enters these BMPs during construction, the sediment shall be removed and the facility shall be returned to conditions specified in the construction documents. Page | 19 2.1.12 Element 12: Manage the Project The project will be managed based on the following principles: Table 5 – Management X Design the project to fit the existing topography, soils, and drainage patterns X Emphasize erosion control rather than sediment control X Minimize the extent and duration of the area exposed X Keep runoff velocities low X Retain sediment on-site X Thoroughly monitor site and maintain all ESC measures X Schedule major earthwork during the dry season Other (please describe) As this project site is located west of the Cascade Mountain Crest, the project will be managed according to the following key project components: Phasing of Construction  The construction project is being phased to the extent practicable in order to prevent soil erosion, and, to the maximum extent possible, the transport of sediment from the site during construction.  Revegetation of exposed areas and maintenance of that vegetation shall be an integral part of the clearing activities during each phase of construction, per the Scheduling BMP (C 162). Seasonal Work Limitations  From October 1 through April 30, clearing, grading, and other soil disturbing activities shall only be permitted if shown to the satisfaction of the local permitting authority that silt-laden runoff will be prevented from leaving the site through a combination of the following: o Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters; and o Limitations on activities and the extent of disturbed areas; and o Proposed erosion and sediment control measures.  Based on the information provided and/or local weather conditions, the local permitting authority may expand or restrict the seasonal limitation on site disturbance.  The following activities are exempt from the seasonal clearing and grading limitations: o Routine maintenance and necessary repair of erosion and sediment control BMPs; o Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil; and o Activities where there is 100 percent infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. Page | 20 Coordination with Utilities and Other Jurisdictions  Care has been taken to coordinate with utilities, other construction projects, and the local jurisdiction in preparing this SWPPP and scheduling the construction work. Inspection and Monitoring  All BMPs shall be inspected, maintained, and repaired as needed to assure continued performance of their intended function. Site inspections shall be conducted by a person who is knowledgeable in the principles and practices of erosion and sediment control. This person has the necessary skills to: o Assess the site conditions and construction activities that could impact the quality of stormwater, and o Assess the effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges.  A Certified Erosion and Sediment Control Lead shall be on-site or on-call at all times.  Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP are inadequate, due to the actual discharge of or potential to discharge a significant amount of any pollutant, appropriate BMPs or design changes shall be implemented as soon as possible. Maintaining an Updated Construction SWPPP  This SWPPP shall be retained on-site or within reasonable access to the site.  The SWPPP shall be modified whenever there is a change in the design, construction, operation, or maintenance at the construction site that has, or could have, a significant effect on the discharge of pollutants to waters of the state.  The SWPPP shall be modified if, during inspections or investigations conducted by the owner/operator, or the applicable local or state regulatory authority, it is determined that the SWPPP is ineffective in eliminating or significantly minimizin g pollutants in stormwater discharges from the site. The SWPPP shall be modified as necessary to include additional or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be completed within seven (7) days following the inspection.  If BMP(s) are deemed do not satisfy the requirements set forth in the General NPDES Permit (Appendix D), the CESCL will promptly implement one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing.  Site inspections and monitoring will be conducted in accordance with Special Condition S4 of the CSWGP. Sampling will occur at the detention pond discharge piping.  The SWPPP will be updated, maintained, and implemented in accordance with Special Conditions S3, S4, and S9 of the CSWGP.  As site work progresses the SWPPP will be modified routinely to reflect changing site conditions. The SWPPP will be reviewed monthly to ensure the content is current.  Upon request, contractor shall provide the DOE and City of Sammamish with current SWPPP. Page | 21 Table 6 – BMP Implementation Schedule Phase of Construction Project Stormwater BMPs Date Wet/Dry Season [Insert construction activity] [Insert BMP] [MM/DD/YYYY] [Insert Season] Stormwater BMPs Date Wet/Dry Page | 22 Phase of Construction Project Season [Insert construction activity] [Insert BMP] [MM/DD/YYYY] [Insert Season] Page | 23 2.1.13 Element 13: Protect Low Impact Development (LID) BMPs No bioretention, rain garden and permeable pavement facilities are proposed by this project due to unsuitable soils for infiltration. The project will utilize basic dispersion and reduced impervious surfaces to meet the on-site BMP requirements. 3.0 Pollution Prevention Team Table 7 – Team Information Title Name(s) Phone Number Certified Erosion and Sediment Control Lead (CESCL) Earth Solutions NW, LLC 425-449-4704 Resident Engineer Yoshio L. Piediscalzi, P.E. 425-827-3063 Emergency Ecology Contact Rob Walls 425-649-7130 Emergency Permittee/ Owner Contact Jamie Waltier 206-315-8130 Non-Emergency Owner Contact Jamie Waltier 206-315-8130 Monitoring Personnel TBD TBD Ecology Regional Office Northwest Regional Office 425-649-7000 Page | 24 4.0 Monitoring and Sampling Requirements Monitoring includes visual inspection, sampling for water quality parameters of concern, and documentation of the inspection and sampling findings in a site log book. A site log book will be maintained for all on-site construction activities and will include:  A record of the implementation of the SWPPP and other permit requirements  Site inspections  Stormwater sampling data File a blank form under Appendix D. The site log book must be maintained on-site within reasonable access to the site and be made available upon request to Ecology or the local jurisdiction. Numeric effluent limits may be required for certain discharges to 303(d) listed waterbodies. See CSWGP Special Condition S8 and Section 5 of this template. Complete the following paragraph for sites that discharge to impaired waterbodies for fine sediment, turbidity, phosphorus, or pH: The receiving waterbody, Cedar River, is impaired for: pH, Temperature, Dissolved Oxygen. All stormwater and dewatering discharges from the site are subject to an effluent limit of 8.5 su for pH and/or 25 NTU for turbidity. 4.1 Site Inspection Site inspections will be conducted at least once every calendar week and within 24 hours following any discharge from the site. For sites that are temporarily stabilized and inactive, the required frequency is reduced to once per calendar month. The discharge point(s) are indicated on the Site Map (see Appendix A) and in accordance with the applicable requirements of the CSWGP. 4.2 Stormwater Quality Sampling 4.2.1 Turbidity Sampling Requirements include calibrated turbidity meter or transparency tube to sample site discharges for compliance with the CSWGP. Sampling will be conducted at all discharge points at least once per calendar week. Method for sampling turbidity: Page | 25 Table 8 – Turbidity Sampling Method Turbidity Meter/Turbidimeter (required for disturbances 5 acres or greater in size) X Transparency Tube (option for disturbances less than 1 acre and up to 5 acres in size) The benchmark for turbidity value is 25 nephelometric turbidity units (NTU) and a transparency less than 33 centimeters. If the discharge’s turbidity is 26 to 249 NTU or the transparency is less than 33 cm but equal to or greater than 6 cm, the following steps will be conducted: 1. Review the SWPPP for compliance with Special Condition S9. Make appropriate revisions within 7 days of the date the discharge exceeded the benchmark. 2. Immediately begin the process to fully implement and maintain appropriate source control and/or treatment BMPs as soon as possible. Address the problems within 10 days of the date the discharge exceeded the benchmark. If installation of necessary treatment BMPs is not feasible within 10 days, Ecology may approve additional time when the Permittee requests an extension within the initial 10-day response period. 3. Document BMP implementation and maintenance in the site log book. If the turbidity exceeds 250 NTU or the transparency is 6 cm or less at any time, the following steps will be conducted: 1. Telephone or submit an electronic report to the applicable Ecology Region’s Environmental Report Tracking System (ERTS) within 24 hours. https://www.ecology.wa.gov/About-us/Get-involved/Report-an-environmental-issue  Central Region (Benton, Chelan, Douglas, Kittitas, Klickitat, Okanogan, Yakima): (509) 575-2490  Eastern Region (Adams, Asotin, Columbia, Ferry, Franklin, Garfield, Grant, Lincoln, Pend Oreille, Spokane, Stevens, Walla Walla, Whitman): (509) 329-3400  Northwest Region (King, Kitsap, Island, San Juan, Skagit, Snohomish, Whatcom): (425) 649-7000  Southwest Region (Clallam, Clark, Cowlitz, Grays Harbor, Jefferson, Lewis, Mason, Pacific, Pierce, Skamania, Thurston, Wahkiakum,): (360) 407-6300 2. Immediately begin the process to fully implement and maintain appropriate source control and/or treatment BMPs as soon as possible. Address the problems within 10 days of the date the discharge exceeded the benchmark. If installation of necessary treatment BMPs is not feasible within 10 days, Ecology may approve additional time when the Permittee requests an extension within the initial 10-day response period 3. Document BMP implementation and maintenance in the site log book. 4. Continue to sample discharges daily until one of the following is true:  Turbidity is 25 NTU (or lower).  Transparency is 33 cm (or greater).  Compliance with the water quality limit for turbidity is achieved. Page | 26 o 1 - 5 NTU over background turbidity, if background is less than 50 NTU o 1% - 10% over background turbidity, if background is 50 NTU or greater  The discharge stops or is eliminated. Page | 27 4.2.2 pH Sampling pH monitoring is required for “Significant concrete work” (i.e. greater than 1000 cubic yards poured concrete or recycled concrete over the life of the project).The use of engineered soils (soil amendments including but not limited to Portland cement-treated base [CTB], cement kiln dust [CKD] or fly ash) also requires pH monitoring. For significant concrete work, pH sampling will start the first day concrete is poured and continue until it is cured, typically three (3) weeks after the last pour. For engineered soils and recycled concrete, pH sampling begins when engineered soils or recycled concrete are first exposed to precipitation and continues until the area is fully stabilized. If the measured pH is 8.5 or greater, the following measures will be taken: 1. Prevent high pH water from entering storm sewer systems or surface water. 2. Adjust or neutralize the high pH water to the range of 6.5 to 8.5 su using appropriate technology such as carbon dioxide (CO2) sparging (liquid or dry ice). 3. Written approval will be obtained from Ecology prior to the use of chemical treatment other than CO2 sparging or dry ice. Method for sampling pH: Table 9 – pH Sampling Method pH meter pH test kit Wide range pH indicator paper Note: pH monitoring equipment unknown at this time; to be determined by CESCL. Page | 28 5.0 Discharges to 303(d) or Total Maximum Daily Load (TMDL) Waterbodies (5.0) 5.1 303(d) Listed Waterbodies Is the receiving water 303(d) (Category 5) listed for turbidity, fine sediment, phosphorus, or pH? Yes No List the impairment(s): Temperature, pH, Dissolved Oxygen. The receiving waterbody, Cedar River, is impaired for: pH, Temperature, and Dissolved Oxygen. All stormwater and dewatering discharges from the site are subject to an effluent limit of 8.5 su for pH and/or 25 NTU for turbidity. If yes, discharges must comply with applicable effluent limitations in S8.C and S8.D of the CSWGP. Describe the method(s) for 303(d) compliance: List and describe BMPs: BMP C252: High pH Neutralization Using CO2 BMP C253: pH Control for High pH Water Discharge testing will occur post-detention where stormwater is discharged into a conveyance swale. If the water is found to have a pH balance of above 8.5, the CESCL will decide which method to use in order to lower pH balances to appropriate levels. If water treatment is not feasible at time of testing, CESCL will direct where to discharge or dispose of stormwater runoff per BMP C253. 5.2 TMDL Waterbodies Waste Load Allocation for CWSGP discharges: Not applicable to this Site. Describe the method(s) for TMDL compliance: List and describe BMPs: Not applicable to this Site. Page | 29 Discharges to TMDL receiving waterbodies will meet in-stream water quality criteria at the point of discharge. The Construction Stormwater General Permit Proposed New Discharge to an Impaired Water Body form is included in Appendix F. Page | 30 6.0 Reporting and Record Keeping (6.0) 6.1 Record Keeping 6.1.1 Site Log Book A site log book will be maintained for all on-site construction activities and will include:  A record of the implementation of the SWPPP and other permit requirements  Site inspections  Sample logs 6.1.2 Records Retention Records will be retained during the life of the project and for a minimum of three (3) years following the termination of permit coverage in accordance with Special Condition S5.C of the CSWGP. Permit documentation to be retained on-site:  CSWGP  Permit Coverage Letter  SWPPP  Site Log Book Permit documentation will be provided within 14 days of receipt of a written request from Ecology. A copy of the SWPPP or access to the SWPPP will be provided to the public when requested in writing in accordance with Special Condition S5.G.2.b of the CSWGP. 6.1.3 Updating the SWPPP The SWPPP will be modified if:  Found ineffective in eliminating or significantly minimizing pollutants in stormwater discharges from the site.  There is a change in design, construction, operation, or maintenance at the construction site that has, or could have, a significant effect on the discharge of pollutants to waters of the State. The SWPPP will be modified within seven (7) days if inspection(s) or investigation(s) determine additional or modified BMPs are necessary for compliance. An updated timeline for BMP implementation will be prepared. Page | 31 6.2 Reporting 6.2.1 Discharge Monitoring Reports Cumulative soil disturbance is one (1) acre or larger; therefore, Discharge Monitoring Reports (DMRs) will be submitted to Ecology monthly. If there was no discharge during a given monitoring period the DMR will be submitted as required, reporting “No Discharge”. The DMR due date is fifteen (15) days following the end of each calendar month. DMRs will be reported online through Ecology’s WQWebDMR System. To sign up for WQWebDMR go to: https://www.ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Water-quality- permits-guidance/WQWebPortal-guidance 6.2.2 Notification of Noncompliance If any of the terms and conditions of the permit is not met, and the resulting noncompliance may cause a threat to human health or the environment, the following actions will be taken: 1. Ecology will be notified within 24-hours of the failure to comply by calling the applicable Regional office ERTS phone number (Regional office numbers listed below). 2. Immediate action will be taken to prevent the discharge/pollution or otherwise stop or correct the noncompliance. If applicable, sampling and analysis of any noncompliance will be repeated immediately and the results submitted to Ecology within five (5) days of becoming aware of the violation. 3. A detailed written report describing the noncompliance will be submitted to Ecology within five (5) days, unless requested earlier by Ecology. Specific information to be included in the noncompliance report is found in Special Condition S5.F.3 of the CSWGP. Anytime turbidity sampling indicates turbidity is 250 NTUs or greater, or water transparency is 6 cm or less, the Ecology Regional office will be notified by phone within 24 hours of analysis as required by Special Condition S5.A of the CSWGP.  Central Region at (509) 575-2490 for Benton, Chelan, Douglas, Kittitas, Klickitat, Okanogan, or Yakima County  Eastern Region at (509) 329-3400 for Adams, Asotin, Columbia, Ferry, Franklin, Garfield, Grant, Lincoln, Pend Oreille, Spokane, Stevens, Walla Walla, or Whitman County  Northwest Region at (425) 649-7000 for Island, King, Kitsap, San Juan, Skagit, Snohomish, or Whatcom County  Southwest Region at (360) 407-6300 for Clallam, Clark, Cowlitz, Grays Harbor, Jefferson, Lewis, Mason, Pacific, Pierce, Skamania, Thurston, or Wahkiakum Include the following information: Page | 32 1. Your name and / Phone number 2. Permit number 3. City / County of project 4. Sample results 5. Date / Time of call 6. Date / Time of sample 7. Project name In accordance with Special Condition S4.D.5.b of the CSWGP, the Ecology Regional office will be notified if chemical treatment other than CO2 sparging is planned for adjustment of high pH water. Page | 33 Appendix/Glossary A. Site Map IN COMPLIANCE WITH CITY OF RENTON STANDARDS16210 SE 134TH STREETRENTON, WASHINGTON 98059DRS PROJECT NO. 17020MAPLE HIGHLANDS MAPLE HIGHLANDS LUA18-000633 C19004791MAPLE HIGHLANDSNSERISSEFORPINGOERDETSREENGINELA53232 OIETATHSOYSFOTGNIHASWIDEIPL.OCILAZ0GRAPHIC SCALE2040801 INCH = 40 FT. IN COMPLIANCE WITH CITY OF RENTON STANDARDS16210 SE 134TH STREETRENTON, WASHINGTON 98059DRS PROJECT NO. 17020MAPLE HIGHLANDS MAPLE HIGHLANDS LUA18-000633 C19004791MAPLE HIGHLANDSNSERISSEFORPINGOERDETSREENGINELA53232 OIETATHSOYSFOTGNIHASWIDEIPL.OCILAZ0GRAPHIC SCALE2040801 INCH = 40 FT. Page | 34 B. BMP Detail Volume II – Construction Stormwater Pollution Prevention - August 2012 4-3 BMP C101: Preserving Natural Vegetation Purpose The purpose of preserving natural vegetation is to reduce erosion wherever practicable. Limiting site disturbance is the single most effective method for reducing erosion. For example, conifers can hold up to about 50 percent of all rain that falls during a storm. Up to 20-30 percent of this rain may never reach the ground but is taken up by the tree or evaporates. Another benefit is that the rain held in the tree can be released slowly to the ground after the storm. Conditions of Use Natural vegetation should be preserved on steep slopes, near perennial and intermittent watercourses or swales, and on building sites in wooded areas. • As required by local governments. • Phase construction to preserve natural vegetation on the project site for as long as possible during the construction period. Design and Installation Specifications Natural vegetation can be preserved in natural clumps or as individual trees, shrubs and vines. The preservation of individual plants is more difficult because heavy equipment is generally used to remove unwanted vegetation. The points to remember when attempting to save individual plants are: • Is the plant worth saving? Consider the location, species, size, age, vigor, and the work involved. Local governments may also have ordinances to save natural vegetation and trees. • Fence or clearly mark areas around trees that are to be saved. It is preferable to keep ground disturbance away from the trees at least as far out as the dripline. Plants need protection from three kinds of injuries: • Construction Equipment - This injury can be above or below the ground level. Damage results from scarring, cutting of roots, and compaction of the soil. Placing a fenced buffer zone around plants to be saved prior to construction can prevent construction equipment injuries. • Grade Changes - Changing the natural ground level will alter grades, which affects the plant's ability to obtain the necessary air, water, and minerals. Minor fills usually do not cause problems although sensitivity between species does vary and should be checked. Trees can typically tolerate fill of 6 inches or less. For shrubs and other plants, the fill should be less. When there are major changes in grade, it may become necessary to supply air to the roots of plants. This can be done by placing a layer of gravel and a tile system over the roots before the fill is made. A tile system protects a tree from a raised grade. The tile system should be Volume II – Construction Stormwater Pollution Prevention - August 2012 4-4 laid out on the original grade leading from a dry well around the tree trunk. The system should then be covered with small stones to allow air to circulate over the root area. Lowering the natural ground level can seriously damage trees and shrubs. The highest percentage of the plant roots are in the upper 12 inches of the soil and cuts of only 2-3 inches can cause serious injury. To protect the roots it may be necessary to terrace the immediate area around the plants to be saved. If roots are exposed, construction of retaining walls may be needed to keep the soil in place. Plants can also be preserved by leaving them on an undisturbed, gently sloping mound. To increase the chances for survival, it is best to limit grade changes and other soil disturbances to areas outside the dripline of the plant. • Excavations - Protect trees and other plants when excavating for drainfields, power, water, and sewer lines. Where possible, the trenches should be routed around trees and large shrubs. When this is not possible, it is best to tunnel under them. This can be done with hand tools or with power augers. If it is not possible to route the trench around plants to be saved, then the following should be observed: Cut as few roots as possible. When you have to cut, cut clean. Paint cut root ends with a wood dressing like asphalt base paint if roots will be exposed for more than 24-hours. Backfill the trench as soon as possible. Tunnel beneath root systems as close to the center of the main trunk to preserve most of the important feeder roots. Some problems that can be encountered with a few specific trees are: • Maple, Dogwood, Red alder, Western hemlock, Western red cedar, and Douglas fir do not readily adjust to changes in environment and special care should be taken to protect these trees. • The windthrow hazard of Pacific silver fir and madrona is high, while that of Western hemlock is moderate. The danger of windthrow increases where dense stands have been thinned. Other species (unless they are on shallow, wet soils less than 20 inches deep) have a low windthrow hazard. • Cottonwoods, maples, and willows have water-seeking roots. These can cause trouble in sewer lines and infiltration fields. On the other hand, they thrive in high moisture conditions that other trees would not. • Thinning operations in pure or mixed stands of Grand fir, Pacific silver fir, Noble fir, Sitka spruce, Western red cedar, Western hemlock, Pacific dogwood, and Red alder can cause serious disease problems. Disease can become established through damaged limbs, trunks, roots, Volume II – Construction Stormwater Pollution Prevention - August 2012 4-5 and freshly cut stumps. Diseased and weakened trees are also susceptible to insect attack. Maintenance Standards Inspect flagged and/or fenced areas regularly to make sure flagging or fencing has not been removed or damaged. If the flagging or fencing has been damaged or visibility reduced, it shall be repaired or replaced immediately and visibility restored. • If tree roots have been exposed or injured, “prune” cleanly with an appropriate pruning saw or lopers directly above the damaged roots and recover with native soils. Treatment of sap flowing trees (fir, hemlock, pine, soft maples) is not advised as sap forms a natural healing barrier. BMP C102: Buffer Zones Purpose Creation of an undisturbed area or strip of natural vegetation or an established suitable planting that will provide a living filter to reduce soil erosion and runoff velocities. Conditions of Use Natural buffer zones are used along streams, wetlands and other bodies of water that need protection from erosion and sedimentation. Vegetative buffer zones can be used to protect natural swales and can be incorporated into the natural landscaping of an area. Critical-areas buffer zones should not be used as sediment treatment areas. These areas shall remain completely undisturbed. The local permitting authority may expand the buffer widths temporarily to allow the use of the expanded area for removal of sediment. Design and Installation Specifications • Preserving natural vegetation or plantings in clumps, blocks, or strips is generally the easiest and most successful method. • Leave all unstable steep slopes in natural vegetation. • Mark clearing limits and keep all equipment and construction debris out of the natural areas and buffer zones. Steel construction fencing is the most effective method in protecting sensitive areas and buffers. Alternatively, wire-backed silt fence on steel posts is marginally effective. Flagging alone is typically not effective. • Keep all excavations outside the dripline of trees and shrubs. • Do not push debris or extra soil into the buffer zone area because it will cause damage from burying and smothering. • Vegetative buffer zones for streams, lakes or other waterways shall be established by the local permitting authority or other state or federal permits or approvals. Maintenance Standards Inspect the area frequently to make sure flagging remains in place and the area remains undisturbed. Replace all damaged flagging immediately. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-6 BMP C103: High Visibility Fence Purpose Fencing is intended to: 1. Restrict clearing to approved limits. 2. Prevent disturbance of sensitive areas, their buffers, and other areas required to be left undisturbed. 3. Limit construction traffic to designated construction entrances, exits, or internal roads. 4. Protect areas where marking with survey tape may not provide adequate protection. Conditions of Use To establish clearing limits plastic, fabric, or metal fence may be used: • At the boundary of sensitive areas, their buffers, and other areas required to be left uncleared. • As necessary to control vehicle access to and on the site. Design and Installation Specifications High visibility plastic fence shall be composed of a high-density polyethylene material and shall be at least four feet in height. Posts for the fencing shall be steel or wood and placed every 6 feet on center (maximum) or as needed to ensure rigidity. The fencing shall be fastened to the post every six inches with a polyethylene tie. On long continuous lengths of fencing, a tension wire or rope shall be used as a top stringer to prevent sagging between posts. The fence color shall be high visibility orange. The fence tensile strength shall be 360 lbs./ft. using the ASTM D4595 testing method. If appropriate install fabric silt fence in accordance with BMP C233 to act as high visibility fence. Silt fence shall be at least 3 feet high and must be highly visible to meet the requirements of this BMP. Metal fences shall be designed and installed according to the manufacturer's specifications. Metal fences shall be at least 3 feet high and must be highly visible. Fences shall not be wired or stapled to trees. Maintenance Standards If the fence has been damaged or visibility reduced, it shall be repaired or replaced immediately and visibility restored. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-7 BMP C105: Stabilized Construction Entrance / Exit Purpose Stabilized Construction entrances are established to reduce the amount of sediment transported onto paved roads by vehicles or equipment. This is done by constructing a stabilized pad of quarry spalls at entrances and exits for construction sites. Conditions of Use Construction entrances shall be stabilized wherever traffic will be entering or leaving a construction site if paved roads or other paved areas are within 1,000 feet of the site. For residential construction provide stabilized construction entrances for each residence, rather than only at the main subdivision entrance. Stabilized surfaces shall be of sufficient length/width to provide vehicle access/parking, based on lot size/configuration. On large commercial, highway, and road projects, the designer should include enough extra materials in the contract to allow for additional stabilized entrances not shown in the initial Construction SWPPP. It is difficult to determine exactly where access to these projects will take place; additional materials will enable the contractor to install them where needed. Design and Installation Specifications See Figure 4.1.1 for details. Note: the 100’ minimum length of the entrance shall be reduced to the maximum practicable size when the size or configuration of the site does not allow the full length (100’). Construct stabilized construction entrances with a 12-inch thick pad of 4- inch to 8-inch quarry spalls, a 4-inch course of asphalt treated base (ATB), or use existing pavement. Do not use crushed concrete, cement, or calcium chloride for construction entrance stabilization because these products raise pH levels in stormwater and concrete discharge to surface waters of the State is prohibited. A separation geotextile shall be placed under the spalls to prevent fine sediment from pumping up into the rock pad. The geotextile shall meet the following standards: Grab Tensile Strength (ASTM D4751) 200 psi min. Grab Tensile Elongation (ASTM D4632) 30% max. Mullen Burst Strength (ASTM D3786-80a) 400 psi min. AOS (ASTM D4751) 20-45 (U.S. standard sieve size) • Consider early installation of the first lift of asphalt in areas that will paved; this can be used as a stabilized entrance. Also consider the installation of excess concrete as a stabilized entrance. During large concrete pours, excess concrete is often available for this purpose. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-8 • Fencing (see BMP C103) shall be installed as necessary to restrict traffic to the construction entrance. • Whenever possible, the entrance shall be constructed on a firm, compacted subgrade. This can substantially increase the effectiveness of the pad and reduce the need for maintenance. • Construction entrances should avoid crossing existing sidewalks and back of walk drains if at all possible. If a construction entrance must cross a sidewalk or back of walk drain, the full length of the sidewalk and back of walk drain must be covered and protected from sediment leaving the site. Maintenance Standards Quarry spalls shall be added if the pad is no longer in accordance with the specifications. • If the entrance is not preventing sediment from being tracked onto pavement, then alternative measures to keep the streets free of sediment shall be used. This may include replacement/cleaning of the existing quarry spalls, street sweeping, an increase in the dimensions of the entrance, or the installation of a wheel wash. • Any sediment that is tracked onto pavement shall be removed by shoveling or street sweeping. The sediment collected by sweeping shall be removed or stabilized on site. The pavement shall not be cleaned by washing down the street, except when high efficiency sweeping is ineffective and there is a threat to public safety. If it is necessary to wash the streets, the construction of a small sump to contain the wash water shall be considered. The sediment would then be washed into the sump where it can be controlled. • Perform street sweeping by hand or with a high efficiency sweeper. Do not use a non-high efficiency mechanical sweeper because this creates dust and throws soils into storm systems or conveyance ditches. • Any quarry spalls that are loosened from the pad, which end up on the roadway shall be removed immediately. • If vehicles are entering or exiting the site at points other than the construction entrance(s), fencing (see BMP C103) shall be installed to control traffic. • Upon project completion and site stabilization, all construction accesses intended as permanent access for maintenance shall be permanently stabilized. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-9 Figure 4.1.1 – Stabilized Construction Entrance Approved as Equivalent Ecology has approved products as able to meet the requirements of BMP C105. The products did not pass through the Technology Assessment Protocol – Ecology (TAPE) process. Local jurisdictions may choose not to accept this product approved as equivalent, or may require additional testing prior to consideration for local use. The products are available for review on Ecology’s website at http://www.ecy.wa.gov/programs/wq/stormwater/newtech/equivalent.html BMP C106: Wheel Wash Purpose Wheel washes reduce the amount of sediment transported onto paved roads by motor vehicles. Conditions of Use When a stabilized construction entrance (see BMP C105) is not preventing sediment from being tracked onto pavement. • Wheel washing is generally an effective BMP when installed with careful attention to topography. For example, a wheel wash can be detrimental if installed at the top of a slope abutting a right-of-way where the water from the dripping truck can run unimpeded into the street. Driveway shall meet the requirements of the permitting agency It is recommended that the entrance be crowned so that runoff drains off the pad Provide full width of ingress/egress area 12” min. thickness Geotextile 4’ – 8” quarry spalls Install driveway culvert if there is a roadside ditch present Volume II – Construction Stormwater Pollution Prevention - August 2012 4-10 • Pressure washing combined with an adequately sized and surfaced pad with direct drainage to a large 10-foot x 10-foot sump can be very effective. • Discharge wheel wash or tire bath wastewater to a separate on-site treatment system that prevents discharge to surface water, such as closed-loop recirculation or upland land application, or to the sanitary sewer with local sewer district approval. • Wheel wash or tire bath wastewater should not include wastewater from concrete washout areas. Design and Installation Specifications Suggested details are shown in Figure 4.1.2. The Local Permitting Authority may allow other designs. A minimum of 6 inches of asphalt treated base (ATB) over crushed base material or 8 inches over a good subgrade is recommended to pave the wheel wash. Use a low clearance truck to test the wheel wash before paving. Either a belly dump or lowboy will work well to test clearance. Keep the water level from 12 to 14 inches deep to avoid damage to truck hubs and filling the truck tongues with water. Midpoint spray nozzles are only needed in extremely muddy conditions. Wheel wash systems should be designed with a small grade change, 6- to 1-inches for a 10-foot-wide pond, to allow sediment to flow to the low side of pond to help prevent re-suspension of sediment. A drainpipe with a 2- to 3-foot riser should be installed on the low side of the pond to allow for easy cleaning and refilling. Polymers may be used to promote coagulation and flocculation in a closed-loop system. Polyacrylamide (PAM) added to the wheel wash water at a rate of 0.25 - 0.5 pounds per 1,000 gallons of water increases effectiveness and reduces cleanup time. If PAM is already being used for dust or erosion control and is being applied by a water truck, the same truck can be used to change the wash water. Maintenance Standards The wheel wash should start out the day with fresh water. The wash water should be changed a minimum of once per day. On large earthwork jobs where more than 10-20 trucks per hour are expected, the wash water will need to be changed more often. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-11 Figure 4.1.2 – Wheel Wash Notes: 1. Asphalt construction entrance 6 in. asphalt treated base (ATB). 2. 3-inch trash pump with floats on the suction hose. 3. Midpoint spray nozzles, if needed. 4. 6-inch sewer pipe with butterfly valves. Bottom one is a drain. Locate top pipe’s invert 1 foot above bottom of wheel wash. 5. 8 foot x 8 foot sump with 5 feet of catch. Build so the sump can be cleaned with a trackhoe. 6. Asphalt curb on the low road side to direct water back to pond. 7. 6-inch sleeve under road. 8. Ball valves. 9. 15 foot. ATB apron to protect ground from splashing water. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-12 BMP C107: Construction Road/Parking Area Stabilization Purpose Stabilizing subdivision roads, parking areas, and other on-site vehicle transportation routes immediately after grading reduces erosion caused by construction traffic or runoff. Conditions of Use Roads or parking areas shall be stabilized wherever they are constructed, whether permanent or temporary, for use by construction traffic. • High Visibility Fencing (see BMP C103) shall be installed, if necessary, to limit the access of vehicles to only those roads and parking areas that are stabilized. Design and Installation Specifications • On areas that will receive asphalt as part of the project, install the first lift as soon as possible. • A 6-inch depth of 2- to 4-inch crushed rock, gravel base, or crushed surfacing base course shall be applied immediately after grading or utility installation. A 4-inch course of asphalt treated base (ATB) may also be used, or the road/parking area may be paved. It may also be possible to use cement or calcium chloride for soil stabilization. If cement or cement kiln dust is used for roadbase stabilization, pH monitoring and BMPs (BMPs C252 and C253) are necessary to evaluate and minimize the effects on stormwater. If the area will not be used for permanent roads, parking areas, or structures, a 6-inch depth of hog fuel may also be used, but this is likely to require more maintenance. Whenever possible, construction roads and parking areas shall be placed on a firm, compacted subgrade. • Temporary road gradients shall not exceed 15 percent. Roadways shall be carefully graded to drain. Drainage ditches shall be provided on each side of the roadway in the case of a crowned section, or on one side in the case of a super-elevated section. Drainage ditches shall be directed to a sediment control BMP. • Rather than relying on ditches, it may also be possible to grade the road so that runoff sheet-flows into a heavily vegetated area with a well-developed topsoil. Landscaped areas are not adequate. If this area has at least 50 feet of vegetation that water can flow through, then it is generally preferable to use the vegetation to treat runoff, rather than a sediment pond or trap. The 50 feet shall not include wetlands or their buffers. If runoff is allowed to sheetflow through adjacent vegetated areas, it is vital to design the roadways and parking areas so that no concentrated runoff is created. • Storm drain inlets shall be protected to prevent sediment-laden water entering the storm drain system (see BMP C220). Maintenance Standards Inspect stabilized areas regularly, especially after large storm events. Crushed rock, gravel base, etc. shall be added as required to maintain a Volume II – Construction Stormwater Pollution Prevention - August 2012 4-13 stable driving surface and to stabilize any areas that have eroded. Following construction, these areas shall be restored to pre-construction condition or better to prevent future erosion. Perform street cleaning at the end of each day or more often if necessary. BMP C120: Temporary and Permanent Seeding Purpose Seeding reduces erosion by stabilizing exposed soils. A well-established vegetative cover is one of the most effective methods of reducing erosion. Conditions of Use Use seeding throughout the project on disturbed areas that have reached final grade or that will remain unworked for more than 30 days. The optimum seeding windows for western Washington are April 1 through June 30 and September 1 through October 1. Between July 1 and August 30 seeding requires irrigation until 75 percent grass cover is established. Between October 1 and March 30 seeding requires a cover of mulch with straw or an erosion control blanket until 75 percent grass cover is established. Review all disturbed areas in late August to early September and complete all seeding by the end of September. Otherwise, vegetation will not establish itself enough to provide more than average protection. • Mulch is required at all times for seeding because it protects seeds from heat, moisture loss, and transport due to runoff. Mulch can be applied on top of the seed or simultaneously by hydroseeding. See BMP C121: Mulching for specifications. • Seed and mulch, all disturbed areas not otherwise vegetated at final site stabilization. Final stabilization means the completion of all soil disturbing activities at the site and the establishment of a permanent vegetative cover, or equivalent permanent stabilization measures (such as pavement, riprap, gabions or geotextiles) which will prevent erosion. Design and Installation Specifications Seed retention/detention ponds as required. Install channels intended for vegetation before starting major earthwork and hydroseed with a Bonded Fiber Matrix. For vegetated channels that will have high flows, install erosion control blankets over hydroseed. Before allowing water to flow in vegetated channels, establish 75 percent vegetation cover. If vegetated channels cannot be established by seed before water flow; install sod in the channel bottom—over hydromulch and erosion control blankets. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-14 • Confirm the installation of all required surface water control measures to prevent seed from washing away. • Hydroseed applications shall include a minimum of 1,500 pounds per acre of mulch with 3 percent tackifier. See BMP C121: Mulching for specifications. • Areas that will have seeding only and not landscaping may need compost or meal-based mulch included in the hydroseed in order to establish vegetation. Re-install native topsoil on the disturbed soil surface before application. • When installing seed via hydroseeding operations, only about 1/3 of the seed actually ends up in contact with the soil surface. This reduces the ability to establish a good stand of grass quickly. To overcome this, consider increasing seed quantities by up to 50 percent. • Enhance vegetation establishment by dividing the hydromulch operation into two phases: 1. Phase 1- Install all seed and fertilizer with 25-30 percent mulch and tackifier onto soil in the first lift. 2. Phase 2- Install the rest of the mulch and tackifier over the first lift. Or, enhance vegetation by: 1. Installing the mulch, seed, fertilizer, and tackifier in one lift. 2. Spread or blow straw over the top of the hydromulch at a rate of 800-1000 pounds per acre. 3. Hold straw in place with a standard tackifier. Both of these approaches will increase cost moderately but will greatly improve and enhance vegetative establishment. The increased cost may be offset by the reduced need for: • Irrigation. • Reapplication of mulch. • Repair of failed slope surfaces. This technique works with standard hydromulch (1,500 pounds per acre minimum) and BFM/MBFMs (3,000 pounds per acre minimum). • Seed may be installed by hand if: • Temporary and covered by straw, mulch, or topsoil. • Permanent in small areas (usually less than 1 acre) and covered with mulch, topsoil, or erosion blankets. • The seed mixes listed in the tables below include recommended mixes for both temporary and permanent seeding. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-15 • Apply these mixes, with the exception of the wetland mix, at a rate of 120 pounds per acre. This rate can be reduced if soil amendments or slow-release fertilizers are used. • Consult the local suppliers or the local conservation district for their recommendations because the appropriate mix depends on a variety of factors, including location, exposure, soil type, slope, and expected foot traffic. Alternative seed mixes approved by the local authority may be used. • Other mixes may be appropriate, depending on the soil type and hydrology of the area. • Table 4.1.2 lists the standard mix for areas requiring a temporary vegetative cover. Table 4.1.2 Temporary Erosion Control Seed Mix % Weight % Purity % Germination Chewings or annual blue grass Festuca rubra var. commutata or Poa anna 40 98 90 Perennial rye - Lolium perenne 50 98 90 Redtop or colonial bentgrass Agrostis alba or Agrostis tenuis 5 92 85 White dutch clover Trifolium repens 5 98 90 • Table 4.1.3 lists a recommended mix for landscaping seed. Table 4.1.3 Landscaping Seed Mix % Weight % Purity % Germination Perennial rye blend Lolium perenne 70 98 90 Chewings and red fescue blend Festuca rubra var. commutata or Festuca rubra 30 98 90 Volume II – Construction Stormwater Pollution Prevention - August 2012 4-16 • Table 4.1.4 lists a turf seed mix for dry situations where there is no need for watering. This mix requires very little maintenance. Table 4.1.4 Low -Growing Turf Seed Mix % Weight % Purity % Germination Dwarf tall fescue (several varieties) Festuca arundinacea var. 45 98 90 Dwarf perennial rye (Barclay) Lolium perenne var. barclay 30 98 90 Red fescue Festuca rubra 20 98 90 Colonial bentgrass Agrostis tenuis 5 98 90 • Table 4.1.5 lists a mix for bioswales and other intermittently wet areas. Table 4.1.5 Bioswale Seed Mix* % Weight % Purity % Germination Tall or meadow fescue Festuca arundinacea or Festuca elatior 75-80 98 90 Seaside/Creeping bentgrass Agrostis palustris 10-15 92 85 Redtop bentgrass Agrostis alba or Agrostis gigantea 5-10 90 80 * Modified Briargreen, Inc. Hydroseeding Guide Wetlands Seed Mix Volume II – Construction Stormwater Pollution Prevention - August 2012 4-17 • Table 4.1.6 lists a low-growing, relatively non-invasive seed mix appropriate for very wet areas that are not regulated wetlands. Apply this mixture at a rate of 60 pounds per acre. Consult Hydraulic Permit Authority (HPA) for seed mixes if applicable. Table 4.1.6 Wet Area Seed Mix* % Weight % Purity % Germination Tall or meadow fescue Festuca arundinacea or Festuca elatior 60-70 98 90 Seaside/Creeping bentgrass Agrostis palustris 10-15 98 85 Meadow foxtail Alepocurus pratensis 10-15 90 80 Alsike clover Trifolium hybridum 1-6 98 90 Redtop bentgrass Agrostis alba 1-6 92 85 * Modified Briargreen, Inc. Hydroseeding Guide Wetlands Seed Mix • Table 4.1.7 lists a recommended meadow seed mix for infrequently maintained areas or non-maintained areas where colonization by native plants is desirable. Likely applications include rural road and utility right-of-way. Seeding should take place in September or very early October in order to obtain adequate establishment prior to the winter months. Consider the appropriateness of clover, a fairly invasive species, in the mix. Amending the soil can reduce the need for clover. Table 4.1.7 Meadow Seed Mix % Weight % Purity % Germination Redtop or Oregon bentgrass Agrostis alba or Agrostis oregonensis 20 92 85 Red fescue Festuca rubra 70 98 90 White dutch clover Trifolium repens 10 98 90 Volume II – Construction Stormwater Pollution Prevention - August 2012 4-18 • Roughening and Rototilling: • The seedbed should be firm and rough. Roughen all soil no matter what the slope. Track walk slopes before seeding if engineering purposes require compaction. Backblading or smoothing of slopes greater than 4H:1V is not allowed if they are to be seeded. • Restoration-based landscape practices require deeper incorporation than that provided by a simple single-pass rototilling treatment. Wherever practical, initially rip the subgrade to improve long-term permeability, infiltration, and water inflow qualities. At a minimum, permanent areas shall use soil amendments to achieve organic matter and permeability performance defined in engineered soil/landscape systems. For systems that are deeper than 8 inches complete the rototilling process in multiple lifts, or prepare the engineered soil system per specifications and place to achieve the specified depth. • Fertilizers: • Conducting soil tests to determine the exact type and quantity of fertilizer is recommended. This will prevent the over-application of fertilizer. • Organic matter is the most appropriate form of fertilizer because it provides nutrients (including nitrogen, phosphorus, and potassium) in the least water-soluble form. • In general, use 10-4-6 N-P-K (nitrogen-phosphorus-potassium) fertilizer at a rate of 90 pounds per acre. Always use slow-release fertilizers because they are more efficient and have fewer environmental impacts. Do not add fertilizer to the hydromulch machine, or agitate, more than 20 minutes before use. Too much agitation destroys the slow-release coating. • There are numerous products available that take the place of chemical fertilizers. These include several with seaweed extracts that are beneficial to soil microbes and organisms. If 100 percent cottonseed meal is used as the mulch in hydroseed, chemical fertilizer may not be necessary. Cottonseed meal provides a good source of long-term, slow-release, available nitrogen. • Bonded Fiber Matrix and Mechanically Bonded Fiber Matrix: • On steep slopes use Bonded Fiber Matrix (BFM) or Mechanically Bonded Fiber Matrix (MBFM) products. Apply BFM/MBFM products at a minimum rate of 3,000 pounds per acre of mulch with approximately 10 percent tackifier. Achieve a minimum of 95 percent soil coverage during application. Numerous products are available commercially. Installed products per manufacturer’s instructions. Most products require 24-36 hours to cure before rainfall and cannot be installed on wet or saturated soils. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-19 Generally, products come in 40-50 pound bags and include all necessary ingredients except for seed and fertilizer. • BFMs and MBFMs provide good alternatives to blankets in most areas requiring vegetation establishment. Advantages over blankets include: • BFM and MBFMs do not require surface preparation. • Helicopters can assist in installing BFM and MBFMs in remote areas. • On slopes steeper than 2.5H:1V, blanket installers may require ropes and harnesses for safety. • Installing BFM and MBFMs can save at least $1,000 per acre compared to blankets. Maintenance Standards Reseed any seeded areas that fail to establish at least 80 percent cover (100 percent cover for areas that receive sheet or concentrated flows). If reseeding is ineffective, use an alternate method such as sodding, mulching, or nets/blankets. If winter weather prevents adequate grass growth, this time limit may be relaxed at the discretion of the local authority when sensitive areas would otherwise be protected. • Reseed and protect by mulch any areas that experience erosion after achieving adequate cover. Reseed and protect by mulch any eroded area. • Supply seeded areas with adequate moisture, but do not water to the extent that it causes runoff. Approved as Equivalent Ecology has approved products as able to meet the requirements of BMP C120. The products did not pass through the Technology Assessment Protocol – Ecology (TAPE) process. Local jurisdictions may choose not to accept this product approved as equivalent, or may require additional testing prior to consideration for local use. The products are available for review on Ecology’s website at http://www.ecy.wa.gov/programs/wq/stormwater/newtech/equivalent.html BMP C121: Mulching Purpose Mulching soils provides immediate temporary protection from erosion. Mulch also enhances plant establishment by conserving moisture, holding fertilizer, seed, and topsoil in place, and moderating soil temperatures. There is an enormous variety of mulches that can be used. This section discusses only the most common types of mulch. Conditions of Use As a temporary cover measure, mulch should be used: • For less than 30 days on disturbed areas that require cover. • At all times for seeded areas, especially during the wet season and Volume II – Construction Stormwater Pollution Prevention - August 2012 4-20 during the hot summer months. • During the wet season on slopes steeper than 3H:1V with more than 10 feet of vertical relief. Mulch may be applied at any time of the year and must be refreshed periodically. • For seeded areas mulch may be made up of 100 percent: cottonseed meal; fibers made of wood, recycled cellulose, hemp, kenaf; compost; or blends of these. Tackifier shall be plant-based, such as guar or alpha plantago, or chemical-based such as polyacrylamide or polymers. Any mulch or tackifier product used shall be installed per manufacturer’s instructions. Generally, mulches come in 40-50 pound bags. Seed and fertilizer are added at time of application. Design and Installation Specifications For mulch materials, application rates, and specifications, see Table 4.1.8. Always use a 2-inch minimum mulch thickness; increase the thickness until the ground is 95% covered (i.e. not visible under the mulch layer). Note: Thickness may be increased for disturbed areas in or near sensitive areas or other areas highly susceptible to erosion. Mulch used within the ordinary high-water mark of surface waters should be selected to minimize potential flotation of organic matter. Composted organic materials have higher specific gravities (densities) than straw, wood, or chipped material. Consult Hydraulic Permit Authority (HPA) for mulch mixes if applicable. Maintenance Standards • The thickness of the cover must be maintained. • Any areas that experience erosion shall be remulched and/or protected with a net or blanket. If the erosion problem is drainage related, then the problem shall be fixed and the eroded area remulched. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-21 Table 4.1.8 Mulch Standards and Guidelines Mulch Material Quality Standards Application Rates Remarks Straw Air-dried; free from undesirable seed and coarse material. 