HomeMy WebLinkAboutMFP22000438.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP22000438
IVR Number: 22000438
Permit Information
Permit Name: Verizon - MCI 1703MNTH.005_FIB_REN_1643
Address/Location:01/27/2022Application Date:3340404035Parcel Number: 500 SW 16TH ST
Permit Type:03/15/2022Issue Date:Franchise
Permit Work Class:03/15/2023Expiration Date:Major Utility
Job Number: 1703MNTH.005_FIB_REN_1643Franchise Type:Telephone
Description: Verizon Business MCI Metro (1703MNTH.005_FIB_REN_1643). Access 3195 LF OF EXISTING TELECOM
CONDUIT, ACCESS (5) EXISTING MANHOLES & PULL FIBER CABLE IN THE RIGHT OF WAY OF SW 16TH ST,
MAPLE AVE SW, SW 12TH ST, AND LIND AVE SW.
Contacts
Name Address PhoneTypeBilling
HOLLY NORTH
MGC TECHNICAL CONSTULTING, INC
8521 154th Ave NE
REDMOND, WA 98052
B: (206) 618-0651Applicant
MasTec Representative
MasTec
151 Stewart Rd SW
Pacific, WA 98047
ApplicantX
William Jenness
MCIMetro
3245 158th Ave SE
Bellevue, WA 98008
Contact
MasTec Representative
MasTec
151 Stewart Rd SW
Pacific, WA 98047
Contact
Matthew Sapp
Verizon - MCI
Contact
Louise Popelka
Verizon MCI Buisness
3245 158th Ave SE
Bellevue, WA 98008
B: (425) 240-0238Contact
Robert Apple
MasTec Network Solutions Inc
22257 68th Ave S
Kent, WA 98032
B: (253) 246-4400
C: (206) 683-0179
Contractor
Business License Number: 38949Electrical Contractor: MASTENS863JS
Construction Contractor: MASTENS876KN
TERRENO SW 16TH LLC 101 MONTGOMERY ST SUITE 200
SAN FRANCISCO, CA 98104
Owner
Amy Ledvina
Verizon - MCImetro
3245 158 Ave SE
Bellevue, WA 98008
H: (425) 505-5651Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MCIMETRO ACCESS TRANSMISSION SERVICES CORP.
Henson Smith
425.287.8701
henson.smith@mastec.com
500 SW 16th St 1703MNTH.005_FIB_REN_1643
Access 3195 LF OF EXISTING TELECOM CONDUIT, ACCESS (5) EXISTING MANHOLES &
PULL FIBER CABLE IN THE RIGHT-OF-WAY OF SW 16TH ST, MAPLE AVE SW, SW 12TH ST, AND LIND AVE SW.
MASTEC NORTH AMERICA, INC.425.287.8701
MASTENA991KJ 51687
01/21/22
MFP22000438
Scott Warlick 3/15/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
1703MNTH.005_ROWE_REN_1643
W 16TH ST, MAPLE AVE SW, SW 12TH ST, AND LIND AVE SW
MASTEC NORTH AMERICA, INC
MATTHEW SMITH 253-736-5107
151 STEWART RD SW, BLDG A PACIFIC, WA 98047
ACCESS (2) EXISTING VAULTS AND (5) EXISTING MANHOLES.
PULL FIBER THROUGH EXISTING CONDUIT
Scott Warlick CED 3/15/2022
MFP22000438
Monday - Friday 8:00AM - 3:00PM
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
AARON LEDVINA
3/15/2022
TRAFFIC CONTROL PLANCITY OF RENTON
PROJECT LOCATION
PROJECT TITLE:
PERMIT NUMBER:
SITE CODE:
(SENECA AVE) COND PROOF PHASE I
1703MNTH.005_ROWE_REN_1643
1703MNTH.005
CONTACT PERSON:
Tercom Construction
Engineering Manager
Chris Bettencourt
9712 Waller Rd E
Tacoma, WA 98446
(Cell) 253.254.1004
(Fax) 253.538.0506
(Email) chrisb@tercomconstruction.com
Foresite Group
Permitting Manager
Arnaldo Blanco, PE
3000 East Cesar Chavez, Suite 400
Austin, TX 78702
(Office) 770.368.1399
(Fax) 770.368.1944
(Cell) 787.349.2960
(Email) ablanco@fg-inc.net
SHEET INDEX:
1 - COVER SHEET AND PROJECT LOCATION
2-7 - TRAFFIC CONTROL PLANS
SHEET: 1 OF 7
MFP22000438
SHEET: 2 OF 7TRAFFIC CONTROL PLANSIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50 / 70 MPH
60 / 65 MPH
45 / 55 MPH
35 / 40 MPH
25 / 30 MPH
25 MPH OR LESS
1500' +/- (OR AS PER MUTCO)
800' +/-
500' +/-
350' +/-
200' +/-
100' +/-
RURAL HIGHWAYS
RURAL ROADS
RUAL ROADS & URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
RUAL ROADS & URBAN ARTERIALS
ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS, AND DRIVEWAYS
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS
MINIMUM TAPER LENGTH IN FEET
LANE
WIDTH
POSTED SPEED LIMIT (MPH)
25 30 35 40 45 50 55 60 65 70
10
11
12
105
115
125
150
165
180
205
225
245
270
295
320
450
495
540
500
550
600
550
605
660
-
660
720
-
-
780
-
-
840
KING COUNTY METRO:
ANY CONSTRUCTION OR INSTALLATION ACTIVITIES AFFECTING TRANSIT OPERATIONS OR FACILITIES MUST
BE COORDINATED THROUGH METRO TRANSIT CONSTRUCTION INFORMATION CENTER (CIC). PLEASE VISIT:
Http://www.kingcounty.gov/transportation/kcdot/MetroTransit/Construction.aspx OR CONTACT CIC AT
206-477-1140 (Construction Impacts) | 206-477-1150 (Trolley Impacts). PLEASE PROVIDE AT LEAST 2 WEEKS
NOTIFICATION FOR BUS REROUTES AND BUS STOP IMPACTS
GENERAL NOTES:
1. ALL WORK TO BE PERFORMED DURING DAYTIME HOURS, UNLESS TRAFFIC VOLUMES OR
MUNICIPALITY DICTATE OTHERWISE.
2. ALL SIGNS ARE 48"X48" BLACK ON FLUORESCENT ORANGE UNLESS OTHERWISE NOTED.
3. TRAFFIC SHALL NOT BE STOPPED IN ANY ONE DIRECTION FOR MORE THAN 10 MINUTES.
4. IF NEEDED PEDESTRIANS WILL BE ACCOMMODATED THROUGH THE WORK ZONE.
5. ALL DRIVEWAY ACCESS SHALL REMAIN OPEN DURING DURATION OF WORK.
6. WORK AREA TO INCLUDE STAGING AREA.
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FEET)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570 645 730
PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE
TYPICAL PROTECTIVE
VEHICLE TYPE WITH TMA
TYPICAL PROTECTIVE VEHICLE (WITH
TMA) LOADED WEIGHT (LBS)
STATIONARY
OPERATION
(FEET)
4 YARD DUMP TRUCK,
SERVICE TRUCK, FLAT BED,
ETC.
MINIMUM WEIGHT 15,000 LBS.
(MAXIMUM WEIGHT SHALL BE IN
ACCORDANCE WITH MANUFACTURER
RECOMMENDATION)
30 MIN.
ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.
* A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE. IF NO TMA
IS USED, THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO
SHIELD WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED
SHORT TERM STATIONARY WORK ZONE FOR
UNDERGROUND REFERNCE PLAN SET
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70 40 80
35/45 30 60
25/30 20 40
TRAFFIC CONTROL PLAN
1415 Seneca
Ave SW WORK AREAXXROAD
WORK
AHEAD
W20-1
BE
PREPARED
TO STOP
W3-4Seneca Ave SWSW 16th St Lind Ave SWSW 16th St
MFP22000438
SHEET: 3 OF 7TRAFFIC CONTROL PLANSIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50 / 70 MPH
60 / 65 MPH
45 / 55 MPH
35 / 40 MPH
25 / 30 MPH
25 MPH OR LESS
1500' +/- (OR AS PER MUTCO)
800' +/-
500' +/-
350' +/-
200' +/-
100' +/-
RURAL HIGHWAYS
RURAL ROADS
RUAL ROADS & URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
RUAL ROADS & URBAN ARTERIALS
ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS, AND DRIVEWAYS
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS
MINIMUM TAPER LENGTH IN FEET
LANE
WIDTH
POSTED SPEED LIMIT (MPH)
25 30 35 40 45 50 55 60 65 70
10
11
12
105
115
125
150
165
180
205
225
245
270
295
320
450
495
540
500
550
600
550
605
660
-
660
720
-
-
780
-
-
840
KING COUNTY METRO:
ANY CONSTRUCTION OR INSTALLATION ACTIVITIES AFFECTING TRANSIT OPERATIONS OR FACILITIES MUST
BE COORDINATED THROUGH METRO TRANSIT CONSTRUCTION INFORMATION CENTER (CIC). PLEASE VISIT:
Http://www.kingcounty.gov/transportation/kcdot/MetroTransit/Construction.aspx OR CONTACT CIC AT
206-477-1140 (Construction Impacts) | 206-477-1150 (Trolley Impacts). PLEASE PROVIDE AT LEAST 2 WEEKS
NOTIFICATION FOR BUS REROUTES AND BUS STOP IMPACTS
GENERAL NOTES:
1. ALL WORK TO BE PERFORMED DURING DAYTIME HOURS, UNLESS TRAFFIC VOLUMES OR
MUNICIPALITY DICTATE OTHERWISE.
2. ALL SIGNS ARE 48"X48" BLACK ON FLUORESCENT ORANGE UNLESS OTHERWISE NOTED.
3. TRAFFIC SHALL NOT BE STOPPED IN ANY ONE DIRECTION FOR MORE THAN 10 MINUTES.
4. IF NEEDED PEDESTRIANS WILL BE ACCOMMODATED THROUGH THE WORK ZONE.
5. ALL DRIVEWAY ACCESS SHALL REMAIN OPEN DURING DURATION OF WORK.
6. WORK AREA TO INCLUDE STAGING AREA.
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FEET)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570 645 730
PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE
TYPICAL PROTECTIVE
VEHICLE TYPE WITH TMA
TYPICAL PROTECTIVE VEHICLE (WITH
TMA) LOADED WEIGHT (LBS)
STATIONARY
OPERATION
(FEET)
4 YARD DUMP TRUCK,
SERVICE TRUCK, FLAT BED,
ETC.
MINIMUM WEIGHT 15,000 LBS.
(MAXIMUM WEIGHT SHALL BE IN
ACCORDANCE WITH MANUFACTURER
RECOMMENDATION)
30 MIN.
ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.
