Loading...
HomeMy WebLinkAbout22-R-TIR-2016-01-08-PRLM Preliminary Technical Information Report Boun Short Plat Renton, Washington Our Job No. 17625 17625.002.doc TABLE OF CONTENTS 1.0 PROJECT OVERVIEW Figure 1 – Technical Information Report (TIR) Worksheet Figure 2 – Site Location Figure 3 – Drainage Basins, Subbasins, and Site Characteristics Figure 4 – Soils 2.0 CONDITIONS AND REQUIREMENTS SUMMARY 2.1 Analysis of the Core Requirements 2.2 Analysis of the Special Requirements 3.0 OFF-SITE ANALYSIS 4.0 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN A. Existing Site Hydrology B. Developed Site Hydrology C. Performance Standards D. Flow Control System E. Water Quality System 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN 6.0 SPECIAL REPORTS AND STUDIES 7.0 OTHER PERMITS 8.0 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN ANALYSIS AND DESIGN A. Erosion and Sediment Control (ESC) Plan Analysis and Design B. Stormwater Pollution Prevention and Spill (SWPPS) Plan Design 9.0 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT 10.0 OPERATIONS AND MAINTENANCE MANUAL Tab 1.0 17625.002.doc 1.0 PROJECT OVERVIEW The proposed Boun Short Plat is a single-family residential project consisting of 7 lots zoned R8. The project is 1.32 acres in size and contains a single tax parcel (102305-9139). The site is located at the northwest corner of N.E. 10th Street and Duvall Avenue N.E., in a portion of Section 10, Township 23 North, Range 5 East, W.M., in the City of Renton. The site is rectangular in shape, with a panhandle portion along the west side of the site extending approximately 150 feet north. The site is currently undeveloped, consisting mostly of brush and a few trees. There is also a 330-square-foot building on site that will be demolished and removed as part of the proposed development. The site is bound along the east property line by Duvall Avenue N.E. and by Chelan Avenue N.E. to the west. The site is bound by single-family residences to the south and north. Access to the site will be provided by an extension of Chelan Place N.E. north, and a proposed private alley connecting Chelan Place N.E. and Chelan Avenue N.E. On-site soils are mapped as Alderwood gravelly sandy loam. Please refer to the Soils Map in this section. All drainage calculations were modeled as till soils. The project will be constructing frontage improvements consisting of asphalt pavement, curb and gutter, and sidewalk. All on-site roads for this project will have a 20-foot paved width. The topography on site is generally flat, with a low area located near the southwest corner of the site. The site generally slopes from east to west, with approximately 6 feet of topographic relief. The project will be mass graded with cuts and fills balanced on site. The project site consists of two (2) separate Threshold Discharge Areas (TDA), the west TDA and the east TDA. Both TDAs trigger full drainage review as each TDA will contain more than 2,000 square feet of new plus replaced impervious surface. The project proposes to combine the two TDAs via a surface water adjustment, which will be submitted to the City of Renton separate from this report. The drainage facilities are required to meet the requirements of the 2009 King County Surface Water Design Manual (KCSWDM), and the 2010 City of Renton Amendments to the KCSWDM. The drainage design shall meet, at a minimum, the Flow Control Duration Standard (Forested Conditions), and Basic Water Quality Treatment. The drainage facility located in Tract A is a combination detention/wetvault, sized for Level 2 Flow Control. The wetvault will be sized pursuant to the 2009 KCSWDM and its amendments to ensure that the Basic Water Quality requirements are met. KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 2009 Surface Water Design Manual 1/1/09 1 17625.003.doc Part 1 PROJECT OWNER AND PROJECT ENGINEER Part 2 PROJECT LOCATION AND DESCRIPTION Project Owner Kent Khnor, Warring Properties Phone (425) 453-6227 Address 845 106th Avenue N.E., Suite 200 Bellevue, WA 98044 Project Engineer Chris Jensen, P.E. Company Barghausen Consulting Engineers , Inc. Phone (425) 251-6222 Project Name Boun Short Plat DDES Permit # N/A Location Township 23 North Range 5 East Section 10 Site Address NWC of N.E. 10th Street & Duvall Avenue N.E. Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS Landuse Services Subdivision / Short Subd. / UPD Building Services M/F / Commercial / SFR Clearing and Grading Right-of-Way Use Other DFW HPA COE 404 DOE Dam Safety FEMA Floodplain COE Wetlands Other Shoreline Management Structural Rockery/Vault/ ESA Section 7 Part 5 PLAN AND REPORT INFORMATION Technical Information Report Type of Drainage Review Full / Targeted / (circle): Large Site Date (include revision 11/17/15 dates): Date of Final: TBD Site Improvement Plan (Engr. Plans) Type (circle one): Full / Modified / Small Site Date (include revision dates): Date of Final: TBD Part 6 ADJUSTMENT APPROVALS Type (circle one): Standard / Complex / Preapplication / Experimental / Blanket Description: (include conditions in TIR Section 2) Combine two threshold discharge areas Date of Approval: KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 