2"-3" thick; 5 bales per 1,000 sf or 2-3 tons per acre Cost-effective protection when applied with adequate thickness. Hand-application generally requires greater thickness than blown straw. The thickness of straw may be reduced by half when used in conjunction with seeding. In windy areas straw must be held in place by crimping, using a tackifier, or covering with netting. Blown straw always has to be held in place with a tackifier as even light winds will blow it away. Straw, however, has several deficiencies that should be considered when selecting mulch materials. It often introduces and/or encourages the propagation of weed species and it has no significant long- term benefits. It should also not be used within the ordinary high-water elevation of surface waters (due to flotation). Hydromulch No growth inhibiting factors. Approx. 25-30 lbs per 1,000 sf or 1,500 - 2,000 lbs per acre Shall be applied with hydromulcher. Shall not be used without seed and tackifier unless the application rate is at least doubled. Fibers longer than about ¾-1 inch clog hydromulch equipment. Fibers should be kept to less than ¾ inch. Composted Mulch and Compost No visible water or dust during handling. Must be produced in accordance with WAC 173-350, Solid Waste Handling Standards. . 2" thick min.; approx. 100 tons per acre (approx. 800 lbs per yard) More effective control can be obtained by increasing thickness to 3". Excellent mulch for protecting final grades until landscaping because it can be directly seeded or tilled into soil as an amendment. Composted mulch has a coarser size gradation than compost. It is more stable and practical to use in wet areas and during rainy weather conditions. Do not use composted mulch near wetlands or near phosphorous impaired water bodies. Chipped Site Vegetation Average size shall be several inches. Gradations from fines to 6 inches in length for texture, variation, and interlocking properties. 2" thick min.; This is a cost-effective way to dispose of debris from clearing and grubbing, and it eliminates the problems associated with burning. Generally, it should not be used on slopes above approx. 10% because of its tendency to be transported by runoff. It is not recommended within 200 feet of surface waters. If seeding is expected shortly after mulch, the decomposition of the chipped vegetation may tie up nutrients important to grass establishment. Wood-based Mulch or Wood Straw No visible water or dust during handling. Must be purchased from a supplier with a Solid Waste Handling Permit or one exempt from solid waste regulations. 2” thick min.; approx. 100 tons per acre (approx. 800 lbs. per cubic yard) This material is often called “hog or hogged fuel.” The use of mulch ultimately improves the organic matter in the soil. Special caution is advised regarding the source and composition of wood-based mulches. Its preparation typically does not provide any weed seed control, so evidence of residual vegetation in its composition or known inclusion of weed plants or seeds should be monitored and prevented (or minimized). Wood Strand Mulch A blend of loose, long, thin wood pieces derived from native conifer or deciduous trees with high length-to-width ratio. 2” thick min. Cost-effective protection when applied with adequate thickness. A minimum of 95-percent of the wood strand shall have lengths between 2 and 10-inches, with a width and thickness between 1/16 and ⅜-inches. The mulch shall not contain resin, tannin, or other compounds in quantities that would be detrimental to plant life. Sawdust or wood shavings shall not be used as mulch. (WSDOT specification (9-14.4(4)) Volume II – Construction Stormwater Pollution Prevention - August 2012 4-22 BMP C122: Nets and Blankets Purpose Erosion control nets and blankets are intended to prevent erosion and hold seed and mulch in place on steep slopes and in channels so that vegetation can become well established. In addition, some nets and blankets can be used to permanently reinforce turf to protect drainage ways during high flows. Nets (commonly called matting) are strands of material woven into an open, but high-tensile strength net (for example, coconut fiber matting). Blankets are strands of material that are not tightly woven, but instead form a layer of interlocking fibers, typically held together by a biodegradable or photodegradable netting (for example, excelsior or straw blankets). They generally have lower tensile strength than nets, but cover the ground more completely. Coir (coconut fiber) fabric comes as both nets and blankets. Conditions of Use Erosion control nets and blankets should be used: • To aid permanent vegetated stabilization of slopes 2H:1V or greater and with more than 10 feet of vertical relief. • For drainage ditches and swales (highly recommended). The application of appropriate netting or blanket to drainage ditches and swales can protect bare soil from channelized runoff while vegetation is established. Nets and blankets also can capture a great deal of sediment due to their open, porous structure. Nets and blankets can be used to permanently stabilize channels and may provide a cost- effective, environmentally preferable alternative to riprap. 100 percent synthetic blankets manufactured for use in ditches may be easily reused as temporary ditch liners. Disadvantages of blankets include: • Surface preparation required. • On slopes steeper than 2.5H:1V, blanket installers may need to be roped and harnessed for safety. • They cost at least $4,000-6,000 per acre installed. Advantages of blankets include: • Installation without mobilizing special equipment. • Installation by anyone with minimal training • Installation in stages or phases as the project progresses. • Installers can hand place seed and fertilizer as they progress down the slope. • Installation in any weather. • There are numerous types of blankets that can be designed with various parameters in mind. Those parameters include: fiber blend, mesh strength, longevity, biodegradability, cost, and availability. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-23 Design and Installation Specifications • See Figure 4.1.3 and Figure 4.1.4 for typical orientation and installation of blankets used in channels and as slope protection. Note: these are typical only; all blankets must be installed per manufacturer’s installation instructions. • Installation is critical to the effectiveness of these products. If good ground contact is not achieved, runoff can concentrate under the product, resulting in significant erosion. • Installation of Blankets on Slopes: 1. Complete final grade and track walk up and down the slope. 2. Install hydromulch with seed and fertilizer. 3. Dig a small trench, approximately 12 inches wide by 6 inches deep along the top of the slope. 4. Install the leading edge of the blanket into the small trench and staple approximately every 18 inches. NOTE: Staples are metal, “U”-shaped, and a minimum of 6 inches long. Longer staples are used in sandy soils. Biodegradable stakes are also available. 5. Roll the blanket slowly down the slope as installer walks backwards. NOTE: The blanket rests against the installer’s legs. Staples are installed as the blanket is unrolled. It is critical that the proper staple pattern is used for the blanket being installed. The blanket is not to be allowed to roll down the slope on its own as this stretches the blanket making it impossible to maintain soil contact. In addition, no one is allowed to walk on the blanket after it is in place. 6. If the blanket is not long enough to cover the entire slope length, the trailing edge of the upper blanket should overlap the leading edge of the lower blanket and be stapled. On steeper slopes, this overlap should be installed in a small trench, stapled, and covered with soil. • With the variety of products available, it is impossible to cover all the details of appropriate use and installation. Therefore, it is critical that the design engineer consult the manufacturer's information and that a site visit takes place in order to ensure that the product specified is appropriate. Information is also available at the following web sites: 1. WSDOT (Section 3.2.4): http://www.wsdot.wa.gov/NR/rdonlyres/3B41E087-FA86-4717- 932D-D7A8556CCD57/0/ErosionTrainingManual.pdf 2. Texas Transportation Institute: http://www.txdot.gov/business/doing_business/product_evaluation/ erosion_control.htm Volume II – Construction Stormwater Pollution Prevention - August 2012 4-24 • Use jute matting in conjunction with mulch (BMP C121). Excelsior, woven straw blankets and coir (coconut fiber) blankets may be installed without mulch. There are many other types of erosion control nets and blankets on the market that may be appropriate in certain circumstances. • In general, most nets (e.g., jute matting) require mulch in order to prevent erosion because they have a fairly open structure. Blankets typically do not require mulch because they usually provide complete protection of the surface. • Extremely steep, unstable, wet, or rocky slopes are often appropriate candidates for use of synthetic blankets, as are riverbanks, beaches and other high-energy environments. If synthetic blankets are used, the soil should be hydromulched first. • 100-percent biodegradable blankets are available for use in sensitive areas. These organic blankets are usually held together with a paper or fiber mesh and stitching which may last up to a year. • Most netting used with blankets is photodegradable, meaning they break down under sunlight (not UV stabilized). However, this process can take months or years even under bright sun. Once vegetation is established, sunlight does not reach the mesh. It is not uncommon to find non-degraded netting still in place several years after installation. This can be a problem if maintenance requires the use of mowers or ditch cleaning equipment. In addition, birds and small animals can become trapped in the netting. Maintenance Standards • Maintain good contact with the ground. Erosion must not occur beneath the net or blanket. • Repair and staple any areas of the net or blanket that are damaged or not in close contact with the ground. • Fix and protect eroded areas if erosion occurs due to poorly controlled drainage. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-25 Min. 2“Overlap Slope surface shall be smooth beforeplacement for proper soil contact. Stapling pattern as permanufacturer’s recommendations. Do not stretch blankets/mattings tight -allow the rolls to mold to any irregularities. For slopes less than 3H:1V, rollsmay be placed in horizontal strips. If there is a berm at thetop of slope, anchorupslope of the berm. Anchor in 6"x6" min. Trenchand staple at 12" intervals. Min. 6" overlap. Staple overlapsmax. 5" spacing. Bring material down to a level area, turnthe end under 4" and staple at 12" intervals. Lime, fertilize, and seed before installation.Planting of shrubs, trees, etc. Should occurafter installation. Figure 4.1.3 – Channel Installation Figure 4.1.4 – Slope Installation Volume II – Construction Stormwater Pollution Prevention - August 2012 4-26 BMP C123: Plastic Covering Purpose Plastic covering provides immediate, short-term erosion protection to slopes and disturbed areas. Conditions of Use Plastic covering may be used on disturbed areas that require cover measures for less than 30 days, except as stated below. • Plastic is particularly useful for protecting cut and fill slopes and stockpiles. Note: The relatively rapid breakdown of most polyethylene sheeting makes it unsuitable for long-term (greater than six months) applications. • Due to rapid runoff caused by plastic covering, do not use this method upslope of areas that might be adversely impacted by concentrated runoff. Such areas include steep and/or unstable slopes. • Plastic sheeting may result in increased runoff volumes and velocities, requiring additional on-site measures to counteract the increases. Creating a trough with wattles or other material can convey clean water away from these areas. • To prevent undercutting, trench and backfill rolled plastic covering products. • While plastic is inexpensive to purchase, the added cost of installation, maintenance, removal, and disposal make this an expensive material, up to $1.50-2.00 per square yard. • Whenever plastic is used to protect slopes install water collection measures at the base of the slope. These measures include plastic- covered berms, channels, and pipes used to covey clean rainwater away from bare soil and disturbed areas. Do not mix clean runoff from a plastic covered slope with dirty runoff from a project. • Other uses for plastic include: 1. Temporary ditch liner. 2. Pond liner in temporary sediment pond. 3. Liner for bermed temporary fuel storage area if plastic is not reactive to the type of fuel being stored. 4. Emergency slope protection during heavy rains. 5. Temporary drainpipe (“elephant trunk”) used to direct water. Design and Installation Specifications • Plastic slope cover must be installed as follows: 1. Run plastic up and down slope, not across slope. 2. Plastic may be installed perpendicular to a slope if the slope length is less than 10 feet. 3. Minimum of 8-inch overlap at seams. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-27 4. On long or wide slopes, or slopes subject to wind, tape all seams. 5. Place plastic into a small (12-inch wide by 6-inch deep) slot trench at the top of the slope and backfill with soil to keep water from flowing underneath. 6. Place sand filled burlap or geotextile bags every 3 to 6 feet along seams and tie them together with twine to hold them in place. 7. Inspect plastic for rips, tears, and open seams regularly and repair immediately. This prevents high velocity runoff from contacting bare soil which causes extreme erosion. 8. Sandbags may be lowered into place tied to ropes. However, all sandbags must be staked in place. • Plastic sheeting shall have a minimum thickness of 0.06 millimeters. • If erosion at the toe of a slope is likely, a gravel berm, riprap, or other suitable protection shall be installed at the toe of the slope in order to reduce the velocity of runoff. Maintenance Standards • Torn sheets must be replaced and open seams repaired. • Completely remove and replace the plastic if it begins to deteriorate due to ultraviolet radiation. • Completely remove plastic when no longer needed. • Dispose of old tires used to weight down plastic sheeting appropriately. Approved as Equivalent Ecology has approved products as able to meet the requirements of BMP C123. The products did not pass through the Technology Assessment Protocol – Ecology (TAPE) process. Local jurisdictions may choose not to accept this product approved as equivalent, or may require additional testing prior to consideration for local use. The products are available for review on Ecology’s website at http://www.ecy.wa.gov/programs/wq/stormwater/newtech/equivalent.html BMP C124: Sodding Purpose The purpose of sodding is to establish permanent turf for immediate erosion protection and to stabilize drainage ways where concentrated overland flow will occur. Conditions of Use Sodding may be used in the following areas: • Disturbed areas that require short-term or long-term cover. • Disturbed areas that require immediate vegetative cover. • All waterways that require vegetative lining. Waterways may also be seeded rather than sodded, and protected with a net or blanket. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-28 Design and Installation Specifications Sod shall be free of weeds, of uniform thickness (approximately 1-inch thick), and shall have a dense root mat for mechanical strength. The following steps are recommended for sod installation: • Shape and smooth the surface to final grade in accordance with the approved grading plan. The swale needs to be overexcavated 4 to 6 inches below design elevation to allow room for placing soil amendment and sod. • Amend 4 inches (minimum) of compost into the top 8 inches of the soil if the organic content of the soil is less than ten percent or the permeability is less than 0.6 inches per hour. See http://www.ecy.wa.gov/programs/swfa/organics/soil.html for further information. • Fertilize according to the supplier's recommendations. • Work lime and fertilizer 1 to 2 inches into the soil, and smooth the surface. • Lay strips of sod beginning at the lowest area to be sodded and perpendicular to the direction of water flow. Wedge strips securely into place. Square the ends of each strip to provide for a close, tight fit. Stagger joints at least 12 inches. Staple on slopes steeper than 3H:1V. Staple the upstream edge of each sod strip. • Roll the sodded area and irrigate. • When sodding is carried out in alternating strips or other patterns, seed the areas between the sod immediately after sodding. Maintenance Standards If the grass is unhealthy, the cause shall be determined and appropriate action taken to reestablish a healthy groundcover. If it is impossible to establish a healthy groundcover due to frequent saturation, instability, or some other cause, the sod shall be removed, the area seeded with an appropriate mix, and protected with a net or blanket. BMP C125: Topsoiling / Composting Purpose Topsoiling and composting provide a suitable growth medium for final site stabilization with vegetation. While not a permanent cover practice in itself, topsoiling and composting are an integral component of providing permanent cover in those areas where there is an unsuitable soil surface for plant growth. Use this BMP in conjunction with other BMPs such as seeding, mulching, or sodding. Native soils and disturbed soils that have been organically amended not only retain much more stormwater, but they also serve as effective biofilters for urban pollutants and, by supporting more vigorous plant growth, reduce the water, fertilizer and pesticides needed to support Volume II – Construction Stormwater Pollution Prevention - August 2012 4-29 installed landscapes. Topsoil does not include any subsoils but only the material from the top several inches including organic debris. Conditions of Use • Permanent landscaped areas shall contain healthy topsoil that reduces the need for fertilizers, improves overall topsoil quality, provides for better vegetal health and vitality, improves hydrologic characteristics, and reduces the need for irrigation. • Leave native soils and the duff layer undisturbed to the maximum extent practicable. Stripping of existing, properly functioning soil system and vegetation for the purpose of topsoiling during construction is not acceptable. Preserve existing soil systems in undisturbed and uncompacted conditions if functioning properly. • Areas that already have good topsoil, such as undisturbed areas, do not require soil amendments. • Restore, to the maximum extent practical, native soils disturbed during clearing and grading to a condition equal to or better than the original site condition’s moisture-holding capacity. Use on-site native topsoil, incorporate amendments into on-site soil, or import blended topsoil to meet this requirement. • Topsoiling is a required procedure when establishing vegetation on shallow soils, and soils of critically low pH (high acid) levels. • Beware of where the topsoil comes from, and what vegetation was on site before disturbance, invasive plant seeds may be included and could cause problems for establishing native plants, landscaped areas, or grasses. • Topsoil from the site will contain mycorrhizal bacteria that are necessary for healthy root growth and nutrient transfer. These native mycorrhiza are acclimated to the site and will provide optimum conditions for establishing grasses. Use commercially available mycorrhiza products when using off-site topsoil. Design and Installation Specifications Meet the following requirements for areas requiring disruption and topsoiling: • Maximize the depth of the topsoil wherever possible to provide the maximum possible infiltration capacity and beneficial growth medium. Topsoil shall have: • A minimum depth of 8-inches. Scarify subsoils below the topsoil layer at least 4-inches with some incorporation of the upper material to avoid stratified layers, where feasible. Ripping or re- structuring the subgrade may also provide additional benefits regarding the overall infiltration and interflow dynamics of the soil system. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-30 • A minimum organic content of 10% dry weight, and 5% organic matter content in turf areas. Incorporate organic amendments to a minimum 8-inch depth except where tree roots or other natural features limit the depth of incorporation. • A pH between 6.0 and 8.0 or matching the pH of the undisturbed soil. • If blended topsoil is imported, then fines should be limited to 25 percent passing through a 200 sieve. • Accomplish the required organic content and pH by either returning native topsoil to the site and/or incorporating organic amendments. • To meet the organic content use compost that meets the definition of “composted materials” in WAC 173-350-220. This code is available online at: http://apps.leg.wa.gov/WAC/default.aspx?cite=173-350-220. The compost must also have an organic matter content of 35% to 65%, and a carbon to nitrogen ratio below 25H:1V. The carbon to nitrogen ratio may be as high as 35H:1V for plantings composed entirely of plants native to the Puget Sound Lowlands region. • For till soils use a mixture of approximately two parts soil to one part compost. This equates to 4 inches of compost mixed to a depth of 12 inches in till soils. Increasing the concentration of compost beyond this level can have negative effects on vegetal health, while decreasing the concentrations can reduce the benefits of amended soils. • Gravel or cobble outwash soils, may require different approaches. Organics and fines easily migrate through the loose structure of these soils. Therefore, the importation of at least 6 inches of quality topsoil, underlain by some type of filter fabric to prevent the migration of fines, may be more appropriate for these soils. • The final composition and construction of the soil system will result in a natural selection or favoring of certain plant species over time. For example, incorporation of topsoil may favor grasses, while layering with mildly acidic, high-carbon amendments may favor more woody vegetation. • Allow sufficient time in scheduling for topsoil spreading prior to seeding, sodding, or planting. • Take care when applying top soil to subsoils with contrasting textures. Sandy topsoil over clayey subsoil is a particularly poor combination, as water creeps along the junction between the soil layers and causes the topsoil to slough. If topsoil and subsoil are not properly bonded, water will not infiltrate the soil profile evenly and it will be difficult to Volume II – Construction Stormwater Pollution Prevention - August 2012 4-31 establish vegetation. The best method to prevent a lack of bonding is to actually work the topsoil into the layer below for a depth of at least 6 inches. • Field exploration of the site shall be made to determine if there is surface soil of sufficient quantity and quality to justify stripping. Topsoil shall be friable and loamy (loam, sandy loam, silt loam, sandy clay loam, and clay loam). Avoid areas of natural ground water recharge. • Stripping shall be confined to the immediate construction area. A 4- inch to 6-inch stripping depth is common, but depth may vary depending on the particular soil. All surface runoff control structures shall be in place prior to stripping. • Do not place topsoil while in a frozen or muddy condition, when the subgrade is excessively wet, or when conditions exist that may otherwise be detrimental to proper grading or proposed sodding or seeding. • In any areas requiring grading remove and stockpile the duff layer and topsoil on site in a designated, controlled area, not adjacent to public resources and critical areas. Stockpiled topsoil is to be reapplied to other portions of the site where feasible. • Locate the topsoil stockpile so that it meets specifications and does not interfere with work on the site. It may be possible to locate more than one pile in proximity to areas where topsoil will be used. Stockpiling of topsoil shall occur in the following manner: • Side slopes of the stockpile shall not exceed 2H:1V. • Between October 1 and April 30: • An interceptor dike with gravel outlet and silt fence shall surround all topsoil. • Within 2 days complete erosion control seeding, or covering stockpiles with clear plastic, or other mulching materials. • Between May 1 and September 30: • An interceptor dike with gravel outlet and silt fence shall surround all topsoil if the stockpile will remain in place for a longer period of time than active construction grading. • Within 7 days complete erosion control seeding, or covering stockpiles with clear plastic, or other mulching materials. • When native topsoil is to be stockpiled and reused the following should apply to ensure that the mycorrhizal bacterial, earthworms, and other beneficial organisms will not be destroyed: 1. Re-install topsoil within 4 to 6 weeks. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-32 2. Do not allow the saturation of topsoil with water. 3. Do not use plastic covering. Maintenance Standards • Inspect stockpiles regularly, especially after large storm events. Stabilize any areas that have eroded. • Establish soil quality and depth toward the end of construction and once established, protect from compaction, such as from large machinery use, and from erosion. • Plant and mulch soil after installation. • Leave plant debris or its equivalent on the soil surface to replenish organic matter. • Reduce and adjust, where possible, the use of irrigation, fertilizers, herbicides and pesticides, rather than continuing to implement formerly established practices. BMP C126: Polyacrylamide (PAM) for Soil Erosion Protection Purpose Polyacrylamide (PAM) is used on construction sites to prevent soil erosion. Applying PAM to bare soil in advance of a rain event significantly reduces erosion and controls sediment in two ways. First, PAM increases the soil’s available pore volume, thus increasing infiltration through flocculation and reducing the quantity of stormwater runoff. Second, it increases flocculation of suspended particles and aids in their deposition, thus reducing stormwater runoff turbidity and improving water quality. Conditions of Use PAM shall not be directly applied to water or allowed to enter a water body. In areas that drain to a sediment pond, PAM can be applied to bare soil under the following conditions: • During rough grading operations. • In Staging areas. • Balanced cut and fill earthwork. • Haul roads prior to placement of crushed rock surfacing. • Compacted soil roadbase. • Stockpiles. • After final grade and before paving or final seeding and planting. • Pit sites. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-33 • Sites having a winter shut down. In the case of winter shut down, or where soil will remain unworked for several months, PAM should be used together with mulch. Design and Installation Specifications PAM may be applied with water in dissolved form. The preferred application method is the dissolved form. PAM is to be applied at a maximum rate of 2/3 pound PAM per 1,000 gallons water (80 mg/L) per 1 acre of bare soil. Table 4.1.9 can be used to determine the PAM and water application rate for a disturbed soil area. Higher concentrations of PAM do not provide any additional effectiveness. Table 4.1.9 PAM and Water Application Rates Disturbed Area (ac) PAM (lbs) Water (gal) 0.50 0.33 500 1.00 0.66 1,000 1.50 1.00 1,500 2.00 1.32 2,000 2.50 1.65 2,500 3.00 2.00 3,000 3.50 2.33 3,500 4.00 2.65 4,000 4.50 3.00 4,500 5.00 3.33 5,000 The Preferred Method: • Pre-measure the area where PAM is to be applied and calculate the amount of product and water necessary to provide coverage at the specified application rate (2/3 pound PAM/1000 gallons/acre). • PAM has infinite solubility in water, but dissolves very slowly. Dissolve pre-measured dry granular PAM with a known quantity of clean water in a bucket several hours or overnight. Mechanical mixing will help dissolve the PAM. Always add PAM to water - not water to PAM. • Pre-fill the water truck about 1/8 full with water. The water does not have to be potable, but it must have relatively low turbidity – in the range of 20 NTU or less. • Add PAM /Water mixture to the truck • Completely fill the water truck to specified volume. • Spray PAM/Water mixture onto dry soil until the soil surface is uniformly and completely wetted. An Alternate Method: Volume II – Construction Stormwater Pollution Prevention - August 2012 4-34 PAM may also be applied as a powder at the rate of 5 lbs. per acre. This must be applied on a day that is dry. For areas less than 5-10 acres, a hand- held “organ grinder” fertilizer spreader set to the smallest setting will work. Tractor-mounted spreaders will work for larger areas. The following shall be used for application of powdered PAM: • Powered PAM shall be used in conjunction with other BMPs and not in place of other BMPs. • Do not use PAM on a slope that flows directly into a stream or wetland. The stormwater runoff shall pass through a sediment control BMP prior to discharging to surface waters. • Do not add PAM to water discharging from site. • When the total drainage area is greater than or equal to 5 acres, PAM treated areas shall drain to a sediment pond. • Areas less than 5 acres shall drain to sediment control BMPs, such as a minimum of 3 check dams per acre. The total number of check dams used shall be maximized to achieve the greatest amount of settlement of sediment prior to discharging from the site. Each check dam shall be spaced evenly in the drainage channel through which stormwater flows are discharged off-site. • On all sites, the use of silt fence shall be maximized to limit the discharges of sediment from the site. • All areas not being actively worked shall be covered and protected from rainfall. PAM shall not be the only cover BMP used. • PAM can be applied to wet soil, but dry soil is preferred due to less sediment loss. • PAM will work when applied to saturated soil but is not as effective as applications to dry or damp soil. • Keep the granular PAM supply out of the sun. Granular PAM loses its effectiveness in three months after exposure to sunlight and air. • Proper application and re-application plans are necessary to ensure total effectiveness of PAM usage. • PAM, combined with water, is very slippery and can be a safety hazard. Care must be taken to prevent spills of PAM powder onto paved surfaces. During an application of PAM, prevent over-spray from reaching pavement as pavement will become slippery. If PAM powder gets on skin or clothing, wipe it off with a rough towel rather than washing with water-this only makes cleanup messier and take longer. • Some PAMs are more toxic and carcinogenic than others. Only the most environmentally safe PAM products should be used. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-35 The specific PAM copolymer formulation must be anionic. Cationic PAM shall not be used in any application because of known aquatic toxicity problems. Only the highest drinking water grade PAM, certified for compliance with ANSI/NSF Standard 60 for drinking water treatment, will be used for soil applications. Recent media attention and high interest in PAM has resulted in some entrepreneurial exploitation of the term "polymer." All PAM are polymers, but not all polymers are PAM, and not all PAM products comply with ANSI/NSF Standard 60. PAM use shall be reviewed and approved by the local permitting authority. • PAM designated for these uses should be "water soluble" or "linear" or "non-crosslinked". Cross-linked or water absorbent PAM, polymerized in highly acidic (pH<2) conditions, are used to maintain soil moisture content. • The PAM anionic charge density may vary from 2-30 percent; a value of 18 percent is typical. Studies conducted by the United States Department of Agriculture (USDA)/ARS demonstrated that soil stabilization was optimized by using very high molecular weight (12- 15 mg/mole), highly anionic (>20% hydrolysis) PAM. • PAM tackifiers are available and being used in place of guar and alpha plantago. Typically, PAM tackifiers should be used at a rate of no more than 0.5-1 lb. per 1000 gallons of water in a hydromulch machine. Some tackifier product instructions say to use at a rate of 3 –5 lbs. per acre, which can be too much. In addition, pump problems can occur at higher rates due to increased viscosity. Maintenance Standards • PAM may be reapplied on actively worked areas after a 48-hour period. • Reapplication is not required unless PAM treated soil is disturbed or unless turbidity levels show the need for an additional application. If PAM treated soil is left undisturbed a reapplication may be necessary after two months. More PAM applications may be required for steep slopes, silty and clayey soils (USDA Classification Type "C" and "D" soils), long grades, and high precipitation areas. When PAM is applied first to bare soil and then covered with straw, a reapplication may not be necessary for several months. • Loss of sediment and PAM may be a basis for penalties per RCW 90.48.080. BMP C130: Surface Roughening Purpose Surface roughening aids in the establishment of vegetative cover, reduces runoff velocity, increases infiltration, and provides for sediment trapping through the provision of a rough soil surface. Horizontal depressions are Volume II – Construction Stormwater Pollution Prevention - August 2012 4-36 created by operating a tiller or other suitable equipment on the contour or by leaving slopes in a roughened condition by not fine grading them. Use this BMP in conjunction with other BMPs such as seeding, mulching, or sodding. Conditions for Use • All slopes steeper than 3H:1V and greater than 5 vertical feet require surface roughening to a depth of 2 to 4 inches prior to seeding.. • Areas that will not be stabilized immediately may be roughened to reduce runoff velocity until seeding takes place. • Slopes with a stable rock face do not require roughening. • Slopes where mowing is planned should not be excessively roughened. Design and Installation Specifications There are different methods for achieving a roughened soil surface on a slope, and the selection of an appropriate method depends upon the type of slope. Roughening methods include stair-step grading, grooving, contour furrows, and tracking. See Figure 4.1.5 for tracking and contour furrows. Factors to be considered in choosing a method are slope steepness, mowing requirements, and whether the slope is formed by cutting or filling. • Disturbed areas that will not require mowing may be stair-step graded, grooved, or left rough after filling. • Stair-step grading is particularly appropriate in soils containing large amounts of soft rock. Each "step" catches material that sloughs from above, and provides a level site where vegetation can become established. Stairs should be wide enough to work with standard earth moving equipment. Stair steps must be on contour or gullies will form on the slope. • Areas that will be mowed (these areas should have slopes less steep than 3H:1V) may have small furrows left by disking, harrowing, raking, or seed-planting machinery operated on the contour. • Graded areas with slopes steeper than 3H:1V but less than 2H:1V should be roughened before seeding. This can be accomplished in a variety of ways, including "track walking," or driving a crawler tractor up and down the slope, leaving a pattern of cleat imprints parallel to slope contours. • Tracking is done by operating equipment up and down the slope to leave horizontal depressions in the soil. Maintenance Standards • Areas that are graded in this manner should be seeded as quickly as possible. • Regular inspections should be made of the area. If rills appear, they should be re-graded and re-seeded immediately. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-37 Figure 4.1.5 – Surface Roughening by Tracking and Contour Furrows Volume II – Construction Stormwater Pollution Prevention - August 2012 4-38 BMP C131: Gradient Terraces Purpose Gradient terraces reduce erosion damage by intercepting surface runoff and conducting it to a stable outlet at a non-erosive velocity. Conditions of Use • Gradient terraces normally are limited to denuded land having a water erosion problem. They should not be constructed on deep sands or on soils that are too stony, steep, or shallow to permit practical and economical installation and maintenance. Gradient terraces may be used only where suitable outlets are or will be made available. See Figure 4.1.6 for gradient terraces. Design and Installation Specifications • The maximum vertical spacing of gradient terraces should be determined by the following method: VI = (0.8)s + y Where: VI = vertical interval in feet s = land rise per 100 feet, expressed in feet y = a soil and cover variable with values from 1.0 to 4.0 Values of “y” are influenced by soil erodibility and cover practices. The lower values are applicable to erosive soils where little to no residue is left on the surface. The higher value is applicable only to erosion-resistant soils where a large amount of residue (1½ tons of straw/acre equivalent) is on the surface. • The minimum constructed cross-section should meet the design dimensions. • The top of the constructed ridge should not be lower at any point than the design elevation plus the specified overfill for settlement. The opening at the outlet end of the terrace should have a cross section equal to that specified for the terrace channel. • Channel grades may be either uniform or variable with a maximum grade of 0.6 feet per 100 feet length (0.6%). For short distances, terrace grades may be increased to improve alignment. The channel velocity should not exceed that which is nonerosive for the soil type. • All gradient terraces should have adequate outlets. Such an outlet may be a grassed waterway, vegetated area, or tile outlet. In all cases the outlet must convey runoff from the terrace or terrace system to a point where the outflow will not cause damage. Vegetative cover should be used in the outlet channel. • The design elevation of the water surface of the terrace should not be lower than the design elevation of the water surface in the outlet at their junction, when both are operating at design flow. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-39 Slope to adequate outlet. 10' min. • Vertical spacing determined by the above methods may be increased as much as 0.5 feet or 10 percent, whichever is greater, to provide better alignment or location, to avoid obstacles, to adjust for equipment size, or to reach a satisfactory outlet. The drainage area above the terrace should not exceed the area that would be drained by a terrace with normal spacing. • The terrace should have enough capacity to handle the peak runoff expected from a 2-year, 24-hour design storm without overtopping. • The terrace cross-section should be proportioned to fit the land slope. The ridge height should include a reasonable settlement factor. The ridge should have a minimum top width of 3 feet at the design height. The minimum cross-sectional area of the terrace channel should be 8 square feet for land slopes of 5 percent or less, 7 square feet for slopes from 5 to 8 percent, and 6 square feet for slopes steeper than 8 percent. The terrace can be constructed wide enough to be maintained using a small vehicle. Maintenance Standards • Maintenance should be performed as needed. Terraces should be inspected regularly; at least once a year, and after large storm events. Figure 4.1.6 – Gradient Terraces Volume II – Construction Stormwater Pollution Prevention - August 2012 4-40 BMP C140: Dust Control Purpose Dust control prevents wind transport of dust from disturbed soil surfaces onto roadways, drainage ways, and surface waters. Conditions of Use • In areas (including roadways) subject to surface and air movement of dust where on-site and off-site impacts to roadways, drainage ways, or surface waters are likely. Design and Installation Specifications • Vegetate or mulch areas that will not receive vehicle traffic. In areas where planting, mulching, or paving is impractical, apply gravel or landscaping rock. • Limit dust generation by clearing only those areas where immediate activity will take place, leaving the remaining area(s) in the original condition. Maintain the original ground cover as long as practical. • Construct natural or artificial windbreaks or windscreens. These may be designed as enclosures for small dust sources. • Sprinkle the site with water until surface is wet. Repeat as needed. To prevent carryout of mud onto street, refer to Stabilized Construction Entrance (BMP C105). • Irrigation water can be used for dust control. Irrigation systems should be installed as a first step on sites where dust control is a concern. • Spray exposed soil areas with a dust palliative, following the manufacturer’s instructions and cautions regarding handling and application. Used oil is prohibited from use as a dust suppressant. Local governments may approve other dust palliatives such as calcium chloride or PAM. • PAM (BMP C126) added to water at a rate of 0.5 lbs. per 1,000 gallons of water per acre and applied from a water truck is more effective than water alone. This is due to increased infiltration of water into the soil and reduced evaporation. In addition, small soil particles are bonded together and are not as easily transported by wind. Adding PAM may actually reduce the quantity of water needed for dust control. Use of PAM could be a cost-effective dust control method. Techniques that can be used for unpaved roads and lots include: • Lower speed limits. High vehicle speed increases the amount of dust stirred up from unpaved roads and lots. • Upgrade the road surface strength by improving particle size, shape, and mineral types that make up the surface and base materials. • Add surface gravel to reduce the source of dust emission. Limit the amount of fine particles (those smaller than .075 mm) to 10 to 20 percent. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-41 • Use geotextile fabrics to increase the strength of new roads or roads undergoing reconstruction. • Encourage the use of alternate, paved routes, if available. • Restrict use of paved roadways by tracked vehicles and heavy trucks to prevent damage to road surface and base. • Apply chemical dust suppressants using the admix method, blending the product with the top few inches of surface material. Suppressants may also be applied as surface treatments. • Pave unpaved permanent roads and other trafficked areas. • Use vacuum street sweepers. • Remove mud and other dirt promptly so it does not dry and then turn into dust. • Limit dust-causing work on windy days. • Contact your local Air Pollution Control Authority for guidance and training on other dust control measures. Compliance with the local Air Pollution Control Authority constitutes compliance with this BMP. Maintenance Standards Respray area as necessary to keep dust to a minimum. BMP C150: Materials on Hand Purpose Keep quantities of erosion prevention and sediment control materials on the project site at all times to be used for regular maintenance and emergency situations such as unexpected heavy summer rains. Having these materials on-site reduces the time needed to implement BMPs when inspections indicate that existing BMPs are not meeting the Construction SWPPP requirements. In addition, contractors can save money by buying some materials in bulk and storing them at their office or yard. Conditions of Use • Construction projects of any size or type can benefit from having materials on hand. A small commercial development project could have a roll of plastic and some gravel available for immediate protection of bare soil and temporary berm construction. A large earthwork project, such as highway construction, might have several tons of straw, several rolls of plastic, flexible pipe, sandbags, geotextile fabric and steel “T” posts. • Materials are stockpiled and readily available before any site clearing, grubbing, or earthwork begins. A large contractor or developer could keep a stockpile of materials that are available for use on several projects. • If storage space at the project site is at a premium, the contractor could maintain the materials at their office or yard. The office or yard must be less than an hour from the project site. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-42 Design and Installation Specifications Depending on project type, size, complexity, and length, materials and quantities will vary. A good minimum list of items that will cover numerous situations includes: Material Clear Plastic, 6 mil Drainpipe, 6 or 8 inch diameter Sandbags, filled Straw Bales for mulching, Quarry Spalls Washed Gravel Geotextile Fabric Catch Basin Inserts Steel “T” Posts Silt fence material Straw Wattles Maintenance Standards • All materials with the exception of the quarry spalls, steel “T” posts, and gravel should be kept covered and out of both sun and rain. • Re-stock materials used as needed. BMP C151: Concrete Handling Purpose Concrete work can generate process water and slurry that contain fine particles and high pH, both of which can violate water quality standards in the receiving water. Concrete spillage or concrete discharge to surface waters of the State is prohibited. Use this BMP to minimize and eliminate concrete, concrete process water, and concrete slurry from entering waters of the state. Conditions of Use Any time concrete is used, utilize these management practices. Concrete construction projects include, but are not limited to, the following: • Curbs • Sidewalks • Roads • Bridges • Foundations • Floors • Runways Design and Installation • Wash out concrete truck chutes, pumps, and internals into formed areas only. Assure that washout of concrete trucks is performed off- Volume II – Construction Stormwater Pollution Prevention - August 2012 4-43 Specifications site or in designated concrete washout areas. Do not wash out concrete trucks onto the ground, or into storm drains, open ditches, streets, or streams. Refer to BMP C154 for information on concrete washout areas. • Return unused concrete remaining in the truck and pump to the originating batch plant for recycling. Do not dump excess concrete on site, except in designated concrete washout areas. • Wash off hand tools including, but not limited to, screeds, shovels, rakes, floats, and trowels into formed areas only. • Wash equipment difficult to move, such as concrete pavers in areas that do not directly drain to natural or constructed stormwater conveyances. • Do not allow washdown from areas, such as concrete aggregate driveways, to drain directly to natural or constructed stormwater conveyances. • Contain washwater and leftover product in a lined container when no formed areas are available,. Dispose of contained concrete in a manner that does not violate ground water or surface water quality standards. • Always use forms or solid barriers for concrete pours, such as pilings, within 15-feet of surface waters. • Refer to BMPs C252 and C253 for pH adjustment requirements. • Refer to the Construction Stormwater General Permit for pH monitoring requirements if the project involves one of the following activities: • Significant concrete work (greater than 1,000 cubic yards poured concrete or recycled concrete used over the life of a project). • The use of engineered soils amended with (but not limited to) Portland cement-treated base, cement kiln dust or fly ash. • Discharging stormwater to segments of water bodies on the 303(d) list (Category 5) for high pH. Maintenance Standards Check containers for holes in the liner daily during concrete pours and repair the same day. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-44 BMP C152: Sawcutting and Surfacing Pollution Prevention Purpose Sawcutting and surfacing operations generate slurry and process water that contains fine particles and high pH (concrete cutting), both of which can violate the water quality standards in the receiving water. Concrete spillage or concrete discharge to surface waters of the State is prohibited. Use this BMP to minimize and eliminate process water and slurry created through sawcutting or surfacing from entering waters of the State. Conditions of Use Utilize these management practices anytime sawcutting or surfacing operations take place. Sawcutting and surfacing operations include, but are not limited to, the following: • Sawing • Coring • Grinding • Roughening • Hydro-demolition • Bridge and road surfacing Design and Installation Specifications • Vacuum slurry and cuttings during cutting and surfacing operations. • Slurry and cuttings shall not remain on permanent concrete or asphalt pavement overnight. • Slurry and cuttings shall not drain to any natural or constructed drainage conveyance including stormwater systems. This may require temporarily blocking catch basins. • Dispose of collected slurry and cuttings in a manner that does not violate ground water or surface water quality standards. • Do not allow process water generated during hydro-demolition, surface roughening or similar operations to drain to any natural or constructed drainage conveyance including stormwater systems. Dispose process water in a manner that does not violate ground water or surface water quality standards. • Handle and dispose cleaning waste material and demolition debris in a manner that does not cause contamination of water. Dispose of sweeping material from a pick-up sweeper at an appropriate disposal site. Maintenance Standards Continually monitor operations to determine whether slurry, cuttings, or process water could enter waters of the state. If inspections show that a violation of water quality standards could occur, stop operations and immediately implement preventive measures such as berms, barriers, secondary containment, and vacuum trucks. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-45 BMP C153: Material Delivery, Storage and Containment Purpose Prevent, reduce, or eliminate the discharge of pollutants to the stormwater system or watercourses from material delivery and storage. Minimize the storage of hazardous materials on-site, store materials in a designated area, and install secondary containment. Conditions of Use These procedures are suitable for use at all construction sites with delivery and storage of the following materials: • Petroleum products such as fuel, oil and grease • Soil stabilizers and binders (e.g. Polyacrylamide) • Fertilizers, pesticides and herbicides • Detergents • Asphalt and concrete compounds • Hazardous chemicals such as acids, lime, adhesives, paints, solvents and curing compounds • Any other material that may be detrimental if released to the environment Design and Installation Specifications The following steps should be taken to minimize risk: • Temporary storage area should be located away from vehicular traffic, near the construction entrance(s), and away from waterways or storm drains. • Material Safety Data Sheets (MSDS) should be supplied for all materials stored. Chemicals should be kept in their original labeled containers. • Hazardous material storage on-site should be minimized. • Hazardous materials should be handled as infrequently as possible. • During the wet weather season (Oct 1 – April 30), consider storing materials in a covered area. • Materials should be stored in secondary containments, such as earthen dike, horse trough, or even a children’s wading pool for non-reactive materials such as detergents, oil, grease, and paints. Small amounts of material may be secondarily contained in “bus boy” trays or concrete mixing trays. • Do not store chemicals, drums, or bagged materials directly on the ground. Place these items on a pallet and, when possible, and within secondary containment. • If drums must be kept uncovered, store them at a slight angle to reduce ponding of rainwater on the lids to reduce corrosion. Domed plastic covers are inexpensive and snap to the top of drums, preventing water from collecting. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-46 Material Storage Areas and Secondary Containment Practices: • Liquids, petroleum products, and substances listed in 40 CFR Parts 110, 117, or 302 shall be stored in approved containers and drums and shall not be overfilled. Containers and drums shall be stored in temporary secondary containment facilities. • Temporary secondary containment facilities shall provide for a spill containment volume able to contain 10% of the total enclosed container volume of all containers, or 110% of the capacity of the largest container within its boundary, whichever is greater. • Secondary containment facilities shall be impervious to the materials stored therein for a minimum contact time of 72 hours. • Secondary containment facilities shall be maintained free of accumulated rainwater and spills. In the event of spills or leaks, accumulated rainwater and spills shall be collected and placed into drums. These liquids shall be handled as hazardous waste unless testing determines them to be non-hazardous. • Sufficient separation should be provided between stored containers to allow for spill cleanup and emergency response access. • During the wet weather season (Oct 1 – April 30), each secondary containment facility shall be covered during non-working days, prior to and during rain events. • Keep material storage areas clean, organized and equipped with an ample supply of appropriate spill clean-up material (spill kit). • The spill kit should include, at a minimum: • 1-Water Resistant Nylon Bag • 3-Oil Absorbent Socks 3”x 4’ • 2-Oil Absorbent Socks 3”x 10’ • 12-Oil Absorbent Pads 17”x19” • 1-Pair Splash Resistant Goggles • 3-Pair Nitrile Gloves • 10-Disposable Bags with Ties • Instructions Volume II – Construction Stormwater Pollution Prevention - August 2012 4-47 BMP C154: Concrete Washout Area Purpose Prevent or reduce the discharge of pollutants to stormwater from concrete waste by conducting washout off-site, or performing on-site washout in a designated area to prevent pollutants from entering surface waters or ground water. Conditions of Use Concrete washout area best management practices are implemented on construction projects where: • Concrete is used as a construction material • It is not possible to dispose of all concrete wastewater and washout off-site (ready mix plant, etc.). • Concrete trucks, pumpers, or other concrete coated equipment are washed on-site. • Note: If less than 10 concrete trucks or pumpers need to be washed out on-site, the washwater may be disposed of in a formed area awaiting concrete or an upland disposal site where it will not contaminate surface or ground water. The upland disposal site shall be at least 50 feet from sensitive areas such as storm drains, open ditches, or water bodies, including wetlands. Design and Installation Specifications Implementation The following steps will help reduce stormwater pollution from concrete wastes: • Perform washout of concrete trucks off-site or in designated concrete washout areas only. • Do not wash out concrete trucks onto the ground, or into storm drains, open ditches, streets, or streams. • Do not allow excess concrete to be dumped on-site, except in designated concrete washout areas. • Concrete washout areas may be prefabricated concrete washout containers, or self-installed structures (above-grade or below-grade). • Prefabricated containers are most resistant to damage and protect against spills and leaks. Companies may offer delivery service and provide regular maintenance and disposal of solid and liquid waste. • If self-installed concrete washout areas are used, below-grade structures are preferred over above-grade structures because they are less prone to spills and leaks. • Self-installed above-grade structures should only be used if excavation is not practical. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-48 Education • Discuss the concrete management techniques described in this BMP with the ready-mix concrete supplier before any deliveries are made. • Educate employees and subcontractors on the concrete waste management techniques described in this BMP. • Arrange for contractor’s superintendent or Certified Erosion and Sediment Control Lead (CESCL) to oversee and enforce concrete waste management procedures. • A sign should be installed adjacent to each temporary concrete washout facility to inform concrete equipment operators to utilize the proper facilities. Contracts Incorporate requirements for concrete waste management into concrete supplier and subcontractor agreements. Location and Placement • Locate washout area at least 50 feet from sensitive areas such as storm drains, open ditches, or water bodies, including wetlands. • Allow convenient access for concrete trucks, preferably near the area where the concrete is being poured. • If trucks need to leave a paved area to access washout, prevent track- out with a pad of rock or quarry spalls (see BMP C105). These areas should be far enough away from other construction traffic to reduce the likelihood of accidental damage and spills. • The number of facilities you install should depend on the expected demand for storage capacity. • On large sites with extensive concrete work, washouts should be placed in multiple locations for ease of use by concrete truck drivers. On-site Temporary Concrete Washout Facility, Transit Truck Washout Procedures: • Temporary concrete washout facilities shall be located a minimum of 50 ft from sensitive areas including storm drain inlets, open drainage facilities, and watercourses. See Figures 4.1.7 and 4.1.8. • Concrete washout facilities shall be constructed and maintained in sufficient quantity and size to contain all liquid and concrete waste generated by washout operations. • Approximately 7 gallons of wash water are used to wash one truck chute. • Approximately 50 gallons are used to wash out the hopper of a concrete pump truck. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-49 • Washout of concrete trucks shall be performed in designated areas only. • Concrete washout from concrete pumper bins can be washed into concrete pumper trucks and discharged into designated washout area or properly disposed of off-site. • Once concrete wastes are washed into the designated area and allowed to harden, the concrete should be broken up, removed, and disposed of per applicable solid waste regulations. Dispose of hardened concrete on a regular basis. • Temporary Above-Grade Concrete Washout Facility • Temporary concrete washout facility (type above grade) should be constructed as shown on the details below, with a recommended minimum length and minimum width of 10 ft, but with sufficient quantity and volume to contain all liquid and concrete waste generated by washout operations. • Plastic lining material should be a minimum of 10 mil polyethylene sheeting and should be free of holes, tears, or other defects that compromise the impermeability of the material. • Temporary Below-Grade Concrete Washout Facility • Temporary concrete washout facilities (type below grade) should be constructed as shown on the details below, with a recommended minimum length and minimum width of 10 ft. The quantity and volume should be sufficient to contain all liquid and concrete waste generated by washout operations. • Lath and flagging should be commercial type. • Plastic lining material shall be a minimum of 10 mil polyethylene sheeting and should be free of holes, tears, or other defects that compromise the impermeability of the material. • Liner seams shall be installed in accordance with manufacturers’ recommendations. • Soil base shall be prepared free of rocks or other debris that may cause tears or holes in the plastic lining material. Maintenance Standards Inspection and Maintenance • Inspect and verify that concrete washout BMPs are in place prior to the commencement of concrete work. • During periods of concrete work, inspect daily to verify continued performance. • Check overall condition and performance. • Check remaining capacity (% full). Volume II – Construction Stormwater Pollution Prevention - August 2012 4-50 • If using self-installed washout facilities, verify plastic liners are intact and sidewalls are not damaged. • If using prefabricated containers, check for leaks. • Washout facilities shall be maintained to provide adequate holding capacity with a minimum freeboard of 12 inches. • Washout facilities must be cleaned, or new facilities must be constructed and ready for use once the washout is 75% full. • If the washout is nearing capacity, vacuum and dispose of the waste material in an approved manner. • Do not discharge liquid or slurry to waterways, storm drains or directly onto ground. • Do not use sanitary sewer without local approval. • Place a secure, non-collapsing, non-water collecting cover over the concrete washout facility prior to predicted wet weather to prevent accumulation and overflow of precipitation. • Remove and dispose of hardened concrete and return the structure to a functional condition. Concrete may be reused on-site or hauled away for disposal or recycling. • When you remove materials from the self-installed concrete washout, build a new structure; or, if the previous structure is still intact, inspect for signs of weakening or damage, and make any necessary repairs. Re-line the structure with new plastic after each cleaning. Removal of Temporary Concrete Washout Facilities • When temporary concrete washout facilities are no longer required for the work, the hardened concrete, slurries and liquids shall be removed and properly disposed of. • Materials used to construct temporary concrete washout facilities shall be removed from the site of the work and disposed of or recycled. • Holes, depressions or other ground disturbance caused by the removal of the temporary concrete washout facilities shall be backfilled, repaired, and stabilized to prevent erosion. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-51 Figure 4.1.7a – Concrete Washout Area Volume II – Construction Stormwater Pollution Prevention - August 2012 4-52 Figure 4.1.7b – Concrete Washout Area Figure 4.1.8 – Prefabricated Concrete Washout Container w/Ramp Volume II – Construction Stormwater Pollution Prevention - August 2012 4-53 BMP C160: Certified Erosion and Sediment Control Lead Purpose The project proponent designates at least one person as the responsible representative in charge of erosion and sediment control (ESC), and water quality protection. The designated person shall be the Certified Erosion and Sediment Control Lead (CESCL) who is responsible for ensuring compliance with all local, state, and federal erosion and sediment control and water quality requirements. Conditions of Use A CESCL shall be made available on projects one acre or larger that discharge stormwater to surface waters of the state. Sites less than one acre may have a person without CESCL certification conduct inspections; sampling is not required on sites that disturb less than an acre. • The CESCL shall: • Have a current certificate proving attendance in an erosion and sediment control training course that meets the minimum ESC training and certification requirements established by Ecology (see details below). Ecology will maintain a list of ESC training and certification providers at: http://www.ecy.wa.gov/programs/wq/stormwater/cescl.html OR • Be a Certified Professional in Erosion and Sediment Control (CPESC); for additional information go to: www.cpesc.net Specifications • Certification shall remain valid for three years. • The CESCL shall have authority to act on behalf of the contractor or developer and shall be available, or on-call, 24 hours per day throughout the period of construction. • The Construction SWPPP shall include the name, telephone number, fax number, and address of the designated CESCL. • A CESCL may provide inspection and compliance services for multiple construction projects in the same geographic region. Duties and responsibilities of the CESCL shall include, but are not limited to the following: • Maintaining permit file on site at all times which includes the Construction SWPPP and any associated permits and plans. • Directing BMP installation, inspection, maintenance, modification, and removal. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-54 • Updating all project drawings and the Construction SWPPP with changes made. • Completing any sampling requirements including reporting results using WebDMR. • Keeping daily logs, and inspection reports. Inspection reports should include: • Inspection date/time. • Weather information; general conditions during inspection and approximate amount of precipitation since the last inspection. • A summary or list of all BMPs implemented, including observations of all erosion/sediment control structures or practices. The following shall be noted: 1. Locations of BMPs inspected. 2. Locations of BMPs that need maintenance. 3. Locations of BMPs that failed to operate as designed or intended. 4. Locations of where additional or different BMPs are required. • Visual monitoring results, including a description of discharged stormwater. The presence of suspended sediment, turbid water, discoloration, and oil sheen shall be noted, as applicable. • Any water quality monitoring performed during inspection. • General comments and notes, including a brief description of any BMP repairs, maintenance or installations made as a result of the inspection. • Facilitate, participate in, and take corrective actions resulting from inspections performed by outside agencies or the owner. BMP C162: Scheduling Purpose Sequencing a construction project reduces the amount and duration of soil exposed to erosion by wind, rain, runoff, and vehicle tracking. Conditions of Use The construction sequence schedule is an orderly listing of all major land- disturbing activities together with the necessary erosion and sedimentation control measures planned for the project. This type of schedule guides the contractor on work to be done before other work is started so that serious erosion and sedimentation problems can be avoided. Following a specified work schedule that coordinates the timing of land- disturbing activities and the installation of control measures is perhaps the most cost-effective way of controlling erosion during construction. The removal of surface ground cover leaves a site vulnerable to accelerated Volume II – Construction Stormwater Pollution Prevention - August 2012 4-55 erosion. Construction procedures that limit land clearing provide timely installation of erosion and sedimentation controls, and restore protective cover quickly can significantly reduce the erosion potential of a site. Design Considerations • Minimize construction during rainy periods. • Schedule projects to disturb only small portions of the site at any one time. Complete grading as soon as possible. Immediately stabilize the disturbed portion before grading the next portion. Practice staged seeding in order to revegetate cut and fill slopes as the work progresses. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-56 4.2 Runoff Conveyance and Treatment BMPs This section contains the standards and specifications for Runoff Conveyance and Treatment BMPs. Table 4.2.1, below, shows the relationship of the BMPs in Section 4.2 to the Construction Stormwater Pollution Prevention Plan (SWPPP) Elements described in Section 3.3.3. Table 4.2.1 Runoff Conveyance and Treatment BMPs by SWPPP Element Volume II – Construction Stormwater Pollution Prevention - August 2012 4-57 BMP C200: Interceptor Dike and Swale Purpose Provide a ridge of compacted soil, or a ridge with an upslope swale, at the top or base of a disturbed slope or along the perimeter of a disturbed construction area to convey stormwater. Use the dike and/or swale to intercept the runoff from unprotected areas and direct it to areas where erosion can be controlled. This can prevent storm runoff from entering the work area or sediment-laden runoff from leaving the construction site. Conditions of Use Where the runoff from an exposed site or disturbed slope must be conveyed to an erosion control facility which can safely convey the stormwater. • Locate upslope of a construction site to prevent runoff from entering disturbed area. • When placed horizontally across a disturbed slope, it reduces the amount and velocity of runoff flowing down the slope. • Locate downslope to collect runoff from a disturbed area and direct water to a sediment basin. Design and Installation Specifications • Dike and/or swale and channel must be stabilized with temporary or permanent vegetation or other channel protection during construction. • Channel requires a positive grade for drainage; steeper grades require channel protection and check dams. • Review construction for areas where overtopping may occur. • Can be used at top of new fill before vegetation is established. • May be used as a permanent diversion channel to carry the runoff. • Sub-basin tributary area should be one acre or less. • Design capacity for the peak flow from a 10-year, 24-hour storm, assuming a Type 1A rainfall distribution, for temporary facilities. Alternatively, use 1.6 times the 10-year, 1-hour flow indicated by an approved continuous runoff model. For facilities that will also serve on a permanent basis, consult the local government’s drainage requirements. Interceptor dikes shall meet the following criteria: Top Width 2 feet minimum. Height 1.5 feet minimum on berm. Side Slope 2H:1V or flatter. Grade Depends on topography, however, dike system minimum is 0.5%, and maximum is 1%. Compaction Minimum of 90 percent ASTM D698 standard proctor. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-58 Horizontal Spacing of Interceptor Dikes: Average Slope Slope Percent Flowpath Length 20H:1V or less 3-5% 300 feet (10 to 20)H:1V 5-10% 200 feet (4 to 10)H:1V 10-25% 100 feet (2 to 4)H:1V 25-50% 50 feet Stabilization depends on velocity and reach Slopes <5% Seed and mulch applied within 5 days of dike construction (see BMP C121, Mulching). Slopes 5 - 40% Dependent on runoff velocities and dike materials. Stabilization should be done immediately using either sod or riprap or other measures to avoid erosion. • The upslope side of the dike shall provide positive drainage to the dike outlet. No erosion shall occur at the outlet. Provide energy dissipation measures as necessary. Sediment-laden runoff must be released through a sediment trapping facility. • Minimize construction traffic over temporary dikes. Use temporary cross culverts for channel crossing. Interceptor swales shall meet the following criteria: Bottom Width 2 feet minimum; the cross-section bottom shall be level. Depth 1-foot minimum. Side Slope 2H:1V or flatter. Grade Maximum 5 percent, with positive drainage to a suitable outlet (such as a sediment pond). Stabilization Seed as per BMP C120, Temporary and Permanent Seeding, or BMP C202, Channel Lining, 12 inches thick riprap pressed into the bank and extending at least 8 inches vertical from the bottom. • Inspect diversion dikes and interceptor swales once a week and after every rainfall. Immediately remove sediment from the flow area. • Damage caused by construction traffic or other activity must be repaired before the end of each working day. Check outlets and make timely repairs as needed to avoid gully formation. When the area below the temporary diversion dike is permanently stabilized, remove the dike and fill and stabilize the channel to blend with the natural surface. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-59 BMP C201: Grass-Lined Channels Purpose To provide a channel with a vegetative lining for conveyance of runoff. See Figure 4.2.1 for typical grass-lined channels. Conditions of Use This practice applies to construction sites where concentrated runoff needs to be contained to prevent erosion or flooding. • When a vegetative lining can provide sufficient stability for the channel cross section and at lower velocities of water (normally dependent on grade). This means that the channel slopes are generally less than 5 percent and space is available for a relatively large cross section. • Typical uses include roadside ditches, channels at property boundaries, outlets for diversions, and other channels and drainage ditches in low areas. • Channels that will be vegetated should be installed before major earthwork and hydroseeded with a bonded fiber matrix (BFM). The vegetation should be well established (i.e., 75 percent cover) before water is allowed to flow in the ditch. With channels that will have high flows, erosion control blankets should be installed over the hydroseed. If vegetation cannot be established from seed before water is allowed in the ditch, sod should be installed in the bottom of the ditch in lieu of hydromulch and blankets. Design and Installation Specifications Locate the channel where it can conform to the topography and other features such as roads. • Locate them to use natural drainage systems to the greatest extent possible. • Avoid sharp changes in alignment or bends and changes in grade. • Do not reshape the landscape to fit the drainage channel. • The maximum design velocity shall be based on soil conditions, type of vegetation, and method of revegetation, but at no times shall velocity exceed 5 feet/second. The channel shall not be overtopped by the peak runoff from a 10-year, 24-hour storm, assuming a Type 1A rainfall distribution." Alternatively, use 1.6 times the 10-year, 1-hour flow indicated by an approved continuous runoff model to determine a flow rate which the channel must contain. • Where the grass-lined channel will also function as a permanent stormwater conveyance facility, consult the drainage conveyance requirements of the local government with jurisdiction. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-60 • An established grass or vegetated lining is required before the channel can be used to convey stormwater, unless stabilized with nets or blankets. • If design velocity of a channel to be vegetated by seeding exceeds 2 ft/sec, a temporary channel liner is required. Geotextile or special mulch protection such as fiberglass roving or straw and netting provides stability until the vegetation is fully established. See Figure 4.2.2. • Check dams shall be removed when the grass has matured sufficiently to protect the ditch or swale unless the slope of the swale is greater than 4 percent. The area beneath the check dams shall be seeded and mulched immediately after dam removal. • If vegetation is established by sodding, the permissible velocity for established vegetation may be used and no temporary liner is needed. • Do not subject grass-lined channel to sedimentation from disturbed areas. Use sediment-trapping BMPs upstream of the channel. • V-shaped grass channels generally apply where the quantity of water is small, such as in short reaches along roadsides. The V-shaped cross section is least desirable because it is difficult to stabilize the bottom where velocities may be high. • Trapezoidal grass channels are used where runoff volumes are large and slope is low so that velocities are nonerosive to vegetated linings. (Note: it is difficult to construct small parabolic shaped channels.) • Subsurface drainage, or riprap channel bottoms, may be necessary on sites that are subject to prolonged wet conditions due to long duration flows or a high water table. • Provide outlet protection at culvert ends and at channel intersections. • Grass channels, at a minimum, should carry peak runoff for temporary construction drainage facilities from the 10-year, 24-hour storm without eroding. Where flood hazard exists, increase the capacity according to the potential damage. • Grassed channel side slopes generally are constructed 3H:1V or flatter to aid in the establishment of vegetation and for maintenance. • Construct channels a minimum of 0.2 foot larger around the periphery to allow for soil bulking during seedbed preparations and sod buildup. Maintenance Standards During the establishment period, check grass-lined channels after every rainfall. • After grass is established, periodically check the channel; check it after every heavy rainfall event. Immediately make repairs. • It is particularly important to check the channel outlet and all road crossings for bank stability and evidence of piping or scour holes. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-61 • Remove all significant sediment accumulations to maintain the designed carrying capacity. Keep the grass in a healthy, vigorous condition at all times, since it is the primary erosion protection for the channel. Figure 4.2.1 – Typical Grass-Lined Channels Volume II – Construction Stormwater Pollution Prevention - August 2012 4-62 OVERCUTCHANNEL 2'(50mm) TOALLOW BULKING DURING SEEDBED PREPARATION TYPICAL INSTALLATION WITH EROSION CONTROL BLANKETS OR TURF REINFORCEMENT MATS Intermittent Check Slot Longitudinal Anchor Trench Shingle-lap spliced ends or begin new roll in an intermittent check slot Prepare soil and apply seed before installing blankets, mats or other temporary channel liner system / NOTES: 1 Design velocities exceeding 2 ft/sec (0.5m/sec) require temporary blankets, mats or similar liners to protect seed and soil until vegetation becomes established. 2 Grass-lined channels with design velocities exceeding 6 ft/sec (2m/sec) should include turf reinforcement mats. Fig ure 4.2 .2 – Temporary Channel Liners Volume II – Construction Stormwater Pollution Prevention - August 2012 4-63 BMP C202: Channel Lining Purpose To protect channels by providing a channel liner using either blankets or riprap. Conditions of Use When natural soils or vegetated stabilized soils in a channel are not adequate to prevent channel erosion. • When a permanent ditch or pipe system is to be installed and a temporary measure is needed. • In almost all cases, synthetic and organic coconut blankets are more effective than riprap for protecting channels from erosion. Blankets can be used with and without vegetation. Blanketed channels can be designed to handle any expected flow and longevity requirement. Some synthetic blankets have a predicted life span of 50 years or more, even in sunlight. • Other reasons why blankets are better than rock include the availability of blankets over rock. In many areas of the state, rock is not easily obtainable or is very expensive to haul to a site. Blankets can be delivered anywhere. Rock requires the use of dump trucks to haul and heavy equipment to place. Blankets usually only require laborers with hand tools, and sometimes a backhoe. • The Federal Highway Administration recommends not using flexible liners whenever the slope exceeds 10 percent or the shear stress exceeds 8 lbs/ft2. Design and Installation Specifications See BMP C122 for information on blankets. Since riprap is used where erosion potential is high, construction must be sequenced so that the riprap is put in place with the minimum possible delay. • Disturbance of areas where riprap is to be placed should be undertaken only when final preparation and placement of the riprap can follow immediately behind the initial disturbance. Where riprap is used for outlet protection, the riprap should be placed before or in conjunction with the construction of the pipe or channel so that it is in place when the pipe or channel begins to operate. • The designer, after determining the riprap size that will be stable under the flow conditions, shall consider that size to be a minimum size and then, based on riprap gradations actually available in the area, select the size or sizes that equal or exceed the minimum size. The possibility of drainage structure damage by children shall be considered in selecting a riprap size, especially if there is nearby water or a gully in which to toss the stones. • Stone for riprap shall consist of field stone or quarry stone of approximately rectangular shape. The stone shall be hard and angular Volume II – Construction Stormwater Pollution Prevention - August 2012 4-64 and of such quality that it will not disintegrate on exposure to water or weathering and it shall be suitable in all respects for the purpose intended. • A lining of engineering filter fabric (geotextile) shall be placed between the riprap and the underlying soil surface to prevent soil movement into or through the riprap. The geotextile should be keyed in at the top of the bank. • Filter fabric shall not be used on slopes greater than 1-1/2H:1V as slippage may occur. It should be used in conjunction with a layer of coarse aggregate (granular filter blanket) when the riprap to be placed is 12 inches and larger. BMP C203: Water Bars Purpose A small ditch or ridge of material is constructed diagonally across a road or right-of-way to divert stormwater runoff from the road surface, wheel tracks, or a shallow road ditch. See Figure 4.2.3. Conditions of use Clearing right-of-way and construction of access for power lines, pipelines, and other similar installations often require long narrow right-of-ways over sloping terrain. Disturbance and compaction promotes gully formation in these cleared strips by increasing the volume and velocity of runoff. Gully formation may be especially severe in tire tracks and ruts. To prevent gullying, runoff can often be diverted across the width of the right-of-way to undisturbed areas by using small predesigned diversions. • Give special consideration to each individual outlet area, as well as to the cumulative effect of added diversions. Use gravel to stabilize the diversion where significant vehicular traffic is anticipated. Design and Installation Specifications Height: 8-inch minimum measured from the channel bottom to the ridge top. • Side slope of channel: 2H:1V maximum; 3H:1V or flatter when vehicles will cross. • Base width of ridge: 6-inch minimum. • Locate them to use natural drainage systems and to discharge into well vegetated stable areas. • Guideline for Spacing: Slope % Spacing (ft) < 5 125 5 - 10 100 10 - 20 75 20 - 35 50 > 35 Use rock lined ditch Volume II – Construction Stormwater Pollution Prevention - August 2012 4-65 • Grade of water bar and angle: Select angle that results in ditch slope less than 2 percent. • Install as soon as the clearing and grading is complete. Reconstruct when construction is complete on a section when utilities are being installed. • Compact the ridge when installed. • Stabilize, seed and mulch the portions that are not subject to traffic. Gravel the areas crossed by vehicles. Maintenance Standards Periodically inspect right-of-way diversions for wear and after every heavy rainfall for erosion damage. • Immediately remove sediment from the flow area and repair the dike. • Check outlet areas and make timely repairs as needed. • When permanent road drainage is established and the area above the temporary right-of-way diversion is permanently stabilized, remove the dikes and fill the channel to blend with the natural ground, and appropriately stabilize the disturbed area. Figure 4.2.3 – Water Bar Volume II – Construction Stormwater Pollution Prevention - August 2012 4-66 BMP C204: Pipe Slope Drains Purpose To use a pipe to convey stormwater anytime water needs to be diverted away from or over bare soil to prevent gullies, channel erosion, and saturation of slide-prone soils. Conditions of Use Pipe slope drains should be used when a temporary or permanent stormwater conveyance is needed to move the water down a steep slope to avoid erosion (Figure 4.2.4). On highway projects, pipe slope drains should be used at bridge ends to collect runoff and pipe it to the base of the fill slopes along bridge approaches. These can be designed into a project and included as bid items. Another use on road projects is to collect runoff from pavement and pipe it away from side slopes. These are useful because there is generally a time lag between having the first lift of asphalt installed and the curbs, gutters, and permanent drainage installed. Used in conjunction with sand bags, or other temporary diversion devices, these will prevent massive amounts of sediment from leaving a project. Water can be collected, channeled with sand bags, Triangular Silt Dikes, berms, or other material, and piped to temporary sediment ponds. Pipe slope drains can be: • Connected to new catch basins and used temporarily until all permanent piping is installed; • Used to drain water collected from aquifers exposed on cut slopes and take it to the base of the slope; • Used to collect clean runoff from plastic sheeting and direct it away from exposed soil; • Installed in conjunction with silt fence to drain collected water to a controlled area; • Used to divert small seasonal streams away from construction. They have been used successfully on culvert replacement and extension jobs. Large flex pipe can be used on larger streams during culvert removal, repair, or replacement; and, • Connected to existing down spouts and roof drains and used to divert water away from work areas during building renovation, demolition, and construction projects. There are now several commercially available collectors that are attached to the pipe inlet and help prevent erosion at the inlet. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-67 Design and Installation Specifications Size the pipe to convey the flow. The capacity for temporary drains shall be sufficient to handle the peak flow from a 10-year, 24-hour storm event, assuming a Type 1A rainfall distribution. Alternatively, use 1.6 times the 10-year, 1-hour flow indicated by an approved continuous runoff model. Consult local drainage requirements for sizing permanent pipe slope drains. • Use care in clearing vegetated slopes for installation. • Re-establish cover immediately on areas disturbed by installation. • Use temporary drains on new cut or fill slopes. • Use diversion dikes or swales to collect water at the top of the slope. • Ensure that the entrance area is stable and large enough to direct flow into the pipe. • Piping of water through the berm at the entrance area is a common failure mode. • The entrance shall consist of a standard flared end section for culverts 12 inches and larger with a minimum 6-inch metal toe plate to prevent runoff from undercutting the pipe inlet. The slope of the entrance shall be at least 3 percent. Sand bags may also be used at pipe entrances as a temporary measure. • The soil around and under the pipe and entrance section shall be thoroughly compacted to prevent undercutting. • The flared inlet section shall be securely connected to the slope drain and have watertight connecting bands. • Slope drain sections shall be securely fastened together, fused or have gasketed watertight fittings, and shall be securely anchored into the soil. • Thrust blocks should be installed anytime 90 degree bends are utilized. Depending on size of pipe and flow, these can be constructed with sand bags, straw bales staked in place, “t” posts and wire, or ecology blocks. • Pipe needs to be secured along its full length to prevent movement. This can be done with steel “t” posts and wire. A post is installed on each side of the pipe and the pipe is wired to them. This should be done every 10-20 feet of pipe length or so, depending on the size of the pipe and quantity of water to divert. • Interceptor dikes shall be used to direct runoff into a slope drain. The height of the dike shall be at least 1 foot higher at all points than the top of the inlet pipe. • The area below the outlet must be stabilized with a riprap apron (see BMP C209 Outlet Protection, for the appropriate outlet material). Volume II – Construction Stormwater Pollution Prevention - August 2012 4-68 Dike material compacted 90% modified proctor CPEP or equivalent pipe Discharge to a stabilizedwatercourse, sediment retentionfacility, or stabilized outlet Inlet and all sections must besecurely fastened togetherwith gasketed watertight fittings Provide riprap pador equivalent energydissipation Interceptor Dike Standard flaredend section • If the pipe slope drain is conveying sediment-laden water, direct all flows into the sediment trapping facility. • Materials specifications for any permanent piped system shall be set by the local government. Maintenance Standards Check inlet and outlet points regularly, especially after storms. The inlet should be free of undercutting, and no water should be going around the point of entry. If there are problems, the headwall should be reinforced with compacted earth or sand bags. • The outlet point should be free of erosion and installed with appropriate outlet protection. • For permanent installations, inspect pipe periodically for vandalism and physical distress such as slides and wind-throw. • Normally the pipe slope is so steep that clogging is not a problem with smooth wall pipe, however, debris may become lodged in the pipe. Figure 4.2.4 – Pipe Slope Drain Volume II – Construction Stormwater Pollution Prevention - August 2012 4-69 BMP C205: Subsurface Drains Purpose To intercept, collect, and convey ground water to a satisfactory outlet, using a perforated pipe or conduit below the ground surface. Subsurface drains are also known as “french drains.” The perforated pipe provides a dewatering mechanism to drain excessively wet soils, provide a stable base for construction, improve stability of structures with shallow foundations, or to reduce hydrostatic pressure to improve slope stability. Conditions of Use Use when excessive water must be removed from the soil. The soil permeability, depth to water table and impervious layers are all factors which may govern the use of subsurface drains. Design and Installation Specifications Relief drains are used either to lower the water table in large, relatively flat areas, improve the growth of vegetation, or to remove surface water. Relief drains are installed along a slope and drain in the direction of the slope. They can be installed in a grid pattern, a herringbone pattern, or a random pattern. • Interceptor drains are used to remove excess ground water from a slope, stabilize steep slopes, and lower the water table immediately below a slope to prevent the soil from becoming saturated. Interceptor drains are installed perpendicular to a slope and drain to the side of the slope. They usually consist of a single pipe or series of single pipes instead of a patterned layout. • Depth and spacing of interceptor drains --The depth of an interceptor drain is determined primarily by the depth to which the water table is to be lowered or the depth to a confining layer. For practical reasons, the maximum depth is usually limited to 6 feet, with a minimum cover of 2 feet to protect the conduit. • The soil should have depth and sufficient permeability to permit installation of an effective drainage system at a depth of 2 to 6 feet. • An adequate outlet for the drainage system must be available either by gravity or by pumping. • The quantity and quality of discharge needs to be accounted for in the receiving stream (additional detention may be required). • This standard does not apply to subsurface drains for building foundations or deep excavations. • The capacity of an interceptor drain is determined by calculating the maximum rate of ground water flow to be intercepted. Therefore, it is Volume II – Construction Stormwater Pollution Prevention - August 2012 4-70 good practice to make complete subsurface investigations, including hydraulic conductivity of the soil, before designing a subsurface drainage system. • Size of drain--Size subsurface drains to carry the required capacity without pressure flow. Minimum diameter for a subsurface drain is 4 inches. • The minimum velocity required to prevent silting is 1.4 ft./sec. The line shall be graded to achieve this velocity at a minimum. The maximum allowable velocity using a sand-gravel filter or envelope is 9 ft/sec. • Filter material and fabric shall be used around all drains for proper bedding and filtration of fine materials. Envelopes and filters should surround the drain to a minimum of 3-inch thickness. • The outlet of the subsurface drain shall empty into a sediment pond through a catch basin. If free of sediment, it can then empty into a receiving channel, swale, or stable vegetated area adequately protected from erosion and undermining. • The trench shall be constructed on a continuous grade with no reverse grades or low spots. • Soft or yielding soils under the drain shall be stabilized with gravel or other suitable material. • Backfilling shall be done immediately after placement of the pipe. No sections of pipe shall remain uncovered overnight or during a rainstorm. Backfill material shall be placed in the trench in such a manner that the drain pipe is not displaced or damaged. • Do not install permanent drains near trees to avoid the tree roots that tend to clog the line. Use solid pipe with watertight connections where it is necessary to pass a subsurface drainage system through a stand of trees. • Outlet--Ensure that the outlet of a drain empties into a channel or other watercourse above the normal water level. • Secure an animal guard to the outlet end of the pipe to keep out rodents. • Use outlet pipe of corrugated metal, cast iron, or heavy-duty plastic without perforations and at least 10 feet long. Do not use an envelope or filter material around the outlet pipe, and bury at least two-thirds of the pipe length. • When outlet velocities exceed those allowable for the receiving stream, outlet protection must be provided. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-71 Maintenance Standards Subsurface drains shall be checked periodically to ensure that they are free-flowing and not clogged with sediment or roots. • The outlet shall be kept clean and free of debris. • Surface inlets shall be kept open and free of sediment and other debris. • Trees located too close to a subsurface drain often clog the system with their roots. If a drain becomes clogged, relocate the drain or remove the trees as a last resort. Drain placement should be planned to minimize this problem. • Where drains are crossed by heavy vehicles, the line shall be checked to ensure that it is not crushed. BMP C206: Level Spreader Purpose To provide a temporary outlet for dikes and diversions consisting of an excavated depression constructed at zero grade across a slope. To convert concentrated runoff to sheet flow and release it onto areas stabilized by existing vegetation or an engineered filter strip. Conditions of Use Used when a concentrated flow of water needs to be dispersed over a large area with existing stable vegetation. • Items to consider are: 1. What is the risk of erosion or damage if the flow may become concentrated? 2. Is an easement required if discharged to adjoining property? 3. Most of the flow should be as ground water and not as surface flow. 4. Is there an unstable area downstream that cannot accept additional ground water? • Use only where the slopes are gentle, the water volume is relatively low, and the soil will adsorb most of the low flow events. Design and Installation Specifications Use above undisturbed areas that are stabilized by existing vegetation. If the level spreader has any low points, flow will concentrate, create channels and may cause erosion. • Discharge area below the outlet must be uniform with a slope flatter than 5H:1V. • Outlet to be constructed level in a stable, undisturbed soil profile (not on fill). • The runoff shall not re-concentrate after release unless intercepted by another downstream measure. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-72 Densely vegetated for aMin. of 100' and slopeless than 5:1 Pressure-Treated 2"x10" 1' Min.2:1 Max.3' Min. • The grade of the channel for the last 20 feet of the dike or interceptor entering the level spreader shall be less than or equal to 1 percent. The grade of the level spreader shall be 0 percent to ensure uniform spreading of storm runoff. • A 6-inch high gravel berm placed across the level lip shall consist of washed crushed rock, 2- to 4-inch or 3/4-inch to 1½-inch size. • The spreader length shall be determined by estimating the peak flow expected from the 10-year, 24-hour design storm. The length of the spreader shall be a minimum of 15 feet for 0.1 cfs and shall increase by 10 feet for each 0.1 cfs thereafter to a maximum of 0.5 cfs per spreader. Use multiple spreaders for higher flows. • The width of the spreader should be at least 6 feet. • The depth of the spreader as measured from the lip should be at least 6 inches and it should be uniform across the entire length. • Level spreaders shall be setback from the property line unless there is an easement for flow. • Level spreaders, when installed every so often in grassy swales, keep the flows from concentrating. Materials that can be used include sand bags, lumber, logs, concrete, and pipe. To function properly, the material needs to be installed level and on contour. Figures 4.2.5Figure425 and 4.2.6 provide a cross-section and a detail of a level spreader. A capped perforated pipe could also be used as a spreader. Maintenance Standards The spreader should be inspected after every runoff event to ensure that it is functioning correctly. • The contractor should avoid the placement of any material on the structure and should prevent construction traffic from crossing over the structure. • If the spreader is damaged by construction traffic, it shall be immediately repaired. Figure 4.2.5 – Cross Section of Level Spreader Volume II – Construction Stormwater Pollution Prevention - August 2012 4-73 Figure 4.2.6 – Detail of Level Spreader BMP C207: Check Dams Purpose Construction of small dams across a swale or ditch reduces the velocity of concentrated flow and dissipates energy at the check dam. Conditions of Use Where temporary channels or permanent channels are not yet vegetated, channel lining is infeasible, and/or velocity checks are required. • Check dams may not be placed in streams unless approved by the State Department of Fish and Wildlife. Check dams may not be placed in wetlands without approval from a permitting agency. • Do not place check dams below the expected backwater from any salmonid bearing water between October 1 and May 31 to ensure that there is no loss of high flow refuge habitat for overwintering juvenile salmonids and emergent salmonid fry. • Construct rock check dams from appropriately sized rock. The rock used must be large enough to stay in place given the expected design flow through the channel. The rock must be placed by hand or by mechanical means (no dumping of rock to form dam) to achieve complete coverage of the ditch or swale and to ensure that the center of the dam is lower than the edges. • Check dams may also be constructed of either rock or pea-gravel filled bags. Numerous new products are also available for this purpose. They tend to be re-usable, quick and easy to install, effective, and cost efficient. • Place check dams perpendicular to the flow of water. • The dam should form a triangle when viewed from the side. This prevents undercutting as water flows over the face of the dam rather than falling directly onto the ditch bottom. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-74 • Before installing check dams impound and bypass upstream water flow away from the work area. Options for bypassing include pumps, siphons, or temporary channels. • Check dams in association with sumps work more effectively at slowing flow and retaining sediment than just a check dam alone. A deep sump should be provided immediately upstream of the check dam. • In some cases, if carefully located and designed, check dams can remain as permanent installations with very minor regrading. They may be left as either spillways, in which case accumulated sediment would be graded and seeded, or as check dams to prevent further sediment from leaving the site. • The maximum spacing between the dams shall be such that the toe of the upstream dam is at the same elevation as the top of the downstream dam. • Keep the maximum height at 2 feet at the center of the dam. • Keep the center of the check dam at least 12 inches lower than the outer edges at natural ground elevation. • Keep the side slopes of the check dam at 2H:1V or flatter. • Key the stone into the ditch banks and extend it beyond the abutments a minimum of 18 inches to avoid washouts from overflow around the dam. • Use filter fabric foundation under a rock or sand bag check dam. If a blanket ditch liner is used, filter fabric is not necessary. A piece of organic or synthetic blanket cut to fit will also work for this purpose. • In the case of grass-lined ditches and swales, all check dams and accumulated sediment shall be removed when the grass has matured sufficiently to protect the ditch or swale - unless the slope of the swale is greater than 4 percent. The area beneath the check dams shall be seeded and mulched immediately after dam removal. • Ensure that channel appurtenances, such as culvert entrances below check dams, are not subject to damage or blockage from displaced stones. Figure 4.2.7 depicts a typical rock check dam. Maintenance Standards Check dams shall be monitored for performance and sediment accumulation during and after each runoff producing rainfall. Sediment shall be removed when it reaches one half the sump depth. • Anticipate submergence and deposition above the check dam and erosion from high flows around the edges of the dam. • If significant erosion occurs between dams, install a protective riprap liner in that portion of the channel. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-75 Approved as Equivalent Ecology has approved products as able to meet the requirements of BMP C207. The products did not pass through the Technology Assessment Protocol – Ecology (TAPE) process. Local jurisdictions may choose not to accept this product approved as equivalent, or may require additional testing prior to consideration for local use. The products are available for review on Ecology’s website at http://www.ecy.wa.gov/programs/wq/stormwater/newtech/equivalent.html Volume II – Construction Stormwater Pollution Prevention - August 2012 4-76 Figure 4.2.7 – Rock Check Dam Volume II – Construction Stormwater Pollution Prevention - August 2012 4-77 BMP C208: Triangular Silt Dike (TSD) (Geotextile-Encased Check Dam) Purpose Triangular silt dikes may be used as check dams, for perimeter protection, for temporary soil stockpile protection, for drop inlet protection, or as a temporary interceptor dike. Conditions of use • May be used on soil or pavement with adhesive or staples. • TSDs have been used to build temporary: 1. sediment ponds; 2. diversion ditches; 3. concrete wash out facilities; 4. curbing; 5. water bars; 6. level spreaders; and, 7. berms. Design and Installation Specifications Made of urethane foam sewn into a woven geosynthetic fabric. It is triangular, 10 inches to 14 inches high in the center, with a 20-inch to 28-inch base. A 2–foot apron extends beyond both sides of the triangle along its standard section of 7 feet. A sleeve at one end allows attachment of additional sections as needed. • Install with ends curved up to prevent water from flowing around the ends. • The fabric flaps and check dam units are attached to the ground with wire staples. Wire staples should be No. 11 gauge wire and should be 200 mm to 300 mm in length. • When multiple units are installed, the sleeve of fabric at the end of the unit shall overlap the abutting unit and be stapled. • Check dams should be located and installed as soon as construction will allow. • Check dams should be placed perpendicular to the flow of water. • When used as check dams, the leading edge must be secured with rocks, sandbags, or a small key slot and staples. • In the case of grass-lined ditches and swales, check dams and accumulated sediment shall be removed when the grass has matured sufficiently to protect the ditch or swale unless the slope of the swale is greater than 4 percent. The area beneath the check dams shall be seeded and mulched immediately after dam removal. Maintenance • Triangular silt dams shall be inspected for performance and sediment Volume II – Construction Stormwater Pollution Prevention - August 2012 4-78 Standards accumulation during and after each runoff producing rainfall. Sediment shall be removed when it reaches one half the height of the dam. • Anticipate submergence and deposition above the triangular silt dam and erosion from high flows around the edges of the dam. Immediately repair any damage or any undercutting of the dam. BMP C209: Outlet Protection Purpose Outlet protection prevents scour at conveyance outlets and minimizes the potential for downstream erosion by reducing the velocity of concentrated stormwater flows. Conditions of use Outlet protection is required at the outlets of all ponds, pipes, ditches, or other conveyances, and where runoff is conveyed to a natural or manmade drainage feature such as a stream, wetland, lake, or ditch. Design and Installation Specifications The receiving channel at the outlet of a culvert shall be protected from erosion by rock lining a minimum of 6 feet downstream and extending up the channel sides a minimum of 1–foot above the maximum tailwater elevation or 1-foot above the crown, whichever is higher. For large pipes (more than 18 inches in diameter), the outlet protection lining of the channel is lengthened to four times the diameter of the culvert. • Standard wingwalls, and tapered outlets and paved channels should also be considered when appropriate for permanent culvert outlet protection. (See WSDOT Hydraulic Manual, available through WSDOT Engineering Publications). • Organic or synthetic erosion blankets, with or without vegetation, are usually more effective than rock, cheaper, and easier to install. Materials can be chosen using manufacturer product specifications. ASTM test results are available for most products and the designer can choose the correct material for the expected flow. • With low flows, vegetation (including sod) can be effective. • The following guidelines shall be used for riprap outlet protection: 1. If the discharge velocity at the outlet is less than 5 fps (pipe slope less than 1 percent), use 2-inch to 8-inch riprap. Minimum thickness is 1-foot. 2. For 5 to 10 fps discharge velocity at the outlet (pipe slope less than 3 percent), use 24-inch to 48-inch riprap. Minimum thickness is 2 feet. 3. For outlets at the base of steep slope pipes (pipe slope greater than 10 percent), an engineered energy dissipater shall be used. • Filter fabric or erosion control blankets should always be used under riprap to prevent scour and channel erosion. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-79 • New pipe outfalls can provide an opportunity for low-cost fish habitat improvements. For example, an alcove of low-velocity water can be created by constructing the pipe outfall and associated energy dissipater back from the stream edge and digging a channel, over- widened to the upstream side, from the outfall. Overwintering juvenile and migrating adult salmonids may use the alcove as shelter during high flows. Bank stabilization, bioengineering, and habitat features may be required for disturbed areas. This work may require a HPA. See Volume V for more information on outfall system design. Maintenance Standards • Inspect and repair as needed. • Add rock as needed to maintain the intended function. • Clean energy dissipater if sediment builds up. BMP C220: Storm Drain Inlet Protection Purpose Storm drain inlet protection prevents coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Use storm drain inlet protection at inlets that are operational before permanent stabilization of the disturbed drainage area. Provide protection for all storm drain inlets downslope and within 500 feet of a disturbed or construction area, unless conveying runoff entering catch basins to a sediment pond or trap. Also consider inlet protection for lawn and yard drains on new home construction. These small and numerous drains coupled with lack of gutters in new home construction can add significant amounts of sediment into the roof drain system. If possible delay installing lawn and yard drains until just before landscaping or cap these drains to prevent sediment from entering the system until completion of landscaping. Provide 18-inches of sod around each finished lawn and yard drain. Table 4.2.2 lists several options for inlet protection. All of the methods for storm drain inlet protection tend to plug and require a high frequency of maintenance. Limit drainage areas to one acre or less. Possibly provide emergency overflows with additional end-of-pipe treatment where stormwater ponding would cause a hazard. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-80 Table 4.2.2 Storm Drain Inlet Protection Type of Inlet Protection Emergency Overflow Applicable for Paved/ Earthen Surfaces Conditions of Use Drop Inlet Protection Excavated drop inlet protection Yes, temporary flooding will occur Earthen Applicable for heavy flows. Easy to maintain. Large area Requirement: 30’ X 30’/acre Block and gravel drop inlet protection Yes Paved or Earthen Applicable for heavy concentrated flows. Will not pond. Gravel and wire drop inlet protection No Applicable for heavy concentrated flows. Will pond. Can withstand traffic. Catch basin filters Yes Paved or Earthen Frequent maintenance required. Curb Inlet Protection Curb inlet protection with a wooden weir Small capacity overflow Paved Used for sturdy, more compact installation. Block and gravel curb inlet protection Yes Paved Sturdy, but limited filtration. Culvert Inlet Protection Culvert inlet sediment trap 18 month expected life. Design and Installation Specifications Excavated Drop Inlet Protection - An excavated impoundment around the storm drain. Sediment settles out of the stormwater prior to entering the storm drain. • Provide a depth of 1-2 ft as measured from the crest of the inlet structure. • Slope sides of excavation no steeper than 2H:1V. • Minimum volume of excavation 35 cubic yards. • Shape basin to fit site with longest dimension oriented toward the longest inflow area. • Install provisions for draining to prevent standing water problems. • Clear the area of all debris. • Grade the approach to the inlet uniformly. • Drill weep holes into the side of the inlet. • Protect weep holes with screen wire and washed aggregate. • Seal weep holes when removing structure and stabilizing area. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-81 • Build a temporary dike, if necessary, to the down slope side of the structure to prevent bypass flow. Block and Gravel Filter - A barrier formed around the storm drain inlet with standard concrete blocks and gravel. See Figure 4.2.8. • Provide a height of 1 to 2 feet above inlet. • Recess the first row 2-inches into the ground for stability. • Support subsequent courses by placing a 2x4 through the block opening. • Do not use mortar. • Lay some blocks in the bottom row on their side for dewatering the pool. • Place hardware cloth or comparable wire mesh with ½-inch openings over all block openings. • Place gravel just below the top of blocks on slopes of 2H:1V or flatter. • An alternative design is a gravel donut. • Provide an inlet slope of 3H:1V. • Provide an outlet slope of 2H:1V. • Provide a1-foot wide level stone area between the structure and the inlet. • Use inlet slope stones 3 inches in diameter or larger. • Use gravel ½- to ¾-inch at a minimum thickness of 1-foot for the outlet slope. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-82 Figure 4.2.8 – Block and Gravel Filter Gravel and Wire Mesh Filter - A gravel barrier placed over the top of the inlet. This structure does not provide an overflow. • Use a hardware cloth or comparable wire mesh with ½-inch openings. • Use coarse aggregate. • Provide a height 1-foot or more, 18-inches wider than inlet on all sides. • Place wire mesh over the drop inlet so that the wire extends a minimum of 1-foot beyond each side of the inlet structure. • Overlap the strips if more than one strip of mesh is necessary. Ponding Height Notes: 1. Drop inlet sediment barriers are to be used for small, nearly level drainage areas. (less than 5%) 2. Excavate a basin of sufficient size adjacent to the drop inlet. 3. The top of the structure (ponding height) must be well below the ground elevation downslope to prevent runoff from bypassing the inlet. A temporary dike may be necessary on the downslope side of the structure. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-83 • Place coarse aggregate over the wire mesh. • Provide at least a 12-inch depth of gravel over the entire inlet opening and extend at least 18-inches on all sides. Catchbasin Filters – Use inserts designed by manufacturers for construction sites. The limited sediment storage capacity increases the amount of inspection and maintenance required, which may be daily for heavy sediment loads. To reduce maintenance requirements combine a catchbasin filter with another type of inlet protection. This type of inlet protection provides flow bypass without overflow and therefore may be a better method for inlets located along active rights-of-way. • Provides 5 cubic feet of storage. • Requires dewatering provisions. • Provides a high-flow bypass that will not clog under normal use at a construction site. • Insert the catchbasin filter in the catchbasin just below the grating. Curb Inlet Protection with Wooden Weir – Barrier formed around a curb inlet with a wooden frame and gravel. • Use wire mesh with ½-inch openings. • Use extra strength filter cloth. • Construct a frame. • Attach the wire and filter fabric to the frame. • Pile coarse washed aggregate against wire/fabric. • Place weight on frame anchors. Block and Gravel Curb Inlet Protection – Barrier formed around a curb inlet with concrete blocks and gravel. See Figure 4.2.9. • Use wire mesh with ½-inch openings. • Place two concrete blocks on their sides abutting the curb at either side of the inlet opening. These are spacer blocks. • Place a 2x4 stud through the outer holes of each spacer block to align the front blocks. • Place blocks on their sides across the front of the inlet and abutting the spacer blocks. • Place wire mesh over the outside vertical face. • Pile coarse aggregate against the wire to the top of the barrier. Curb and Gutter Sediment Barrier – Sandbag or rock berm (riprap and aggregate) 3 feet high and 3 feet wide in a horseshoe shape. See Figure 4.2.10. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-84 • Construct a horseshoe shaped berm, faced with coarse aggregate if using riprap, 3 feet high and 3 feet wide, at least 2 feet from the inlet. • Construct a horseshoe shaped sedimentation trap on the outside of the berm sized to sediment trap standards for protecting a culvert inlet. Maintenance Standards • Inspect catch basin filters frequently, especially after storm events. Clean and replace clogged inserts. For systems with clogged stone filters: pull away the stones from the inlet and clean or replace. An alternative approach would be to use the clogged stone as fill and put fresh stone around the inlet. • Do not wash sediment into storm drains while cleaning. Spread all excavated material evenly over the surrounding land area or stockpile and stabilize as appropriate. Approved as Equivalent Ecology has approved products as able to meet the requirements of BMP C220. The products did not pass through the Technology Assessment Protocol – Ecology (TAPE) process. Local jurisdictions may choose not to accept this product approved as equivalent, or may require additional testing prior to consideration for local use. The products are available for review on Ecology’s website at http://www.ecy.wa.gov/programs/wq/stormwater/newtech/equivalent.html Volume II – Construction Stormwater Pollution Prevention - August 2012 4-85 Figure 4.2.9 – Block and Gravel Curb Inlet Protection A Plan View Wire Screen or Filter Fabric Catch Basin Curb Inlet Concrete Block Ponding Height Overflow 2x4 Wood Stud (100x50 Timber Stud) Concrete Block Wire Screen or Filter Fabric Curb Inlet ¾" Drain Gravel (20mm) ¾" Drain Gravel (20mm)Section A - A Back of Curb Concrete Block 2x4 Wood Stud Catch BasinBack of Sidewalk NOTES: 1. Use block and gravel type sediment barrier when curb inlet is located in gently sloping street segment, where water can pond and allow sediment to separate from runoff. 2. Barrier shall allow for overflow from severe storm event. 3. Inspect barriers and remove sediment after each storm event. Sediment and gravel must be removed from the traveled way immediately. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-86 Figure 4.2.10 – Curb and Gutter Barrier Volume II – Construction Stormwater Pollution Prevention - August 2012 4-87 If required, drape filter fabricover brush and secure in 4"x4"min. trench with compactedbackfill. Min. 5' wide brush barrier withmax. 6" diameter woody debris.Alternatively topsoil strippingsmay be used to form the barrier. Anchor downhill edge offilter fabric with stakes,sandbags, or equivalent. 2' Min. Height BMP C231: Brush Barrier Purpose The purpose of brush barriers is to reduce the transport of coarse sediment from a construction site by providing a temporary physical barrier to sediment and reducing the runoff velocities of overland flow. Conditions of Use • Brush barriers may be used downslope of all disturbed areas of less than one-quarter acre. • Brush barriers are not intended to treat concentrated flows, nor are they intended to treat substantial amounts of overland flow. Any concentrated flows must be conveyed through the drainage system to a sediment pond. The only circumstance in which overland flow can be treated solely by a brush barrier, rather than by a sediment pond, is when the area draining to the barrier is small. • Brush barriers should only be installed on contours. Design and Installation Specifications • Height 2 feet (minimum) to 5 feet (maximum). • Width 5 feet at base (minimum) to 15 feet (maximum). • Filter fabric (geotextile) may be anchored over the brush berm to enhance the filtration ability of the barrier. Ten-ounce burlap is an adequate alternative to filter fabric. • Chipped site vegetation, composted mulch, or wood-based mulch (hog fuel) can be used to construct brush barriers. • A 100 percent biodegradable installation can be constructed using 10- ounce burlap held in place by wooden stakes. Figure 4.2.11 depicts a typical brush barrier. Maintenance Standards • There shall be no signs of erosion or concentrated runoff under or around the barrier. If concentrated flows are bypassing the barrier, it must be expanded or augmented by toed-in filter fabric. • The dimensions of the barrier must be maintained. Figure 4.2.11 – Brush Barrier Volume II – Construction Stormwater Pollution Prevention - August 2012 4-88 BMP C232: Gravel Filter Berm Purpose A gravel filter berm is constructed on rights-of-way or traffic areas within a construction site to retain sediment by using a filter berm of gravel or crushed rock. Conditions of Use Where a temporary measure is needed to retain sediment from rights-of- way or in traffic areas on construction sites. Design and Installation Specifications • Berm material shall be ¾ to 3 inches in size, washed well-grade gravel or crushed rock with less than 5 percent fines. • Spacing of berms: − Every 300 feet on slopes less than 5 percent − Every 200 feet on slopes between 5 percent and 10 percent − Every 100 feet on slopes greater than 10 percent • Berm dimensions: − 1 foot high with 3H:1V side slopes − 8 linear feet per 1 cfs runoff based on the 10-year, 24-hour design storm Maintenance Standards • Regular inspection is required. Sediment shall be removed and filter material replaced as needed. BMP C233: Silt Fence Purpose Use of a silt fence reduces the transport of coarse sediment from a construction site by providing a temporary physical barrier to sediment and reducing the runoff velocities of overland flow. See Figure 4.2.12 for details on silt fence construction. Conditions of Use Silt fence may be used downslope of all disturbed areas. • Silt fence shall prevent soil carried by runoff water from going beneath, through, or over the top of the silt fence, but shall allow the water to pass through the fence. • Silt fence is not intended to treat concentrated flows, nor is it intended to treat substantial amounts of overland flow. Convey any concentrated flows through the drainage system to a sediment pond. • Do not construct silt fences in streams or use in V-shaped ditches. Silt fences do not provide an adequate method of silt control for anything deeper than sheet or overland flow. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-89 Figure 4.2.12 – Silt Fence Design and Installation Specifications • Use in combination with sediment basins or other BMPs. • Maximum slope steepness (normal (perpendicular) to fence line) 1H:1V. • Maximum sheet or overland flow path length to the fence of 100 feet. • Do not allow flows greater than 0.5 cfs. • The geotextile used shall meet the following standards. All geotextile properties listed below are minimum average roll values (i.e., the test result for any sampled roll in a lot shall meet or exceed the values shown in Table 4.2.3): Table 4.2.3 Geotextile Standards Polymeric Mesh AOS (ASTM D4751) 0.60 mm maximum for slit film woven (#30 sieve). 0.30 mm maximum for all other geotextile types (#50 sieve). 0.15 mm minimum for all fabric types (#100 sieve). Water Permittivity (ASTM D4491) 0.02 sec-1 minimum Grab Tensile Strength (ASTM D4632) 180 lbs. Minimum for extra strength fabric. 100 lbs minimum for standard strength fabric. Grab Tensile Strength (ASTM D4632) 30% maximum Ultraviolet Resistance (ASTM D4355) 70% minimum • Support standard strength fabrics with wire mesh, chicken wire, 2-inch x 2-inch wire, safety fence, or jute mesh to increase the strength of the Volume II – Construction Stormwater Pollution Prevention - August 2012 4-90 fabric. Silt fence materials are available that have synthetic mesh backing attached. • Filter fabric material shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum of six months of expected usable construction life at a temperature range of 0°F. to 120°F. • One-hundred percent biodegradable silt fence is available that is strong, long lasting, and can be left in place after the project is completed, if permitted by local regulations. • Refer to Figure 4.2.12 for standard silt fence details. Include the following standard Notes for silt fence on construction plans and specifications: 1. The contractor shall install and maintain temporary silt fences at the locations shown in the Plans. 2. Construct silt fences in areas of clearing, grading, or drainage prior to starting those activities. 3. The silt fence shall have a 2-feet min. and a 2½-feet max. height above the original ground surface. 4. The filter fabric shall be sewn together at the point of manufacture to form filter fabric lengths as required. Locate all sewn seams at support posts. Alternatively, two sections of silt fence can be overlapped, provided the Contractor can demonstrate, to the satisfaction of the Engineer, that the overlap is long enough and that the adjacent fence sections are close enough together to prevent silt laden water from escaping through the fence at the overlap. 5. Attach the filter fabric on the up-slope side of the posts and secure with staples, wire, or in accordance with the manufacturer's recommendations. Attach the filter fabric to the posts in a manner that reduces the potential for tearing. 6. Support the filter fabric with wire or plastic mesh, dependent on the properties of the geotextile selected for use. If wire or plastic mesh is used, fasten the mesh securely to the up-slope side of the posts with the filter fabric up-slope of the mesh. 7. Mesh support, if used, shall consist of steel wire with a maximum mesh spacing of 2-inches, or a prefabricated polymeric mesh. The strength of the wire or polymeric mesh shall be equivalent to or greater than 180 lbs. grab tensile strength. The polymeric mesh must be as resistant to the same level of ultraviolet radiation as the filter fabric it supports. 8. Bury the bottom of the filter fabric 4-inches min. below the ground surface. Backfill and tamp soil in place over the buried portion of the filter fabric, so that no flow can pass beneath the fence and Volume II – Construction Stormwater Pollution Prevention - August 2012 4-91 scouring cannot occur. When wire or polymeric back-up support mesh is used, the wire or polymeric mesh shall extend into the ground 3-inches min. 9. Drive or place the fence posts into the ground 18-inches min. A 12–inch min. depth is allowed if topsoil or other soft subgrade soil is not present and 18-inches cannot be reached. Increase fence post min. depths by 6 inches if the fence is located on slopes of 3H:1V or steeper and the slope is perpendicular to the fence. If required post depths cannot be obtained, the posts shall be adequately secured by bracing or guying to prevent overturning of the fence due to sediment loading. 10. Use wood, steel or equivalent posts. The spacing of the support posts shall be a maximum of 6-feet. Posts shall consist of either: • Wood with dimensions of 2-inches by 2-inches wide min. and a 3-feet min. length. Wood posts shall be free of defects such as knots, splits, or gouges. • No. 6 steel rebar or larger. • ASTM A 120 steel pipe with a minimum diameter of 1-inch. • U, T, L, or C shape steel posts with a minimum weight of 1.35 lbs./ft. • Other steel posts having equivalent strength and bending resistance to the post sizes listed above. 11. Locate silt fences on contour as much as possible, except at the ends of the fence, where the fence shall be turned uphill such that the silt fence captures the runoff water and prevents water from flowing around the end of the fence. 12. If the fence must cross contours, with the exception of the ends of the fence, place gravel check dams perpendicular to the back of the fence to minimize concentrated flow and erosion. The slope of the fence line where contours must be crossed shall not be steeper than 3H:1V. • Gravel check dams shall be approximately 1-foot deep at the back of the fence. Gravel check dams shall be continued perpendicular to the fence at the same elevation until the top of the check dam intercepts the ground surface behind the fence. • Gravel check dams shall consist of crushed surfacing base course, gravel backfill for walls, or shoulder ballast. Gravel check dams shall be located every 10 feet along the fence where the fence must cross contours. • Refer to Figure 4.2.13 for slicing method details. Silt fence installation using the slicing method specifications: Volume II – Construction Stormwater Pollution Prevention - August 2012 4-92 1. The base of both end posts must be at least 2- to 4-inches above the top of the filter fabric on the middle posts for ditch checks to drain properly. Use a hand level or string level, if necessary, to mark base points before installation. 2. Install posts 3- to 4-feet apart in critical retention areas and 6- to 7- feet apart in standard applications. 3. Install posts 24-inches deep on the downstream side of the silt fence, and as close as possible to the filter fabric, enabling posts to support the filter fabric from upstream water pressure. 4. Install posts with the nipples facing away from the filter fabric. 5. Attach the filter fabric to each post with three ties, all spaced within the top 8-inches of the filter fabric. Attach each tie diagonally 45 degrees through the filter fabric, with each puncture at least 1-inch vertically apart. Each tie should be positioned to hang on a post nipple when tightening to prevent sagging. 6. Wrap approximately 6-inches of fabric around the end posts and secure with 3 ties. 7. No more than 24-inches of a 36-inch filter fabric is allowed above ground level. Compact the soil immediately next to the filter fabric with the front wheel of the tractor, skid steer, or roller exerting at least 60 pounds per square inch. Compact the upstream side first and then each side twice for a total of four trips. Check and correct the silt fence installation for any deviation before compaction. Use a flat-bladed shovel to tuck fabric deeper into the ground if necessary. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-93 Figure 4.2.13 – Silt Fence Installation by Slicing Method Maintenance Standards • Repair any damage immediately. • Intercept and convey all evident concentrated flows uphill of the silt fence to a sediment pond. • Check the uphill side of the fence for signs of the fence clogging and acting as a barrier to flow and then causing channelization of flows parallel to the fence. If this occurs, replace the fence or remove the trapped sediment. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-94 • Remove sediment deposits when the deposit reaches approximately one-third the height of the silt fence, or install a second silt fence. • Replace filter fabric that has deteriorated due to ultraviolet breakdown. BMP C234: Vegetated Strip Purpose Vegetated strips reduce the transport of coarse sediment from a construction site by providing a temporary physical barrier to sediment and reducing the runoff velocities of overland flow. Conditions of Use • Vegetated strips may be used downslope of all disturbed areas. • Vegetated strips are not intended to treat concentrated flows, nor are they intended to treat substantial amounts of overland flow. Any concentrated flows must be conveyed through the drainage system to a sediment pond. The only circumstance in which overland flow can be treated solely by a strip, rather than by a sediment pond, is when the following criteria are met (see Table 4.2.4): Table 4.2.4 Contributing Drainage Area for Vegetated Strips Average Contributing area Slope Average Contributing area Percent Slope Max Contributing area Flowpath Length 1.5H:1V or flatter 67% or flatter 100 feet 2H:1V or flatter 50% or flatter 115 feet 4H:1V or flatter 25% or flatter 150 feet 6H:1V or flatter 16.7% or flatter 200 feet 10H:1V or flatter 10% or flatter 250 feet Design and Installation Specifications • The vegetated strip shall consist of a minimum of a 25-foot flowpath length continuous strip of dense vegetation with topsoil. Grass- covered, landscaped areas are generally not adequate because the volume of sediment overwhelms the grass. Ideally, vegetated strips shall consist of undisturbed native growth with a well-developed soil that allows for infiltration of runoff. • The slope within the strip shall not exceed 4H:1V. • The uphill boundary of the vegetated strip shall be delineated with clearing limits. Maintenance Standards • Any areas damaged by erosion or construction activity shall be seeded immediately and protected by mulch. • If more than 5 feet of the original vegetated strip width has had vegetation removed or is being eroded, sod must be installed. • If there are indications that concentrated flows are traveling across the buffer, surface water controls must be installed to reduce the flows Volume II – Construction Stormwater Pollution Prevention - August 2012 4-95 entering the buffer, or additional perimeter protection must be installed. BMP C235: Wattles Purpose Wattles are temporary erosion and sediment control barriers consisting of straw, compost, or other material that is wrapped in biodegradable tubular plastic or similar encasing material. They reduce the velocity and can spread the flow of rill and sheet runoff, and can capture and retain sediment. Wattles are typically 8 to 10 inches in diameter and 25 to 30 feet in length. Wattles are placed in shallow trenches and staked along the contour of disturbed or newly constructed slopes. See Figure 4.2.14 for typical construction details. WSDOT Standard Plan I-30.30-00 also provides information on Wattles (http://www.wsdot.wa.gov/Design/Standards/Plans.htm#SectionI) Conditions of Use • Use wattles: • In disturbed areas that require immediate erosion protection. • On exposed soils during the period of short construction delays, or over winter months. • On slopes requiring stabilization until permanent vegetation can be established. • The material used dictates the effectiveness period of the wattle. Generally, Wattles are typically effective for one to two seasons. • Prevent rilling beneath wattles by properly entrenching and abutting wattles together to prevent water from passing between them. Design Criteria • Install wattles perpendicular to the flow direction and parallel to the slope contour. • Narrow trenches should be dug across the slope on contour to a depth of 3- to 5-inches on clay soils and soils with gradual slopes. On loose soils, steep slopes, and areas with high rainfall, the trenches should be dug to a depth of 5- to 7- inches, or 1/2 to 2/3 of the thickness of the wattle. • Start building trenches and installing wattles from the base of the slope and work up. Spread excavated material evenly along the uphill slope and compacted using hand tamping or other methods. • Construct trenches at intervals of 10- to 25-feet depending on the steepness of the slope, soil type, and rainfall. The steeper the slope the closer together the trenches. • Install the wattles snugly into the trenches and abut tightly end to end. Do not overlap the ends. • Install stakes at each end of the wattle, and at 4-foot centers along entire length of wattle. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-96 • If required, install pilot holes for the stakes using a straight bar to drive holes through the wattle and into the soil. • Wooden stakes should be approximately 3/4 x 3/4 x 24 inches min. Willow cuttings or 3/8-inch rebar can also be used for stakes. • Stakes should be driven through the middle of the wattle, leaving 2 to 3 inches of the stake protruding above the wattle. Maintenance Standards • Wattles may require maintenance to ensure they are in contact with soil and thoroughly entrenched, especially after significant rainfall on steep sandy soils. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-97 Figure 4.2.14 – Wattles Volume II – Construction Stormwater Pollution Prevention - August 2012 4-98 • Inspect the slope after significant storms and repair any areas where wattles are not tightly abutted or water has scoured beneath the wattles. Approved as Equivalent Ecology has approved products as able to meet the requirements of BMP C235. The products did not pass through the Technology Assessment Protocol – Ecology (TAPE) process. Local jurisdictions may choose not to accept this product approved as equivalent, or may require additional testing prior to consideration for local use. The products are available for review on Ecology’s website at http://www.ecy.wa.gov/programs/wq/stormwater/newtech/equivalent.html BMP C236: Vegetative Filtration Purpose Vegetative Filtration may be used in conjunction with BMP C241 Temporary Sediment Ponds, BMP C206 Level Spreader and a pumping system with surface intake to improve turbidity levels of stormwater discharges by filtering through existing vegetation where undisturbed forest floor duff layer or established lawn with thatch layer are present. Vegetative Filtration can also be used to infiltrate dewatering waste from foundations, vaults, and trenches as long as runoff does not occur. Conditions of Use • For every five acre of disturbed soil use one acre of grass field, farm pasture, or wooded area. Reduce or increase this area depending on project size, ground water table height, and other site conditions. • Wetlands shall not be used for filtration. • Do not use this BMP in areas with a high ground water table, or in areas that will have a high seasonal ground water table during the use of this BMP. • This BMP may be less effective on soils that prevent the infiltration of the water, such as hard till. • Using other effective source control measures throughout a construction site will prevent the generation of additional highly turbid water and may reduce the time period or area need for this BMP. • Stop distributing water into the vegetated area if standing water or erosion results. Design Criteria • Find land adjacent to the project that has a vegetated field, preferably a farm field, or wooded area. • If the project site does not contain enough vegetated field area consider obtaining permission from adjacent landowners (especially for farm fields). • Install a pump and downstream distribution manifold depending on the project size. Generally, the main distribution line should reach 100 to 200-feet long (many large projects, or projects on tight soil, will Volume II – Construction Stormwater Pollution Prevention - August 2012 4-99 require systems that reach several thousand feet long with numerous branch lines off of the main distribution line). • The manifold should have several valves, allowing for control over the distribution area in the field. • Install several branches of 4” schedule 20, swaged-fit common septic tight-lined sewer line, or 6” fire hose, which can convey the turbid water out to various sections of the field. See Figure 4.2.15. • Determine the branch length based on the field area geography and number of branches. Typically, branches stretch from 200-feet to several thousand feet. Always, lay branches on contour with the slope. • On uneven ground, sprinklers perform well. Space sprinkler heads so that spray patterns do not overlap. • On relatively even surfaces, a level spreader using 4-inch perforated pipe may be used as an alternative option to the sprinkler head setup. Install drain pipe at the highest point on the field and at various lower elevations to ensure full coverage of the filtration area. Pipe should be place with the holes up to allow for a gentle weeping of stormwater evenly out all holes. Leveling the pipe by staking and using sandbags may be required. • To prevent the over saturation of the field area, rotate the use of branches or spray heads. Do this as needed based on monitoring the spray field. • Monitor the spray field on a daily basis to ensure that over saturation of any portion of the field doesn’t occur at any time. The presence of standing puddles of water or creation of concentrated flows visually signify that over saturation of the field has occurred. • Since the operator is handling contaminated water, physically monitor the vegetated spray field all the way down to the nearest surface water, or furthest spray area, to ensure that the water has not caused overland or concentrated flows, and has not created erosion around the spray nozzle. • Monitoring usually needs to take place 3-5 times per day to ensure sheet-flow into state waters. Do not exceed water quality standards for turbidity. • Ecology strongly recommends that a separate inspection log be developed, maintained and kept with the existing site logbook to aid the operator conducting inspections. This separate “Field Filtration Logbook” can also aid the facility in demonstrating compliance with permit conditions. Maintenance Standards • Inspect the spray nozzles daily, at a minimum, for leaks and plugging from sediment particles. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-100 • If erosion, concentrated flows, or over saturation of the field occurs, rotate the use of branches or spray heads or move the branches to a new field location. • Check all branches and the manifold for unintended leaks. Flowpath Guidelines for Vegetative Filtration Average Slope Average Area % Slope Estimated Flowpath Length (ft) 1.5H:1V 67% 250 2H:1V 50% 200 4H:1V 25% 150 6H:1V 16.7% 115 10H:1V 10% 100 Figure 4.2.15 – Manifold and Braches in a wooded, vegetated spray field Volume II – Construction Stormwater Pollution Prevention - August 2012 4-101 BMP C240: Sediment Trap Purpose A sediment trap is a small temporary ponding area with a gravel outlet used to collect and store sediment from sites cleared and/or graded during construction. Sediment traps, along with other perimeter controls, shall be installed before any land disturbance takes place in the drainage area. Conditions of Use Prior to leaving a construction site, stormwater runoff must pass through a sediment pond or trap or other appropriate sediment removal best management practice. Non-engineered sediment traps may be used on-site prior to an engineered sediment trap or sediment pond to provide additional sediment removal capacity. It is intended for use on sites where the tributary drainage area is less than 3 acres, with no unusual drainage features, and a projected build-out time of six months or less. The sediment trap is a temporary measure (with a design life of approximately 6 months) and shall be maintained until the site area is permanently protected against erosion by vegetation and/or structures. Sediment traps and ponds are only effective in removing sediment down to about the medium silt size fraction. Runoff with sediment of finer grades (fine silt and clay) will pass through untreated, emphasizing the need to control erosion to the maximum extent first. Whenever possible, sediment-laden water shall be discharged into on-site, relatively level, vegetated areas (see BMP C234 – Vegetated Strip). This is the only way to effectively remove fine particles from runoff unless chemical treatment or filtration is used. This can be particularly useful after initial treatment in a sediment trap or pond. The areas of release must be evaluated on a site-by-site basis in order to determine appropriate locations for and methods of releasing runoff. Vegetated wetlands shall not be used for this purpose. Frequently, it may be possible to pump water from the collection point at the downhill end of the site to an upslope vegetated area. Pumping shall only augment the treatment system, not replace it, because of the possibility of pump failure or runoff volume in excess of pump capacity. All projects that are constructing permanent facilities for runoff quantity control should use the rough-graded or final-graded permanent facilities for traps and ponds. This includes combined facilities and infiltration facilities. When permanent facilities are used as temporary sedimentation facilities, the surface area requirement of a sediment trap or pond must be met. If the surface area requirements are larger than the surface area of the permanent facility, then the trap or pond shall be enlarged to comply with the surface area requirement. The permanent pond shall also be divided into two cells as required for sediment ponds. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-102 Either a permanent control structure or the temporary control structure (described in BMP C241, Temporary Sediment Pond) can be used. If a permanent control structure is used, it may be advisable to partially restrict the lower orifice with gravel to increase residence time while still allowing dewatering of the pond. A shut-off valve may be added to the control structure to allow complete retention of stormwater in emergency situations. In this case, an emergency overflow weir must be added. A skimmer may be used for the sediment trap outlet if approved by the Local Permitting Authority. Design and Installation Specifications • See Figures 4.2.16 and 4.2.17 for details. • If permanent runoff control facilities are part of the project, they should be used for sediment retention. • To determine the sediment trap geometry, first calculate the design surface area (SA) of the trap, measured at the invert of the weir. Use the following equation: SA = FS(Q2/Vs) where Q2 = Design inflow based on the peak discharge from the developed 2-year runoff event from the contributing drainage area as computed in the hydrologic analysis. The 10-year peak flow shall be used if the project size, expected timing and duration of construction, or downstream conditions warrant a higher level of protection. If no hydrologic analysis is required, the Rational Method may be used. Vs = The settling velocity of the soil particle of interest. The 0.02 mm (medium silt) particle with an assumed density of 2.65 g/cm3 has been selected as the particle of interest and has a settling velocity (Vs) of 0.00096 ft/sec. FS = A safety factor of 2 to account for non-ideal settling. Therefore, the equation for computing surface area becomes: SA = 2 x Q2/0.00096 or 2080 square feet per cfs of inflow Note: Even if permanent facilities are used, they must still have a surface area that is at least as large as that derived from the above formula. If they do not, the pond must be enlarged. • To aid in determining sediment depth, all sediment traps shall have a staff gauge with a prominent mark 1-foot above the bottom of the trap. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-103 Surface area determinedat top of weir Note: Trap may be formed by berm or bypartial or complete excavation Discharge to stabilizedconveyance, outlet, orlevel spreader ¾" - 1.5"Washed gravel Geotextile Flat Bottom 1' Min. Overflow 1' Min. 4' Min. RipRap2"-4" Rock 1' Min. 1.5' Min. 3.5'-5' 3H : 1 V M a x . • Sediment traps may not be feasible on utility projects due to the limited work space or the short-term nature of the work. Portable tanks may be used in place of sediment traps for utility projects. Maintenance Standards • Sediment shall be removed from the trap when it reaches 1-foot in depth. • Any damage to the pond embankments or slopes shall be repaired. Figure 4.2.16 – Cross Section of Sediment Trap Figure 4.2.17 – Sediment Trap Outlet Native soil or compacted backfill Geotextile Min. 1' depth 2"-4"' rock Min. 1' depth 3/4"-1.5" washed gravel 6' Min. 1' Min. depth overflow spillway Volume II – Construction Stormwater Pollution Prevention - August 2012 4-104 BMP C241: Temporary Sediment Pond Purpose Sediment ponds remove sediment from runoff originating from disturbed areas of the site. Sediment ponds are typically designed to remove sediment no smaller than medium silt (0.02 mm). Consequently, they usually reduce turbidity only slightly. Conditions of Use Prior to leaving a construction site, stormwater runoff must pass through a sediment pond or other appropriate sediment removal best management practice. A sediment pond shall be used where the contributing drainage area is 3 acres or more. Ponds must be used in conjunction with erosion control practices to reduce the amount of sediment flowing into the basin. Design and Installation Specifications • Sediment basins must be installed only on sites where failure of the structure would not result in loss of life, damage to homes or buildings, or interruption of use or service of public roads or utilities. Also, sediment traps and ponds are attractive to children and can be very dangerous. Compliance with local ordinances regarding health and safety must be addressed. If fencing of the pond is required, the type of fence and its location shall be shown on the ESC plan. • Structures having a maximum storage capacity at the top of the dam of 10 acre-ft (435,600 ft3) or more are subject to the Washington Dam Safety Regulations (Chapter 173-175 WAC). • See Figures 4.2.18, 4.2.19, and 4.2.20 for details. • If permanent runoff control facilities are part of the project, they should be used for sediment retention. The surface area requirements of the sediment basin must be met. This may require temporarily enlarging the permanent basin to comply with the surface area requirements. The permanent control structure must be temporarily replaced with a control structure that only allows water to leave the pond from the surface or by pumping. The permanent control structure must be installed after the site is fully stabilized. . • Use of infiltration facilities for sedimentation basins during construction tends to clog the soils and reduce their capacity to infiltrate. If infiltration facilities are to be used, the sides and bottom of the facility must only be rough excavated to a minimum of 2 feet above final grade. Final grading of the infiltration facility shall occur only when all contributing drainage areas are fully stabilized. The infiltration pretreatment facility should be fully constructed and used with the sedimentation basin to help prevent clogging. • Determining Pond Geometry Obtain the discharge from the hydrologic calculations of the peak flow for the 2-year runoff event (Q2). The 10-year peak flow shall be used if Volume II – Construction Stormwater Pollution Prevention - August 2012 4-105 the project size, expected timing and duration of construction, or downstream conditions warrant a higher level of protection. If no hydrologic analysis is required, the Rational Method may be used. Determine the required surface area at the top of the riser pipe with the equation: SA = 2 x Q2/0.00096 or 2080 square feet per cfs of inflow See BMP C240 for more information on the derivation of the surface area calculation. The basic geometry of the pond can now be determined using the following design criteria: • Required surface area SA (from Step 2 above) at top of riser. • Minimum 3.5-foot depth from top of riser to bottom of pond. • Maximum 3H:1V interior side slopes and maximum 2H:1V exterior slopes. The interior slopes can be increased to a maximum of 2H:1V if fencing is provided at or above the maximum water surface. • One foot of freeboard between the top of the riser and the crest of the emergency spillway. • Flat bottom. • Minimum 1-foot deep spillway. • Length-to-width ratio between 3:1 and 6:1. • Sizing of Discharge Mechanisms. The outlet for the basin consists of a combination of principal and emergency spillways. These outlets must pass the peak runoff expected from the contributing drainage area for a 100-year storm. If, due to site conditions and basin geometry, a separate emergency spill- way is not feasible, the principal spillway must pass the entire peak runoff expected from the 100-year storm. However, an attempt to provide a separate emergency spillway should always be made. The runoff calculations should be based on the site conditions during construction. The flow through the dewatering orifice cannot be utilized when calculating the 100-year storm elevation because of its potential to become clogged; therefore, available spillway storage must begin at the principal spillway riser crest. The principal spillway designed by the procedures contained in this standard will result in some reduction in the peak rate of runoff. However, the riser outlet design will not adequately control the basin discharge to the predevelopment discharge limitations as stated in Minimum Requirement #7: Flow Control. However, if the basin for a permanent stormwater detention pond is used for a temporary Volume II – Construction Stormwater Pollution Prevention - August 2012 4-106 Riser pipe(principal spillway)open at top withtrash rackper Fig 4.4.4E Dewatering device (see riser detail) Wire-backed silt fencestaked haybales wrappedwith filter fabric, orequivalent divider Dewatering orifice Concrete base (see riser detail) Discharge to stabilized conveyance outlet or level spreader Embankment compacted 95% pervious materials such as gravel or clean sand shall not be used 6' min. WidthCrest of emergency spillway Key divider into slopeto prevent flowaround sides The pond length shall be 3 to 6 times the maximum pond width Emergency overflow spillway Discharge to stabilizedconveyance, outlet, orlevel spreader Note: Pond may be formed by berm or by partial or complete excavation Inflow Pond length Silt fence or equivalent divider Riser pipe sedimentation basin, the control structure for the permanent pond can be used to maintain predevelopment discharge limitations. The size of the basin, the expected life of the construction project, the anticipated downstream effects and the anticipated weather conditions during construction, should be considered to determine the need of additional discharge control. See Figure 4.2.21 for riser inflow curves. Figure 4.2.18 – Sediment Pond Plan View Figure 4.2.19 – Sediment Pond Cross Section Volume II – Construction Stormwater Pollution Prevention - August 2012 4-107 Perforated polyethylene drainage tubing, diameter min. 2" larger than dewatering orifice. Tubing shall comply with ASTM F667 and AASHTO M294 Polyethylene cap Provide adequate strapping Dewatering orifice, schedule, 40 steel stub min. Diameter as per calculations Alternatively, metal stakes and wire may be used to prevent flotation 2X riser dia. Min. Concrete base Corrugated metal riser Watertight coupling 18" min. 6" min. Tack weld 3.5" min. Figure 4.2.20 – Sediment Pond Riser Detail Volume II – Construction Stormwater Pollution Prevention - August 2012 4-108 Figure 4.2.21 – Riser Inflow Curves Volume II – Construction Stormwater Pollution Prevention - August 2012 4-109 Principal Spillway: Determine the required diameter for the principal spillway (riser pipe). The diameter shall be the minimum necessary to pass the site’s 15-minute, 10-year flowrate. If using the Western Washington Hydrology Model (WWHM), Version 2 or 3, design flow is the 10-year (1 hour) flow for the developed (unmitigated) site, multiplied by a factor of 1.6. Use Figure 4.2.21 to determine this diameter (h = 1-foot). Note: A permanent control structure may be used instead of a temporary riser. Emergency Overflow Spillway: Determine the required size and design of the emergency overflow spillway for the developed 100-year peak flow using the method contained in Volume III. Dewatering Orifice: Determine the size of the dewatering orifice(s) (minimum 1-inch diameter) using a modified version of the discharge equation for a vertical orifice and a basic equation for the area of a circular orifice. Determine the required area of the orifice with the following equation: 5.0 5.0 3600x6.0 )2( Tg hAAs o = where Ao = orifice area (square feet) As = pond surface area (square feet) h = head of water above orifice (height of riser in feet) T = dewatering time (24 hours) g = acceleration of gravity (32.2 feet/second2) Convert the required surface area to the required diameter D of the orifice: o o AADx54.13x24==π The vertical, perforated tubing connected to the dewatering orifice must be at least 2 inches larger in diameter than the orifice to improve flow characteristics. The size and number of perforations in the tubing should be large enough so that the tubing does not restrict flow. The orifice should control the flow rate. • Additional Design Specifications The pond shall be divided into two roughly equal volume cells by a permeable divider that will reduce turbulence while allowing movement of water between cells. The divider shall be at least one- half the height of the riser and a minimum of one foot below the top of the riser. Wire-backed, 2- to 3-foot high, extra strength filter fabric supported by treated 4"x4"s can be used as a divider. Alternatively, staked straw bales wrapped with filter fabric (geotextile) may be used. If the pond is more than 6 feet deep, a different mechanism must be proposed. A riprap embankment is one acceptable method of Volume II – Construction Stormwater Pollution Prevention - August 2012 4-110 separation for deeper ponds. Other designs that satisfy the intent of this provision are allowed as long as the divider is permeable, structurally sound, and designed to prevent erosion under or around the barrier. To aid in determining sediment depth, one-foot intervals shall be prominently marked on the riser. If an embankment of more than 6 feet is proposed, the pond must comply with the criteria contained in Volume III regarding dam safety for detention BMPs. • The most common structural failure of sedimentation basins is caused by piping. Piping refers to two phenomena: (1) water seeping through fine-grained soil, eroding the soil grain by grain and forming pipes or tunnels; and, (2) water under pressure flowing upward through a granular soil with a head of sufficient magnitude to cause soil grains to lose contact and capability for support. The most critical construction sequences to prevent piping will be: 1. Tight connections between riser and barrel and other pipe connections. 2. Adequate anchoring of riser. 3. Proper soil compaction of the embankment and riser footing. 4. Proper construction of anti-seep devices. Maintenance Standards • Sediment shall be removed from the pond when it reaches 1–foot in depth. • Any damage to the pond embankments or slopes shall be repaired. BMP C250: Construction Stormwater Chemical Treatment Purpose This BMP applies when using stormwater chemicals in batch treatment or flow-through treatment. Turbidity is difficult to control once fine particles are suspended in stormwater runoff from a construction site. Sedimentation ponds are effective at removing larger particulate matter by gravity settling, but are ineffective at removing smaller particulates such as clay and fine silt. Traditional erosion and sediment control BMPs may not be adequate to ensure compliance with the water quality standards for turbidity in receiving water. Chemical treatment can reliably provide exceptional reductions of turbidity and associated pollutants. Chemical treatment may be required to meet turbidity stormwater discharge requirements, especially when construction is to proceed through the wet season. Conditions of Use Formal written approval from Ecology is required for the use of chemical treatment regardless of site size. The Local Permitting Authority may also Volume II – Construction Stormwater Pollution Prevention - August 2012 4-111 require review and approval. When approved, the chemical treatment systems must be included in the Construction Stormwater Pollution Prevention Plan (SWPPP). Design and Installation Specifications See Appendix II-B for background information on chemical treatment. Criteria for Chemical Treatment Product Use: Chemically treated stormwater discharged from construction sites must be nontoxic to aquatic organisms. The Chemical Technology Assessment Protocol (CTAPE) must be used to evaluate chemicals proposed for stormwater treatment. Only chemicals approved by Ecology under the CTAPE may be used for stormwater treatment. The approved chemicals, their allowable application techniques (batch treatment or flow-through treatment), allowable application rates, and conditions of use can be found at the Department of Ecology Emerging Technologies website: http://www.ecy.wa.gov/programs/wq/stormwater/newtech/technologies.ht ml. Treatment System Design Considerations: The design and operation of a chemical treatment system should take into consideration the factors that determine optimum, cost-effective performance. It is important to recognize the following: • Only Ecology approved chemicals may be used and must follow approved dose rate. • The pH of the stormwater must be in the proper range for the polymers to be effective, which is typically 6.5 to 8.5 • The coagulant must be mixed rapidly into the water to ensure proper dispersion. • A flocculation step is important to increase the rate of settling, to produce the lowest turbidity, and to keep the dosage rate as low as possible. • Too little energy input into the water during the flocculation phase results in flocs that are too small and/or insufficiently dense. Too much energy can rapidly destroy floc as it is formed. • Care must be taken in the design of the withdrawal system to minimize outflow velocities and to prevent floc discharge. Discharge from a batch treatment system should be directed through a physical filter such as a vegetated swale that would catch any unintended floc discharge. Currently, flow-through systems always discharge through the chemically enhanced sand filtration system. • System discharge rates must take into account downstream conveyance integrity. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-112 Polymer Batch Treatment Process Description: A batch chemical treatment system consists of the stormwater collection system (either temporary diversion or the permanent site drainage system), a storage pond, pumps, a chemical feed system, treatment cells, and interconnecting piping. The batch treatment system shall use a minimum of two lined treatment cells in addition to an untreated stormwater storage pond. Multiple treatment cells allow for clarification of treated water while other cells are being filled or emptied. Treatment cells may be ponds or tanks. Ponds with constructed earthen embankments greater than six feet high or which impound more than 10 acre-feet require special engineering analyses. The Ecology Dam Safety Section has specific design criteria for dams in Washington State (see http://www.ecy.wa.gov/programs/wr/dams/GuidanceDocs.html ). Stormwater is collected at interception point(s) on the site and is diverted by gravity or by pumping to an untreated stormwater storage pond or other untreated stormwater holding area. The stormwater is stored until treatment occurs. It is important that the holding pond be large enough to provide adequate storage. The first step in the treatment sequence is to check the pH of the stormwater in the untreated stormwater storage pond. The pH is adjusted by the application of carbon dioxide or a base until the stormwater in the storage pond is within the desired pH range, 6.5 to 8.5. When used, carbon dioxide is added immediately downstream of the transfer pump. Typically sodium bicarbonate (baking soda) is used as a base, although other bases may be used. When needed, base is added directly to the untreated stormwater storage pond. The stormwater is recirculated with the treatment pump to provide mixing in the storage pond. Initial pH adjustments should be based on daily bench tests. Further pH adjustments can be made at any point in the process. Once the stormwater is within the desired pH range (dependant on polymer being used), the stormwater is pumped from the untreated stormwater storage pond to a treatment cell as polymer is added. The polymer is added upstream of the pump to facilitate rapid mixing. After polymer addition, the water is kept in a lined treatment cell for clarification of the sediment-floc. In a batch mode process, clarification typically takes from 30 minutes to several hours. Prior to discharge samples are withdrawn for analysis of pH, flocculent chemical concentration, and turbidity. If both are acceptable, the treated water is discharged. Several configurations have been developed to withdraw treated water from the treatment cell. The original configuration is a device that withdraws the treated water from just beneath the water surface using a Volume II – Construction Stormwater Pollution Prevention - August 2012 4-113 float with adjustable struts that prevent the float from settling on the cell bottom. This reduces the possibility of picking up sediment-floc from the bottom of the pond. The struts are usually set at a minimum clearance of about 12 inches; that is, the float will come within 12 inches of the bottom of the cell. Other systems have used vertical guides or cables which constrain the float, allowing it to drift up and down with the water level. More recent designs have an H-shaped array of pipes, set on the horizontal. This scheme provides for withdrawal from four points rather than one. This configuration reduces the likelihood of sucking settled solids from the bottom. It also reduces the tendency for a vortex to form. Inlet diffusers, a long floating or fixed pipe with many small holes in it, are also an option. Safety is a primary concern. Design should consider the hazards associated with operations, such as sampling. Facilities should be designed to reduce slip hazards and drowning. Tanks and ponds should have life rings, ladders, or steps extending from the bottom to the top. Polymer Batch Treatment Process Description: At a minimum, a flow-through chemical treatment system consists of the stormwater collection system (either temporary diversion or the permanent site drainage system), an untreated stormwater storage pond, and the chemically enhanced sand filtration system. Stormwater is collected at interception point(s) on the site and is diverted by gravity or by pumping to an untreated stormwater storage pond or other untreated stormwater holding area. The stormwater is stored until treatment occurs. It is important that the holding pond be large enough to provide adequate storage. Stormwater is then pumped from the untreated stormwater storage pond to the chemically enhanced sand filtration system where polymer is added. Adjustments to pH may be necessary before chemical addition. The sand filtration system continually monitors the stormwater for turbidity and pH. If the discharge water is ever out of an acceptable range for turbidity or pH, the water is recycled to the untreated stormwater pond where it can be retreated. For batch treatment and flow-through treatment, the following equipment should be located in a lockable shed: • The chemical injector. • Secondary containment for acid, caustic, buffering compound, and treatment chemical. • Emergency shower and eyewash. • Monitoring equipment which consists of a pH meter and a turbidimeter. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-114 System Sizing: Certain sites are required to implement flow control for the developed sites. These sites must also control stormwater release rates during construction. Generally, these are sites that discharge stormwater directly, or indirectly, through a conveyance system, into a fresh water. System sizing is dependent on flow control requirements. Sizing Criteria for Batch Treatment Systems for Flow Control Exempt Water Bodies: The total volume of the untreated stormwater storage pond and treatment ponds or tanks must be large enough to treat stormwater that is produced during multiple day storm events. It is recommended that at a minimum the untreated stormwater storage pond be sized to hold 1.5 times the runoff volume of the 10-year, 24-hour storm event. Bypass should be provided around the chemical treatment system to accommodate extreme storm events. Runoff volume shall be calculated using the methods presented in Volume 3, Chapter 2. Worst-case land cover conditions (i.e., producing the most runoff) should be used for analyses (in most cases, this would be the land cover conditions just prior to final landscaping). Primary settling should be encouraged in the untreated stormwater storage pond. A forebay with access for maintenance may be beneficial. There are two opposing considerations in sizing the treatment cells. A larger cell is able to treat a larger volume of water each time a batch is processed. However, the larger the cell the longer the time required to empty the cell. A larger cell may also be less effective at flocculation and therefore require a longer settling time. The simplest approach to sizing the treatment cell is to multiply the allowable discharge flow rate times the desired drawdown time. A 4-hour drawdown time allows one batch per cell per 8-hour work period, given 1 hour of flocculation followed by two hours of settling. If the discharge is directly to a flow control exempt receiving water listed in Appendix I-E of Volume I or to an infiltration system, there is no discharge flow limit. Ponds sized for flow control water bodies must at a minimum meet the sizing criteria for flow control exempt waters. Sizing Criteria for Flow-Through Treatment Systems for Flow Control Exempt Water Bodies: When sizing storage ponds or tanks for flow-through systems for flow control exempt water bodies, the treatment system capacity should be a factor. The untreated stormwater storage pond or tank should be sized to hold 1.5 times the runoff volume of the 10-year, 24-hour storm event minus the treatment system flowrate for an 8-hour period. For a chitosan- enhanced sand filtration system, the treatment system flowrate should be sized using a hydraulic loading rate between 6-8 gpm/ft². Other hydraulic Volume II – Construction Stormwater Pollution Prevention - August 2012 4-115 loading rates may be more appropriate for other systems. Bypass should be provided around the chemical treatment system to accommodate extreme storms. Runoff volume shall be calculated using the methods presented in Volume 3, Chapter 2. Worst-case land cover conditions (i.e., producing the most runoff) should be used for analyses (in most cases, this would be the land cover conditions just prior to final landscaping). Sizing Criteria for Flow Control Water Bodies: Sites that must implement flow control for the developed site condition must also control stormwater release rates during construction. Construction site stormwater discharges shall not exceed the discharge durations of the pre-developed condition for the range of pre-developed discharge rates from ½ of the 2-year flow through the 10-year flow as predicted by an approved continuous runoff model. The pre-developed condition to be matched shall be the land cover condition immediately prior to the development project. This restriction on release rates can affect the size of the storage pond and treatment cells. The following is how WWHM can be used to determine the release rates from the chemical treatment systems: 1. Determine the pre-developed flow durations to be matched by entering the existing land use area under the “Pre-developed” scenario in WWHM. The default flow range is from ½ of the 2-year flow through the 10-year flow. 2. Enter the post developed land use area in the “Developed Unmitigated” scenario in WWHM. 3. Copy the land use information from the “Developed Unmitigated” to “Developed Mitigated” scenario. 4. While in the “Developed Mitigated” scenario, add a pond element under the basin element containing the post-developed land use areas. This pond element represents information on the available untreated stormwater storage and discharge from the chemical treatment system. In cases where the discharge from the chemical treatment system is controlled by a pump, a stage/storage/discharge (SSD) table representing the pond must be generated outside WWHM and imported into WWHM. WWHM can route the runoff from the post- developed condition through this SSD table (the pond) and determine compliance with the flow duration standard. This would be an iterative design procedure where if the initial SSD table proved to be inadequate, the designer would have to modify the SSD table outside WWHM and re-import in WWHM and route the runoff through it again. The iteration will continue until a pond that complies with the flow duration standard is correctly sized. Notes on SSD table characteristics: Volume II – Construction Stormwater Pollution Prevention - August 2012 4-116 • The pump discharge rate would likely be initially set at just below ½ of the 2-year flow from the pre-developed condition. As runoff coming into the untreated stormwater storage pond increases and the available untreated stormwater storage volume gets used up, it would be necessary to increase the pump discharge rate above ½ of the 2-year. The increase(s) above ½ of the 2-year must be such that they provide some relief to the untreated stormwater storage needs but at the same time will not cause violations of the flow duration standard at the higher flows. The final design SSD table will identify the appropriate pumping rates and the corresponding stage and storages. • When building such a flow control system, the design must ensure that any automatic adjustments to the pumping rates will be as a result of changes to the available storage in accordance with the final design SSD table. 5. It should be noted that the above procedures would be used to meet the flow control requirements. The chemical treatment system must be able to meet the runoff treatment requirements. It is likely that the discharge flow rate of ½ of the 2-year or more may exceed the treatment capacity of the system. If that is the case, the untreated stormwater discharge rate(s) (i.e., influent to the treatment system) must be reduced to allow proper treatment. Any reduction in the flows would likely result in the need for a larger untreated stormwater storage volume. If the discharge is to a municipal storm drainage system, the allowable discharge rate may be limited by the capacity of the public system. It may be necessary to clean the municipal storm drainage system prior to the start of the discharge to prevent scouring solids from the drainage system. If the municipal storm drainage system discharges to a water body not on the flow control exempt list, the project site is subject to flow control requirements. Obtain permission from the owner of the collection system before discharging to it. If system design does not allow you to discharge at the slower rates as described above and if the site has a retention or detention pond that will serve the planned development, the discharge from the treatment system may be directed to the permanent retention/detention pond to comply with the flow control requirement. In this case, the untreated stormwater storage pond and treatment system will be sized according to the sizing criteria for flow- through treatment systems for flow control exempt water bodies described earlier except all discharge (water passing through the treatment system and stormwater bypassing the treatment system) will be directed into the permanent retention/detention pond. If site constraints make locating the untreated stormwater storage pond difficult, the permanent retention/detention pond may be divided to serve as the untreated stormwater storage pond and the post-treatment flow control pond. A berm or barrier must be used in this case so the untreated water does not mix with the treated Volume II – Construction Stormwater Pollution Prevention - August 2012 4-117 water. Both untreated stormwater storage requirements, and adequate post- treatment flow control must be achieved. The post-treatment flow control pond’s revised dimensions must be entered into the WWHM and the WWHM must be run to confirm compliance with the flow control requirement. Maintenance Standards Monitoring: At a minimum, the following monitoring shall be conducted. Test results shall be recorded on a daily log kept on site. Additional testing may be required by the NPDES permit based on site conditions. Operational Monitoring: • Total volume treated and discharged. • Flow must be continuously monitored and recorded at not greater than 15-minute intervals. • Type and amount of chemical used for pH adjustment. • Amount of polymer used for treatment. • Settling time. Compliance Monitoring: • Influent and effluent pH, flocculent chemical concentration, and turbidity must be continuously monitored and recorded at not greater than 15-minute intervals. pH and turbidity of the receiving water. Biomonitoring: Treated stormwater must be non-toxic to aquatic organisms. Treated stormwater must be tested for aquatic toxicity or residual chemicals. Frequency of biomonitoring will be determined by Ecology. Residual chemical tests must be approved by Ecology prior to their use. If testing treated stormwater for aquatic toxicity, you must test for acute (lethal) toxicity. Bioassays shall be conducted by a laboratory accredited by Ecology, unless otherwise approved by Ecology. Acute toxicity tests shall be conducted per the CTAPE protocol. Discharge Compliance: Prior to discharge, treated stormwater must be sampled and tested for compliance with pH, flocculent chemical concentration, and turbidity limits. These limits may be established by the Construction Stormwater General Permit or a site-specific discharge permit. Sampling and testing for other pollutants may also be necessary at some sites. pH must be within the range of 6.5 to 8.5 standard units and not cause a change in the pH of the receiving water of more than 0.2 standard units. Treated stormwater samples and measurements shall be taken from the discharge pipe or another location representative of the nature of the treated stormwater discharge. Samples used for determining compliance with the water quality standards in the receiving water shall not be taken from the treatment pond prior to decanting. Compliance with the water quality standards is determined in the receiving water. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-118 Operator Training: Each contractor who intends to use chemical treatment shall be trained by an experienced contractor . Each site using chemical treatment must have an operator trained and certified by an organization approved by Ecology. Standard BMPs: Surface stabilization BMPs should be implemented on site to prevent significant erosion. All sites shall use a truck wheel wash to prevent tracking of sediment off site. Sediment Removal and Disposal: • Sediment shall be removed from the storage or treatment cells as necessary. Typically, sediment removal is required at least once during a wet season and at the decommissioning of the cells. Sediment remaining in the cells between batches may enhance the settling process and reduce the required chemical dosage. • Sediment that is known to be non-toxic may be incorporated into the site away from drainages. BMP C251: Construction Stormwater Filtration Purpose Filtration removes sediment from runoff originating from disturbed areas of the site. Background Information: Filtration with sand media has been used for over a century to treat water and wastewater. The use of sand filtration for treatment of stormwater has developed recently, generally to treat runoff from streets, parking lots, and residential areas. The application of filtration to construction stormwater treatment is currently under development. Conditions of Use Traditional BMPs used to control soil erosion and sediment loss from sites under development may not be adequate to ensure compliance with the water quality standard for turbidity in the receiving water. Filtration may be used in conjunction with gravity settling to remove sediment as small as fine silt (0.5 µm). The reduction in turbidity will be dependent on the particle size distribution of the sediment in the stormwater. In some circumstances, sedimentation and filtration may achieve compliance with the water quality standard for turbidity. The use of construction stormwater filtration does not require approval from Ecology as long as treatment chemicals are not used. Filtration in conjunction with polymer treatment requires testing under the Chemical Technology Assessment Protocol – Ecology (CTAPE) before it can be initiated. Approval from the appropriate regional Ecology office must be obtained at each site where polymers use is proposed prior to use. For more guidance on stormwater chemical treatment see BMP C250. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-119 Design and Installation Specifications Two types of filtration systems may be applied to construction stormwater treatment: rapid and slow. Rapid sand filters are the typical system used for water and wastewater treatment. They can achieve relatively high hydraulic flow rates, on the order of 2 to 20 gpm/sf, because they have automatic backwash systems to remove accumulated solids. In contrast, slow sand filters have very low hydraulic rates, on the order of 0.02 gpm/sf, because they do not have backwash systems. Slow sand filtration has generally been used to treat stormwater. Slow sand filtration is mechanically simple in comparison to rapid sand filtration but requires a much larger filter area. Filtration Equipment. Sand media filters are available with automatic backwashing features that can filter to 50 µm particle size. Screen or bag filters can filter down to 5 µm. Fiber wound filters can remove particles down to 0.5 µm. Filters should be sequenced from the largest to the smallest pore opening. Sediment removal efficiency will be related to particle size distribution in the stormwater. Treatment Process Description. Stormwater is collected at interception point(s) on the site and is diverted to an untreated stormwater sediment pond or tank for removal of large sediment and storage of the stormwater before it is treated by the filtration system. The untreated stormwater is pumped from the trap, pond, or tank through the filtration system in a rapid sand filtration system. Slow sand filtration systems are designed as flow through systems using gravity. Maintenance Standards Rapid sand filters typically have automatic backwash systems that are triggered by a pre-set pressure drop across the filter. If the backwash water volume is not large or substantially more turbid than the untreated stormwater stored in the holding pond or tank, backwash return to the untreated stormwater pond or tank may be appropriate. However, other means of treatment and disposal may be necessary. • Screen, bag, and fiber filters must be cleaned and/or replaced when they become clogged. • Sediment shall be removed from the storage and/or treatment ponds as necessary. Typically, sediment removal is required once or twice during a wet season and at the decommissioning of the ponds. Sizing Criteria for Flow-Through Treatment Systems for Flow Control Exempt Water Bodies: When sizing storage ponds or tanks for flow-through systems for flow control exempt water bodies the treatment system capacity should be a factor. The untreated stormwater storage pond or tank should be sized to hold 1.5 times the runoff volume of the 10-year, 24-hour storm event minus the treatment system flowrate for an 8-hour period. For a chitosan- enhanced sand filtration system, the treatment system flowrate should be sized using a hydraulic loading rate between 6-8 gpm/ft². Other hydraulic Volume II – Construction Stormwater Pollution Prevention - August 2012 4-120 loading rates may be more appropriate for other systems. Bypass should be provided around the chemical treatment system to accommodate extreme storms. Runoff volume shall be calculated using the methods presented in Volume 3, Chapter 2. Worst-case conditions (i.e., producing the most runoff) should be used for analyses (most likely conditions present prior to final landscaping). Sizing Criteria for Flow Control Water Bodies: Sites that must implement flow control for the developed site condition must also control stormwater release rates during construction. Construction site stormwater discharges shall not exceed the discharge durations of the pre-developed condition for the range of pre-developed discharge rates from 1/2 of the 2-year flow through the 10-year flow as predicted by an approved continuous runoff model. The pre-developed condition to be matched shall be the land cover condition immediately prior to the development project. This restriction on release rates can affect the size of the storage pond, the filtration system, and the flow rate through the filter system. The following is how WWHM can be used to determine the release rates from the filtration systems: 1. Determine the pre-developed flow durations to be matched by entering the land use area under the “Pre-developed” scenario in WWHM. The default flow range is from ½ of the 2-year flow through the 10-year flow. 2. Enter the post developed land use area in the “Developed Unmitigated” scenario in WWHM. 3. Copy the land use information from the “Developed Unmitigated” to “Developed Mitigated” scenario. 4. There are two possible ways to model stormwater filtration systems: a. The stormwater filtration system uses an untreated stormwater storage pond/tank and the discharge from this pond/tank is pumped to one or more filters. In-line filtration chemicals would be added to the flow right after the pond/tank and before the filter(s). Because the discharge is pumped, WWHM can’t generate a stage/storage /discharge (SSD) table for this system. This system is modeled the same way as described in BMP C250 and is as follows: While in the “Developed Mitigated” scenario, add a pond element under the basin element containing the post-developed land use areas. This pond element represents information on the available untreated stormwater storage and discharge from the filtration system. In cases where the discharge from the filtration system is controlled by a pump, a stage/storage/discharge (SSD) table representing the pond must be generated outside WWHM and Volume II – Construction Stormwater Pollution Prevention - August 2012 4-121 imported into WWHM. WWHM can route the runoff from the post-developed condition through this SSD table (the pond) and determine compliance with the flow duration standard. This would be an iterative design procedure where if the initial SSD table proved to be out of compliance, the designer would have to modify the SSD table outside WWHM and re-import in WWHM and route the runoff through it again. The iteration will continue until a pond that enables compliance with the flow duration standard is designed. Notes on SSD table characteristics: • The pump discharge rate would likely be initially set at just below ½ if the 2-year flow from the pre-developed condition. As runoff coming into the untreated stormwater storage pond increases and the available untreated stormwater storage volume gets used up, it would be necessary to increase the pump discharge rate above ½ of the 2-year. The increase(s) above ½ of the 2-year must be such that they provide some relief to the untreated stormwater storage needs but at the same time they will not cause violations of the flow duration standard at the higher flows. The final design SSD table will identify the appropriate pumping rates and the corresponding stage and storages. • When building such a flow control system, the design must ensure that any automatic adjustments to the pumping rates will be as a result of changes to the available storage in accordance with the final design SSD table. b. The stormwater filtration system uses a storage pond/tank and the discharge from this pond/tank gravity flows to the filter. This is usually a slow sand filter system and it is possible to model it in WWHM as a Filter element or as a combination of Pond and Filter element placed in series. The stage/storage/discharge table(s) may then be generated within WWHM as follows: (i) While in the “Developed Mitigated” scenario, add a Filter element under the basin element containing the post-developed land use areas. The length and width of this filter element would have to be the same as the bottom length and width of the upstream untreated stormwater storage pond/tank. (ii) In cases where the length and width of the filter is not the same as those for the bottom of the upstream untreated stormwater storage tank/pond, the treatment system may be modeled as a Pond element followed by a Filter element. By having these two elements, WWHM would then generate a SSD table for the storage pond which then gravity flows to the Filter element. The Filter element downstream of the untreated stormwater Volume II – Construction Stormwater Pollution Prevention - August 2012 4-122 storage pond would have a storage component through the media, and an overflow component for when the filtration capacity is exceeded. WWHM can route the runoff from the post-developed condition through the treatment systems in 4b and determine compliance with the flow duration standard. This would be an iterative design procedure where if the initial sizing estimates for the treatment system proved to be inadequate, the designer would have to modify the system and route the runoff through it again. The iteration would continue until compliance with the flow duration standard is achieved. 5. It should be noted that the above procedures would be used to meet the flow control requirements. The filtration system must be able to meet the runoff treatment requirements. It is likely that the discharge flow rate of ½ of the 2-year or more may exceed the treatment capacity of the system. If that is the case, the untreated stormwater discharge rate(s) (i.e., influent to the treatment system) must be reduced to allow proper treatment. Any reduction in the flows would likely result in the need for a larger untreated stormwater storage volume. If system design does not allow you to discharge at the slower rates as described above and if the site has a retention or detention pond that will serve the planned development, the discharge from the treatment system may be directed to the permanent retention/detention pond to comply with the flow control requirements. In this case, the untreated stormwater storage pond and treatment system will be sized according to the sizing criteria for flow- through treatment systems for flow control exempt waterbodies described earlier except all discharges (water passing through the treatment system and stormwater bypassing the treatment system) will be directed into the permanent retention/detention pond. If site constraints make locating the untreated stormwater storage pond difficult, the permanent retention/detention pond may be divided to serve as the untreated stormwater discharge pond and the post-treatment flow control pond. A berm or barrier must be used in this case so the untreated water does not mix with the treated water. Both untreated stormwater storage requirements, and adequate post- treatment flow control must be achieved. The post-treatment flow control pond’s revised dimensions must be entered into the WWHM and the WWHM must be run to confirm compliance with the flow control requirement. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-123 BMP C252: High pH Neutralization Using CO2 Purpose When pH levels in stormwater rise above 8.5 it is necessary to lower the pH levels to the acceptable range of 6.5 to 8.5, this process is called pH neutralization. pH neutralization involves the use of solid or compressed carbon dioxide gas in water requiring neutralization. Neutralized stormwater may be discharged to surface waters under the General Construction NPDES permit. Neutralized process water such as concrete truck wash-out, hydro- demolition, or saw-cutting slurry must be managed to prevent discharge to surface waters. Any stormwater contaminated during concrete work is considered process wastewater and must not be discharged to surface waters. Reason for pH Neutralization: A pH level range of 6.5 to 8.5 is typical for most natural watercourses, and this neutral pH is required for the survival of aquatic organisms. Should the pH rise or drop out of this range, fish and other aquatic organisms may become stressed and may die. Calcium hardness can contribute to high pH values and cause toxicity that is associated with high pH conditions. A high level of calcium hardness in waters of the state is not allowed. The water quality standard for pH in Washington State is in the range of 6.5 to 8.5. Ground water standard for calcium and other dissolved solids in Washington State is less than 500 mg/l. Conditions of Use Causes of High pH: High pH at construction sites is most commonly caused by the contact of stormwater with poured or recycled concrete, cement, mortars, and other Portland cement or lime containing construction materials. (See BMP C151: Concrete Handling for more information on concrete handling procedures). The principal caustic agent in cement is calcium hydroxide (free lime). Advantages of CO2 Sparging: • Rapidly neutralizes high pH water. • Cost effective and safer to handle than acid compounds. • CO2 is self-buffering. It is difficult to overdose and create harmfully low pH levels. • Material is readily available. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-124 The Chemical Process: When carbon dioxide (CO2) is added to water (H2O), carbonic acid (H2CO3) is formed which can further dissociate into a proton (H+) and a bicarbonate anion (HCO3-) as shown below: CO2 + H2O ↔ H2CO3 ↔ H+ + HCO3- The free proton is a weak acid that can lower the pH. Water temperature has an effect on the reaction as well. The colder the water temperature is the slower the reaction occurs and the warmer the water temperature is the quicker the reaction occurs. Most construction applications in Washington State have water temperatures in the 50°F or higher range so the reaction is almost simultaneous. Design and Installation Specifications Treatment Process: High pH water may be treated using continuous treatment, continuous discharge systems. These manufactured systems continuously monitor influent and effluent pH to ensure that pH values are within an acceptable range before being discharged. All systems must have fail safe automatic shut off switches in the event that pH is not within the acceptable discharge range. Only trained operators may operate manufactured systems. System manufacturers often provide trained operators or training on their devices. The following procedure may be used when not using a continuous discharge system: 1. Prior to treatment, the appropriate jurisdiction should be notified in accordance with the regulations set by the jurisdiction. 2. Every effort should be made to isolate the potential high pH water in order to treat it separately from other stormwater on-site. 3. Water should be stored in an acceptable storage facility, detention pond, or containment cell prior to treatment. 4. Transfer water to be treated to the treatment structure. Ensure that treatment structure size is sufficient to hold the amount of water that is to be treated. Do not fill tank completely, allow at least 2 feet of freeboard. 5. The operator samples the water for pH and notes the clarity of the water. As a rule of thumb, less CO2 is necessary for clearer water. This information should be recorded. 6. In the pH adjustment structure, add CO2 until the pH falls in the range of 6.9-7.1. Remember that pH water quality standards apply so adjusting pH to within 0.2 pH units of receiving water (background pH) is recommended. It is unlikely that pH can be adjusted to within 0.2 pH units using dry ice. Compressed carbon dioxide gas should be introduced to the water using a carbon dioxide diffuser located near Volume II – Construction Stormwater Pollution Prevention - August 2012 4-125 the bottom of the tank, this will allow carbon dioxide to bubble up through the water and diffuse more evenly. 7. Slowly discharge the water making sure water does not get stirred up in the process. Release about 80% of the water from the structure leaving any sludge behind. 8. Discharge treated water through a pond or drainage system. 9. Excess sludge needs to be disposed of properly as concrete waste. If several batches of water are undergoing pH treatment, sludge can be left in treatment structure for the next batch treatment. Dispose of sludge when it fills 50% of tank volume. Sites that must implement flow control for the developed site must also control stormwater release rates during construction. All treated stormwater must go through a flow control facility before being released to surface waters which require flow control. Maintenance Standards Safety and Materials Handling: • All equipment should be handled in accordance with OSHA rules and regulations. • Follow manufacturer guidelines for materials handling. Operator Records: Each operator should provide: • A diagram of the monitoring and treatment equipment. • A description of the pumping rates and capacity the treatment equipment is capable of treating. Each operator should keep a written record of the following: • Client name and phone number. • Date of treatment. • Weather conditions. • Project name and location. • Volume of water treated. • pH of untreated water. • Amount of CO2 needed to adjust water to a pH range of 6.9-7.1. • pH of treated water. • Discharge point location and description. A copy of this record should be given to the client/contractor who should retain the record for three years. Volume II – Construction Stormwater Pollution Prevention - August 2012 4-126 BMP C253: pH Control for High pH Water Purpose When pH levels in stormwater rise above 8.5 it is necessary to lower the pH levels to the acceptable range of 6.5 to 8.5, this process is called pH neutralization. Stormwater with pH levels exceeding water quality standards may be treated by infiltration, dispersion in vegetation or compost, pumping to a sanitary sewer, disposal at a permitted concrete batch plant with pH neutralization capabilities, or carbon dioxide sparging. BMP C252 gives guidelines for carbon dioxide sparging. Reason for pH Neutralization: A pH level range of 6.5 to 8.5 is typical for most natural watercourses, and this pH range is required for the survival of aquatic organisms. Should the pH rise or drop out of this range, fish and other aquatic organisms may become stressed and may die. Conditions of Use Causes of High pH: High pH levels at construction sites are most commonly caused by the contact of stormwater with poured or recycled concrete, cement, mortars, and other Portland cement or lime containing construction materials. (See BMP C151: Concrete Handling for more information on concrete handling procedures). The principal caustic agent in cement is calcium hydroxide (free lime). Design and Installation Specifications Disposal Methods: Infiltration • Infiltration is only allowed if soil type allows all water to infiltrate (no surface runoff) without causing or contributing to a violation of surface or ground water quality standards. • Infiltration techniques should be consistent with Volume V, Chapter 7 Dispersion Use BMP T5.30 Full Dispersion Sanitary Sewer Disposal • Local sewer authority approval is required prior to disposal via the sanitary sewer. Concrete Batch Plant Disposal • Only permitted facilities may accept high pH water. • Facility should be contacted before treatment to ensure they can accept the high pH water. Stormwater Discharge Any pH treatment options that generate treated water that must be discharged off site are subject to flow control requirements. Sites that must implement flow control for the developed site must also control Volume II – Construction Stormwater Pollution Prevention - August 2012 4-127 stormwater release rates during construction. All treated stormwater must go through a flow control facility before being released to surface waters which require flow control. Page | 35 C. Correspondence Page | 36 D. Site Inspection Form Construction Stormwater Site Inspection Form Page 1 Project Name Permit # Inspection Date Time Name of Certified Erosion Sediment Control Lead (CESCL) or qualified inspector if less than one acre Print Name: Approximate rainfall amount since the last inspection (in inches): Approximate rainfall amount in the last 24 hours (in inches): Current Weather Clear Cloudy Mist Rain Wind Fog A. Type of inspection: Weekly Post Storm Event Other B. Phase of Active Construction (check all that apply): Pre Construction/installation of erosion/sediment controls Clearing/Demo/Grading Infrastructure/storm/roads Concrete pours Vertical Construction/buildings Utilities Offsite improvements Site temporary stabilized Final stabilization C. Questions: 1. Were all areas of construction and discharge points inspected? Yes No 2. Did you observe the presence of suspended sediment, turbidity, discoloration, or oil sheen Yes No 3. Was a water quality sample taken during inspection? (refer to permit conditions S4 & S5) Yes No 4. Was there a turbid discharge 250 NTU or greater, or Transparency 6 cm or less?* Yes No 5. If yes to #4 was it reported to Ecology? Yes No 6. Is pH sampling required? pH range required is 6.5 to 8.5. Yes No If answering yes to a discharge, describe the event. Include when, where, and why it happened; what action was taken, and when. *If answering yes to # 4 record NTU/Transparency with continual sampling daily until turbidity is 25 NTU or less/ transparency is 33 cm or greater. Sampling Results: Date: Parameter Method (circle one) Result Other/Note NTU cm pH Turbidity tube, meter, laboratory pH Paper, kit, meter Construction Stormwater Site Inspection Form Page 2 D. Check the observed status of all items. Provide “Action Required “details and dates. Element # Inspection BMPs Inspected BMP needs maintenance BMP failed Action required (describe in section F) yes no n/a 1 Clearing Limits Before beginning land disturbing activities are all clearing limits, natural resource areas (streams, wetlands, buffers, trees) protected with barriers or similar BMPs? (high visibility recommended) 2 Construction Access Construction access is stabilized with quarry spalls or equivalent BMP to prevent sediment from being tracked onto roads? Sediment tracked onto the road way was cleaned thoroughly at the end of the day or more frequent as necessary. 3 Control Flow Rates Are flow control measures installed to control stormwater volumes and velocity during construction and do they protect downstream properties and waterways from erosion? If permanent infiltration ponds are used for flow control during construction, are they protected from siltation? 4 Sediment Controls All perimeter sediment controls (e.g. silt fence, wattles, compost socks, berms, etc.) installed, and maintained in accordance with the Stormwater Pollution Prevention Plan (SWPPP). Sediment control BMPs (sediment ponds, traps, filters etc.) have been constructed and functional as the first step of grading. Stormwater runoff from disturbed areas is directed to sediment removal BMP. 5 Stabilize Soils Have exposed un-worked soils been stabilized with effective BMP to prevent erosion and sediment deposition? Construction Stormwater Site Inspection Form Page 3 Element # Inspection BMPs Inspected BMP needs maintenance BMP failed Action required (describe in section F) yes no n/a 5 Stabilize Soils Cont. Are stockpiles stabilized from erosion, protected with sediment trapping measures and located away from drain inlet, waterways, and drainage channels? Have soils been stabilized at the end of the shift, before a holiday or weekend if needed based on the weather forecast? 6 Protect Slopes Has stormwater and ground water been diverted away from slopes and disturbed areas with interceptor dikes, pipes and or swales? Is off-site storm water managed separately from stormwater generated on the site? Is excavated material placed on uphill side of trenches consistent with safety and space considerations? Have check dams been placed at regular intervals within constructed channels that are cut down a slope? 7 Drain Inlets Storm drain inlets made operable during construction are protected. Are existing storm drains within the influence of the project protected? 8 Stabilize Channel and Outlets Have all on-site conveyance channels been designed, constructed and stabilized to prevent erosion from expected peak flows? Is stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent stream banks, slopes and downstream conveyance systems? 9 Control Pollutants Are waste materials and demolition debris handled and disposed of to prevent contamination of stormwater? Has cover been provided for all chemicals, liquid products, petroleum products, and other material? Has secondary containment been provided capable of containing 110% of the volume? Were contaminated surfaces cleaned immediately after a spill incident? Were BMPs used to prevent contamination of stormwater by a pH modifying sources? Construction Stormwater Site Inspection Form Page 4 Element # Inspection BMPs Inspected BMP needs maintenance BMP failed Action required (describe in section F) yes no n/a 9 Cont. Wheel wash wastewater is handled and disposed of properly. 10 Control Dewatering Concrete washout in designated areas. No washout or excess concrete on the ground. Dewatering has been done to an approved source and in compliance with the SWPPP. Were there any clean non turbid dewatering discharges? 11 Maintain BMP Are all temporary and permanent erosion and sediment control BMPs maintained to perform as intended? 12 Manage the Project Has the project been phased to the maximum degree practicable? Has regular inspection, monitoring and maintenance been performed as required by the permit? Has the SWPPP been updated, implemented and records maintained? 13 Protect LID Is all Bioretention and Rain Garden Facilities protected from sedimentation with appropriate BMPs? Is the Bioretention and Rain Garden protected against over compaction of construction equipment and foot traffic to retain its infiltration capabilities? Permeable pavements are clean and free of sediment and sediment laden- water runoff. Muddy construction equipment has not been on the base material or pavement. Have soiled permeable pavements been cleaned of sediments and pass infiltration test as required by stormwater manual methodology? Heavy equipment has been kept off existing soils under LID facilities to retain infiltration rate. E. Check all areas that have been inspected. All in place BMPs All disturbed soils All concrete wash out area All material storage areas All discharge locations All equipment storage areas All construction entrances/exits Construction Stormwater Site Inspection Form Page 5 F. Elements checked “Action Required” (section D) describe corrective action to be taken. List the element number; be specific on location and work needed. Document, initial, and date when the corrective action has been completed and inspected. Element # Description and Location Action Required Completion Date Initials Attach additional page if needed Sign the following certification: “I certify that this report is true, accurate, and complete, to the best of my knowledge and belief” Inspected by: (print) (Signature) Date: Title/Qualification of Inspector: CITY OF RENTON SURFACE WATER DESIGN MANUAL 2017 City of Renton Surface Water Design Manual 12/12/2016 8-E-1 REFERENCE 8-E CSWPP WORKSHEET FORMS E S C M A I N T E N A N C E R E P O R T Performed By:___________________________ Date:___________________________ Project Name:___________________________ CED Permit #:___________________________ Clearing Limits Damage OK Problem Visible OK Problem Intrusions OK Problem Other OK Problem Mulch Rills/Gullies OK Problem Thickness OK Problem Other OK Problem Nets/Blankets Rills/Gullies OK Problem Ground Contact OK Problem Other OK Problem Plastic Tears/Gaps OK Problem Other OK Problem Seeding Percent Cover OK Problem Rills/Gullies OK Problem Mulch OK Problem Other OK Problem Sodding Grass Health OK Problem Rills/Gullies OK Problem Other OK Problem Perimeter Protection including Silt Fence Damage OK Problem Sediment Build-up OK Problem Concentrated Flow OK Problem Other OK Problem REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET 12/12/2016 2017 City of Renton Surface Water Design Manual Ref 8-E-2 Flow Control, Treatment, and On-site BMP/Facility Protection Damage OK Problem Sedimentation OK Problem Concentrated Flow OK Problem Rills/Gullies OK Problem Intrusions OK Problem Other OK Problem Brush Barrier Damage OK Problem Sediment Build-up OK Problem Concentrated Flow OK Problem Other OK Problem Vegetated Strip Damage OK Problem Sediment Build-up OK Problem Concentrated Flow OK Problem Other OK Problem Construction Entrance Dimensions OK Problem Sediment Tracking OK Problem Vehicle Avoidance OK Problem Other OK Problem Wheel Wash Dimensions OK Problem Sed build up or tracking OK Problem Other OK Problem Construction Road Stable Driving Surf. OK Problem Vehicle Avoidance OK Problem Other OK Problem Sediment Trap/Pond Sed. Accumulation OK Problem Overtopping OK Problem Inlet/Outlet Erosion OK Problem Other OK Problem Catch Basin/Inlet Protection Sed. Accumulation OK Problem Damage OK Problem Clogged Filter OK Problem Other OK Problem Interceptor Dike/Swale Damage OK Problem Sed. Accumulation OK Problem Overtopping OK Problem Other OK Problem REFERENCE 8-E: CSWPP WORKSHEET FORMS 2017 City of Renton Surface Water Design Manual 12/12/2016 8-E-3 Pipe Slope Drain Damage OK Problem Inlet/Outlet OK Problem Secure Fittings OK Problem Other OK Problem Ditches Damage OK Problem Sed. Accumulation OK Problem Overtopping OK Problem Other OK Problem Outlet Protection Scour OK Problem Other OK Problem Level Spreader Damage OK Problem Concentrated Flow OK Problem Rills/Gullies OK Problem Sed. Accumulation OK Problem Other OK Problem Dewatering Controls Sediment OK Problem Dust Control Palliative applied OK Problem Miscellaneous Wet Season Stockpile OK Problem Other OK Problem Comments: Actions Taken: Problems Unresolved: REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET 12/12/2016 2017 City of Renton Surface Water Design Manual Ref 8-E-4 BMP Implementation Completed by: Title: Date: Develop a plan for implementing each BMP. Describe the steps necessary to implement the BMP (i.e., any construction or design), the schedule for completing those steps (list dates), and the person(s) responsible for implementation. BMPs Description of Action(s) Required for Implementation Scheduled Milestone and Completion Date(s) Person Responsible for Action Good Housekeeping 1. 2. 3 Preventive Maintenance 1. 2. 3. 4. Spill Prevention and Emergency Cleanup 1. 2. 3. Inspections 1. 2. 3. REFERENCE 8-E: CSWPP WORKSHEET FORMS 2017 City of Renton Surface Water Design Manual 12/12/2016 8-E-5 BMPs Description of Action(s) Required for Implementation Schedule Milestone and Completion Date(s) Person Responsible for Action Source Control BMPs 1. 2. 3 4. 5. 6. 7. 8. Water Quality Facilities 1. 2. 3. 4. Flow Control Facilities 1. 2. 3. 4. On-Site BMPs 1. 2. 3. 4. REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET 12/12/2016 2017 City of Renton Surface Water Design Manual Ref 8-E-6 Pollution Prevention Team Completed by: ______________________ Title: ______________________________ Date: ______________________________ Responsible Official: Title: Team Leader: Office Phone: Cell Phone: Responsibilities: (1) Title: Office Phone: Cell Phone: Responsibilities: (2) Title: Office Phone: Cell Phone: Responsibilities: REFERENCE 8-E: CSWPP WORKSHEET FORMS 2017 City of Renton Surface Water Design Manual 12/12/2016 8-E-7 Employee Training Completed by: Title: Date: Describe the annual training of employees on the SWPPP, addressing spill response, good housekeeping, and material management practices. Training Topics 1.) LINE WORKERS Brief Description of Training Program/Materials (e.g., film, newsletter course) Schedule for Training (list dates) Attendees Spill Prevention and Response Good Housekeeping Material Management Practices 2.) P2 TEAM: SWPPP Implementation Monitoring Procedures REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEETS 12/12/2016 2017 City of Renton Surface Water Design Manual Ref 8-E-8 List of Significant Spills and Leaks Completed by: Title: Date: List all spills and leaks of toxic or hazardous pollutants that were significant but are not limited to, release of oil or hazardous substances in excess of reportable quantities. Although not required, we suggest you list spills and leaks of non-hazardous materials. Date (month/ day/ year) Location (as indicated on site map) Description Response Procedure Preventive Measure Taken Type of Material Quantity Source, If Known Reason for Spill/Leak Amount of Material Recovered Material no longer exposed to stormwater (Yes/No) REFERENCE 8-E: CSWPP WORKSHEET FORMS 2017 City of Renton Surface Water Design Manual 12/12/2016 8-E-9 Potential Pollutant Source Identification Completed by: Title: Date: List all potential stormwater pollutants from materials handled, treated, or stored onsite. Potential Stormwater Pollutant Stormwater Pollutant Source Likelihood of pollutant being present in your stormwater discharge. If yes, explain REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEETS 12/12/2016 2017 City of Renton Surface Water Design Manual Ref 8-E-10 Material Inventory Completed by: Title: Date: List materials handled, treated, stored, or disposed of at the project site that may potentially be exposed to precipitation or runoff. Material Purpose/Location Quantity (Units) Likelihood of contact with stormwater If Yes, describe reason: Past Spill or Leak Used Produced Stored (indicate per wk. or yr.) Yes No Page | 37 E. Construction Stormwater General Permit (CSWGP) Issuance Date: Effective Date: Expiration Date: November 18, 2015 January I, 2016 December 31, 2020 Modification Issuance Date: March 22, 2017 Modification Effective Date: May 5, 2017 CONSTRUCTION STORMW ATER GENERAL PERMIT National Pollutant Discharge Elimination System (NPDES) and State Waste Discharge General Permit for Stormwater Discharges Associated with Construction Activity State of Washington Department of Ecology Olympia, Washington 98504 In compliance with the provisions of Chapter 90.48 Revised Code of Washington (State of Washington Water Pollution Control Act) and Title 33 United States Code, Section 1251 et seq. The Federal Water Pollution Control Act (The Clean Water Act) Until this permit expires, is modified, or revoked, Permittees that have properly obtained coverage under this general permit are authorized to discharge in accordance with the special and general conditions that follow. her R. Bartlett Wa r Quality Program Manager Washington State Department of Ecology Construction Stormwater General Permit Page 2 TABLE OF CONTENTS LIST OF TABLES ...........................................................................................................................3 SUMMARY OF PERMIT REPORT SUBMITTALS .....................................................................4 SPECIAL CONDITIONS ................................................................................................................5 S1. PERMIT COVERAGE ........................................................................................................5 S2. APPLICATION REQUIREMENTS ...................................................................................8 S3. COMPLIANCE WITH STANDARDS .............................................................................12 S4. MONITORING REQUIREMENTS, BENCHMARKS, AND REPORTING TRIGGERS ................................................................................................13 S5. REPORTING AND RECORDKEEPING REQUIREMENTS .........................................20 S6. PERMIT FEES...................................................................................................................23 S7. SOLID AND LIQUID WASTE DISPOSAL ....................................................................23 S8. DISCHARGES TO 303(d) OR TMDL WATERBODIES ................................................23 S9. STORMWATER POLLUTION PREVENTION PLAN...................................................27 S10. NOTICE OF TERMINATION .........................................................................................37 GENERAL CONDITIONS ...........................................................................................................38 G1. DISCHARGE VIOLATIONS ...........................................................................................38 G2. SIGNATORY REQUIREMENTS.....................................................................................38 G3. RIGHT OF INSPECTION AND ENTRY .........................................................................39 G4. GENERAL PERMIT MODIFICATION AND REVOCATION ......................................39 G5. REVOCATION OF COVERAGE UNDER THE PERMIT .............................................39 G6. REPORTING A CAUSE FOR MODIFICATION ............................................................40 G7. COMPLIANCE WITH OTHER LAWS AND STATUTES .............................................40 G8. DUTY TO REAPPLY .......................................................................................................40 G9. TRANSFER OF GENERAL PERMIT COVERAGE .......................................................41 G10. REMOVED SUBSTANCES .............................................................................................41 G11. DUTY TO PROVIDE INFORMATION ...........................................................................41 G12. OTHER REQUIREMENTS OF 40 CFR ...........................................................................41 G13. ADDITIONAL MONITORING ........................................................................................41 G14. PENALTIES FOR VIOLATING PERMIT CONDITIONS .............................................41 G15. UPSET ...............................................................................................................................42 G16. PROPERTY RIGHTS ........................................................................................................42 Construction Stormwater General Permit Page 3 G17. DUTY TO COMPLY ........................................................................................................42 G18. TOXIC POLLUTANTS.....................................................................................................42 G19. PENALTIES FOR TAMPERING .....................................................................................43 G20. REPORTING PLANNED CHANGES .............................................................................43 G21. REPORTING OTHER INFORMATION ..........................................................................43 G22. REPORTING ANTICIPATED NON-COMPLIANCE .....................................................43 G23. REQUESTS TO BE EXCLUDED FROM COVERAGE UNDER THE PERMIT ..........44 G24. APPEALS ..........................................................................................................................44 G25. SEVERABILITY ...............................................................................................................44 G26. BYPASS PROHIBITED ....................................................................................................44 APPENDIX A – DEFINITIONS ...................................................................................................47 APPENDIX B – ACRONYMS .....................................................................................................55 LIST OF TABLES Table 1: Summary of Required Submittals ................................................................................... 