HomeMy WebLinkAboutSummary_Preapp_Mtg_PRE12-000017DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE:March 13, 2012 TO:Vanessa Dolbee, Planner FROM:Arneta Henninger, Plan Review SUBJECT:QFC Fueling Station at NE 4TH St & Duvall Ave 4615 NE 4TH St PRE 12-017 Parcel 1523059124 (see PRE 10-046 and PRE 09-027) NOTE: The applicant is cautioned that information contained in this summary is preliminary and non- binding and may be subject to modification and/or concurrence by official city decision-makers. Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. I have completed a preliminary review for the above-referenced proposal for the QFC gas station, located at the southwest corner of NE 4th St and Duvall Ave NE, all in Section 15, Township 23N, Range 5E, which proposes a to construct a cashier’s kiosk covering nine multi-product dispensers and creating 10 vehicle fueling positions (project includes restrooms). The following comments are based on the pre- application submittal made to the City of Renton by the applicant for a refueling station. Water 1. There is an existing 8” CI water main located in NE 4th St (see City of Renton water drawing W- 0240 for detailed engineering plans) and an existing 8” water main in Duvall Ave NE (see City of Renton water drawing W-0943 for detailed engineering plans). 2. This project is located in the Aquifer Protection Zone 2. 3. Construction of a commercial building will trigger a separate review. 4. Per the City of Renton Fire Marshal, the preliminary fire flow calculated for this site is 1,500 GPM. A minimum of two fire hydrants is required. 5. Any new construction must have one fire hydrant capable of delivering a minimum of 1,000 GPM and shall be located within 150 feet of the front of the structure, and additional hydrants (also capable of delivering a minimum of 1,000 GPM) within 300 feet of the front of the structure. This distance is measured along the travel route. The number of additional hydrants required is dependent on the calculated fire flow of the new commercial building. Existing fire hydrants shall be retrofitted with a quick disconnect Stortz fitting. 6. Per City records there is an existing ¾” water meter on the site. The proposed gas station would need to install a minimum 1” water meter with a Reduced Pressure Backflow Prevention Device in a “Hot Box”. QFC Fueling Station – PRE 12-017 Page 2 of 3 March 13, 2012 H:\CED\Planning\Current Planning\PRE12-017.Vanessa\Plan Review Comments PRE 12-017.doc 7. The existing ¾”meter might be considered for use as the irrigation meter, in which case a DCVA is required at the meter. 8. The Water System Development Charge is based on the size of any and all water meters. They are triggered if there is a new water meter or if an existing water meter is upsized. Credit is granted for the existing service. These fees are collected at the time a construction permit is issued. Sanitary Sewer 1. There is an existing 24” sanitary sewer main located in NE 4th St. 2. This project will need to connect to the existing MH in the intersection of NE 4 th St and Duvall Ave NE by installing an inside drop connection. 3. A commercial building permit will trigger a separate review. The applicant needs to show how this site will be served with a commercial side sewer with a minimum 6” diameter pipe. 4. Separate drains for the concrete islands are required to be connected to an oil water separator downstream in a vault in a positive direction. A shut off valve is required to be installed. 5. There may be an abandoned septic tank and/or a drain field on this site which will need to be abandoned in accordance with the King County Health Dept. 6. This site is located in the East Renton Special Assessment District (SAD 0002). This fee is $.0973 per square foot of the parcel of land and is required to be paid prior to issuance of a construction permit. 7. The Sanitary Sewer System Development Charge is based on the size of the domestic water meter. These fees are collected at the time a construction permit is issued. Storm Drainage 1. There are storm drainage facilities in NE 4th St and in Duvall Ave NE. 2. A conceptual drainage plan and report is required to be submitted with the formal application for a commercial project. The project shall comply with the City of Renton Amendments to the 2009 King County Surface Water Design. 3. Your civil engineer will look in the Manual under Section 1.2.3.1 Area-Specific Flow Control Facility Requirement. This site is located, per the Flow Control Application Map, in the Flow Control Duration Standard (Forested Conditions). 