DEPARTMENT OF
COMMUNITY AND
ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:July 12, 2012
TO:Pre-Application File No. 12-052
FROM:Vanessa Dolbee, Senior Planner
SUBJECT:Renton Honda Relocation – 3701 E Valley Road
General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and permitting
issues are based on the pre-application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official
decision-makers (e.g., Hearing Examiner, Community & Economic Development Administrator,
Public Works Administrator, Planning Director, Development Services Director, and City
Council). Review comments may also need to be revised based on site planning and other
design changes required by City staff or made by the applicant. The applicant is encouraged to
review all applicable sections of the Renton Municipal Code. The Development Regulations are
available for purchase for $50.00 plus tax, from the Finance Division on the first floor of City Hall
or online at www.rentonwa.gov
Project Proposal: The subject property is located at 3701 E Valley Road. The project site totals
9.26 acres in area and is located within the Medium Industrial (IM). The pre-application packet
indicates that the proposal is to remodel the interior of the existing 157,225 square foot building
and update the exterior façade. The site would be updated by providing customer, ADA and
bicycle parking and removal of the existing greenhouse. The removal of a 4,600 square foot
greenhouse would allow for a new “Service Drive” under the existing canopy. Access to the
site would continue to be provided via the existing curb cuts along East Valley Road.
Current Use: The property currently used for motorcycle sales and service and contains two
buildings.
Zoning: The property is located within the Employment Area Valley (EAV) land use designation
and the Medium Industrial (IM) zoning designation. Vehicle Sales and vehicle service - small are
outright permitted uses within the IM zone. However, vehicle all operations for vehicle services
shall be conducted entirely within an enclosed structure. Vehicles shall only be held on the
property while being serviced and shall have an active repair or service invoice that shall be
made available to the City upon the City’s request. Vehicle storage before or after service shall
not be allowed. Vehicles held on the site shall be subject to the screening and landscaping
provisions in RMC 4-4-120, Storage Lots – Outside, unless enclosed within a building. Vehicle
holding areas shall count toward the maximum lot coverage standard of the zone. Any overnight
Renton Honda Relocation, PRE12-052
Page 2 of 5
July 12, 2012
h:\ced\planning\current planning\preapps\12-052 vanessa\12-052 (im renton honda relocation).doc
vehicle parking accessory to this use shall not be located in the front setback or in a side setback
along a street. Based on the provided information is appears the vehicle service space would
be provided in the existing structure.
Development Standards: The project would be subject to RMC 4-2-130A, “Development
Standards for Industrial Zoning Designations” effective at the time of complete application
(noted as “IM standards” herein).
Minimum Lot Size, Width and Depth – There are no minimum requirements for lot width or
depth within the IM zone, however, there is a minimum lot size requirement of 35,000 square
feet which is not applicable to the proposal.
Lot Coverage – There is no minimum lot coverage requirement within the IM zone.
Setbacks – Setbacks are the distance between the building and the property line or any private
access easement. The required setbacks in the IM zone are as follows: 20 feet for a front yard;
zero for the rear yard; and zero for the interior side yards. The proposal appears to comply with
the required setback requirements.
Building Height – There is no maximum building height requirement within the IM zone.
Screening – Screening must be provided for all surface-mounted and roof top utility and
mechanical equipment. The site plan application or building permit application will need to
include elevations and details for the proposed methods of screening.
Refuse and Recycling Areas – Refuse and recycling areas need to meet the requirements of RMC
4-4-090, “Refuse and Recyclables Standards” (enclosed). For office, educational and
institutional developments a minimum of 2 square feet per every 1,000 square feet of building
gross floor area shall be provided for recyclable deposit areas and a minimum of 4 square feet
per 1,000 square feet of building gross floor area shall be provided for refuse deposit areas with
a total minimum area of 100 square feet.
Refuse and Recycling information as not provided with the application. This information shall
be provided at time of building permit application.
Landscaping – New development shall comply with the City of Renton Landscape
requirements. The subject development would be required to comply with this section
if the cost of the remodel/addition is equal to or greater than fifty percent (50%) of the
assessed property valuation.
Except for critical areas, all portions of the development area not covered by structures,
required parking, access, circulation or service areas, must be landscaped with native, drought-
resistant vegetative cover. The development standards require that all pervious areas within
the property boundaries be landscaped. The minimum on-site landscape width required along
street frontages is 10 feet, except where reduced through the site plan development review
process. When an Industrial Zoned Lot or Use is Abutting a Residential or Commercial Zone: A
fifteen-foot (15') wide partially sight-obscuring landscaped visual barrier, or ten-foot (10') wide
fully sight-obscuring landscaped visual barrier, is required along the common property line.