4 Table 2: Summary of Required On-site Documentation............................................................... 4 Table 3: Summary of Primary Monitoring Requirements .......................................................... 15 Table 4: Monitoring and Reporting Requirements ..................................................................... 17 Table 5: Turbidity, Fine Sediment & Phosphorus Sampling and Limits for 303(d)-Listed Waters .................................................................................................... 25 Table 6: pH Sampling and Limits for 303(d)-Listed Waters ...................................................... 26 Construction Stormwater General Permit Page 4 SUMMARY OF PERMIT REPORT SUBMITTALS Refer to the Special and General Conditions within this permit for additional submittal requirements. Appendix A provides a list of definitions. Appendix B provides a list of acronyms. Table 1: Summary of Required Submittals Permit Section Submittal Frequency First Submittal Date S5.A and S8 High Turbidity/Transparency Phone Reporting As Necessary Within 24 hours S5.B Discharge Monitoring Report Monthly* Within 15 days following the end of each month S5.F and S8 Noncompliance Notification – Telephone Notification As necessary Within 24-hours S5.F Noncompliance Notification – Written Report As necessary Within 5 Days of non- compliance S9.C Request for Chemical Treatment Form As necessary Written approval from Ecology is required prior to using chemical treatment (with the exception of dry ice or CO2 to adjust pH) G2 Notice of Change in Authorization As necessary G6 Permit Application for Substantive Changes to the Discharge As necessary G8 Application for Permit Renewal 1/permit cycle No later than 180 days before expiration G9 Notice of Permit Transfer As necessary G20 Notice of Planned Changes As necessary G22 Reporting Anticipated Non- compliance As necessary SPECIAL NOTE: *Permittees must submit electronic Discharge Monitoring Reports (DMRs) to the Washington State Department of Ecology monthly, regardless of site discharge, for the full duration of permit coverage . Refer to Section S5.B of this General Permit for more specific information regarding DMRs. Table 2: Summary of Required On-site Documentation Document Title Permit Conditions Permit Coverage Letter See Conditions S2, S5 Construction Stormwater General Permit See Conditions S2, S5 Site Log Book See Conditions S4, S5 Stormwater Pollution Prevention Plan (SWPPP) See Conditions S9, S5 Construction Stormwater General Permit Page 5 SPECIAL CONDITIONS S1. PERMIT COVERAGE A. Permit Area This Construction Stormwater General Permit (CSWGP) covers all areas of Washington State, except for federal operators and Indian Country as specified in Special Condition S1.E.3. B. Operators Required to Seek Coverage Under this General Permit: 1. Operators of the following construction activities are required to seek coverage under this CSWGP: a. Clearing, grading and/or excavation that results in the disturbance of one or more acres (including off-site disturbance acreage authorized in S1.C.2) and discharges stormwater to surface waters of the State; and clearing, grading and/or excavation on sites smaller than one acre that are part of a larger common plan of development or sale, if the common plan of development or sale will ultimately disturb one acre or more and discharge stormwater to surface waters of the State. i. This includes forest practices (including, but not limited to, class IV conversions) that are part of a construction activity that will result in the disturbance of one or more acres, and discharge to surface waters of the State (that is, forest practices that prepare a site for construction activities); and b. Any size construction activity discharging stormwater to waters of the State that the Washington State Department of Ecology (Ecology): i. Determines to be a significant contributor of pollutants to waters of the State of Washington. ii. Reasonably expects to cause a violation of any water quality standard. 2. Operators of the following activities are not required to seek coverage under this CSWGP (unless specifically required under Special Condition S1.B.1.b. above): a. Construction activities that discharge all stormwater and non-stormwater to ground water, sanitary sewer, or combined sewer, and have no point source discharge to either surface water or a storm sewer system that drains to surface waters of the State. b. Construction activities covered under an Erosivity Waiver (Special Condition S2.C). c. Routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of a facility. Construction Stormwater General Permit Page 6 C. Authorized Discharges: 1. Stormwater Associated with Construction Activity. Subject to compliance with the terms and conditions of this permit, Permittees are authorized to discharge stormwater associated with construction activity to surface waters of the State or to a storm sewer system that drains to surface waters of the State. (Note that “surface waters of the State” may exist on a construction site as well as off site; for example, a creek running through a site.) 2. Stormwater Associated with Construction Support Activity. This permit also authorizes stormwater discharge from support activities related to the permitted construction site (for example, an on-site portable rock crusher, off-site equipment staging yards, material storage areas, borrow areas, etc.) provided: a. The support activity relates directly to the permitted construction site that is required to have an NPDES permit; and b. The support activity is not a commercial operation serving multiple unrelated construction projects, and does not operate beyond the completion of the construction activity; and c. Appropriate controls and measures are identified in the Stormwater Pollution Prevention Plan (SWPPP) for the discharges from the support activity areas. 3. Non-Stormwater Discharges. The categories and sources of non-stormwater discharges identified below are authorized conditionally, provided the discharge is consistent with the terms and conditions of this permit: a. Discharges from fire-fighting activities. b. Fire hydrant s ystem flushing. c. Potable water, including uncontaminated water line flushing. d. Hydrostatic test water. e. Uncontaminated air conditioning or compressor condensate. f. Uncontaminated ground water or spring water. g. Uncontaminated excavation dewatering water (in accordance with S9.D.10). h. Uncontaminated discharges from foundation or footing drains. i. Uncontaminated or potable water used to control dust. Permittees must minimize the amount of dust control water used. j. Routine external building wash down that does not use detergents. k. Landscape irrigation water. The SWPPP must adequately address all authorized non-stormwater discharges, except for discharges from fire-fighting activities, and must comply with Special Condition S3. Construction Stormwater General Permit Page 7 At a minimum, discharges from potable water (including water line flushing), fire hydrant system flushing, and pipeline hydrostatic test water must undergo the following: dechlorination to a concentration of 0.1 parts per million (ppm) or less, and pH adjustment to within 6.5 – 8.5 standard units (su), if necessary. D. Prohibited Discharges: The following discharges to waters of the State, including ground water, are prohibited. 1. Concrete wastewater. 2. Wastewater from washout and clean-up of stucco, paint, form release oils, curing compounds and other construction materials. 3. Process wastewater as defined by 40 Code of Federal Regulations (CFR) 122.2 (see Appendix A of this permit). 4. Slurry materials and waste from shaft drilling, including process wastewater from shaft drilling for construction of building, road, and bridge foundations unless managed according to Special Condition S9.D.9.j. 5. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance. 6. Soaps or solvents used in vehicle and equipment washing. 7. Wheel wash wastewater, unless managed according to Special Condition S9.D.9. 8. Discharges from dewatering activities, including discharges from dewatering of trenches and excavations, unless managed according to Special Condition S9.D.10. E. Limits on Coverage Ecology may require any discharger to apply for and obtain coverage under an individual permit or another more specific general permit. Such alternative coverage will be required when Ecology determines that this CSWGP does not provide adequate assurance that water quality will be protected, or there is a reasonable potential for the project to cause or contribute to a violation of water quality standards. The following stormwater discharges are not covered by this permit: 1. Post-construction stormwater discharges that originate from the site after completion of construction activities and the site has undergone final stabilization. 2. Non-point source silvicultural activities such as nursery operations, site preparation, reforestation and subsequent cultural treatment, thinning, prescribed burning, pest and fire control, harvesting operations, surface drainage, or road construction and maintenance, from which there is natural runoff as excluded in 40 CFR Subpart 122. 3. Stormwater from any federal operator. Construction Stormwater General Permit Page 8 4. Stormwater from facilities located on “Indian Country” as defined in 18 U.S.C.§1151, except portions of the Puyallup Reservation as noted below. Indian Country includes: a. All land within any Indian Reservation notwithstanding the issuance of any patent, and, including rights-of-way running through the reservation. This includes all federal, tribal, and Indian and non-Indian privately owned land within the reservation. b. All off-reservation Indian allotments, the Indian titles to which have not been extinguished, including rights-of-way running through the same. c. All off-reservation federal trust lands held for Native American Tribes. Puyallup Exception: Following the Puyallup Tribes of Indians Land Settlement Act of 1989, 25 U.S.C. §1773; the permit does apply to land within the Puyallup Reservation except for discharges to surface water on land held in trust by the federal government. 5. Stormwater from any site covered under an existing NPDES individual permit in which stormwater management and/or treatment requirements are included for all stormwater discharges associated with construction activity. 6. Stormwater from a site where an applicable Total Maximum Daily Load (TMDL) requirement specifically precludes or prohibits discharges from construction activity. S2. APPLICATION REQUIREMENTS A. Permit Application Forms 1. Notice of Intent Form/Timeline a. Operators of new or previously unpermitted construction activities must submit a complete and accurate permit application (Notice of Intent, or NOI) to Ecology. b. Operators must apply using the electronic application form (NOI) available on Ecology’s website http://www.ecy.wa.gov/programs/wq/stormwater/ construction/index.html. Permittees unable to submit electronically (for example, those who do not have an internet connection) must contact Ecology to request a waiver and obtain instructions on how to obtain a paper NOI. Department of Ecology Water Quality Program - Construction Stormwater PO Box 47696 Olympia, Washington 98504-7696 Construction Stormwater General Permit Page 9 c. The operator must submit the NOI at least 60 days before discharging stormwater from construction activities and must submit it on or before the date of the first public notice (see Special Condition S2.B below for details). The 30- day public comment period begins on the publication date of the second public notice. Unless Ecology responds to the complete application in writing, based on public comments, or any other relevant factors, coverage under the general permit will automatically commence on the thirty-first day following receipt by Ecology of a completed NOI, or the issuance date of this permit, whichever is later; unless Ecology specifies a later date in writing as required by WAC173- 226-200(2). d. If an applicant intends to use a Best Management Practice (BMP) selected on the basis of Special Condition S9.C.4 (“demonstrably equivalent” BMPs), the applicant must notify Ecology of its selection as part of the NOI. In the event the applicant selects BMPs after submission of the NOI, it must provide notice of the selection of an equivalent BMP to Ecology at least 60 days before intended use of the equivalent BMP. e. Permittees must notify Ecology regarding any changes to the information provided on the NOI by submitting an updated NOI. Examples of such changes include, but are not limited to: i. Changes to the Permittee’s mailing address, ii. Changes to the on-site contact person information, and iii. Changes to the area/acreage affected by construction activity. f. Applicants must notify Ecology if they are aware of contaminated soils and/or groundwater associated with the construction activity. Provide detailed information with the NOI (as known and readily available) on the nature and extent of the contamination (concentrations, locations, and depth), as well as pollution prevention and/or treatment BMPs proposed to control the discharge of soil and/or groundwater contaminants in stormwater. Examples of such detail may include, but are not limited to: i. List or table of all known contaminants with laboratory test results showing concentration and depth, ii. Map with sample locations, iii. Temporary Erosion and Sediment Control (TESC) plans, iv. Related portions of the Stormwater Pollution Prevention Plan (SWPPP) that address the management of contaminated and potentially contaminated construction stormwater and dewatering water, v. Dewatering plan and/or dewatering contingency plan. Construction Stormwater General Permit Page 10 2. Transfer of Coverage Form The Permittee can transfer current coverage under this permit to one or more new operators, including operators of sites within a Common Plan of Development, provided the Permittee submits a Transfer of Coverage Form in accordance with General Condition G9. Transfers do not require public notice. B. Public Notice For new or previously unpermitted construction activities, the applicant must publish a public notice at least one time each week for two consecutive weeks, at least 7 days apart, in a newspaper with general circulation in the county where the construction is to take place. The notice must contain: 1. A statement that “The applicant is seeking coverage under the Washington State Department of Ecology’s Construction Stormwater NPDES and State Waste Discharge General Permit”. 2. The name, address and location of the construction site. 3. The name and address of the applicant. 4. The type of construction activity that will result in a discharge (for example, residential construction, commercial construction, etc.), and the number of acres to be disturbed. 5. The name of the receiving water(s) (that is, the surface water(s) to which the site will discharge), or, if the discharge is through a storm sewer system, the name of the operator of the system. 6. The statement: “Any persons desiring to present their views to the Washington State Department of Ecology regarding this application, or interested in Ecology’s action on this application, may notify Ecology in writing no later than 30 days of the last date of publication of this notice. Ecology reviews public comments and considers whether discharges from this project would cause a measurable change in receiving water quality, and, if so, whether the project is necessary and in the overriding public interest according to Tier II antidegradation requirements under WAC 173-201A-320. Comments can be submitted to: Department of Ecology, PO Box 47696, Olympia, Washington 98504-7696 Attn: Water Quality Program, Construction Stormwater.” Construction Stormwater General Permit Page 11 C. Erosivity Waiver Construction site operators may qualify for an erosivity waiver from the CSWGP if the following conditions are met: 1. The site will result in the disturbance of fewer than 5 acres and the site is not a portion of a common plan of development or sale that will disturb 5 acres or greater. 2. Calculation of Erosivity “R” Factor and Regional Timeframe: a. The project’s rainfall erosivity factor (“R” Factor) must be less than 5 during the period of construction activity, as calculated (see the CSWGP homepage http://www.ecy.wa.gov/programs/wq/stormwater/construction/index.html for a link to the EPA’s calculator and step by step instructions on computing the “R” Factor in the EPA Erosivity Waiver Fact Sheet). The period of construction activity starts when the land is first disturbed and ends with final stabilization. In addition: b. The entire period of construction activity must fall within the following timeframes: i. For sites west of the Cascades Crest: June 15 – September 15. ii. For sites east of the Cascades Crest, excluding the Central Basin: June 15 – October 15. iii. For sites east of the Cascades Crest, within the Central Basin: no additional timeframe restrictions apply. The Central Basin is defined as the portions of Eastern Washington with mean annual precipitation of less than 12 inches. For a map of the Central Basin (Average Annual Precipitation Region 2), refer to http://www.ecy.wa.gov/programs/wq/stormwater/ construction/resourcesguidance.html. 3. Construction site operators must submit a complete Erosivity Waiver certification form at least one week before disturbing the land. Certification must include statements that the operator will: a. Comply with applicable local stormwater requirements; and b. Implement appropriate erosion and sediment control BMPs to prevent violations of water quality standards. 4. This waiver is not available for facilities declared significant contributors of pollutants as defined in Special Condition S1.B.1.b. or for any size construction activity that could reasonably expect to cause a violation of any water quality standard as defined in Special Condition S1.B.1.b.ii. 5. This waiver does not apply to construction activities which include non- stormwater discharges listed in Special Condition S1.C.3. Construction Stormwater General Permit Page 12 6. If construction activity extends beyond the certified waiver period for any reason, the operator must either: a. Recalculate the rainfall erosivity “R” factor using the original start date and a new projected ending date and, if the “R” factor is still under 5 and the entire project falls within the applicable regional timeframe in Special Condition S2.C.2.b, complete and submit an amended waiver certification form before the original waiver expires; or b. Submit a complete permit application to Ecology in accordance with Special Condition S2.A and B before the end of the certified waiver period. S3. COMPLIANCE WITH STANDARDS A. Discharges must not cause or contribute to a violation of surface water quality standards (Chapter 173-201A WAC), ground water quality standards (Chapter 173-200 WAC), sediment management standards (Chapter 173-204 WAC), and human health-based criteria in the National Toxics Rule (40 CFR Part 131.36). Discharges not in compliance with these standards are not authorized. B. Prior to the discharge of stormwater and non-stormwater to waters of the State, the Permittee must apply all known, available, and reasonable methods of prevention, control, and treatment (AKART). This includes the preparation and implementation of an adequate SWPPP, with all appropriate BMPs installed and maintained in accordance with the SWPPP and the terms and conditions of this permit. C. Ecology presumes that a Permittee complies with water quality standards unless discharge monitoring data or other site-specific information demonstrates that a discharge causes or contributes to a violation of water quality standards, when the Permittee complies with the following conditions. The Permittee must fully: 1. Comply with all permit conditions, including planning, sampling, monitoring, reporting, and recordkeeping conditions. 2. Implement stormwater BMPs contained in stormwater management manuals published or approved by Ecology, or BMPs that are demonstrably equivalent to BMPs contained in stormwater technical manuals published or approved by Ecology, including the proper selection, implementation, and maintenance of all applicable and appropriate BMPs for on-site pollution control. (For purposes of this section, the stormwater manuals listed in Appendix 10 of the Phase I Municipal Stormwater Permit are approved by Ecology.) D. Where construction sites also discharge to ground water, the ground water discharges must also meet the terms and conditions of this CSWGP. Permittees who discharge to ground water through an injection well must also comply with any applicable requirements of the Underground Injection Control (UIC) regulations, Chapter 173-218 WAC. Construction Stormwater General Permit Page 13 S4. MONITORING REQUIREMENTS, BENCHMARKS AND REPORTING TRIGGERS A. Site Log Book The Permittee must maintain a site log book that contains a record of the implementation of the SWPPP and other permit requirements, including the installation and maintenance of BMPs, site inspections, and stormwater monitoring. B. Site Inspections The Permittee’s site inspections must include all areas disturbed by construction activities, all BMPs, and all stormwater discharge points under the Permittee’s operational control. (See Special Conditions S4.B.3 and B.4 below for detailed requirements of the Permittee’s Certified Erosion and Sediment Control Lead [CESCL].) Construction sites one acre or larger that discharge stormwater to surface waters of the State must have site inspections conducted by a certified CESCL. Sites less than one acre may have a person without CESCL certification conduct inspections. 1. The Permittee must examine stormwater visually for the presence of suspended sediment, turbidity, discoloration, and oil sheen. The Permittee must evaluate the effectiveness of BMPs and determine if it is necessary to install, maintain, or repair BMPs to improve the quality of stormwater discharges. Based on the results of the inspection, the Permittee must correct the problems identified by: a. Reviewing the SWPPP for compliance with Special Condition S9 and making appropriate revisions within 7 days of the inspection. b. Immediately beginning the process of fully implementing and maintaining appropriate source control and/or treatment BMPs as soon as possible, addressing the problems no later than within 10 days of the inspection. If installation of necessary treatment BMPs is not feasible within 10 days, Ecology may approve additional time when an extension is requested by a Permittee within the initial 10-day response period. c. Documenting BMP implementation and maintenance in the site log book. 2. The Permittee must inspect all areas disturbed by construction activities, all BMPs, and all stormwater discharge points at least once every calendar week and within 24 hours of any discharge from the site. (For purposes of this condition, individual discharge events that last more than one day do not require daily inspections. For example, if a stormwater pond discharges continuously over the course of a week, only one inspection is required that week.) The Permittee may reduce the inspection frequency for temporarily stabilized, inactive sites to once every calendar month. Construction Stormwater General Permit Page 14 3. The Permittee must have staff knowledgeable in the principles and practices of erosion and sediment control. The CESCL (sites one acre or more) or inspector (sites less than one acre) must have the skills to assess the: a. Site conditions and construction activities that could impact the quality of stormwater, and b. Effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges. 4. The SWPPP must identify the CESCL or inspector, who must be present on site or on-call at all times. The CESCL must obtain this certification through an approved erosion and sediment control training program that meets the minimum training standards established by Ecology (see BMP C160 in the manual referred to in Special Condition S9.C.1 and 2). 5. The Permittee must summarize the results of each inspection in an inspection report or checklist and enter the report/checklist into, or attach it to, the site log book. At a minimum, each inspection report or checklist must include: a. Inspection date and time. b. Weather information, the general conditions during inspection and the approximate amount of precipitation since the last inspection, and precipitation within the last 24 hours. c. A summary or list of all implemented BMPs, including observations of all erosion/sediment control structures or practices. d. A description of the locations: i. Of BMPs inspected; ii. Of BMPs that need maintenance and why; iii. Of BMPs that failed to operate as designed or intended; and iv. Where additional or different BMPs are needed, and why. e. A description of stormwater discharged from the site. The Permittee must note the presence of suspended sediment, turbidity, discoloration, and oil sheen, as applicable. f. Any water quality monitoring performed during inspection. g. General comments and notes, including a brief description of any BMP repairs, maintenance or installations made following the inspection. h. A summary report and a schedule of implementation of the remedial actions that the Permittee plans to take if the site inspection indicates that the site is out of compliance. The remedial actions taken must meet the requirements of the SWPPP and the permit. Construction Stormwater General Permit Page 15 i. The name, title, and signature of the person conducting the site inspection, a phone number or other reliable method to reach this person, and the following statement: “I certify that this report is true, accurate, and complete to the best of my knowledge and belief.” Table 3: Summary of Primary Monitoring Requirements Size of Soil Disturbance1 Weekly Site Inspections Weekly Sampling w/ Turbidity Meter Weekly Sampling w/ Transparency Tube Weekly pH Sampling2 CESCL Required for Inspections? Sites that disturb less than 1 acre, but are part of a larger Common Plan of Development Required Not Required Not Required Not Required No Sites that disturb 1 acre or more, but fewer than 5 acres Required Sampling Required – either method3 Required Yes Sites that disturb 5 acres or more Required Required Not Required4 Required Yes 1 Soil disturbance is calculated by adding together all areas that will be affected by construction activity. Construction activity means clearing, grading, excavation, and any other activity that disturbs the surface of the land, including ingress/egress from the site. 2 If construction activity results in the disturbance of 1 acre or more, and involves significant concrete work (1,000 cubic yards of poured concrete or recycled concrete over the life of a project) or the use of engineered soils (soil amendments including but not limited to Portland cement-treated base [CTB], cement kiln dust [CKD], or fly ash), and stormwater from the affected area drains to surface waters of the State or to a storm sewer stormwater collection system that drains to other surface waters of the State, the Permittee must conduct pH sampling in accordance with Special Condition S4.D. 3 Sites with one or more acres, but fewer than 5 acres of soil disturbance, must conduct turbidity or transparency sampling in accordance with Special Condition S4.C. 4 Sites equal to or greater than 5 acres of soil disturbance must conduct turbidity sampling using a turbidity meter in accordance with Special Condition S4.C. Construction Stormwater General Permit Page 16 C. Turbidity/Transparency Sampling Requirements 1. Sampling Methods a. If construction activity involves the disturbance of 5 acres or more, the Permittee must conduct turbidity sampling per Special Condition S4.C. b. If construction activity involves 1 acre or more but fewer than 5 acres of soil disturbance, the Permittee must conduct either transparency sampling or turbidity sampling per Special Condition S4.C. 2. Sampling Frequency a. The Permittee must sample all discharge points at least once every calendar week when stormwater (or authorized non-stormwater) discharges from the site or enters any on-site surface waters of the state (for example, a creek running through a site); sampling is not required on sites that disturb less than an acre. b. Samples must be representative of the flow and characteristics of the discharge. c. Sampling is not required when there is no discharge during a calendar week. d. Sampling is not required outside of normal working hours or during unsafe conditions. e. If the Permittee is unable to sample during a monitoring period, the Permittee must include a brief explanation in the monthly Discharge Monitoring Report (DMR). f. Sampling is not required before construction activity begins. g. The Permittee may reduce the sampling frequency for temporarily stabilized, inactive sites to once every calendar month. 3. Sampling Locations a. Sampling is required at all points where stormwater associated with construction activity (or authorized non-stormwater) is discharged off site, including where it enters any on-site surface waters of the state (for example, a creek running through a site). b. The Permittee may discontinue sampling at discharge points that drain areas of the project that are fully stabilized to prevent erosion. c. The Permittee must identify all sampling point(s) on the SWPPP site map and clearly mark these points in the field with a flag, tape, stake or other visible marker. d. Sampling is not required for discharge that is sent directly to sanitary or combined sewer systems. Construction Stormwater General Permit Page 17 e. The Permittee may discontinue sampling at discharge points in areas of the project where the Permittee no longer has operational control of the construction activity. 4. Sampling and Analysis Methods a. The Permittee performs turbidity analysis with a calibrated turbidity meter (turbidimeter) either on site or at an accredited lab. The Permittee must record the results in the site log book in nephelometric turbidity units (NTUs). b. The Permittee performs transparency analysis on site with a 1¾-inch-diameter, 60-centimeter (cm)-long transparency tube. The Permittee will record the results in the site log book in centimeters (cm). Table 4: Monitoring and Reporting Requirements Parameter Unit Analytical Method Sampling Frequency Benchmark Value Phone Reporting Trigger Value Turbidity NTU SM2130 Weekly, if discharging 25 NTUs 250 NTUs Transparency cm Manufacturer instructions, or Ecology guidance Weekly, if discharging 33 cm 6 cm 5. Turbidity/Transparency Benchmark Values and Reporting Triggers The benchmark value for turbidity is 25 NTUs or less. The benchmark value for transparency is 33 centimeters (cm). Note: Benchmark values do not apply to discharges to segments of water bodies on Washington State’s 303(d) list (Category 5) for turbidity, fine sediment, or phosphorus; these discharges are subject to a numeric effluent limit for turbidity. Refer to Special Condition S8 for more information. a. Turbidity 26 – 249 NTUs, or Transparency 32 – 7 cm: If the discharge turbidity is 26 to 249 NTUs; or if discharge transparency is less than 33 cm, but equal to or greater than 6 cm, the Permittee must: i. Review the SWPPP for compliance with Special Condition S9 and make appropriate revisions within 7 days of the date the discharge exceeded the benchmark. ii. Immediately begin the process to fully implement and maintain appropriate source control and/or treatment BMPs as soon as possible, addressing the problems within 10 days of the date the discharge exceeded the benchmark. If installation of necessary treatment BMPs is not feasible within 10 days, Ecology may approve additional time when the Permittee requests an extension within the initial 10-day response period. Construction Stormwater General Permit Page 18 iii. Document BMP implementation and maintenance in the site log book. b. Turbidity 250 NTUs or greater, or Transparency 6 cm or less: If a discharge point’s turbidity is 250 NTUs or greater, or if discharge transparency is less than or equal to 6 cm, the Permittee must complete the reporting and adaptive management process described below. i. Telephone or submit an electronic report to the applicable Ecology Region’s Environmental Report Tracking System (ERTS) number (or through Ecology’s Water Quality Permitting Portal [WQWebPortal] – Permit Submittals when the form is available) within 24 hours, in accordance with Special Condition S5.A.  Central Region (Okanogan, Chelan, Douglas, Kittitas, Yakima, Klickitat, Benton): (509) 575-2490  Eastern Region (Adams, Asotin, Columbia, Ferry, Franklin, Garfield, Grant, Lincoln, Pend Oreille, Spokane, Stevens, Walla Walla, Whitman): (509) 329-3400  Northwest Region (Kitsap, Snohomish, Island, King, San Juan, Skagit, Whatcom): (425) 649-7000  Southwest Region (Grays Harbor, Lewis, Mason, Thurston, Pierce, Clark, Cowlitz, Skamania, Wahkiakum, Clallam, Jefferson, Pacific): (360) 407-6300 Links to these numbers and the ERTS reporting page are located on the following web site: http://www.ecy.wa.gov/programs/wq/stormwater/construction/index.html. ii. Review the SWPPP for compliance with Special Condition S9 and make appropriate revisions within 7 days of the date the discharge exceeded the benchmark. iii. Immediately begin the process to fully implement and maintain appropriate source control and/or treatment BMPs as soon as possible, addressing the problems within 10 days of the date the discharge exceeded the benchmark. If installation of necessary treatment BMPs is not feasible within 10 days, Ecology may approve additional time when the Permittee requests an extension within the initial 10-day response period. iv. Document BMP implementation and maintenance in the site log book. v. Sample discharges daily until: a) Turbidity is 25 NTUs (or lower); or b) Transparency is 33 cm (or greater); or Construction Stormwater General Permit Page 19 c) The Permittee has demonstrated compliance with the water quality limit for turbidity: 1) No more than 5 NTUs over background turbidity, if background is less than 50 NTUs, or 2) No more than 10% over background turbidity, if background is 50 NTUs or greater; or d) The discharge stops or is eliminated. D. pH Sampling Requirements – Significant Concrete Work or Engineered Soils If construction activity results in the disturbance of 1 acre or more, and involves significant concrete work (significant concrete work means greater than 1000 cubic yards poured concrete or recycled concrete used over the life of a project) or the use of engineered soils (soil amendments including but not limited to Portland cement-treated base [CTB], cement kiln dust [CKD], or fly ash), and stormwater from the affected area drains to surface waters of the State or to a storm sewer system that drains to surface waters of the State, the Permittee must conduct pH sampling as set forth below. Note: In addition, discharges to segments of water bodies on Washington State’s 303(d) list (Category 5) for high pH are subject to a numeric effluent limit for pH; refer to Special Condition S8. 1. For sites with significant concrete work, the Permittee must begin the pH sampling period when the concrete is first poured and exposed to precipitation, and continue weekly throughout and after the concrete pour and curing period, until stormwater pH is in the range of 6.5 to 8.5 (su). 2. For sites with recycled concrete where monitoring is required, the Permittee must begin the weekly pH sampling period when the recycled concrete is first exposed to precipitation and must continue until the recycled concrete is fully stabilized with the stormwater pH in the range of 6.5 to 8.5 (su). 3. For sites with engineered soils, the Permittee must begin the pH sampling period when the soil amendments are first exposed to precipitation and must continue until the area of engineered soils is fully stabilized. 4. During the applicable pH monitoring period defined above, the Permittee must obtain a representative sample of stormwater and conduct pH analysis at least once per week. 5. The Permittee must sample pH in the sediment trap/pond(s) or other locations that receive stormwater runoff from the area of significant concrete work or engineered soils before the stormwater discharges to surface waters. 6. The benchmark value for pH is 8.5 standard units. Anytime sampling indicates that pH is 8.5 or greater, the Permittee must either: Construction Stormwater General Permit Page 20 a. Prevent the high pH water (8.5 or above) from entering storm sewer systems or surface waters; or b. If necessary, adjust or neutralize the high pH water until it is in the range of pH 6.5 to 8.5 (su) using an appropriate treatment BMP such as carbon dioxide (CO2) sparging or dry ice. The Permittee must obtain written approval from Ecology before using any form of chemical treatment other than CO2 sparging or dry ice. 7. The Permittee must perform pH analysis on site with a calibrated pH meter, pH test kit, or wide range pH indicator paper. The Permittee must record pH sampling results in the site log book. S5. REPORTING AND RECORDKEEPING REQUIREMENTS A. High Turbidity Reporting Anytime sampling performed in accordance with Special Condition S4.C indicates turbidity has reached the 250 NTUs or more (or transparency less than or equal to 6 cm) high turbidity reporting level, the Permittee must either call the applicable Ecology Region’s Environmental Report Tracking System (ERTS) number by phone within 24 hours of analysis or submit an electronic ERTS report (or submit an electronic report through Ecology’s Water Quality Permitting Portal (WQWebPortal) – Permit Submittals when the form is available). See the CSWGP web site for links to ERTS and the WQWebPortal: http://www.ecy.wa.gov/programs/wq/stormwater/construction/ index.html. Also, see phone numbers in Special Condition S4.C.5.b.i. B. Discharge Monitoring Reports (DMRs) Permittees required to conduct water quality sampling in accordance with Special Conditions S4.C (Turbidity/Transparency), S4.D (pH), S8 (303[d]/TMDL sampling), and/or G13 (Additional Sampling) must submit the results to Ecology. Permittees must submit monitoring data using Ecology's WQWebDMR web application accessed through Ecology’s Water Quality Permitting Portal. To find out more information and to sign up for WQWebDMR go to: http://www.ecy.wa.gov/programs/ wq/permits/paris/portal.html. Permittees unable to submit electronically (for example, those who do not have an internet connection) must contact Ecology to request a waiver and obtain instructions on how to obtain a paper copy DMR at: Department of Ecology Water Quality Program - Construction Stormwater PO Box 47696 Olympia, Washington 98504-7696 Permittees who obtain a waiver not to use WQWebDMR must use the forms provided to them by Ecology; submittals must be mailed to the address above. Permittees shall Construction Stormwater General Permit Page 21 submit DMR forms to be received by Ecology within 15 days following the end of each month. If there was no discharge during a given monitoring period, all Permittees must submit a DMR as required with “no discharge" entered in place of the monitoring results. DMRs are required for the full duration of permit coverage (from issuance date to termination). For more information, contact Ecology staff using information provided at the following web site: www.ecy.wa.gov/programs/wq/permits/paris/contacts.html. C. Records Retention The Permittee must retain records of all monitoring information (site log book, sampling results, inspection reports/checklists, etc.), Stormwater Pollution Prevention Plan, copy of the permit coverage letter (including Transfer of Coverage documentation), and any other documentation of compliance with permit requirements for the entire life of the construction project and for a minimum of three years following the termination of permit coverage. Such information must include all calibration and maintenance records, and records of all data used to complete the application for this permit. This period of retention must be extended during the course of any unresolved litigation regarding the discharge of pollutants by the Permittee or when requested by Ecology. D. Recording Results For each measurement or sample taken, the Permittee must record the following information: 1. Date, place, method, and time of sampling or measurement. 2. The first and last name of the individual who performed the sampling or measurement. 3. The date(s) the analyses were performed. 4. The first and last name of the individual who performed the analyses. 5. The analytical techniques or methods used. 6. The results of all analyses. E. Additional Monitoring by the Permittee If the Permittee monitors any pollutant more frequently than required by this permit using test procedures specified by Special Condition S4 of this permit, the results of this monitoring must be included in the calculation and reporting of the data submitted in the Permittee’s DMR. F. Noncompliance Notification In the event the Permittee is unable to comply with any part of the terms and conditions of this permit, and the resulting noncompliance may cause a threat to human health or the environment (such as but not limited to spills of fuels or other materials, catastrophic pond or slope failure, and discharges that violate water quality standards), or exceed Construction Stormwater General Permit Page 22 numeric effluent limitations (see S8. Discharges to 303(d) or TMDL Waterbodies), the Permittee must, upon becoming aware of the circumstance: 1. Notify Ecology within 24-hours of the failure to comply by calling the applicable Regional office ERTS phone number (refer to Special Condition S4.C.5.b.i. or www.ecy.wa.gov/programs/wq/stormwater/construction/turbidity.html for Regional ERTS phone numbers). 2. Immediately take action to prevent the discharge/pollution, or otherwise stop or correct the noncompliance, and, if applicable, repeat sampling and analysis of any noncompliance immediately and submit the results to Ecology within five (5) days of becoming aware of the violation. 3. Submit a detailed written report to Ecology within five (5) days, of the time the Permittee becomes aware of the circumstances, unless requested earlier by Ecology. The report must be submitted using Ecology’s Water Quality Permitting Portal (WQWebPortal) - Permit Submittals, unless a waiver from electronic reporting has been granted according to S5.B. The report must contain a description of the noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and the steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Permittee must report any unanticipated bypass and/or upset that exceeds any effluent limit in the permit in accordance with the 24-hour reporting requirement contained in 40 C.F.R. 122.41(l)(6). Compliance with these requirements does not relieve the Permittee from responsibility to maintain continuous compliance with the terms and conditions of this permit or the resulting liability for failure to comply. Upon request of the Permittee, Ecology may waive the requirement for a written report on a case-by- case basis, if the immediate notification is received by Ecology within 24 hours. G. Access to Plans and Records 1. The Permittee must retain the following permit documentation (plans and records) on site, or within reasonable access to the site, for use by the operator or for on-site review by Ecology or the local jurisdiction: a. General Permit b. Permit Coverage Letter c. Stormwater Pollution Prevention Plan (SWPPP) d. Site Log Book 2. The Permittee must address written requests for plans and records listed above (Special Condition S5.G.1) as follows: Construction Stormwater General Permit Page 23 a. The Permittee must provide a copy of plans and records to Ecology within 14 days of receipt of a written request from Ecology. b. The Permittee must provide a copy of plans and records to the public when requested in writing. Upon receiving a written request from the public for the Permittee’s plans and records, the Permittee must either: i. Provide a copy of the plans and records to the requester within 14 days of a receipt of the written request; or ii. Notify the requester within 10 days of receipt of the written request of the location and times within normal business hours when the plans and records may be viewed; and provide access to the plans and records within 14 days of receipt of the written request; or iii. Within 14 days of receipt of the written request, the Permittee may submit a copy of the plans and records to Ecology for viewing and/or copying by the requester at an Ecology office, or a mutually agreed location. If plans and records are viewed and/or copied at a location other than at an Ecology office, the Permittee will provide reasonable access to copying services for which a reasonable fee may be charged. The Permittee must notify the requester within 10 days of receipt of the request where the plans and records may be viewed and/or copied. S6. PERMIT FEES The Permittee must pay permit fees assessed by Ecology. Fees for stormwater discharges covered under this permit are established by Chapter 173-224 WAC. Ecology continues to assess permit fees until the permit is terminated in accordance with Special Condition S10 or revoked in accordance with General Condition G5. S7. SOLID AND LIQUID WASTE DISPOSAL The Permittee must handle and dispose of solid and liquid wastes generated by construction activity, such as demolition debris, construction materials, contaminated materials, and waste materials from maintenance activities, including liquids and solids from cleaning catch basins and other stormwater facilities, in accordance with: A. Special Condition S3, Compliance with Standards B. WAC 173-216-110 C. Other applicable regulations S8. DISCHARGES TO 303(d) OR TMDL WATERBODIES A. Sampling and Numeric Effluent Limits For Certain Discharges to 303(d)-listed Waterbodies Construction Stormwater General Permit Page 24 1. Permittees who discharge to segments of waterbodies listed as impaired by the State of Washington under Section 303(d) of the Clean Water Act for turbidity, fine sediment, high pH, or phosphorus, must conduct water quality sampling according to the requirements of this section, and Special Conditions S4.C.2.b-f and S4.C.3.b-d, and must comply with the applicable numeric effluent limitations in S8.C and S8.D. 2. All references and requirements associated with Section 303(d) of the Clean Water Act mean the most current listing by Ecology of impaired waters (Category 5) that exists on January 1, 2016, or the date when the operator’s complete permit application is received by Ecology, whichever is later. B. Limits on Coverage for New Discharges to TMDL or 303(d)-listed Waters Operators of construction sites that discharge to a TMDL or 303(d)-listed waterbody are not eligible for coverage under this permit unless the operator: 1. Prevents exposing stormwater to pollutants for which the waterbody is impaired, and retains documentation in the SWPPP that details procedures taken to prevent exposure on site; or 2. Documents that the pollutants for which the waterbody is impaired are not present at the site, and retains documentation of this finding within the SWPPP; or 3. Provides Ecology with data indicating the discharge is not expected to cause or contribute to an exceedance of a water quality standard, and retains such data on site with the SWPPP. The operator must provide data and other technical information to Ecology that sufficiently demonstrate: a. For discharges to waters without an EPA-approved or -established TMDL, that the discharge of the pollutant for which the water is impaired will meet in- stream water quality criteria at the point of discharge to the waterbody; or b. For discharges to waters with an EPA-approved or -established TMDL, that there is sufficient remaining wasteload allocation in the TMDL to allow construction stormwater discharge and that existing dischargers to the waterbody are subject to compliance schedules designed to bring the waterbody into attainment with water quality standards. Operators of construction sites are eligible for coverage under this permit if Ecology issues permit coverage based upon an affirmative determination that the discharge will not cause or contribute to the existing impairment. C. Sampling and Numeric Effluent Limits for Discharges to Water Bodies on the 303(d) List for Turbidity, Fine Sediment, or Phosphorus 1. Permittees who discharge to segments of water bodies on the 303(d) list (Category 5) for turbidity, fine sediment, or phosphorus must conduct turbidity sampling in accordance with Special Condition S4.C.2 and comply with either of the numeric effluent limits noted in Table 5 below. Construction Stormwater General Permit Page 25 2. As an alternative to the 25 NTUs effluent limit noted in Table 5 below (applied at the point where stormwater [or authorized non-stormwater] is discharged off-site), Permittees may choose to comply with the surface water quality standard for turbidity. The standard is: no more than 5 NTUs over background turbidity when the background turbidity is 50 NTUs or less, or no more than a 10% increase in turbidity when the background turbidity is more than 50 NTUs. In order to use the water quality standard requirement, the sampling must take place at the following locations: a. Background turbidity in the 303(d)-listed receiving water immediately upstream (upgradient) or outside the area of influence of the discharge. b. Turbidity at the point of discharge into the 303(d)-listed receiving water, inside the area of influence of the discharge. 3. Discharges that exceed the numeric effluent limit for turbidity constitute a violation of this permit. 4. Permittees whose discharges exceed the numeric effluent limit shall sample discharges daily until the violation is corrected and comply with the non- compliance notification requirements in Special Condition S5.F. Table 5: Turbidity, Fine Sediment & Phosphorus Sampling and Limits for 303(d)-Listed Waters Parameter identified in 303(d) listing Parameter Sampled Unit Analytical Method Sampling Frequency Numeric Effluent Limit1  Turbidity  Fine Sediment  Phosphorus Turbidity NTU SM2130 Weekly, if discharging 25 NTUs, at the point where stormwater is discharged from the site; OR In compliance with the surface water quality standard for turbidity (S8.C.2.a) 1Permittees subject to a numeric effluent limit for turbidity may, at their discretion, choose either numeric effluent limitation based on site-specific considerations including, but not limited to, safety, access and convenience. D. Discharges to Water Bodies on the 303(d) List for High pH 1. Permittees who discharge to segments of water bodies on the 303(d) list (Category 5) for high pH must conduct pH sampling in accordance with the table below, and comply with the numeric effluent limit of pH 6.5 to 8.5 su (Table 6). Construction Stormwater General Permit Page 26 Table 6: pH Sampling and Limits for 303(d)-Listed Waters Parameter identified in 303(d) listing Parameter Sampled/Units Analytical Method Sampling Frequency Numeric Effluent Limit High pH pH /Standard Units pH meter Weekly, if discharging In the range of 6.5 – 8.5 2. At the Permittee’s discretion, compliance with the limit shall be assessed at one of the following locations: a. Directly in the 303(d)-listed waterbody segment, inside the immediate area of influence of the discharge; or b. Alternatively, the Permittee may measure pH at the point where the discharge leaves the construction site, rather than in the receiving water. 3. Discharges that exceed the numeric effluent limit for pH (outside the range of 6.5 – 8.5 su) constitute a violation of this permit. 4. Permittees whose discharges exceed the numeric effluent limit shall sample discharges daily until the violation is corrected and comply with the non- compliance notification requirements in Special Condition S5.F. E. Sampling and Limits for Sites Discharging to Waters Covered by a TMDL or Another Pollution Control Plan 1. Discharges to a waterbody that is subject to a Total Maximum Daily Load (TMDL) for turbidity, fine sediment, high pH, or phosphorus must be consistent with the TMDL. Refer to http://www.ecy.wa.gov/programs/wq/tmdl/ TMDLsbyWria/TMDLbyWria.html for more information on TMDLs. a. Where an applicable TMDL sets specific waste load allocations or requirements for discharges covered by this permit, discharges must be consistent with any specific waste load allocations or requirements established by the applicable TMDL. i. The Permittee must sample discharges weekly or as otherwise specified by the TMDL to evaluate compliance with the specific waste load allocations or requirements. ii. Analytical methods used to meet the monitoring requirements must conform to the latest revision of the Guidelines Establishing Test Procedures for the Analysis of Pollutants contained in 40 CFR Part 136. Turbidity and pH methods need not be accredited or registered unless conducted at a laboratory which must otherwise be accredited or registered. b. Where an applicable TMDL has established a general waste load allocation for construction stormwater discharges, but has not identified specific requirements, Construction Stormwater General Permit Page 27 compliance with Special Conditions S4 (Monitoring) and S9 (SWPPPs) will constitute compliance with the approved TMDL. c. Where an applicable TMDL has not specified a waste load allocation for construction stormwater discharges, but has not excluded these discharges, compliance with Special Conditions S4 (Monitoring) and S9 (SWPPPs) will constitute compliance with the approved TMDL. d. Where an applicable TMDL specifically precludes or prohibits discharges from construction activity, the operator is not eligible for coverage under this permit. 2. Applicable TMDL means a TMDL for turbidity, fine sediment, high pH, or phosphorus that is completed and approved by EPA before January 1, 2016, or before the date the operator’s complete permit application is received by Ecology, whichever is later. TMDLs completed after the operator’s complete permit application is received by Ecology become applicable to the Permittee only if they are imposed through an administrative order by Ecology, or through a modification of permit coverage. S9. STORMWATER POLLUTION PREVENTION PLAN The Permittee must prepare and properly implement an adequate Stormwater Pollution Prevention Plan (SWPPP) for construction activity in accordance with the requirements of this permit beginning with initial soil disturbance and until final stabilization. A. The Permittee’s SWPPP must meet the following objectives: 1. To implement best management practices (BMPs) to prevent erosion and sedimentation, and to identify, reduce, eliminate or prevent stormwater contamination and water pollution from construction activity. 2. To prevent violations of surface water quality, ground water quality, or sediment management standards. 3. To control peak volumetric flow rates and velocities of stormwater discharges. B. General Requirements 1. The SWPPP must include a narrative and drawings. All BMPs must be clearly referenced in the narrative and marked on the drawings. The SWPPP narrative must include documentation to explain and justify the pollution prevention decisions made for the project. Documentation must include: a. Information about existing site conditions (topography, drainage, soils, vegetation, etc.). b. Potential erosion problem areas. c. The 13 elements of a SWPPP in Special Condition S9.D.1-13, including BMPs used to address each element. Construction Stormwater General Permit Page 28 d. Construction phasing/sequence and general BMP implementation schedule. e. The actions to be taken if BMP performance goals are not achieved—for example, a contingency plan for additional treatment and/or storage of stormwater that would violate the water quality standards if discharged. f. Engineering calculations for ponds, treatment systems, and any other designed structures. When a treatment system requires engineering calculations, these calculations must be included in the SWPPP. Engineering calculations do not need to be included in the SWPPP for treatment systems that do not require such calculations. 2. The Permittee must modify the SWPPP if, during inspections or investigations conducted by the owner/operator, or the applicable local or state regulatory authority, it is determined that the SWPPP is, or would be, ineffective in eliminating or significantly minimizing pollutants in stormwater discharges from the site. The Permittee must then: a. Review the SWPPP for compliance with Special Condition S9 and make appropriate revisions within 7 days of the inspection or investigation. b. Immediately begin the process to fully implement and maintain appropriate source control and/or treatment BMPs as soon as possible, addressing the problems no later than 10 days from the inspection or investigation. If installation of necessary treatment BMPs is not feasible within 10 days, Ecology may approve additional time when an extension is requested by a Permittee within the initial 10-day response period. c. Document BMP implementation and maintenance in the site log book. The Permittee must modify the SWPPP whenever there is a change in design, construction, operation, or maintenance at the construction site that has, or could have, a significant effect on the discharge of pollutants to waters of the State. C. Stormwater Best Management Practices (BMPs) BMPs must be consistent with: 1. Stormwater Management Manual for Western Washington (most current approved edition at the time this permit was issued), for sites west of the crest of the Cascade Mountains; or 2. Stormwater Management Manual for Eastern Washington (most current approved edition at the time this permit was issued), for sites east of the crest of the Cascade Mountains; or 3. Revisions to the manuals listed in Special Condition S9.C.1. & 2., or other stormwater management guidance documents or manuals which provide an equivalent level of pollution prevention, that are approved by Ecology and incorporated into this permit in accordance with the permit modification requirements of WAC 173-226-230; or Construction Stormwater General Permit Page 29 4. Documentation in the SWPPP that the BMPs selected provide an equivalent level of pollution prevention, compared to the applicable Stormwater Management Manuals, including: a. The technical basis for the selection of all stormwater BMPs (scientific, technical studies, and/or modeling) that support the performance claims for the BMPs being selected. b. An assessment of how the selected BMP will satisfy AKART requirements and the applicable federal technology-based treatment requirements under 40 CFR part 125.3. D. SWPPP – Narrative Contents and Requirements The Permittee must include each of the 13 elements below in Special Condition S9.D.1-13 in the narrative of the SWPPP and implement them unless site conditions render the element unnecessary and the exemption from that element is clearly justified in the SWPPP. 1. Preserve Vegetation/Mark Clearing Limits a. Before beginning land-disturbing activities, including clearing and grading, clearly mark all clearing limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area. b. Retain the duff layer, native topsoil, and natural vegetation in an undisturbed state to the maximum degree practicable. 2. Establish Construction Access a. Limit construction vehicle access and exit to one route, if possible. b. Stabilize access points with a pad of quarry spalls, crushed rock, or other equivalent BMPs, to minimize tracking sediment onto roads. c. Locate wheel wash or tire baths on site, if the stabilized construction entrance is not effective in preventing tracking sediment onto roads. d. If sediment is tracked off site, clean the affected roadway thoroughly at the end of each day, or more frequently as necessary (for example, during wet weather). Remove sediment from roads by shoveling, sweeping, or pickup and transport of the sediment to a controlled sediment disposal area. e. Conduct street washing only after sediment removal in accordance with Special Condition S9.D.2.d. Control street wash wastewater by pumping back on site or otherwise preventing it from discharging into systems tributary to waters of the State. 3. Control Flow Rates a. Protect properties and waterways downstream of development sites from erosion and the associated discharge of turbid waters due to increases in the Construction Stormwater General Permit Page 30 velocity and peak volumetric flow rate of stormwater runoff from the project site, as required by local plan approval authority. b. Where necessary to comply with Special Condition S9.D.3.a, construct stormwater retention or detention facilities as one of the first steps in grading. Assure that detention facilities function properly before constructing site improvements (for example, impervious surfaces). c. If permanent infiltration ponds are used for flow control during construction, protect these facilities from siltation during the construction phase. 4. Install Sediment Controls The Permittee must design, install and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. At a minimum, the Permittee must design, install and maintain such controls to: a. Construct sediment control BMPs (sediment ponds, traps, filters, infiltration facilities, etc.) as one of the first steps in grading. These BMPs must be functional before other land disturbing activities take place. b. Minimize sediment discharges from the site. The design, installation and maintenance of erosion and sediment controls must address factors such as the amount, frequency, intensity and duration of precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soil particle sizes expected to be present on the site. c. Direct stormwater runoff from disturbed areas through a sediment pond or other appropriate sediment removal BMP, before the runoff leaves a construction site or before discharge to an infiltration facility. Runoff from fully stabilized areas may be discharged without a sediment removal BMP, but must meet the flow control performance standard of Special Condition S9.D.3.a. d. Locate BMPs intended to trap sediment on site in a manner to avoid interference with the movement of juvenile salmonids attempting to enter off-channel areas or drainages. e. Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal and maximize stormwater infiltration, unless infeasible. f. Where feasible, design outlet structures that withdraw impounded stormwater from the surface to avoid discharging sediment that is still suspended lower in the water column. 5. Stabilize Soils a. The Permittee must stabilize exposed and unworked soils by application of effective BMPs that prevent erosion. Applicable BMPs include, but are not limited to: temporary and permanent seeding, sodding, mulching, plastic covering, erosion control fabrics and matting, soil application of polyacrylamide Construction Stormwater General Permit Page 31 (PAM), the early application of gravel base on areas to be paved, and dust control. b. The Permittee must control stormwater volume and velocity within the site to minimize soil erosion. c. The Permittee must control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion. d. Depending on the geographic location of the project, the Permittee must not allow soils to remain exposed and unworked for more than the time periods set forth below to prevent erosion: West of the Cascade Mountains Crest During the dry season (May 1 - September 30): 7 days During the wet season (October 1 - April 30): 2 days East of the Cascade Mountains Crest, except for Central Basin* During the dry season (July 1 - September 30): 10 days During the wet season (October 1 - June 30): 5 days The Central Basin*, East of the Cascade Mountains Crest During the dry season (July 1 - September 30): 30 days During the wet season (October 1 - June 30): 15 days *Note: The Central Basin is defined as the portions of Eastern Washington with mean annual precipitation of less than 12 inches. e. The Permittee must stabilize soils at the end of the shift before a holiday or weekend if needed based on the weather forecast. f. The Permittee must stabilize soil stockpiles from erosion, protected with sediment trapping measures, and where possible, be located away from storm drain inlets, waterways, and drainage channels. g. The Permittee must minimize the amount of soil exposed during construction activity. h. The Permittee must minimize the disturbance of steep slopes. i. The Permittee must minimize soil compaction and, unless infeasible, preserve topsoil. 6. Protect Slopes a. The Permittee must design and construct cut-and-fill slopes in a manner to minimize erosion. Applicable practices include, but are not limited to, reducing continuous length of slope with terracing and diversions, reducing slope steepness, and roughening slope surfaces (for example, track walking). Construction Stormwater General Permit Page 32 b. The Permittee must divert off-site stormwater (run-on) or ground water away from slopes and disturbed areas with interceptor dikes, pipes, and/or swales. Off-site stormwater should be managed separately from stormwater generated on the site. c. At the top of slopes, collect drainage in pipe slope drains or protected channels to prevent erosion. i. West of the Cascade Mountains Crest: Temporary pipe slope drains must handle the peak 10-minute flow rate from a Type 1A, 10-year, 24-hour frequency storm for the developed condition. Alternatively, the 10-year, 1-hour flow rate predicted by an approved continuous runoff model, increased by a factor of 1.6, may be used. The hydrologic analysis must use the existing land cover condition for predicting flow rates from tributary areas outside the project limits. For tributary areas on the project site, the analysis must use the temporary or permanent project land cover condition, whichever will produce the highest flow rates. If using the Western Washington Hydrology Model (WWHM) to predict flows, bare soil areas should be modeled as "landscaped area.” ii. East of the Cascade Mountains Crest: Temporary pipe slope drains must handle the expected peak flow rate from a 6-month, 3-hour storm for the developed condition, referred to as the short duration storm. d. Place excavated material on the uphill side of trenches, consistent with safety and space considerations. e. Place check dams at regular intervals within constructed channels that are cut down a slope. 7. Protect Drain Inlets a. Protect all storm drain inlets made operable during construction so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. b. Clean or remove and replace inlet protection devices when sediment has filled one-third of the available storage (unless a different standard is specified by the product manufacturer). 8. Stabilize Channels and Outlets a. Design, construct and stabilize all on-site conveyance channels to prevent erosion from the following expected peak flows: i. West of the Cascade Mountains Crest: Channels must handle the peak 10-minute flow rate from a Type 1A, 10-year, 24-hour frequency storm for the developed condition. Alternatively, the 10-year, 1-hour flow rate indicated by an approved continuous runoff model, increased by a factor of 1.6, may be used. The hydrologic analysis must use the existing land Construction Stormwater General Permit Page 33 cover condition for predicting flow rates from tributary areas outside the project limits. For tributary areas on the project site, the analysis must use the temporary or permanent project land cover condition, whichever will produce the highest flow rates. If using the WWHM to predict flows, bare soil areas should be modeled as "landscaped area.” ii. East of the Cascade Mountains Crest: Channels must handle the expected peak flow rate from a 6-month, 3-hour storm for the developed condition, referred to as the short duration storm. b. Provide stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent stream banks, slopes, and downstream reaches at the outlets of all conveyance systems. 9. Control Pollutants Design, install, implement and maintain effective pollution prevention measures to minimize the discharge of pollutants. The Permittee must: a. Handle and dispose of all pollutants, including waste materials and demolition debris that occur on site in a manner that does not cause contamination of stormwater. b. Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum products, and other materials that have the potential to pose a threat to human health or the environment. On-site fueling tanks must include secondary containment. Secondary containment means placing tanks or containers within an impervious structure capable of containing 110% of the volume contained in the largest tank within the containment structure. Double- walled tanks do not require additional secondary containment. c. Conduct maintenance, fueling, and repair of heavy equipment and vehicles using spill prevention and control measures. Clean contaminated surfaces immediately following any spill incident. d. Discharge wheel wash or tire bath wastewater to a separate on-site treatment system that prevents discharge to surface water, such as closed-loop recirculation or upland land application, or to the sanitary sewer with local sewer district approval. e. Apply fertilizers and pesticides in a manner and at application rates that will not result in loss of chemical to stormwater runoff. Follow manufacturers’ label requirements for application rates and procedures. f. Use BMPs to prevent contamination of stormwater runoff by pH-modifying sources. The sources for this contamination include, but are not limited to: bulk cement, cement kiln dust, fly ash, new concrete washing and curing waters, recycled concrete stockpiles, waste streams generated from concrete grinding and sawing, exposed aggregate processes, dewatering concrete vaults, concrete Construction Stormwater General Permit Page 34 pumping and mixer washout waters. (Also refer to the definition for "concrete wastewater" in Appendix A--Definitions.) g. Adjust the pH of stormwater or authorized non-stormwater if necessary to prevent an exceedance of groundwater and/or surface water quality standards. h. Assure that washout of concrete trucks is performed off-site or in designated concrete washout areas only. Do not wash out concrete truck drums or concrete handling equipment onto the ground, or into storm drains, open ditches, streets, or streams. Washout of concrete handling equipment may be disposed of in a designated concrete washout area or in a formed area awating concrete where it will not contaminate surface or ground water. Do not dump excess concrete on site, except in designated concrete washout areas. Concrete spillage or concrete discharge directly to groundwater or surface waters of the State is prohibited. Do not wash out to formed areas awaiting LID facilities. i. Obtain written approval from Ecology before using any chemical treatment, with the exception of CO2 or dry ice used to adjust pH. j. Uncontaminated water from water-only based shaft drilling for construction of building, road, and bridge foundations may be infiltrated provided the wastewater is managed in a way that prohibits discharge to surface waters. Prior to infiltration, water from water-only based shaft drilling that comes into contact with curing concrete must be neutralized until pH is in the range of 6.5 to 8.5 (su). 10. Control Dewatering a. Permittees must discharge foundation, vault, and trench dewatering water, which have characteristics similar to stormwater runoff at the site, into a controlled conveyance system before discharge to a sediment trap or sediment pond. b. Permittees may discharge clean, non-turbid dewatering water, such as well- point ground water, to systems tributary to, or directly into surface waters of the State, as specified in Special Condition S9.D.8, provided the dewatering flow does not cause erosion or flooding of receiving waters. Do not route clean dewatering water through stormwater sediment ponds. Note that “surface waters of the State” may exist on a construction site as well as off site; for example, a creek running through a site. c. Other dewatering treatment or disposal options may include: i. Infiltration. ii. Transport off site in a vehicle, such as a vacuum flush truck, for legal disposal in a manner that does not pollute state waters. Construction Stormwater General Permit Page 35 iii. Ecology-approved on-site chemical treatment or other suitable treatment technologies (see S9.D.9.i. regarding chemical treatment written approval). iv. Sanitary or combined sewer discharge with local sewer district approval, if there is no other option. v. Use of a sedimentation bag with discharge to a ditch or swale for small volumes of localized dewatering. d. Permittees must handle highly turbid or contaminated dewatering water separately from stormwater. 11. Maintain BMPs a. Permittees must maintain and repair all temporary and permanent erosion and sediment control BMPs as needed to assure continued performance of their intended function in accordance with BMP specifications. b. Permittees must remove all temporary erosion and sediment control BMPs within 30 days after achieving final site stabilization or after the temporary BMPs are no longer needed. 12. Manage the Project a. Phase development projects to the maximum degree practicable and take into account seasonal work limitations. b. Inspection and monitoring – Inspect, maintain and repair all BMPs as needed to assure continued performance of their intended function. Conduct site inspections and monitoring in accordance with Special Condition S4. c. Maintaining an updated construction SWPPP – Maintain, update, and implement the SWPPP in accordance with Special Conditions S3, S4 and S9. 13. Protect Low Impact Development (LID) BMPs The primary purpose of LID BMPs/On-site LID Stormwater Management BMPs is to reduce the disruption of the natural site hydrology. LID BMPs are permanent facilities. a. Permittees must protect all Bioretention and Rain Garden facilities from sedimentation through installation and maintenance of erosion and sediment control BMPs on portions of the site that drain into the Bioretention and/or Rain Garden facilities. Restore the facilities to their fully functioning condition if they accumulate sediment during construction. Restoring the facility must include removal of sediment and any sediment-laden Bioretention/Rain Garden soils, and replacing the removed soils with soils meeting the design specification. Construction Stormwater General Permit Page 36 b. Permittees must maintain the infiltration capabilities of Bioretention and Rain Garden facilities by protecting against compaction by construction equipment and foot traffic. Protect completed lawn and landscaped areas from compaction due to construction equipment. c. Permittees must control erosion and avoid introducing sediment from surrounding land uses onto permeable pavements. Do not allow muddy construction equipment on the base material or pavement. Do not allow sediment-laden runoff onto permeable pavements. d. Permittees must clean permeable pavements fouled with sediments or no longer passing an initial infiltration test using local stormwater manual methodology or the manufacturer’s procedures. e. Permittees must keep all heavy equipment off existing soils under LID facilities that have been excavated to final grade to retain the infiltration rate of the soils. E. SWPPP – Map Contents and Requirements The Permittee’s SWPPP must also include a vicinity map or general location map (for example, a USGS quadrangle map, a portion of a county or city map, or other appropriate map) with enough detail to identify the location of the construction site and receiving waters within one mile of the site. The SWPPP must also include a legible site map (or maps) showing the entire construction site. The following features must be identified, unless not applicable due to site conditions: 1. The direction of north, property lines, and existing structures and roads. 2. Cut and fill slopes indicating the top and bottom of slope catch lines. 3. Approximate slopes, contours, and direction of stormwater flow before and after major grading activities. 4. Areas of soil disturbance and areas that will not be disturbed. 5. Locations of structural and nonstructural controls (BMPs) identified in the SWPPP. 6. Locations of off-site material, stockpiles, waste storage, borrow areas, and vehicle/equipment storage areas. 7. Locations of all surface water bodies, including wetlands. 8. Locations where stormwater or non-stormwater discharges off-site and/or to a surface waterbody, including wetlands. 9. Location of water quality sampling station(s), if sampling is required by state or local permitting authority. Construction Stormwater General Permit Page 37 10. Areas where final stabilization has been accomplished and no further construction- phase permit requirements apply. 11. Location or proposed location of LID facilities. S10. NOTICE OF TERMINATION A. The site is eligible for termination of coverage when it has met any of the following conditions: 1. The site has undergone final stabilization, the Permittee has removed all temporary BMPs (except biodegradable BMPs clearly manufactured with the intention for the material to be left in place and not interfere with maintenance or land use), and all stormwater discharges associated with construction activity have been eliminated; or 2. All portions of the site that have not undergone final stabilization per Special Condition S10.A.1 have been sold and/or transferred (per General Condition G9), and the Permittee no longer has operational control of the construction activity; or 3. For residential construction only, the Permittee has completed temporary stabilization and the homeowners have taken possession of the residences. B. When the site is eligible for termination, the Permittee must submit a complete and accurate Notice of Termination (NOT) form, signed in accordance with General Condition G2, to: Department of Ecology Water Quality Program – Construction Stormwater PO Box 47696 Olympia, Washington 98504-7696 When an electronic termination form is available, the Permittee may choose to submit a complete and accurate Notice of Termination (NOT) form through the Water Quality Permitting Portal rather than mailing a hardcopy as noted above. The termination is effective on the thirty-first calendar day following the date Ecology receives a complete NOT form, unless Ecology notifies the Permittee that the termination request is denied because the Permittee has not met the eligibility requirements in Special Condition S10.A. Permittees are required to comply with all conditions and effluent limitations in the permit until the permit has been terminated. Permittees transferring the property to a new property owner or operator/Permittee are required to complete and submit the Notice of Transfer form to Ecology, but are not required to submit a Notice of Termination form for this type of transaction. Construction Stormwater General Permit Page 38 GENERAL CONDITIONS G1. DISCHARGE VIOLATIONS All discharges and activities authorized by this general permit must be consistent with the terms and conditions of this general permit. Any discharge of any pollutant more frequent than or at a level in excess of that identified and authorized by the general permit must constitute a violation of the terms and conditions of this permit. G2. SIGNATORY REQUIREMENTS A. All permit applications must bear a certification of correctness to be signed: 1. In the case of corporations, by a responsible corporate officer; 2. In the case of a partnership, by a general partner of a partnership; 3. In the case of sole proprietorship, by the proprietor; or 4. In the case of a municipal, state, or other public facility, by either a principal executive officer or ranking elected official. B. All reports required by this permit and other information requested by Ecology (including NOIs, NOTs, and Transfer of Coverage forms) must be signed by a person described above or by a duly authorized representative of that person. A person is a duly authorized representative only if: 1. The authorization is made in writing by a person described above and submitted to Ecology. 2. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility, such as the position of plant manager, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters. C. Changes to authorization. If an authorization under paragraph G2.B.2 above is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of paragraph G2.B.2 above must be submitted to Ecology prior to or together with any reports, information, or applications to be signed by an authorized representative. D. Certification. Any person signing a document under this section must make the following certification: “I certify under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering information, the information submitted is, to the best of my Construction Stormwater General Permit Page 39 knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” G3. RIGHT OF INSPECTION AND ENTRY The Permittee must allow an authorized representative of Ecology, upon the presentation of credentials and such other documents as may be required by law: A. To enter upon the premises where a discharge is located or where any records are kept under the terms and conditions of this permit. B. To have access to and copy – at reasonable times and at reasonable cost – any records required to be kept under the terms and conditions of this permit. C. To inspect – at reasonable times – any facilities, equipment (including monitoring and control equipment), practices, methods, or operations regulated or required under this permit. D. To sample or monitor – at reasonable times – any substances or parameters at any location for purposes of assuring permit compliance or as otherwise authorized by the Clean Water Act. G4. GENERAL PERMIT MODIFICATION AND REVOCATION This permit may be modified, revoked and reissued, or terminated in accordance with the provisions of Chapter 173-226 WAC. Grounds for modification, revocation and reissuance, or termination include, but are not limited to, the following: A. When a change occurs in the technology or practices for control or abatement of pollutants applicable to the category of dischargers covered under this permit. B. When effluent limitation guidelines or standards are promulgated pursuant to the CWA or Chapter 90.48 RCW, for the category of dischargers covered under this permit. C. When a water quality management plan containing requirements applicable to the category of dischargers covered under this permit is approved, or D. When information is obtained that indicates cumulative effects on the environment from dischargers covered under this permit are unacceptable. G5. REVOCATION OF COVERAGE UNDER THE PERMIT Pursuant to Chapter 43.21B RCW and Chapter 173-226 WAC, the Director may terminate coverage for any discharger under this permit for cause. Cases where coverage may be terminated include, but are not limited to, the following: A. Violation of any term or condition of this permit. B. Obtaining coverage under this permit by misrepresentation or failure to disclose fully all relevant facts. Construction Stormwater General Permit Page 40 C. A change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge. D. Failure or refusal of the Permittee to allow entry as required in RCW 90.48.090. E. A determination that the permitted activity endangers human health or the environment, or contributes to water quality standards violations. F. Nonpayment of permit fees or penalties assessed pursuant to RCW 90.48.465 and Chapter 173-224 WAC. G. Failure of the Permittee to satisfy the public notice requirements of WAC 173-226- 130(5), when applicable. The Director may require any discharger under this permit to apply for and obtain coverage under an individual permit or another more specific general permit. Permittees who have their coverage revoked for cause according to WAC 173-226-240 may request temporary coverage under this permit during the time an individual permit is being developed, provided the request is made within ninety (90) days from the time of revocation and is submitted along with a complete individual permit application form. G6. REPORTING A CAUSE FOR MODIFICATION The Permittee must submit a new application, or a supplement to the previous application, whenever a material change to the construction activity or in the quantity or type of discharge is anticipated which is not specifically authorized by this permit. This application must be submitted at least sixty (60) days prior to any proposed changes. Filing a request for a permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not relieve the Permittee of the duty to comply with the existing permit until it is modified or reissued. G7. COMPLIANCE WITH OTHER LAWS AND STATUTES Nothing in this permit will be construed as excusing the Permittee from compliance with any applicable federal, state, or local statutes, ordinances, or regulations. G8. DUTY TO REAPPLY The Permittee must apply for permit renewal at least 180 days prior to the specified expiration date of this permit. The Permittee must reapply using the electronic application form (NOI) available on Ecology’s website. Permittees unable to submit electronically (for example, those who do not have an internet connection) must contact Ecology to request a waiver and obtain instructions on how to obtain a paper NOI. Department of Ecology Water Quality Program - Construction Stormwater PO Box 47696 Olympia, Washington 98504-7696 Construction Stormwater General Permit Page 41 G9. TRANSFER OF GENERAL PERMIT COVERAGE Coverage under this general permit is automatically transferred to a new discharger, including operators of lots/parcels within a common plan of development or sale, if: A. A written agreement (Transfer of Coverage Form) between the current discharger (Permittee) and new discharger, signed by both parties and containing a specific date for transfer of permit responsibility, coverage, and liability (including any Administrative Orders associated with the Permit) is submitted to the Director; and B. The Director does not notify the current discharger and new discharger of the Director’s intent to revoke coverage under the general permit. If this notice is not given, the transfer is effective on the date specified in the written agreement. When a current discharger (Permittee) transfers a portion of a permitted site, the current discharger must also submit an updated application form (NOI) to the Director indicating the remaining permitted acreage after the transfer. G10. REMOVED SUBSTANCES The Permittee must not re-suspend or reintroduce collected screenings, grit, solids, sludges, filter backwash, or other pollutants removed in the course of treatment or control of stormwater to the final effluent stream for discharge to state waters. G11. DUTY TO PROVIDE INFORMATION The Permittee must submit to Ecology, within a reasonable time, all information that Ecology may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit or to determine compliance with this permit. The Permittee must also submit to Ecology, upon request, copies of records required to be kept by this permit [40 CFR 122.41(h)]. G12. OTHER REQUIREMENTS OF 40 CFR All other requirements of 40 CFR 122.41 and 122.42 are incorporated in this permit by reference. G13. ADDITIONAL MONITORING Ecology may establish specific monitoring requirements in addition to those contained in this permit by administrative order or permit modification. G14. PENALTIES FOR VIOLATING PERMIT CONDITIONS Any person who is found guilty of willfully violating the terms and conditions of this permit shall be deemed guilty of a crime, and upon conviction thereof shall be punished by a fine of up to ten thousand dollars ($10,000) and costs of prosecution, or by imprisonment at the discretion of the court. Each day upon which a willful violation occurs may be deemed a separate and additional violation. Construction Stormwater General Permit Page 42 Any person who violates the terms and conditions of a waste discharge permit shall incur, in addition to any other penalty as provided by law, a civil penalty in the amount of up to ten thousand dollars ($10,000) for every such violation. Each and every such violation shall be a separate and distinct offense, and in case of a continuing violation, every day’s continuance shall be deemed to be a separate and distinct violation. G15. UPSET Definition – “Upset” means an exceptional incident in which there is unintentional and temporary noncompliance with technology-based permit effluent limitations because of factors beyond the reasonable control of the Permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. An upset constitutes an affirmative defense to an action brought for noncompliance with such technology-based permit effluent limitations if the requirements of the following paragraph are met. A Permittee who wishes to establish the affirmative defense of upset must demonstrate, through properly signed, contemporaneous operating logs or other relevant evidence that: 1) an upset occurred and that the Permittee can identify the cause(s) of the upset; 2) the permitted facility was being properly operated at the time of the upset; 3) the Permittee submitted notice of the upset as required in Special Condition S5.F, and; 4) the Permittee complied with any remedial measures required under this permit. In any enforcement proceeding, the Permittee seeking to establish the occurrence of an upset has the burden of proof. G16. PROPERTY RIGHTS This permit does not convey any property rights of any sort, or any exclusive privilege. G17. DUTY TO COMPLY The Permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the Clean Water Act and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or denial of a permit renewal application. G18. TOXIC POLLUTANTS The Permittee must comply with effluent standards or prohibitions established under Section 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish those standards or prohibitions, even if this permit has not yet been modified to incorporate the requirement. Construction Stormwater General Permit Page 43 G19. PENALTIES FOR TAMPERING The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate any monitoring device or method required to be maintained under this permit shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. If a conviction of a person is for a violation committed after a first conviction of such person under this condition, punishment shall be a fine of not more than $20,000 per day of violation, or imprisonment of not more than four (4) years, or both. G20. REPORTING PLANNED CHANGES The Permittee must, as soon as possible, give notice to Ecology of planned physical alterations, modifications or additions to the permitted construction activity. The Permittee should be aware that, depending on the nature and size of the changes to the original permit, a new public notice and other permit process requirements may be required. Changes in activities that require reporting to Ecology include those that will result in: A. The permitted facility being determined to be a new source pursuant to 40 CFR 122.29(b). B. A significant change in the nature or an increase in quantity of pollutants discharged, including but not limited to: for sites 5 acres or larger, a 20% or greater increase in acreage disturbed by construction activity. C. A change in or addition of surface water(s) receiving stormwater or non-stormwater from the construction activity. D. A change in the construction plans and/or activity that affects the Permittee’s monitoring requirements in Special Condition S4. Following such notice, permit coverage may be modified, or revoked and reissued pursuant to 40 CFR 122.62(a) to specify and limit any pollutants not previously limited. Until such modification is effective, any new or increased discharge in excess of permit limits or not specifically authorized by this permit constitutes a violation. G21. REPORTING OTHER INFORMATION Where the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or in any report to Ecology, it must promptly submit such facts or information. G22. REPORTING ANTICIPATED NON-COMPLIANCE The Permittee must give advance notice to Ecology by submission of a new application or supplement thereto at least forty-five (45) days prior to commencement of such discharges, of any facility expansions, production increases, or other planned changes, such as process modifications, in the permitted facility or activity which may result in noncompliance with permit limits or conditions. Any maintenance of facilities, which might necessitate Construction Stormwater General Permit Page 44 unavoidable interruption of operation and degradation of effluent quality, must be scheduled during non-critical water quality periods and carried out in a manner approved by Ecology. G23. REQUESTS TO BE EXCLUDED FROM COVERAGE UNDER THE PERMIT Any discharger authorized by this permit may request to be excluded from coverage under the general permit by applying for an individual permit. The discharger must submit to the Director an application as described in WAC 173-220-040 or WAC 173-216-070, whichever is applicable, with reasons supporting the request. These reasons will fully document how an individual permit will apply to the applicant in a way that the general permit cannot. Ecology may make specific requests for information to support the request. The Director will either issue an individual permit or deny the request with a statement explaining the reason for the denial. When an individual permit is issued to a discharger otherwise subject to the construction stormwater general permit, the applicability of the construction stormwater general permit to that Permittee is automatically terminated on the effective date of the individual permit. G24. APPEALS A. The terms and conditions of this general permit, as they apply to the appropriate class of dischargers, are subject to appeal by any person within 30 days of issuance of this general permit, in accordance with Chapter 43.21B RCW, and Chapter 173-226 WAC. B. The terms and conditions of this general permit, as they apply to an individual discharger, are appealable in accordance with Chapter 43.21B RCW within 30 days of the effective date of coverage of that discharger. Consideration of an appeal of general permit coverage of an individual discharger is limited to the general permit’s applicability or nonapplicability to that individual discharger. C. The appeal of general permit coverage of an individual discharger does not affect any other dischargers covered under this general permit. If the terms and conditions of this general permit are found to be inapplicable to any individual discharger(s), the matter shall be remanded to Ecology for consideration of issuance of an individual permit or permits. G25. SEVERABILITY The provisions of this permit are severable, and if any provision of this permit, or application of any provision of this permit to any circumstance, is held invalid, the application of such provision to other circumstances, and the remainder of this permit shall not be affected thereby. G26. BYPASS PROHIBITED A. Bypass Procedures Bypass, which is the intentional diversion of waste streams from any portion of a treatment facility, is prohibited for stormwater events below the design criteria for Construction Stormwater General Permit Page 45 stormwater management. Ecology may take enforcement action against a Permittee for bypass unless one of the following circumstances (1, 2, 3 or 4) is applicable. 1. Bypass of stormwater is consistent with the design criteria and part of an approved management practice in the applicable stormwater management manual. 2. Bypass for essential maintenance without the potential to cause violation of permit limits or conditions. Bypass is authorized if it is for essential maintenance and does not have the potential to cause violations of limitations or other conditions of this permit, or adversely impact public health. 3. Bypass of stormwater is unavoidable, unanticipated, and results in noncompliance of this permit. This bypass is permitted only if: a. Bypass is unavoidable to prevent loss of life, personal injury, or severe property damage. “Severe property damage” means substantial physical damage to property, damage to the treatment facilities which would cause them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. b. There are no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, maintenance during normal periods of equipment downtime (but not if adequate backup equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventative maintenance), or transport of untreated wastes to another treatment facility. c. Ecology is properly notified of the bypass as required in Special Condition S5.F of this permit. 4. A planned action that would cause bypass of stormwater and has the potential to result in noncompliance of this permit during a storm event. The Permittee must notify Ecology at least thirty (30) days before the planned date of bypass. The notice must contain: a. A description of the bypass and its cause. b. An analysis of all known alternatives which would eliminate, reduce, or mitigate the need for bypassing. c. A cost-effectiveness analysis of alternatives including comparative resource damage assessment. d. The minimum and maximum duration of bypass under each alternative. e. A recommendation as to the preferred alternative for conducting the bypass. Construction Stormwater General Permit Page 46 f. The projected date of bypass initiation. g. A statement of compliance with SEPA. h. A request for modification of water quality standards as provided for in WAC 173-201A-110, if an exceedance of any water quality standard is anticipated. i. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. 5. For probable construction bypasses, the need to bypass is to be identified as early in the planning process as possible. The analysis required above must be considered during preparation of the Stormwater Pollution Prevention Plan (SWPPP) and must be included to the extent practical. In cases where the probable need to bypass is determined early, continued analysis is necessary up to and including the construction period in an effort to minimize or eliminate the bypass. Ecology will consider the following before issuing an administrative order for this type bypass: a. If the bypass is necessary to perform construction or maintenance-related activities essential to meet the requirements of this permit. b. If there are feasible alternatives to bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, stopping production, maintenance during normal periods of equipment down time, or transport of untreated wastes to another treatment facility. c. If the bypass is planned and scheduled to minimize adverse effects on the public and the environment. After consideration of the above and the adverse effects of the proposed bypass and any other relevant factors, Ecology will approve, conditionally approve, or deny the request. The public must be notified and given an opportunity to comment on bypass incidents of significant duration, to the extent feasible. Approval of a request to bypass will be by administrative order issued by Ecology under RCW 90.48.120. B. Duty to Mitigate The Permittee is required to take all reasonable steps to minimize or prevent any discharge or sludge use or disposal in violation of this permit that has a reasonable likelihood of adversely affecting human health or the environment. Construction Stormwater General Permit Page 47 APPENDIX A – DEFINITIONS AKART is an acronym for “all known, available, and reasonable methods of prevention, control, and treatment.” AKART represents the most current methodology that can be reasonably required for preventing, controlling, or abating the pollutants and controlling pollution associated with a discharge. Applicable TMDL means a TMDL for turbidity, fine sediment, high pH, or phosphorus, which was completed and approved by EPA before January 1, 2016, or before the date the operator’s complete permit application is received by Ecology, whichever is later. Applicant means an operator seeking coverage under this permit. Benchmark means a pollutant concentration used as a permit threshold, below which a pollutant is considered unlikely to cause a water quality violation, and above which it may. When pollutant concentrations exceed benchmarks, corrective action requirements take effect. Benchmark values are not water quality standards and are not numeric effluent limitations; they are indicator values. Best Management Practices (BMPs) means schedules of activities, prohibitions of practices, maintenance procedures, and other physical, structural and/or managerial practices to prevent or reduce the pollution of waters of the State. BMPs include treatment systems, operating procedures, and practices to control: stormwater associated with construction activity, spillage or leaks, sludge or waste disposal, or drainage from raw material storage. Buffer means an area designated by a local jurisdiction that is contiguous to and intended to protect a sensitive area. Bypass means the intentional diversion of waste streams from any portion of a treatment facility. Calendar Day A period of 24 consecutive hours starting at 12:00 midnight and ending the following 12:00 midnight. Calendar Week (same as Week) means a period of seven consecutive days starting at 12:01 a.m. (0:01 hours) on Sunday. Certified Erosion and Sediment Control Lead (CESCL) means a person who has current certification through an approved erosion and sediment control training program that meets the minimum training standards established by Ecology (see BMP C160 in the SWMM). Chemical Treatment means the addition of chemicals to stormwater and/or authorized non- stormwater prior to filtration and discharge to surface waters. Clean Water Act (CWA) means the Federal Water Pollution Control Act enacted by Public Law 92-500, as amended by Public Laws 95-217, 95-576, 96-483, and 97-117; USC 1251 et seq. Combined Sewer means a sewer which has been designed to serve as a sanitary sewer and a storm sewer, and into which inflow is allowed by local ordinance. Construction Stormwater General Permit Page 48 Common Plan of Development or Sale means a site where multiple separate and distinct construction activities may be taking place at different times on different schedules and/or by different contractors, but still under a single plan. Examples include: 1) phased projects and projects with multiple filings or lots, even if the separate phases or filings/lots will be constructed under separate contract or by separate owners (e.g., a development where lots are sold to separate builders); 2) a development plan that may be phased over multiple years, but is still under a consistent plan for long-term development; 3) projects in a contiguous area that may be unrelated but still under the same contract, such as construction of a building extension and a new parking lot at the same facility; and 4) linear projects such as roads, pipelines, or utilities. If the project is part of a common plan of development or sale, the disturbed area of the entire plan must be used in determining permit requirements. Composite Sample means a mixture of grab samples collected at the same sampling point at different times, formed either by continuous sampling or by mixing discrete samples. May be "time-composite" (collected at constant time intervals) or "flow-proportional" (collected either as a constant sample volume at time intervals proportional to stream flow, or collected by increasing the volume of each aliquot as the flow increases while maintaining a constant time interval between the aliquots. Concrete Wastewater means any water used in the production, pouring and/or clean-up of concrete or concrete products, and any water used to cut, grind, wash, or otherwise modify concrete or concrete products. Examples include water used for or resulting from concrete truck/mixer/pumper/tool/chute rinsing or washing, concrete saw cutting and surfacing (sawing, coring, grinding, roughening, hydro-demolition, bridge and road surfacing). When stormwater comingles with concrete wastewater, the resulting water is considered concrete wastewater and must be managed to prevent discharge to waters of the State, including ground water. Construction Activity means land disturbing operations including clearing, grading or excavation which disturbs the surface of the land. Such activities may include road construction, construction of residential houses, office buildings, or industrial buildings, site preparation, soil compaction, movement and stockpiling of topsoils, and demolition activity. Contaminant means any hazardous substance that does not occur naturally or occurs at greater than natural background levels. See definition of “hazardous substance” and WAC 173-340-200. Contaminated Groundwater means groundwater which contains contaminants, pollutants, or hazardous substances that do not occur naturally or occur at levels greater than natural background. Contaminated Soil means soil which contains contaminants, pollutants, or hazardous substances that do not occur naturally or occur at levels greater than natural background. Demonstrably Equivalent means that the technical basis for the selection of all stormwater BMPs is documented within a SWPPP, including: 1. The method and reasons for choosing the stormwater BMPs selected. Construction Stormwater General Permit Page 49 2. The pollutant removal performance expected from the BMPs selected. 3. The technical basis supporting the performance claims for the BMPs selected, including any available data concerning field performance of the BMPs selected. 4. An assessment of how the selected BMPs will comply with state water quality standards. 