2009 Surface Water Design Manual 1/1/09 2 17625.003.doc Part 7 MONITORING REQUIREMENTS Monitoring Required: Yes / No Start Date: Completion Date: Describe: Part 8 SITE COMMUNITY AND DRAINAGE BASIN Community Plan : Special District Overlays: Drainage Basin: Lower Cedar River Basin Stormwater Requirements: Part 9 ONSITE AND ADJACENT SENSITIVE AREAS River/Stream Lake Wetlands Closed Depression Floodplain Other Steep Slope Erosion Hazard Landslide Hazard Coal Mine Hazard Seismic Hazard Habitat Protection Part 10 SOILS Soil Type Slopes Erosion Potential Alderwood Gravelly Sandy Loam 8-15% Low High Groundwater Table (within 5 feet) Sole Source Aquifer Other Seeps/Springs Additional Sheets Attached KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 2009 Surface Water Design Manual 1/1/09 3 17625.003.doc Part 11 DRAINAGE DESIGN LIMITATIONS REFERENCE LIMITATION / SITE CONSTRAINT Core 2 – Offsite Analysis Sensitive/Critical Areas SEPA Other Additional Sheets Attached Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area) Threshold Discharge Area: (name or description) Site Threshold Discharge Area (East and West to be combined) Core Requirements (all 8 apply) Discharge at Natural Location Number of Natural Discharge Locations: 1 Offsite Analysis Level: 1 / 2 / 3 dated: 11/17/15 Flow Control Level: 1 / 2 / 3 or Exemption Number (incl. facility summary sheet) Small Site BMPs Conveyance System Spill containment located at: Erosion and Sediment Control ESC Site Supervisor: TBD Contact Phone: After Hours Phone: Maintenance and Operation Responsibility: Private / Public If Private, Maintenance Log Required: Yes / No Financial Guarantees and Provided: Yes / No Liability Water Quality Type: Basic / Sens. Lake / Enhanced Basic / Bog (include facility summary sheet) or Exemption No. Landscape Management Plan: Yes / No Special Requirements (as applicable) Area Specific Drainage Type: CDA / SDO / MDP / BP / LMP / Shared Fac. / None Requirements Name: Floodplain/Floodway Delineation Type: Major / Minor / Exemption / None 100-year Base Blood Elevation (or range): Datum: Flood Protection Facilities Describe: Source Control Describe landuse: (comm./industrial landuse) Describe any structural controls: KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 2009 Surface Water Design Manual 1/1/09 4 17625.003.doc Oil Control High-use Site: Yes / No Treatment BMP: Maintenance Agreement: Yes / No with whom? Other Drainage Structures Describe: Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION Clearing Limits Cover Measures Perimeter Protection Traffic Area Stabilization Sediment Retention Surface Water Control Dewatering Control Dust Control Flow Control MINIMUM ESC REQUIREMENTS AFTER CONSTRUCTION Stabilize Exposed Surfaces Remove and Restore Temporary ESC Facilities Clean and Remove All Silt and Debris Ensure Operation of Permanent Facilities Flag Limits of SAO and open space preservation areas Other Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch) Flow Control Type/Description Water Quality Type/Description Detention Infiltration Regional Facility Shared Facility Flow Control BMPs Other Vault Biofiltration Wetpool Media Filtration Oil Control Spill Control Flow Control BMPs Other KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 2009 Surface Water Design Manual 1/1/09 5 17625.003.doc Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS Drainage Easement Covenant Native Growth Protection Covenant Tract Other Cast in Place Vault Retaining Wall Rockery > 4' High Structural on Steep Slope Other Part 17 SIGNATURE OF PROFESSIONAL ENGINEER I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attached Technical Information Report. To the best of my knowledge the information provided here is accurate. Signed/Date Tab 2.0 17625.002.doc 2.0 CONDITIONS AND REQUIREMENTS SUMMARY 2.1 Analysis of the Core Requirements Core Requirement No. 1: Discharge at the Natural Location. Response: Runoff from the west TDA leaves the site near the southwest corner via sheet flow, where it is then collected by the existing storm system within Chelan Avenue N.E. The proposed detention vault will discharge to the existing storm system within Chelan Avenue N.E. Runoff from the east TDA leaves the site along the east property line, where it is collected by a roadside ditch and conveyed north along Duvall Avenue N.E. The two TDAs will be combined per a surface water adjustment. Core Requirement No. 2: Off-Site Analysis. Response: An off-site analysis has been performed pursuant to the 2009 KCSWDM. See Section 3.0 for the Level 1 Off-Site Drainage Analysis. Core Requirement No. 3: Flow Control. Response: Flow Control Duration Standard (Forested Conditions) is required. Flow control requirements will be met by a detention vault designed pursuant to the 2009 KCSWDM and the 2010 City of Renton Amendments to the KCSWDM. See Section 4.0 for more information. Core Requirement No. 4: Conveyance System. Response: The conveyance system has been designed pursuant to the 2009 KCSWDM and the 2010 City of Renton Amendments to the KCSWDM. Conveyance calculations and backwater analysis will be provided during final engineering. Core Requirement