* A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE. IF NO TMA
IS USED, THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO
SHIELD WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED
SHORT TERM STATIONARY WORK ZONE FOR
UNDERGROUND REFERNCE PLAN SET
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70 40 80
35/45 30 60
25/30 20 40
TRAFFIC CONTROL PLAN
1415 Seneca
Ave SW
XXROAD
WORK
AHEAD
W20-1
BE
PREPARED
TO STOP
W3-4WORK AREASeneca Ave SWSW 16th St Lind Ave SWSW 16th St
MFP22000438
SHEET: 4 OF 7TRAFFIC CONTROL PLANSIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50 / 70 MPH
60 / 65 MPH
45 / 55 MPH
35 / 40 MPH
25 / 30 MPH
25 MPH OR LESS
1500' +/- (OR AS PER MUTCO)
800' +/-
500' +/-
350' +/-
200' +/-
100' +/-
RURAL HIGHWAYS
RURAL ROADS
RUAL ROADS & URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
RUAL ROADS & URBAN ARTERIALS
ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS, AND DRIVEWAYS
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS
MINIMUM TAPER LENGTH IN FEET
LANE
WIDTH
POSTED SPEED LIMIT (MPH)
25 30 35 40 45 50 55 60 65 70
10
11
12
105
115
125
150
165
180
205
225
245
270
295
320
450
495
540
500
550
600
550
605
660
-
660
720
-
-
780
-
-
840
KING COUNTY METRO:
ANY CONSTRUCTION OR INSTALLATION ACTIVITIES AFFECTING TRANSIT OPERATIONS OR FACILITIES MUST
BE COORDINATED THROUGH METRO TRANSIT CONSTRUCTION INFORMATION CENTER (CIC). PLEASE VISIT:
Http://www.kingcounty.gov/transportation/kcdot/MetroTransit/Construction.aspx OR CONTACT CIC AT
206-477-1140 (Construction Impacts) | 206-477-1150 (Trolley Impacts). PLEASE PROVIDE AT LEAST 2 WEEKS
NOTIFICATION FOR BUS REROUTES AND BUS STOP IMPACTS
GENERAL NOTES:
1. ALL WORK TO BE PERFORMED DURING DAYTIME HOURS, UNLESS TRAFFIC VOLUMES OR
MUNICIPALITY DICTATE OTHERWISE.
2. ALL SIGNS ARE 48"X48" BLACK ON FLUORESCENT ORANGE UNLESS OTHERWISE NOTED.
3. TRAFFIC SHALL NOT BE STOPPED IN ANY ONE DIRECTION FOR MORE THAN 10 MINUTES.
4. IF NEEDED PEDESTRIANS WILL BE ACCOMMODATED THROUGH THE WORK ZONE.
5. ALL DRIVEWAY ACCESS SHALL REMAIN OPEN DURING DURATION OF WORK.
6. WORK AREA TO INCLUDE STAGING AREA.
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FEET)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570 645 730
PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE
TYPICAL PROTECTIVE
VEHICLE TYPE WITH TMA
TYPICAL PROTECTIVE VEHICLE (WITH
TMA) LOADED WEIGHT (LBS)
STATIONARY
OPERATION
(FEET)
4 YARD DUMP TRUCK,
SERVICE TRUCK, FLAT BED,
ETC.
MINIMUM WEIGHT 15,000 LBS.
(MAXIMUM WEIGHT SHALL BE IN
ACCORDANCE WITH MANUFACTURER
RECOMMENDATION)
30 MIN.
ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.
* A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE. IF NO TMA
IS USED, THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO
SHIELD WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED
SHORT TERM STATIONARY WORK ZONE FOR
UNDERGROUND REFERNCE PLAN SET
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70 40 80
35/45 30 60
25/30 20 40
TRAFFIC CONTROL PLAN
1415 Seneca
Ave SW
WORK
AREAWORK
AREA
ROAD
WORK
AHEAD
W20-1 XXXLEFT LANE
CLOSED
AHEAD
W20-5L W4-2L R4-7XXXROAD
WORK
AHEAD
W20-1RIGHT LANE
CLOSED
AHEAD
W20-5RW4-2RSeneca Ave SWSW 16th St Lind Ave SWSW 16th St
MFP22000438
SHEET: 5 OF 7TRAFFIC CONTROL PLANSIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50 / 70 MPH
60 / 65 MPH
45 / 55 MPH
35 / 40 MPH
25 / 30 MPH
25 MPH OR LESS
1500' +/- (OR AS PER MUTCO)
800' +/-
500' +/-
350' +/-
200' +/-
100' +/-
RURAL HIGHWAYS
RURAL ROADS
RUAL ROADS & URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
RUAL ROADS & URBAN ARTERIALS
ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS, AND DRIVEWAYS
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS
MINIMUM TAPER LENGTH IN FEET
LANE
WIDTH
POSTED SPEED LIMIT (MPH)
25 30 35 40 45 50 55 60 65 70
10
11
12
105
115
125
150
165
180
205
225
245
270
295
320
450
495
540
500
550
600
550
605
660
-
660
720
-
-
780
-
-
840
KING COUNTY METRO:
ANY CONSTRUCTION OR INSTALLATION ACTIVITIES AFFECTING TRANSIT OPERATIONS OR FACILITIES MUST
BE COORDINATED THROUGH METRO TRANSIT CONSTRUCTION INFORMATION CENTER (CIC). PLEASE VISIT:
Http://www.kingcounty.gov/transportation/kcdot/MetroTransit/Construction.aspx OR CONTACT CIC AT
206-477-1140 (Construction Impacts) | 206-477-1150 (Trolley Impacts). PLEASE PROVIDE AT LEAST 2 WEEKS
NOTIFICATION FOR BUS REROUTES AND BUS STOP IMPACTS
GENERAL NOTES:
1. ALL WORK TO BE PERFORMED DURING DAYTIME HOURS, UNLESS TRAFFIC VOLUMES OR
MUNICIPALITY DICTATE OTHERWISE.
2. ALL SIGNS ARE 48"X48" BLACK ON FLUORESCENT ORANGE UNLESS OTHERWISE NOTED.
3. TRAFFIC SHALL NOT BE STOPPED IN ANY ONE DIRECTION FOR MORE THAN 10 MINUTES.
4. IF NEEDED PEDESTRIANS WILL BE ACCOMMODATED THROUGH THE WORK ZONE.
5. ALL DRIVEWAY ACCESS SHALL REMAIN OPEN DURING DURATION OF WORK.
6. WORK AREA TO INCLUDE STAGING AREA.
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FEET)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570 645 730
PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE
TYPICAL PROTECTIVE
VEHICLE TYPE WITH TMA
TYPICAL PROTECTIVE VEHICLE (WITH
TMA) LOADED WEIGHT (LBS)
STATIONARY
OPERATION
(FEET)
4 YARD DUMP TRUCK,
SERVICE TRUCK, FLAT BED,
ETC.
MINIMUM WEIGHT 15,000 LBS.
(MAXIMUM WEIGHT SHALL BE IN
ACCORDANCE WITH MANUFACTURER
RECOMMENDATION)
30 MIN.
ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.
* A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE. IF NO TMA
IS USED, THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO
SHIELD WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED
SHORT TERM STATIONARY WORK ZONE FOR
UNDERGROUND REFERNCE PLAN SET
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70 40 80
35/45 30 60
25/30 20 40
TRAFFIC CONTROL PLAN
WORK
AREALind Ave SWSW 16th StMaple Ave SWXXLB XROAD
WORK
AHEAD
W20-1
RIGHT LANE
CLOSED
AHEAD
W20-5RW4-2R
MFP22000438
SHEET: 6 OF 7TRAFFIC CONTROL PLANSIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50 / 70 MPH
60 / 65 MPH
45 / 55 MPH
35 / 40 MPH
25 / 30 MPH
25 MPH OR LESS
1500' +/- (OR AS PER MUTCO)
800' +/-
500' +/-
350' +/-
200' +/-
100' +/-
RURAL HIGHWAYS
RURAL ROADS
RUAL ROADS & URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
RUAL ROADS & URBAN ARTERIALS
ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS, AND DRIVEWAYS
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS
MINIMUM TAPER LENGTH IN FEET
LANE
WIDTH
POSTED SPEED LIMIT (MPH)
25 30 35 40 45 50 55 60 65 70
10
11
12
105
115
125
150
165
180
205
225
245
270
295
320
450
495
540
500
550
600
550
605
660
-
660
720
-
-
780
-
-
840
KING COUNTY METRO:
ANY CONSTRUCTION OR INSTALLATION ACTIVITIES AFFECTING TRANSIT OPERATIONS OR FACILITIES MUST
BE COORDINATED THROUGH METRO TRANSIT CONSTRUCTION INFORMATION CENTER (CIC). PLEASE VISIT:
Http://www.kingcounty.gov/transportation/kcdot/MetroTransit/Construction.aspx OR CONTACT CIC AT
206-477-1140 (Construction Impacts) | 206-477-1150 (Trolley Impacts). PLEASE PROVIDE AT LEAST 2 WEEKS
NOTIFICATION FOR BUS REROUTES AND BUS STOP IMPACTS
GENERAL NOTES:
1. ALL WORK TO BE PERFORMED DURING DAYTIME HOURS, UNLESS TRAFFIC VOLUMES OR
MUNICIPALITY DICTATE OTHERWISE.
2. ALL SIGNS ARE 48"X48" BLACK ON FLUORESCENT ORANGE UNLESS OTHERWISE NOTED.
3. TRAFFIC SHALL NOT BE STOPPED IN ANY ONE DIRECTION FOR MORE THAN 10 MINUTES.
4. IF NEEDED PEDESTRIANS WILL BE ACCOMMODATED THROUGH THE WORK ZONE.
5. ALL DRIVEWAY ACCESS SHALL REMAIN OPEN DURING DURATION OF WORK.
6. WORK AREA TO INCLUDE STAGING AREA.
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FEET)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570 645 730
PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE
TYPICAL PROTECTIVE
VEHICLE TYPE WITH TMA
TYPICAL PROTECTIVE VEHICLE (WITH
TMA) LOADED WEIGHT (LBS)
STATIONARY
OPERATION
(FEET)
4 YARD DUMP TRUCK,
SERVICE TRUCK, FLAT BED,
ETC.
MINIMUM WEIGHT 15,000 LBS.
(MAXIMUM WEIGHT SHALL BE IN
ACCORDANCE WITH MANUFACTURER
RECOMMENDATION)
30 MIN.
ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.
* A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE. IF NO TMA
IS USED, THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO
SHIELD WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED
SHORT TERM STATIONARY WORK ZONE FOR
UNDERGROUND REFERNCE PLAN SET
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70 40 80
35/45 30 60
25/30 20 40
TRAFFIC CONTROL PLANLind Ave SWSW 16th StMaple Ave SWWORK AREAXXLBROAD
WORK
AHEAD
W20-1
W20-7a
XXROAD
WORK
AHEAD
W20-1
W20-7a
MFP22000438
SHEET: 7 OF 7TRAFFIC CONTROL PLANSIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50 / 70 MPH
60 / 65 MPH
45 / 55 MPH
35 / 40 MPH
25 / 30 MPH
25 MPH OR LESS
1500' +/- (OR AS PER MUTCO)
800' +/-
500' +/-
350' +/-
200' +/-
100' +/-
RURAL HIGHWAYS
RURAL ROADS
RUAL ROADS & URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
RUAL ROADS & URBAN ARTERIALS
ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DISIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS, AND DRIVEWAYS
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS
MINIMUM TAPER LENGTH IN FEET
LANE
WIDTH
POSTED SPEED LIMIT (MPH)
25 30 35 40 45 50 55 60 65 70
10
11
12
105
115
125
150
165
180
205
225
245
270
295
320
450
495
540
500
550
600
550
605
660
-
660
720
-
-
780
-
-
840
KING COUNTY METRO:
ANY CONSTRUCTION OR INSTALLATION ACTIVITIES AFFECTING TRANSIT OPERATIONS OR FACILITIES MUST
BE COORDINATED THROUGH METRO TRANSIT CONSTRUCTION INFORMATION CENTER (CIC). PLEASE VISIT:
Http://www.kingcounty.gov/transportation/kcdot/MetroTransit/Construction.aspx OR CONTACT CIC AT
206-477-1140 (Construction Impacts) | 206-477-1150 (Trolley Impacts). PLEASE PROVIDE AT LEAST 2 WEEKS
NOTIFICATION FOR BUS REROUTES AND BUS STOP IMPACTS
GENERAL NOTES:
1. ALL WORK TO BE PERFORMED DURING DAYTIME HOURS, UNLESS TRAFFIC VOLUMES OR
MUNICIPALITY DICTATE OTHERWISE.