4. The Surface Water SDC fees are $0.405 per square foot of new impervious area. These fees are collected at the time a construction permit is issued. Street Improvements 1. Per the NE 3rd/NE 4th St Corridor Plan, the proposal needs to construct the typical street section matching existing curb on NE 4th St. This will include two 11-foot travel lanes, a two- way left hand turn lane, and a 5’ bike lane adjacent to the new curb. The typical street section needs to show a 5-foot sidewalk separated from the roadway curb and adjacent to the new property line, with a planting strip including street trees on NE 4th St. Additional right-of-way will be required to achieve the above. 2. Per City of Renton code, property corners in commercial blocks at intersections of public rights- of-way shall have a dedicated minimum radius of 25 feet. 3. The curb return for the arterial is required to be dedicated at the minimum radius of 35 feet for the intersection of NE 4th St and Duvall Ave NE. 4. The plans must include the relocation of the traffic signal pole and controller, located at NE 4 th St & Duvall, as part of this development design. QFC Fueling Station – PRE 12-017 Page 3 of 3 March 13, 2012 H:\CED\Planning\Current Planning\PRE12-017.Vanessa\Plan Review Comments PRE 12-017.doc 5. The driveway access on NE 4th St shall be right turn in and right turn out only due to the close proximity to the Duvall Ave NE intersection. 6. A channelization plan (striping, buttons, arrows) for Duvall Ave NE will be required. 7. The typical road section for Duvall Ave NE is 20’ paving from centerline to face of curb, and 5’ sidewalk adjacent to property line. 8. A Traffic Study is required addressing queuing and driveway/access safety evaluations. General Comments 1. All required utility, drainage, and street improvements will require separate plan submittals prepared according to City of Renton drafting standards by a licensed Civil Engineer. 2. All plans shall be tied to a minimum of two of the City of Renton Horizontal and Vertical Control Network. 3. Permit application must include an itemized cost estimate for these improvements. Half of the fee must be paid upon application for building and construction permits, and the remainder when the permits are issued. There will be additional fees for water service related expenses. See Drafting Standards. DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE:March 15, 2012 TO:Pre-application File No. 12-017 FROM:Vanessa Dolbee, Senior Planner SUBJECT:QFC Fuel Center General: We have completed a preliminary review of the pre-application for the above- referenced development proposal. The following comments on development and permitting issues are based on the pre-application submittals made to the City of Renton by the applicant and the codes in effect on the date of review. The applicant is cautioned that information contained in this summary may be subject to modification and/or concurrence by official decision-makers (e.g., Hearing Examiner, Community & Economic Development Administrator, Public Works Administrator, Planning Director, Development Services Director, and City Council). Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. The applicant is encouraged to review all applicable sections of the Renton Municipal Code. The Development Regulations are available for purchase for $50.00 plus tax, from the Finance Division on the first floor of City Hall or online at www.rentonwa.gov Project Proposal: The subject site consists of one lot located at the southwest corner of the intersection of NE 4th Street and Duvall Avenue NE. Currently, the lot is vacant with two curb cuts (one on NE 4th and the other on Duvall). There are currently no curbs and sidewalks, except a small portion at the corner intersection. The site is 22,092 square feet/0.51 acres in area. The applicant proposes to construct a QFC Fuel Center with a 43- by 92-foot canopy, a 160 square foot cashier’s kiosk, and space for 10 vehicle fueling positions. The development would include the installation of two underground storage tanks, one 20,000-gallon for regular unleaded fuel and one 18,999-gallon split or dual tank divided between diesel and supreme unleaded fuel. Vehicular access would be provided on both NE 4th Street and Duvall Avenue NE, in addition to an internal vehicular connection to the property to the south. The site is currently zoned Commercial Arterial (CA) and is located within Urban Design District ‘D’. The abutting and adjacent properties are all zoned CA. The City’s Critical Areas Maps indicate an onsite wetland, Maplewood Creek (Class 4 stream) and that the property is within an Aquifer Protection Area (Zone 2). QFC Fuel Center, PRE12-017 Page 2 of 7 March 15, 2012 Current Use: The subject site is currently vacant. Zoning: The property is located within the Commercial Corridor (CC) land use designation and the Commercial Arterial (CA) zoning