Loading...
HomeMy WebLinkAboutEx12_Geotechnical_Engineering_Report_2 Corporate Office 17522 Bothell Way Northeast Bothell, Washington 98011 Phone 425.415.0551 ♦ Fax 425.415.0311 www.riley-group.com GEOTECHNICAL ENGINEERING REPORT PREPARED BY: THE RILEY GROUP, INC. 17522 BOTHELL WAY NORTHEAST BOTHELL, WASHINGTON 98011 PREPARED FOR: ANITA WOO 12906 NORTHEAST 25TH PLACE BELLEVUE, WASHINGTON 98004 RGI PROJECT NO. 2021-123 JEFFERSON TOWNHOMES 1518 JEFFERSON AVENUE NORTHEAST RENTON, WASHINGTON SEPTEMBER 1, 2021 Exhibit 12 RECEIVED Clark Close 10/27/2021 PLANNING DIVISION DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Corporate Office 17522 Bothell Way Northeast Bothell, Washington 98011 Phone 425.415.0551 ♦ Fax 425.415.0311 www.riley-group.com September 1, 2021 Anita Woo 12906 Northeast 25th Place Bellevue, Washington 98004 Subject: Geotechnical Engineering Report Jefferson Townhomes 1518 Jefferson Avenue Northeast Renton, Washington RGI Project No. 2021-123 Dear Ms. Woo: As requested, The Riley Group, Inc. (RGI) has performed a Geotechnical Engineering Report (GER) for the Jefferson Townhomes located at 1518 Jefferson Avenue Northeast, Renton, Washington. Our services were completed in accordance with our proposal dated February 23rd, 2021 and authorized by you on July 9, 2021. The information in this GER is based on our understanding of the proposed construction, and the soil and groundwater conditions encountered in the test pits completed by RGI at the site on August 2nd, 2021. RGI recommends that you submit the project plans and specifications to RGI for a general review so that we may confirm that the recommendations in this GER are interpreted and implemented properly in the construction documents. RGI also recommends that a representative of our firm be present on site during portions of the project construction to confirm that the soil and groundwater conditions are consistent with those that form the basis for the engineering recommendations in this GER. If you have any questions or require additional information, please contact us. Respectfully submitted, THE RILEY GROUP, INC. Eric L. Woods, LG Kristina M. Weller, PE Project Geologist Principal Geotechnical Engineer DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report i September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 TABLE OF CONTENTS 1.0 INTRODUCTION ............................................................................................................................... 1 2.0 PROJECT DESCRIPTION ............................................................................................................... 1 3.0 FIELD EXPLORATION AND LABORATORY TESTING .......................................................... 1 3.1 FIELD EXPLORATION ................................................................................................................................... 1 3.2 LABORATORY TESTING ................................................................................................................................ 2 4.0 SITE CONDITIONS ........................................................................................................................... 2 4.1 SURFACE .................................................................................................................................................. 2 4.2 GEOLOGY ................................................................................................................................................. 2 4.3 SOILS ....................................................................................................................................................... 2 4.4 GROUNDWATER ........................................................................................................................................ 3 4.5 SEISMIC CONSIDERATIONS ........................................................................................................................... 3 4.6 GEOLOGIC HAZARD AREAS .......................................................................................................................... 4 5.0 DISCUSSION AND RECOMMENDATIONS ................................................................................. 4 5.1 GEOTECHNICAL CONSIDERATIONS ................................................................................................................. 4 5.2 EARTHWORK ............................................................................................................................................. 4 5.2.1 Erosion and Sediment Control ..................................................................................................... 4 5.2.2 Stripping and Subgrade Preparation ............................................................................................ 5 5.2.3 Excavations................................................................................................................................... 6 5.2.4 Structural Fill ................................................................................................................................ 6 5.2.5 Cut and Fill Slopes ........................................................................................................................ 7 5.2.6 Wet Weather Construction Considerations ................................................................................. 8 5.3 FOUNDATIONS .......................................................................................................................................... 8 5.4 RETAINING WALLS ..................................................................................................................................... 9 5.5 SLAB-ON-GRADE CONSTRUCTION ............................................................................................................... 10 5.6 DRAINAGE .............................................................................................................................................. 10 5.6.1 Surface ....................................................................................................................................... 10 5.6.2 Subsurface .................................................................................................................................. 11 5.6.3 Infiltration .................................................................................................................................. 11 6.0 ADDITIONAL SERVICES .............................................................................................................. 11 7.0 LIMITATIONS ................................................................................................................................. 12 LIST OF FIGURES AND APPENDICES Figure 1 ..................................................................................................................... Site Vicinity Map Figure 2 ............................................................................................... Geotechnical Exploration Plan Figure 3 ............................................................................................... Retaining Wall Drainage Detail Figure 4 ....................................................................................................Typical Footing Drain Detail Appendix A .......................................................................... Field Exploration and Laboratory Testing DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report ii September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 Executive Summary This Executive Summary should be used in conjunction with the entire Geotechnical Engineering Report (GER) for design and/or construction purposes. It should be recognized that specific details were not included or fully developed in this section, and the GER must be read in its entirety for a comprehensive understanding of the items contained herein. Section 7.0 should be read for an understanding of limitations. RGI’s geotechnical scope of work included the advancement of five test pits to approximate depths of 7 feet below existing site grades. Based on the information obtained from our subsurface exploration, the site is suitable for development of the proposed project. The following geotechnical considerations were identified: Soil Conditions: The soils encountered during field exploration include up to 6.5 feet of loose fill comprised of silty sand with some gravel and sand with some gravel and silt over loose to medium dense silty sand with some gravel, gravelly sand with some silt, and sand with some silt and gravel. Groundwater: No groundwater seepage was encountered during our subsurface exploration. Foundations: Foundations for the proposed building may be supported on conventional spread footings bearing on medium dense native soil or structural fill. Slab-on-grade: Slab-on-grade floors and slabs for the proposed building can be supported on medium dense native soil or structural fill. DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report 1 September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 1.0 Introduction This Geotechnical Engineering Report (GER) presents the results of the geotechnical engineering services provided for the Jefferson Townhomes in Renton, Washington. The purpose of this evaluation is to assess subsurface conditions and provide geotechnical recommendations for the construction of a townhome development. Our scope of services included field explorations, laboratory testing, engineering analyses, and preparation of this GER. The recommendations in the following sections of this GER are based upon our current understanding of the proposed site development as outlined below. If actual features vary or changes are made, RGI should review them in order to modify our recommendations as required. In addition, RGI requests to review the site grading plan, final design drawings and specifications when available to verify that our project understanding is correct and that our recommendations have been properly interpreted and incorporated into the project design and construction. 2.0 Project description The project site is located at 1518 Jefferson Avenue Northeast in Renton, Washington. The approximate location of the site is shown on Figure 1. The site is currently occupied by a single-family residence. RGI understands that the existing structure will be demolished and townhomes will be constructed on the site. At the time of preparing this GER, building plans were not available for our review. Based on our experience with similar construction, RGI anticipates that the proposed building will be supported on perimeter walls with bearing loads of two to six kips per linear foot, and a series of columns with a maximum load up to 30 kips. Slab-on-grade floor loading of 250 pounds per square foot (psf) are expected. 3.0 Field Exploration and Laboratory Testing 3.1 FIELD EXPLORATION On August 2nd, 2021, RGI observed the excavation of five test pits. The approximate exploration locations are shown on Figure 2. Field logs of each exploration were prepared by the geotechnical technician that continuously observed the excavation. These logs included visual classifications of the materials encountered during excavation as well as our interpretation of the subsurface conditions between samples. The test pit logs included in Appendix A represent an interpretation of the field logs and include modifications based on laboratory observation and analysis of the samples. DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report 2 September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 3.2 LABORATORY TESTING During the field exploration, a representative portion of each recovered sample was sealed in containers and transported to our laboratory for further visual and laboratory examination. Selected samples retrieved from the test pits were tested for moisture content and grain size analysis to aid in soil classification and provide input for the recommendations provided in this GER. The results and descriptions of the laboratory tests are enclosed in Appendix A. 4.0 Site Conditions 4.1 SURFACE The subject site is a rectangular-shaped parcel of land approximately 0.22 acres in size. The site is bound to the north, east and south by single-family residences, and to the west by Jefferson Avenue NE. The existing site is occupied by a single-family residence. The site slopes generally to the east with an overall elevation difference of approximately 8 feet. The site is vegetated with grass, decorative plants and shrubs, and several medium- to large-diameter trees. 4.2 GEOLOGY Review of the Geologic Map of Surficial Deposits in the Seattle 30’ by 60’ Quadrangle, Washington, by James C. Yount, etc. (1993) indicates that the soil in the project vicinity is mapped as Vashon till (Qt), which is light to dark gray, nonsorted, nonstratified mixture of clay, silt, sand, and gravel. However soil encountered at the site matches the description for Vashon recessional outwash deposit (Qvr) found mapped to the west of the site, which is poorly to moderately sorted stratified gravel and sand with some silt and clay. 4.3 SOILS The soils encountered during field exploration include up to 6.5 feet of loose fill comprised of silty sand with some gravel and sand with some gravel and silt over loose to medium dense silty sand with some gravel, gravelly sand with some silt, and sand with some silt and gravel. More detailed descriptions of the subsurface conditions encountered are presented in the Test pits included in Appendix A. Sieve analysis was performed on four selected soil samples. Grain size distribution curves are included in Appendix A. DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report 3 September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 4.4 GROUNDWATER No groundwater seepage was encountered during our subsurface exploration It should be recognized that fluctuations of the groundwater table will occur due to seasonal variations in the amount of rainfall, runoff, and other factors not evident at the time the explorations were performed. In addition, perched water can develop within seams and layers contained in fill soils or higher permeability soils overlying less permeable soils following periods of heavy or prolonged precipitation. Therefore, groundwater levels during construction or at other times in the future may be higher or lower than the levels indicated on the logs. Groundwater level fluctuations should be considered when developing the design and construction plans for the project. 4.5 SEISMIC CONSIDERATIONS Based on the International Building Code (IBC), RGI recommends the follow seismic parameters for design. Table 1 IBC Parameter 2018 Value Site Soil Class1 D2 Site Latitude 47.506039 N Site Longitude -122.179538 W Short Period Spectral Response Acceleration, SS (g) 1.426 1-Second Period Spectral Response Acceleration, S1 (g) 0.489 Adjusted Short Period Spectral Response Acceleration, SMS (g) 1.426 Adjusted 1-Sec Period Spectral Response Acceleration, SM1 (g) 0.8853 Numeric seismic design value at 0.2 second; SDS(g) 0.951 Numeric seismic design value at 1.0 second; SD1(g) 0.593 1. Note: In general accordance with Chapter 20 of ASCE 7-16. The Site Class is based on the average characteristics of the upper 100 feet of the subsurface profile. 2. Note: ASCE 7-16 require a site soil profile determination extending to a depth of 100 feet for seismic site classification. The current scope of our services does not include the required 100 foot soil profile determination. Test pits extended to a maximum depth of 7 feet, and this seismic site class definition considers that similar soil continues below the maximum depth of the subsurface exploration. Additional exploration to deeper depths would be required to confirm the conditions below the current depth of exploration. 3. Note: In accordance with ASCE 11.4.8, a ground motion hazard analysis is not required for the following cases: • Structures on Site Class E sites with SS greater than or equal to 1.0, provided the site coefficient Fa is taken as equal to that of Site Class C. • Structures on Site Class D sites with S1 greater than or equal to 0.2, provided that the value of the seismic response coefficient Cs is determined by Eq. 12.8-2 for values of T ≤ 1.5Ts and taken as equal to 1.5 times the value computed in accordance with either Eq. 12.8-3 for TL ≥ T > 1.5Ts or Eq. 12.8-4 for T > TL. • Structures on Site Class E sites with S1 greater than or equal to 0.2, provided that T is less than or equal to Ts and the equivalent static force procedure is used for design. The above exceptions do not apply to seismically isolated structures, structures with damping systems or structures designed using the response history procedures of Chapter 16. DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report 4 September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 Liquefaction is a phenomenon where there is a reduction or complete loss of soil strength due to an increase in water pressure induced by vibrations from a seismic event. Liquefaction mainly affects geologically recent deposits of fine-grained sands that are below the groundwater table. Soils of this nature derive their strength from intergranular friction. The generated water pressure or pore pressure essentially separates the soil grains and eliminates this intergranular friction, thus reducing or eliminating the soil’s strength. RGI reviewed the results of the field and laboratory testing and assessed the potential for liquefaction of the site’s soil during an earthquake. Since the site is underlain by medium dense soils and lacks an established shallow groundwater table, RGI considers that the possibility of liquefaction during an earthquake is low. 4.6 GEOLOGIC HAZARD AREAS Regulated geologically hazardous areas include erosion, landslide, earthquake, or other geological hazards. Based on the definition in the Renton Municipal Code, the site does not contain geologically hazardous areas. 5.0 Discussion and Recommendations 5.1 GEOTECHNICAL CONSIDERATIONS Based on our study, the site is suitable for the proposed construction from a geotechnical standpoint. Foundations for the proposed building can be supported on conventional spread footings bearing on competent native soil or structural fill. Slab-on-grade floors can be similarly supported. Detailed recommendations regarding the above issues and other geotechnical design considerations are provided in the following sections. These recommendations should be incorporated into the final design drawings and construction specifications. 5.2 EARTHWORK The earthwork is expected to include excavating and backfilling the building foundations and preparing slab subgrades. 5.2.1 EROSION AND SEDIMENT CONTROL Potential sources or causes of erosion and sedimentation depend on construction methods, slope length and gradient, amount of soil exposed and/or disturbed, soil type, construction sequencing and weather. The impacts on erosion-prone areas can be reduced by implementing an erosion and sedimentation control plan. The plan should be designed in accordance with applicable city and/or county standards. DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report 5 September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 RGI recommends the following erosion control Best Management Practices (BMPs):  Scheduling site preparation and grading for the drier summer and early fall months and undertaking activities that expose soil during periods of little or no rainfall  Retaining existing vegetation whenever feasible  Establishing a quarry spall construction entrance  Installing siltation control fencing or anchored straw or coir wattles on the downhill side of work areas  Covering soil stockpiles with anchored plastic sheeting  Revegetating or mulching exposed soils with a minimum 3-inch thickness of straw if surfaces will be left undisturbed for more than one day during wet weather or one week in dry weather  Directing runoff away from exposed soils and slopes  Minimizing the length and steepness of slopes with exposed soils and cover excavation surfaces with anchored plastic sheeting  Decreasing runoff velocities with check dams, straw bales or coir wattles  Confining sediment to the project site  Inspecting and maintaining erosion and sediment control measures frequently (The contractor should be aware that inspection and maintenance of erosion control BMPs is critical toward their satisfactory performance. Repair and/or replacement of dysfunctional erosion control elements should be anticipated.) Permanent erosion protection should be provided by reestablishing vegetation using hydroseeding and/or landscape planting. Until the permanent erosion protection is established, site monitoring should be performed by qualified personnel to evaluate the effectiveness of the erosion control measures. Provisions for modifications to the erosion control system based on monitoring observations should be included in the erosion and sedimentation control plan. 5.2.2 STRIPPING AND SUBGRADE PREPARATION Stripping efforts should include removal of pavements, vegetation, organic materials, and deleterious debris from areas slated for building, pavement, and utility construction. The Test pits encountered 6 to 8 inches of topsoil and rootmass. Deeper areas of stripping may be required in heavily vegetated areas of the site. Subgrade soils that become disturbed due to elevated moisture conditions should be overexcavated to reveal firm, non-yielding, non-organic soils and backfilled with compacted structural fill. In order to maximize utilization of site soils as structural fill, RGI recommends that the earthwork portion of this project be completed during extended DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report 6 September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 periods of warm and dry weather if possible. If earthwork is completed during the wet season (typically November through May) it will be necessary to take extra precautionary measures to protect subgrade soils. Wet season earthwork will require additional mitigative measures beyond that which would be expected during the drier summer and fall months. 5.2.3 EXCAVATIONS All temporary cut slopes associated with the site and utility excavations should be adequately inclined to prevent sloughing and collapse. The site soils consist of medium dense silty sand with some gravel, gravelly sand with some silt, and sand with some gravel and silt. Accordingly, for excavations more than 4 feet but less than 20 feet in depth, the temporary side slopes should be laid back with a minimum slope inclination of 1.5H:1V (Horizontal:Vertical). If there is insufficient room to complete the excavations in this manner, or excavations greater than 20 feet in depth are planned, using temporary shoring to support the excavations should be considered. For open cuts at the site, RGI recommends:  No traffic, construction equipment, stockpiles or building supplies are allowed at the top of cut slopes within a distance of at least five feet from the top of the cut  Exposed soil along the slope is protected from surface erosion using waterproof tarps and/or plastic sheeting  Construction activities are scheduled so that the length of time the temporary cut is left open is minimized  Surface water is diverted away from the excavation  The general condition of slopes should be observed periodically by a geotechnical engineer to confirm adequate stability and erosion control measures In all cases, however, appropriate inclinations will depend on the actual soil and groundwater conditions encountered during earthwork. Ultimately, the site contractor must be responsible for maintaining safe excavation slopes that comply with applicable OSHA or WISHA guidelines. 5.2.4 STRUCTURAL FILL RGI recommends fill below the foundation and floor slab, behind retaining walls, and below pavement and hardscape surfaces be placed in accordance with the following recommendations for structural fill. The structural fill should be placed after completion of site preparation procedures as described above. The suitability of excavated site soils and import soils for compacted structural fill use will depend on the gradation and moisture content of the soil when it is placed. As the amount of fines (that portion passing the U.S. No. 200 sieve) increases, soil becomes increasingly DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report 7 September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 sensitive to small changes in moisture content and adequate compaction becomes more difficult or impossible to achieve. Soils containing more than about 5 percent fines cannot be consistently compacted to a dense, non-yielding condition when the moisture content is more than 2 percent above or below optimum. Optimum moisture content is that moisture that results in the greatest compacted dry density with a specified compactive effort. Non-organic site soils are only considered suitable for structural fill provided that their moisture content is within about two percent of the optimum moisture level as determined by American Society of Testing and Materials D1557-09 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (ASTM D1557). Excavated site soils may not be suitable for re-use as structural fill depending on the moisture content and weather conditions at the time of construction. If soils are stockpiled for future reuse and wet weather is anticipated, the stockpile should be protected with plastic sheeting that is securely anchored. Even during dry weather, moisture conditioning (such as, windrowing and drying) of site soils to be reused as structural fill may be required. The site soils are moisture sensitive and may require moisture conditioning prior to use as structural fill. If on-site soils are or become unusable, it may become necessary to import clean, granular soils to complete site work that meet the grading requirements listed in Table 2 to be used as structural fill. Table 2 Structural Fill Gradation U.S. Sieve Size Percent Passing 4 inches 100 No. 4 sieve 22 to 100 No. 200 sieve 0 to 5* *Based on minus 3/4 inch fraction. Prior to use, an RGI representative should observe and test all materials imported to the site for use as structural fill. Structural fill materials should be placed in uniform loose layers not exceeding 12 inches and compacted to 95 percent of the maximum dry density. The soil’s maximum density and optimum moisture should be determined by ASTM D1557. Placement and compaction of structural fill should be observed by RGI. 5.2.5 CUT AND FILL SLOPES All permanent cut and fill slopes should be graded with a finished inclination no greater than 2H:1V. Upon completion of construction, the slope face should be trackwalked, compacted and vegetated, or provided with other physical means to guard against erosion. DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report 8 September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 All fill placed for slope construction should meet the structural fill requirements as described this section. Final grades at the top of the slopes must promote surface drainage away from the slope crest. Water must not be allowed to flow in an uncontrolled fashion over the slope face. If it is necessary to direct surface runoff towards the slope, it should be controlled at the top of the slope, piped in a closed conduit installed on the slope face, and taken to an appropriate point of discharge beyond the toe of the slope. 5.2.6 WET WEATHER CONSTRUCTION CONSIDERATIONS RGI recommends that preparation for site grading and construction include procedures intended to drain ponded water, control surface water runoff, and to collect shallow subsurface seepage zones in excavations where encountered. It will not be possible to successfully compact the subgrade or utilize on-site soils as structural fill if accumulated water is not drained prior to grading or if drainage is not controlled during construction. Attempting to grade the site without adequate drainage control measures will reduce the amount of on-site soil effectively available for use, increase the amount of select import fill materials required, and ultimately increase the cost of the earthwork phases of the project. Free water should not be allowed to pond on the subgrade soils. RGI anticipates that the use of berms and shallow drainage ditches, with sumps and pumps in utility trenches, will be required for surface water control during wet weather and/or wet site conditions. 5.3 FOUNDATIONS Following site preparation and grading, the proposed building foundation can be supported on conventional spread footings bearing on competent native soil or structural fill. Loose, organic, or other unsuitable soils may be encountered in the proposed building footprint. If unsuitable soils are encountered, they should be overexcavated and backfilled with structural fill. If loose soils are encountered, the soils should be moisture conditioned and compacted to a firm and unyielding condition. The foundation design value assumes the foundation is supported on at least two feet of medium dense native soil or structural fill. DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report 9 September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 Table 3 Foundation Design Design Parameter Value Allowable Bearing Capacity 2,000 psf1 Friction Coefficient 0.30 Passive pressure (equivalent fluid pressure) 250 pcf2 Minimum foundation dimensions Columns: 24 inches Walls: 16 inches 1. psf = pounds per square foot 2. pcf = pounds per cubic foot The allowable foundation bearing pressures apply to dead loads plus design live load conditions. For short-term loads, such as wind and seismic, a 1/3 increase in this allowable capacity may be used. At perimeter locations, RGI recommends not including the upper 12 inches of soil in the computation of passive pressures because they can be affected by weather or disturbed by future grading activity. The passive pressure value assumes the foundation will be constructed neat against competent soil or backfilled with structural fill as described in Section 5.2.4. The recommended base friction and passive resistance value includes a safety factor of about 1.5. Perimeter foundations exposed to weather should be at a minimum depth of 18 inches below final exterior grades. Interior foundations can be constructed at any convenient depth below the floor slab. Finished grade is defined as the lowest adjacent grade within 5 feet of the foundation for perimeter (or exterior) footings and finished floor level for interior footings. With spread footing foundations designed in accordance with the recommendations in this section, maximum total and differential post-construction settlements of 1 inch and 1/2 inch, respectively, should be expected. 5.4 RETAINING WALLS If retaining walls are needed in the building area, RGI recommends cast-in-place concrete walls be used. The magnitude of earth pressure development on retaining walls will partly depend on the quality of the wall backfill. RGI recommends placing and compacting wall backfill as structural fill. Wall drainage will be needed behind the wall face. A typical retaining wall drainage detail is shown in Figure 3. With wall backfill placed and compacted as recommended, and drainage properly installed, RGI recommends using the values in the following table for design. DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report 10 September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 Table 4 Retaining Wall Design Design Parameter Value Allowable Bearing Capacity 2,000 psf Active Earth Pressure (unrestrained walls) 35 pcf At-rest Earth Pressure (restrained walls) 50 pcf For seismic design, an additional uniform load of 7 times the wall height (H) for unrestrained walls and 14H in psf for restrained walls should be applied to the wall surface. Friction at the base of foundations and passive earth pressure will provide resistance to these lateral loads. Values for these parameters are provided in Section 5.3. 5.5 SLAB-ON-GRADE CONSTRUCTION Once site preparation has been completed as described in Section 5.2, suitable support for slab-on-grade construction should be provided. RGI recommends that the concrete slab be placed on top of medium dense native soil or structural fill. Immediately below the floor slab, RGI recommends placing a four-inch thick capillary break layer of clean, free-draining sand or gravel that has less than five percent passing the U.S. No. 200 sieve. This material will reduce the potential for upward capillary movement of water through the underlying soil and subsequent wetting of the floor slab. Where moisture by vapor transmission is undesirable, an 8- to 10-millimeter thick plastic membrane should be placed on a 4-inch thick layer of clean gravel. For the anticipated floor slab loading, we estimate post-construction floor settlements of 1/4- to 1/2-inch. 5.6 DRAINAGE 5.6.1 SURFACE Final exterior grades should promote free and positive drainage away from the building area. Water must not be allowed to pond or collect adjacent to foundations or within the immediate building area. For non-pavement locations, RGI recommends providing a minimum drainage gradient of 3 percent for a minimum distance of 10 feet from the building perimeter. In paved locations, a minimum gradient of 1 percent should be provided unless provisions are included for collection and disposal of surface water adjacent to the structure. DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report 11 September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 5.6.2 SUBSURFACE RGI recommends installing perimeter foundation drains. A typical footing drain detail is shown on Figure 4. The foundation drains and roof downspouts should be tightlined separately to an approved discharge facility. Subsurface drains must be laid with a gradient sufficient to promote positive flow to a controlled point of approved discharge. 5.6.3 INFILTRATION RGI evaluated the potential to infiltrate stormwater runoff at the site. An infiltration test was completed in test pit TP-5 at a depth of approximately 5 feet below existing grade in general accordance with a Small-Scale Pilot Infiltration Test described in the 2017 City of Renton Surface Water Design Manual (CRSWDM). Table 5 Infiltration Rates Test Location Test Depth Field Measured Rate (Inches per hour) Design Rate (Inches per hour) TP-5 5 4.08 1.6 CRSWDM correction factors were applied to the field measured rate of 4.08 inches per hour. Idesign = Imeasured x Ftesting x Fplugging x Fgeometry Correction factors of 0.5 (Ftesting) for the PIT test method and 0.8 (Fplugging) for loamy sand loams were applied to the field measured rate to estimate the long-term design infiltration rate. We assumed Fgeometry = 1. The application of the correction factors yield a long-term design rate (Idesign) of 1.6 inches per hour. This rate can be used to design a site specific infiltration element. 6.0 Additional Services RGI is available to provide further geotechnical consultation throughout the design phase of the project. RGI should review the final design and specifications in order to verify that earthwork and foundation recommendations have been properly interpreted and incorporated into project design and construction. RGI is also available to provide geotechnical engineering and construction monitoring services during construction. The integrity of the earthwork and construction depends on proper site preparation and procedures. In addition, engineering decisions may arise in the field in the event that variations in subsurface conditions become apparent. Construction monitoring services are not part of this scope of work. If these services are desired, please let us know and we will prepare a cost proposal. DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report 12 September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 7.0 Limitations This GER is the property of RGI, Anita Woo, and its designated agents. Within the limits of the scope and budget, this GER was prepared in accordance with generally accepted geotechnical engineering practices in the area at the time this GER was issued. This GER is intended for specific application to the Jefferson Townhomes project in Renton, Washington, and for the exclusive use of Anita Woo and its authorized representatives. No other warranty, expressed or implied, is made. Site safety, excavation support, and dewatering requirements are the responsibility of others. The scope of services for this project does not include either specifically or by implication any environmental or biological (for example, mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, we can provide a proposal for these services. The analyses and recommendations presented in this GER are based upon data obtained from the explorations performed on site. Variations in soil conditions can occur, the nature and extent of which may not become evident until construction. If variations appear evident, RGI should be requested to reevaluate the recommendations in this GER prior to proceeding with construction. It is the client’s responsibility to see that all parties to the project, including the designers, contractors, subcontractors, are made aware of this GER in its entirety. The use of information contained in this GER for bidding purposes should be done at the contractor’s option and risk. DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 USGS, 2020, Mercer Island, Washington USGS, 2020, Renton, Washington 7.5-Minute Quadrangle Approximate Scale: 1"=1000' 0 500 1000 2000 N Site Vicinity Map Figure 1 08/2021 Corporate Office 17522 Bothell Way Northeast Bothell, Washington 98011 Phone: 425.415.0551 Fax: 425.415.0311 Jefferson Townhomes RGI Project Number: 2021-123-1 Date Drawn: Address: 1518 Jefferson Avenue Northeast, Renton, Washington 98056 SITE DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 TP-1TP-2TP-3TP-4TP-508/2021Corporate Office17522 Bothell Way NortheastBothell, Washington 98011Phone: 425.415.0551Fax: 425.415.0311Jefferson TownhomesRGI Project Number:2021-123-1Date Drawn:Address: 1518 Jefferson Avenue Northeast, Renton, Washington 98056Figure 2Approximate Scale: 1"=30'0153060N= Test pit by RGI, 08/02/21= Site boundaryGeotechnical Exploration PlanDocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Incliniations) 12" Over the Pipe 3" Below the Pipe Perforated Pipe 4" Diameter PVC Compacted Structural Backfill (Native or Import) 12" min. Filter Fabric Material 12" Minimum Wide Free-Draining Gravel Slope to Drain (See Report for Appropriate Excavated Slope 08/2021 Corporate Office 17522 Bothell Way Northeast Bothell, Washington 98011 Phone: 425.415.0551 Fax: 425.415.0311 Jefferson Townhomes RGI Project Number: 2021-123-1 Date Drawn: Address: 1518 Jefferson Avenue Northeast, Renton, Washington 98056 Retaining Wall Drainage Detail Figure 3 Not to Scale DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 3/4" Washed Rock or Pea Gravel 4" Perforated Pipe Building Slab Structural Backfill Compacted Filter Fabric 08/2021 Corporate Office 17522 Bothell Way Northeast Bothell, Washington 98011 Phone: 425.415.0551 Fax: 425.415.0311 Jefferson Townhomes RGI Project Number: 2021-123-1 Date Drawn: Address: 1518 Jefferson Avenue Northeast, Renton, Washington 98056 Typical Footing Drain Detail Figure 4 Not to Scale DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 Geotechnical Engineering Report September 1, 2021 Jefferson Townhomes, Renton, Washington RGI Project No. 2021-123 APPENDIX A FIELD EXPLORATION AND LABORATORY TESTING On August 2nd, 2021, RGI performed field explorations using a backhoe. We explored subsurface soil conditions at the site by observing the excavation of five test pits to a maximum depth of 7 feet below existing grade. The test pit locations are shown on Figure 2. The test pit locations were approximately determined by measurements from existing property lines and paved roads. A geologist from our office conducted the field exploration and classified the soil conditions encountered, maintained a log of each test exploration, obtained representative soil samples, and observed pertinent site features. All soil samples were visually classified in accordance with the Unified Soil Classification System (USCS). Representative soil samples obtained from the explorations were placed in closed containers and taken to our laboratory for further examination and testing. As a part of the laboratory testing program, the soil samples were classified in our in house laboratory based on visual observation, texture, plasticity, and the limited laboratory testing described below. Moisture Content Determinations Moisture content determinations were performed in accordance with ASTM D2216-10 Standard Test Methods for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass (ASTM D2216) on representative samples obtained from the exploration in order to aid in identification and correlation of soil types. The moisture content of typical sample was measured and is reported on the test pit logs. Grain Size Analysis A grain size analysis indicates the range in diameter of soil particles included in a particular sample. Grain size analyses was determined using D6913-04(2009) Standard Test Methods for Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis (ASTM D6913) on four of the samples. DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 THE RILEY GROUP, INC. 17522 Bothell Way NE Bothell, WA 98011 PHONE: (425) 415-0551 FAX: (425) 415-0311 GRAIN SIZE ANALYSIS ASTM D421, D422, D1140, D2487, D6913 PROJECT TITLE Jefferson Townhomes SAMPLE ID/TYPE TP-1 PROJECT NO.2021-123-1 SAMPLE DEPTH 1.5 feet TECH/TEST DATE LB 8/3/2021 DATE RECEIVED 8/3/2021 WATER CONTENT (Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture Wt Wet Soil & Tare (gm) (w1)735.6 Weight Of Sample (gm)704.2 Wt Dry Soil & Tare (gm) (w2)704.2 Tare Weight (gm) 15.7 Weight of Tare (gm) (w3)15.7 (W6) Total Dry Weight (gm) 688.5 Weight of Water (gm) (w4=w1-w2) 31.4 SIEVE ANALYSIS Weight of Dry Soil (gm) (w5=w2-w3) 688.5 Cumulative Moisture Content (%) (w4/w5)*100 5 Wt Ret (Wt-Tare) (%Retained)% PASS +Tare {(wt ret/w6)*100}(100-%ret) % COBBLES 0.0 12.0"15.7 0.00 0.00 100.00 cobbles % C GRAVEL 26.6 3.0"15.7 0.00 0.00 100.00 coarse gravel % F GRAVEL 17.7 2.5" coarse gravel % C SAND 6.8 2.0" coarse gravel % M SAND 16.9 1.5"15.7 0.00 0.00 100.00 coarse gravel % F SAND 21.6 1.0" coarse gravel % FINES 10.3 0.75"198.8 183.10 26.59 73.41 fine gravel % TOTAL 100.0 0.50" fine gravel 0.375"273.4 257.70 37.43 62.57 fine gravel D10 (mm)0.075 #4 321.0 305.30 44.34 55.66 coarse sand D30 (mm)0.38 #10 368.1 352.40 51.18 48.82 medium sand D60 (mm)7.5 #20 medium sand Cu 100.0 #40 484.8 469.10 68.13 31.87 fine sand Cc 0.3 #60 fine sand #100 607.0 591.30 85.88 14.12 fine sand #200 633.2 617.50 89.69 10.31 fines PAN 704.2 688.50 100.00 0.00 silt/clay DESCRIPTION Gravelly SAND with some silt USCS SP-SM Prepared For:Reviewed By: Anita Woo ELW 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.11101001000 % P A S S I N G Grain size in millimeters 12"3" 2" 1".75" .375" #4 #10 #20 #40 #60 #100 #200 DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 THE RILEY GROUP, INC. 17522 Bothell Way NE Bothell, WA 98011 PHONE: (425) 415-0551 FAX: (425) 415-0311 GRAIN SIZE ANALYSIS ASTM D421, D422, D1140, D2487, D6913 PROJECT TITLE Jefferson Townhomes SAMPLE ID/TYPE TP-1 PROJECT NO.2021-123-1 SAMPLE DEPTH 5.5 feet TECH/TEST DATE LB 8/3/2021 DATE RECEIVED 8/3/2021 WATER CONTENT (Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture Wt Wet Soil & Tare (gm) (w1)791.0 Weight Of Sample (gm)759.3 Wt Dry Soil & Tare (gm) (w2)759.3 Tare Weight (gm) 15.7 Weight of Tare (gm) (w3)15.7 (W6) Total Dry Weight (gm) 743.6 Weight of Water (gm) (w4=w1-w2) 31.7 SIEVE ANALYSIS Weight of Dry Soil (gm) (w5=w2-w3) 743.6 Cumulative Moisture Content (%) (w4/w5)*100 4 Wt Ret (Wt-Tare) (%Retained)% PASS +Tare {(wt ret/w6)*100}(100-%ret) % COBBLES 0.0 12.0"15.7 0.00 0.00 100.00 cobbles % C GRAVEL 7.7 3.0"15.7 0.00 0.00 100.00 coarse gravel % F GRAVEL 21.7 2.5" coarse gravel % C SAND 9.4 2.0" coarse gravel % M SAND 20.8 1.5"15.7 0.00 0.00 100.00 coarse gravel % F SAND 30.6 1.0" coarse gravel % FINES 9.9 0.75"72.6 56.90 7.65 92.35 fine gravel % TOTAL 100.0 0.50" fine gravel 0.375"150.4 134.70 18.11 81.89 fine gravel D10 (mm)0.075 #4 233.9 218.20 29.34 70.66 coarse sand D30 (mm)0.29 #10 303.7 288.00 38.73 61.27 medium sand D60 (mm)2 #20 medium sand Cu 26.7 #40 458.1 442.40 59.49 40.51 fine sand Cc 0.6 #60 fine sand #100 660.2 644.50 86.67 13.33 fine sand #200 686.0 670.30 90.14 9.86 fines PAN 759.3 743.60 100.00 0.00 silt/clay DESCRIPTION SAND with some gravel and silt USCS SP-SM Prepared For:Reviewed By: Anita Woo ELW 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.11101001000 % P A S S I N G Grain size in millimeters 12"3" 2" 1".75" .375" #4 #10 #20 #40 #60 #100 #200 DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 THE RILEY GROUP, INC. 17522 Bothell Way NE Bothell, WA 98011 PHONE: (425) 415-0551 FAX: (425) 415-0311 GRAIN SIZE ANALYSIS ASTM D421, D422, D1140, D2487, D6913 PROJECT TITLE Jefferson Townhomes SAMPLE ID/TYPE TP-1 PROJECT NO.2021-123-1 SAMPLE DEPTH 6.5 feet TECH/TEST DATE LB 8/3/2021 DATE RECEIVED 8/3/2021 WATER CONTENT (Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture Wt Wet Soil & Tare (gm) (w1)845.0 Weight Of Sample (gm)807.9 Wt Dry Soil & Tare (gm) (w2)807.9 Tare Weight (gm) 15.6 Weight of Tare (gm) (w3)15.6 (W6) Total Dry Weight (gm) 792.3 Weight of Water (gm) (w4=w1-w2) 37.1 SIEVE ANALYSIS Weight of Dry Soil (gm) (w5=w2-w3) 792.3 Cumulative Moisture Content (%) (w4/w5)*100 5 Wt Ret (Wt-Tare) (%Retained)% PASS +Tare {(wt ret/w6)*100}(100-%ret) % COBBLES 0.0 12.0"15.6 0.00 0.00 100.00 cobbles % C GRAVEL 16.2 3.0"15.6 0.00 0.00 100.00 coarse gravel % F GRAVEL 8.4 2.5" coarse gravel % C SAND 7.4 2.0" coarse gravel % M SAND 18.1 1.5"15.6 0.00 0.00 100.00 coarse gravel % F SAND 40.7 1.0" coarse gravel % FINES 9.1 0.75"144.3 128.70 16.24 83.76 fine gravel % TOTAL 100.0 0.50" fine gravel 0.375"185.4 169.80 21.43 78.57 fine gravel D10 (mm)0.09 #4 210.7 195.10 24.62 75.38 coarse sand D30 (mm)0.25 #10 269.6 254.00 32.06 67.94 medium sand D60 (mm)1.1 #20 medium sand Cu 12.2 #40 413.4 397.80 50.21 49.79 fine sand Cc 0.6 #60 fine sand #100 712.9 697.30 88.01 11.99 fine sand #200 735.8 720.20 90.90 9.10 fines PAN 807.9 792.30 100.00 0.00 silt/clay DESCRIPTION SAND with some gravel and silt USCS SP-SM Prepared For:Reviewed By: Anita Woo ELW 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.11101001000 % P A S S I N G Grain size in millimeters 12"3" 2" 1".75" .375" #4 #10 #20 #40 #60 #100 #200 DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491 THE RILEY GROUP, INC. 17522 Bothell Way NE Bothell, WA 98011 PHONE: (425) 415-0551 FAX: (425) 415-0311 GRAIN SIZE ANALYSIS ASTM D421, D422, D1140, D2487, D6913 PROJECT TITLE Jefferson Townhomes SAMPLE ID/TYPE TP-5 PROJECT NO.2021-123-1 SAMPLE DEPTH 4.5 feet TECH/TEST DATE LB 8/3/2021 DATE RECEIVED 8/3/2021 WATER CONTENT (Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture Wt Wet Soil & Tare (gm) (w1)787.4 Weight Of Sample (gm)731.8 Wt Dry Soil & Tare (gm) (w2)731.8 Tare Weight (gm) 15.7 Weight of Tare (gm) (w3)15.7 (W6) Total Dry Weight (gm) 716.1 Weight of Water (gm) (w4=w1-w2) 55.6 SIEVE ANALYSIS Weight of Dry Soil (gm) (w5=w2-w3) 716.1 Cumulative Moisture Content (%) (w4/w5)*100 8 Wt Ret (Wt-Tare) (%Retained)% PASS +Tare {(wt ret/w6)*100}(100-%ret) % COBBLES 0.0 12.0"15.7 0.00 0.00 100.00 cobbles % C GRAVEL 4.1 3.0"15.7 0.00 0.00 100.00 coarse gravel % F GRAVEL 13.4 2.5" coarse gravel % C SAND 4.9 2.0" coarse gravel % M SAND 14.4 1.5"15.7 0.00 0.00 100.00 coarse gravel % F SAND 43.3 1.0" coarse gravel % FINES 20.0 0.75"44.8 29.10 4.06 95.94 fine gravel % TOTAL 100.0 0.50" fine gravel 0.375"96.9 81.20 11.34 88.66 fine gravel D10 (mm)#4 140.7 125.00 17.46 82.54 coarse sand D30 (mm)#10 175.5 159.80 22.32 77.68 medium sand D60 (mm)#20 medium sand Cu #40 278.5 262.80 36.70 63.30 fine sand Cc #60 fine sand #100 555.2 539.50 75.34 24.66 fine sand #200 588.4 572.70 79.97 20.03 fines PAN 731.8 716.10 100.00 0.00 silt/clay DESCRIPTION Silty SAND with some gravel USCS SM Prepared For:Reviewed By: Anita Woo ELW 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.11101001000 % P A S S I N G Grain size in millimeters 12"3" 2" 1".75" .375" #4 #10 #20 #40 #60 #100 #200 DocuSign Envelope ID: E4190986-0960-4AF4-9156-D3C7AC5C2491