2. ALL SIGNS ARE 48"X48" BLACK ON FLUORESCENT ORANGE UNLESS OTHERWISE NOTED.
3. TRAFFIC SHALL NOT BE STOPPED IN ANY ONE DIRECTION FOR MORE THAN 10 MINUTES.
4. IF NEEDED PEDESTRIANS WILL BE ACCOMMODATED THROUGH THE WORK ZONE.
5. ALL DRIVEWAY ACCESS SHALL REMAIN OPEN DURING DURATION OF WORK.
6. WORK AREA TO INCLUDE STAGING AREA.
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FEET)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570 645 730
PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE
TYPICAL PROTECTIVE
VEHICLE TYPE WITH TMA
TYPICAL PROTECTIVE VEHICLE (WITH
TMA) LOADED WEIGHT (LBS)
STATIONARY
OPERATION
(FEET)
4 YARD DUMP TRUCK,
SERVICE TRUCK, FLAT BED,
ETC.
MINIMUM WEIGHT 15,000 LBS.
(MAXIMUM WEIGHT SHALL BE IN
ACCORDANCE WITH MANUFACTURER
RECOMMENDATION)
30 MIN.
ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.
* A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE. IF NO TMA
IS USED, THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO
SHIELD WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED
SHORT TERM STATIONARY WORK ZONE FOR
UNDERGROUND REFERNCE PLAN SET
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70 40 80
35/45 30 60
25/30 20 40
TRAFFIC CONTROL PLAN
WORK
AREAXXLBX
ROAD
WORK
AHEAD
W20-1
RIGHT LANE
CLOSED
AHEAD
W20-5R W4-2R
ROAD
WORK
AHEAD
W20-1
RIGHT LANE
CLOSED
AHEAD
W20-5R
W4-2R
Lind Ave Sw
MFP22000438
PROJECT STATUS: PERMITTING STATUS DATE: 06/20/2019OUTSIDE PLANT CONSTRUCTIONENGINEERING SERVICESCAPITAL PROJECT #: 072443-001(SENECA AVE) COND PROOF PHASE IMCI PERMIT NUMBER: 1703MNTH.005_ROWE_REN_1643UNDERGROUND CONDUIT INSTALLATIONSITE CODE: 1703MNTH.005RENTON, WASHINGTONRIGHT-OF-WAY CONSTRUCTION PERMITThis permit is for Major construction work in the ROW and will be billed at an additional$60/HR for inspections. After hours and weekend work will be billed at $125/HR
SHEET INDEXPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024A-01OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE IN/AN/AABASUNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAGENERAL PROJECT INFORMATION (A-SERIES)COVER SHEETSHEET INDEXPROJECT OVERVIEWSYMBOL KEYCONTACT INFORMATION (B-SERIES)CONTACT INFORMATION SHEETCONSTRUCTION PLANS (C-SERIES)KEY MAP SHEETSITE PLAN SHEETSSTANDARD NOTES & DETAILS (D-SERIES)GENERAL NOTESCONSTRUCTION DETAIL DRAWINGSSPECIFIC NOTES & DETAILS (E-SERIES)GENERAL NOTESCONSTRUCTION DETAIL DRAWINGSADDITIONAL INFORMATION (F-SERIES)NOT USEDA-00A-01A-02A-03B-01C-00C-01 - C-08D-01 - D-02D-03 - D-10E-01E-02 - E-04N/A
PROJECT OVERVIEWPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024A-02OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE IN/AN/AABASUNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAPROJECT SCOPEADDRESS RANGE TABLEPRIMARY STREETADDRESSESCROSS STREET(S)SENECA AVE SWSW 16TH ST1415MAPLE AVE SWLINDA AVE SW500 - 2341402 - 1123N/AN/ALINDA AVE SWI40 FWYSW GRAND WAYPROJECT QUANTITIESINSTALLQNTY2"D CONDUIT (DIRECT. BORE)2"D CONDUIT (MISSILE BORE)30"X48"X24" VAULT(S)429 LF0 LF036"X60"X36" VAULT(S)024"X36"X24" VAULT(S)22"D CONDUIT (TRENCH) 5 LF17"X30"X24" VAULT(S)048"X48"X48" MANHOLE(S)0
PROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024A-03OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE IN/AN/AABASUNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WASYMBOL KEYMCI PROPOSED CONSTRUCTIONDIRECTIONAL BORE/MISSILE BOREOPEN TRENCH17"X30"X24" VAULT24"X36"X24" VAULT30"X48"X24" VAULT36"X60"X36" VAULTBORE PITMCI EXISTING/FUTURE CONSTRUCTIONEXISTING MCI METRO CONDUITEXISTING MCI METRO VAULTVFUTURE MCI METRO CONDUITOTHER UTILITIESWWWATER LINEFIRE HYDRANTSDSTORMWATER LINESTORMWATER ACCESSSSSSWASTEWATER LINEWWWASTEWATER MANHOLEWATER VALVEOVERHEAD POWER LINEUNDERGROUND POWER LINETFPOWER TRANSFORMEREPOWER MANHOLEJPOWER JUNCTION BOXEPOWER CABINETEVPOWER VAULTPOLESTREET LIGHTTRAFFIC LIGHTWATER METERGAS LINEGAS METERTELECOM MANHOLETELECOM CABINETTELECOM VAULTUNKNOWN MANHOLEGAS VALVEUNKNOWN VAULTTELECOM LINEGMTTCTMHUVMH48"X48"X48" MANHOLEWVSTORMWATER CATCH BASINCBOTHER UTILITIESSIDEWALKEDGE OF PAVEMENTBACK OF CURBRIGHT OF WAYPLANIMETRICSE.O.P.STREET CENTERLINETREEB.O.C.R.O.W.C.L.UG/CUG/CDSMLFUTURE 17"X30"X24" VAULTFUTURE 24"X36"X24" VAULTFUTURE 30"X48"X24" VAULTFUTURE 36"X60"X36" VAULTDSMLSPLICE ENCLOSURE
PROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024B-01OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE IN/AN/AABASUNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WACONTACT INFORMATIONONE CALL SYSTEM (UTILITY LOCATES)MCI METRO INC.UTILITIESMCI UTILITY LOCATE RAILROADS1-800-624-9675CITY GOVERNMENT(S)OUTSIDE PLANT ENGINEERING:OUTSIDE PLANT CONSTRUCTION:RIGHT-OF-WAY:CONTRACTS:OTHERS:ENGINEERING CONTRACTOR:CONSTRUCTION CONTRACTOR:SENIOR PROJECT ENGINEER:LOUISE POPELKAPROJECT SUPERVISOR:FIELD CONSTRUCTION SUPERINTENDENT:MANAGER:AGENT:MANAGER:NAME OF FIRM:MASTECPROJECT MANAGER:ERIKA YOUNGPROJECT SUPERVISOR:KEVIN KINDLENAME OF FIRM:FORESITE GROUPPROJECT MANAGER:LUKE RICKELPROJECT ENGINEER:ARNALDO BLANCO(210)722-6429(787)349-2960(267)969-0345(253)606-5423(425)240-0238AT&T LONG DISTANCE: DANIEL MCGEOUGHAT&T METRO: CLIFF ROBERTS(425)896-9830(425)896-9851AT&T MOBILITY/SINGULAR (SOUTH OF I-90): GARY TOPORKEAT&T MOBILITY/CINGULAR: BILL LACOUNT(253)680-2403(360)395-5425CENTURY LINK: IVAN ESMERALCOMCAST: JILL LOOK(425)427-9903(206)396-6032COAL CREEK UTILITY DISTRICT: PATRICK MARTINELI/INTEGRA: ERIC LAYTON(206)255-1961(425)970-7763FRONTIER COMMUNICATIONS NW: JAY SCHWAB(425)263-4019LEVEL 3 COMMUNICATIONS: KRISHNA MITCHELLONEFIBER COMMUNICATIONS: BILL BODIN(720)387-3342(916)765-2074OLYMPIC PIPELINE CO.: TIMOTHY FEHRPUDGET SOUND ENERGY: ANDY SWAYNE(425)427-9903(425)462-3852PUDGET SOUND ENERGY EMERGENCY DISPATCHPSE/INFRASOURCE: AURELIE JOHANNSON(888)225-5773(425)466-4771PSE/POTELCO: BOB CARLSENSEATTLE PUBLIC UTILITIES: RICHARD COX(425)864-0496(206)900-4434T-MOBILE USA: NOTICE ADDRESSVERIZON WIRELESS NW: LELAH VAGA1-877-373-0093(425)603-8275XO COMMUNICATIONS/VERIZON WIRELESS: CHRISTOPHER MAPESZAYO FIBER SOLUTIONS: JOSEPH MORTON(206)315-5014(253)255-1917PROJECT MANAGER:CIARA MCDONNELL-RAY(425)606-77041-800-424-5555CITY OF SEATTLECITY OF ALGONACITY OF AUBURNCITY OF BELLEVUECITY OF BLACK DIAMONDCITY OF COVINGTONCITY OF DES MOINESCITY OF FEDERAL WAYCITY OF KENTCITY OF MAPLE VALLEYCITY OF MERCER ISLANDCITY OF NEWCASTLECITY OF NORMANDY PARKCITY OF PACIFICCITY OF RENTONCITY OF SAMMAMISHCITY OF SETACCITY OF TUKWILA(206)684-7623(253)833-2897(253)931-3000(425)452-6800(360)886-5700(253)480-2400(206)878-4595(253)835-7000(253)856-5200(425)413-8800(206)275-7605(425)649-4444(206)248-7603(253)929-1110(425)430-6400(425)295-0500(206)973-4800(206)431-3670SOUTH KING COUNTYFEDERAL GOVERNMENTCOUNTY GOVERNMENTSTATE GOVERNMENTROW CONSTRUCTION PERMIT INFORMATIONUTILITY FRANCHISE INFORMATIONJOB STARTS (UTILITY INSPECTION)SHORELINE PERMITSGRADING/CLEARING PERMITSCOUNTY ROAD STANDARDSVARIANCES FROM ROAD STANDARDSCOUNTY ROAD PROJECTSPERMITS FOR OTHER COUNTY PROPERTYONE-CALL (CALL BEFORE YOU DIG)(206)296-7456(206)296-7456(206)296-8122(206)296-6650(206)296-6610(206)296-3783(206)296-3783(206)296-6530(206)296-74561-800-424-5555KING COUNTYUTILITIES & DEVELOPMENT MANAGER (NORTHWEST):MARIA MYRHOFERASSISTANT UTILITIES & DEVELOPMENT MANAGER (NORTHWEST):DEE GARDNERUTILITY ACOMODATIONS (NORTHWEST):ARLENE REHMUTILITIES & DEVELOPMENT MANAGER (OLYMPIC):RAFAEL REYES(206) 440-4120(206) 440-4122(206) 440-4131(360) 570-6743WASHINGTON STATE DEPARTMENT OF TRANSPORTATIONPROJECT ENGINEER:BRAD LANDIS(425)229-3123
C-01C-02C-03C-04C-05C-06C-07C-08SW 16TH STMAPLE AVE SW
NORTHPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024C-00SIDEWALKE.O.PR.O.W.EDGE OF PAVEMENTRIGHT OF WAYBORE/MISSILE BOREOPEN TRENCHLEGEND:STREET CENTERLINEC.L.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ONDOCUMENT RESEARCH AND FIELD EVALUATION. THEINFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT ISTHE CONTRACTOR'S RESPONSABILITY TO PHYSICALLYLOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIESWITHIN CONSTRUCTION PATH.ALL INSTALLATIONS MUST COMPLY WITH MINIMUMHORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES.B.O.CBACK OF CURBPOTHOLE LOCATIONCONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36INCHES OF COVER WHEN UNOBSTRUCTED. CONTRACTOR TOMAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES.DEPTH TO BE ADJUSTED ACCORDINGLY.CAUTION!!ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OFADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED INACCORDANCE WITH ALL REQUIRED ADA STANDARDS ANDSPECIFICATIONS.NOTE TO CONTRACTOR:ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREETO BE DUGGED USING HYDRO VACCUUM EXCAVATION.ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ONFIELD SURVEY AND OBSERVATIONS. LOCATIONS MAY NOT BEACCURATE OR COMPLETE.OUTSIDE PLANT CONSTRUCTION EXISTING CONDUITAERIAL STRANDCITY OF RENTONN/AABASDATEDESCRIPTIONINITIAL(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATION 500 SW 16TH ST,RENTON, WA1703MNTH.005_ROWE_REN_1643N/A