designation. Vehicle fueling stations are outright permitted within the CA zone. The property is also located within Urban Design District ‘D’, and therefore subject to additional design elements. Proposals should have unique, identifiable design treatment in terms of landscaping, building design, signage and street furniture. Development Standards: The project would be subject to RMC 4-2-120A, “Development Standards for Commercial Zoning Designations” effective at the time of complete application (noted as “CA standards” herein). A copy of these standards is included. Minimum Lot Size, Width and Depth – There are no minimum requirements for lot size, lot width or depth within the CA zone at this location. Lot Coverage – The CA zone allows a maximum building coverage of 65 percent, or 75 percent if parking is provided within a building or within an on-site parking garage. There appears to be a 4,116 square foot footprint on the 22,092 square foot site; resulting in a building lot coverage of approximately 18.63 percent. The project proposal appears to comply with lot coverage requirements. At the time of formal land use application the applicant will required to provide a lot coverage analysis and calculations for the subject site. Setbacks – Setbacks are the distance between the building and the property line or any private access easement. Setback requirements in the CA zone are as follows: 10 feet minimum for the front yard and side yard along a street but may be reduced to zero feet through the site plan review process provided blank walls are not located within the reduced setback. The maximum front yard setback is 15 feet. It appears that the fueling station exceeds the maximum front yard setback allowed by code. The maximum setback may be modified by the Reviewing Official through the site development plan review process if the applicant can demonstrate that the site development plan meets the following criteria: a. Orients development to the pedestrian through such measures as providing pedestrian walkways beyond those required by the Renton Municipal Code (RMC), encouraging pedestrian amenities and supporting alternatives to single occupant vehicle (SOV) transportation; and b. Creates a low scale streetscape through such measures as fostering distinctive architecture and mitigating the visual dominance of extensive and unbroken parking along the street front; and c. Promotes safety and visibility through such measures as discouraging the creation of hidden spaces, minimizing conflict between pedestrian and traffic and ensuring adequate setbacks to accommodate required parking and/or access that could not be provided otherwise. QFC Fuel Center, PRE12-017 Page 3 of 7 March 15, 2012 Detailed elevations are required in order to provide an estimation of support for the proposed front yard setback in excess of the maximum 15-feet. There is no minimum rear or side yard setbacks unless the project site is adjacent to residential zoned property. The project site does not abut a residentially zoned property. Therefore, the buildings/structures on this site are not subject to an increased setback. Gross Floor Area – There are no minimum requirements for gross floor area within the CA zone. Building Height – The maximum building height allowed in the CA zone is 50 feet. Building elevations and detailed descriptions of elements and building materials are required with a formal land use submittal and/or building permit application. Elevation drawings were submitted with the pre-application materials however the drawings were not to scale, therefore, compliance with height limits would be verified at the time of formal application. Screening – Screening must be provided for all surface-mounted and roof top utility and mechanical equipment. The application will need to include elevations and details for the proposed methods of screening. Refuse and Recycling Areas – Refuse and recycling areas need to meet the requirements of RMC 4-4-090, “Refuse and Recyclables Standards”. In manufacturing and other nonresidential developments, a minimum of three (3) square feet per every one thousand (1,000) square feet of building gross floor area shall be provided for recyclables deposit areas and a minimum of six (6) square feet per one thousand (1,000) square feet of building gross floor area shall be provided for refuse deposit areas. A total minimum area of one hundred (100) square feet shall be provided for recycling and refuse deposit areas. Refuse and recycling information was not provided with the pre- application materials. Compliance with this standard will be verified at time of formal land use review. Landscaping – Except for critical areas, all portions of the development area not covered by