General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and permitting
issues are based on the pre-application submittals made to the City of Renton by the applicant and
the codes in effect on the date of review. The applicant is cautioned that information contained in
this summary may be subject to modification and/or concurrence by official decision-makers (e.g.,
Hearing Examiner, Planning Director, Public Works Administrator, Development Services Director
and City Council). Review comments may also need to be revised based on site planning and
other design changes required by City staff or made by the applicant. The applicant is encouraged
to review all applicable sections of the Renton Municipal Code. The Development Regulations are
available for purchase for $50.00 plus tax, from the Finance Division on the first floor of City Hall
or online at www.rentonwa.gov
Project Proposal
The subject property is at 289 Perimeter Road at the Renton Municipal Airport. The applicant has
proposed to develop a 10,000 gallon above-ground fuel tank on a concrete slab and install the
necessary infrastructure to provide airplane and fueling truck access to such facility. The fuel
station would be located near the US customs facility on the Northeastern end of the existing
Airport. The subject location would be near Lake Washington. It appears that no changes are
proposed to the site access, which would remain off of Perimeter Road.
Current Use: Currently the subject site is an operating Municipal Airport.
Development Standards: The project would be subject to RMC 4-2-130A, “Development
Standards for Industrial Zoning Designations” and the City of Renton’s Shoreline Master Program
(SMP) because the subject project is located near Lake Washington.
Zoning: The subject site is located within the Medium Industrial (IM) zoning designation. The site
is also located within the Employment Area Industrial Comprehensive Plan designation. The
proposed use would be an airport-related use and would be considered accessory to the principal
use (Airport) which is a permitted use in the IM zone. The subject site is located within the
Shoreline High Intensity environment of Lake Washington reach J.
Rainier Flight Fueling Facility
September 6, 2012
Page 2 of 4
Development Standards: The project would be subject to RMC 4-2-130A, “Development
Standards for Industrial Zoning Designations” (noted as “IM standards” herein). A copy of these
standards is included herewith.
Minimum Lot Size, Width and Depth – There are no minimum requirements for lot width or depth
within the IM zone, however, there is a minimum lot size requirement of 35,000 square feet. The
minimum lot size requirement is not applicable to the proposal, as the applicant is not proposing
land division.
Lot Coverage – There is no minimum lot coverage requirement within the IM zone, except for the
limitations imposed by the City’s landscaping requirements.
Setbacks – Setbacks are the distance between the building and the property line or any private
access easement. The required setbacks in the IM zone are as follows: 15 feet for the front yard
except a 50-foot setback is required if adjacent to a residential zone; 15 feet for the side yard
along a street; zero for the rear yard; and zero for the interior side yard. For the proposed project,
the front yard would be oriented towards East Perimeter Road. The subject site is adjacent to King
County R-48 zoned property as such the front yard setback would be 50 feet. The proposal
appears to comply with all required setbacks.
Building Height – There is no maximum building height requirement within the IM zone. Although
the subject site is located within the Airport influence area, Safety Zone 5 “Sideline
Approach/Departure Zone”. Height is restricted in this area by the FAR Part 77 surface area, as
such the applicant shall verify at time of land use application and building permit that the height
of the proposed structure does not penetrate the FAR Part 77 surface area.
The shoreline jurisdiction also restricts height of structures however the proposed fuelling
tank/station is located outside the 200-foot shoreline jurisdiction, therefore the related height
restrictions would not apply.
Parking – Street parking, loading areas and driveways shall be provided in accordance with the
provisions of the current parking regulations (enclosed). The identified use is not specified in RMC
4-4-080, therefore The Department of Community and Economic Development staff shall
determine which of the uses is most similar based upon staff experience with various uses and
information provided by the applicant. As the subject proposal is intended for Aviation use and
not vehicular use, it appears that parking standards for airplane hangars would be similar to the
subject proposal. Airplane hangars do not require parking.
Refuse and Recycling Areas – Refuse and recycling areas need to meet the requirements of RMC 4-
4-090, “Refuse and Recyclables Standards” (enclosed).
Landscaping – Except for critical areas, all portions of the development area not covered by
structures, required parking, access, circulation or service areas, must be landscaped with native,
drought-resistant vegetative cover. Ten feet (10') of on-site landscaping is required along all
public street frontages, with the exception of areas for required walkways and driveways and
those zones with building setbacks less than ten feet (10'). Please refer to landscape regulations
(RMC 4-4-070 and RMC 4-4-080F.7) for further general and specific landscape requirements
(enclosed). A conceptual landscape plan and landscape analysis meeting the requirements in
RMC 4-8-120D.12, shall be submitted at the time of land use application.
