Loading...
HomeMy WebLinkAboutfire comments FIRE & EMERGENCY SERVICES DEPARTMENT M E M O R A N D U M   DATE: April 10, 2012     TO: Rocale Timmons, Associate Planner     FROM: Corey Thomas, Plans Review Inspector     SUBJECT: Springbrook Church of Christ Outbuilding      1. The preliminary fire flow requirement is 1,500 gpm. A minimum of two fire hydrants are required. One fire hydrant is required within 150-feet of the proposed building and one hydrant is required within 300-feet. There are no existing hydrants within 300-feet of the proposed building. A water availability certificate is required from Soos Creek Water and Sewer District. 2. The fire mitigation impact fees are currently applicable at the rate of $0.52 per square foot of commercial area. 3. Fire department apparatus access roads are required to be a minimum of 20-feet wide with 25-feet inside and 45-feet outside turning radius.