No. 5: Erosion and Sediment Control. Response: Temporary erosion control measures will be provided during final engineering. Core Requirement No. 6: Maintenance and Operations. Response: All proposed storm structures will be publicly maintained by the City of Renton; therefore, no Operation and Maintenance Manuals are required. Core Requirement No. 7: Financial Guarantees and Liability. Response: The project will provide a Site Improvement Bond Quantity Worksheet to establish a bond amount for drainage facility restoration and site stabilization financial guarantee prior to construction. Core Requirement No. 8: Water Quality. Response: Basic Water Quality is required for this project. This requirement is met by a wetvault. The wetvault is in combination with the detention vault, and sizing will be completed during final engineering. 17625.002.doc 2.2 Analysis of the Special Requirements Special Requirement No. 1: Other Adopted Area-Specific Requirements. Response: The proposed project is not located in a designated Critical Drainage Area. Special Requirement No. 2: Flood Hazard Area Delineation. Response: As indicated by the FEMA Map included in this report, the proposed site does not lie within a floodplain or floodway of a stream, so this special requirement does not apply. Special Requirement No. 3: Flood Protection Facilities. Response: The project does not rely on an existing flood protection facility or propose to modify or construct a new flood protection facility, so this special requirement does not apply. Special Requirement No. 4: Source Control. Response: The project does not require a commercial building or commercial site development permit; therefore, this special requirement does not apply. Special Requirement No. 5: Oil Control. Response: This site is not classified as a High Use Site given the criteria in the 2009 KCSWDM; therefore, this special requirement does not apply. Special Requirement No. 6: Aquifer Protection Area. Response: The project site is not located within an Aquifer Protection Area; therefore, this special requirement does not apply. Tab 3.0 17625.002.doc 3.0 OFF-SITE ANALYSIS The Level 1 Off-Site Drainage Analysis is included in this section. LEVEL 1 OFF-SITE DRAINAGE ANALYSIS Boun Short Plat NWC of N.E. 10th Street and Duvall Avenue N.E. Renton, Washington Prepared for: Kent Khnor Warring Properties 845 106th Avenue N.E., Suite 200 Bellevue, WA 98044 January 6, 2016 Our Job No. 17625 CIVIL ENGINEERING, LAND PLANNING, SURVEYING 18215 72ND AVENUE SOUTH KENT, WA 98032 (425) 251-6222 (425) 251-8782 FAX BRANCH OFFICES ¨ TUMWATER, WA ¨ LONG BEACH, CA ¨ ROSEVILLE, CA ¨ SAN DIEGO, CA www.barghausen.com 17625.004.doc TABLE OF CONTENTS TASK 1 STUDY AREA DEFINITION AND MAPS EXHIBIT A Vicinity Map EXHIBIT B Downstream Drainage Map EXHIBIT C Upstream Basin Map TASK 2 RESOURCE REVIEW EXHIBIT D FEMA Map EXHIBIT E Sensitive Areas Folios EXHIBIT F SCS Soils Map EXHIBIT G Assessor’s Map EXHIBIT H Wetland Inventory Map EXHIBIT I Basin Reconnaissance Summary Report TASK 3 FIELD INSPECTION 3.1 Conveyance System Nuisance Problems (Type 1) 3.2 Severe Erosion Problems (Type 2) 3.3 Severe Flooding Problems (Type 3) EXHIBIT J Off-Site Analysis Drainage System Table TASK 4 DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS EXHIBIT K Drainage Complaints TASK 5 MITIGATION OF EXISTING OR POTENTIAL PROBLEMS 17625.004.doc TASK 1 STUDY AREA DEFINITION AND MAPS The proposed Boun Short Plat is a single-family residential project consisting of 7 lots zoned R8. The project is 1.32 acres in size and contains a single tax parcel (102305-9139). The site is located at the northwest corner of N.E. 10th Street and Duvall Avenue N.E., in a portion of Section 10, Township 23 North, Range 5 East, W.M., in the City of Renton. The site is rectangular in shape, with a panhandle portion along the west side of the site extending approximately 150 feet north. The site is currently undeveloped, consisting mostly of brush and a few trees. There is also a 330-square-foot building on site that will be demolished and removed as part of the proposed development. The site is bound along the east property line by Duvall Avenue N.E. and by Chelan Avenue N.E. to the west. The site is bound by single-family residences to the south and north. Access to the site will be provided by an extension of Chelan Place N.E. north, and a proposed private alley connecting Chelan Place N.E. and Chelan Avenue N.E. On-site soils are mapped as Alderwood gravelly sandy loam. Please refer to the Soils Map in this section. All drainage calculations were modeled as till soils. The project will be constructing frontage improvements consisting of asphalt pavement, curb and gutter, and sidewalk. All on-site roads for this project will have a 20-foot paved width. The topography on site is generally flat, with a low area located near the southwest corner of the site. The site generally slopes from east to west, with approximately 6 feet of topographic relief. The project will be mass graded with cuts and fills balanced on site. The drainage facilities are required to meet the requirements of the 2009 King County Surface Water Design Manual (KCSWDM), and