structures, required parking, access, circulation or service areas, must be landscaped with native, drought-resistant vegetative cover. The development standards require that all pervious areas within the property boundaries be landscaped. The minimum onsite landscape width required along street frontages is 10 feet, except where reduced through the site plan development review process. Right-of-way dedications along NE 4th Street and Duvall Avenue NE are required; onsite landscaping would be calculated after such right-of-way dedications. The submitted site plan does not indicate any landscaping. Please refer to landscape regulations (RMC 4-4-070) for further general and specific landscape requirements (enclosed). Please also note that RMC 4-4-070F.6 specifies landscape standards for parking lots. Since the site is located within Design District D, there are further landscape requirements within the Design District Guidelines (RMC 4- 3-100). A conceptual landscape plan and landscape analysis meeting the QFC Fuel Center, PRE12-017 Page 4 of 7 March 15, 2012 requirements in RMC 4-8-120D.12 must be submitted at the time of formal land use application and/or building permit. Tree Preservation – A tree inventory and a tree retention plan along with a tree retention worksheet shall be provided with the formal land use application. The tree retention plan must show preservation of at least 5 percent of significant trees, and indicate how proposed development would be sited to accommodate preservation of significant trees that would be retained. If the trees cannot be retained, they may be replaced with minimum 2 inch caliper trees at a rate of six to one Fences – If the applicant intends to install any fences as part of this project, the location must be designated on the landscape plan. A fence detail should also be included on the plan as well. Parking – Drive-through facilities shall be so located that sufficient on-site vehicle stacking space is provided for the handling of motor vehicles using such facility during peak business hours. Typically 5 stacking spaces per window are required unless otherwise determined by the Planning Director. Stacking spaces cannot obstruct required parking spaces or ingress/egress within the site or extend into the public right- of-way. One parking space would be required for the cashier’s kiosk. Vehicle stacking and parking were not indentified on the provided application materials; therefore staff could not determine compliance with these standards. Information shall be provided with the formal land use application to determine compliance with parking and vehicle standing requirements. Access – Driveway widths are limited by the driveway standards, in RMC 4-4-080I. There are sections of the street frontages on both NE 4th Street and Duvall Avenue NE that are paved in a fashion that suggests previous driveways were once located there. The Urban Design District ‘D’ guidelines state that parking lots should be accessed from alleys or side streets. Pedestrian Access – A pedestrian connection must be provided from a public entrance to the street, in order to provide direct, clear and separate pedestrian walks from sidewalks to building entries and internally from buildings to abutting retail properties. It appears that the proposal does not provide adequate pedestrian connections to NE 4th Street or Duvall Avenue NE. The applicant would be required to revise the site plan to include pedestrian connections through the development to both streets. Signage – Only one freestanding business sign (monument/ground, projecting or roof) is permitted per street frontage. Each sign shall not exceed an area greater than one and one-half square feet for each lineal foot of property frontage that is occupied by the business. In no case shall the sign exceed a total of 300 square feet (150 square feet per face). In addition to the permitted freestanding sign, a wall sign with a copy area not exceeding 20% of the façade to which it is applied is also permitted. No new poles signs are permitted within the CA zone. QFC Fuel Center, PRE12-017 Page 5 of 7 March 15, 2012 Lighting – Per RMC 4-4-075A, no use shall cause light trespass beyond the boundaries of the property lines. A lighting plan shall be submitted at the time of formal land use application and/or building permit for review and approval by the Planning Division Project Manager. Building Design Standards (District D): Compliance with Urban Design Regulations, District ‘D’, is required along the eastern facade. See the attached checklist and Renton Municipal Code section 4-3-100. The following bullets are a few of the standards outlined in the regulations. The front entry of all building shall be oriented to the street or a