500 SW 16TH STSW 16TH ST0+001+002+003+004+00B.O.C.C.L.R.O.W.B.O.C.R.O.W.B.O.C.C.L.R.O.W.B.O.C.R.O.W.B.O.C.C.L.R.O.W.B.O.C.R.O.W.STSTA: 0+00ACCESS (1) EXISTING 4'X4'X4'TELECOM MANHOLE FORCABLE PULLING ONLYNORTHPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024C-01SIDEWALKE.O.PR.O.W.EDGE OF PAVEMENTRIGHT OF WAYBORE/MISSILE BOREOPEN TRENCHLEGEND:STREET CENTERLINEC.L.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ONDOCUMENT RESEARCH AND FIELD EVALUATION. THEINFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT ISTHE CONTRACTOR'S RESPONSABILITY TO PHYSICALLYLOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIESWITHIN CONSTRUCTION PATH.ALL INSTALLATIONS MUST COMPLY WITH MINIMUMHORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES.B.O.CBACK OF CURBPOTHOLE LOCATIONCONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36INCHES OF COVER WHEN UNOBSTRUCTED. CONTRACTOR TOMAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES.DEPTH TO BE ADJUSTED ACCORDINGLY.CAUTION!!ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OFADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED INACCORDANCE WITH ALL REQUIRED ADA STANDARDS ANDSPECIFICATIONS.NOTE TO CONTRACTOR:ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREETO BE DUGGED USING HYDRO VACCUUM EXCAVATION.ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ONFIELD SURVEY AND OBSERVATIONS. LOCATIONS MAY NOT BEACCURATE OR COMPLETE.0'20'40'80'OUTSIDE PLANT CONSTRUCTION EXISTING CONDUITAERIAL STRANDCITY OF RENTONN/AABASDATEDESCRIPTIONINITIAL(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATION 500 SW 16TH ST,RENTON, WA1703MNTH.005_ROWE_REN_16431" = 40'
T SW 16TH ST316 SW 16TH STSW 16TH STLIND AVE SW5+006+007+008+00UVSTA: 6+43ACCESS (1) EXISTING 4'X4'X4'TELECOM MANHOLE FORCABLE PULLING ONLYB.O.C.C.L.R.O.W.B.O.C.R.O.W.B.O.C.C.L.R.O.W.B.O.C.R.O.W.B.O.C.C.L.R.O.W.B.O.C.R.O.W.B.O.C.C.L.R.O.W.B.O.C.R.O.W.NORTHPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024C-02SIDEWALKE.O.PR.O.W.EDGE OF PAVEMENTRIGHT OF WAYBORE/MISSILE BOREOPEN TRENCHLEGEND:STREET CENTERLINEC.L.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ONDOCUMENT RESEARCH AND FIELD EVALUATION. THEINFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT ISTHE CONTRACTOR'S RESPONSABILITY TO PHYSICALLYLOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIESWITHIN CONSTRUCTION PATH.ALL INSTALLATIONS MUST COMPLY WITH MINIMUMHORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES.B.O.CBACK OF CURBPOTHOLE LOCATIONCONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36INCHES OF COVER WHEN UNOBSTRUCTED. CONTRACTOR TOMAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES.DEPTH TO BE ADJUSTED ACCORDINGLY.CAUTION!!ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OFADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED INACCORDANCE WITH ALL REQUIRED ADA STANDARDS ANDSPECIFICATIONS.NOTE TO CONTRACTOR:ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREETO BE DUGGED USING HYDRO VACCUUM EXCAVATION.ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ONFIELD SURVEY AND OBSERVATIONS. LOCATIONS MAY NOT BEACCURATE OR COMPLETE.0'20'40'80'OUTSIDE PLANT CONSTRUCTION EXISTING CONDUITAERIAL STRANDCITY OF RENTONN/AABASDATEDESCRIPTIONINITIAL(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATION 500 SW 16TH ST,RENTON, WA1703MNTH.005_ROWE_REN_16431" = 40'
T1415 MAPLE AVE SW234 SW 16TH ST1402 MAPLE AVE SWMAPLE AVE SWSW 16TH ST9+0010+0011+0012+0013+00STA: 12+44ACCESS (1) EXISTING 4'X4'X4'TELECOM MANHOLE FORCABLE PULLING ONLYB.O.C.C.L.R.O.W.B.O.C.R.O.W.B.O.C.C.L.R.O.W.B.O.C.R.O.W.B.O.C.C.L.R.O.W.B.O.C.R.O.W.B.O.C.C.L.R.O.W.B.O.C.R.O.W.MAPLE AVE SWNORTHPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024C-03SIDEWALKE.O.PR.O.W.EDGE OF PAVEMENTRIGHT OF WAYBORE/MISSILE BOREOPEN TRENCHLEGEND:STREET CENTERLINEC.L.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ONDOCUMENT RESEARCH AND FIELD EVALUATION. THEINFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT ISTHE CONTRACTOR'S RESPONSABILITY TO PHYSICALLYLOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIESWITHIN CONSTRUCTION PATH.ALL INSTALLATIONS MUST COMPLY WITH MINIMUMHORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES.B.O.CBACK OF CURBPOTHOLE LOCATIONCONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36INCHES OF COVER WHEN UNOBSTRUCTED. CONTRACTOR TOMAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES.DEPTH TO BE ADJUSTED ACCORDINGLY.CAUTION!!ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OFADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED INACCORDANCE WITH ALL REQUIRED ADA STANDARDS ANDSPECIFICATIONS.NOTE TO CONTRACTOR:ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREETO BE DUGGED USING HYDRO VACCUUM EXCAVATION.ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ONFIELD SURVEY AND OBSERVATIONS. LOCATIONS MAY NOT BEACCURATE OR COMPLETE.0'20'40'80'OUTSIDE PLANT CONSTRUCTION EXISTING CONDUITAERIAL STRANDCITY OF RENTONN/AABASDATEDESCRIPTIONINITIAL(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATION 500 SW 16TH ST,RENTON, WA1703MNTH.005_ROWE_REN_16431" = 40'
1401 MAPLE AVE SW1420 MAPLE AVE SW1402 MAPLE AVE SWI-405 FWYI-405 RAMPI-405 FWYI-405 RAMPSR 167 RAMP14+0015+0016+0017+0018+00(440 LF) CONDUIT PROOF ANDPULL FIBER THROUGHEXISTING CONDUIT ONLYB.O.C.C.L.R.O.W.B.O.C.R.O.W.B.O.C.C.L.R.O.W.B.O.C.R.O.W.C.L.SR 167 RAMPMAPLE AVE SWNORTHPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024C-04SIDEWALKE.O.PR.O.W.EDGE OF PAVEMENTRIGHT OF WAYBORE/MISSILE BOREOPEN TRENCHLEGEND:STREET CENTERLINEC.L.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ONDOCUMENT RESEARCH AND FIELD EVALUATION. THEINFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT ISTHE CONTRACTOR'S RESPONSABILITY TO PHYSICALLYLOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIESWITHIN CONSTRUCTION PATH.ALL INSTALLATIONS MUST COMPLY WITH MINIMUMHORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES.B.O.CBACK OF CURBPOTHOLE LOCATIONCONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36INCHES OF COVER WHEN UNOBSTRUCTED. CONTRACTOR TOMAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES.DEPTH TO BE ADJUSTED ACCORDINGLY.CAUTION!!ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OFADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED INACCORDANCE WITH ALL REQUIRED ADA STANDARDS ANDSPECIFICATIONS.NOTE TO CONTRACTOR:ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREETO BE DUGGED USING HYDRO VACCUUM EXCAVATION.ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ONFIELD SURVEY AND OBSERVATIONS. LOCATIONS MAY NOT BEACCURATE OR COMPLETE.0'20'40'80'OUTSIDE PLANT CONSTRUCTION EXISTING CONDUITAERIAL STRANDCITY OF RENTONN/AABASDATEDESCRIPTIONINITIAL(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATION 500 SW 16TH ST,RENTON, WA1703MNTH.005_ROWE_REN_16431" = 40'
209 SW 13TH ST325 SW 12TH STMAPLE AVE SWSW 13TH ST17+0018+0019+0020+0021+00C.L.R.O.W.C.L.(316 LF) CONDUIT PROOF ANDPULL FIBER THROUGHEXISTING CONDUIT ONLYR.O.W.R.O.W.C.L.R.O.W.NORTHPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024C-05SIDEWALKE.O.PR.O.W.EDGE OF PAVEMENTRIGHT OF WAYBORE/MISSILE BOREOPEN TRENCHLEGEND:STREET CENTERLINEC.L.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ONDOCUMENT RESEARCH AND FIELD EVALUATION. THEINFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT ISTHE CONTRACTOR'S RESPONSABILITY TO PHYSICALLYLOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIESWITHIN CONSTRUCTION PATH.ALL INSTALLATIONS MUST COMPLY WITH MINIMUMHORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES.B.O.CBACK OF CURBPOTHOLE LOCATIONCONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36INCHES OF COVER WHEN UNOBSTRUCTED. CONTRACTOR TOMAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES.DEPTH TO BE ADJUSTED ACCORDINGLY.CAUTION!!ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OFADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED INACCORDANCE WITH ALL REQUIRED ADA STANDARDS ANDSPECIFICATIONS.NOTE TO CONTRACTOR:ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREETO BE DUGGED USING HYDRO VACCUUM EXCAVATION.ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ONFIELD SURVEY AND OBSERVATIONS. LOCATIONS MAY NOT BEACCURATE OR COMPLETE.0'20'40'80'OUTSIDE PLANT CONSTRUCTION EXISTING CONDUITAERIAL STRANDCITY OF RENTONN/AABASDATEDESCRIPTIONINITIAL(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATION 500 SW 16TH ST,RENTON, WA1703MNTH.005_ROWE_REN_16431" = 40'