the 2010 City of Renton Amendments to the KCSWDM. The drainage design shall meet, at a minimum, the Flow Control Duration Standard (Forested Conditions), and Basic Water Quality Treatment. The drainage facility located in Tract A is a combination detention/wetvault, sized for Level 2 Flow Control. The wetvault will be sized pursuant to the 2009 KCSWDM and its amendments to ensure that the Basic Water Quality requirements are met. The site is comprised of two separate Threshold Discharge Areas (TDA): TDA 1 (west) and TDA 2 (east). Runoff from TDA 1 generally sheet flows south and west, where it leaves the site near the southwest corner of the site. Stormwater runoff is then collected by an existing storm system within Chelan Avenue N.E. Runoff from TDA 2 generally sheet flows east and north, where it leaves the site along the east property line. Stormwater runoff is collected by a roadside ditch just west of Duvall Avenue N.E. and conveyed north. UPSTREAM DRAINAGE ANALYSIS The site is a localized high point, and receives negligible upstream runoff from adjacent properties. 17625.004.doc TASK 2 RESOURCE REVIEW · Adopted Basin Plans: The site is located within the Lower Cedar River Basin. Refer to Appendix A for the portions of the basin that applies to this project. · Finalized Drainage Studies: This is not applicable. · Basin Reconnaissance Summary Report: This site is located in the Lower Cedar River Basin, which is covered by the Lower Cedar River Basin and Nonpoint Pollution Action Plan dated July 1997 (included in Appendix A) · Critical Drainage Area Maps: The project will not discharge to any critical areas or wetlands. · Floodplain and Floodway FEMA Maps: Please see the enclosed FEMA Map (also in Section 1.0 of the TIR) utilized for analysis. As indicated on the map, the site is located in Zone X and is outside of the 500-year floodplain. · Other Off-Site Analysis Reports: A review of the Basin Reconnaissance Summary Report and a site investigation were conducted in preparation of this Level 1 Off-Site Drainage Analysis. The United States Department of Agriculture Soils Conservation Service Map is also provided within Exhibit F. To our knowledge and research, there are no other reports available on file with the City of Renton for this sub-basin and project site. · Sensitive Areas Folios: Based on review of the King County Sensitive Areas Map Folios, the site does not contain any On-Site Wetlands, Erosion Areas, Sensitive Areas, or Landslide Areas. · Road Drainage Problems: This is not applicable. · United States Department of Agriculture King County Soils Survey: Based on the Soils Map Exhibit F) for this area, the site is underlain with Alderwood gravelly sandy loam. The soils were modeled as till soils. · Wetland Inventory Map: From the May Creek Wetland Inventory Report, there is no known documentation or inventory of wetlands for the project site. · Migrating River Studies: This is not applicable. · City of Renton Aquifer Protection Zones: Per the City of Renton's GIS Map, the project site is not located within an Aquifer Recharge Area. 17625.004.doc TASK 3 FIELD INSPECTION 3.1 Conveyance System Nuisance Problems (Type 1) Conveyance system nuisance problems, in general, are defined as any existing or predicted flooding or erosion that does not constitute a severe flooding or erosion problem. Conveyance system nuisance problems are defined as flooding or erosion that results in the overflow of the constructed conveyance system for runoff events less than or equal to a 10-year event. Examples include inundation of a shoulder or lane of a roadway. Examples include overflows collecting in yards or pastures, shallow flows across driveways, minor flooding in crawlspaces or unheated garages/outbuildings, and minor erosion. There were no conveyance system nuisance problems observed during the site visit. Furthermore, based on review of drainage complaints received from the City of Renton, there is no evidence of past conveyance system nuisance problems occurring in the direct downstream drainage course for both TDAs. 3.1 Conveyance System Nuisance Problems (Type 1) Conveyance system nuisance problems are minor but chronic flooding or erosion problems that result from the overflow of a constructed conveyance system that is substandard or has become too small as a result of upstream development. Such problems warrant additional attention because of their chronic nature and because they result from the failure of a conveyance system to provide a minimum acceptable level of protection. There were no conveyance system nuisance problems observed during the site visit. This site will have a Level 2 Flow Control facility, which will restrict the flow of the 2-year release rate to 50 percent of the pre-developed site and will provide adequate mitigation to prevent any future drainage complaints as a result of this proposed site development. 