Kejriwal Lift
Construction Dates : The date of construction will depend on when the necessary
government approvals for the lift are issued. Installation of the lift will take one day to
complete. The in-water work window at the site is open from July 16th through
December 31st. The lift will be installed during the work window opening of 2022.
Hours and Days of Operation: The work will take place during the City of Renton’s
typical hours of construction which are 7:00 am through 10:00 pm Monday through
Friday and 9:00 am through 10:00 pm Saturday and Sunday.
Proposed Hauling/Transportation Routes: The lift will be brought to the site by barge.
Measures to be implemented to minimize dust, traffic and transportation impacts,
erosion, mud, noise, and other noxious characteristics: Work will take place only
during allowed hours of operation. Only a couple vehicular trips are required to install
the lift. Erosion will not be caused by the installation. Noise levels from installation are
very low.
Special Hours Proposed for Construction: No special hours are proposed for
construction.
Preliminary Traffic Control Plan: Traffic control is not necessary for the project.