1123 MAPLE AVE
SWMAPLE AVE SWSW 12TH ST
MAPLE AVE SW T20+0021+0022+0023+0024+0025+0026+00STA: 22+33ACCESS (1) EXISTING 4'X4'X4'TELECOM MANHOLE FORCABLE PULLING ONLYC.L.R.O.W.R.O.W
.C.L.R.O.W.R.O.W.R.O.W.C.L.R.O.W.R.O.W.R.O.W.R.O.W.C.L.B.O.C.C.L.B.O.C.NORTHPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024C-06SIDEWALKE.O.PR.O.W.EDGE OF PAVEMENTRIGHT OF WAYBORE/MISSILE BOREOPEN TRENCHLEGEND:STREET CENTERLINEC.L.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ONDOCUMENT RESEARCH AND FIELD EVALUATION. THEINFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT ISTHE CONTRACTOR'S RESPONSABILITY TO PHYSICALLYLOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIESWITHIN CONSTRUCTION PATH.ALL INSTALLATIONS MUST COMPLY WITH MINIMUMHORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES.B.O.CBACK OF CURBPOTHOLE LOCATIONCONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36INCHES OF COVER WHEN UNOBSTRUCTED. CONTRACTOR TOMAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES.DEPTH TO BE ADJUSTED ACCORDINGLY.CAUTION!!ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OFADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED INACCORDANCE WITH ALL REQUIRED ADA STANDARDS ANDSPECIFICATIONS.NOTE TO CONTRACTOR:ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREETO BE DUGGED USING HYDRO VACCUUM EXCAVATION.ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ONFIELD SURVEY AND OBSERVATIONS. LOCATIONS MAY NOT BEACCURATE OR COMPLETE.0'20'40'80'OUTSIDE PLANT CONSTRUCTION EXISTING CONDUITAERIAL STRANDCITY OF RENTONN/AABASDATEDESCRIPTIONINITIAL(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATION 500 SW 16TH ST,RENTON, WA1703MNTH.005_ROWE_REN_16431" = 40'
HH1201 LIND AVE SWSW GRADY WAYLIND AVE SW25+00 26+00 27+0028+0029+0030+00R.O.W.R.O.W.C.L.R.O.W.R.O.W.R.O.W.C.L.B.O.C.C.L.B.O.C.R.O.W.C.L.NORTHPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024C-07SIDEWALKE.O.PR.O.W.EDGE OF PAVEMENTRIGHT OF WAYBORE/MISSILE BOREOPEN TRENCHLEGEND:STREET CENTERLINEC.L.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ONDOCUMENT RESEARCH AND FIELD EVALUATION. THEINFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT ISTHE CONTRACTOR'S RESPONSABILITY TO PHYSICALLYLOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIESWITHIN CONSTRUCTION PATH.ALL INSTALLATIONS MUST COMPLY WITH MINIMUMHORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES.B.O.CBACK OF CURBPOTHOLE LOCATIONCONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36INCHES OF COVER WHEN UNOBSTRUCTED. CONTRACTOR TOMAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES.DEPTH TO BE ADJUSTED ACCORDINGLY.CAUTION!!ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OFADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED INACCORDANCE WITH ALL REQUIRED ADA STANDARDS ANDSPECIFICATIONS.NOTE TO CONTRACTOR:ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREETO BE DUGGED USING HYDRO VACCUUM EXCAVATION.ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ONFIELD SURVEY AND OBSERVATIONS. LOCATIONS MAY NOT BEACCURATE OR COMPLETE.0'20'40'80'OUTSIDE PLANT CONSTRUCTION EXISTING CONDUITAERIAL STRANDCITY OF RENTONN/AABASDATEDESCRIPTIONINITIAL(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATION 500 SW 16TH ST,RENTON, WA1703MNTH.005_ROWE_REN_16431" = 40'
955 LIND AVE SWSW GRADY WAYSW 10TH STLIND AVE SW31+9530+0031+00SEE PERMIT PACKAGE:1703MNTH.005_ROW_REN_1644STA: 31+95ACCESS (1) EXISTING 4'X4'X4'TELECOM MANHOLE FORCABLE PULLING ONLYR.O.W.C.L.TR.O.W.C.L.NORTHPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024C-08SIDEWALKE.O.PR.O.W.EDGE OF PAVEMENTRIGHT OF WAYBORE/MISSILE BOREOPEN TRENCHLEGEND:STREET CENTERLINEC.L.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ONDOCUMENT RESEARCH AND FIELD EVALUATION. THEINFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT ISTHE CONTRACTOR'S RESPONSABILITY TO PHYSICALLYLOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIESWITHIN CONSTRUCTION PATH.ALL INSTALLATIONS MUST COMPLY WITH MINIMUMHORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES.B.O.CBACK OF CURBPOTHOLE LOCATIONCONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36INCHES OF COVER WHEN UNOBSTRUCTED. CONTRACTOR TOMAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES.DEPTH TO BE ADJUSTED ACCORDINGLY.CAUTION!!ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OFADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED INACCORDANCE WITH ALL REQUIRED ADA STANDARDS ANDSPECIFICATIONS.NOTE TO CONTRACTOR:ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREETO BE DUGGED USING HYDRO VACCUUM EXCAVATION.ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ONFIELD SURVEY AND OBSERVATIONS. LOCATIONS MAY NOT BEACCURATE OR COMPLETE.0'20'40'80'OUTSIDE PLANT CONSTRUCTION EXISTING CONDUITAERIAL STRANDCITY OF RENTONN/AABASDATEDESCRIPTIONINITIAL(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATION 500 SW 16TH ST,RENTON, WA1703MNTH.005_ROWE_REN_16431" = 40'
MCI METRO GENERAL NOTES AND REQUIREMENTSGENERAL NOTESMCI OSP CONSTRUCTION GENERAL REQUIREMENTSTOOLS AND EQUIPMENT SPECIFICALLY DESIGNED FOR THE JOB AT HAND ARE REQUIRED. USE THE PROPER TOOLFOR THE JOB.PROTECTING MCI FACILITIES IS EXTREMELY IMPORTANT; HOWEVER, SAFETY REGARDING YOURSELF AND OTHERS ISTHE MOST IMPORTANT PART OF ANY PROJECT.CONTRACTORS ARE NOT ALLOWED TO CUT ANY CABLE. CABLES SCHEDULED FOR REMOVAL WILL BE CUT BY MCIOPERATIONS PERSONNEL, AND ONLY AFTER VERIFICATION THAT ALL TRAFFIC HAS BEEN OFF-LOADED.ALL FEDERAL, STATE AND LOCAL SAFETY REGULATIONS MUST BE FOLLOWED WITHOUT EXCEPTION.PERSONAL PROTECTIVE EQUIPMENT APPROPRIATE FOR THE SPECIFIC WORK SITE SHALL BE USED AT ALL TIMES.AT A MINIMUM, HARD HAT, SAFETY SHOES/STEEL-TOED BOOTS, AND FLORESCENT ORANGE OR GREEN WORK VESTARE REQUIRED UPON ENTERING ANY MCI WORK SITE.USE OF INTOXICANTS, DRUGS, INHALANTS OR ANY OTHER SUBSTANCES THAT MAY IMPAIR ALERTNESS ARE STRICTLYPROHIBITED.EXTREME CAUTION MUST BE USED AT ALL TIMES WHEN WORKING ON OR NEAR ACTIVE CABLES. AN MCI EMPLOYEEOR CONTRACT REPRESENTATIVE MUST APPROVE AND BE PRESENT PRIOR TO AND DURING ALL CABLE HANDLINGACTIVITIES.CONDUIT WORK INVOLVING ACTIVE CABLES REQUIRES SPECIALIZED TOOLS SPECIFICALLY DESIGNED TO ACCESSDUCTS WITH ACTIVE CABLES.MCI COMPRISES THE FOLLOWING OPERATING ENTITIES:-MCI COMMUNICATIONS SERVICES, INC.-MCI METRO ACCESS TRANSMISSION SERVICES, LLC-MCI METRO ACCESS TRANSMISSION SERVICES OF VIRGINIA, INC.-MCI METRO ACCESS TRANSMISSION SERVICES OF MASSACHUSETTS, INC.-METROPOLITIAN FIBER SYSTEMS OF NEW YORK, INC.1.2.ALL WORK TO BE PERFORMED IN STRICT ACCORDANCE WITH THE APPLICABLE CODES OR REQUIREMENTS OF ANY REGULATINGGOVERNMENTAL AGENCY, MCI METRO, OR THE RIGHT-OF-WAY GRANTOR.LOCATIONS OF SOME OF THE PHYSICAL FEATURES WERE OBTAINED FROM DATED RAILROAD VALUATION MAPS OR OTHERDRAWINGS, AND MAY BE AS SHOWN OR DEPICTED ON THESE DRAWINGS.3.UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS, BUT ARE NOTNECESSARILY EXACT. THEREFORE, UTILITY LOCATIONS WILL BE VERIFIED AT LEAST 100 FEET IN ADVANCE OF TRENCHING ORPLOWING, SO THAT CHANGES IN CABLE PLACEMENT CAN BE MADE IN EVENT OF CONFLICT.4.ALL KNOWN BURIED OBSTRUCTIONS ARE SHOWN ON SITE PLAN. ANY AND ALL OTHERS ENCOUNTERED ARE ALSO THERESPONSIBILITY OF THE CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.5.ANY AND ALL IMPROVEMENTS, SUCH AS ASPHALT OR CONCRETE PAVEMENT, CURBS, GUTTERS, WALKS, DRAINAGE DITCHES,EMBANKMENTS, SHRUBS, TREES, GRASS SOD, ETC., IF DAMAGED, SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITIONS.6.EQUIPMENT TYPES SPECIFIED HEREIN (ie: "BACKHOE" "SWAMP PLOW", ETC.) ARE SUGGESTIONS ONLY AND ARE NOT INTENDEDAS REQUIREMENTS. CONTRACTOR WILL BE NOTIFIED AS TO EXCEPTIONS.7.PROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024D-01OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
(SENECA AVE) COND PROOF PHASE IDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