3.2 Severe Erosion Problems (Type 2) Severe erosion problems are defined as downstream channels, ravines, or slopes with evidence of or potential for erosion/incision, sufficient to pose a sedimentation hazard to downstream conveyance systems or propose a landslide hazard by undercutting adjacent slopes. Severe erosion problems do not include roadway or minor ditch erosion. Based on the site visit, there was no evidence of, or potential for, erosion/incision sufficient to pose a sedimentation hazard downstream within the limits of the study. Stormwater runoff from the site will be collected and conveyed to a detention and water quality facility where it will then be discharged off site. As a result, no future erosion problems should occur downstream because of this development. 3.3 Severe Flooding Problems (Type 3) Severe flooding problems can be caused by conveyance system overflows or the elevated water surfaces of ponds, lakes, wetlands, or closed depressions. Severe flooding problems are defined as follows: · Flooding of the finished area of a habitable building for runoff events less than or equal to the 100-year event. Examples include flooding of finished floors of homes and commercial or industrial buildings. Flooding in electrical/heating systems and components in the crawlspace or garage of a home. Such problems are referred to as "severe building flooding problems." 17625.004.doc · Flooding over all lanes of a roadway or severely impacting a sole access driveway for runoff events less than or equal to the 100-year event. Such problems are referred to as "severe roadway flooding problems." Based on a review of the FEMA Map (Exhibit D) the proposed site is outside of the 500-year floodplain, and there is no evidence of severe flooding problems encountered during our visit. 17625.004.doc TASK 4 DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS DOWNSTREAM DRAINAGE ANALYSIS: West TDA In the pre-developed condition, runoff from the west TDA sheet flows to the south west corner, where it leaves the site via sheet flow. The runoff is then collected by the existing stormwater system within Chelan Avenue N.E. Once collected, the stormwater is conveyed approximately 185 feet via existing storm drains west via the storm drain system within N.E. 10th Street and then discharged into an existing regional stormwater pond (Facility ID No. 111336) approximately 500 feet west of the site. Once detained, the stormwater is discharged back into the existing storm system in N.E. 10th Street, where it continues to be conveyed west to the storm system within Anacortes Avenue N.E. From there, it is conveyed north along Anacortes Avenue N.E. approximately 850 feet, bringing the total distance off site to approximately 1,350 feet (1/4 mile) where the downstream was terminated. In the developed condition, stormwater runoff will be collected and conveyed by the proposed on-site conveyance system to the proposed detention vault. From there, it will be discharged into the existing stormwater system within Chelan Avenue N.E. and maintain the downstream flowpath of the existing conditions. We believe that the proposed development will not significantly increase the amount of runoff entering the existing storm system within Chelan Avenue N.E. DOWNSTREAM DRAINAGE ANALYSIS: East TDA In the pre-developed condition, runoff from the east TDA sheet flows east, where it leaves the site along the east property line and is collected by an existing roadside ditch along the west side of Duvall Avenue N.E. Once collected, stormwater runoff sheet flows north within the ditch approximately 760 feet where it is collected by an existing stormwater system along the west side of Duvall Avenue N.E. Runoff continues north within the existing storm system for more than 560 feet, totaling 1,320 feet (1/4 mile) where the downstream was terminated. In the developed condition, stormwater runoff will be collected and conveyed by the proposed on-site conveyance system to the proposed detention vault. The stormwater will no longer be discharged to the existing natural discharge location for the east TDA. A stormwater adjustment will be proposed to combine the two TDAs. We believe that the proposed development will not significantly decrease the amount of runoff entering the existing storm system within Duvall Avenue N.E., as the existing area is undeveloped and relatively small (35,300 sf). Below is a list of drainage complaints within a 1-mile radius for the proposed Boun Short Plat received from Gary Fink at the City of Renton on November 10, 2015: 1. Honey Creek Inlet: Duvall Avenue N.E. / N.E. Sunset Blvd. – Ongoing Maintenance inspection point, clear inlet after significant storm events. · The above complaint is a note for maintenance of an inlet, and will not be affected by the proposed development. 2. Duvall Place N.E., South of N.E. 7th Place – Overtopping of east ditch line, sedimentation. Dec 2014. · This complaint is located south of the site, and is not within the downstream drainage course. 17625.004.doc 3. N.E. 6th St / Duvall Ave NE – Flooding of Right of Way at NE corner of intersection. Obstruction of drain inlet & outfall to wetland. Nov 2013. · This complaint is located south of the site, and is not within the downstream drainage course. 4. NE 5th St / Duvall Ave NE – Ongoing Maintenance inspection point, inspect / clear wetland outfall after significant storm events. · This complaint is located south of the site, and is not within the downstream drainage course. 