landscaped pedestrian-only courtyard. Service enclosures shall be made of masonry, ornamental metal or wood, or some combination of the three (3). Developments located at district gateways shall be marked with visually prominent features. Gateway elements shall be oriented toward and scaled for both pedestrians and vehicles. Parking shall be located so that it is screened from surrounding streets by buildings, landscaping, and/or gateway features as dictated by location The number of driveways and curb cuts shall be minimized, so that pedestrian circulation along the sidewalk is minimally impeded. A pedestrian circulation system of pathways that are clearly delineated and connect buildings, open space, and parking areas with the sidewalk system and abutting properties shall be provided Architectural elements that incorporate plants, particularly at building entrances, in publicly accessible spaces and at facades along streets, shall be provided. Pedestrian overhead weather protection in the form of awnings, marquees, canopies, or building overhangs shall be provided. These elements shall be a minimum of four and one-half feet (4-1/2') wide along at least seventy five percent (75%) of the length of the building facade facing the street, a maximum height of fifteen feet (15') above the ground elevation, and no lower than eight feet (8') above ground level. A Public plaza shall be provided at the intersection of NE 4th Street and Duvall Avenue NE. The plaza shall measure no less than one thousand (1,000) square feet with a minimum dimension of twenty feet (20') on one side abutting the sidewalk. The public plaza must be landscaped consistent with RMC 4-4-070, including at minimum street trees, decorative paving, pedestrian-scaled lighting, and seating. Such pedestrian plaza has not been indicated on the site plan submitted with the pre-application materials. The required plaza area must be shown on the site plan and landscape plans submitted with the formal land use action. QFC Fuel Center, PRE12-017 Page 6 of 7 March 15, 2012 Critical Areas: Based on the City’s Critical Areas Maps, the site is located within Aquifer Protection Area (Zone 2), identified wetland area, and in the vicinity of Maplewood Creek (Class 4 stream). Aquifer Protection Zone 2: The project proposes to store hazardous materials on site. As such, the project will be subject to additional requirements under RMC 4-3-050H.2.d (enclosed) which may include but is not limited to secondary containment, hazardous material monitoring, emergency collection devices, inspection of containment and emergency equipment, and employee training. Hazardous materials shall not be spilled, leaked, emitted, discharged, disposed, or allowed to escape or leach into the air, into groundwater, surface water, surface soils or subsurface soils. Exception: Intentional withdrawals of hazardous materials for the purpose of legitimate sale, use, or disposal and discharges permitted under federal, state, or local law.Additionally, if the project involves the placement of more than one hundred (100) cubic yards of imported fill, then a source statement would be required for each source location from which imported fill will be obtained. Wetland: The site is located within or near a wetlands area. A wetland reconnaissance shall be provided, clarifying the presence of wetlands on site. If wetlands are determined to be located on or near the subject site, a wetland assessment and delineation would also be required. Stream: Maplewood Creek is a Class 4 stream which requires a 35-foot stream buffer measured from the bank (ordinary high water mark). A stream report delineating and classifying the stream on site is required to be submitted with the formal land use application. In addition, if there are proposed impacts to the stream, a mitigation plan should also be submitted. City staff may require secondary review of the stream report, at the expense of the applicant. Environmental Review The proposed project would be subject to Washington State Environmental Policy Act (SEPA). Therefore, an environmental checklist is a submittal requirement. An environmental determination will be made by the Renton Environmental Review Committee. This determination is subject to appeal by either the project proponent, by a citizen of the community, or another entity having standing for an appeal. Permit Requirements The proposal would require Administrative Site Plan and Environmental (SEPA) Review. The purpose of the Site Plan process is the detailed arrangement of project elements so as to be compatible with the physical characteristics of a site and with the surrounding area. An additional purpose of Site Plan is to ensure quality development consistent with City goals and policies. General review criteria includes the following: a. Conformance with the Comprehensive Plan; b. Conformance with existing land use regulations; QFC Fuel Center, PRE12-017 Page 7 of 7 March 15, 2012 c. Mitigation of impacts to surrounding properties and uses; d. Mitigation of impacts of the proposed site plan to the site; e. Conservation of areawide property values; f. Safety and efficiency of vehicle and pedestrian circulation; g. Provision of adequate light and air; h. Mitigation of noise, odors and other harmful or unhealthy conditions; i. Availability of public services and facilities; and j. Prevention of neighborhood deterioration and blight. The applicant will also be subject to Design Review as part of the Site Plan Review and a Design Checklist shall be completed and submitted as part of the application materials. All applications can be reviewed concurrently in an estimated time frame of 12 weeks once a complete application is accepted. The Site Plan Review application fee is $2,000. The application fee for SEPA Review (Environmental Checklist) is $1,000. A 3% technology fee, for land use application fees, would also be assessed at the time of application. Detailed information regarding the land use application submittal is provided in the attached handouts. In addition to the required land use permits, separate construction, building and sign permits would be required. The review of these permits may occur concurrently with the review of the land use permits, but cannot be issued prior to the completion of any appeal periods. Impact Mitigation Fees: In addition to the applicable building and construction fees, the following mitigation fees would be required prior to the issuance of building permits. Impact fees, which would replace mitigation fees, may be adopted prior to construction. Those fees are to be determined. A Transportation Mitigation Fee based on $75.00 per new daily trip attributed to the development; A Fire Mitigation Fee based on $0.52 per square foot of new commercial building area. A handout listing all of the City’s Development-related fees is attached for reference. Expiration: Upon site plan approval, the site plan approval is valid for two years with a possible two-year extension. cc: Jennifer Henning FIRE & EMERGENCY SERVICES DEPARTMENT M E M O R A N D U M DATE:March 1, 2012 TO:Vanessa Dolbee, Senior Planner FROM:Corey Thomas, Plans Review Inspector SUBJECT:QFC Fueling Station 1. The preliminary fire flow requirement is 1,500 gpm. Two fire hydrants are required. One fire hydrant is required within 150-feet of the proposed building and one hydrant is required within 300-feet. Existing hydrants can be counted toward the requirement as long as they meet current code, including 5-inch storz fittings. It appears adequate fire flow and fire hydrants exist in this area. 2. The fire mitigation impact fees are currently applicable at the rate of $0.52 per square foot of building area. Fees are not charged for canopy structures. Credit would be granted for the existing building to be removed, so no new fees would apply as the old building is bigger than the one proposed. 3. Separate plans and permits are required to be submitted to the Renton Fire Department for review and permitting of all underground fuel tanks and tank monitoring systems. 4. All new commercial fuel dispensing facilities shall be provided with an approved on site standby power system to facilitate fuel dispensing during local power outages or disaster. 5. Fire department apparatus access is adequate. 6. An electronic site plan is required to be submitted to the Renton Fire Department for pre-fire planning purposes prior to occupancy of the building. See attached sheet for the format in which to submit your plans. h:\3000 crr\3200 tech svcs\plans review-inspector\preapps\qfcgas.doc Renton Fire Department Pre Fire Planning In an effort to streamline our pre-fire process, we are requesting that you submit a site plan of your construction project in one of the following formats which we can then convert to VISIO.vsd. This is required to be submitted prior to occupancy. ABC Flowcharter.af3 ABC Flowcharter.af2 Adobe Illustrator File.ai AutoCad Drawing.dwg AutoCad Drawing.dgn Computer Graphics Metafile.cgm Corel Clipart Format.cmx Corel DRAW! Drawing File Format.edr Corel Flow.cfl Encapsulated Postscript File.eps Enhanced Metafile.emf IGES Drawing File Format.igs Graphics Interchange Format.gif Macintosh PICT Format.pct Micrografx Designer Ver 3.1.drw Micrografx Designer Ver 6.0.dsf Microstation Drawing.dgn Portable Network Graphics Format.pnf Postscript File.ps Tag Image File Format.tif Text.txt Text.csv VISIO.vsd Windows Bitmap.bmp Windows Bitmap.dib Windows Metafile.wmf Zsoft PC Paintbrush Bitmap.pcx