FIBER OPTIC CABLE UNCOVERING SYSTEMPRIOR TO ANY EXCAVATION, THE MCI EMPLOYEE OR CONTRACT REPRESENTATIVE MUST VERIFY THE INITIALLOCATE MARKS COMPLETED BY MCI OPERATIONS. DO NOT TRUST LOCATE RESULTS COMPLETED BY OTHERS!THE MCI OR CONTRACT REPRESENTATIVE MUST LOCATE THE CABLE RUNNING LINE BY MAKING AT LEASTONE PASS IN EACH DIRECTION. LOCATE RESULTS MUST THEN BE COMPARED WITH PREVIOUS MARKS ANDTHE AS-BUILTS.IF THE PROPOSED WORK INVOLVES DIGGING OR EXCAVATING WITHIN 3 FEET OF THE CABLE, THE CABLEROUTE WILL BE MARKED CONTINUALLY WITH ORANGE PAINT AND SUPPLEMENTED BY MARKER FLAGS PLACEDEVERY 10 FT. THE EXCAVATION CONTRACTOR MUST POTHOLE (ALL POTHOLES MUST BE COMPLETED BY HANDDIGGING OR VACUUM EXCAVATION) A MINIMUM OF EVERY 15 FT., THEN EXPOSE THE ENTIRE LENGTH OF THECABLE BY HAND DIGGING OR VACUUM EXCAVATION.IF THE PROPOSED WORK INVOLVES DIGGING OR EXCAVATING WITHIN 15 FEET (BUT NOT CLOSER THAN 5 FEET)OF THE CABLE, THE CABLE ROUTE WILL BE MARKED CONTINUALLY WITH ORANGE PAINT AND SUPPLEMENTEDBY MARKER FLAGS PLACED EVERY 10 FT. THE EXCAVATION CONTRACTOR MUST POTHOLE THE CABLE AMINIMUM OF EVERY 30 FT.IF THE PROPOSED WORK INVOLVES DIGGING OR EXCAVATING WITHIN 5 FEET (BUT NOT CLOSER THAN 3 FEET)OF THE CABLE, THE CABLE ROUTE WILL BE MARKED CONTINUALLY WITH ORANGE PAINT AND SUPPLEMENTEDBY MARKER FLAGS PLACED EVERY 10 FT. THE EXCAVATION CONTRACTOR MUST POTHOLE THE CABLE AMINUMUM OF EVERY 15 FT.THE CABLE WILL ALSO BE POTHOLED AT ANY CHANGE IN THE RUNNING LINE OF MORE THAN 1 FT. IN ANYDIRECTION, ANYTIME THE ACCURACY OF THE ELECTRONIC LOCATE IS QUESTIONED, OR THE MARKED RUNNINGLINE DOES NOT MATCH THE AS-BUILTS.NO MECHANICAL EXCAVATION WITHIN 3 FT. OF OSP FACILITIES WILL BE ALLOWED UNLESS THE FACILITIESHAVE FIRST BEEN PROPERLY LOCATED, POTHOLED, POSITIVELY IDENTIFIED, CONTINUOUSLY EXPOSED BY HANDDIGGING OR VACUUM EXCAVATION, AND THE FACILITES ARE CLEARLY VISIBLE.IN ADDITION, MECHANICAL EXCAVATION WITHIN 3 FT. OF OSP FACILITIES REQUIRES ON-SITE PRIOR APPROVALFROM MCI'S EMPLOYEE OR CONTRACT REPRESENTATIVE.PLEASE REFER TO THE LATEST EDITION OF THE MCI OSP HANDBOOK FOR ADDITIONAL DETAILS. KNOW IT ANDFOLLOW IT.7.EXPOSING REQUIREMENTS:6.THE TITLE OF THIS PROGRAM, F.O.C.U.S., AN ACRONYM FOR "FIBER OPTIC CABLE UNCOVERING SYSTEM," WAS SELECTEDTO REMIND EVERYONE INVOLVED WITH WORKING NEAR MCI'S ACTIVE FIBER OPTIC SYSTEMS TO FOCUS ON PROTECTINGTHE FACILITIES. IF, DURING THE COURSE OF THE PROJECT, YOU NOTICE ANY ACTIVITY WHICH MAY JEOPARDIZE THEMCI OSP FACILITIES, IT IS YOUR DUTY TO STOP THE WORK AND RE-F.O.C.U.S.F.O.C.U.S. RULES MUST BE FOLLOWED ON ALL MCI PROJECTS INVOLVING WORK ON OR NEAR MCI OSP FACILITIES.SAFETY IS MCI'S NUMBER ONE PRIORITY; EVERYONE MUST REFRAIN FROM UNSAFE AND IMPROPER PRACTICES.REVIEW OF F.O.C.U.S. IS MANDATORY AT EVERY PRE-BID, PRE-CONSRUCTION SITE MEETING AND DAILY TAILGATEMEETING. F.O.C.U.S. DISCUSSION MUST INCLUDE SITE-SPECIFIC HISTORY, UNIQUE PROBLEMS, FACILITYCONFIGURATIONS THAT MAY BE ENCOUNTERED, AND PAST ERRORS. "THOSE WHO DO NOT LEARN FROM HISTORY AREDOOMED TO REPEAT IT." DO NOT LET THIS HAPPEN TO YOU.ANY WORK NEAR OR REQUIRING HANDLING OF MCI OUTSIDE PLANT FACILITIES CAN ONLY BE PERFORMED WITH AN MCIEMPLOYEE OR CONTRACT REPRESENTATIVE PRESENT -- THIS MEANS OUT OF HIS OR HER VEHICLE AND DIRECTLYMONITORING THE SYSTEM. THE REPRESENTATIVE MUST HAVE A PROPERLY OPERATING CABLE LOCATOR CHECKED FORACCURACY EVERY DAY PRIOR TO COMMENCEMENT OF WORK (COMPARISON OF LINE AND DEPTH READINGS TO ACTUALLINE AND DEPTH OF THE CABLE).LOCATE AND POTHOLE REQUIREMENTS:3.5.4.2.1.CONSTRUCTION NOTESALL CONDUIT WILL BE 4" ID SCHEDULE 40 (i.e. PVC OR BSP/GSP, MANUFACTURED SPLIT PVC OR SPLIT BSP/GSP), UNLESS SPECIFIEDOTHERWISE.1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY. SEE CONTACT SHEETFOR CONTACT NAME AND TELEPHONE NUMBER.2.ALL UNDERGROUND OBSTRUCTIONS, WHEN LOCATED, WILL REQUIRE THE PLACEMENT OF A BURIED CABLE MARKER AND THEPLACEMENT OF 4' MANUFACTURED SPLIT PVC, BSP/GSP OVER OR UNDER EACH OBSTRUCTION.3.SHORING MAY BE REQUIRED AND SHALL COMPLY WITH O.S.H.A. STANDARDS.4.ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 42" MINIMUM COVER UNLESS SPECIFIED OTHERWISE ON THE CONSTRUCTIONDRAWINGS.5.MECHANICAL PROTECTION SHALL BE REQUIRED ANYTIME A 36" MINIMUM COVER IS UNOBTAINABLE UNLESS SPECIFIED OTHERWISEON THE CONSTRUCTION DRAWINGS.6.ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM 38.2" RADIUS UNLESS SPECIFIED OTHERWISE. ALL SPLITCONDUIT BENDS AND SOLID PVC BENDS SHALL REQUIRE CONCRETE ENCASEMENT, UNLESS SPECIFIED OTHERWISE.7.OPERATIONS PERSONNEL TO BE CONTACTED BY THE CONTRACTOR 48 HOURS PRIOR TO CONSTRUCTION. SEE CONTACT SHEETFOR CONTACT NAME AND TELEPHONE NUMBER.8.ALL STATIONING IS BASED ON AS-BUILT INFORMATION, THERFORE SOME VARIANCE SHOULD BE ANTICIPATED. ADJUST AS NEEDED.9.RAILROAD COMMUNICATION AND SIGNAL CABLES TO BE LOCATED PRIOR TO THE CONSTRUCTION ACTIVITY. RAILROAD TO BE GIVEN48 HOURS NOTICE PRIOR TO CONSTRUCTION.10.ALL BURIED CABLE MARKER POSTS AND HARDWARE PLACED AND/OR REMOVED ON ALL NEW AND EXISTING ROUTES SHALL BEIMPLEMENTED AS FOLLOWS.11.ON THOSE ROUTES THAT ARE CONSIDERED TO BE IN A NORTH TO SOUTH GEOGRAPHICAL ORIENTATION, THE SOUTHERN-MOSTSIGN AND POST SHOULD BE REMOVED.FOR NEW ROUTES BEING CONSTRUCTED, ONE SIGN POST WILL BE PLACED AT THE NORTH END OF EACH HANDHOLE.ON THOSE ROUTES THAT ARE CONSIDERED TO BE IN AN EAST TO WEST GEOGRAPHICAL ORIENTATION, THE WESTERN-MOST SIGNAND POST SHOULD BE REMOVED.FOR NEW ROUTES BEING CONSTRUCTED, ONE SIGN POST WILL BE PLACED AT THE EAST END OF THE EACH HANDHOLE.MCI METRO GENERAL NOTES AND REQUIREMENTSPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024D-02OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
MCI CONSTRUCTION DETAILS/TYPICALSTYPICAL DIRECTIONAL BORE DETAILFOR CONDUITDIRECTIONAL BORE CROSS SECTIONCOVERHDPE's, AS SPECIFIED & CONDUIT AS SPECIFIED FIBER OPTIC CABLEINNERDUCTS AND/OR E/W ANY NUMBER OF EXISTING GRADETYPICAL DETAILAA4" DIAMETER TO SEAL GAP BETWEEN 2" CONDUIT AND PVC SLEEVE.EPOXY GROUT IS USED AT BOTH ENDS OF CORE BORE (WHERE OCCCURS)CORE BORENOTE:HEADWALL DIAM. CORE BOREEPOXIED INTO 5" SCHEDULE 40 GIP/GRC CONCRETE OR ROCK 4" CORE BORE2" CONDUITTYPICAL DETAILCDIRECTIONAL BORE CROSS SECTIONFOR JOINT CONDUITCOVERCONDUIT AS SPECIFIED E/W ANY NUMBER OF INNERDUCTS AND/OR HDPE's, AS SPECIFIED & FIBER OPTIC CABLEEXISTING GRADETYPICAL DETAILBAPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024D-03OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
MIN.TRENCH & PLACE CONDUITEXISTING GRADEBURIED CABLE MARKER TAPECOMPACT BACKFILLS IN 6" LAYERS WITH ROCK FREE MATERIALCONDUIT AS SPECIFIED E/W ANY NUMBER OF INNERDUCTS AND/OR HDPE's, AS SPECIFIED & FIBER OPTIC CABLECOVER12" MIN. BELOW FINISHED GRADE6" MIN.TYPICAL DETAILB12"OPEN CUT CONCRETE OR ASPHALTPLAN VIEWCONDUIT AS SPECIFIED E/W ANY NUMBER OF INNERDUCTS AND/OR HDPE's, AS SPECIFIED & FIBER OPTIC CABLESAW CUT AND REMOVE 2' MIN.TYPICAL DETAILAMCI CONSTRUCTION DETAILS/TYPICALSTYPICAL OPEN TRENCH DETAILCOVERVARIESTRENCH EROSION CONTROLFRONT CROSS SECTION VIEWEXISTING GRADEFILLED BAGSCLEAN BACKFILLTOE OF BANKCONDUIT AS SPECIFIED E/W ANY NUMBER OF INNERDUCTS AND/OR HDPE's, AS SPECIFIED & FIBER OPTIC CABLENOTE: BACKFILL MUST BE MADE WITH ROCK FREE MATERIALNOTES:1. INTERLOCK BAGS INTO TRENCH, ONE LAYER PARALLEL WITH THE CABLE, THE SECOND LAYER CROSSWISE AND THE THIRD LAYER PARALLEL, ETC.. TAMP THE BAGS FIRMLY INTO PLACE AND PLACE THE BAGS SO THEY WILL CONFORM TO THE PREDISTURBED BANK.2. BAGS WILL EXTEND THE FULL WIDTH AND DEPTH OF EXCAVATION TO UNDISTURBED SOIL.SPACE ROWSEQUALLYVARIESEXISTING GRADETOP OF BANKFILLED BAGSSIDE CROSS SECTION VIEWTYPICAL DETAILDAXTRENCH & PLACE JOINT CONDUITEXISTING GRADEBURIED CABLE MARKER TAPECOMPACT BACKFILL IN 6" LAYERS WITH ROCK FREE MATERIAL. 2-SACK SAND-SLURRY BACKFILL MAY BE REQUIRED BY THE LOCAL GOV. AGENCYCONDUIT AS SPECIFIED E/W ANY NUMBER OF INNERDUCTS AND/OR HDPE's, AS SPECIFIED & FIBER OPTIC CABLECONDUIT AS SPECIFIED E/W PULL ROPECOVER.12" MIN. BELOW FINISHED GRADE12" MIN.TYPICAL DETAILCAPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024D-04OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
