HomeMy WebLinkAboutPlan Review Comments PRE 12-011
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:
February 15, 2012
\g June 14, 2010
TO:
Jerry Wasser, Planner
FROM:
Jan Illian, Plan Review
SUBJECT:
Emeritus Memory Care
71 – SW Victoria Street
PRE 12-011
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-binding and may be subject to modification and/or concurrence by official city decision-makers.
Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal. The following comments are based on the pre-application submittal made to the City of Renton by the applicant.
Water
1. A Reduced Pressure Backflow Assembly (RPBA) will be required to be installed inline of the domestic water meter to the building in an above ground insulated “hot box”, per City standard.
City records do not show a backflow device is installed at the meter at this time.
2. The existing backflow device installed on the fire service line does not meet current Department of Health standards. The check valve assembly will need to be replaced with a double
detector check valve (DDCVA) to meet current standards. The device shall be installed outside in a vault or inside the building in accordance with City of Renton standards.
3. If the applicant increases the size of the existing domestic water or adds new water meter(s), system development fees and new permit fees will be assessed.