Commercial zoned property is located across E Valley Road and adjacent to the southern
property line at the eastern edge.
Please refer to landscape regulations (RMC 4-4-070) for additional general and specific
landscape requirements (enclosed). A conceptual landscape plan and landscape analysis
Renton Honda Relocation, PRE12-052
Page 3 of 5
July 12, 2012
h:\ced\planning\current planning\preapps\12-052 vanessa\12-052 (im renton honda relocation).doc
meeting the requirements in RMC 4-8-120D.12, shall be submitted at the time of application
for building permit application.
Fences – If the applicant intends to install any fences as part of this project, the location must be
designated on the landscape plan. A fence detail should also be included on the plan as well.
Parking – The following ratios would be applicable to the site:
Use Square Footage of Use Ratio Required Spaces
Vehicle sales
(large and
small
vehicles)
with outdoor
retail sales
areas:
37,219 SF Min and Max: 1 per
5,000 SF.
The sales area is not a
parking lot and does not
have to comply with
dimensional
requirements,
landscaping or the bulk
storage section
requirements for
setbacks and screening.
Any arrangement of
motor vehicles is
allowed as long as:
A minimum 5-foot
perimeter landscaping
area is provided;
They are not displayed
in required landscape
areas; and
Adequate fire access is
provided per Fire
Department approval.
Min/Max: 7
General Office 16,410 SF Min: 2.0 spaces / 1,000 SF
Max: 4.5 spaces / 1,000 SF
Min: 33
Max: 74
Renton Honda Relocation, PRE12-052
Page 4 of 5
July 12, 2012
h:\ced\planning\current planning\preapps\12-052 vanessa\12-052 (im renton honda relocation).doc
Vehicle
service and
repair (large
and small
vehicles):
53,699 SF A Min and Max: 2.5 per
1,000 SF of net floor area
Min/Max: 134
The applicant is proposing a total of 454 parking stalls which falls above the maximum
permitted per Renton Municipal Code. However, vehicle stalls provided for display of “for
sale” vehicles do not count towards the parking stall count. Additionally, the applicant
identified a Storage Area in the provided project narrative; staff was unable to determine
what the storage area was applicable to and therefore has not included this area in the above
calculations. The applicant will be required at the time of Site Plan application or building
permit application to provide a parking analysis of the subject site.
Parking area square footage calculations utilize net square feet. Net square footage is the total
of all floor area of a building, excluding stairwells, elevator shafts, mechanical equipment rooms,
interior vehicular parking or loading, and all floors below the ground floor, except when used for
human habitation or service to the public. Where practical difficulties exist in meeting parking
requirements, the applicant may request a modification from these standards. The applicant
will be required at the time of formal land use application to provide detailed parking
information (i.e. stall and drive aisle dimensions) and calculations of the subject site and the
overall campus use.
It should be noted that the parking regulations specify standard stall dimensions. Surface
parking stalls must be a minimum of 9 feet x 20 feet, compact dimensions of 8½ feet x 16 feet,
and parallel stall dimensions of 9 feet x 23 feet; compact surface parking spaces shall not
account for more than 30 percent of the spaces in the surface parking lots.
ADA accessible stalls must be a minimum of 8 feet in width by 20 feet in length, with an adjacent
access aisle of 8 feet in width for van accessible spaces. The appropriate amount of ADA
accessible stalls based on the total number of spaces must be provided. Surface parking lots
with 15 or more than 100 stalls shall provide a minimum of 15 square feet of landscaping per
parking space. Please refer to landscape regulations (RMC 4-4-070 and RMC 4-4-080F.7) for
further general and specific landscape requirements (enclosed).
Access –No changes are proposed to the site access. All access would be gained from two curb
cuts along E valley Road. .
Critical Areas: The subject site is located in a seismic hazard area and has been identified to be
within the vicinity of wetlands.
The seismic hazard is related to potential liquefaction of soils during an earthquake
event. A geotechnical analysis for the site is required. The analysis needs to assess soil
conditions and detail construction measures to assure building stability.