5. NE 5th Ct / Union Ave NE – Blocked grate at wetland outlet, NE corner of intersection. Grate/Structure replaced May 2013. · This complaint is located south of the site, and is not within the downstream drainage course. 6. 4810 NE 4th – Ongoing Maintenance inspection point. Blocked inlet results in localized right-of- way flooding at NE 4th. · This complaint is located south of the site, and is not within the downstream drainage course. 1 Colleen Allen From:Gary Fink <GFink@Rentonwa.gov> Sent:Tuesday, November 10, 2015 11:09 AM To:Colleen Allen Subject:Boun Short Plat / Barghausen Job #17625 Drainage Complaint History - Renton Good Morning Colleen, Sorry to run late on this request….let me know if you have any questions. Gary The following are the documented drainage issues within a one-mile radius of the Boun Short Plat site. Please note that the information provided is sourced from recorded issues logged in City of Renton drainage complaint records and City Maintenance records and cannot be deemed a comprehensive list of all past issues. · Honey Creek Inlet: Duvall Ave NE / NE Sunset Blvd – Ongoing Maintenance inspection point, clear inlet after significant storm events. · Duvall Pl NE, South of NE 7th Pl – Overtopping of east ditch line, sedimentation. Dec 2014 · NE 6th St / Duvall Ave NE – Flooding of Right of Way at NE corner of intersection. Obstruction of drain inlet & outfall to wetland. Nov 2013 · NE 5th St / Duvall Ave NE – Ongoing Maintenance inspection point, inspect / clear wetland outfall after significant storm events. · NE 5th Ct / Union Ave NE – Blocked grate at wetland outlet, NE corner of intersection. Grate/Structure replaced May 2013 · 4810 NE 4th – Ongoing Maintenance inspection point. Blocked inlet results in localized right-of-way flooding at NE 4th. Refer to King County IMap drainage complaint maps for historic drainage issues prior to annexation. Best Regards, Gary Fink City of Renton Utility Systems Division - Surface Water Utility Phone:(425) 430-7392 / Fax:(425) 430-7241 GFink@RentonWa.gov 17625.004.doc TASK 5 MITIGATION OF EXISTING OR POTENTIAL PROBLEMS No existing or potential problems were found during our site inspection. The proposed plan design within the 2009 KCSWDM and the 2010 City of Renton Amendments to the KCSWDM guidelines should have no adverse impact to future drainage conditions. Proposed flow control BMPs will be implemented and formal flow control will be provided to ensure the runoff leaving the site meets the requirements for the Conservation Flow Control (Level 2). Tab 4.0 17625.002.doc 4.0 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN A. Existing Site Hydrology The site is rectangular in shape, with a panhandle portion along the west side of the site extending approximately 150 feet north. The site is currently undeveloped, consisting mostly of brush and a few trees. There is also a 330-square-foot building on site that will be demolished and removed as part of the proposed development. The site is bound along the east property line by Duvall Avenue N.E. and by Chelan Avenue N.E. to the west. The site is bound by single-family residences to the south and north. Access to the site will be provided by an extension of Chelan Place N.E. north, and a proposed private alley connecting Chelan Place N.E. and Chelan Avenue N.E. There are two separate Threshold Discharge Areas (TDA) located on site. Runoff from the West TDA leaves the site near the southwest corner, where it is collected by an existing storm system located in Chelan Avenue N.E. Runoff from the East TDA leaves the site near the northeast corner, where it sheet flows into an existing roadside ditch, and continues in the ditch north along Duvall Avenue N.E. eventually discharging into Honey Creek. The project proposes to combine the two threshold discharge areas. B. Developed Site Hydrology The completed project will create 7 single-family lots. The total developed area will be 1.32 acres in size. New impervious surfaces will include roadways, driveways, sidewalks, and roof areas. The project will be providing a drainage facility. A conveyance system consisting of catch basins and storm drain pipes will be constructed in the roadways to collect drainage from the site and convey the runoff to the new drainage facility. A combination detention/wetvault will be constructed in Tract A to provide water quality and flow control for the project. The pond will contain a control structure fitted with a riser overflow. Stormwater from the vault will be conveyed to the existing stormwater system within Chelan Avenue N.E. The project proposes a single detention vault that combines the runoff from both the West and East TDA's and discharging to the natural discharge location of the West TDA. It is understood that a drainage adjustment will likely be necessary to divert flows as proposed. The vault was designed in accordance with Level 2 Flow Control methodology matching historic peaks and durations as outlined in the 2009 KCSWDM and the 2010 City of Renton Amendments to the KCSWDM. However, the diversion of flows from the East TDA to the West TDA will cause a slight increase in peak flows and durations to the West TDA even though the project is matching historic conditions from the entire site. The drainage adjustment would be for the diversion of flows and for the increase in peaks and durations in the West TDA. When attempting to design the mitigated flow to match peaks and durations for the pre-developed West TDA only, it was found that a detention vault could not reasonably be sized to match the extremely small pre-developed peaks and durations. 17625.002.doc C. Performance Standards The KCRTS Runoff Time Series Program was used to size the detention facility. The detention vault was sized for Conservation Flow Control (Level 2) based on the requirements of the 2009 KCSWDM and the 2010 City of Renton Amendments to the KCSWDM. Individual lot BMPs will be applied to an impervious area equal to 10 percent of the lot size for lots less than 11,000 square feet. The BMP credit has been applied to the impervious land cover data, which was used to size the detention vault. Please refer to the KCRTS calculations provided in this section. D. Flow Control System The proposed flow control system will require a drainage adjustment as it cannot feasibly meet the minimum requirements for flow control. The vault will be sized to meet the historical flows of the entire site, rather than the West TDA. As mentioned above, calculations will be provided to show that no conveyance issues will result by the increased flow to the West TDA, and that no stormwater runoff will be taken away from wetlands on the downstream drainage course of the East TDA. Flow Control System details will be submitted during final engineering. E. Water Quality System A wetvault will be used for water quality. Sizing of the wetvault will be prepared during final engineering. Tab 5.0 17625.002.doc 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN Conveyance system analysis will be provided in final engineering. Tab 6.0 17625.002.doc 6.0 SPECIAL REPORTS AND STUDIES The following special reports and studies are included: 6.1 Arborist Report prepared by Greenforest Inc. dated October 14, 2015.  Greenforest  Incorporated     C  o  n  s  u  l  t  i  n  g            A  r  b  o  r  i  s  t       4547  South  Lucile  Street,  Seattle,  WA  98118                          Tel.    206-­‐723-­‐0656       October  14,  2015     Kent  Khnor   26721  106th  Ave  SW   Kent  WA  98030     RE:  Arborist  Report,  Boun  Short  Plat,  Parcel  No.  1023059139     You  contracted  my  services  as  a  consulting  arborist.    My  assignment  is  to:     1. Inspect  and  inventory  5  significant  trees  as  shown  on  preliminary  tree  retention   plan.   2. Confirm  significant  tree  quantity  on  site.   3. Record  tree  species,  diameter,  dripline  and  visible  defects.     4. Assess  tree  health  and  structure.   5. Prepare  a  written  report  of  findings.     I  received  a  preliminary  tree  retention  plan  from  Ivana  Halvorsen,  of  Barghausen   Consulting  Engineers,  Inc.,  locating  5  significant  trees.    I  visited  the  site  10/6/15  and   performed  a  field  inspection.    The  site  is  flat  and  covered  mostly  in  unmanaged   brambles.    I  inspected  the  5  surveyed  trees  plus  an  additional  2  trees  of  significant  size,   which  are  the  subject  of  this  report.    Six  of  the  7  trees  are  Douglas-­‐fir,  and  range  in  size   from  6  to  30  inches  DBH.    The  seventh  tree  is  a  red  alder.     TREE  INSPECTION  –  Tree  Health,  Condition  and  Viability   I  marked  each  tree  with  1”  x  3.5”  aluminum  tag  indicating  tree  number.  I  visually   inspected  each  tree  from  the  ground  and  rated  both  tree  health  and  structure.       A  tree’s  structure  is  distinct  from  its  health.    This  inspection  identifies  what  is  visible   with  both.    Structure  is  the  way  the  tree  is  put  together  or  constructed,  and  identifying   obvious  defects  can  be  helpful  in  determining  if  a  tree  is  predisposed  to  failure.    Tree   health  assesses  disease,  insect  infestation  and  old  age.     No  invasive  procedures  were  performed  on  any  trees.  The  results  of  this  inspection  are   based  on  what  was  visible  at  the  time  of  the  inspection.       Kent  Khnor   RE:  Arborist  Report,  Boun  Short  Plat,  Parcel  No.  1023059139   October  14,  2015   Page  2  of  7     Greenforest    Registered  Consulting  Arborist     The  table  below  summarizes  my  inspection  results  and  provides  the  following   information  for  each  tree:     Tree  number  as  shown  on  tag  in  the  field.   Tree  Species  Common  name.   DBH  Stem  diameter  in  inches  measured  4.5  feet  from  the  ground.   Dripline  Average  branch  extension  from  the  trunk  as  radius  in  feet.   Tree  Class  Tree,  Significant:  A  tree  with  a  caliper  of  at  least  six  inches  (6"),  or  an   alder  or  cottonwood  tree  with  a  caliper  of  at  least  eight  inches  (8").  Tree,   Landmark:  A  tree  with  a  caliper  of  thirty  inches  (30")  or  greater.   Tree  Status  Indicates  if  tree  will  be  saved  or  removed.   