MCI CONSTRUCTION DETAILS/TYPICALSRESTORATION DETAILSREMOVE AND RESTORE ASPHALTFOR CONDUITASPHALT OVERLAY (IF REQUIRED)(VARIES PER PERMIT REQUIREMENT)24" MIN.4" MIN.CONCRETE SUB BASEBURIED CABLE MARKER TAPECOMPACT BACKFILLS IN 6" LAYERS WITH ROCK FREE MATERIAL6" MIN.CLEAN BACKFILLCONDUIT AS SPECIFIED E/W ANY NUMBER OF INNERDUCTS AND/OR HDPE's, AS SPECIFIED & FIBER OPTIC CABLE6" MIN.3" MIN.CLEAN BACKFILL6" MIN.EXISTING ASPHALT6"TYPICAL DETAILAREMOVE AND RESTORE CONCRETEFOR CONDUITCONDUIT AS SPECIFIED E/W ANY NUMBER OF INNERDUCTS AND/OR HDPE's, AS SPECIFIED & FIBER OPTIC CABLE3" MIN.TYPICAL DETAILBPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024D-05OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
PROFILE VIEWD/L PLAN VIEWJACK & BORE ROADWAYR/WEOPROADWAYEOPGRADEEXISTING DITCH42"MIN.48"MIN.EOP VARIESEOP D/L MIN.5'VARIESVARIESVARIESR/W4" BSP E/W 2-1 1/4 "JACK & BOREJACK & BORE 4" BSP E/W 2-1 1/4 " INDTS.INDTS.42"MIN.DITCHCONDUIT AS SPECIFIED E/W ANY NUMBER OF INNERDUCTS AND/OR HDPE's, AS SPECIFIED BOTH SIDES & FIBER OPTIC CABLE5'MIN.TYPICAL DETAILAJACK & BORE MAIN TRACKPLAN VIEW15' MIN.PROFILE VIEWR/W
66"MIN.R/W
VARIES15' MIN.JACK & BORE 4" R/W
" INDTS.BSP E/W 2-1 1/4 42" MIN.R/W
OPTIC CABLEBOTH SIDES & FIBER HDPE's, AS SPECIFIED INNERDUCTS AND/OR E/W ANY NUMBER OF CONDUIT AS SPECIFIED TYPICAL DETAILBR/W
R/W
MIN.42"MIN.66"MIN.42"JACK AND BORE DUAL TRACKSR/W
APPROX.PROFILE VIEWVARIES22.5'15'22.5'PLAN VIEWR/W TYPICAL DETAILC66"R/WR/WCONDUIT AS SPECIFIED E/W ANY NUMBER OF INNERDUCTS AND/OR HDPE's, AS SPECIFIED BOTH SIDES & FIBER OPTIC CABLEJACK & BORE 4" BSP E/W 2-1 1/4 " INDTS.PREFERABLY NOT LESS THAN 4515' MIN.42" MIN.RAILEXISTING GRADEPROFILE VIEWPLAN VIEWJACK & BORE AUXILLARY TRACK15' MIN.MIN.TYPICAL DETAILDEXISTING JACK & BORE 2-1.9" O.D. HDPE5" BSP E/W MIN.42" GRADE48" MIN.H42" MIN.HOPTIC CABLEBOTH SIDES & FIBER HDPE's, AS SPECIFIED INNERDUCTS AND/OR E/W ANY NUMBER OF CONDUIT AS SPECIFIED JACK AND BORE CULVERT2-1.9" O.D. HDPESPILLWAYCONCRETE 5" BSP E/W JACK & BORE PROFILE VIEWVARIESVARIESSPILLWAYCULVERTCONCRETE AND/OR SPILLWAYPLAN VIEWHCULVERT
HTYPICAL DETAILEMCI CONSTRUCTION DETAILS/TYPICALSJACK AND BORE DETAILPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024D-06OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
MCI CONSTRUCTION DETAILS/TYPICALS4'x4'x4' OR 4'x4'x2' MANHOLE DETAILS1" PVC SLEEVEFOR GROUND RODUPPER SECTIONLOWER SECTIONUPPER SECTIONLOWER SECTIONPULL IRONS (TYP.)1 EACH WALLCENTERED UNDERTERMINATORSPULL IRON (TYP.)10''SUITABLE DIRTBACKFILLCRUSHED STONEPROFILEPLANMANHOLEMANHOLEPVC, OR BSP/GSPCONDUIT (TYP.)48''36''12''4'' DIAMETER TERMINATOR (TYP.)12''X4'' STANDARD SUMP22''72''72''30''10''MIN.43''6''12''48''49''41''30''4''32''32''12'' X 4'' STANDARD SUMP48''24''24''7''7''21''16''6''21''6''6''48''24''24''24''12''7''7''30''19''16''4''48"6"6"27"27"60"60"4'' DIAM. TERMINATORS(FOR SCH. 40 PIPE)4 EACH WALL1. VOID IN EXCAVATED AREAS TO BE BACKFILLED WITH SELECT MATERIAL.2. BOTTOM OF EXCAVATED PIT TO BE BACKFILLED WITH 12" OF CRUSHED STONE (3/4" GRADE).3. SHORING WILL BE REQUIRED.4. ALL MANHOLES SHALL BE PLACED WITH COVER FLUSH WITH EXITING GRADETYPICAL DETAIL "B"NOTES:TYPICAL DETAIL "E" RING AND COVER DETAIL RING: 390lbs. COVER: 300lbs.NOTES:.375'' X 1.50'' FULLY THREADEDBOLTS AND INSERTS (2 BOLTSAND INSERTS EACH WALL)EXISTINGGRADESUITABLE DIRTBACKFILLMANHOLE COVER IRONWORKS #B-30 TYPICAL DETAIL "A"TYPICAL NECK EXTENSION DETAIL REINFORCEDCONCRETENECK EXTENSIONTYPICAL DETAIL "D"DALWORTH QUICKSET MANHOLEWALLS: 6in. HEADROOM: 48in.REINFORCED CONCRETEMANHOLE (UPPER SECTION)WEIGHT: +4300 LBS.REINFORCED CONCRETEMANHOLE (UPPER SECTION)WEIGHT: +4300 LBS.4'' DIAMETERTERMINATOR(TYPICAL.)1'' PVC SLEEVEFOR GROUNDINGRODTYPICAL DETAIL "C"TYPICAL DETAIL "F"BOLT INSERTS AND PULL IRONS2 SECTIONSTERMINATORS, SUMP, & GROUND ROD SLEEVE2 SECTIONSNOTE:INSERT SPACINGARRANGED FORFIBER OPTIC CABLE"3M" SPLICE CASE.1.375"1.375"1. EACH COVER TO HAVE (4) PICK SLOTS FOR REMOVING.2. STAMP CARRIER'S ID IN COVER.3. ACCESS HOLE: 30"CARRIER LOGOPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024D-07OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
MCI CONSTRUCTION DETAILS/TYPICALS2.5' x 5' x 2.5' HANDHOLE DETAILSFIBERGLASS VAULT4'' X 1.50'' X .25''NEOPRENE RUBBERINSIDE LOOKING OUTSIDE WALL VIEWDETAIL "D"(144 SQ. IN. TOTAL DRAINAGE)PLAN VIEWVAULT BOTTOMDETAIL "B"CROSS SECTIONLOCKING DEVICESECTION A-ALOCK DOWN DEVICEDETAIL "A-1"3'' REINFORCEDEXCAVATION PITDETAIL "C"BACKFILLSUITABLE DIRTHANDHOLE7' - 0''40 PVC (BOTH ENDS)PLUG. BELL ENDS TO4.50'' BELL ENDS W/ PVCPLANACCOMODATE SCHED.30''CRUSHED STONE(ONE SIDE ONLY)EMS MARKER5' - 0''OR HDPECONDUIT (TYP.)PVC, BSP/GSPEXISTING GRADESUITABLE DIRTBACKFILL25''(TYP)7''RIB2.50'' KNOCKOUT (BOTH ENDS)PROFILE2'' KNOCKOUT (BOTH ENDS)LIFTING BOLTS (TYP. 4 PLACES)30''6''29.50''6''EXPLODED ISOMETRIC DETAILDETAIL "A"1.625'' X 1'' X 33''UNISTRUT CHANNELSEE DETAIL "A-4"THIS SHEET.375'' INSERT30''(ONE SIDE ONLY)3M CAT #1411EMS MARKER(3 REQUIRED)SUPPORT BEAMTHIS SHEETSEE DETAIL "A-1"DIRT SHIELDDEVICE ANDLOCK DOWNSEE DETAIL "A-3"THIS SHEETSURFACENON-SKID1-800-624-9675MCISEE DETAIL "A-2"PLASTIC VAULT (FRP)FIBERGLASS REINFORCED4'' X 2'' WITH CENTER PINLOCKING BEAM60''THIS SHEET(CENTER ONLY)BONDED TO VAULT BYMANUFACTURERMORTAR FRAME (RPM)REINFORCED POLYMERCOVER AND FRAME.50 IN..75 IN.POLYMER MORTARREINFORCEDLIFTING SLOT20,000 LBS. LOADING WEIGHTPOLYMER MORTAR (RPM) COVER FORTWO PIECE REINFORCEDABRACKET (HOT DIPPEDRPM COVEREACH APPROXIMATELY POUNDS.THE LIDS ARE POLYMER CONCRETE MATERIAL,APROXIMATELY POUNDS IN WEIGHT.WITH 12'' OF CRUSHED STONE (.75'' GRADE).5. THIS HANDHOLE IS OF FIBERGLASS MATERIAL,4. ALL HANDHOLES SHALL BE PLACED BELOW3. SHORING WILL BE REQUIRED.2. BOTTOM OF EXCAVATED PIT TO BE BACKFILLED1. VOID IN EXCAVATED AREAS TO BE BACKFILLED(TYP. AT 6 PLACES)GALV) (2 REQ'D)LAG BOLT ANCHORS MUSTLINEAR DISTANCE BETWEENBE 25''.ANCHOR (TYP.).375'' LAG BOLTNOTE:7''EXISTING GRADE.WITH SELECT MATERIAL.NOTES:.50'' OPENING (MAX)FOR GROUND ROD30''TYP.12''TYP.12''59.50''(TYP - 4 PL)6'' X 6'' DRAIN(TYP - 2 PL)1'' DIA HOLERPM FRAMEVAULTFIBERGLASSSUPPORT BEAMDETAIL "A-4"INSTALLATIONBEAMSUPPORTWITH NUT, AND WASHER.75'' X 1.25'' HEX BOLT(TYP-4 PLACES)LS)OF 2-PIECE RPM COVERCOVER HOLD DOWN BRACKETCOVER HOLD DOWN.375'' INSERTDETAIL "A-3"WASHERWITH FLAT.1875'' SCREWANEOPRENE COVERENGAGED LOCK DETAIL "A-2"DOWN DEVICEP1000 UNISTRUT.50'' STAINLESS STEEL(SELF CLEANING)STAINLESS END CAPCAPTURE NUT W/ACME THD. BOLT &PROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024D-08OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
MCI CONSTRUCTION DETAILS/TYPICALSTYPICAL VAULT DETAILW[SEE TABLE]L[SEE TABLE]H[SEE TABLE]VAULT SIZEL (LENGTH)W (WIDTH)H (HEIGHT)DROP SIZE17 IN.30 IN.24 IN.MEDIUM SIZE30 IN.48 IN.24 IN.SMALL SIZE24 IN.36 IN.24 IN.LARGE SIZE36 IN.60 IN.36 IN.*NOTE: SEE SITE PLAN FOR LOCATION AND TYPEPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024D-09OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
MCI CONSTRUCTION DETAILS/TYPICALSHANDHOLE SLACK STORAGE DETAILSCABLE RACKLOOP DIRECTIONCABLE RACKLOOP DIRECTIONCABLE RACKCABLE RACKSPLICE
CASE60"SPLICE CASECABLE RACKLOOP DIRECTIONCABLE RACKSPLICE CASELOOP DIRECTION25'CABLE RETAINERCABLE RETAINERSECTION B-B30"DETAIL "A"CABLE SLACK ARRANGEMENTDETAIL "B"HANDHOLE LAYOUT14.25"2.25"BB.375"-16 MOUNTING INSERTSFOR SPLICE CASING4 PLACES (2 EACH SIDE)PROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024D-10OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
CITY OF RENTON GENERAL NOTES AND REQUIREMENTSGENERAL NOTESALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CITY OF RENTON MUNICIPAL CODE TITLE IV, ALLAPPLICABLE ORDINANCES, THE PROPOSED ACCESSIBILITY GUIDELINES FOR PEDESTRIAN FACILITIES IN THE PUBLICRIGHT-OF-WAY (PROWAG), THE STATE OF WASHINGTON MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND ALLWSDOT STANDARDS AND SPECIFICATIONS.1.ALL UNDERGROUND UTILITY LINES MUST HAVE A MINIMUM 36" COVER FROM FINISHED GRADE, DITCH BOTTOM, OR NATURALGROUND. REFER TO WSDOT UTILITY MANUAL FOR PIPE COVER REQUIREMENTS ON STATE ROUTES; SR 18, SR 99, SR 161, SR 509.8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVEEQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH AND SAFETY OF THE PUBLIC, AND TOPROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. ANY WORK WITHINTHE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOREACH LANE OF TRAFFIC AFFECTED. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-07-23-TRAFFIC CONTROL, SHALLAPPLY.12.TEMPORARY EROSION AND SEDIMENTATION CONTROL SHOULD BE IN ACCORDANCE WITH THE KING COUNTY EROSION ANDSEDIMENT CONTROL STANDARD. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATEWITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANINGOPERATION SHALL NOT FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM.15.ANY EXCAVATION WITHIN PROXIMITY OF TREE DRIP LINES SHALL BE PERFORMED VIA HYDRO VACUUM EXCAVATION.16.