HomeMy WebLinkAboutPlan Review Comments PRE 12-020
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:
March 13, 2012
TO:
Jerry Wasser, Planner
FROM:
Arneta Henninger, Plan Review
SUBJECT:
Sons of Haiti Youth Development
301 S 3RD St
PRE 12-020
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-binding and may be subject to modification and/or concurrence by official city decision-makers.
Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal for change of use at the southeast corner of the intersection of S 3rd St and Shattuck Ave S, in Section 18, Township
23N, Range 5E. The following comments are based on the pre-application submittal made to the City of Renton by the applicant.
Water
This site is located in the City of Renton Water service area.
There is an existing 8” watermain located in S 3rd St.
The project appears to be a Tenant Improvement; therefore additional improvements are likely not triggered.
Sanitary Sewer
There is an existing 8” sanitary sewer main located on south side of parcel.
The project appears to be a Tenant Improvement; therefore additional improvements are likely not triggered.
Storm Drainage
There are existing storm drainage facilities in S 3rd St and in Shattuck Ave S.
The project is subject to the City of Renton Amendments to the 2009 King County Surface Water Design. The project appears to be an interior Tenant Improvement; therefore improvements
or reports are likely not triggered.
Street Improvements
The project appears to be a Tenant Improvement; therefore additional offsite improvements are likely not triggered.
General Comments
If triggered utility, drainage, and street improvements will require separate plan submittals prepared according to City of Renton drafting standards by a licensed Civil Engineer.
All plans shall be tied to a minimum of two of the City of Renton Horizontal and Vertical Control Network.
Permit application must include an itemized cost estimate for these improvements. Half of the fee must be paid upon application for building and construction permits, and the remainder
when the permits are issued. There will be additional fees for water service related expenses. See the City of Renton Drafting Standards.