5. An assessment of how the selected BMPs will satisfy both applicable federal technology- based treatment requirements and state requirements to use all known, available, and reasonable methods of prevention, control, and treatment (AKART). Department means the Washington State Department of Ecology. Detention means the temporary storage of stormwater to improve quality and/or to reduce the mass flow rate of discharge. Dewatering means the act of pumping ground water or stormwater away from an active construction site. Director means the Director of the Washington State Department of Ecology or his/her authorized representative. Discharger means an owner or operator of any facility or activity subject to regulation under Chapter 90.48 RCW or the Federal Clean Water Act. Domestic Wastewater means water carrying human wastes, including kitchen, bath, and laundry wastes from residences, buildings, industrial establishments, or other places, together with such ground water infiltration or surface waters as may be present. Ecology means the Washington State Department of Ecology. Engineered Soils means the use of soil amendments including, but not limited, to Portland cement treated base (CTB), cement kiln dust (CKD), or fly ash to achieve certain desirable soil characteristics. Equivalent BMPs means operational, source control, treatment, or innovative BMPs which result in equal or better quality of stormwater discharge to surface water or to ground water than BMPs selected from the SWMM. Erosion means the wearing away of the land surface by running water, wind, ice, or other geological agents, including such processes as gravitational creep. Erosion and Sediment Control BMPs means BMPs intended to prevent erosion and sedimentation, such as preserving natural vegetation, seeding, mulching and matting, plastic covering, filter fences, sediment traps, and ponds. Erosion and sediment control BMPs are synonymous with stabilization and structural BMPs. Federal Operator is an entity that meets the definition of “Operator” in this permit and is either any department, agency or instrumentality of the executive, legislative, and judicial branches of Construction Stormwater General Permit Page 50 the Federal government of the United States, or another entity, such as a private contractor, performing construction activity for any such department, agency, or instrumentality. Final Stabilization (same as fully stabilized or full stabilization) means the establishment of a permanent vegetative cover, or equivalent permanent stabilization measures (examples of permanent non-vegetative stabilization methods include, but are not limited to riprap, gabions or geotextiles) which prevents erosion. Ground Water means water in a saturated zone or stratum beneath the land surface or a surface waterbody. Hazardous Substance means any dangerous or extremely hazardous waste as defined in RCW 70.105.010 (5) and (6), or any dangerous or extremely dangerous waste as designated by rule under chapter 70.105 RCW; any hazardous substance as defined in RCW 70.105.010(10) or any hazardous substance as defined by rule under chapter 70.105 RCW; any substance that, on the effective date of this section, is a hazardous substance under section 101(14) of the federal cleanup law, 42 U.S.C., Sec. 9601(14); petroleum or petroleum products; and any substance or category of substances, including solid waste decomposition products, determined by the director by rule to present a threat to human health or the environment if released into the environment . The term hazardous substance does not include any of the following when contained in an underground storage tank from which there is not a release: crude oil or any fraction thereof or petroleum, if the tank is in compliance with all applicable federal, state, and local law. Injection Well means a well that is used for the subsurface emplacement of fluids. (See Well.) Jurisdiction means a political unit such as a city, town or county; incorporated for local self- government. National Pollutant Discharge Elimination System (NPDES) means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring, and enforcing permits, and imposing and enforcing pretreatment requirements, under sections 307, 402, 318, and 405 of the Federal Clean Water Act, for the discharge of pollutants to surface waters of the State from point sources. These permits are referred to as NPDES permits and, in Washington State, are administered by the Washington State Department of Ecology. Notice of Intent (NOI) means the application for, or a request for coverage under this general permit pursuant to WAC 173-226-200. Notice of Termination (NOT) means a request for termination of coverage under this general permit as specified by Special Condition S10 of this permit. Operator means any party associated with a construction project that meets either of the following two criteria:  The party has operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications; or Construction Stormwater General Permit Page 51  The party has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a SWPPP for the site or other permit conditions (e.g., they are authorized to direct workers at a site to carry out activities required by the SWPPP or comply with other permit conditions). Permittee means individual or entity that receives notice of coverage under this general permit. pH means a liquid’s measure of acidity or alkalinity. A pH of 7 is defined as neutral. Large variations above or below this value are considered harmful to most aquatic life. pH Monitoring Period means the time period in which the pH of stormwater runoff from a site must be tested a minimum of once every seven days to determine if stormwater pH is between 6.5 and 8.5. Point Source means any discernible, confined, and discrete conveyance, including but not limited to, any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, and container from which pollutants are or may be discharged to surface waters of the State. This term does not include return flows from irrigated agriculture. (See Fact Sheet for further explanation.) Pollutant means dredged spoil, solid waste, incinerator residue, filter backwash, sewage, garbage, domestic sewage sludge (biosolids), munitions, chemical wastes, biological materials, radioactive materials, heat, wrecked or discarded equipment, rock, sand, cellar dirt, and industrial, municipal, and agricultural waste. This term does not include sewage from vessels within the meaning of section 312 of the CWA, nor does it include dredged or fill material discharged in accordance with a permit issued under section 404 of the CWA. Pollution means contamination or other alteration of the physical, chemical, or biological properties of waters of the State; including change in temperature, taste, color, turbidity, or odor of the waters; or such discharge of any liquid, gaseous, solid, radioactive or other substance into any waters of the State as will or is likely to create a nuisance or render such waters harmful, detrimental or injurious to the public health, safety or welfare; or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses; or to livestock, wild animals, birds, fish or other aquatic life. Process Wastewater means any water which, during manufacturing or processing, comes into direct contact with or results from the production or use of any raw material, intermediate product, finished product, byproduct, or waste product. If stormwater commingles with process wastewater, the commingled water is considered process wastewater. Receiving Water means the waterbody at the point of discharge. If the discharge is to a storm sewer system, either surface or subsurface, the receiving water is the waterbody to which the storm system discharges. Systems designed primarily for other purposes such as for ground water drainage, redirecting stream natural flows, or for conveyance of irrigation water/return flows that coincidentally convey stormwater are considered the receiving water. Construction Stormwater General Permit Page 52 Representative means a stormwater or wastewater sample which represents the flow and characteristics of the discharge. Representative samples may be a grab sample, a time- proportionate composite sample, or a flow proportionate sample. Ecology’s Construction Stormwater Monitoring Manual provides guidance on representative sampling. Responsible Corporate Officer for the purpose of signatory authority means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures (40 CFR 122.22). Sanitary Sewer means a sewer which is designed to convey domestic wastewater. Sediment means the fragmented material that originates from the weathering and erosion of rocks or unconsolidated deposits, and is transported by, suspended in, or deposited by water. Sedimentation means the depositing or formation of sediment. Sensitive Area means a waterbody, wetland, stream, aquifer recharge area, or channel migration zone. SEPA (State Environmental Policy Act) means the Washington State Law, RCW 43.21C.020, intended to prevent or eliminate damage to the environment. Significant Amount means an amount of a pollutant in a discharge that is amenable to available and reasonable methods of prevention or treatment; or an amount of a pollutant that has a reasonable potential to cause a violation of surface or ground water quality or sediment management standards. Significant Concrete Work means greater than 1000 cubic yards poured concrete or recycled concrete used over the life of a project. Significant Contributor of Pollutants means a facility determined by Ecology to be a contributor of a significant amount(s) of a pollutant(s) to waters of the State of Washington. Site means the land or water area where any "facility or activity" is physically located or conducted. Source Control BMPs means physical, structural or mechanical devices or facilities that are intended to prevent pollutants from entering stormwater. A few examples of source control Construction Stormwater General Permit Page 53 BMPs are erosion control practices, maintenance of stormwater facilities, constructing roofs over storage and working areas, and directing wash water and similar discharges to the sanitary sewer or a dead end sump. Stabilization means the application of appropriate BMPs to prevent the erosion of soils, such as, temporary and permanent seeding, vegetative covers, mulching and matting, plastic covering and sodding. See also the definition of Erosion and Sediment Control BMPs. Storm Drain means any drain which drains directly into a storm sewer system, usually found along roadways or in parking lots. Storm Sewer System means a means a conveyance, or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains designed or used for collecting or conveying stormwater. This does not include systems which are part of a combined sewer or Publicly Owned Treatment Works (POTW) as defined at 40 CFR 122.2. Stormwater means that portion of precipitation that does not naturally percolate into the ground or evaporate, but flows via overland flow, interflow, pipes, and other features of a stormwater drainage system into a defined surface waterbody, or a constructed infiltration facility. Stormwater Management Manual (SWMM) or Manual means the technical Manual published by Ecology for use by local governments that contain descriptions of and design criteria for BMPs to prevent, control, or treat pollutants in stormwater. Stormwater Pollution Prevention Plan (SWPPP) means a documented plan to implement measures to identify, prevent, and control the contamination of point source discharges of stormwater. Surface Waters of the State includes lakes, rivers, ponds, streams, inland waters, salt waters, and all other surface waters and water courses within the jurisdiction of the State of Washington. Temporary Stabilization means the exposed ground surface has been covered with appropriate materials to provide temporary stabilization of the surface from water or wind erosion. Materials include, but are not limited to, mulch, riprap, erosion control mats or blankets and temporary cover crops. Seeding alone is not considered stabilization. Temporary stabilization is not a substitute for the more permanent “final stabilization.” Total Maximum Daily Load (TMDL) means a calculation of the maximum amount of a pollutant that a waterbody can receive and still meet state water quality standards. Percentages of the total maximum daily load are allocated to the various pollutant sources. A TMDL is the sum of the allowable loads of a single pollutant from all contributing point and nonpoint sources. The TMDL calculations must include a "margin of safety" to ensure that the waterbody can be protected in case there are unforeseen events or unknown sources of the pollutant. The calculation must also account for seasonable variation in water quality. Construction Stormwater General Permit Page 54 Transfer of Coverage (TOC) means a request for transfer of coverage under this general permit as specified by General Condition G9 of this permit. Treatment BMPs means BMPs that are intended to remove pollutants from stormwater. A few examples of treatment BMPs are detention ponds, oil/water separators, biofiltration, and constructed wetlands. Transparency means a measurement of water clarity in centimeters (cm), using a 60 cm transparency tube. The transparency tube is used to estimate the relative clarity or transparency of water by noting the depth at which a black and white Secchi disc becomes visible when water is released from a value in the bottom of the tube. A transparency tube is sometimes referred to as a “turbidity tube.” Turbidity means the clarity of water expressed as nephelometric turbidity units (NTUs) and measured with a calibrated turbidimeter. Uncontaminated means free from any contaminant. See definition of “contaminant” and WAC 173-340-200. Waste Load Allocation (WLA) means the portion of a receiving water’s loading capacity that is allocated to one of its existing or future point sources of pollution. WLAs constitute a type of water quality based effluent limitation (40 CFR 130.2[h]). Water-only Based Shaft Drilling is a shaft drilling process that uses water only and no additives are involved in the drilling of shafts for construction of building, road, or bridge foundations. Water quality means the chemical, physical, and biological characteristics of water, usually with respect to its suitability for a particular purpose. Waters of the State includes those waters as defined as "waters of the United States" in 40 CFR Subpart 122.2 within the geographic boundaries of Washington State and "waters of the State" as defined in Chapter 90.48 RCW, which include lakes, rivers, ponds, streams, inland waters, underground waters, salt waters, and all other surface waters and water courses within the jurisdiction of the state of Washington. Well means a bored, drilled or driven shaft, or dug hole whose depth is greater than the largest surface dimension. (See Injection well.) Wheel Wash Wastewater means any water used in, or resulting from the operation of, a tire bath or wheel wash (BMP C106: Wheel Wash), or other structure or practice that uses water to physically remove mud and debris from vehicles leaving a construction site and prevent track- out onto roads. When stormwater comingles with wheel wash wastewater, the resulting water is considered wheel wash wastewater and must be managed according to Special Condition S9.D.9. Construction Stormwater General Permit Page 55 APPENDIX B – ACRONYMS AKART All Known, Available, and Reasonable Methods of Prevention, Control, and Treatment BMP Best Management Practice CESCL Certified Erosion and Sediment Control Lead CFR Code of Federal Regulations CKD Cement Kiln Dust cm Centimeters CTB Cement-Treated Base CWA Clean Water Act DMR Discharge Monitoring Report EPA Environmental Protection Agency ERTS Environmental Report Tracking System ESC Erosion and Sediment Control FR Federal Register LID Low Impact Development NOI Notice of Intent NOT Notice of Termination NPDES National Pollutant Discharge Elimination System NTU Nephelometric Turbidity Unit RCW Revised Code of Washington SEPA State Environmental Policy Act SWMM Stormwater Management Manual SWPPP Stormwater Pollution Prevention Plan TMDL Total Maximum Daily Load UIC Underground Injection Control USC United States Code USEPA United States Environmental Protection Agency WAC Washington Administrative Code WQ Water Quality WWHM Western Washington Hydrology Model Page | 38 F. 303(d) List Waterbodies / TMDL Waterbodies Information 1/16/2019 Print Approved Listing https://fortress.wa.gov/ecy/approvedwqa/ApprovedPrintListing.aspx?LISTING_ID=10655 1/2 Listing ID: 10655 Main Listing Information Listing ID:10655 2014 Category:5 Waterbody Name:CEDAR RIVER 2012 Category:5 Medium:Water 2008 Category:5 Parameter:pH 2004 Category:2 WQI Project:None Assigned On 1998 303(d) List?:N Designated Use:None Assigned On 1996 303(d) List?:N Assessment Unit Assessment Unit ID:17110012000024 Location Identification Counties:King Waterbody ID (WBID):None Assigned Town/Range/Section (Legacy):23N-5E-18 WRIA:8 - Cedar-Sammamish Waterbody Class:RA Basis Location ID [KCM-0438], [08C070] -- In 2010, 1 of 24 sample values (4%) showed an excursion of the criteria for this waterbody; Location ID [KCM-0438], [08C070] -- In 2009, 2 of 22 sample values (9%) showed an excursion of the criteria for this waterbody; Location ID [KCM-X438], [08C070] -- In 2008, 1 of 27 sample values (4%) showed an excursion of the criteria for this waterbody; Location ID [KCM-X438], [08C070] -- In 2007, 1 of 24 sample values (4%) showed an excursion of the criteria for this waterbody; Location ID [KCM-X438], [08C070] -- In 2006, 0 of 24 sample values (0%) showed an excursion of the criteria for this waterbody; Location ID [KCM-X438] -- In 2006, 0 of 8 samples (0.0%) showed an excursion of the criteria for this waterbody. Location ID [KCM-X438] -- In 2005, 0 of 14 samples (0.0%) showed an excursion of the criteria for this waterbody. Location ID [08C070] -- In 2005, 1 of 12 samples (8.3%) showed an excursion of the criteria for this waterbody: 1 high pH excursion. Location ID [KCM-X438] -- In 2004, 1 of 13 samples (7.7%) showed an excursion of the criteria for this waterbody: 1 low pH excursion. Location ID [08C070] -- In 2004, 2 of 12 samples (16.7%) showed an excursion of the criteria for this waterbody: 2 high pH excursions. King County unpublished data from station X438 show 0 excursions beyond the criteria out of 80 all samples collected between 1998 and 2002. Hallock (2004), Dept. of Ecology ambient station 08C070 shows that 1 of 31 samples exceed the criterion. Hallock (2001) Dept. of Ecology Ambient Monitoring Station 08C070 (CEDAR RIVER AT LOGAN 1/16/2019 Print Approved Listing https://fortress.wa.gov/ecy/approvedwqa/ApprovedPrintListing.aspx?LISTING_ID=10655 2/2 ST], [RENTON) shows 1 excursions beyond the criterion out of 59 samples collected between 1993 - 2001. Remarks Remark Modified By Modified On Visibility Combined Listing: Listing IDs 50844, 50843, 12630 were rolled into this listing Chad Brown 9/24/2015 Public As a result of merging of stream assessment units in 2014, this record was merged with the record formerly associated with Listing ID 12630. Patrick Lizon 11/19/2014 Public The Category 5 designation is based on data from 2004, 2007, 2008, 2009, and 2010. An assessment unit is assigned a Category 5 designation for pH when at least three values in the dataset being considered do not meet the pH criteria and at least 10% of the values in a given year do not meet the criteria. Patrick Lizon 11/19/2014 Public High pH Excursions Jessica Archer 7/23/2014 Public EIM User Study ID:User Location ID: AMS001 08C070 AMS001-2 08C070 AMS001E 08C070 KCstrm-1 KCM-X438 KCstrm-1 KCM-X438 KCstrm-1 KCM-0438 Print 1/16/2019 Print Approved Listing https://fortress.wa.gov/ecy/approvedwqa/ApprovedPrintListing.aspx?LISTING_ID=4816 1/2 Listing ID: 4816 Main Listing Information Listing ID:4816 2014 Category:5 Waterbody Name:CEDAR RIVER 2012 Category:5 Medium:Water 2008 Category:5 Parameter:Temperature 2004 Category:5 WQI Project:None Assigned On 1998 303(d) List?:N Designated Use:None Assigned On 1996 303(d) List?:N Assessment Unit Assessment Unit ID:17110012000024 Location Identification Counties:King Waterbody ID (WBID):None Assigned Town/Range/Section (Legacy):23N-5E-7 WRIA:8 - Cedar-Sammamish Waterbody Class:RAA Basis Location ID: KCM-0438 -- In 2010, 0 of 3 sample values (0%) showed an excursion of the criteria (16°C) for this waterbody; {Supplemental Spawning Period}: Location ID: KCM-0438 -- In 2010, 0 of 9 sample values (0%) showed an excursion of the criteria (13°C) for this waterbody; Location IDs: KCM-0438 / 08C070 / KCM-X438 -- In 2009, 3 of 13 sample values (23%) showed an excursion of the criteria (16°C) for this waterbody; {Supplemental Spawning Period}: Location ID: KCM-0438 -- In 2009, 1 of 8 sample values (13%) showed an excursion of the criteria (13°C) for this waterbody; Location IDs: KCM-X438 / 08C070 -- In 2008, 2 of 27 sample values (7%) showed an excursion of the criteria (16°C) for this waterbody; Location ID: 08C070 -- In 2008, between 7/8/2008 and 9/30/2008, the 7-day mean of daily maximum values (7DADmax) exceeded the criterion for this waterbody (16°C) on 36 of 85 days (42%); The maximum exceedance during this period was 18.46°C for the 7-day period centered on 8/15/2008 ; Location IDs: KCM-X438 / 08C070 -- In 2007, 1 of 24 sample values (4%) showed an excursion of the criteria (16°C) for this waterbody; Location ID: 08C070 -- In 2007, between 7/23/2007 and 9/19/2007, the 7-day mean of daily maximum values (7DADmax) exceeded the criterion for this waterbody (16°C) on 48 of 59 days (81%); The maximum exceedance during this period was 18.77°C for the 7-day period centered on 8/2/2007 ; Location IDs: KCM-X438 / 08C070 -- In 2006, 1 of 24 sample values (4%) showed an excursion of the criteria (16°C) for this waterbody; Location ID: 08C070 -- In 2006, between 6/19/2006 and 9/15/2006, the 7-day mean of daily maximum values (7DADmax) exceeded the criterion for this waterbody (16°C) on 81 of 89 days (91%); The maximum exceedance during this period was 20.26°C for the 7-day period centered 1/16/2019 Print Approved Listing https://fortress.wa.gov/ecy/approvedwqa/ApprovedPrintListing.aspx?LISTING_ID=4816 2/2 on 7/24/2006 ; Location ID: 08C070 -- In 2005, between 7/18/2005 and 9/19/2005, the 7-day mean of daily maximum values (7DADmax) exceeded the criterion for this waterbody (16°C) on 48 of 64 days (75%); The maximum exceedance during this period was 19.7°C for the 7-day period centered on 8/6/2005 ; Location ID: 08C070 -- In 2004, between 6/21/2004 and 9/30/2004, the 7-day mean of daily maximum values (7DADmax) exceeded the criterion for this waterbody (16°C) on 78 of 102 days (76%); The maximum exceedance during this period was 20.73°C for the 7-day period centered on 7/25/2004 ; King County unpublished data from station X438 (Cedar River RM 0.2) show temperature criterion was exceeded in all years between 1998 and 2002. Dept. of Ecology unpublished data from core ambient monitoring station 08C070 (Cedar R. at Logan St. Bridge) shows a 7-day mean of daily maximum values of 19.1 for mid-week 11 August 2001. Hallock (2001) Dept. of Ecology Ambient Monitoring Station 08C070 (CEDAR RIVER AT LOGAN ST/RENTON) shows 1 excursions beyond the criterion out of 62 samples collected between 1993 - 2001 . Remarks Remark Modified By Modified On Visibility Combined Listing: Listing ID 6573 was rolled into this listing Chad Brown 9/24/2015 Public As a result of merging of two stream reaches into a single assessment unit in 2014, this record was merged with the record formerly associated with the Listing ID 6573. This does not affect the existing Category 5 determination for this assessment unit. Patrick Lizon 10/24/2014 Public The Core Summer Salmonid Habitat temperature criterion (16°C) applies to this assessment unit.Patrick Lizon 10/24/2014 Public Supplemental Spawning Criterion (13°C) applies from Sept. 15 through June 15.Patrick Lizon 10/24/2014 Public Data for 2005 and 2007 does not cover the core critical season for temperature. Maximum temperatures may be higher than observed data; Nicholas Groebner 4/24/2014 Public EIM User Study ID:User Location ID: AMS001E 08C070 AMS004 08C070 AMSXXX 08C070 KCstrm-1 KCM-0438 KCstrm-1 KCM-X438 Print 1/16/2019 Print Approved Listing https://fortress.wa.gov/ecy/approvedwqa/ApprovedPrintListing.aspx?LISTING_ID=10654 1/2 Listing ID: 10654 Main Listing Information Listing ID:10654 2014 Category:5 Waterbody Name:CEDAR RIVER 2012 Category:3 Medium:Water 2008 Category:3 Parameter:Dissolved Oxygen 2004 Category:1 WQI Project:None Assigned On 1998 303(d) List?:N Designated Use:None Assigned On 1996 303(d) List?:N Assessment Unit Assessment Unit ID:17110012000024 Location Identification Counties:King Waterbody ID (WBID):None Assigned Town/Range/Section (Legacy):23N-5E-18 WRIA:8 - Cedar-Sammamish Waterbody Class:RA Basis Location ID: [KCM-0438] -- In 2010, 0 of 12 sample values (0%) showed an excursion of the criterion (9.5 mg/L) for this waterbody; Location IDs: [KCM-0438] [08C070] [KCM-X438] -- In 2009, 0 of 20 sample values (0%) showed an excursion of the criterion (9.5 mg/L) for this waterbody; Location IDs: [KCM-X438] [08C070] -- In 2008, 1 of 24 sample values (4%) showed an excursion of the criterion (9.5 mg/L) for this waterbody; Location IDs: [KCM-X438] [08C070] -- In 2007, 1 of 24 sample values (4%) showed an excursion of the criterion (9.5 mg/L) for this waterbody; Location IDs: [KCM-X438] [08C070] -- In 2006, 0 of 24 sample values (0%) showed an excursion of the criterion (9.5 mg/L) for this waterbody; Location ID [08C070] -- In 2005, 12 samples showed no excursions of the criterion for this waterbody, (criterion = 8.0 mg/L). Location ID [KCM-X438] -- In 2005, 4 of 13 sample values (30.8%) showed an excursion of the criterion for this waterbody, (criterion = 9.5 mg/L). Location ID [08C070] -- In 2004, 12 samples showed no excursions of the criterion for this waterbody, (criterion = 8.0 mg/L). Location ID [KCM-X438] -- In 2004, 3 of 13 sample values (23.1%) showed an excursion of the criterion for this waterbody, (criterion = 9.5 mg/L). Hallock (2001) Dept. of Ecology Ambient Monitoring Station 08C070 (CEDAR RIVER AT LOGAN ST/RENTON) shows 0 excursions beyond the criterion out of 60 samples collected between 1993 - 2001 King County unpublished data from station X438 (Cedar River RM 0.2) show excursions beyond the dissolved oxygen criterion in 2000 and 2001 Remarks Remark Modified By Modified On Visibility 1/16/2019 Print Approved Listing https://fortress.wa.gov/ecy/approvedwqa/ApprovedPrintListing.aspx?LISTING_ID=10654 2/2 Combined Listing: Listing IDs 47560, 47561, 12673 were rolled into this listing Chad Brown 9/24/2015 Public Category 5 based on ten percent or more of the samples collected in a single year were excursions of the criterion, and at least 3 excursions exist from all data considered. Nicholas Groebner 12/18/2014 Public Data from earlier years was compared to a different criteria because the assigned designated use for the waterbody segment was either incorrectly identified or updated in the 2006 standards revisions. Assessment against the current criteria does not change the impairment status of this waterbody. Nicholas Groebner 12/18/2014 Public Historical Remarks: (public) This listing changed from Category 3 to Category 5 due to the inclusion of data from Listing ID 12673 during the conversion to NHD. Nicholas Groebner 12/18/2014 Public Ten percent or more of the samples collected in a single year were excursions of the criterion, and at least 3 excursions exist from all data considered. Jessica Archer 10/3/2014 Public Historic Remarks: This listing changed from Category 3 to Category 5 due to the inclusion of data from Listing ID 12673 during the conversion to NHD. Jessica Archer 10/3/2014 Public Data from earlier years was compared to a different criteria because the assigned designated use for the waterbody segment was either incorrectly identified or updated in the 2006 standards revisions. Assessment against the current criteria does not change the impairment status of this waterbody. Jessica Archer 10/3/2014 Public EIM User Study ID:User Location ID: AMS001 08C070 AMS001E 08C070 KCstrm-1 KCM-X438 Page | 39 G. Contaminated Site Information Page | 40 H. Engineering Calculations Sediment Pond Sizing Summary The sediment pond was sized using the requirements stated in Appendix D of the 2017 City of Renton Surface Water Design Manual Section D.2.1.5.2 which requires 2,080 sf of surface area per cfs of inflow which was calculated using WWHM2012 (15 min timesteps) to analyze the developed site conditions. Catchment Area: 4.65 ac. 10-year Peak Flow Rate: 2.1585 cfs Required Surface Area: 4,490 sf Provided Surface Area: 8,848 sf (Vault S.A.) 2020 D. R. STRONG Consulting Engineers Inc. Page 75 MAPLE HIGHLANDS Technical Information Report Renton, Washington APPENDIX “D” WWHM REPORT WWHM2012 PROJECT REPORT Maple Highlands 2/14/2020 8:19:19 AM Page 2 General Model Information Project Name:Maple Highlands Site Name:Maple Highlands Site Address: City:RENTON Report Date:2/14/2020 Gage:Seatac Data Start:1948/10/01 Data End:2009/09/30 Timestep:15 Minute Precip Scale:1.167 Version Date:2018/10/10 Version:4.2.16 POC Thresholds Low Flow Threshold for POC1:50 Percent of the 2 Year High Flow Threshold for POC1:50 Year Maple Highlands 2/14/2020 8:19:19 AM Page 3 Landuse Basin Data Predeveloped Land Use PREDEV Bypass:No GroundWater:No Pervious Land Use acre C, Forest, Mod 3.28 C, Forest, Steep 1.796 Pervious Total 5.076 Impervious Land Use acre Impervious Total 0 Basin Total 5.076 Element Flows To: Surface Interflow Groundwater Maple Highlands 2/14/2020 8:19:19 AM Page 4 Mitigated Land Use RDIN Bypass:No GroundWater:No Pervious Land Use acre C, Lawn, Flat 2.392 C, Forest, Steep 0.39 Pervious Total 2.782 Impervious Land Use acre ROADS MOD 0.739 ROOF TOPS FLAT 0.895 DRIVEWAYS FLAT 0.225 SIDEWALKS MOD 0.398 Impervious Total 2.257 Basin Total 5.039 Element Flows To: Surface Interflow Groundwater Vault 1 Vault 1 Maple Highlands 2/14/2020 8:19:19 AM Page 5 BYPASS Bypass:Yes GroundWater:No Pervious Land Use acre C, Lawn, Flat 0.011 Pervious Total 0.011 Impervious Land Use acre ROADS FLAT 0.025 Impervious Total 0.025 Basin Total 0.036 Element Flows To: Surface Interflow Groundwater Maple Highlands 2/14/2020 8:19:19 AM Page 6 Routing Elements Predeveloped Routing Maple Highlands 2/14/2020 8:19:19 AM Page 7 Mitigated Routing Vault 1 Width:73 ft. Length:120 ft. Depth:7 ft. Discharge Structure Riser Height:6 ft. Riser Diameter:12 in. Orifice 1 Diameter:1.6 in.Elevation:0 ft. Orifice 2 Diameter:2 in.Elevation:3.35 ft. Orifice 3 Diameter:1.75 in.Elevation:4.75 ft. Element Flows To: Outlet 1 Outlet 2 Vault Hydraulic Table Stage(feet)Area(ac.)Volume(ac-ft.)Discharge(cfs)Infilt(cfs) 0.0000 0.201 0.000 0.000 0.000 0.0778 0.201 0.015 0.019 0.000 0.1556 0.201 0.031 0.027 0.000 0.2333 0.201 0.046 0.033 0.000 0.3111 0.201 0.062 0.038 0.000 0.3889 0.201 0.078 0.043 0.000 0.4667 0.201 0.093 0.047 0.000 0.5444 0.201 0.109 0.051 0.000 0.6222 0.201 0.125 0.054 0.000 0.7000 0.201 0.140 0.058 0.000 0.7778 0.201 0.156 0.061 0.000 0.8556 0.201 0.172 0.064 0.000 0.9333 0.201 0.187 0.067 0.000 1.0111 0.201 0.203 0.069 0.000 1.0889 0.201 0.219 0.072 0.000 1.1667 0.201 0.234 0.075 0.000 1.2444 0.201 0.250 0.077 0.000 1.3222 0.201 0.265 0.079 0.000 1.4000 0.201 0.281 0.082 0.000 1.4778 0.201 0.297 0.084 0.000 1.5556 0.201 0.312 0.086 0.000 1.6333 0.201 0.328 0.088 0.000 1.7111 0.201 0.344 0.090 0.000 1.7889 0.201 0.359 0.092 0.000 1.8667 0.201 0.375 0.094 0.000 1.9444 0.201 0.391 0.096 0.000 2.0222 0.201 0.406 0.098 0.000 2.1000 0.201 0.422 0.100 0.000 2.1778 0.201 0.438 0.102 0.000 2.2556 0.201 0.453 0.104 0.000 2.3333 0.201 0.469 0.106 0.000 2.4111 0.201 0.484 0.107 0.000 2.4889 0.201 0.500 0.109 0.000 2.5667 0.201 0.516 0.111 0.000 2.6444 0.201 0.531 0.113 0.000 2.7222 0.201 0.547 0.114 0.000 2.8000 0.201 0.563 0.116 0.000 2.8778 0.201 0.578 0.117 0.000 Maple Highlands 2/14/2020 8:19:19 AM Page 8 2.9556 0.201 0.594 0.119 0.000 3.0333 0.201 0.610 0.121 0.000 3.1111 0.201 0.625 0.122 0.000 3.1889 0.201 0.641 0.124 0.000 3.2667 0.201 0.656 0.125 0.000 3.3444 0.201 0.672 0.127 0.000 3.4222 0.201 0.688 0.157 0.000 3.5000 0.201 0.703 0.172 0.000 3.5778 0.201 0.719 0.183 0.000 3.6556 0.201 0.735 0.192 0.000 3.7333 0.201 0.750 0.201 0.000 3.8111 0.201 0.766 0.209 0.000 3.8889 0.201 0.782 0.216 0.000 3.9667 0.201 0.797 0.223 0.000 4.0444 0.201 0.813 0.230 0.000 4.1222 0.201 0.829 0.236 0.000 4.2000 0.201 0.844 0.242 0.000 4.2778 0.201 0.860 0.248 0.000 4.3556 0.201 0.875 0.253 0.000 4.4333 0.201 0.891 0.259 0.000 4.5111 0.201 0.907 0.264 0.000 4.5889 0.201 0.922 0.269 0.000 4.6667 0.201 0.938 0.274 0.000 4.7444 0.201 0.954 0.279 0.000 4.8222 0.201 0.969 0.306 0.000 4.9000 0.201 0.985 0.321 0.000 4.9778 0.201 1.001 0.333 0.000 5.0556 0.201 1.016 0.343 0.000 5.1333 0.201 1.032 0.353 0.000 5.2111 0.201 1.048 0.363 0.000 5.2889 0.201 1.063 0.371 0.000 5.3667 0.201 1.079 0.380 0.000 5.4444 0.201 1.094 0.388 0.000 5.5222 0.201 1.110 0.396 0.000 5.6000 0.201 1.126 0.403 0.000 5.6778 0.201 1.141 0.411 0.000 5.7556 0.201 1.157 0.418 0.000 5.8333 0.201 1.173 0.425 0.000 5.9111 0.201 1.188 0.432 0.000 5.9889 0.201 1.204 0.438 0.000 6.0667 0.201 1.220 0.627 0.000 6.1444 0.201 1.235 1.024 0.000 6.2222 0.201 1.251 1.504 0.000 6.3000 0.201 1.266 1.973 0.000 6.3778 0.201 1.282 2.349 0.000 6.4556 0.201 1.298 2.590 0.000 6.5333 0.201 1.313 2.782 0.000 6.6111 0.201 1.329 2.950 0.000 6.6889 0.201 1.345 3.107 0.000 6.7667 0.201 1.360 3.257 0.000 6.8444 0.201 1.376 3.399 0.000 6.9222 0.201 1.392 3.535 0.000 7.0000 0.201 1.407 3.665 0.000 7.0778 0.201 1.423 3.791 0.000 7.1556 0.000 0.000 3.912 0.000 Maple Highlands 2/14/2020 8:19:19 AM Page 9 Analysis Results POC 1 + Predeveloped x Mitigated Predeveloped Landuse Totals for POC #1 Total Pervious Area:5.076 Total Impervious Area:0 Mitigated Landuse Totals for POC #1 Total Pervious Area:2.793 Total Impervious Area:2.282 Flow Frequency Method:Log Pearson Type III 17B Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.245585 5 year 0.4092 10 year 0.534367 25 year 0.710296 50 year 0.853657 100 year 1.007169 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.147899 5 year 0.234887 10 year 0.308373 25 year 0.422181 50 year 0.524126 100 year 0.64253 Annual Peaks Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1949 0.340 0.104 1950 0.371 0.179 1951 0.458 0.390 1952 0.163 0.091 1953 0.133 0.109 1954 0.182 0.123 1955 0.311 0.126 1956 0.263 0.216 1957 0.249 0.121 1958 0.223 0.126 Maple Highlands 2/14/2020 8:19:51 AM Page 10 1959 0.185 0.108 1960 0.377 0.336 1961 0.183 0.127 1962 0.128 0.086 1963 0.179 0.121 1964 0.242 0.113 1965 0.189 0.168 1966 0.147 0.110 1967 0.419 0.126 1968 0.218 0.111 1969 0.215 0.105 1970 0.180 0.108 1971 0.223 0.148 1972 0.366 0.245 1973 0.174 0.127 1974 0.221 0.129 1975 0.303 0.120 1976 0.212 0.126 1977 0.098 0.092 1978 0.181 0.126 1979 0.101 0.087 1980 0.630 0.262 1981 0.147 0.112 1982 0.399 0.272 1983 0.253 0.127 1984 0.161 0.102 1985 0.093 0.105 1986 0.392 0.236 1987 0.365 0.274 1988 0.155 0.102 1989 0.094 0.099 1990 1.076 0.379 1991 0.521 0.342 1992 0.204 0.126 1993 0.181 0.104 1994 0.075 0.084 1995 0.231 0.165 1996 0.597 0.394 1997 0.453 0.350 1998 0.183 0.108 1999 0.646 0.255 2000 0.178 0.128 2001 0.048 0.085 2002 0.261 0.244 2003 0.390 0.107 2004 0.431 0.408 2005 0.280 0.140 2006 0.264 0.126 2007 0.818 0.734 2008 0.862 0.440 2009 0.372 0.235 Ranked Annual Peaks Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 1.0761 0.7343 2 0.8623 0.4403 3 0.8177 0.4076 Maple Highlands 2/14/2020 8:19:51 AM Page 11 4 0.6460 0.3936 5 0.6295 0.3904 6 0.5971 0.3786 7 0.5211 0.3498 8 0.4581 0.3417 9 0.4533 0.3361 10 0.4311 0.2744 11 0.4195 0.2720 12 0.3994 0.2623 13 0.3921 0.2549 14 0.3897 0.2453 15 0.3770 0.2445 16 0.3724 0.2359 17 0.3709 0.2352 18 0.3662 0.2162 19 0.3647 0.1787 20 0.3400 0.1678 21 0.3114 0.1648 22 0.3025 0.1476 23 0.2802 0.1402 24 0.2641 0.1289 25 0.2629 0.1280 26 0.2611 0.1271 27 0.2527 0.1269 28 0.2488 0.1268 29 0.2421 0.1264 30 0.2314 0.1263 31 0.2234 0.1262 32 0.2228 0.1260 33 0.2206 0.1260 34 0.2176 0.1257 35 0.2153 0.1256 36 0.2117 0.1227 37 0.2041 0.1211 38 0.1887 0.1211 39 0.1846 0.1204 40 0.1832 0.1129 41 0.1825 0.1121 42 0.1820 0.1110 43 0.1812 0.1103 44 0.1810 0.1091 45 0.1796 0.1083 46 0.1787 0.1082 47 0.1779 0.1079 48 0.1743 0.1074 49 0.1632 0.1050 50 0.1606 0.1048 51 0.1552 0.1044 52 0.1472 0.1040 53 0.1472 0.1024 54 0.1327 0.1020 55 0.1282 0.0990 56 0.1009 0.0921 57 0.0980 0.0912 58 0.0940 0.0870 59 0.0932 0.0857 60 0.0752 0.0849 61 0.0481 0.0842 Maple Highlands 2/14/2020 8:19:52 AM Page 12 Maple Highlands 2/14/2020 8:19:52 AM Page 13 Duration Flows The Facility PASSED Flow(cfs)Predev Mit Percentage Pass/Fail 0.1228 13349 10076 75 Pass 0.1302 11533 5585 48 Pass 0.1376 10119 5294 52 Pass 0.1449 8947 5101 57 Pass 0.1523 7756 4932 63 Pass 0.1597 6904 4765 69 Pass 0.1671 6083 4490 73 Pass 0.1745 5458 4280 78 Pass 0.1819 4911 4045 82 Pass 0.1892 4357 3790 86 Pass 0.1966 3940 3523 89 Pass 0.2040 3561 3221 90 Pass 0.2114 3236 2982 92 Pass 0.2188 2962 2733 92 Pass 0.2261 2652 2464 92 Pass 0.2335 2389 2186 91 Pass 0.2409 2118 1926 90 Pass 0.2483 1878 1659 88 Pass 0.2557 1685 1467 87 Pass 0.2631 1498 1235 82 Pass 0.2704 1357 1048 77 Pass 0.2778 1239 862 69 Pass 0.2852 1098 738 67 Pass 0.2926 1017 708 69 Pass 0.3000 949 680 71 Pass 0.3074 869 642 73 Pass 0.3147 811 595 73 Pass 0.3221 751 550 73 Pass 0.3295 677 510 75 Pass 0.3369 623 468 75 Pass 0.3443 567 420 74 Pass 0.3516 503 376 74 Pass 0.3590 443 342 77 Pass 0.3664 388 308 79 Pass 0.3738 339 269 79 Pass 0.3812 277 220 79 Pass 0.3886 235 187 79 Pass 0.3959 196 146 74 Pass 0.4033 164 105 64 Pass 0.4107 141 81 57 Pass 0.4181 115 71 61 Pass 0.4255 98 61 62 Pass 0.4329 88 45 51 Pass 0.4402 72 21 29 Pass 0.4476 64 16 25 Pass 0.4550 56 15 26 Pass 0.4624 52 14 26 Pass 0.4698 49 14 28 Pass 0.4772 47 14 29 Pass 0.4845 43 13 30 Pass 0.4919 39 13 33 Pass 0.4993 36 12 33 Pass 0.5067 34 10 29 Pass Maple Highlands 2/14/2020 8:19:52 AM Page 14 0.5141 28 9 32 Pass 0.5214 24 9 37 Pass 0.5288 19 9 47 Pass 0.5362 16 8 50 Pass 0.5436 15 8 53 Pass 0.5510 10 8 80 Pass 0.5584 10 8 80 Pass 0.5657 9 7 77 Pass 0.5731 9 7 77 Pass 0.5805 9 7 77 Pass 0.5879 9 7 77 Pass 0.5953 9 6 66 Pass 0.6027 8 5 62 Pass 0.6100 8 5 62 Pass 0.6174 8 5 62 Pass 0.6248 8 5 62 Pass 0.6322 7 5 71 Pass 0.6396 7 4 57 Pass 0.6469 6 4 66 Pass 0.6543 6 4 66 Pass 0.6617 6 3 50 Pass 0.6691 5 3 60 Pass 0.6765 5 3 60 Pass 0.6839 5 3 60 Pass 0.6912 5 2 40 Pass 0.6986 5 2 40 Pass 0.7060 5 2 40 Pass 0.7134 5 2 40 Pass 0.7208 5 2 40 Pass 0.7282 5 2 40 Pass 0.7355 5 0 0 Pass 0.7429 4 0 0 Pass 0.7503 4 0 0 Pass 0.7577 4 0 0 Pass 0.7651 4 0 0 Pass 0.7724 4 0 0 Pass 0.7798 4 0 0 Pass 0.7872 4 0 0 Pass 0.7946 4 0 0 Pass 0.8020 4 0 0 Pass 0.8094 4 0 0 Pass 0.8167 4 0 0 Pass 0.8241 3 0 0 Pass 0.8315 3 0 0 Pass 0.8389 3 0 0 Pass 0.8463 3 0 0 Pass 0.8537 2 0 0 Pass Maple Highlands 2/14/2020 8:19:52 AM Page 15 Water Quality Water Quality BMP Flow and Volume for POC #1 On-line facility volume:0.4345 acre-feet On-line facility target flow:0.4529 cfs. Adjusted for 15 min:0.4529 cfs. Off-line facility target flow:0.2498 cfs. Adjusted for 15 min:0.2498 cfs. Maple Highlands 2/14/2020 8:19:52 AM Page 16 LID Report Maple Highlands 2/14/2020 8:20:15 AM Page 17 Model Default Modifications Total of 0 changes have been made. PERLND Changes No PERLND changes have been made. IMPLND Changes No IMPLND changes have been made. Maple Highlands 2/14/2020 8:20:15 AM Page 18 Appendix Predeveloped Schematic Maple Highlands 2/14/2020 8:20:16 AM Page 19 Mitigated Schematic Maple Highlands 2/14/2020 8:20:18 AM Page 20 Predeveloped UCI File RUN GLOBAL WWHM4 model simulation START 1948 10 01 END 2009 09 30 RUN INTERP OUTPUT LEVEL 3 0 RESUME 0 RUN 1 UNIT SYSTEM 1 END GLOBAL FILES <File> <Un#> <-----------File Name------------------------------>*** <-ID-> *** WDM 26 Maple Highlands.wdm MESSU 25 PreMaple Highlands.MES 27 PreMaple Highlands.L61 28 PreMaple Highlands.L62 30 POCMaple Highlands1.dat END FILES OPN SEQUENCE INGRP INDELT 00:15 PERLND 11 PERLND 12 COPY 501 DISPLY 1 END INGRP END OPN SEQUENCE DISPLY DISPLY-INFO1 # - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND 1 PREDEV MAX 1 2 30 9 END DISPLY-INFO1 END DISPLY COPY TIMESERIES # - # NPT NMN *** 1 1 1 501 1 1 END TIMESERIES END COPY GENER OPCODE # # OPCD *** END OPCODE PARM # # K *** END PARM END GENER PERLND GEN-INFO <PLS ><-------Name------->NBLKS Unit-systems Printer *** # - # User t-series Engl Metr *** in out *** 11 C, Forest, Mod 1 1 1 1 27 0 12 C, Forest, Steep 1 1 1 1 27 0 END GEN-INFO *** Section PWATER*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *** 11 0 0 1 0 0 0 0 0 0 0 0 0 12 0 0 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT-INFO <PLS > ***************** Print-flags ***************************** PIVL PYR # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ********* Maple Highlands 2/14/2020 8:20:18 AM Page 21 11 0 0 4 0 0 0 0 0 0 0 0 0 1 9 12 0 0 4 0 0 0 0 0 0 0 0 0 1 9 END PRINT-INFO PWAT-PARM1 <PLS > PWATER variable monthly parameter value flags *** # - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT *** 11 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 0 0 0 0 0 END PWAT-PARM1 PWAT-PARM2 <PLS > PWATER input info: Part 2 *** # - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC 11 0 4.5 0.08 400 0.1 0.5 0.996 12 0 4.5 0.08 400 0.15 0.5 0.996 END PWAT-PARM2 PWAT-PARM3 <PLS > PWATER input info: Part 3 *** # - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP 11 0 0 2 2 0 0 0 12 0 0 2 2 0 0 0 END PWAT-PARM3 PWAT-PARM4 <PLS > PWATER input info: Part 4 *** # - # CEPSC UZSN NSUR INTFW IRC LZETP *** 11 0.2 0.5 0.35 6 0.5 0.7 12 0.2 0.3 0.35 6 0.3 0.7 END PWAT-PARM4 PWAT-STATE1 <PLS > *** Initial conditions at start of simulation ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 *** # - # *** CEPS SURS UZS IFWS LZS AGWS GWVS 11 0 0 0 0 2.5 1 0 12 0 0 0 0 2.5 1 0 END PWAT-STATE1 END PERLND IMPLND GEN-INFO <PLS ><-------Name-------> Unit-systems Printer *** # - # User t-series Engl Metr *** in out *** END GEN-INFO *** Section IWATER*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # ATMP SNOW IWAT SLD IWG IQAL *** END ACTIVITY PRINT-INFO <ILS > ******** Print-flags ******** PIVL PYR # - # ATMP SNOW IWAT SLD IWG IQAL ********* END PRINT-INFO IWAT-PARM1 <PLS > IWATER variable monthly parameter value flags *** # - # CSNO RTOP VRS VNN RTLI *** END IWAT-PARM1 IWAT-PARM2 <PLS > IWATER input info: Part 2 *** # - # *** LSUR SLSUR NSUR RETSC END IWAT-PARM2 IWAT-PARM3 Maple Highlands 2/14/2020 8:20:18 AM Page 22 <PLS > IWATER input info: Part 3 *** # - # ***PETMAX PETMIN END IWAT-PARM3 IWAT-STATE1 <PLS > *** Initial conditions at start of simulation # - # *** RETS SURS END IWAT-STATE1 END IMPLND SCHEMATIC <-Source-> <--Area--> <-Target-> MBLK *** <Name> # <-factor-> <Name> # Tbl# *** PREDEV*** PERLND 11 3.28 COPY 501 12 PERLND 11 3.28 COPY 501 13 PERLND 12 1.796 COPY 501 12 PERLND 12 1.796 COPY 501 13 ******Routing****** END SCHEMATIC NETWORK <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # *** COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1 <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # *** END NETWORK RCHRES GEN-INFO RCHRES Name Nexits Unit Systems Printer *** # - #<------------------><---> User T-series Engl Metr LKFG *** in out *** END GEN-INFO *** Section RCHRES*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG *** END ACTIVITY PRINT-INFO <PLS > ***************** Print-flags ******************* PIVL PYR # - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR ********* END PRINT-INFO HYDR-PARM1 RCHRES Flags for each HYDR Section *** # - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each FG FG FG FG possible exit *** possible exit possible exit * * * * * * * * * * * * * * *** END HYDR-PARM1 HYDR-PARM2 # - # FTABNO LEN DELTH STCOR KS DB50 *** <------><--------><--------><--------><--------><--------><--------> *** END HYDR-PARM2 HYDR-INIT RCHRES Initial conditions for each HYDR section *** # - # *** VOL Initial value of COLIND Initial value of OUTDGT *** ac-ft for each possible exit for each possible exit <------><--------> <---><---><---><---><---> *** <---><---><---><---><---> END HYDR-INIT END RCHRES Maple Highlands 2/14/2020 8:20:18 AM Page 23 SPEC-ACTIONS END SPEC-ACTIONS FTABLES END FTABLES EXT SOURCES <-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # *** WDM 2 PREC ENGL 1.167 PERLND 1 999 EXTNL PREC WDM 2 PREC ENGL 1.167 IMPLND 1 999 EXTNL PREC WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP END EXT SOURCES EXT TARGETS <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd *** <Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg*** COPY 501 OUTPUT MEAN 1 1 48.4 WDM 501 FLOW ENGL REPL END EXT TARGETS MASS-LINK <Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->*** <Name> <Name> # #<-factor-> <Name> <Name> # #*** MASS-LINK 12 PERLND PWATER SURO 0.083333 COPY INPUT MEAN END MASS-LINK 12 MASS-LINK 13 PERLND PWATER IFWO 0.083333 COPY INPUT MEAN END MASS-LINK 13 END MASS-LINK END RUN Maple Highlands 2/14/2020 8:20:18 AM Page 24 Mitigated UCI File RUN GLOBAL WWHM4 model simulation START 1948 10 01 END 2009 09 30 RUN INTERP OUTPUT LEVEL 3 0 RESUME 0 RUN 1 UNIT SYSTEM 1 END GLOBAL FILES <File> <Un#> <-----------File Name------------------------------>*** <-ID-> *** WDM 26 Maple Highlands.wdm MESSU 25 MitMaple Highlands.MES 27 MitMaple Highlands.L61 28 MitMaple Highlands.L62 30 POCMaple Highlands1.dat END FILES OPN SEQUENCE INGRP INDELT 00:15 PERLND 16 PERLND 12 IMPLND 2 IMPLND 4 IMPLND 5 IMPLND 9 IMPLND 1 RCHRES 1 COPY 1 COPY 501 COPY 601 DISPLY 1 END INGRP END OPN SEQUENCE DISPLY DISPLY-INFO1 # - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND 1 Vault 1 MAX 1 2 30 9 END DISPLY-INFO1 END DISPLY COPY TIMESERIES # - # NPT NMN *** 1 1 1 501 1 1 601 1 1 END TIMESERIES END COPY GENER OPCODE # # OPCD *** END OPCODE PARM # # K *** END PARM END GENER PERLND GEN-INFO <PLS ><-------Name------->NBLKS Unit-systems Printer *** # - # User t-series Engl Metr *** in out *** 16 C, Lawn, Flat 1 1 1 1 27 0 12 C, Forest, Steep 1 1 1 1 27 0 END GEN-INFO *** Section PWATER*** ACTIVITY Maple Highlands 2/14/2020 8:20:18 AM Page 25 <PLS > ************* Active Sections ***************************** # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *** 16 0 0 1 0 0 0 0 0 0 0 0 0 12 0 0 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT-INFO <PLS > ***************** Print-flags ***************************** PIVL PYR # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ********* 16 0 0 4 0 0 0 0 0 0 0 0 0 1 9 12 0 0 4 0 0 0 0 0 0 0 0 0 1 9 END PRINT-INFO PWAT-PARM1 <PLS > PWATER variable monthly parameter value flags *** # - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT *** 16 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 0 0 0 0 0 END PWAT-PARM1 PWAT-PARM2 <PLS > PWATER input info: Part 2 *** # - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC 16 0 4.5 0.03 400 0.05 0.5 0.996 12 0 4.5 0.08 400 0.15 0.5 0.996 END PWAT-PARM2 PWAT-PARM3 <PLS > PWATER input info: Part 3 *** # - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP 16 0 0 2 2 0 0 0 12 0 0 2 2 0 0 0 END PWAT-PARM3 PWAT-PARM4 <PLS > PWATER input info: Part 4 *** # - # CEPSC UZSN NSUR INTFW IRC LZETP *** 16 0.1 0.25 0.25 6 0.5 0.25 12 0.2 0.3 0.35 6 0.3 0.7 END PWAT-PARM4 PWAT-STATE1 <PLS > *** Initial conditions at start of simulation ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 *** # - # *** CEPS SURS UZS IFWS LZS AGWS GWVS 16 0 0 0 0 2.5 1 0 12 0 0 0 0 2.5 1 0 END PWAT-STATE1 END PERLND IMPLND GEN-INFO <PLS ><-------Name-------> Unit-systems Printer *** # - # User t-series Engl Metr *** in out *** 2 ROADS/MOD 1 1 1 27 0 4 ROOF TOPS/FLAT 1 1 1 27 0 5 DRIVEWAYS/FLAT 1 1 1 27 0 9 SIDEWALKS/MOD 1 1 1 27 0 1 ROADS/FLAT 1 1 1 27 0 END GEN-INFO *** Section IWATER*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # ATMP SNOW IWAT SLD IWG IQAL *** 2 0 0 1 0 0 0 4 0 0 1 0 0 0 5 0 0 1 0 0 0 9 0 0 1 0 0 0 Maple Highlands 2/14/2020 8:20:18 AM Page 26 1 0 0 1 0 0 0 END ACTIVITY PRINT-INFO <ILS > ******** Print-flags ******** PIVL PYR # - # ATMP SNOW IWAT SLD IWG IQAL ********* 2 0 0 4 0 0 0 1 9 4 0 0 4 0 0 0 1 9 5 0 0 4 0 0 0 1 9 9 0 0 4 0 0 0 1 9 1 0 0 4 0 0 0 1 9 END PRINT-INFO IWAT-PARM1 <PLS > IWATER variable monthly parameter value flags *** # - # CSNO RTOP VRS VNN RTLI *** 2 0 0 0 0 0 4 0 0 0 0 0 5 0 0 0 0 0 9 0 0 0 0 0 1 0 0 0 0 0 END IWAT-PARM1 IWAT-PARM2 <PLS > IWATER input info: Part 2 *** # - # *** LSUR SLSUR NSUR RETSC 2 400 0.05 0.1 0.08 4 400 0.01 0.1 0.1 5 400 0.01 0.1 0.1 9 400 0.05 0.1 0.08 1 400 0.01 0.1 0.1 END IWAT-PARM2 IWAT-PARM3 <PLS > IWATER input info: Part 3 *** # - # ***PETMAX PETMIN 2 0 0 4 0 0 5 0 0 9 0 0 1 0 0 END IWAT-PARM3 IWAT-STATE1 <PLS > *** Initial conditions at start of simulation # - # *** RETS SURS 2 0 0 4 0 0 5 0 0 9 0 0 1 0 0 END IWAT-STATE1 END IMPLND SCHEMATIC <-Source-> <--Area--> <-Target-> MBLK *** <Name> # <-factor-> <Name> # Tbl# *** RDIN*** PERLND 16 2.392 RCHRES 1 2 PERLND 16 2.392 RCHRES 1 3 PERLND 12 0.39 RCHRES 1 2 PERLND 12 0.39 RCHRES 1 3 IMPLND 2 0.739 RCHRES 1 5 IMPLND 4 0.895 RCHRES 1 5 IMPLND 5 0.225 RCHRES 1 5 IMPLND 9 0.398 RCHRES 1 5 BYPASS*** PERLND 16 0.011 COPY 501 12 PERLND 16 0.011 COPY 601 12 Maple Highlands 2/14/2020 8:20:18 AM Page 27 PERLND 16 0.011 COPY 501 13 PERLND 16 0.011 COPY 601 13 IMPLND 1 0.025 COPY 501 15 IMPLND 1 0.025 COPY 601 15 ******Routing****** PERLND 16 2.392 COPY 1 12 PERLND 12 0.39 COPY 1 12 IMPLND 2 0.739 COPY 1 15 IMPLND 4 0.895 COPY 1 15 IMPLND 5 0.225 COPY 1 15 IMPLND 9 0.398 COPY 1 15 PERLND 16 2.392 COPY 1 13 PERLND 12 0.39 COPY 1 13 RCHRES 1 1 COPY 501 16 END SCHEMATIC NETWORK <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # *** COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1 <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # *** END NETWORK RCHRES GEN-INFO RCHRES Name Nexits Unit Systems Printer *** # - #<------------------><---> User T-series Engl Metr LKFG *** in out *** 1 Vault 1 1 1 1 1 28 0 1 END GEN-INFO *** Section RCHRES*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG *** 1 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT-INFO <PLS > ***************** Print-flags ******************* PIVL PYR # - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR ********* 1 4 0 0 0 0 0 0 0 0 0 1 9 END PRINT-INFO HYDR-PARM1 RCHRES Flags for each HYDR Section *** # - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each FG FG FG FG possible exit *** possible exit possible exit * * * * * * * * * * * * * * *** 1 0 1 0 0 4 0 0 0 0 0 0 0 0 0 2 2 2 2 2 END HYDR-PARM1 HYDR-PARM2 # - # FTABNO LEN DELTH STCOR KS DB50 *** <------><--------><--------><--------><--------><--------><--------> *** 1 1 0.02 0.0 0.0 0.5 0.0 END HYDR-PARM2 HYDR-INIT RCHRES Initial conditions for each HYDR section *** # - # *** VOL Initial value of COLIND Initial value of OUTDGT *** ac-ft for each possible exit for each possible exit <------><--------> <---><---><---><---><---> *** <---><---><---><---><---> 1 0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 END HYDR-INIT END RCHRES Maple Highlands 2/14/2020 8:20:18 AM Page 28 SPEC-ACTIONS END SPEC-ACTIONS FTABLES FTABLE 1 92 4 Depth Area Volume Outflow1 Velocity Travel Time*** (ft) (acres) (acre-ft) (cfs) (ft/sec) (Minutes)*** 0.000000 0.201102 0.000000 0.000000 0.077778 0.201102 0.015641 0.019374 0.155556 0.201102 0.031283 0.027399 0.233333 0.201102 0.046924 0.033557 0.311111 0.201102 0.062565 0.038749 0.388889 0.201102 0.078206 0.043322 0.466667 0.201102 0.093848 0.047457 0.544444 0.201102 0.109489 0.051260 0.622222 0.201102 0.125130 0.054799 0.700000 0.201102 0.140771 0.058123 0.777778 0.201102 0.156413 0.061267 0.855556 0.201102 0.172054 0.064257 0.933333 0.201102 0.187695 0.067115 1.011111 0.201102 0.203336 0.069855 1.088889 0.201102 0.218978 0.072492 1.166667 0.201102 0.234619 0.075036 1.244444 0.201102 0.250260 0.077497 1.322222 0.201102 0.265901 0.079882 1.400000 0.201102 0.281543 0.082198 1.477778 0.201102 0.297184 0.084451 1.555556 0.201102 0.312825 0.086645 1.633333 0.201102 0.328466 0.088784 1.711111 0.201102 0.344108 0.090874 1.788889 0.201102 0.359749 0.092916 1.866667 0.201102 0.375390 0.094914 1.944444 0.201102 0.391032 0.096872 2.022222 0.201102 0.406673 0.098790 2.100000 0.201102 0.422314 0.100672 2.177778 0.201102 0.437955 0.102519 2.255556 0.201102 0.453597 0.104334 2.333333 0.201102 0.469238 0.106118 2.411111 0.201102 0.484879 0.107872 2.488889 0.201102 0.500520 0.109598 2.566667 0.201102 0.516162 0.111297 2.644444 0.201102 0.531803 0.112971 2.722222 0.201102 0.547444 0.114620 2.800000 0.201102 0.563085 0.116246 2.877778 0.201102 0.578727 0.117849 2.955556 0.201102 0.594368 0.119431 3.033333 0.201102 0.610009 0.120993 3.111111 0.201102 0.625650 0.122534 3.188889 0.201102 0.641292 0.124056 3.266667 0.201102 0.656933 0.125560 3.344444 0.201102 0.672574 0.127046 3.422222 0.201102 0.688215 0.157686 3.500000 0.201102 0.703857 0.172007 3.577778 0.201102 0.719498 0.183208 3.655556 0.201102 0.735139 0.192825 3.733333 0.201102 0.750781 0.201435 3.811111 0.201102 0.766422 0.209329 3.888889 0.201102 0.782063 0.216681 3.966667 0.201102 0.797704 0.223600 4.044444 0.201102 0.813346 0.230166 4.122222 0.201102 0.828987 0.236434 4.200000 0.201102 0.844628 0.242447 4.277778 0.201102 0.860269 0.248238 4.355556 0.201102 0.875911 0.253832 4.433333 0.201102 0.891552 0.259252 4.511111 0.201102 0.907193 0.264515 4.588889 0.201102 0.922834 0.269636 4.666667 0.201102 0.938476 0.274627 4.744444 0.201102 0.954117 0.279498 Maple Highlands 2/14/2020 8:20:18 AM Page 29 4.822222 0.201102 0.969758 0.306594 4.900000 0.201102 0.985399 0.321106 4.977778 0.201102 1.001041 0.333147 5.055556 0.201102 1.016682 0.343899 5.133333 0.201102 1.032323 0.353808 5.211111 0.201102 1.047964 0.363102 5.288889 0.201102 1.063606 0.371918 5.366667 0.201102 1.079247 0.380344 5.444444 0.201102 1.094888 0.388444 5.522222 0.201102 1.110530 0.396264 5.600000 0.201102 1.126171 0.403838 5.677778 0.201102 1.141812 0.411195 5.755556 0.201102 1.157453 0.418356 5.833333 0.201102 1.173095 0.425342 5.911111 0.201102 1.188736 0.432166 5.988889 0.201102 1.204377 0.438842 6.066667 0.201102 1.220018 0.627616 6.144444 0.201102 1.235660 1.024437 6.222222 0.201102 1.251301 1.504118 6.300000 0.201102 1.266942 1.973944 6.377778 0.201102 1.282583 2.349621 6.455556 0.201102 1.298225 2.590558 6.533333 0.201102 1.313866 2.782384 6.611111 0.201102 1.329507 2.950198 6.688889 0.201102 1.345148 3.107907 6.766667 0.201102 1.360790 3.257172 6.844444 0.201102 1.376431 3.399243 6.922222 0.201102 1.392072 3.535086 7.000000 0.201102 1.407713 3.665470 7.077778 0.201102 1.423355 3.791015 END FTABLE 1 END FTABLES EXT SOURCES <-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # *** WDM 2 PREC ENGL 1.167 PERLND 1 999 EXTNL PREC WDM 2 PREC ENGL 1.167 IMPLND 1 999 EXTNL PREC WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP END EXT SOURCES EXT TARGETS <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd *** <Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg*** RCHRES 1 HYDR RO 1 1 1 WDM 1000 FLOW ENGL REPL RCHRES 1 HYDR STAGE 1 1 1 WDM 1001 STAG ENGL REPL COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL COPY 601 OUTPUT MEAN 1 1 48.4 WDM 901 FLOW ENGL REPL END EXT TARGETS MASS-LINK <Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->*** <Name> <Name> # #<-factor-> <Name> <Name> # #*** MASS-LINK 2 PERLND PWATER SURO 0.083333 RCHRES INFLOW IVOL END MASS-LINK 2 MASS-LINK 3 PERLND PWATER IFWO 0.083333 RCHRES INFLOW IVOL END MASS-LINK 3 MASS-LINK 5 IMPLND IWATER SURO 0.083333 RCHRES INFLOW IVOL END MASS-LINK 5 MASS-LINK 12 PERLND PWATER SURO 0.083333 COPY INPUT MEAN Maple Highlands 2/14/2020 8:20:18 AM Page 30 END MASS-LINK 12 MASS-LINK 13 PERLND PWATER IFWO 0.083333 COPY INPUT MEAN END MASS-LINK 13 MASS-LINK 15 IMPLND IWATER SURO 0.083333 COPY INPUT MEAN END MASS-LINK 15 MASS-LINK 16 RCHRES ROFLOW COPY INPUT MEAN END MASS-LINK 16 END MASS-LINK END RUN Maple Highlands 2/14/2020 8:20:18 AM Page 31 Predeveloped HSPF Message File Maple Highlands 2/14/2020 8:20:18 AM Page 32 Mitigated HSPF Message File Maple Highlands 2/14/2020 8:20:18 AM Page 33 Disclaimer Legal Notice This program and accompanying documentation are provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2020; All Rights Reserved. Clear Creek Solutions, Inc. 6200 Capitol Blvd. Ste F Olympia, WA. 98501 Toll Free 1(866)943-0304 Local (360)943-0304 www.clearcreeksolutions.com