Rainier Flight Fueling Facility
September 6, 2012
Page 3 of 4
Fences – If the applicant intends to install any fences as part of this project, the location must be
designated on the landscape plan. A fence detail should also be included on the landscape plan as
well.
Critical Areas: The City of Renton’s Critical Areas Maps indicate that the subject site is within the
vicinity of seismic hazards and Lake Washington a Shoreline of the State.
The seismic hazard is related to potential liquefaction of soils during an earthquake event. A
geotechnical analysis for the site may be required. The analysis would need to assess soil
conditions and detail construction measures to assure building stability.
Shoreline Regulations: The objective of the High Intensity Overlay is to provide opportunities for
large-scale office and commercial employment centers as well as multi-family residential use and
public services. This district provides opportunities for water-dependent and water-oriented uses
while protecting existing ecological functions and restoring ecological functions in areas that have
been previously degraded. Development may also provide for public use and/or community use,
especially access to and along the water's edge.
RMC 4-3-090E.10.f addresses Aviation in the SMP, see regulations below:
ii. Airports:
(a) A new airport shall not be allowed to locate within the shoreline; however, an airport
already located within a shoreline shall be permitted.
(b) Upgrades of facilities to meet FAA requirements or improvements in technology shall be
permitted.
(c) Facilities to serve seaplanes may be included as an accessory use in any existing airport.
(d) Helipads may be included as an accessory use in any existing airport.
(e) Aviation-related manufacturing shall be permitted in an airport.
(f) New or upgraded airport facilities shall be designed and operated such that:
(1) All facilities that are non-water-dependent shall be located outside of
shoreline jurisdiction, if feasible. When sited within shoreline jurisdiction, uses
and/or developments such as parking, hangars, service buildings or areas, access
roads, utilities, signs, and storage of materials shall be located as far from the
land/water interface as feasible. The minimum setback shall be twenty feet (20')
from the OHWM of the shoreline and shall be designed and spaced to allow
viewing of airport activities from the area along the water’s edge.
(2) New or upgraded airport facilities shall minimize impacts on shoreline
ecological functions, including control of pollutant discharge. The standards for
water quality and criteria for application shall be those in current stormwater
control regulations.
(3) New facilities dispensing fuel or facilities associated with use of hazardous
materials shall require a Shoreline Conditional Use Permit.
Development Standards within Shoreline Jurisdiction:
For non-water oriented uses, the minimum structure setback from the Ordinary High
Water Mark (OHWM) is 100 feet; however, this setback can be reduced to 75 feet.
Rainier Flight Fueling Facility
September 6, 2012
Page 4 of 4
Impervious Area within the Buffer/Setback shall be limited to 5 percent
Vegetation Conservation Buffer: 100 feet from the OHWM. Non-water-oriented uses may
be established closer to OHWM only in cases where the vegetation conservation buffer is
varied in accordance with RMC4-5-090F1, Vegetation Conservation. Buildings shall be no
closer than seventy five feet (75'), except as consistent with a Master Site Plan approved
prior to the adoption of the Shoreline Master Program.
Public access shall be provided for non-water-dependent development and uses, unless
ecological restoration is provided. Public access identified for Lake Washington Reach J
shall be provided to the Lake Waterfront from the lawn area of the Will Rogers, Wiley Post
Memorial Sea Plane Base and should be maintained if such access is not in conflict with the
aeronautical use of the property.
Environmental Review: The project may be exempt from SEPA review as the installation of tanks
with a capacity of 10,000 gallons or less is exempt. However, if grading exceeds 500 cubic yards
the project would not be exempt from SEPA review.
Permit Requirements: The proposal would require a Shoreline Substantial Development Permit
(SSDP) and potentially Environmental Review SEPA. This permit would be reviewed in an
estimated timeframe of 6 - 8 weeks with an additional 21-day review period for the SSDP with the
Washington State Department of Ecology. The fee for the SSDP is $2,000.00 and $1,000.00 for the
Environmental Review. Please note that each of these land use permits has an additional 3
percent Technology Surcharge Fee.
In addition to the required land use permit, separate construction, building and sign permits
would be required. The review of these permits may occur concurrently with the review of the
SSDP and SEPA, but cannot be issued prior to the completion of any appeal periods.
*Once the application materials are complete, the applicant is strongly encouraged to
have one copy of the application materials pre-screened at the 6th floor front counter prior to
submitting the complete application package. Please call for an appointment.
cc: Jennifer Henning
`
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:September 5, 2012
TO:Vanessa Dolbee, Planner
FROM:Arneta Henninger, Plan Review
SUBJECT:RAINIER FLIGHT FUELING FACILITY
289 E. PERIMETER ROAD
PRE 12-069 PORTION OF PARCEL 0723059007
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official city decision-makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review to install a 10,000 gallon above-ground fuel tank on a concrete
slab, construct a canopy over the fuel pumps and credit card machine and provide an area for fuel truck
parking while filling the tank building site on the airport, located in Sect. 7 Twp. 23N, Rng 5 E. The
following comments are based on the pre-application submittal made to the City of Renton by the
applicant.
Water
This site is located in the City of Renton water service areas.
The site is not located in the Aquifer Protection Zone.
There is an existing 8” DI water main located on the Airport on West Perimeter road. See City of
Renton drawing number W 04550D.
There is an existing 2” water meter off of the main in West Perimeter Road.
The site is located in the 196 water pressure zone. The static pressure is approximately 74 psi at the
building pad level.
Construction of a commercial building, if any, will trigger a separate review.
The existing fire hydrants may need to be fitted with stortz fittings to bring them up to current City
code.
The Water System Development Charges are based on the size of the (each and all) water meter(s).
These fees are collected at the time a construction permit is issued then prior to the issuance of the
building permit.
Rainier Flight Fueling Facility PRE 12-069
Page 2 of 2
September 5, 2012
H:\CED\Planning\Current Planning\PREAPPS\12-069.Vanessa\Plan Review Comments PRE 12-069.doc
Sanitary Sewer
There is an existing Metro sewer main on West Perimeter Rd.
The site is not located in any Special Assessment Districts or any Latecomers boundary.
Project coordination with King County Wastewater Treatment is needed, regarding the Bryn Mawr
Siphon. Contact is Todd Keithahn, PE in the Wastewater Treatment Division.
The Sanitary Sewer System Development Charges are based on the size of the domestic water
meter. These fees are collected at the time a construction permit is issued; if there is no
construction permit, then prior to the issuance of the building permit.
Storm Drainage
There is an existing storm drainage pipe in this area.
A storm drainage report will be required. All storm drainage shall be in compliance with the City of
Renton amendments to the 2009 King County Surface Water Drainage Manual.
If the project will have over 2,000 sq ft of new impervious area, flow control will be required.
If there will be more than 5,000 square feet of new impervious surface, water quality treatment will
be required.
Stormwater requirements for the oil/water separator are covered in Chapter 6 of the King County
Manual.
Developer shall confirm with their engineer that the site is located in Zone X (shaded), which is the
500 year flood plain.
Storm System Development Charges are $0.405 per square foot of new impervious surface area.
These fees are collected at the time a construction permit is issued.
Street Improvements
Additional street improvements will not be required.
Traffic Mitigation fees do not apply. A traffic study will not be required.
General Comments
All required utility, drainage, and street improvements will require separate plan submittals
prepared according to City of Renton drafting standards by a licensed Civil Engineer.
All plans shall be tied to a minimum of two of the City of Renton Horizontal and Vertical Control
Network.
Permit application must include an itemized cost estimate for these improvements. Half of the fee
must be paid upon application for building and construction permits, and the remainder when the
permits are issued. There may be additional fees for water service related expenses. See Drafting
Standards.
FIRE & EMERGENCY SERVICES DEPARTMENT
M E M O R A N D U M
DATE:September 4, 2012
TO:Vanessa Dolbee, Senior Planner
FROM:Corey Thomas, Plans Review Inspector
SUBJECT:Preliminary Comments for Rainier Flight Fueling Facility
1. The proposed aboveground fuel tank shall meet all requirements of the
International Fire Code. Tank shall be a listed protected above ground tank that
is a UL listed 142 tank or equivalent. Separate plans, permits and fees are
required for the installation of the tank and shall be submitted to the Renton Fire
Department for review and permitting. A tank of this size is required to be a
minimum of 15-feet from all property lines and buildings.
2. The fuel trucks shall also meet all the requirements as outlined in the fire code.
The parking area for the fuel trucks shall be designed to control leakage such
that adjacent buildings and storm drains are not contaminated be leaking fuel.
Parking area shall maintain a minimum distance of 50-feet from parked aircraft
and buildings. Fuel trucks shall maintain a minimum of 10-feet separation from
each other. Proposed location cannot meet these requirements.