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY ALL UTILITY DISTRICTS AND PRIVATE PROPERTY OWNERS WHENSUCH PROPERTY IS LIABLE TO INJURY OR DAMAGE THROUGH THE PERFORMANCE OF THE ABOVE WORK. CALL 1-800-424-5555 48HOURS IN ADVANCE FOR UNDERGROUND UTILITY LOCATION. THIS INSTRUCTION DOES NOT RELIEVE THE CONTRACTOR FROMREQUIRED NOTIFICATION OF COUNTY INSPECTORS AS SPECIFIED IN PARAGRAPH 1, ABOVE.9.AFTER COMPLETION OF CONSTRUCTION WORK THE CONTRACTOR SHALL RESTORE ALL RIGHTS OF WAY AND PUBLIC PLACES TOTHE CONDITION WHICH IS EQUIVALENT TO OR BETTER THAN THE CONDITION OF THE RIGHT OF WAY PRIOR TO COMMENCING THEWORK AND TO A CONDITION SATISFACTORY TO THE CITY WITHIN 30 DAYS. CONTRACTOR SHALL REPAIR THE DAMAGE AT ITSSOLE COST AND EXPENSE, WITHOUT DELAY OR INTERRUPTION AND WITHIN THE TIME PERIOD PRESCRIBED BY THE CITY.11.3.A SIGNED COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.2.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRE-CONSTRUCTION MEETING MUST BE HELD BETWEEN THE CITYOF RENTON, THE APPLICANT, AND THE APPLICANT'S CONSTRUCTION REPRESENTATIVE. ALL PRE-CONSTRUCTION MEETINGSSHALL BE SCHEDULED AT A MAXIMUM OF 14 DAYS PRIOR TO THE JOB START DATE.4.JOBS ARE REQUIRED TO BE CALLED IN FOR JOB START, RE-INSEPCTION AND PROJECT FINAL INSPECTIONS. INSPECTIONS SHALLBE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BYGOING TO MYBUILDINGPERMIT.COM.6.ALL ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95% DENSITY IN ACCORDANCE WITH WSDOT 2-06.3.CONTRACTOR SHALL PROVIDE AND INSTALL ALL REGULATORY AND WARNING SIGNS PER THE LATEST EDITION OF MANUAL ONUNIFORM TRAFFIC CONTROL DEVICES.13.ESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUEFUNCTION.14.7.WHENEVER PART OF A SQUARE OR SLAB OF EXISTING CONCRETE SIDEWALK OR DRIVEWAY IS CUT OR DAMAGE, THE ENTIRESQUARE OR SLAB SHALL BE REMOVED OR REPLACED. ALL MATERIALS AND COMPACTION SHALL BE IN ACCORDANCE WITH THECITY OF RENTON STANDARDS.PERMITTEE SHALL NOT CLEAR, REMOVE OR DISTURB ANY TREES OR VEGETATION IN THE RIGHT OF WAY WITHOUT SUBMITTING AREVEGETATION AND EROSION CONTROL PLAN, IN FORM AND CONTENT ACCEPTABLE TO THE CITY.17.CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS DEPARTMENT AT LEAST TWENTY-FOUR (24) HOURS, BUT NOT MORE THANSEVENTY-TWO (72) HOURS, PRIOR TO COMMENCING THE WORK. CREW MUST CALL PERMIT # AND WORK LOCATION EACHMORNING THEY ARE TO BE WORKING IN TOWN TO VERIFY THE START OF WORK. FAILURE TO PROVIDE SUCH NOTICE WILL RESULTIN THE ASSESSMENT OF A JOB START PENALTY CHARGE PER EACH OCCURRENCE, IN ADDITION TO ANY OTHER FEES PROVIDEDFOR IN THIS PERMIT.10.GENERAL NOTES5.ALL UTILITY TRENCHES IN THE RIGHT-OF-WAY SHALL BE BACKFILLED 5/8" CRUSHED ROCK AND COMPACTED TO 95% DENSITY.WHEN TRENCH WIDTH IS 18 INCHES OR LESS, AND IS WITHIN THE TRAVELED WAY, TRENCH WILL BE BACKFILLED WITH CONTROLDENSITY FILL (SELF-COMPACTED FLOWABLE FILL) AS DEFINED BY WASHINGTON AGGREGATES AND CONCRETE ASSOCIATION.THE AGGREGATE WILL BE 3/8 -INCH MINUS.PROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024E-01OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
CITY OF RENTON DETAILS/TYPICALSPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024E-02OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
CITY OF RENTON DETAILS/TYPICALSPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024E-03OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
TEMPORARY EROSION/SEDIMENTATION CONTROLSHEET 1 OF 1 SHEETPrefabricated units may be used in lieu of the designshown on this plan upon approval of the Eng
ineer.Structure shall be constructed such that geotextilematerial shall be fastened to posts creating a seam-less joint.Ensure that ponding height of water does not causeflooding on adjacent roadways or private property.Perform maintenance in accordance with StandardSpecification 8-01.3(15).1.2.3.4.ATTACH WOOD OR METAL CROSSBRACES TO STABILIZE WOODGEOTEXTILEINLETPOST (SEE STD. SPEC. 8-01.3(9)A).COMPACTED NATIVE SOIL2' - 0" MIN.1' - 0" MIN.GRATEFASTEN CROSS BRACES TOGETHER WITHSCREWS, NAILS. NYLON TIES OR WIREINLET(CROSS BRACES NOT SHOWN)(ENTIRE FENCE NOT SHOWNFOR ILLUSTRATIVE PURPOSES)FLOWSILT FENCE ~ SEESTD. PLAN I-30.104"4"BURY GEOTEXTILE IN TRENCHGEOTEXTILE FOR TEMPORARY SILT FENCE~ SEE STD. SPEC 9-33.2(1), TABLE 6INLETTEMPORARY SILT FENCE FOR INLET PROTECTION IN UNPAVED AREASWSDOT-I-40.10-00Size the Below Inlet Grate Device (BIGD) for the storm water structure itwill service.The BIGD shall have a built-in high-flow relief system (overflow bypass).The retrieval system must allow removal of the BIGD without spilling thecollected material.Perform maintenance in accordance with Standard Specificat
ion 8-01.3(15).1.2.3.4.OVERFLOW BYPASS5" MAX.TRIMGRATE FRAMEFILTEREDWATERSEDIMENT AND DEBRISSHEET 1 OF 1 SHEETDRAINAGE GRATEBELOW INLET GRATE DEVICEOVERFLOW BYPASS (TYP.)DRAINAGE GRATE~ RECTANGULAR GRATE SHOWNRETRIEVAL SYSTEM (TYP.)BELOW INLET GRATE DEVICENOT TO SCALESTORM DRAIN INLET PROTECTIONWSDOT-I-40.20-00SHEET 1 OF 1 SHEETFABRIC (GEOTEXTILE)(TYPICAL)TYPICAL SILT FENCEWITHOUT BACKUP SUPPORT1.2.3.(WOOD POSTS SHOWN)SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGHTOGETHER TO PREVENT SILT LADEN WATER FROMESCAPING THROUGH THE FENCE AT THE OVERLAP.SEE NOTE 1SEE NOTE 1GEOTEXTILE FOR SILT FENCE ~ SEE STANDARDSPECIFICATION SECTION9-33.2 (1), TABLE 6(STEEL POSTS SHOWN)~~(STEEL POSTS SHOWN)POST ~ SEE STD.SPEC. 8-01.3(9)AGEOTEXTILEFLOWBURY GEOTEXTILEIN TRENCH4"2' - 0" MIN.2' - 0" MIN.FASTEN GEOTEXTILE TOPOST EVERY 6" (IN.) O.C.4"BACKFILLED &COMPACTEDNATIVE SOILFASTEN TO POSTEVERY 6" O.CSELF-LOCKING TIE~NYLON 6/6 (MIN. GRADE),120# MIN. TENSILE STRENGTH, UV STABILIZEDPOST~ WOOD OR STEEL(TYPICAL)4.DURING EXCAVATION, MINIMIZE DISTURBING THE GROUNDAROUND TRENCH AS MUCH AS IS FEASIBLE, AND SMOOTHSURFACE FOLLOWING EXCAVATION TO AVOID CONCENT-RATING FLOWS. COMPACTION MUST BE ADEQUATE TOPREVENT UNDERCUTTING FLOWS.Install the ends of the silt fence to point slightly upslope to preventsediment from flowing around the ends of the fence.Perform maintenance in accordance with Standard Specifications8-01.3(9)A and 8-01.3(15).Splices shall never be placed in low spots or sump locations. Ifsplices are located in low or sump areas, the fence may need to bereinstalled unless the Project Engineer approves the installation.Install silt fencing parallel to mapped contour l
ines.3/22/13SILT FENCEWSDOT-I-30.15-02SHEET 1 OF 1 SHEETHIGH VISIBILITYSILT FENCE(STEEL POSTS SHOWN)FABRIC (GEOTEXTILE)(TYPICAL)SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHERTO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THEFENCE AT THE OVERLAP. JOINING SECTIONS SHALL NOT BE PLACEDIN LOW SPOTS OR IN SUMP LOCATIONS.(WOOD POSTS SHOWN)FASTEN GEOTEXTILE TOPOST EVERY 6" (IN.)
O.C.SEE NOTE 1SEE NOTE 1GEOTEXTILE FOR HIGH VISIBILITY SILT FENCECOLOR - ORANGE ~ SEE STANDARDSPECIFICATION SECTION9-33.2 (1), TABLE 6~~POST ~ SEE STD.SPEC. 8-01.3(9)AGEOTEXTILEFLOWBURY GEOTEXTILEIN TRENCHBACKFILLED &COMPACTEDNATIVE SOIL(STEEL POSTS SHOWN)FASTEN GEOTEXTILE TOPOST EVERY 6" (IN.) O.C.TYPICAL HIGH VISIBILITY SILT FENCEWITHOUT BACKUP SUPPORTPOST ~WOOD OR STEEL(TYPICAL)SELF-LOCKING TIE~NYLON 6/6 (MIN. GRADE),120# MIN. TENSILE STRENGTH, UV STABILIZED1.2.3.4.DURING EXCAVATION, MIN
IMIZE DISTURBING THE GROUNDAROUND TRENCH AS MUCH AS IS FEASIBLE, AND SMOOTHSURFACE FOLLOWING EXCAVATION
TO AVOID CONCENT-RATING FLOWS. COMPACTION MUST BE ADEQUATE TOPREVENT UNDERCUTTING FLOWS.Install the ends of the high visibility silt fence to po
int slightly upslopeto prevent sediment from flowing around the ends of the fence.Perform maintenance in accordance with Standard Specifications8-01.3(9)A and 8-01.3(15).Splices shall never be p
laced in low spots or sump locations. Ifsplices are located in low or sump areas, the fence may need to bereinstalled unless the Project Engineer approves the installation.Install si
lt fencing parallel to mapped contour lines.3/22/13HIGH VISIBILITY SILT FENCEWSDOT-I-30.17-00PROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024E-04OUTSIDE PLANT CONSTRUCTION
(SENECA AVE) COND PROOF PHASE I
UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MNTH.005_ROWE_REN_1643CITY OF RENTON500 SW 16TH ST,RENTON, WAN/AN/AABAS
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP22000438
(Date)(Signature)
Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES