Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LUA99-161
CITY OF RENTON ,M-EMORANDUM Date: January 11, 2000R ECHO To: Michael Benoit/Wastewater Utility JAN192 Q From: Elizabeth Higgins/Development Planning CITY OF Subject: Talbot Crest Lift Station Replacement UTILITY SYSTEMS � Project No. LUA-99-161,TP,ECF We would like to inform you that no appeals were filed on the Determination of Non-Significance (DNS)for the subject project. This decision is final and application for the appropriately required permits may„proceed. If you have questions,please call me at(425)430-7382. % 5 so i--444 7 is et.r 2i-per- aJr J^ dnsmemo - CITY OF RENTON RECE ® � MEMORANDUM DEC221999 ♦ ♦ /Ty op sl.P1 okay.ys„,tri RANT • N Date: December 21, 1999 To: Michael Benoit/Wastewater Utility l 1 From: Elizabeth Higgins/Development Planning ' Subject: Talbot Crest Lift Station Replacement Project No. LUA-99-161,TP,ECF We would like to inform you that the Environmental Review Committee has issued a Determination of Non-Significance(DNS)for the subject project. Appeals of the environmental determination must be filed in writing on or before 5:00 PM January 10, 2000. Appeals must be filed in writing together with the required $75.00 application fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98055. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-11 B. Additional information regarding the appeal process may be obtained from the Renton City Clerk's Office, (425)-430-6510. If you have questions, please call me at(425)430-7382. dnsmemo CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE ADVISORY NOTES APPLICATION NUMBER: LUA-99-161,TP,ECF APPLICANT: City of Renton/Utilities Systems Division,Wastewater Dept. PROJECT NAME: Talbot Crest Lift Station Replacement DESCRIPTION OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging outside of the City R.O.W. LOCATION OF PROPOSAL: The project is located in South Renton, in the City of Renton right-of-way near 2515 Talbot Crest Drive South Advisory Notes to Applicant: The following notes are supplemental information provided in conjunction with the environmental determination. Because these notes are provided as information only, they are not subject to the appeal process for environmental determinations. 1. The applicant shall perform all work in conformance with the approved plans and specifications that will be or have been reviewed and approved by the Planning/Building/Public Works Department. 2. The applicant shall maintain traffic in conformance with the Traffic Control Plan as approved the City Traffic Engineer. 3. The applicant shall ensure that access for emergency vehicles is maintained at all times. In the event of a road closure, the applicant shall notify the Renton Fire and Police Departments at least 24 hours in advance of closure. 4. Some residents in the vicinity of the proposed project have shift-work schedules and may experience inconvenience due to daytime construction in the proximity of their residence(s). In the event the City of Renton receives complaints in this situation, the contractor should be notified and either construction noise attenuation or off-site accommodations should be made, on a temporary basis and by mutual agreement, until such time that the inconvenience ceases. CITY OF RENTON MEMORANDUM Date: November 29, 1999 To: Michael Benoit/Wastewater Utility From: Elizabeth River Higgins/Development Planning Subject: Talbot Crest Lift Station Replacement q341--- Project No. LUA-99-161,ECF The Development Planning Section of the City of Renton has received the above-referenced application for environmental review. A presentation of the proposed amendment to the Environmental Review Committee (ERC) is scheduled for December 21, 1999. Following the ERC meeting, I will send you copies of the ERC determination along with the timeframes for the public comment and appeal periods for your files. Please provide a charge number for the publication of the environmental determination. acceptance - CD d+ o A # U al Cili4 "---""m— 0 i 2z a1 ® c :> O w 2E.0 g a gal € @gO 0s zO Egn.W > wo 0. w,,. P--, C\2 I I Q&i o g E. O C� ' -I::::'; pix a % CI O ' vj ,. w i`tr '` ti, r... ....' wit , Gp .} s F`k, ,f ,• V ....._ fj i ,SJ ..f JIC Y, ,�e` t0 %�,Y1 i..,.._..., `\ ;,� iC...� ..,,fa„''� 'mot r.. ' nn „ i• t.._z s v t.,, i' 6 i 'o. y„ '.. i 1 7 t 1^1 ��EOM u.'cm ,..;.. �, • ,... i...3 JN ! 6 `Y Or 7 " ! It ry, l;r ,el' S46�� s O..--, /06/ Alb .,,.' S t,u .,,S J /'1 1 q/0 :A_ ----------------- ,,,•,,,„... ..... , , „ „ „ , ,,,„..,,,.. r, }\T _ ,„ • 0 „, ,,„_, ,_,....,.., ,...., t 'may /` Rom..! V) U W f- 0 U CZ 0 a_ . j } } L. t@t@ k Pd Call°n q_s'o] ....) r ,,) REMOVE EXI611NG VENTS TO MINIMUM 12' - a PROPOSED TEMPORARY RELOCATION OF EXISTING TELEMETRY EXISTING SITE LEGEND —BELOW GRADE.FILL WITH CDF. . D ANTENNA FOR OPERATION OF EXISTING UFT STATION.TO ���' j ti REMOVED AND DELIVERED TO CITY SHOPS AFTER EXISTING EX SSMH 0 DECIDUOUS TREE PROPOSED Q'1GINE STATION IS DECOMMISSIONED. ❑ EX CATCH BASIN TYPE 1 GENERATOR CONNECTION. h ® * CONIFER TREE I "PPOSED INTAKE VENT PEDESTAL.COMPLETE EX CATCH BASIN TYPE 2 EXHAUST VENT PEDESTAL`, �) ' STRUCTION AFTER DECOMMISSION OF g WA TER VALVE Q HEDGE • .ISTING UFT STATION. EXISTING TELEMETRY AND ANTENNA MAST. - FIRE HYDRANT -C UTILITY POLE - j- ' PROPOSED 3'WETWELL WATER METER` � VENT PIPE REBUILD SIDEWALK AFTER ABANDONMENT OF ® E-- GUY POLE ' IRRIGA 710N VALVE . EXISTING UFT STATION. P WATER BLOW OFF I. MAIL BOX --- PROPOSED 6" 1 BACKFLOW PREVENTER,SEE DETAIL SHEET. C ROCKROC ER CASE L EXHAUST VENT PIPE -=-�=— � TELEPHONE CABINET t PROPOSED 6'INTAKE �� `�� -- BINET r 4 -- a---1—_ �� �;� :` CABLE 7Y C ® SURFACE BRASS MONUMENT VENT PIPE \ ..,. - _ � - , al GAS L VALVE A )1( PK NAIL j,_ --- -v-- _ - G -- - '' GAS METER FOUND REBAR& CAP #I 1 s. IIIII, a r OR IRON PIPE ' © POWER TELEPHONE EX WATER LINE THE CONTRACTOR SHALL LOCATE THE ( 4 r O LIGHT POLE LT EX SANITARY SEWER LINE — EX EXISTING FORCEMAIN AND INSTALL A _ i� - I i� tt YARD LIGHT .___�— IRON STORM LINE TEMPORARY WYE FITTING WITH TWO GATE-=_�1---'--- _ _ IP �-" _ _ --- .��'- -V I� ® MONITORING HELL EX FORCE MAIN LINE VALVES.SEE DETAIL THIS SHEET.AFTER ___t. — --- ___.__= _,�___• _ ( - - "— .P _ w� Q' PEDESTRIAN PUSH BUTTON POLE THE PROPOSED UFT STATION IS TESTED _ -: a SIGN AND APPROVED FOR OPERATION,THE 3 -" J ® TRAFFIOSJ NSIGN N BOX WYE AND GATE VALVES SHALL BE �� PROPOSED 3/4'WATER REMOVED AND REPLACED WITH SERVICE PER CITY STANDARD 1 -4'45"BEND(w/BLOCK) \ DETAIL 1 -4'DI PIPE,LT r' -_ , o 1 -4'COUPLING ', •.gin ' -✓ 3/4"WATER SERVICE PROPOSED SITE LEGEND 1-TRANSITION COUPUNG(DI TO PE) +'1-I+' L 1j--- •r3{o •,,}4: /• TO DRYWELL _..— PROPOSED 4'DI FORCEMAIN �+ • : ,. '' •�`�'�' `'S•' ry`: / REMOVE CURVED SECTION OF EXCAVATION BOUNDS SOUTH BORDER OF PAVEMENT AND 4 �' - '" o J°' " CURB AND RECONSTRUCT TO CURB,GUTTER,AND SIDEWALK 1 °J''y. �a SECTIONS. EXISTING STRAIGHT 6 4 PROPOSED SEWER PIPING (WEST SIDE OF STREET) I- PROPOSED WATER PIPING RESTORATION._.c-f_=- N r. % -.__.... ` _._._-._/� ------�_ M --� _ 1V--, NORTH BORDER OF PAVEMENT AND STA tt+91.1.1.8'Lt AND SIDEWALK CONSTRUCTION NOTES - - CURB,GUTTER, SE CORNER OF DRYNELL / (WEST SIDE ONLY)RESTORATION. � / CP 1.UNITS OF EXCAVATION SHOWN ARE TO BE MAINTAINED AT ALL TIMES.CONTRACTOR MAY NOT EXCEED SHOWN © $TA 11+98.7.6.9'LT S QUADRANT 12+11.3.0F WETWELL • / d j/ CD CENTER OF DRYWELL I OMITS WITHOUT PRIOR WRITTEN AUTHORIZATION BY OWNER'S REPRESENTATIVE. STA 12+16.1 6.7'II UNITS OF EXCAVATION '�•' CENTER OF NETNELL ``.\ j t 2.ACCESS TO AU.DRIVEWAYS MUST BE PROVIDED BETWEEN THE HOURS OF 4pm AND 9am. i� I PROPOSED SERVICE TAP AND PROPOSED KNELL INTAKE ��`�� i PIPE BY CITY.CONTRACTOR TO 3.EXISTING UFT STATION MUST REMAIN IN SERVICE UNTIL PROPOSED STATION IS APPROVED BY OWNER FOR v PROVIDE TRENCHING,BACKFILL OPERATION. '-"� AND TRENCH RESTORATION. 4.ANY IMPROVEMENTS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO ORIGINAL OR BETTER ---r-w w w �1 CONDITION AS DETERMINED BY OWNER.STREET,CURB,SIDEWALK,LANDSCAPING,FENCES,UTILITIES AND ALL w .'w, w w w i OTHER EXISTING IMPROVEMENTS ARE INCLUDED AND INCIDENTAL TO THE PROJECT. s w.F-" 7 sr------.___.__ST sr ` w w" w w 5.EXCAVATION FOR W:TNELL MAY ONLY EE ACCOIILW®BY AUGURING TO MINIMIZE AREA OF EXCAVATION. —.-I st-- sr te - ----_____I-_ DRYRELL MAY BE INSTALLED USING OPEN TRENCH EXCAVATION. s,._.. _sr sr v t. sr- sr sr---. __ 6.CONSTRUCTION OF 8'SEWER BETWEEN EXISTING MANHOLE AND PROPOSED WETWELL MAY BE CONSTRUCTED _ si —Sr BY ONE OF TWO METHODS.(1)OPEN TRENCH or(2)TUNNEUNG WITH APPROPRIATE WORKER PROTECTION. r '� - I WHICHEVER METHOD IS SELECTED,EXCAVATION MAY NOT EXTEND BEYOND THE UNITS SHOWN ON THIS PLAN. 4"' - - _ i i 7.PAVEMENT,CURB&GUTTER,AND SIDEWALK-CONTRACTOR SHALL SAW CUT AND REMOVE ALL ASPHALT WITHIN BOUNDARIES SHOWN ON THE PLANS,INCLUDING ALL CURB&GUTTER AND SIDEWALK ON THE WEST SIDE. • --- CURB, R SIDEWALK T NOTBE REPLACEDDAMAGED THE t+ - `- - _ - _._ __. l --! 7r .,—__ --___-_-- CONTRACTOR DURING CONSTRUCTION CONTRACTOR SHALL REPLACE ALL CURB,GUTTER,AND SIDEWALK TO �� /--_ _`/ - - "` "' MATCH EXISTING.THE REMOVED ROADWAY SHALL BE REPLACED WITH 4'ASPHALT IN TWO LIFTS OVER 6'OF _ CONTRACTOR TO PROTECT COMPACTED CRUSHED SURFACING TOP COURSE(CSTC).CSTC SHALL BE COMPACTED TO 95%MODIFIED. a.._..:.� �+ i EXISTING CURB FROM DAMAGE DURING ASPHALT REMOVAL PROPOSED SITE PLAN ,-= 10' GRADE PAVEMENT TO PROVIDE INTAKE VENT CROWN AT CENTERLINE AND EXHAUST VENT CONTINUOUS SLOPE.SQ SOUTH._ .._.__ C EXISTING GRADE RIM 108.00 - -- _ -----_-.--- -- . �CLOPMENT PLANNING 108(-0.00 local datum) ----- - - - - - ---- ----------RIM 107.50 - -RIM 107.70_ -_- _ - CITY OF RENTON ,os _ r EXISTING 104 --�-ii_j_ __veAIN -_- .,. iiiiliiii ,f ,----- ----- N119 -'_` 1999 102 - - `/�- PROPOSED FORCEMAIN RECEI141FVED EIVEp 100 EXISTING UFT STATION EXISTING MANHOLE 96 -- ---- -----' -'------- EXISTING SEWER PIPING n� �� RH2 ENGINEERING.INC. ORYWELL nua//w .m2Dom 94- --- ----- --_- --- -- ----- PROPOSED SEWER PIPING m1.00:15.052 ----_ t.ep0.720.8052 EXISTING GRAVITY SEWER GATE VALVE ENGINEERS _..--__.—.--__..____._--__.---__..._ PLANNERS REDMONDOFF10E 425.889.1488 __---__ COSTING GRAVITY SEVER I GATE VALVE S C I E I S T S WENATCHEE OFFICE 50.8 PROPOSED WETWELL THRUST BLOCKING 88 . .. -__ ----- ---- - - WYE FITTING 86 ------- • ------ ------ — EXISTING SEWER PIPING CITY OF RENTON- 1 ti ' 84 ----- LIFT STATION REPL 'OJECT 82 - -- - - -- - TEMPORARY FORCEMAIN CONNECTION DETAIL TAL= );-z• FT STATION WEST ELEVATION Q NOT TO SCALE 41IOSED SITE PLAN ,.= 10• JOB Na MINEDNMINEDIE M D O DER t a SN SCALE PLO OR ma. 199.054.01 I TAL-C1 1 RCP I NM LNOV 05,1999 I SHOWN I 5 I TC2 I 3or12 0 Z O 714 , 'CliAlifO------""mr— w X Chi es z 0 E•c aO CD14 a rw a o 8 k...„ ce . ..,.. 0 g z Li 124 0 al E Ua. 41 .,,. .. ,5„r -•:� ��i ✓r F,, ,� , ,yam ;s -Th '1.....-,2, CU I',I ,... (i) .114 / -. t'...S :4,..........7 ,.....SIvi-al-ON, (-TA. „,-...„. Y,, `•,.'. ..: it n 2 t z r g.... . -"4 U t 3 ' )' ,•1'-• _ r'_..,..„I* ...,.... ' 1 ,3,.,...3 T1 ),....k c'`. y� J , , - 1 3" f i ,z • s \V 1 it IIP ---....... t...\-1 Sill I IS °:)CY\Z f'"'" '— i Alt , 2 , —1—>\..r—.1. r ,1 v-G v) co-. , '') "r'� ,. a - 'T r......:� t.,_,....,, ,...._ fk_,,,d o 'i`t , t __,_1 €r•�''', ;...„j s ,y .,.._3 , r q. _t -1:,r,j m.- �y_r•^..•.I ,6......i • Fi ,.,f.,* y`R i ',tf,..,ter V. ..._ t (� ` ' . % ' - .�.... r ' , L (v V) W 1— Cie 0 3 "t ----s. r , ______ �- Smooth Feed SheetsTM i SUN >��-i�i Use template for 5160® l - MORTENSEN P B I EVOY CECIL H , WOLSTED WILLIAM 2319 TALBOT CREST DR S : 401 S 23RD ST 407 S 23 RD ST RENTON WA 98055 RENTON WA 98055 ! RENTON WA 98055 >- - - - - - ,I ; - - CITY OF RENTON , OLIN RICHARD D 1 ' LOKE VICTOR K Y 200 MILL AVE S . 2320 TALBOT CREST DR 12006 SE 76TH ST RENTON WA 98055 RENTON WA 98055 ' , RENTON WA 98056 l l' I ! WILLIAMS ISAIAH D+VELECIA M NORRIS LARRY A JR+DELORIS D ' FORD BETTY J 2332 TALBOT CREST DR S ' 2402 TALBOT CREST DR S 2408 TALBOT CREST DRIVE SOUTH RENTON WA 98055 RENTON WA 98055 j RENTON WA 98055 CHINN DEAN M ' F• OUNTAIN BARRY B I, HANSEN RODNEY&DEBBE 2414 TALBOT CREST DR S , 2420 TALBOT CREST DR ; ' 2500 TALBOT CREST DR RENTON WA 98055 ' RENTON WA 98055 1 RENTON WA 98055 II - / ~1 EVERSON RANDALL L j HENDERSON CHRISTY+STEPHEN : 1 MAGNO WILFREDO 2510 TALBOT CREST DR S ! 2325 TALBOT CREST DR S : 2331 TALBOT CREST DR S RENTON WA 98055 I RENTON WA 98055 ; ; RENTON WA 98055 I - - -- - - - SAUNDERS KARALA D+CHRISTOPH F• RANGELLO WILLIAM J NGUYEN KIM ANH LE 2337 TALBOT CREST DR S 1 ; 2401 TALBOT CREST DR S 2407 TALBOT CREST DR S RENTON WA 98055 , 1 RENTON WA 98055 , RENTON WA - 98055 PICKREIGN CYNTHIA J , ! ESPEY DIANE , WILLIAMS BARTOW JR+MINNIE L 2413 TALBOT CREST DR S 2419 TALBOT CREST DR S ; 2503 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 - -- - - - CUMMINGS RAYMOND+MARILYN L j : l CAMP MERLE M 1 YEAGER LESLIE M 2509 TALBOT CREST DR S ' ' 408 S 26TH 400 S 26TH ST RENTON WA 98055 . RENTON WA 98055 j RENTON WA 98055 ! ( .lLEMKE REBECCA A+DALE M ' S• MITH DON C ' ' HEM OSCAR F 403 S 26TH ST 401 S 26TH ' HEM C J RENTON WA 98055 RENTON WA 98055 1 2619 TALBOT CREST DR S ' RENTON WA 98055 MCCLAIN CHARLIE W+ARNETTA NELSON RONALD N TRAUTMANN JOHN F 2613 TALBOT CREST DR 2607 TALBOT CREST DR S 2601 TALBOT CREST DR S RENTON WA 98055 ! RENTON WA 98055 RENTON WA 98055 Z .AVERY® Address Labels Laser 5160® Srhooth Feed SheetsTo I Use template for 51600 1 1 HOLZBOOG DAVID S+AMY L I ' 1 NESS ROSEMARY 1, I ALSTERBERG ROBERT T 2527 TALBOT CREST DR SO 1 2521 TALBOT CREST DR S ! ' ; 2515 TALBOT CREST DR S RENTON WA 98055 ' 1 RENTON WA 98055 ; ; 1 RENTON WA 98055 ' I I KLEINDL DONALD F 1 MURCHISON JEFFERSON G+MYRTL ' , LOMBARDI LEONARD S 2606 TALBOT CREST DR S • ' 2528 TALBOT CREST DR 1 2522 TALBOT CREST DR S RENTON WA 98055 ; ' RENTON WA 98055 1 RENTON WA 98056 1 j 1 — — — SARGENT JOHN C+JENNIFER K I! , CITY OF RENTON 2516 TALBOT CREST DR S 1 200 MILL AVE SOUTH RENTON WA 98055 :! RENTON WA 98055 1 1 • i — - - - - 'I 1 - -- - - - ---J 1 II I 1 , I! I , — — I! :11 - 1 (• i 1• is I ' —i 1 1 ; 1 l - I 1 ; Th> _ ,J I I . 1 1 ® AVERYO Address Labels 1 Laser 5160® wQ �u4 MORTENSEN P B , EVOY CECIL H WOLSTED WILLIAM 2319 TALBOT CREST DR S 401 S 23RD ST 407 S 23 RD ST RENTON WA 98055 RENTON WA 98055 RENTON WA/' 98055 k ›.. t 4til TY OF REIsQN OLIN RICHARD D Q LO./ VICTOR K Y 0 MILL AVE S\, 2320 TALBOT CREST D'; 006 SE 76TH ST NTON WA 98055 RENTON WA 9 t off§ RENTON WA ' 98056 WILLIAMS ISAIAH D+VE , _,ems,,t NORRIS LARRY A JR+DELORIS . FORD BETTY J 2332 TALBOT CRESTEM .. } 2402 TALBOT CREST DR S 2408 TALB•f C«R+E.y L�J E SOUTH RENTON WA 411.1-17; RENTON WA 9805 RENTON W . W8155 d • �Q t CHINN DEAN M FOUNTAIN BARRY : HANSEN ROD.N EY&DEBBE 2414 TALBOT CREST DR S 2420 TALBOT C' 87T DR 2500 TALBOT CREST DR RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 ri EVERSON RANDALL L HB DE' :`o�j`�'e1"4!v cl , STEPHEN MAGNO WILFREDO 2510 TALBOT CREST DR S 232 T: :aCOJuIa�n 1Ln S 2331 TALBOT CREST DR S RENTON WA 98055 REN IN 7p C98055 RENTON WA 98055 SAUNDERS KARALA D+CHRISTOPH FRANGELL o WILLIAM J NGUYEN KIM ANH LE 2337 TAL:i„ °a •T DR S 2401 TALBO CREST DR S 2,.1, ,AggiD T CREST DR S RENT aklIVA . 98055 RENTON WA 98055 Mr d_N PM> G� 98055 , W W Q PICKRE c 7 ---, J ESPEY DIANE t,lAv' ,RTOW.JR+MINNIE L 2413 TALBOT CREST DR S 2419 TALBOT CREST I ' S 2503 TALBOT CREST DR S RENTON WA 980:5 RENTON WA °8055 RENTON WA 98055 CUMMINGS RAYM t D+MARILYN L is'). }'Q_1 RLE M YEAGER LESLIE M 2509 TALBOT C' :T DR S .``� •, 400 S 26TH ST RENTON WA 98055 1"Des 1 A 98055 RENTON WA 98055 4 LEMKE ' . :ECCA A+DALE M SMITH DON C HEM OSCAR F 403 S 6 ST 401 S 26TH HEM C J 1�] e 0 WA 98055 RENTON WA 9805 , 2619 TALBOT CREST DR S RENTON WA 98055 74.111 �U Q Q R'u C ) CHARLIE W+ARNETTA NELSON RONALD N 'I ' ,UTMANN JOHN F .13 TALBOT CREST DR 2607 TALBOT CREST DR S 2601 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 ._ -1-,----- ,...) , 6,#8... , ,, •., ,_., v) ...: .u,,....,04„,„„, . •..... ,.. .., . 2.,,,,y, .att, ,•,_ ail 0E141 • 1 - ------------------ -.- Z I-- 0 CD 1 1 LLI I DI 0— _I L91"-IS ,..._. , 1. . • •. , I I • • ,--1 pd AairoA 1.s03 CITY OF RENTON MEMORANDUM Date: January 11, 2000 To: Michael Benoit/Wastewater Utility enning . LFrom: Elizabeth Higgins/Development � Subject: Talbot Crest Lift Station Replacement Project No. LUA-99-161,TP,ECF We would like to inform you that no appeals were filed on the Determination of Non-Significance (DNS)for the subject project. This decision is final and application for the appropriately required permits may proceed. If you have questions, please call me at(425)430-7382. dnsmemo On the ZZ . day of Decemlo.0 ' , 1999, I deposited in the mails of the United States, a sealed envelope containing ekc d--tt wnma-i-kms documents. This information was sent to: Name Representing Department of Ecology • Don Hurter WSDOT KC Wastewater Treatment Division . Larry Fisher Washington Department of Fisheries David F. Dietzman Department of Natural Resources Shirley Lukhang Seattle Public Utilities Duwamish Indian Tribe Rod Malcom Muckleshoot Indian Tribe Joe Jainga Puget Sound Energy (Signature of Sender) STATE OF WASHINGTON ) ) SS . COUNTY OF KING ) I certify that I know or have satisfactory evidence that? cc ce.y‘ C d. el-- signed this instrument and acknowledged it to be his/her/their free and voluntary actJfor the uses and purposes mentioned in the instrument. MARL Notary Public in and for the State of Wash gton NOTARY PUBLIC STATE OF Notary (Print) MARILYN KAMCHEFF COMMISSION EXPIRES My appointmerllAV #RGINTMENT EXPIRES:6-29-03 JUNE 29,2003 • Project Name: —ra.1 Lr+ S-ak\rn Project Number: LUR , 99 v llol , br✓ • NOTARY.DOC . • �� CITY .�)F RENTON ,., ..IL i, Planning/Building/Public Works Department `.: -. . _ Al 5•.. Jesse Tanner,Mayor Gregg Zimmerman P E.,Administrator December 22, 1999 • Washington State Department of Ecology Environmental Review Section PO Box 47703.. ` , Olympia,WA 98504-7703 . Subject: Environmental Determinations • Transmitted herewith is a copy of the Environmental Determination for the following project reviewed by the Environmental Review Committee (ERC)on December 21, 1999: DETERMINATION OF NON-SIGNIFICANCE , TALBOT CREST LIFT STATION - - LUA-99-161,ECF - • The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station Would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. .Work isscheduled :, to commence in January 2000 with completion planned for June 2000.•The City has requested a Temporary Use ` Permit for construction staging'outside of the City R.O.W,- Location:The project is located in South Renton, in the City of Renton right-of-way near 2515 Talbot Crest Drive South: . - Appeals of the environmental determination must be filed in writing on or before 5:00 PM January 10, 2000. Appeals must be filed,in writing together with the required$75.00 application fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton,WA 98055. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-11 B. Additional information regarding the appeal process may be obtained from the Renton CityClerk's Office, (425)-430-6510. , If you have questions, please call me at(425)430-7382. • For the Environmental Review Committee, , Planner Project Manager cc: King County Wastewater Treatment Division Larry Fisher, Department of Fisheries David F. Dietzman, Department of Natural Resources • Don Hurter, Department of Transportation ' Shirley Lukhang, Seattle Public Utilities • - , . Duwamish Tribal Office , • Rod Malcom,Fisheries, Muckleshoot Indian Tribe(Ordinance) - - . . Joe Jainga, Puget Sound Energy ,.. ,ra-eric ltr g Y 1055SouthGrady - Way `Rento`n" ashin •n 80'W o 9 55 - - � _ ii - 1 • • CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE ADVISORY NOTES " • • APPLICATION NUMBER: ° LUA-99-161,TP,ECF' APPLICANT: City of Renton/Utilities Systems Division,Wastewater Dept. PROJECT NAME: Talbot Crest Lift Station Replacement DESCRIPTION OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift • Station. 'A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction • staging outside of the City R.O.W. LOCATION OF PROPOSAL: :` The project_is located in South Renton, in the City of Renton 2• •' _ - � : . . '-•; .right-of-way near 51 - '5�Talbot Crest Drive South ., Ate' .5'. ^•• Advisory Notes to Applicant: _ • The following notes are supplemental information.provided in:conjunction with the environmental ''' • • determination. Because these notes are provided as information only, they are not subject to the appeal. process for environmental determinations: `" ; : , - - - 1. The applicant shall perform all work in conformance with the approved plans and specifications that will be or have been reviewed and approved by the Planning/Building/Public Works Department. 2. The applicant shall maintain traffic in,conformance with the Traffic Control Plan as approved the City Traffic Engineer. 3. The applicant shall ensure that access for emergency vehicles is maintained at all times. In the event of a road closure,the applicant shall notify the Renton Fire and Police Departments at least 24 hours in advance of closure. 4. Some residents in the vicinity of the proposed project have shift-work schedules and may experience inconvenience due to daytime construction in the proximity of their residence(s). In the event the City of Renton receives complaints in this situation,the contractor should be notified and either construction noise attenuation or off-site accommodations should be made, on a temporary basis and by mutual agreement, until such time that the inconvenience ceases. ' P': Y CITY OF RENTON ;; MEMORANDUM se$?; Date: December 21, 1999 To: Michael Benoit/Wastewater Utility c4isly From: Elizabeth Higgins/Development Planning Subject: Talbot Crest Lift Station Replacement Project No. LUA-99-161,TP,ECF • We would like to inform you that the Environmental Review Committee has issued a Determination of Non-Significance (DNS)for the subject project. Appeals of the environmental determination must be filed in writing on or before 5:00 PM January 10, 2000. Appeals must be filed in writing together with the required $75.00 application fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98055. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-11 B. Additional information regarding the appeal process may be obtained from the Renton City Clerk's Office, (425)-430-6510. If you have questions, please call me at(425)430-7382. • dnsmemo CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE ADVISORY NOTES APPLICATION NUMBER: LUA-99-161,TP,ECF APPLICANT: City of Renton/Utilities Systems Division,Wastewater Dept. PROJECT NAME: Talbot Crest Lift Station Replacement DESCRIPTION OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging outside of the City R.O.W. LOCATION OF PROPOSAL: The project is located in South Renton, in the City of Renton right-of-way near 2515 Talbot Crest Drive South • Advisory Notes to Applicant: The following notes are supplemental information provided in conjunction with the environmental determination. Because these notes are provided as information only, they are not subject to the appeal process for environmental determinations. 1. The applicant shall perform all work in conformance with the approved plans and specifications that will be or have been reviewed and approved by the Planning/Building/Public Works Department. 2. The applicant shall maintain traffic in conformance with the Traffic Control Plan as approved the City Traffic Engineer. 3. The applicant shall ensure that access for emergency vehicles is maintained at all times. In the event of a road closure,the applicant shall notify the Renton Fire and Police Departments at least 24 hours in advance of closure. 4. Some residents in the vicinity of the proposed project have shift-work schedules and may experience inconvenience due to daytime construction in the proximity of their residence(s). In the event the City of Renton receives complaints in this situation, the contractor should be notified and either construction noise attenuation or off-site accommodations should be made, on a temporary basis and by mutual agreement, until such time that the inconvenience ceases. _-') _) / ENVIRONMENTAL DETERMINATION POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION PROJECT NAME: TALBOT CREST LIFT STATION REPLACEMENT PROJECT NUMBER: LUA-99-161,ECF The City of Renton Wastewater Department of the Utilities Systems Division has requested an Environmental Review of the proposed replacement of the Talbot Crest sanitary sewer lift station. The project would be located in the City of Renton right-of-way near 2515 Talbot Crest Drive S.in an area of the City that is zoned Residential 8 dwelling units per acre(R-8). Construction of the new station will require excavation of the roadway for a distance of 80 lineal feet.The Utilities Systems Division has requested authorization from the City of Renton Council for a temporary closure of a portion of Talbot Crest Drive for up to eight weeks in winter/spring of 2000 for this project. The request was referred to the Council Transportation Committee on December 6,1999. While the road will be closed for through traffic,the contractor will maintain access to all driveways,except for short periods of time. Property owners with driveways to the south of the construction project will have to enter Talbot Crest Drive from the south,while property owners with driveways to the north of the construction project will have to enter from the north. If a construction staging area outside the City of Renton right-of-way is required,a Temporary Use Permit • will be obtained. A replacement lift station would be built within 20 to 50 feet of the existing station. The replacement lift station will be placed in large,underground vaults on the west side of Talbot Crest Drive S. The former lift station;located behind the sidewalk, would be abandoned in place.The top of the station will be removed,the equipment will be removed,and the old manhole filled in. The existing antenna will remain. The telemetry control panel for the new • station will be mounted on the existing antenna and replace the existing panel. The road and sidewalk will be restored following construction. Work is scheduled to commence in January 2000,with completion planned for June 2000. THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE ENVIRONMENT. Appeals of the environmental determination must be filed in writing on or before 5:00 PM January 10, 2000. Appeals must be filed in writing together with the required$75.00 application fee with: Hearing Examiner,City of Renton, 1055 South Grady Way, Renton,WA 98055. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-11B. Additional information regarding the appeal process may be obtained from the Renton City Clerk's Office,(425)-430-6510. I S 23rci St I I / L '. I_____ _ \ �a ifiltw �o a .13 MS I u. - 1111111111S - y \DC TION _ � ®"IN -S th j,... S t, S G� J _ t ;_,n S 27th FOR FURTHER INFORMATION, PLEASE CONTACT THE CITY OF RENTON, DEVELOPMENT SERVICES DIVISION AT(425)430-7200. DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION ' Please include the project NUMBER when calling for'proper file identification. AFFIDAVIT OF PUBLICATION 'NOTICE OF ENVIRONMENTAL Charlotte Ann Kassens first duly sworn on oath states that he/she is the Legal Clerk of the ---DETERMINATION- -" ti ENVIRONMENTAL REVIEW COMMITTEE RENTON,WASHINGTON SOUTH COUNTY JOURNAL The Environmental' Review Committee (ERC) has issued a Determination of 600 S. Washington Avenue, Kent, Washington 98032 I Non-Significance for the following project I under the authority of the Renton Municipal d Code. a daily newspaper published seven (7)times a week. Said newspaper is a legal TALBOT CREST LIFT STATION newspaper of general publication and is now and has been for more than six months r LUA-99-161,ECF Environmental review for replacement of prior to the date of publication, referred to, printed and published in the English language the Talbot-Crest Lift Station. Location: continually as a daily newspaper in Kent, King County, Washington. The South County Talbot Crest Drive South in ROW near 2515 Talbot Crest Drive South. Journal has been approved as a legal newspaper by order of the Superior Court of the Appeals of the environmental determina- ' State ofWashington for King County. tion must be filed in writing on or before The notice in the exact form attached, was ublished in the South Count be 0 PM January 10, 2000. Appeals must p y be filed in writing together with the required ,I Journal (and not in supplemental form)which was regularly distributed to the subscribers $75.00 application fee with: Hearing ., during the below stated period. The annexed notice, a Examiner, City of Renton, 1055 South Grady Way, Renton,WA 98055.Appeals to the Examiner are governed by City of " Talbot Crest Lift Station Renton Municipal Code Section 4-8-11B. , • Additional information regarding the appeal ' process may be obtained from the Renton as published on: 12/27/99 City Clerk's Office,(425)430-6510. . Publication Date:.December 27,1999 • e• •for said fore••'-• •u•licatio is the sum of$40.25, Publishedmerin the South County Journal The full amount of the fee chaf g � December 27,1999.7023 charged to Acct. No. 8051 e67. Legal Number 7023 / AAP /� �- Legal Clerk, S•uth':unty Journal Subscribed and sworn before me on this A l' day of - , 19 OD ellongoppp,p Yh- t�"s P, 42, Notary Public of the State of Washington �: v;;;AI a� residing in Renton vim: - m -rye— King County, Washington C a - '4'o Ap 1 7r1 , „ ''''e NOTICE OF ENVIRONMENTAL DETERMINATION ENVIRONMENTAL REVIEW COMMITTEE RENTON, WASHINGTON The Environmental Review Committee (ERC) has issued a Determination of Non-Significance for the following project under the authority of the Renton Municipal Code. TALBOT CREST LIFT STATION LUA-99-161,ECF Environmental review for replacement of the Talbot Crest Lift Station. Location: Talbot Crest Drive South In ROW near 2515 Talbot Crest Drive South. Appeals of the environmental determination must be filed in writing on or before 5:00 PM January 10, 2000. Appeals must be filed in writing together with the required $75.00 application fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98055. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-11 B. Additional information regarding the appeal process may be obtained from the Renton City Clerk's Office, (425)-430-6510. Publication Date: December 27, 1999 Account No. 51067 dnspub 0. CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE APPLICATION NUMBER: LUA-99-161,TP,ECF APPLICANT: City of Renton/Utilities Systems Division,Wastewater Dept. PROJECT NAME: Talbot Crest Lift Station Replacement DESCRIPTION OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging outside of the City R.O.W. LOCATION OF PROPOSAL: The project is located in South Renton, in the City of Renton right-of-way near 2515 Talbot Crest Drive South LEAD AGENCY: City of Renton Department of Planning/Building/Public Works Development Planning Section This Determination of Non-Significance is issued under WAC 197-11-340. Because other agencies of jurisdiction may be involved,the lead agency will not act on this proposal for fourteen (14)days. Appeals of the environmental determination must be filed in writing on or before 5:00 PM January 10, 2000. Appeals must be filed in writing together with the required $75.00 application fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton,WA 98055. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-11 B. Additional information regarding the appeal process may be obtained from the Renton City Clerk's Office, (425)-430-6510. PUBLICATION DATE: December 27, 1999 DATE OF DECISION: December 21, 1999 SIGNATURES: �� T2 2J/ l Greiirririrma ,Ad itrator DATE Departmerft�of anning/Building/Public Works 4 A.d( ,, /„ (97 aDATEiri'IIr Shepherd, Ad (strator C mmunity Services Department ., �, tea, _ %1-�/-�� „/ e' 1,h eler, Fire Chief DATE Ren on Fire Department eresignature • CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE ADVISORY NOTES APPLICATION NUMBER: LUA-99-161,TP,ECF APPLICANT: City of Renton/Utilities Systems Division,Wastewater Dept. PROJECT NAME: Talbot Crest Lift Station Replacement DESCRIPTION OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging outside of the City R.O.W. LOCATION OF PROPOSAL: The project is located in South Renton, in the City of Renton right-of-way near 2515 Talbot Crest Drive South • Advisory Notes to Applicant: The following notes are supplemental information provided in conjunction with the environmental determination. Because these notes are provided as information only, they are not subject to the appeal process for environmental determinations. 1. The applicant shall perform all work in conformance with the approved plans and specifications that will be or have been reviewed and approved by the Planning/Building/Public Works Department. 2. The applicant shall maintain traffic in conformance with the Traffic Control Plan as approved the City Traffic Engineer. 3. The applicant shall ensure that access for emergency vehicles is maintained at all times. In the event of a road closure,the applicant shall notify the Renton Fire and Police Departments at least 24 hours in advance of closure. 4. Some residents in the vicinity of the proposed project have shift-work schedules and may experience inconvenience due to daytime construction in the proximity of their residence(s). In the event the City of Renton receives complaints in this situation, the contractor should be notified and either construction noise attenuation or off-site accommodations should be made, on a temporary basis and by mutual agreement, until such time that the inconvenience ceases. STAFF City of Renton REPORT Department of Planning/Building/Public Works ENVIRONMENTAL REVIEW COMMITTEE • A. BACKGROUND ERC Meeting Date: December 21, 1999 Project Name: Talbot Crest Lift Station Replacement • Applicant: City of Renton • Utilities Systems Division Wastewater Department . , 1055 S. Grady Way Renton, WA 98055 attn: Michael A. Benoit • File Number: LUA-99-161, TP, ECF Reviewing Planner: Elizabeth Higgins, AICP _ - __ - - - S 23ra St i J \ c-, a w • q all 7:3 f-1, • F.' pow „ ....._,, ,_::, L.: A S( PRO ECT iY S+� 1. L❑C TI❑N 1 a S2.th mi ^ -W ; f®N ®� `41i\:-:: _ INIsSnt® ® 4 \,..i -- St 0 G 'c' ,,,, : - - } fit. ` 2�r City of Renton PB/PW Department Envi) mtal Review Committee Staff Report TALBOT CREST LIFT STATION REPLACs2.FENT LUA-99-161,ECF REPORT AND DECISION OFDECEMBER 21,1999 Page2 of 5 Project Description: The City of Renton Wastewater Department of the Utilities Systems Division has requested an Environmental Review of the proposed replacement of the Talbot Crest sanitary sewer lift station. The project would be located in the City of Renton right-of-way near 2515 Talbot Crest Drive S. in an area of the City that is zoned Residential 8 dwelling units per acre (R-8). Construction of the new station will require excavation of the roadway for a distance of 80 lineal feet. The Utilities Systems Division has requested authorization from the City of Renton Council for a temporary closure of a portion of Talbot Crest Drive for up to eight weeks in winter/spring of 2000 for this project. The request was referred to the Council Transportation Committee on December 6, 1999. While the road will be closed for through traffic,the contractor will maintain access to all driveways, except for short periods of time. Property owners with driveways to the south of the construction project will have to enter Talbot Crest Drive from the south, while property owners with driveways to the north of the construction project will have • to enter from the north. If a construction staging area outside the City of Renton right-of-way is required, a Temporary Use Permit will be obtained. A replacement lift station would be built within 20 to 50 feet of the existing station. The replacement lift station will be placed in large, underground vaults on the west side of Talbot Crest Drive S. The former lift station, located behind the sidewalk, would be abandoned in place. The top of the station will be removed,the equipment will be removed, and the old manhole filled in. The existing antenna will remain. The telemetry control panel for the new station will be mounted on the existing antenna and replace the existing panel. The road and sidewalk will be restored following construction. Work is scheduled to commence in January 2000, with completion planned for June 2000. Project Location: The project is located in South Renton, in the City of Renton right-of-way near 2515 Talbot Crest Drive South. ercrpt City of Renton PB/PWDepartment Envii 'mtal Review Committee Staff Report TALBOT CREST LIFT STATION REPLA&;civIENT LUA-99-161,ECF REPORT AND DECISION OFDECEMBER 21,1999 Page3 of 5 Exist. Bldg. Area gsf: N/A Proposed New Bldg. Area gsf: N/A Site Area: N/A Total Building Area gsf. N/A RECOMMENDATION Staff Recommend that the Environmental Review Committee issue a Determination of Non-Significance. B. RECOMMENDATION Based on analysis of probable impacts from the proposal, staff recommend that the responsible officials make the following environmental determination: DETERMINATION OF DETERMINATION OF NON-SIGNIFICANCE NON-SIGNIFICANCE-MITIGATED. Issue DNS with 14 day Appeal Period. Issue DNS-M with 14 day Appeal Period. Issue DNS-M with 15 day Comment Period followed by a 14 day Appeal Period. C. MITIGATION MEASURES No mitigation measures are recommended, beyond those already included within the proposed project description and code requirements. Advisory Notes to Applicant: The following notes are supplemental information provided in conjunction with the environmental determination. Because these notes are provided as information only, they are not subject to the appeal process for environmental determinations. 1. The applicant shall perform all work in conformance with the approved plans and specifications that will be or have been reviewed and approved by the Planning/Building/Public Works Department. 2. The applicant shall maintain traffic in conformance with the Traffic Control Plan as approved the City Traffic Engineer. 3. The applicant shall ensure that access for emergency vehicles is maintained at all times. In the event of a road closure,the applicant shall notify the Renton Fire and Police Departments at least 24 hours in advance of closure. 4. Some residents in the vicinity of the proposed project have shift-work schedules and may experience inconvenience due to daytime construction in the proximity of their residence(s). In the event the City of Renton receives complaints in this situation,the contractor should be notified and either construction noise attenuation or off-site accommodations should be made, on a temporary basis and by mutual agreement, until such time that the inconvenience ceases. ercrpt City of Renton PB/PWDepartment Envij', 'mtal Review Committee Staff Report TALBOT CREST LIFT STATION REPLALiviENT LUA-99-161,ECF REPORT AND DECISION OFDECEMBER 21,1999 Page4 of 5 D. ENVIRONMENTAL IMPACTS In compliance with RCW 43.21 C. 240, the following project environmental review addresses only those project impacts that are not adequately addressed under existing development standards and environmental regulations. 1. Earth/Geology Impacts: The areas in which the proposed work would be done are primarily paved rights-of-way. The developed area where the existing lift station is located is generally hilly and sites adjacent to steep slopes that descend to the valley floor. No slopes exceed 0.6 percent in the near vicinity of the project site. A recent subsurface investigation by Golder Associates, Inc. indicate that soils in the area generally consist of dense, silty, fine sand and till over siltstone (Tukwila Formation). No grading or filling will be required. When backfilling trenches, native material removed during excavation will be used, if it meets City standards. If native material is not of an appropriate quality, backfill will be imported from an approved source. There will not be any new impervious surfaces resulting from this project. All paved areas will be restored in asphalt or concrete. Where unpaved areas are disturbed, they will be restored to their preconstruction condition. Mitigation Measures: None required. Nexus: Not applicable 2. Air Impacts: It is anticipated that some adverse air quality impacts would be associated with the construction phase of the project. On-site emissions will consist of fugitive dust and emissions from construction equipment. These are anticipated to be minor and largely confined near the site. Exhaust from vehicle and construction equipment is controlled by state and federal regulations. No further site specific mitigation for the identified impacts from exhaust are required. Mitigation Measures: None required. Nexus: Not applicable 3. Water Impacts: The Panther Creek Wetlands are approximately 300 feet west of the project site, with developed single- family parcels between the two. No other surface water features are in the vicinity of the project. No mitigation will be required. Mitigation Measures: None required. Nexus: Not applicable 4. Transportation Impacts: The proposed site is in Talbot Crest Drive,which is a looped road that connects at the north and south to Talbot Road South. Access to the site would be via Talbot Road South to Talbot Crest Drive. Mitigation Measures: None required. Nexus: Not applicable ercrpt City ofRenton PB/PW Department Envil sntal Review Committee Staff Report TALBOT CREST LIFT STATION REPLAC-EdviENTLUA-99-161,ECF REPORT AND DECISION OFDECEMBER 21,1999 Page5 of 5 5. Stormwater Impacts: Minor temporary rerouting of existing drainage may take place during construction. City of Renton sedimentation and erosion control measures will be employed during construction to mitigate impacts that may be caused by the moving, storage, and use of earth materials in the construction of the project. Mitigation Measures: None recommended. Nexus: Not applicable 6. Environmentally Sensitive Areas Impacts:A portion of the Talbot Crest area, to the north of the site, is identified as a moderate coal mine hazard sensitive area. There are no known coal mines at the proposed project site. The area to the west of Talbot Crest Drive is designated a potential erosion hazard sensitive area. It is not anticipated that any work associated with the proposed project or the finished lift station will have potential erosion impacts. The Talbot Crest area has been identified as a moderate to high slide potential sensitive area. It is not anticipated that any work associated with the proposed project or the finished lift station will have potential slide impacts. Mitigation Measures: None recommended. Nexus: Not applicable E. COMMENTS OF REVIEWING DEPARTMENTS The proposal has been circulated to City Departmental/Divisional Reviewers for their review. Where applicable, these comments have been incorporated into the text of this report as Mitigation Measures and/or Notes to Applicant. X Copies of all Review Comments are contained in the Official File. Copies of all Review Comments are attached to this report. Environmental Determination Appeal Process Appeals of the environmental determination must be filed in writing on or before 5:00 PM January 10, 2000. Appeals must be filed in writing together with the required $75.00 application fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton,WA 98055. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-11 B. Additional information regarding the appeal process may be obtained from the Renton City Clerk's Office, (425)-430-6510. ercrpt YtTE' ?'if If +;ro •";' _^ REMOVE-BELOWLINTS mi ,C. I W l PRCposm 19PCRARY RELOCAna ar COSTING MUM !COSTING SITE LEGEND N1R1NA OR oRRAT NT Cf TONG LIFT STAR 1 R � S T'pjy1Y� �ow� G1F ;1 l HmevTO AND DSRvtrT ro ott SOPS ARIX EASING Elf SENN a DECIDUOUS TREE £qtA F �AIEM E4�a. g"*I STATOR 5 OEQ?IY59oNE6O EX GTOI BARN rM£I P r. tl CA ® Ex uTOI 6ASM P/PE 7 cMEER TREE M+R( .. •..,..NTAIIE GAB PEDESTAL Col WE RJ -., i EIOWISi qHT PEDEnAI` nos AFTER pECDYtlS9W Or a WRIER VALVE CD WEDGE ��>h ti. "3-j"' 1p aiSTNC LET STORM [Ls1No 1EIOIETiY AND INT:NU NAST. FlRE NYDRANr ^rY;2 iEs a47%"`: :CR4 a.{ NEDN3ED)•EETELL N. Unurr POLE - y�yyav� _._ { $ f[y' � ^'11�'(1 VENT PPE • RE NO=NM AFTER 0/2500FHT Or WA RR YEIER GUY POLE :ykv vH .. • �•.; ' DIMING ISr STATBt IRRIGATION VALVE a MAIL BOX S R • 4 WATER BLOW OFF BIN ROCKERY S:"y..T^*u•'W4rr 27 ®S7', �w%ioPoYD B 1 a s �.�- • �_� BAOUION Pfdl9eFA SEE OEiAt 9�L m R2EAllONE CABINET j�:7k' x^^ ,$i'" A PROPOSED B'NWT %` /L ® CABLE ry CABINET • MLN M CASE D A Y A 1,t O 'ENT TOPE- ='- ��`'�12�—�'"� ® A/RFAeE BRASS MONUMENT O ,/ �1G �II.`. al GAS VALVE ■ ■ _ �- • `III ® GAS METER 1L PK NAIL ...„,,.t_ a, _ - .,.,.+ wC`�� . - © IELEPNOVE MANNOLE OQ IRON PIPE i-2+' A.,yy .SS �` k>.. �!«at'= .a ,'�ti�6's. 3 I A •, S _ .v. MI POKER VAULT EX WATER UNE ME EAnRACTOR SHALL LCCATE RE d,:,- - a A ../ IQ,Ki 4,1.,. . '- ■N 2^" 1 e uGHT POE a `I" �P EX SANITARY SERER UNE EYTSTNG PORCELAIN AND wSTAM A - - - _�.'Aa_ L� IQ, tiA ;j��i '"3"{� ,xyc{_��?ttt`� • a YARD UGNT Of STORM MALE n]PORARY WTE FRYING WM TA GAM ! a— _�f -.a�:)`.� �S'.:C�y.+, .F- `�i=q'?:',: —o—o--IRON FENCE �r �I ,?.' K1 6 iu • MONITORING REEL EX FORCE MAIN LANE VALVES SEE DETAIL M5 MT.AMER li •''•'-� PEDESTRIAN PUSH BUTTON POE ME PR6OSED UPT MINN5 1ES1ED , - I�BI LRf�a i �' a2. AND APOSED U ELM INN 5 T,TE _ �- 1R - �I ■TE AND EMIT VALVES SHALL• = '' - - TMt10 POST SIGN REMOVED AND REPLACED mM :.^ ',. ... ". ; /A'WATER KUL -A•E Bee(■HL BE :.:'. ..+y SEANCE PER an STANDARD ® rersne&money eox 1-A'pRFC UT ,LYy '�" +Ts?.I `F..r. _ • 1-1R/t51nLH CWI- (De TO PE)DUNG Jy7N:� i� ,Eh I I . i T/AEM/SERNa PROPOSED BEEF LEGEND PROPOSED Y D rdECEYAN - _ .` • II;;;: ::::....:..( _ I -.-.. ..:. M a / REMOVE CUM SECTOR 6 I I E7GVAT0I1 BONDS SOUTH BORDER Di PAVEMENT AND • .. -:`] �:v ii:i:'s:: ::j::•`^`::y:?:i':i NRB/N0 RCONSTaOT i0 QIR&LITTER,AA sDENALX T / , ALGAL mM EYKTNG SmNOHi L 1 PROPOSED.SEVER MUG (WEST soEREsirnsMAno�x. l• _.. +ce.R.-a1ts �o11i ,. sErnas — �II� �-I� . PROWSED■AiIDf PPNG i. RA 11AM I 1 K U .O _ NO M BORDER Or PAVNENi ND N.H.• GARBS.CUTTER IND SHERAUE CONSTRUCTION NOTEfi • W1�A "ttA n.ani Bg LE - - -m Tuu i ee•"Lt - _ (REST SCE OILY)1xs1GR,AnoR Mr .- - • EERIER a mRWN. - :.S p1------- ■EIVEIL I -�R i- r CA Ill I.LOOTS OF EIIGVATON 910YM ARE TO RE YILYTAwED AT All DIES OLIIRACitlt ILLY NOT EN®semi LOOTS iu 19em a BTU �' • • m1MLR PRIOR MITTEN AUDIONZATIDN BY omGR'S REPRESTOT O E NUS 6 E1T:AVAnOX .. - @H1FR p'YElm11 ,`•i - 2ACCESS TO AIL US DRNEWA15 MT BE PROMO BETOLDH THE!OURS EY APT AND 905 - __ "PROPOSED IE1EE11 Nd12..- l. • • I vpE�BY ptt.SERVICE niA�CioR TO LIFT STAna OUST RUM w XRIACE UHTR.PRCPD¢D STARCH APPROVED BY OMER TOR PTOwE MOOING.aAaD+HLCPERATOL ■ - - - -'-' - I• AND DEALER RESTORATION a ANY OPROVELENrz oSnRRBED pllaelG WNSTRucTON SHAM BE fSsiORED m udONI1 DI BEi1EA D?OTLE AS .DITS.C6 BY OWER STREET ORES,9DEMAU1,LM'OSCNIN 7RINSES•URNI E AND ALL mxm wsme IMPRowIB9s ARE uxaRmm MD INmEMTA ro Trc PRour. >'P • 'Y _ ri. -_sT. • AT M,� ... .,Jr ■ r L DARINFIL WY BE NNSTAUM UOR NOVELL SI GOW TRENAffCH1 AVATOL OIII■e ro 1@NLEE AREA OP ExuvAnel. '. .: '31'-i;KT 1l,sa-,,,. 21 7a :may,: .e^R:,y,. '. FT___sr : yW-�*T-SCE,' �..r„R},.,,Y _ i.3+2 n�c.M' i..:.52'++.t.l,.a>u - I &CONSTNCneH Or e'ass BETWEEN ENSTwc WNNQE NOPROPOSED YEMEN.NAY BE CONSTANC1ED ,3 3 K- `4: y 19E"-4"i-1,"a��-"%-' as -_R-..y'.1!"''i' a 7':y.-5.—.-.7 3y0,40- ._ f.ei _ 'TO ■ n BY of Ef TOO YEIXWS 1 ORAL TRENCH ]NWQPIC VON MPR 75`.- :i> '4.xzc?MPA.a+yM3„ f's;5.-:4 .r,.e.-•_..,.Z>'�y 77. �.'µltFs '':%T;.a '-2y .,. „.:5�v - __ --_:e.- 7r.37.+.-,R._ _ () >(I PPWAIE ROWER Rro1EenUL J 1MOHEVE 1ETOD 5 SELECTED.TRAVAIL WYAT WEND BEM ME DOTS sAA CN Ma - .F-%S 5:,r1E1!.•:& s_v: `�`I 20 ee 's'.VIlr-:a'r:.*ti._? 'J 4;a-t-< aj ,� -"N'Ti <.. .:;-.x`.2'74 :-5Sr:. -- - PUN ���':a;ia'T.y., .A,�.0 .�� v.'�:.:'T'T�,.4„.n., •��,:p�x1.. _ �,,,Y?.A�;_.n,..�+.,,a,,;:7'� `4'%y =S:v] err-' 7*,24�.,t. . frw.'gt-':N'r~ _1 ,Y�.t3 .:Y,:'.�yx'g..-4b_ ,. ..% 1 5` _ __syy�,�,'ijrl�iw:dz1 ^F•r.f TWBCIR.RES Pr GUTTER. E PLANS. 0E.CONTRACTOR9RLLL SAWTTE OJTAN ASIDWALKCAu WEST `AE-1-";:"-: � - VS Zi. In. CT .r1 .`�.x R ? -J 'i"" -Zk',.-L'�.;•1.^x - VW B]UA9Nffi SHOW ax T4 PEARS.NQWwc ALL p.Ne a GUTTER AND SIDEWALK a TIE WEST sOE r }3 CURB.OMER.MD SKULK el THE EASTSOE SHALL AT BE REPLACED MESS 0/BIAGED BY THE :. _: ,x G`w Ott+'v^+'- •�'_'� �— �.� 1�•� nI-ien �T}•^e TT. -`R MATCH CWMACTCR DIRMG COMMON.WO RACTDE SHALL REPLACE ALL CURB.GUTTER,AND SIDEWALK TO '•='.La'af :`1+�L<I �i •�tt`.sY�:J _ - •2�..•{}i'vi`..�''Ci:Tt-`.ti-''-'-: ^/1;✓;Y.,,,✓?' ,'S:-• NNTWCTOR TO PROIECr PACTm gUG91NEo SURFACING WYIIRSE(CSS1C}61C SHALL DE �9HLALL tiE A�IiPAALC1ED TOro95 ROOMED.UM 6 Or lib' ,�=_,. 1 --A ERSTA pIAB EROO DALAEF CUING ASPHALT REMOVAL PROPOSED SITE PLAN 1•-10 GRADE PAYMENT AATT LDnERLME NO DMSi VENT HUT VENT uo- E>STNG GRADE -�+ �'"°t TM`""" - O>=1/ELOPMENT P HOB(-OM lard DEWY) E 107.5A Rw 1DR.7o_ ., rev+oaao � CITY OF CANNING a- 1,24. 'A&22/, ` �^ RENTON UMW roREnAw aJ'.. . .-.... ..,..._._ _ 3iW, :.: r 199 rot PROPOSED FORCED. '•`�y •', .I - r RECEIVED �.AA__: .akx. R �-t,F f. �"�' '�l_t _/ •I ,,t5S1�`. I `MIING LIFT STATOR ED n:t 4. 5. V, ge "__--- V:'Fcs` Yu1'.:'L,;,*.s ;C0154 F-..----'>„yt .••• �•• `EASING RANKLE pN: n�ic �.f 'TF� C ----------'"------"- cams sEeER PPwe 7 9,__.- ,. MANG I 1�RRTII� ^ , 425/222 MI .3,S:ter I MISTING LGNTY SERER GATE VALVE PR�OSED SERER ---------- PI IRS yD-_"--__ _. E09mO GRANT(SERER) 1T-20E2 OFFICE. ix;G'E7 "..�':j I GATE VALVE c H H 5 r 5 Vvcw 20222122223 P-0--_ PROPOSED"EU- +a^4• t st .P`1 THRUST 9.oIXING Ins nrsso F • ?4P.'(iP.: CITY OF RENTON-1999 USING SEWER PPNG & " r'' LIFT STATION REPL=`r Dll p.��;•KOJECT °' TEMPORARY FORCEMAIN CONNECTION DETAIL TAL:H. A I FT STATION WEST ELEVATION NOT TO BANE 1 I I•NOSED SITE PLAN 1••1G 199 USAD I TAL-C1 I RCP ITEM I NOV OS.1999 I SHOT. I S I�X2 I Ss,,R City(1r__,_Jnton Department of Planning/Building/Pu___ works ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT: Cc o1noVV\ L I.- Are—ke+,/VJcMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF DATE CIRCULATED: NOVEMBER 29, 1999 APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth Higg ns PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 • LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. 4/0k F SITE AREA: 2,500 sq.ft. (in City R.O.W.) BUILDING AREA(gross): N/A 4 'Otiq '9, `f 1v 1470. 1 SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. 'W, tati9t,could built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would �A...sd ned in pl ce with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to co �yn Ja Gary 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction sta ,$Ut o he City R.O.W. A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet B. POLICY-RELATED COMMENTS Nv 9DL' (""'( L 5 . . ��s—� ����_ r?u N)hr& C. CODE-RELATED COMMENTS We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas wh //o ation is needed to properly assess this proposal. Pee let6s) Signature of D' c or or Auth zed epresentative Date routing Rev.10/93 • poNitgoanifiggillpir , - 41.1r0 • 440,-011110 City of Renton Department of Planning/Building/Public Works NVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEE ,... REV EI WINGDEP'RTMEN-�- 1g- weem, y" K oa} . 'D'=GEMBERIplarc11999� APPLICATION NO: LUA-99-161,ECF DATE CIRCULATED: NOVEMBER 29, 1999 APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth Higgins PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. SITE AREA: 2,500 sq.ft. (in City R.O.W.) I BUILDING AREA(gross): N/A SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of the City R.O.W. A. ENVIRONMENTAL IMPACT(e.g. Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth _ Housing Air Aesthetics Water Light/Glare Plants Recreation __ Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet • 71)i/u/ G C4 B. POLICY-RELATED COMMENTS . • C. CODE-RELATED COMMENTS We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where additional information is needed to properly assess this proposal. 61 i )a- 3--77 Signature of Director r authorized Representative Date routing Rev.10/93 City of Renton Department of Planning/Building/Public Works ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT: 170,44s COMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF DATE CIRCULATED: NOVEMBER 29, 1999 APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth Higgins PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. SITE AREA: 2,500 sft. (in City R.O.W.) BUILDING AREA(gross): N/A SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of the City R.O.W. A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities _ Animals Transportation Environmental Health Public Services _ Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet Ce (-'eirl'ea/71111.1/6 461 B. POLICY-RELATED COMMENTS / /i . . • C. CODE-RELATED COMMENTS 0. /Z1, e /ZUD - 174a LC/ I We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where additional information is n ded to properly ass ss this proposal. lz. 17 ignature of Director or Authoriz d Representative Date routing Rev.10/93 • ab 41110 City of Renton Department of Planning/Building/Public Works ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT: CpvAsk :h SetN,«e/3 COMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF DATE CIRCULATED: NOVEMBER 29, 1999 `'i) APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth Higgins "„ �� lrs PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607• LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. �� ' T ra SITE AREA: 2,500 sq.ft. (in City R.O.W.) BUILDING AREA(gross): N/A 4.0 SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station toM be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in prace with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of the City R.O.W. A. ENVIRONMENTAL IMPACT(e.g. Non-Code)COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants _ Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet B. POLICY-RELATED COMMENTS IV ,ve' C. CODE-RELATED COMMENTS mvc We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas wher additional information is needed to properly assess this proposal. /417 S' ture of Direct r Authorized Representative Date (r rou'ng Rev.10/93 • . City of Renton Department of Planning/Building/Public Works ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT: j\ — W-,r— COMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF DATE CIRCULATED: NOVEMBER 29, 1999 CITY OF RENTON' APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth Higgins,„„ �.. PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 DE, 0 "4JSJ LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. SITE AREA: 2,500 sq.ft. (in City R.O.W.) BUILDING AREA(gross): N/A BUILLHi\dj D1V401L9N SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of the City R.O.W. A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable. Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare _ Plants _ Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet B. POLICY-RELATED COMMENTS • C. CODE-RELATED COMMENTS �0 GOMWI-e We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where additional information is needed to properly assess this proposaL kJ 1 z/hf Signature of Director or Authorized Representative Date routing Rev.10/93 • City of Renton Department of Planning/Building/Public Works ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT:T1-e_fr2.t1C,Ali jo--n COMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF DATE CIRCULATED: NOVEMBER 29, 1999 APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth jggins_ rtti i INF9YR' EuEr6 . PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 Gins pr!r<«M+TI Th BUREAU LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. M01( 2, U IgZ SITE AREA: 2,500 sq.ft. (in City R.O.W.) I BUILDING AREA(gross): N/A SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station �q` ievv,�i t stat® ,g Ile be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of the City R.O.W. A. ENVIRONMENTAL IMPACT(e.g. Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities ' Animals Transportation. Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet /0 A B. POLICY-RELATED COMMENTS ,04 C. CODE-RELATED COMMENTS /OA We have reviewe this application i particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where add'ional informatio i eeded to properly assess this proposal. / ?/J G� cJu r Signatur of irector or Authorize _Repr entative Date routing I Rev.10/93 City of Renton Department of Planning/Building/Public Works ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT: f V r o Zhp-r COMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF 1 DATE CIRCULATED: NOVEMBER 29, 1999 APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth Higgins 1 al_OP pt.. i�l PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. � + 7909, SITE AREA: 2,500 sq.ft. (in City R.O.W.) BUILDING AREA(gross): N/A o� 61e V SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station woulMN built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of the City R.O.W. A. ENVIRONMENTAL IMPACT(e.g. Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet B. POLICY-RELATED COMMENTS C. CODE-RELATED COMMENTS IOU c;o wiHte4. We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where additional information is needed to properly assess this proposal. Signature of Director or Authorized Representative Date routing Rev.10/93 - .. City of Renton Department of Planning/Building/Public Works ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT:Su 1 v „e.f I LLEW i--COMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF I DATE CIRCULATED: NOVEMBER 29, 1999 APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth Higgins PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 g �k.�� LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. N,, SITE AREA: 2,500 sq.ft. (in City R.O.W.) I BUILDING AREA(gross): N/A eb SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift stati& would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned"itplace with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in J- 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of th ity R.O.W. A. ENVIRONMENTAL IMPACT(e.g. Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet B. POLICY-RELATED COMMENTS C. CODE-1RELATED COMMENTS ?Of) We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where additional information is needed to properly assess this proposal. Signature of Director or Authorized Representative Date routing Rev.10/93 • QPMENT SERVICES DIVIS`I "' <'M <>> ..M N..... .E....... . S.. S.O.N.................................................................. LIST O S .RRO�•� NDIN PROPE "Y WNER PROJECT NAME: 'VM 4d T c_2C5T `%+ Ssa j 1 u PL.Ac¢.-I APPLICATION NO: LllA• 61'1 • ltoI \FLe The following is a list of property owners within 300 feet of the subject site. The Development Services Division will notify these individuals of the proposed development. NAME ADDRESS ASSESSOR'S PARCEL NUMBER • • • • - -• (Attach additional sheets, if necessary) i e. (Continued) NAME ADDRESS ASSESSOR'S PARCEL NUMBER ' Applicant Certification I, ��c,'. tc 4 ?e.�o�r , hereby certify that the above lists) of adjacent property (Print Name) -�I111111//// owners and their addresses were obtained from: ��� FERlt �/� ® City of Renton Technical Services Records` o?�c:ss'°"Fxo;�s�� 0 Title Company Records ��°NpTARy 90 r 0 King County Assessors Records -�— v ��. PUBLIC �2� Signed ��—��' Date ��-io-99 3i9>'•.:k9y 9 •?:Ci�� (Applicant) • o%J•j jl 1���````` NOTARY ATTESTED: Subscribed and sworn before me, a Notary Public, in and for the State of Washington, residing at F� i�1�Ta N on the l 0 day of pv �Im���. , 19 1 cJ Signed �(/12G� C• (Notary• Public) :;:.;;: :.»>;; ::::>::::; :>:::;>:.::>::»:Fo .Ctt :.of:RentoUse::::.n;>: .::.....:>:;; . :>::;:>::::::, :<::> :..;,:. >; ::::>::>,:>::::: < CTI'::.ICATON`:.>OF:MAILI:`>:G ! : >: :: niliki>> < .> >: N I,`SG�UI :.. , hereby certify that notices of the proposed.application were mailed to ::::CI E to ee :.::>::::;:»:::::>:.;> : :«:::>:::>:::>:>:::::::::»::<:::;::'::::.:::> ::::::>:::;<::::::::::>:>::::>:>::>: : : >>:>::>:;:: each:listed ro ert ;Tow• ne::. >::::>:<f�:::::��: :::::�..:.::.::::. : .. .... . ....... Signed .. . .. ...�� Date....:. . � A :. :S. Su scrbd>yd:s >':>r'<}befor '"a No a> P.:>:::::;:>:< :< fo'r <>e>St to O: <::.ington: . TTE.T•...:...: .:::::::..!.:: ;.::. ::.. ..., a .;:.::t.:::rY. a ::f Wash n9 ;: :..:. .........:.:::::::..:::..:::.on:the:;:<::� ;..::.;:da:.»of:::: :�. .� ::.::. ::::::.::::::.:,:::: 9...�`'.�� ::.;;..>:.::.::.. • 59ZdIUX�faO19�t;;g11�VC�"�! listprop.doc �,_NO.LDNIHSVM dO BI'�S-, REV 07/98 MARILYN KAMCHEFF �AYRPPOINTMENTEXPIRES:6-29-03 2 ` ±IlHY3 �� iON 1IMV < ji3l•I9NI�! NAlll /---.777T;'.P._1:.i ‘:,..: ' i: ,'il,• ' _ . MORTENSEN P 13 EVOY CECIL H WOLSTED WILLIAM 2319 TAI:I3OT CREST DR S 401 S 23RD ST 407 S 23 RD ST RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 CITY OF RENTON OLIN RICHARD D LOKE VICTOR K Y 200 MILL AVE S 2320 TALBOT CREST DR 12006 SE 76TH ST RENTON WA 98055 RENTON WA 98055 RENTON WA 98056 WILLIAMS ISAIAH D+VELECIA M NORRIS LARRY A JR+DELORIS D FORD BETTY J 2332 TALBOT CREST DR S 2402 TALBOT CREST DR S 2408 TALBOT CREST DRIVE SOUTH RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 CHINN DEAN M FOUNTAIN BARRY B HANSEN RODNEY&DEBBE 2414 TALBOT CREST DR S 2420 TALBOT CREST DR 2500 TALBOT CREST DR RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 EVERSON RANDALL L HENDERSON CHRISTY+STEPHEN MAGNO WILFREDO 2510 TALBOT CREST DR S 2325 TALBOT CREST DR S 2331 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 SAUNDERS KARALA D+CHRISTOPH FRANGELLO WILLIAM J NGUYEN KIM ANH LE 2337 TALBOT CREST DR S 2401 TALBOT CREST DR S 2407 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 PICKREIGN CYNTHIA J ESPEY DIANE .WILLIAMS BARTOW JR+MINNIE L 2413 TALBOT CREST DR S 2419 TALBOT CREST DR S 2503 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 CUMMINGS RAYMOND+MARILYN L CAMP MERLE M YEAGER LESLIE M 2509 TALBOT CREST DR S 408 S 26TH 400 S 26TH ST RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 LEMKE REBECCA A+DALE M SMITH DON C HEM OSCAR F 403 S 26TH ST 401 S 26TH HEM C J RENTON WA 98055 RENTON WA 98055 2619 TALBOT CREST DR S • RENTON WA 98055 MCCLAIN CHARLIE W+ARNETTA NELSON RONALD N TRAUTMANN JOHN F 2613 TALBOT CREST DR..- . .. . : 2607 TALBOT CREST DR S 2601 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 //A AVERY® Address Labels Laser 5160® HOLZBOOG DAVID S+AMY L NESS ROSEMARY ALSTERBERG ROBERT T 2527 TALBOT CREST DR SO 2521 TALBOT CREST DR S 2515 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 • KLEINDL DONALD F MURCHISON JEFFERSON G+MYRTL LOMBARDI LEONARD S 2606 TALBOT CREST DR S 2528 TALBOT CREST DR 2522 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98056 SARGENT JOHN C+JENNIFER K CITY OF RENTON 2516 TALBOT CREST DR S 200 MILL AVE SOUTH RENTON WA 98055 RENTON WA 98055 • ® AVERY® Address Labels Laser 5160® • ��AY 0� Comments on the above application must be submitted in writing to Ms.Elizabeth Higgins,Senior Planner,Development '�_ + Services Division,1055 South Grady Way,Renton,WA 98055,by 5:00 PM on December 13,1999.If you have questions 1 .� about this proposal,or wish to be made a party of record and receive additional notification by mail,contact the Project s Co Manager.Anyone who submits written comments will automatically became a party of record and will be notified of any • decision on this project. NOTICE OF APPLICATION CONTACT PERSON: ELIZABETH HIGGINS(425)430-7382 AND PROPOSED DETERMINATION OF NON- ;PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION SIGNIFICANCE(DNS) DATE: November 29,1999 LAND USE NUMBER: LUA-99-181,ECF APPLICATION NAME: TALBOT CREST LIFT STATION REPLACEMENT PROJECT DESCRIPTION: The City of Renton proposes replacement of the Talbot Crest Lift Station.A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South.The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a I —Temporary Use Permit for construction staging outside of the City R.O.W. l S 23rd St / l PROJECT LOCATION: Talbot Crest Drive So.In RO.W.near 2515 Talbot Crest Drive So -- ` � \ PERMIT APPLICATION DATE: November 12,1999 __ a 0 NOTICE OF COMPLETE APPLICATION: November 29,1999 Permits/Review Requested: Environmental(SEPA)Review,Temporary Use Permit Ilk �o Other Permits which may be required: None acc .c cc7111 Requested Studies: None '^ - Location where application may w - be reviewed: Planning/Building/Public Works Division,Development Services > Department,1055 South Grady Way,Renton,WA 98055 PUBLIC HEARING: N/A ,. PRO ECT .. ; sS w L❑C',TI❑N ` CONSISTENCY OVERVIEW: Analytical process M S th Project consistency refers to whether a project Is consistent with adopted and applicable development regulations,or In 1...... o their absence,comprehensive plan policies.RCW 36.70B.110 2 « a statement of the preliminary defennination of a projecl's consisteng)Pwithe at the Notice of Application(NOA)include ry type of land use,level of development, 3,infrasWcture,and character of development if one has been made at the time of notice.At a minimum,every NOA shall Stinclude a determination of the project's consistency with the zoning,comprehensive plan and development regulations. JG� Land Use: Residential 8(R-8)Zone -- •C; r I _I^`I S ' Environmental Documents thati . .__ S 27th Evaluate the Proposed Project: Environmental Checklist `- ,2;•1• l` Development Regulations AAth Pl Used For Project Mitigation: N/A '�I Proposed Mitigation Measures: NIA I ' I mafiWl / mated — - ----- -- — — CERTIFICATION • ' I, .),Ess c -oeopciik , hereby certify that 3 copies of the above document were posted by me in 3 conspicuous places on or nearby the described property on 7 - gen_ s- (671 r • Signed: �� ��,®(_ ATTEST: Subcribed and sworn before me, a Nortary Public,'in for a State of Washington residing , on the 27_ d day of . j S4 MARILYN KAMCHEFF Y NOTARY PUBLIC ),---)"7 eo_ )-n( STATE OF WASHINGTON s COMMISSION EXPIRES MARILYN KAMCHEFF JUNE 29, 20®3 ; MY APPOINTMENT EXPIRES:6-29-03 ti• �•'NT•.NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF NON- SIGNIFICANCE (DNS) DATE: November 29,1999 LAND USE NUMBER: LUA-99-161,ECF APPLICATION NAME: TALBOT CREST LIFT STATION REPLACEMENT PROJECT DESCRIPTION: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new. • lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging outside of the City R.O.W. PROJECT LOCATION: Talbot Crest Drive So.In R.O.W.near 2515 Talbot Crest Drive So PERMIT APPLICATION DATE: November 12, 1999 Si / NOTICE OF COMPLETE APPLICATION: November 29,1999 \/ Permits/Review Requested: Environmental(SEPA)Review,Temporary Use Permit Other Permits which may be required: . None Requested Studies: None Location where application may be reviewed: Planning/Building/Public Works Division,Development Services Department,1055 South Grady Way,Renton,WA 98055 PUBLIC HEARING: N/A CONSISTENCY OVERVIEW: Analytical process Project consistency refers to whether a project is consistent with adopted and applicable development regulations,or in their absence,comprehensive plan policies. RCW 36.70B.110(2)(g)provides that the Notice of Application(NOA)include a statement of the preliminary determination of a project's consistency with the type of land use,level of development, infrastructure,and character of development if one has been made at the time of notice. At a minimum,every NOA shall include a determination of the project's consistency with the zoning,comprehensive plan and development regulations. Land Use: Residential 8(R-8)Zone Environmental Documents that Evaluate the Proposed Project: Environmental Checklist Development Regulations Used For Project Mitigation: N/A Proposed Mitigation Measures: N/A mailout r Comments on the above application must be submitted in writing to Ms. Elizabeth Higgins,Senior Planner, Development Services Division, 1055 South Grady Way,Renton,WA 98055,by 5:00 PM on December 13,1999. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager.Anyone who submits written comments will automatically become a party of record and will be notified of,any decision on this project. CONTACT PERSON: ELIZABETH HIGGINS (425)430-7382 PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION • S 23rd St • / ! J — - '''''' \ i} ----, .,:p. 0 MI a r` i all N ® C .-_ PRO ECT S 0 LOCATION ~� W - ® L S th C' J St r � C'C, 1 - 0S 27th ' iiii S •thPl� mailout CITY OF RENTON MEMORANDUM Date: November 29, 1999 To: Michael Benoit/Wastewater Utility From: Elizabeth River Higgins/Development Planning Subject: Talbot Crest Lift Station Replacement Project No. LUA-99-161,ECF The Development Planning Section of the City of Renton has received the above-referenced application for environmental review. A presentation of the proposed amendment to the Environmental Review Committee (ERC) is scheduled for December 21, 1999. Following the ERC meeting, I will send you copies of the ERC determination along with the timeframes for the public comment and appeal periods for your files. Please provide a charge number for the publication of the environmental determination. acceptance .................................................. • :'' '•• .:.'.'••..�I.'• �•'•:::i-.••.?:......�:.i:., .....?:!:......::''::.t:::.tij::::: 1:: ..,...' :',{'::':t�:{+.:.::'.:i::'::i:..••...i iy:i:ii::i Y Y::...........:{:{{:::.!::::::iiiSi,.....::. :y:::?t$......i:t.:i'•f:• ...................................... «OP`ERTY<OW.N.:E,::(S''<' mEmiri'>i iimm 1...................................... :.......:...:...:.:....:............:R....J...:CT:..: ORMT..ON...................::............. • Note ttthafo:1:0 more that•ohe legalOWflek,.p(eaSe attach are addlttohal:: ::«sLa:.A:itiiicat hill :eac ii.V.i.::.; "::.::::::::giNi::::::.>>?:>s>;; igig . :nbtan��dtMa c..Ppl� � n.. c. h.owner;:,......:.....:,.:..............:...:............... PROJECT OR DEVELOPMENT NAME: NAME: -1`AL-40T c2C•51- L.r Pr ST4T1 '- G tt-t O F 1eeni-to•) l'Zr P��4c sr�-�1�.�1- PROPERTY/PROJECT ADDRESS(S)/LOCATION: ADDRESS: • .. to SS S Co', r,--S A•`r . j)Cr, ' Ofat Crr/451- MPLC CITY: ZIP: KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S): e F',.);o...1 't.So S S- IV/A TELEPHONE NUMBER: EXISTING LAND USE(S): (yZs) 4130 '7ZC.D(.. 1✓11--, 2tc.,•i1- - c)F - 'Pe i P....C.::.N.:.::::i..::athg.r.. tE a downer}.::::::::.:::::::w: PROPOSED LAND USES: NAME: COMPANY(if applicable): EXISTING COMPREHENSIVE PLAN MAP DESIGNATION: ' S./ ..VL.5; FA•.-i Il y e✓i 5i.,76_T/ 4.I- A D D R E S S: PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION (if applicable): • n-//A CITY: ZIP: EXISTING ZONING: g475% ipr_a7► 4Lr. S•JcolF F.4.►-t•4.y TELEPHONE NUMBER: g SQ /4'c' ®' LOPIyENTN� ING PROPOSED-ZONING (if applicable): CNTyOFREN ON .' N A- p➢ Q ►e • 1 2 ,`,., SIT,E•A_REA1SQ. FT. OR ACREAGE): / . NAME: .?.:>"S Q CD SRC-1- �L I VED /�-u,cH4�'L A 'C4Jo,r x.. ,l' t..4...,°`LG1Tb elC.4-T=OP-v4'4) PROJECTALUE: • COMPANY (if applicable): 4.14 5TC t—),e 7C'.0 C> :V ?1 L„i):- :. • "3Ci )' OF • 2ctaTc) .) : . . O;OC)CDC . . ADDRESS: - IS THE SITE LOCATED IN THE AQUIFER PROTECTION AREA? /U S`S- S Cq ✓L.4 e)'s L-)4 'r tJ v • CITY: ZIP: . • 2��.1 i o,J 9 S��� IS THE SITE LOCATED IN=ANY OTHER TYPE OF ENVIRONMENTALLY SENSITIVE AREA? -• TELEPHONE NUMBER: tJc) - . . . - - }:Igli i':EAC41 r..TI:ON;.i«i•. P:.:; :..E...TY: At. ab`11'><:.:., i irate'`sheet filliecassar:'';:• '�LE�A ..�� ..:t>�Fi....ROP �. . ..�e a e.�t.�f.�rl ,....;}}iiii:.}:.::.:;.>::.:.;i:<.:.�r;; . . . . ... .............. • • 'TA i_cr c2.4— ,O2/UC 5.U`174 i ct ? ' /2'GH?- O•�`- cJAYJ . 4 • 414Pee i 0 v--t Are c.'`1' 2 S "/ S TA'L{ja'T L' 2 .4' s— 0 e/ Of' 5 d J %K _ . &OC47S0 i._l •• .%N•<`-, -/CJ,i ; Vey. Gt'= .'5/`C7/ uJ - '3 0 7-0,..3.3skit .'' Z.3/`J 1(ZA,-��e S r . ' • tiff•i:•}ii:•i:Y i S:::-,,,,,,,,,,:-::•}}:i•iii:tii•}:tiff?•}:ti!•}:tin}i}:.}:4}:•}:iii::i•:ry;�;,,,--}}}},:::: L•.--,}tiff}:•:�i,,:::?.i:.i:::}i:}},,,,:,,,,:;::{v:3::i}}:.y:ii::•hiii:::**::}:iv :::::i4i:i•:i.1L4:viim::y};i•i}iiii' };:�iiiiiyii::-0}::?i:�}ii:C•ii i•}i::*•i:x:iii: C•• ��C `+t3 ����I `` `�ll:�a�v �`�>`Q� '�'�'��...Via.. � #. .wl���>; :et .ir. :e e :<i :RP: —ANNEXATION $ SUBDIVISION: . COMP. PLAN AMENDMENT $ • — — REZONE $ _ LOT LINE ADJUSTMENT $ — SPECIAL PERMIT $ _ SHORT PLAT $ _TEMPORARY PERMIT $ _TENTATIVE.PLAT $ — CONDITIONAL USE PERMIT - $ . • _ PRELIMINARY PLAT $ — SITE PLAN APPROVAL $ _ FINAL PLAT $ _GRADE & FILL PERMIT-, . - $ .. A . :(NO. CU. YDS: 1 PLANNED UNIT DEVELOPMENT: $ _VARIANCE • $ ::(FROM SECTION: 1 _ PRELIMINARY _WAIVER $ FINAL _WETLAND PERMIT $ ' ROUTINE VEGETATION — MOBILE HOME PARKS: $ MANAGEMENT PERMIT $ BINDING SITE PLAN $ • SHORELINE REVIEWS: , _ SUBSTANTIAL DEVELOPMENT $ • _ CONDITIONAL USE $ _ VARIANCE . . $ • — EXEMPTION ` $NO Charge _ ENVIRONMENTAL REVIEW $ REVISION $ ,FFID v. > >>: : :..;WN:ER,i H' `. >'gi::. i> €>`><€<>>> <><; ` '>> < gm I>> i::Ni`>im:<>»<><><<>>;<�> ><>><�>>;> ><» ;»< <»`»>> > » >>> >>>< >�IFF k. .IT..OF..OV�I'lV RSIi.P............................................................................... I, (PrintName) , declare that I am (please check one)_the owner of the property involved in this application, the . .• authorized representative to act for the property owner(please attach proof of authorization),and that the foregoing statements and answers herein contained and the information herewith submitted aie in`�lt�4 f,, ,ue and correct to the best of my knowledge and belief. . • Cr P,•��sston ea,.,,i� • �•04` �4" 9�'J-TEST: Subscribed and sworn to before me, a Notary Public, in and •' !`7tci./4�C c_ A' ':Q.4;�o.is • , r .+... OTA ".Of�the State of w '-• .. •�� /�y � e= /�'S{-{'� •residirig�at (Name of Owner/Representative) C : — — : = R.I✓)4 TON , on the ► Oday of . 4 ,, cp: PUBLIC ,'2..�Ot/.• 1934: • (Signature of Owner/Representative) . 4-0k WAS`A*. //AAA, C - /. / //111111 (Signature of Notary Pub!' 1. .;;:::::::�>'::.;'..;:::>i:::>:.:>:<:i::.:<::: ::>;: ::» :: ::>:: :.;i::>::>:.:>:>:.}::>:;:::>::::>:::>':(T. ..s. ct n..t ... .e.. . .m i. . .d..b ..C. ..Staff..1....................... :.::.::: ::: ...:::.: .:::....:::::::.:::.::.::::.:.:.i:..:.:.} '.:..:�: '.i";.:.::.:.:.}:.::i:.:.:.}i':.i::.}:..:•:.:�.::".iii:.::':. :•:..:.::.}....,...;:.:;.i....i:.:.i::...;.::...;.:::.:::;::..,..:::::::::::....::::::.::::::::..::::.:.::.: ::...: . .:::.:::.::::.:::::.;:.;i::::::. :<:<:>:::::»>:»clt::::: Ile:::Num6�r...:::. .. ::: ::::::.. :::.:.::::::::.:::A::: AAD.:::::8 F.:::::CAI S:»::»CAR.:.U::;;:CI a::.::.0 .. .:::::. H.•:: C •:::. LAi:.:.:::::.4:: :::::::::::::::::::}:::�:::.:::::::.;.:::.}:.::::.}..i::.:.: ............. . •.....�. .--.;ii;:.i:.:.ii:;.i:;; iii:;i:.i:..i':..ii:.:;::.:.::::;.;:.:;i:.:::;.ii:.:«:::.::;::: :>::::::::::<::::::::.:.�: :::::::::::::::::::::::::: :::. .::::::::::: ::.�.�:::::.:::::.:: <:.:::::... :::.}:g:M i » :<:FPi;p:>:<:::;.::.: 1:,»:.:::::;:.:. »:•}:S. •:•}:•:S..-:i>:•i:::SH PL'- >}}:S> : ��:: : ::. ii: - -'",`,. t�V: ., :;::>:»<:........ .HP.......... ......FP.PP.........BYM........ .A.A...... .A..H...... .. .. ..A...... .H.PL-H.....SI'..::<SNf>:'S.M.E<: <:::P« :.: >::: ;=5:<: :V.>H..... :.>:.i:.i:.>:.i::.»:.::.i:::::.:::::.:ii...:..........::•::::........:..:. ::.i:•:<6�>:•}:•:•i:•:;•:•;•::•>i:•;;::i:+.';}:•i:.}:•i••;•i:•:'::::i:•:i:.::.::.�::.:.;'::::_:::::..:•:::::.�:.;;••<:::.;::::.:�.;�.�.;;.;::;;•:,::i:•>:•i:•i•:•i:.}'.}}::+sc:.:'.i:•:::•>i:.:;..i}i:.r:ii:.ii:.:.>:.:.•:•:•i:•: :.:;:i:.>:.:i:.i::t:i:;:>:. <:»'::>::TOTAL'FE S `1:>�:;;::;>i::>:<:>:>:<::>::>:::><:>::>:<:>:€::<€::'.:::s>::is»TOTAL:'POSTAGI • :.. :<:: :::>:::>:»< :»<:::>>:>><'>:>::>:>:::>:>: :<::::>>;:>:>::: ':::::<:>: >::,::>::>':;::i:<::<:<:: ':::.»:.' ... .ES................................................. ..PROVI.DED....$ . . MASTERAP.DOC- REVISED 8/97 .. - _ Talbot Crest Lift Station Replacement The City of Renton is planning to replace the Talbot Crest Lift Station. This will entail the construction of a new lift station in Talbot Crest Drive South. The new station will be built in large vaults under the west side of the roadway. The existing station, located behind the sidewalk west of the road,will be abandoned in place. The top of the station will be removed,the equipment will be removed,and the old manhole filled in. The existing antenna will remain. The telemetry;control panel for the new station will be mounted on the existing antenna and replace the existing panel. The road and sidewalk will be restored in the construction zone. Construction of the new station will entail excavation of the roadway. While the road will be closed for through traffic,the contractor will maintain access to all driveways,except for short periods of time. Property owners with driveways to the south of the construction project will have to enter Talbot Crest Drive from the south,while Property owners with driveways to the north of the construction project will have to enter from the north. We expect work to start in mid January 2000 and should be completed by June 2000. DEVELOPMENT PLANNING CITY OF RENTON NOV 12 1999 RECEIVED CITY OF RENTON ". . DEVELOPMENT SERVICES DIVISION ENVIRONMENTAL CHECKLIST PURPOSE OF CHECKLIST: The State Environmental Policy Act(SEPA), Chapter 43.21 C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An Environmental Impact Statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done)and to help the agency decide whether an EIS is required. INSTRUCTIONS FOR APPLICANTS: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer or if a question does not apply to your proposal, write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions-ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. USE OF CHECKLIST FOR NONPROJECT PROPOSALS: Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). For nonproject actions (actions involving decisions on policies, plans and programs), the references in the checklist to the words "project," "applicant," and "property or site" should " osal," "proposer,"and"affected geographic area," respectively. GI OF RED ON ING NOV El ? 1999 1998 City of Renton Long-Range Wastewater'iJlanagement Plan Environmental Checklist A. BACKGROUND 1. Name of proposed project, if applicable: Talbot Crest.Lift Station Replacement 2. Name;of applicant: City of Renton -Wastewater Utility • 3. Address and phone number of applicant and contact person: 1055 South Grady Way Contact: Michael Benoit-(425)430-7206 Renton,WA 98055 4. Date checklist prepared: October 25, 1999 5. Agency requesting checklist: City of Renton 6. Proposed timing or schedule (including phasing, if applicable): Begin Construction January 10, 1999 Complete construction May 30, 2000 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. No . 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. None 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes,-explain. No 10. List any governmental approvals or permits that will be needed for your proposal, if known. Temporary Use Permit(for construction staging area outside City right-of-way) 11. Give;brief, complete description of your proposal, including the proposed uses and the size of the • project and site. The project consists of construction of a new Talbot Crest Sewage Lift Station. The new station will be located under ground in Talbot Crest Drive, within 20-50 feet of the existing station. The antenna and telemetry panel will be the largest `structures' above ground. The existing station will be abandoned. E:\96comp\SEPA98.doc\MAB -2- 1998 City of Renton Long-Range Wastewdner Management Plan Environmental Checklist 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The majority of project will be located in the right-of-way in the vicinity of 2515 Talbot Crest Drive. The existing lift station that is located on easement adjacent to the right-of- way will be abandoned. The new station's telemetry panel and antenna will be located on the easement, adjacent to the right-of-way, where the existing panel and antenna are located. B. ENVIRONMENTAL ELEMENTS 1. EARTH a. General description of the site (circle one); flat, rolling, hilly, steep slopes, mountainous, other The areas in which the proposed sanitary sewer work would be done are basically flat paved rights-of-way. The easement area west of Talbot Crest Drive, where we will be abandoning the existing station is also flat with some landscaping. The developed area where the lift station is located is generally hilly and sits adjacent to steep slopes (west of the houses on the west side of Talbot Crest Drive)that descends to the valley floor b. What is the steepest slope on the site (approximate percent slope?) The proposed project is in a flat area with the centerline of the rights-of-way having - a maximum slope of approximately 0.6% The easement area where the existing station will be abandoned and the new telemetry panel and antenna will reside has a slope of around 0.6%. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Based upon a recent subsurface investigation (Boring) performed by Golder Associates Inc.,the soils at the proposed sight for the lift station generally consist of dense silty fine sand and till over siltstone(Tukwila Formation). d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No. E:\96comp\SEPA98.doc\MAB -3- 1998 City of Renton Long-Range Wastet._._.. .11anagement Plan Environmental Checklist e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. Construction of this project will not require grading or filling of a site. When backfilling the trench, we will use native material (that which was removed during excavation) if it meets standards. If the native material is not of an appropriate quality,we will import backfill from an approved source. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Construction of this project will be in paved areas and will not cause significant erosion. City of Renton sedimentation and erosion control measures will be employed during construction to mitigate impacts that may be caused by the moving,storage and use of earth materials in the construction of the project. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? There will not be any new impervious surfaces resulting from this project. All portions that take place in existing paved areas will be restored in asphalt or concrete. Where unpaved areas are disturbed, they will be restored to their preconstruction condition. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Standard City of Renton sedimentation and erosion control measures will be employed during construction. 2. AIR a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. During construction, on-site emissions will consist of fugitive dust and emissions from construction equipment. These are anticipated to be minor and largely confined near the site. b. Are there any off-site sources of emission or odor that may affect your proposal? If so, ' generally describe. No. c. . Proposed measures to reduce or control emissions or other impacts,to air, if any: Equipment and construction of this project will meet federal, state, and local emissions requirements. E:\96comp\SEPA98.doc\MAB -4- 1998 City of Renton Long-Range Wastewater Management Plan Environmental Checklist 3. WATER a. ' Surface Water: 1) Is there any surface water body on or in the immediate vicinity of the site (includi1g year- ' round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. No. The Panther Creek Wetlands are approximately 300 feet west of the project site with developed single-family parcels between the two. 2) Will the project require any work over, in or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. ' No. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. Minor temporary rerouting of existing drainage may take place during construction 5) Does the proposal lie within a 100-year flood plain? If so, note location on the site plan. No. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground Water: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give, general description, purpose, and approximate quantities if known. • Minor dewatering may occur in the trenches during construction. 2) Describe waste material that will be discharged into the ground from septic tanks or other - i sources, if any•(for example: Domestic sewage; industrial, containing the following chemicals...; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the systems) are expected to serve. This project is to replace an existing sanitary sewer lift station and will not create a discharge of waste material into the ground from septic tanks or other sources. E:\96comp\SEPA98.doc\MAB -5- 1998 City of Renton Long-Range Wasteu:''E..... •.Ianagement Plan Environmental Checklist C. Water Runoff(including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters, If so, describe? It is not expected that there will be any changes in the runoff pattern as a result of this project. The paved surfaces and drainage will'be restored to pre construction patterns. 2) Could waste material enter ground or surface waters? If so, generally describe. No. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: N/A • 4. PLANTS a. Check or circle types of vegetation found on the site: X deciduous tree: alder, maple, aspen, other(birch) X evergreen tree: fir, cedar, pine, other X shrubs X grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants:water lily, eel grass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? Some vegetation, most likely grass or shrubs, may be impacted when the contractor abandons the existing station. c. List threatened or endangered species known to be on or near the site. None E:\96comp\SEPA98.doc\MAB -6- 1998 City of Renton Long-Range Wastewater Management Plan Environmental Checklist d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Vegetated areas that are disturbed will be restored to their pre-construction condition. 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: A wide variety of birds and animals native to the Puget Sound Lowlands may be found in the vicinity of the study area. The more common are underlined below: Birds: hawk, heron, eagle, songbirds, other: misc.scavenger birds (i.e. crows) Mammals: deer, bear, elk, beaver, other misc.small mammals (i.e.squirrels) Fish: bass, salmon, trout, herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. None known c. Is the site part of a migration route? If so, explain The entire State of Washington is included within the Pacific flyway migration route. We do not anticipate that this project will have any major, long term impacts on migration routes. d. Proposed measures to preserve or enhance wildlife, if any: None 6. ENERGY AND NATURAL RESOURCES a: What kinds of energy (electric, natural gas, oil, wood stove, solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. The new station will use electric power for operation, as did the old station. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: None E:\96comp\SEPA98.doc\MAB -7- 1998 City of Renton Long-Range Wastei_`_,__.ilanagement Plan Environmental Checklist - 7. ENVIRONMENTAL HEALTH a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. With the exception of potential fuel spills during construction, no hazardous chemicals or other health hazard risks are anticipated. 1) Describe special emergency services that might be required. The only anticipated emergency needs during construction would be ambulance w/ paramedical personnel (in the event of a construction related accident), fire suppression equipment (in the event of a fire, or the emergency spill response team(in the event of a major fuel spill). 2) Proposed measures to reduce or control environmental health hazards, if any: On-site areas will be designated for refueling. Refueling areas will be equipped with appropriate equipment to comply with spill prevention and cleanup procedures established by the City. • b. Noise 1) ; What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? None 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Short term noise from construction equipment would occur between 7:00 AM and 7:00 PM. 3) Proposed measures to reduce or control noise impacts, if any: All construction equipment will meet all federal, state and local laws for noise restrictions. 8. LAND AND SHORELINE USE a. ' What is the current use of the site and adjacent properties? The site is currently improved public rights of way. The adjacent properties are developed single family lots. The existing station, which will be abandoned, is situated in the south east corner of one of the developed parcels (adjacent to the street). b. Has the site been used for agriculture? If so, describe. No E:\96comp\SEPA98.doc\MAB -8- 1998 City of Renton Long-Range Wastewater Management Plan Environmental Checklist c. Describe any structures on the site. The project is within improved rights-of-way. There are no structures at the location of the new station. Adjacent to the site of the new station are single family homes and the existing sewer lift station. The existing station is almost completely under ground. d. Will any structures be demolished? If so, what? The existing lift station will be abandoned in place, filled, the top section(s) removed, and the surface re-landscaped. The existing antenna will remain. The existing telemetry panel will be replaced with the new telemetry panel. e. , What is the current zoning classification of the site? The Construction zone is public rights-of-way. The adjacent properties are zoned Residential Single-Family—8 units per acre. f. What is the current comprehensive plan designation of the site? The current designation for the site is Single Family Residential. g. If applicable, what is the current shoreline master program designation of the site? N/A h. ' Has any part of the site been classified as an "environmentally sensitive" area? -If so, specify. A portion of the Talbot Crest Area, to the north of the site, is identified as a moderate coal mine hazard sensitive area. The area to the west of Talbot Crest Drive is designated an erosion hazard sensitive area. We do not anticipate that any work associated with this project or the finished station to have erosion impacts. The Talbot Crest Area has been identified as a moderate to high slide sensitive area. We do not anticipate that any work associated with this project or the , finished station to have slide impacts. , Approximately how many people would reside or work in the completed project? None. j. Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: N/A E:\96comp\SEPA98.doc\MAB -9- 1998 City of Renton Long-Range Waste , „Aanagement Plan Environmental Checklist Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: N/A 9. HOUSING a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. None. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. None. c. Proposed measures to reduce or control housing impacts, if any: N/A 10. AESTHETICS a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed. The completed project will be at or below ground level except for the telemetry panel and antenna. The new telemetry panel will replace the existing panel. b. What views in the immediate vicinity would be altered or obstructed? None c. Proposed measures to reduce or control aesthetic impacts, if any: N/A 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None. b. Could light or glare from the finished project be a safety hazard or interfere with views? No. c. What existing off-site sources of light or glare may affect your proposal? None. d. Proposed measures to reduce or control light and glare impacts, if any: E:\96comp\SEPA98.doc\MAB -10- 1998 City of Renton Long-Range Wastewater Management Plan Environmental Checklist N/A 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? Talbot Hill Park and Talbot Hill Elementary School are near by b. Would the proposed project displace any existing recreational uses? If so, describe. No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: N/A. 13. HISTORIC AND CULTURAL PRESERVATION a. Are there any places or objects listed on, or proposed for, national state, or local preservation registers known to be on or next to the site? If so, generally describe. No. b. Generally describe any landmarks or evidence of historic, archaeological, scientific; or cultural importance known to be on or next to the site. N/A. c. Proposed measures to reduce or control impacts, if any: N/A 14. TRANSPORTATION a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. The construction site will be in Talbot Crest Drive south, which is a looped road that connects at the north and south to Talbot Road South. Access to the site would be via Talbot Road South to Talbot Crest Drive. b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? Yes. There is not a bus that utilizes Talbot Crest Drive, however the 169 bus does use Talbot Road which is within easy walking distance of the construction zone. c. How many parking spaces would the completed project have? How many would the project eliminate? None. E:\96comp\SEPA98.doc\MAB -1 1- 1998 City of Renton Long-Range Waster....,, .lanagement Plan Environmental Checklist d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private? No. e. , Will the project use(or occur in the immediate vicinity of)water, rail, or air transportation? If so, generally describe. No. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. The finished project will require approximately 2 to 6 vehicle trips PER WEEK that will typically occur between 7:00 AM and 5 PM. There may also be an occasional ' ' emergency trip to the site at other hours. The number of vehicle trips should be the same or less than generated by the existing station.. • g. Proposed measures to reduce or control transportation impacts, if any: During construction, proper traffic control and detour routing will be used. 15. PUBLIC SERVICES a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. No. b. Proposed measures to reduce or control direct impacts on public services, if any. N/A 16. UTILITIES a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service,telephone,sanitary sewer,cable b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Please refer to question A-11. E:\96comp\SEPA98.doc\MAB -12- 1998 City of Renton Long-Range Wastewater Management Plan Environmental Checklist C. SIGNATURE I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration of non-significance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. Proponent: Name Printed: Michael A Benoit Date: ii/i o /' 9 • • E:\96comp\SEPA98.doc\MAB -13- City of Renton Department of Planning/Building/Public Works ENVIRONMENTAL 8 DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT: Miles COMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF DATE CIRCULATED: NOVEMBER 29, 1999 APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth Higgins PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. SITE AREA: 2,500 sq:ft. (in City R.O.W.) I BUILDING AREA(gross): N/A SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of the City R.O.W. A. ENVIRONMENTAL IMPACT(e.g. Non-Code)COMMENTS Element of the Probable Probable More ' Element of the Probable Probable More Environment Minor Major Information , Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet cObe4_,e Ct -e- frteatZ1/1" 1-/6 l°4 B. POLICY-RELATED COMMENTS c(7(..c. / 4 / "" . • • C. CODE-RELATED COMMENTS OZLele (7be YL°- 17a leeLj—°/62)41/ I We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where additional information is n ded to properly ass ss this proposal. l t i ignature of Director or Authoriz d Representative Date /17 routing Rev.10/93 41110 City of Renton Department of Planning/Building/Public Works ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT: CUV\ Vu o SeNLCeo COMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF DATE CIRCULATED: NOVEMBER 29, 1999 %I_ APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth Higgins ries PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 n'" <,0 LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. �� ,9619 SITE AREA: 2,500 sq.ft. (in City R.O.W.) BUILDING AREA(gross): N/A 4. SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift stationflfUgyig be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed,and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of the City R.O.W. A. ENVIRONMENTAL IMPACT(e.g. Non-Code) COMMENTS Element of'the Probable Probable More Element of the Probable Probable More Environment Minor Major Information. Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals _ - Transportation Environmental Health Public Services • Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet B. POLICY-RELATED COMMENTS i/of1lG C. CODE-RELATED COMMENTS Worn We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas wher additional information is needed to properly assess this proposal. !� 4 427/ S' ture of Direct r Authorized Representative Date rou'ng Rev.10/93 • City of Renton Department of Planning/Building/Public Works ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT: peC1"uc.J War— COMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF DATE CIRCULATED: NOVEMBER 29, 1999 CITY OF P!E61"TC?P.a APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth Higgin�g� PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 DE.t.9 0I a iwJ LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. SITE AREA: 2,500 sq.ft. (in City R.O.W.) BUILDING AREA(gross): N/A tat, 1L UmB"d(j LD1V4gQN SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of the City R.O.W. A. ENVIRONMENTAL IMPACT(e.g. Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet B. POLICY-RELATED COMMENTS C. CODE-RELATED COMMENTS J0 cobf4►M-el/LI We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where additional information is needed to properly assess this proposal. k'1 1 z//4r9' Signature of Director or Authorized Representative Date routing Rev.10/93 City of Renton Department of Planning/Building/Public Works • ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT:" \re jPV-.poc,v11J-In COMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF DATE CIRCULATED: NOVEMBER 29, 1999 APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 ppc Dom IENITint\i BUREAU LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. NOV 19 SS SITE AREA: 2,500 sq.ft. (in City R.O.W.) BUILDING AREA(gross): N/A SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station ew ji#E stt ®'h o ldlbe built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would lie abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of the City R.O.W. A. ENVIRONMENTAL IMPACT(e.g. Non-Code)COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare • Plants Recreation Land/Shoreline Use Utilities ' Animals Transportation. Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet B. POLICY-RELATED COMMENTS 104 C. CODE-RELATED COMMENTS AA� We have reviewe this application i particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where add'Tonal informatio /eeded to properly assess this proposal. / 4444)-0 Signature of irectororAuthorize•.Repr en ?tative Date routing Rev.10/93 City of Renton Department of Planning/Building/Public Works ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT:— 1pv71Z.-hp-t COMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF DATE CIRCULATED: NOVEMBER 29, 1999 APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth Higgins � PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 'Lilt 2 LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. ,off + 793,9 SITE AREA: 2,500 sq.ft. (in City R.O.W.) BUILDING AREA(gross): N/A SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station wourle" built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of the City R.O.W. A. ENVIRONMENTAL IMPACT(e.g.Non-Code)COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth _ Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use _ Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet B. POLICY-RELATED COMMENTS C. CODE-RELATED COMMENTS Nu LOWttM(4. We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where additional information is needed to properly assess this proposal. lVCV taco 1//90Avg Signature of Director or Authorized Representative Date routing Rev.10/93 0 City of Renton Department of Planning/Building/Public Works ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT:Su_v_aLd ik(L*- 1JJ tI --COMMENTS DUE: DECEMBER 13, 1999 APPLICATION NO: LUA-99-161,ECF DATE CIRCULATED: NOVEMBER 29, 1999 APPLICANT: City of Renton/Wastewater Utility PROJECT MANAGER: Elizabeth Higgins 0/t_ PROJECT TITLE: Talbot Crest Lift Station Replacement WORK ORDER NO: 78607 � Cl„t� LOCATION: Talbot Crest Drive So. In R.O.W.near 2515 Talbot Crest Drive So. 1,1 SITE AREA: 2,500 sq.ft. (in City R.O.W.) I BUILDING AREA(gross): N/A "°�� 4,rd TUB SUMMARY OF PROPOSAL: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station ouldbe built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandonedttolace with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in Ja'fajrryy 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging out of thBCity R.O.W. A. ENVIRONMENTAL IMPACT(e.g. Non-Code)COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment • Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Airport Environment 10,000 Feet 14,000 Feet B. POLICY-RELATED COMMENTS C. CODE-RELATED1 COMMENTS NJ Co W11Ltt it it We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where additional information is needed to properly assess this proposal. X�CCi Walt) 11/30%tq Signature of Director or Authorized Representative Date routing Rev.10/93 :::.:..::.................................................................................. • .•RENT N<<> > > »> .... > > '» .....,> > �� <> `>< < >�:<><:::::<:»::.......... .E.... Q .... N..... .E..�/ C. S.. kUk51.0.N................................................... I :: ' 1 NDINR P ; ��.``.. ` :: .t `::.;. : :: .: ' :::: :::. :.:::. .:::::.OU ::: ::...:.: ..: . ::::. :::.:. ...O. RTY DOWNERS........ > `tlt n'`30O:feet of thy''sub`ect s 'e '<`< > <<< > <` ' '` >`:> `{'>>'`<. ... >>' PROJECT NAME: 'TAvad z C.2FST `t+ S'ra; e', APPLICATION NO: 1—JP‘• °I1 • ItpI FL• The following is a list of property owners within 300 feet of the subject site. The Development Services Division will notify these individuals of the proposed development. NAME ADDRESS ASSESSOR'S PARCEL NUMBER v2zry /' 4-7 T4 t(-a rVC) "e9g4 ; ,A•f�sCe n .•.'t ii' • } may.. n af• ay. • • • • • • • • • (Attach additional sheets, if necessary) p • (Continued) NAME • ADDRESS ASSESSOR'S PARCEL NUMBER • • Applicant Certification I, M.c '.it c A• ltNJo,r , hereby certify that the above list(s) of adjacent property (Print Name) :` •owners and their addresses were obtained from: N‘o. FEF.004, El City of Renton Technical Services Records o.•00 0 Title Company Records =���°NOT4Ry 0 King County Assessors Records = • ,_ . Sax.. PUBLIC 124 a--� it-Io-SS i*r. • '�O� Signed Date / 0**. s, ?�p (Applicant) • /�I/1111 11%��``` NOTARY ATTESTED: Subscribed and sworn before me, a Notary Public, in and for'the State of Washington, residing at A 2.�TTn N on the I 0 day of I\.l 0V �YY13��. , 193g. • Signed (42h1 G • /L -2 (Notary Public) • `'` CE IFI TION OF A L each listed r'o ert: >:own.er.:on.........f.................... ............ .: . . .;..;.;.: .;'.;:;'::.::.;:.;;:...:<:.:.;':.::.;:.;:.;.;:. :..i:::�i:i:•;•i.:::':..:'' ::':::::::::isisi::::i::::i::i::::: •::::•::::::::i:::::::::::::i:':::',:::::::::�::::::iii':i:::::i:::::::;::::,v':::•:::::::i::::i::i::::::i::<:i}:::::: sighb • Signed ... �1....�-' ..'�e•�.... ;:.;;;:.;;::.:;:.:::;Dat:::;;... . ......... ..........: ..................................................... shin>;�on esidin �k-Aw >:<:>_:>:::<:>»:<:<:>::;::>:::;:>::<:::;:on:ahe;.;•::�:'.r�...:.:..da :of::.......: �;.::::...:::..:......:.::::::....::..::,.1:9::..�':�,?::;:;;:'.:::::;;>::>:>::><>::>::;;:.;:.;:; listprop.doo U -NOlJNIHSdN1 A®31`�1 -s REV 07/98 IV IARILYN KAMCHEFF MY APPOINTMENT EXPIRES:6-29.03 2 4 (�d A�V�.ON- - �i�l�I1e-I�V�� NAIi�'�d I / / -. MORTENSEN P t EVOY CECIL H WOLSTED WILLIAM 2319 TALBOT CREST DR S 401 S 23RD ST 407 S 23 RD ST RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 CITY OF RENTON OLIN RICHARD D LOKE VICTOR K Y 200 MILL AVE S 2320 TALBOT CREST DR 12006 SE 76TH ST RENTON WA 98055 RENTON WA 98055 RENTON WA 98056 WILLIAMS ISAIAH D+VELECIA M NORRIS LARRY A JR+DELORIS D FORD BETTY J 2332 TALBOT CREST DR S 2402 TALBOT CREST DR S 2408 TALBOT CREST DRIVE SOUTH RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 CHINN DEAN M FOUNTAIN BARRY B HANSEN RODNEY&DEBBE 2414 TALBOT CREST DR S 2420 TALBOT CREST DR 2500 TALBOT CREST DR RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 EVERSON RANDALL L HENDERSON CHRISTY+STEPHEN MAGNO WILFREDO 2510 TALBOT CREST DR S 2325 TALBOT CREST DR S 2331 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 SAUNDERS KARALA D+CHRISTOPH FRANGELLO WILLIAM J NGUYEN KIM ANH LE 2337 TALBOT CREST DR S 2401 TALBOT CREST DR S 2407 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 PICKREIGN CYNTHIA J ESPEY DIANE WILLIAMS BARTOW JR+MINNIE L 2413 TALBOT CREST DR S 2419 TALBOT CREST DR S 2503 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 CUMMINGS RAYMOND+MARILYN L CAMP MERLE M YEAGER LESLIE M 2509 TALBOT CREST DR S 408 S 26TH 400 S 26TH ST RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 LEMKE REBECCA A+DALE M SMITH DON C HEM OSCAR F 403 S 26TH ST 401 S 26TH HEM C J RENTON WA 98055 RENTON WA 98055 2619 TALBOT CREST DR S RENTON WA 98055 MCCLAIN CHARLIE W+ARNETTA NELSON RONALD N TRAUTMANN JOHN F 2613 TALBOT CREST DR.. . _ 2607 TALBOT CREST DR S 2601 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 Al AVERY® Address Labels Laser 5160® �e� ip arG ror _1�t HOLZBOOG DAVID S+AMY L NESS ROSEMARY .ALSTERBERG ROBERT T 2527 TA.LBOT CREST DR SO 2521 TALBOT CREST DR S 2515 TALBOT CREST DR S RENTON WA 98055 RENTON WA 98055 RENTON WA 98055 • KLEINDL DONALD F MURCHISON JEFFERSON G+MYRTL LOMBARDI LEONARD S 2606 TALBOT CREST DR S 2528 TALBOT CREST DR 2522 TALBOT CREST DR S - RENTON WA 98055 RENTON WA 98055 RENTON WA 98056 SARGENT JOHN C+JENNIFER K CITY OF RENTON 2516 TALBOT CREST DR S 200 MILL AVE SOUTH • RENTON WA 98055 RENTON WA 98055 • • • ® AVERY® Address Labels Laser 5160® • 0\®vtf + Comments on the above application must be submitted in writing to Ms.Elizabeth Higgins,Senior Planner,Development Services Division,1055 South Grady Way,Renton,WA 98055,by 5:00 PM on December 13,1999.If you have questions .� .$ about this proposal,or wish to be made a party of record and receive additional notification by mail,contact the Project :eiv TO Manager.Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. NOTICE OF APPLICATION CONTACT PERSON: ELIZABETH HIGGINS(425)430-7382 AND PROPOSED DETERMINATION OF NON- (PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION I SIGNIFICANCE (DNS) DATE: November 29,1999 LAND USE NUMBER: LUA-99-161,ECF APPLICATION NAME: TALBOT CREST LIFT STATION REPLACEMENT PROJECT DESCRIPTION: The City of Renton proposes replacement of the Talbot Crest Lift Station.A new lift station would be bait in large underground vaults on the West side of Talbot Crest Drive South.The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a -Temporary Use Permit for construction staging outside of the City R.O.W. I. S 23rd St L J l PROJECT LOCATION: Talbot Crest Drive So.In R.O.W.near 2515 Talbot Crest Drive So -- \ PERMfT APPLICATION DATE: November 12,1999 — ,P NOTICE OF COMPLETE APPLICATION: November 29,1999 x. Permits/Review Requested: ' Environmental(SEPA)Review,Temporary Use Permit Other Permits which may be required: . None -a • Requested Studies: None • ' Location where application may w \ be reviewed: Planning/Building/Public Works Division,Development Services > Department,1055 South Grady Way,Renton,WA 98055 PRO ECT $j PUBLIC HEARING: N/A m /• .ii: I CONSISTENCY OVERVIEW: w' L❑C'�TION � � Analytical process « $ ,{ � Project consistency refers to whether a project is consistent with adopted and applicable development regulations,or in ),,L_. o (heir absence,comprehensive plan policies.RCW 36.708.110 2 «()(g)provides that the Notice of Application(NOA)inclutle _ a statement of the preliminaryf levelinallon of a project's consisten with the ��%' type of land use,level of development, 3infrasWclure,and character of development it one has been made at the lime of notice.Al a minimum,every NOA shallJ411 include a determination of the project's consistency with the zoning,comprehensive plan and development regulations. $t _ $,tLand Use: Residential 8(R-8)Zone 1 :.: I - S e�� Environmental Documents that - S 27th Evaluate the Proposed Project: Environmental Checklist 2/�\\Y�r Development Regulations PRth -1 Used For Project Mitigation: N/A Proposed Mitigation Measures: N/A malice maawt __— . CERTIFICATION I, «( p._-A , hereby certify that 3 copies of the above • document were posted by me in 3 conspicuous places on or nearby the described property on j z y >00__- - r.9GS • Signed: �i ATTEST: Subcribed and sworn before me, a Nortary Public, in for a State of Washington residing i1i�� , on the Z2. ci� day of 1 S 9 • a MARILYN KAMCHEFF NOTARY PUBLIC ; ��ce 1 1 r_Ao--4616STATE OF WASHINGTON y . COMMISSION! EXPIRES MARILYN KAMCHEFF JtlNIE 2�, 20D3 ' MY APPOINTMENT EXPIRES:6-29-03 ,- .. ,...-,„ • . • . ti O bat NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF NON- SIGNIFICANCE (DNS) DATE: November 29,1999 LAND USE NUMBER: LUA-99-161,ECF APPLICATION NAME: TALBOT CREST LIFT STATION REPLACEMENT PROJECT DESCRIPTION: The City of Renton proposes replacement of the Talbot Crest Lift Station. A new lift station would be built in large underground vaults on the West side of Talbot Crest Drive South. The former lift station would be abandoned in place with portions removed and portions to remain. The road and sidewalk will be restored. Work is scheduled to commence in January 2000 with completion planned for June 2000. The City has requested a Temporary Use Permit for construction staging outside of the City R.O.W. PROJECT LOCATION: Talbot Crest Drive So.In R.O.W.near 2515 Talbot Crest Drive So PERMIT APPLICATION DATE: November 12,1999 sl�/ NOTICE OF COMPLETE APPLICATION: November 29,1999 `/ Permits/Review Requested: Environmental(SEPA)Review,Temporary Use Permit Other Permits which may be required: . None Requested Studies: None Location where application may be reviewed: Planning/Building/Public Works Division,Development Services Department,1055 South Grady Way,Renton,WA 98055 PUBLIC HEARING: N/A CONSISTENCY OVERVIEW: Analytical process Project consistency refers to whether a project is consistent with adopted and applicable development regulations,or in their absence,comprehensive plan policies. RCW 36.70B.110(2)(g)provides that the Notice of Application(NOA)include a statement of the preliminary determination of a project's consistency with the type of land use,level of development, infrastructure,and character of development if one has been made at the time of notice. At a minimum,every NOA shall include a determination of the project's consistency with the zoning,comprehensive plan and development regulations. Land Use: Residential 8(R-8)Zone Environmental Documents that Evaluate the Proposed Project: Environmental Checklist Development Regulations Used For Project Mitigation: N/A Proposed Mitigation Measures: N/A mailout r Comments on the above application must be submitted in writing to Ms. Elizabeth Higgins,Senior Planner, Development Services Division,1055 South Grady Way,Renton,WA 98055,by 5:00 PM on December 13,1999. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager.Anyone who submits written comments will automatically become a party of record and will be notified of,any decision on this project. CONTACT PERSON: ELIZABETH HIGGINS (425)430-7382 PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION r ' S 23rd St — ''-, \ Ir \ o • - tt Ito .. - ii PRO s tn W LOC TI❑N `� iibI1 ? 5 th S 27th la 4 .:. . S'milk ._: NA mailout I _ CITY OF RENTON MEMORANDUM Date: November 29, 1999 To: Michael Benoit/Wastewater Utility From: Elizabeth River Higgins/Development Planning Subject: Talbot Crest Lift Station Replacement Project No. LUA-99-161,ECF The Development Planning Section of the City of Renton has received the above-referenced application for environmental review. A presentation of the proposed amendment to the Environmental Review Committee (ERC) is scheduled for December 21, 1999. Following the ERC meeting, I will send you copies of the ERC determination along with the timeframes for the public comment and appeal periods for your files. Please provide a charge number for the publication of the environmental determination. acceptance -., :..'t:';i:f<�:.i::9E?.'',�'`: i:?V I`.'f1G� i�..?::rii '::..•:::::LL•:;: k.:�L•::.�::::.:�.�::::::::::::::::::::::::::::::::::::::::::;::.:.:::::::::::::::. ! :: .:,.,,:is}:i•i:;{y:�:•:;:;.;::•;2%?:::;,;•:;::: ::•:, :::•::•::•:;:::;?:;:::.:•>:: ::•::':i;: };} i<L•:•:':::y':�:; ' .:: :.'r.:2 :::: :::ti::::::: : :• ` S:%:i<:<�+�,)t /�µ� �+��+ �yjh�+ EV(� ►�1` i .�::::::::::::<.:::;.::::.':::`::.':::::?:::::::>::iiLi::i:::::::.;.L:::i•r:S•:i•'t::ii::i:;r•:::ii i::Si::::.:i.::::;•:;:;i•:;•::;:;•:;•::iL::.;:.;:;:ii•>;•>:L'.:>:: .................... ........?. .......... : ::.�..:.:•: :.� :: :.:•:•:.:::...:::....:: ::n:: :�::: :: ... .:i:•. .... . •.::::::::A 4:•:L� 'Lh; ". .:: ..�: n. :..�. ::: '.i:' '.:. ry: ::ii:::v::}iii:L•iiii;i:C}:ii::is�:4;.i'?::•:•::::.. .. : .>.;i•••••:::::if:i::'.:::::::i:::ijiiy:ii:::Y2}:;:i:-••••• 'i :i;? 'L: .... :ii L:x; .ii ::i:i:: :L• {;::::: i' :i:. '.:::: ';:::•i;• :::i :i :i:2: ': :;{i:'r:::i::::::::::::::::::::i::i:::::L':i::::i:::K::::i:::C::::{:*:is:i::iS::'ri%L.:{LL:{ij:,... :i};:j:i.'•i::ii`vii:{>.:'i::`viii;::i:;•;:i'�':� �ii.:iiv:i:wii::: ��:i:::iv:::}i}:Ly::ii?::::::i:: iiii:: > R`O.•:.'ERTY>O: N ER•SYMN:i' >< ` `> < `< <> <::O EC_>;>.:.:.>;;;Fi R;::::>::>;.:.I.O::NESi ino ::.::.::.::.;;::.;:;.:;:.:;;<::.;:.::.::.;i:.;:.. :.. .... ................ ... ... ......... .......... :..�.�:: ::::::.�::.�:........:.. ... QJECT..1.NE4�3MAT�.ON.................... ........... ;Note i iif therb Is mOre:thatG one IegaCoWle1 'please:attach;Sr additional. .dcteriiad:MastifeApplia tioiii:f ieWii fx: Wnec...; ........ ....... ......i PROJECT OR DEVELOPMENT NAME: • NAME: TAt-SOT c' C•Si tI P► 5 T4Ti '- C.t T`f 0' ►2 EP3 T PROPERTY/PROJECT ADDRESS(S)/LOCATION: ADDRESS: ... to S'S 5, C.?4,0 y t... 4`s ' -z- J)&- oe-1 iL -& Crai five 5' CITY: ZIP: KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S): e as:a ct.a : ci SoSS tit/A TELEPHONE NUMBER: : EXISTING LAND USE(S): • I y ZS) L'i 3 0 ,2CC L C. ,-/ 1,2 t to wr cS F - - A -, i:ryi:•{.i^R n:..Ltijni::i:::i: ::::::i+j}•i:::::::�:is::{:S::i:{.:i::LStS:i:::j:}::Li i:::�:vi::L:::i::::::::i:i:::::i::i: T:.:: if:. e ::>::>:�PPLLC,�4N...... .f..:oth. r...��an:�awn:er :>:>i::»:>:>::::<:: ..................................................... -' PROPOSED LAND USES: I NAME: Ctt`i 2tcoNT - uA - ••1^`1 COMPANY(if applicable): EXISTING COMPREHENSIVE PLAN MAP DESIGNATION: ADDRESS: • PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION (if applicable): NIA CITY: ZIP: EXISTING ZONING: gt.5t oC.�T i AL. SAJ(el£ F'A,►-t►t.-y TELEPHONE NUMBER: a s" /4c44 �' LQpMENTP PROPOSED ZONING (if applicable): �11y®FREN ONNNpy• . • R., u NOV 1 s ; :.:::;:.>;>::.:.:;;;;;:;:.;:;:;.:<.:.;.;.::;.;:;.: T . �. .. .. i1s.� .....gagNinninge w a. r NAME: :......:.:.::: :: :::...:.::..........:.::: .:....... .:::: . . ......... ............ ...::.µ 5 F OR ACSck•EA E ,^'''.._!'�`' .'SITE•AREA••(SQ ACREAGE): c t jy/CNgE'L R 447j00iT �:\'r!;• • ,,7`''Y4` .1r-11`t 1(Zl6tiFT.-40P_04ti`l .. .. . , ": • ° COMPANY(if applicable): PROJECT;VALUE: 1 T+�J•d c/A STC`►? ()?�L i: :y • `,0 t ,'' ' ;� ADDRESS: - "; eo;'a': : IS THE SITE LOCATED IN THE AQUIFER PROTECTION AREA? /0cs- S Cq ✓.4.O‘al [.•-)4 `/ o . CITY: : ZIP: . • s" - — IS THE SITE'LOCATED INANYOTHER TYPE OF ENVIRONMENTALLY - 2$s to --); 9SoS - ' SENSITIVE AREA? - - - - TELEPHONE NUMBER: ' - . ' 1J"C7 C�2s) ' 3U_-72db _ - - - _— - • '>' L A ..DESf.�,.1TIO11I F P E TY Atte.EG .:t.� . ...ROP R... ti.se aE:a��>s[to`�ti.•F��rt�:Cessa�:':: :< • TA i_lor c2E5T ;J2iue S'G.JT ,r ..(Cr ?- re/G "T- o4`... v4yJ 4r /¢PP,2 cog i --, A.T,L. `/ 2 5 ' S TA c-(30. c 2.' s'J /J l i d 4` 5.0 J i K . . L..oc..4TS.0 i..) ,2-y,c,. -iCJC' • ly C.) /' • 5.•ANC77c/L O O Ta.,.).Jr/tr e47 au • • AP > CATI;> '& >�<::<:Y'.::E�'>•�..�►...P 1I.0 I1t... ..FEE '> >` n><> o <> >> ;` ;> ; > ' g>`<s > ff::>.. aII:<::::»»»:::::�::>:::::>::::<:::::»::»»:�<�>:<::<:::::::. .... ...�... ........ . ......at Q........ �s..t...a...a . ... .....�I. .....ta.....�r.......:+�et. .............e..iee ................................... . ............................ ........ —ANNEXATION $_ SUBDIVISION: — COMP. PLAN AMENDMENT $ • — REZONE $_ _LOT LINE ADJUSTMENT $ _ SPECIAL PERMIT $ _ SHORT PLAT $ _TEMPORARY PERMIT $ _TENTATIVE.PLAT $ _ CONDITIONAL USE PERMIT $ . _ PRELIMINARY PLAT - $ _SITE PLAN APPROVAL $ _ FINAL PLAT $ _GRADE & FILL PERMIT, . $_ -. -. ••• INO. CU. YDS: ) PLANNED UNIT DEVELOPMENT: $ _VARIANCE $ ;(FROM SECTION:. ) _ PRELIMINARY _WAIVER • $ . FINAL •_WETLAND PERMIT $ _ ROUTINE VEGETATION — MOBILE HOME PARKS: $_ MANAGEMENT PERMIT $ _ BINDING SITE PLAN $ • SHORELINE-REVIEWS: , - _ SUBSTANTIAL DEVELOPMENT $_ _ CONDITIONAL USE $ _ VARIANCE . . $ _ EXEMPTION " ' $No Charge — ENVIRONMENTAL REVIEW $ REVISION $ • ; FFITD�� IT' F<OWNER< : I '<«<< «i.< » < > < <<<<< imimma»>:':•:m >'<m :....:...-:::::::>::.:.:.::::::::>:: :.:..:::::;;:::::.„..:...!:::...:.:::.:.....:::.:.:::.:„....>: < <::::> ..A..F A. .......0 ....0..INN ER-.,.— .... ,::.:.................... I, (Print'Janie) , declare that l.am (please check one)_the owner of the property involved in this application, the . .• authorized representative to act for the property owner(please attach proof of authorization), and that the foregoing statements and answers herein . contained and the information herewith submitted are in`ski 11inlyu and correct to the best of my knowledge and belief. ' •• �� G' FER/r/N i : :cr..��ssion'e.tz..��• 2:of %m.'3,e TEST: Subscribed and sworn to before me,a Notary Public, in and • Mres•/4ec. A',. -;flSJc,r . s ;,. +iv OTA '".Or the State of W '/�Y e= ��I'..,residing at (Name of Owner/Representative) : _ R.I✓)`E TUN ,on the 1 0 day of 1.15,... PUBLIC 'Z.ttll O\/-• 19 (Signature of Owner/Representative) a�OF'WpSN�`�� A, C { 4)-1... CI cf.„ . .. . - .. . . ./ . ��1 I/lhI 1111�� (Signature of Notary Pub!' • .;;:::>::::>::;>:::: :,: :::>::::.::.:::.::;::>�>;:�:.;:.;;:.:�:;.;:.;;;:.:.:;:.;;;:::.:.:.>:;.;:.:::::.:ET .s..sectian:>to<:>a:e>com .eted..b .:C. ::Staff:...1::.::::::.:...:....... ................... .. . ..:..................:::...: :>:::>:>:<:>>:::>::li.: ::I`il@;Num#� :.::;.... c.... .. :>:>::>::;:<::.< :>:«:»::»::>::>«::A»:<:::AAb�::.::::SSp:.::::.>:GAPr ;:.;:;.: : :� .:;::.;;: .::. ;:.;:.:.. ., ::::::;::..�:. ::::> .:. •::::.:....;::.;:.;;:.:;.:.:.:.:.:: .::::.:::::::::.�:.:::::�X.::::::::::::::.::..::.�::�.::... ...... ✓�. .. .......:........................�::..........:...:.........:�5. ::CAP.�L#.:::�P�4.::::C:1,1.:A..::..GU.:H.:...E�I....I_LA:.:::::.�::::.: :::.:.:::::.::::.::.:: .Ffl'........P. ......FP.PP.........RVM:<::�::»S!�...A:.�::SA.:H.::.::SHPI:-A:.;;:.::SH1'1_-i-):.:.:;;Sf':.;;:.;5 :::.:: gaT ;:.>:.::.:tl-. :.::::: : ::::.: :.:::::.:#N.:: ::>:<:>:::::TOTAL�'PEES ''? > <> : < >>< :<>:»><::::>;:>>::::::::><:::::>::::<::>'TOTAL PO V :...:::: :<::::_::::<:<>:< :<::<:.>:::.::»;::.:.>:<::><:::::::::::::: :::.:«:<::<:::«:>:: :<:.><>::: :>::>::>»:::<::«: . . ... .. ........................T . .. .STAGE..PRO. .IOEQ....