Based on the proposal, no expansion of the existing building or parking area is proposed
on the west side of the site where the wetlands are shown to be located. As such, staff
does not anticipate any wetland impacts as a result of the proposed application.
Renton Honda Relocation, PRE12-052
Page 5 of 5
July 12, 2012
h:\ced\planning\current planning\preapps\12-052 vanessa\12-052 (im renton honda relocation).doc
Environmental Review
The demolition of the Greenhouse would be subject to SEPA Environmental Review, because is
exceeds 4,000 square feet. However, the tenant improvements to the existing structure would
not trigger SEPA Environmental Review. Therefore an environmental checklist is a submittal
requirement. An environmental determination will be made by the Renton Environmental
Review Committee. This determination is subject to appeal by either the project proponent, by
a citizen of the community, or another entity having standing for an appeal.
Permit Requirements
(Only for the demolition of the greenhouse)
The proposal would require Environmental (SEPA) Review. The application can be reviewed in
an estimated time frame of 6-8 weeks once a complete application is accepted. The application
fee for SEPA Review (Environmental Checklist) is $1,000. There is a technology fee, of 3 %,
based on the total land use application fees for the project. Detailed information regarding the
land use application submittal is provided in the attached handouts.
In addition to the required land use permits, separate construction, building and sign permits
would be required. The review of these permits may occur concurrently with the review of
the land use permits, but cannot be issued prior to the completion of any appeal periods.
Impact Mitigation Fees: In addition to the applicable building and construction fees, the
following mitigation fees would be required prior to the issuance of building permits. Impact
fees, which would replace mitigation fees, may be adopted prior to construction. Those fees are
to be determined. The following are current fees:
A Transportation Mitigation Fee based on $75.00 per new daily trip attributed to the
development;
A Fire Mitigation Fee based on $0.52 per square foot of new commercial building
area.
cc: Jennifer Henning
FIRE & EMERGENCY SERVICES DEPARTMENT
M E M O R A N D U M
DATE:July 2, 2012
TO:Vanessa Dolbee, Senior Planner
FROM:Corey Thomas, Plans Review Inspector
SUBJECT:Renton Honda Relocation
1. Separate plans and permits required for all tenant improvement
changes needed to the existing fire sprinkler and fire alarm systems.
2. Applicant shall provide a hazardous material inventory statement
at time of building permit application. Use of city form required.
Separate plans and permits required for the installation and/or
removal of any aboveground or underground hazardous material
tanks.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:July 3, 2012
TO:Vanessa Dolbee, Planner
FROM:Jan Illian, Plan Review
SUBJECT:Renton Honda Relocation
3701 – E. Valley Road
PRE 12-052
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official city decision-makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal. The following comments are
based on the pre-application submittal made to the City of Renton by the applicant.
Water
1. Water service is provided by the City of Renton. There is an existing 12-inch looped water main
around the building. There is a 2-inch domestic meter, a 1-1/2 inch irrigation meter and a 6-inch fire line
serving the building.
2. A water system development fee is owed if the size of the existing domestic water meter or fire line
is increased. Fee is payable prior to issuance of the building permit.
3. The applicant will be required to install a reduced pressure backflow assembly (RBBA) downstream of
the 2 -inch domestic water if not already installed.
Sanitary Sewer
1. Sewer service is provided by the City of Renton. There is an existing 8-inch sewer main fronting the
site in Renton Ave South and an 8-inch main in an easement along the north property line of the site.
2. A sewer system development fee is owed if the size of the existing domestic water meter is
increased. Fee is payable prior to issuance of the building permit.
3. The existing oils and grease (FOG) removal system will need to be checked and verified to ensure it
meets current City Wastewater requirements for the new proposed auto repair use.
Renton Honda Relocation PRE 12-052
Page 2 of 2
July 2, 2012
i:\preapps\my dental office.doc
Storm Drainage
1. There is a storm conveyance system in the parking lot and is connected to the city storm system.
2. A surface water system development fee of $.405 per square foot of new impervious surface may
apply, although it appears the site is 100% impervious. This is payable prior to issuance of the
construction permit.
Transportation/Street
1. Traffic mitigation fees will be based on the new (net) anticipated daily trips. Fee will be $75 per
additional generated daily trip as determined by the ITE trip generation manual.
General Comments
1. All construction utility permits for drainage and street improvements will require separate plan
submittals. All utility plans shall conform to the Renton Drafting Standards. Plans shall be prepared by a
licensed Civil Engineer.