$ .....: . ......... MASTERAP.DOC- REVISED 8/97 - - - • ' Talbot Crest Lift Station Replacement The City of Renton is planning to replace the Talbot Crest Lift Station. This will entail the construction of a new lift station in Talbot Crest Drive South. The new station will be built in large vaults under the west side of the roadway. The existing station, located behind the sidewalk west of the road,will be abandoned in place. The top of the station will be removed,the equipment will be removed,and the old manhole filled in. The existing antenna will remain. The telemetry control panel for the new station will be mounted on the existing antenna and replace the existing panel. The road and sidewalk will be restored in the construction zone. Construction of the new station will entail excavation of the roadway. While the road will be closed for through traffic,the contractor will maintain access to all driveways, except for short periods of time. Property owners with driveways to the south of the construction project will have to enter Talbot Crest Drive from the south,while Property owners with driveways to the north of the construction project will have to enter from the north. We expect work to start in mid January 2000 and should be completed by June 2000. DEVELOPMENT PLANNING CITY OF RENTON NOV 12 1999 RECEIVED . . CITY OF RENTON ° DEVELOPMENT SERVICES DIVISION ENVIRONMENTAL CHECKLIST PURPOSE OF CHECKLIST: The State Environmental Policy Act(SEPA), Chapter 43.21 C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An Environmental Impact Statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. INSTRUCTIONS FOR APPLICANTS: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer or if a question does not apply to your proposal, write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions -ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. USE OF CHECKLIST FOR NONPROJECT PROPOSALS: Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). For nonproject actions (actions involving decisions on policies, plans and programs), the references in the checklist to the words "project," "applicant," and "property or site" should osal," "proposer,"and"affected geographic area," respectively. SIT®EN ONNINC NOV I21999 RECEIVED 1998 City of Renton Long-Range Wastewdiel Management Plan Environmental Checklist A. BACKGROUND 1. Name of proposed project, if applicable: Talbot Crest Lift Station Replacement 2. Name of applicant: City of Renton -Wastewater Utility 3. Address and phone number of applicant and contact person: 1055 South Grady Way Contact: Michael Benoit-(425)430-7206 Renton,WA 98055 4. Date checklist prepared: October 25, 1999 5. Agency requesting checklist: City of Renton 6. Proposed timing or schedule (including phasing, if applicable): Begin Construction January 10, 1999 Complete construction May 30, 2000 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. No ' 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. None 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. No 10. List any governmental approvals or permits that will be needed for your proposal, if known. Temporary Use Permit(for construction staging area outside City right-of-way) 11. Give'brief, complete description of your proposal, including the proposed uses and the size of the • project and site. The project consists of construction of a new Talbot Crest Sewage Lift Station. The new station will be located under ground in Talbot Crest Drive, within 20-50 feet of the existing station. The antenna and telemetry panel will be the largest `structures' above ground. The existing station will be abandoned. E:\96comp\SEPA98.doc\MAB -2- 1998 City of Renton Long-Range Wastewater Management Plan Environmental Checklist 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The majority of project will be located in the right-of-way in the vicinity of 2515 Talbot Crest Drive. The existing lift station that is located on easement adjacent to the right-of- way will be abandoned. The new station's telemetry panel and antenna will be located on the easement, adjacent to the right-of-way; where the existing panel and antenna are located. B. ENVIRONMENTAL ELEMENTS 1. EARTH a. General description of the site (circle one); flat, rolling, hilly, steep slopes, mountainous, other The areas in which the proposed sanitary sewer work would be done are basically flat paved rights-of-way. The easement'area west of Talbot Crest Drive, where we will be abandoning the existing station is also flat with some landscaping. The developed area where the lift station is located is generally hilly and sits adjacent to steep slopes (west of the houses on the west side of Talbot Crest Drive)that descends to the valley floor b. What is the steepest slope on the site(approximate percent slope?) The proposed project is in a flat area with the centerline of the rights-of-way having - a maximum slope of approximately 0.6% The easement area where the existing station will be abandoned and the new telemetry panel and antenna will reside has a slope of around 0.6%. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Based upon a recent subsurface investigation (Boring) performed by Golder Associates Inc.,the soils at the proposed sight for the lift station generally consist of dense silty fine sand and till over siltstone(Tukwila Formation). d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No. - E:\96comp\SEPA98.doc\MAB -3- 1998 City of Renton Long-Range Wastet._.... .ilanagement Plan Environmental Checklist e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. Construction of this project will not require grading or filling of a site. When backfilling the trench, we will use native material (that which was removed during excavation) if it meets standards. If the native material is not of an appropriate quality,we will import backfill from an approved source. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Construction of this project will be in paved areas and will not cause significant erosion. City of Renton sedimentation and erosion control measures will be employed during construction to mitigate impacts that may be caused by the moving,storage and use of earth materials in the construction of the project. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? There will not be any new impervious surfaces resulting from this project. All portions that take place in existing paved areas will be restored in asphalt or concrete. Where unpaved areas are disturbed, they will be restored to their preconstruction condition. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Standard City of Renton sedimentation and erosion control measures will be employed during construction. 2. AIR a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. During construction, on-site emissions will consist of fugitive dust and emissions from construction equipment. These are anticipated to be minor and largely confined near the site. b. Are there any off-site sources of emission or odor that may affect your proposal? If so, generally describe. No. c. ' Proposed measures to reduce or control emissions or other impacts to air, if any: Equipment and construction of this project will meet federal, state, and local emissions requirements. E:\96comp\SEPA98.doc\MAB -4- 1998 City of Renton Long-Range Wastewater Management Plan Environmental Checklist 3. WATER a. Surface Water: 1) Is there any surface water body on or in the immediate vicinity of the site (including year- round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. No. The Panther Creek Wetlands are approximately 300 feet west of the project site with developed single-family parcels between the two. 2) ! Will the project require any work over, in or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. No. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. Minor temporary rerouting of existing drainage may take place during construction 5) Does the proposal lie within a 100-year flood plain? If so, note location on the site plan. No. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground Water: 1) ! Will ground water be withdrawn, or will water be discharged to ground water? Give, general description, purpose, and approximate quantities if known. • Minor dewatering may occur in the trenches during construction. 2) Describe waste material that will be discharged into the ground from septic tanks or other - sources, if any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. This project is to replace an existing sanitary sewer lift station and will not create a discharge of waste material into the ground from septic tanks or other sources. E:\96comp\SEPA98.doc\MAB -5- 1998 City of Renton Long-Range Wasteu:...., ,.lanagement Plan Environmental Checklist - C. Water Runoff(including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters, If so, describe? It is not expected that there will be any changes in the runoff pattern as a result of this project. The paved surfaces and drainage will be restored to pre construction patterns. 2) Could waste material enter ground or surface waters? If so, generally describe. No. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: N/A • 4. PLANTS a. Check or circle types of vegetation found on the site: X deciduous tree: alder, maple, aspen, other(birch) X evergreen tree: fir, cedar, pine, other X shrubs X grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants:water lily, eel grass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? Some vegetation, most likely grass or shrubs, may be impacted-when the contractor abandons the existing station. c. List threatened or endangered species known to be on or near the site. None E:\96comp\SEPA98.doc\MAB -6- 1998 City of Renton Long-Range Wastewater Management Plan Environmental Checklist d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Vegetated areas that are disturbed will be restored to their pre-construction condition. • 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: A wide variety of birds and animals native to the Puget Sound Lowlands may be found in the vicinity of the study area. The more common are underlined below: Birds: hawk, heron, eagle, songbirds, other: misc.scavenger birds (i.e. crows) Mammals: deer, bear, elk, beaver, other misc.small mammals (i.e.squirrels) Fish: bass, salmon, trout, herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. ' None known c. Is the site part of a migration route? If so, explain The entire State of Washington is included within the Pacific flyway migration route. We do not anticipate that this project will have any major, long term impacts on migration routes. d. Proposed measures to preserve or enhance wildlife, if any: None 6. ENERGY AND NATURAL RESOURCES a: What kinds of energy (electric, natural gas, oil, wood stove, solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. The new station will use electric power for operation, as did the old station. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to`reduce or control energy impacts, if any: None E:\96comp\SEPA98.doc\MAB -7- 1998 City of Renton Long-Range Waster..... ,Jlanagement Plan Environmental Checklist 7. ENVIRONMENTAL HEALTH a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. With the exception of potential fuel spills during construction, no hazardous chemicals or other health hazard risks are anticipated. 1) Describe special emergency services that might be required. The only anticipated emergency needs during construction would be ambulance w/ paramedical personnel (in the event of a construction related accident), fire suppression equipment (in the event of a fire, or the emergency spill response team (in the event of a major fuel spill). 2) Proposed measures to reduce or control environmental health hazards, if any: On-site areas will be designated for refueling. Refueling areas will be equipped with appropriate equipment to comply with spill prevention and cleanup procedures established by the City. • b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? None 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Short term noise from construction equipment would occur between 7:00 AM and 7:00 PM. 3) Proposed measures to reduce or control noise impacts, if any: All construction equipment will meet all federal, state and local laws for noise restrictions. 8. LAND AND SHORELINE USE a. What is the current use of the site and adjacent properties? The site is currently improved public rights of way. The adjacent properties are developed single family lots. The existing station, which will be abandoned, is situated in the south east corner of one of the developed parcels (adjacent to the street). b. Has the site been used for agriculture? If so, describe. No E:\96comp\SEPA98.doc\MAB -8- 1998 City of Renton Long-Range Wastewater Management Plan Environmental Checklist c. Describe any structures on the site. The project is within improved rights-of-way. There are no structures at the location of the new station. Adjacent to the site of the new station are single family ' homes and the existing sewer lift station. The existing station is almost completely under ground. d. Will any structures be demolished? If so, what? The existing lift station will be abandoned in place, filled, the top section(s) removed, and the surface re-landscaped. The existing antenna will remain. The existing telemetry panel will be replaced with the new telemetry panel. e. What is the current zoning classification of the site? The Construction zone is public rights-of-way. The adjacent properties are zoned Residential Single-Family—8 units per acre. f. What is the current comprehensive plan designation of the site? The current designation for the site is Single Family Residential. g. If applicable, what is the current shoreline master program designation of the site? N/A h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. A portion of the Talbot Crest Area, to the north of the site, is identified as a moderate coal mine hazard sensitive area. The area to the west of Talbot Crest Drive is designated an erosion hazard sensitive area. We do not anticipate that any work associated with this project or the finished station to have erosion impacts. The Talbot Crest Area has been identified as a moderate to high slide sensitive area. We do not anticipate that any work associated with this project or the finished station to have slide impacts. Approximately how many people would reside or work in the completed project? None. j. Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: N/A E:\96comp\SEPA98.doc\MAB -9- 1998 City of Renton Long-Range Wastew i. , .Jlanagement Plan Environmental Checklist I. ! Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: N/A 9. HOUSING a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. None. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. None. c. Proposed measures to reduce or control housing impacts, if any: N/A 10. AESTHETICS a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed. The completed project will be at or below ground level except for the telemetry panel and antenna. The new telemetry panel will replace the existing panel. b. What views in the immediate vicinity would be altered or obstructed? None c. Proposed measures to reduce or control aesthetic impacts, if any: N/A 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None. b. Could light or glare from the finished project be a safety hazard or interfere with views? No. c. What existing off-site sources of light or glare may affect your proposal? None. d. Proposed measures to reduce or control light and glare impacts, if any: E:\96comp\SEPA98.doc\MAB -10- 1998 City of Renton Long-Range Wastewater Management Plan Environmental Checklist - • N/A 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? Talbot Hill Park and Talbot Hill Elementary School are near by b. Would the proposed project displace any existing recreational uses? If so, describe. No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: N/A. 13. HISTORIC AND CULTURAL PRESERVATION a. Are there any places or objects listed on, or proposed for, national state, or local preservation registers known to be on or next to the site? If so, generally-describe. No. b. Generally describe any landmarks or evidence of historic, archaeological, scientific; or cultural importance known to be on or next to the site. N/A. c. Proposed measures to reduce or control impacts, if any: N/A 14. TRANSPORTATION a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. The construction site will be in Talbot Crest Drive south, which is a looped road that connects at the north and south to Talbot Road South. Access to the site would be via Talbot Road-South to Talbot Crest Drive. b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? Yes. There is not a bus that utilizes Talbot Crest Drive, however the 169 bus does use Talbot Road which is within easy walking distance of the construction zone. c. How many parking spaces would the completed project have? How many would the project eliminate? None. E:\96comp\SEPA98.doc\MAB -I 1- 1998 City of Renton Long-Range Waste‘,:u.w. Aanagement Plan Environmental Checklist - i d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private? • No. e. Will the project use(or occur in the immediate vicinity of)water, rail, or air transportation? If so, generally describe. No. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. The finished project will require approximately 2 to 6 vehicle trips PER WEEK that will typically occur between 7:00 AM and 5 PM. There may also be an occasional emergency trip to the site at other hours. The number of vehicle trips should be the same or less than generated by the existing station.. • g. Proposed measures to reduce or control transportation impacts, if any: During construction, proper traffic control and detour routing will be used. 15. PUBLIC SERVICES a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. No. b. Proposed measures to reduce or control direct impacts on public services, if any. N/A 16. UTILITIES a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service,telephone,sanitary sewer,cable b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Please refer to question A-11. E:\96comp\SEPA98.doc\MAB -12- • 1998 City of Renton Long-Range Wastewater Management Plan Environmental Checklist C. SIGNATURE I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration of non-significance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. 1-Proponent: - -t-c.—eg=5" Name Printed: Michael A Benoit Date: 1,/,o A S E:\96comp\SEPA98.doc\MAB -13-