Dangerous,  Dead  Or  Viable?    Tree,  Dangerous:  Any  tree  that  has  been  certified   as  dead,  terminally  diseased,  damaged,  or  otherwise  dangerous  to  persons   or  property  by  a  licensed  landscape  architect,  or  certified  arborist,  and  for   healthy  trees,  a  determination  by  the  arborist  whether  the  tree  is  viable  for   retention.   Visible  defects  Obvious  structural  defects  or  diseases  visible  at  time  of   inspection.     One  tree  has  been  injured  repeatedly  with  a  hatchet.  Its  trunk  is  wounded  and  it  is  the   only  tree  not  viable  for  retention.    A  couple  dozen  red  alders  are  growing  along  the  east   side  of  the  site,  though  only  1  is  of  significant  size.      Tree  No.  Species    DBH  Dripline  Tree  Class  Status:    Save  Or  Remove  Dangerous,  Dead  Or  Viable?  Visible  Defects   1  Douglas-­‐fir  20”  14'     Significant  Remove  Dangerous   Hatchet  injury  on  trunk;   sequoia  pitch  moth   infestation.   2  Douglas-­‐fir  16”  12’  Significant  Remove  Viable    3  Douglas-­‐fir  12”  16’  Significant  Remove  Viable    4  Douglas-­‐fir  30”  18’  Landmark  Remove  Viable    5  Douglas-­‐fir  28”  16’  Significant  Remove  Viable    6  Douglas-­‐fir  6”  6’  Significant  Remove  Viable    7  Red  alder  9”  12’  Significant  Remove  Viable           Kent  Khnor   RE:  Arborist  Report,  Boun  Short  Plat,  Parcel  No.  1023059139   October  14,  2015   Page  3  of  7     Greenforest    Registered  Consulting  Arborist     Minimum  Tree  Density   For  detached  single-­‐family  development,  two  (2)  significant  trees  are  required  for  every   five  thousand  (5,000)  sq.  ft.  of  lot  area,  or  the  gross  equivalent  of  caliper  inches   provided  by  one  (1)  or  more  retained  tree.    Since  no  trees  are  retained,  supplemental   trees  are  necessary  to  meet  the  minimum  tree  density  requirement.    The  following  table   lists  the  proposed  7  lots  by  number,  size  (SF),  minimum  significant  tree  requirement,   new  trees  proposed  for  each  Lot,  retained  trees  on  each  Lot,  and  compliance  with  the   minimum  tree  density  requirement.    Fifteen  supplemental  trees  are  required  for   compliance.     Lot  Size  (SF)   Min.  Significant   Trees  Required   New   Trees1   Retained   Trees  Compliant   1  5002  2  2  0  Yes   2  5741  2  2  0  Yes   3  5890  2  2  0  Yes   4  6075  2  2  0  Yes   5  5658  2  2  0  Yes   6  5657  2  2  0  Yes   7  6453  3  3  0  Yes       The  project  landscape  architect  shall  address  location,  species,  planting  and   maintenance  specifications  for  supplemental  trees  under  separate  cover.       The  smaller  Doug-­‐firs  and  alder  trees  proposed  for  removal  stand  alone  on  this  parcel   (1,  2,  3,  6,  7,).    Only  smaller  trees  and  brambles  surround  them.    There  are  no  nearby   trees  that  will  remain,  either  on  this  site  or  on  adjoining  parcels  that  could  be  impacted   by  their  removal.         The  two  trees  within  the  right-­‐of-­‐way  are  edge  trees  (4,  5),  and  have  been  pruned   heavily  because  of  adjacent  overhead  power  lines.      East  of  these  two  trees  is  a  stand  of   other  mature  Douglas-­‐fir  on  the  adjoining  parcels.    Although  all  these  trees  are  in  a   contiguous  canopy  group,  they  have  sufficient  spacing  to  allow  good  trunk  taper  and   moderate  live  crown  ratios.    Further,  mature  trees  across  the  street  to  the  west  will   continue  to  provide  wind  buffer.    The  impact  to  adjacent  trees  will  be  negligible  to   minor  from  the  removal  of  the  two  ROW  trees.                                                                                                                         1    When  the  required  number  of  protected  trees  cannot  be  retained,  replacement  trees,  with  at  least  a  two-­‐inch  (2")   caliper  or  an  evergreen  at  least  six  feet  (6')  tall,  shall  be  planted.       Kent  Khnor   RE:  Arborist  Report,  Boun  Short  Plat,  Parcel  No.  1023059139   October  14,  2015   Page  4  of  7     Greenforest    Registered  Consulting  Arborist       Thank  you  for  your  business.    Please  let  me  know  if  you  have  any  questions.     Sincerely,       GreenForest,  Inc.       By  Favero  Greenforest,  M.  S.             ISA  Certified  Arborist  #  PN  -­‐0143A     ASCA  Registered  Consulting  Arborist®  #379   ISA  Tree  Risk  Assessment  Qualified     Attachments:   1. Assumptions  and  Limiting  Conditions   2. Color  Images  of  Site   3. Site  Plan       Kent  Khnor   RE:  Arborist  Report,  Boun  Short  Plat,  Parcel  No.  1023059139   October  14,  2015   Page  5  of  7     Greenforest    Registered  Consulting  Arborist       Attachment  No.  1  -­‐  Assumptions  &  Limiting  Conditions     1) A  field  examination  of  the  site  was  made  10/6/15.      My  observations  and   conclusions  are  as  of  that  date.     2) Care  has  been  taken  to  obtain  all  information  from  reliable  sources.    All  data  has   been  verified  insofar  as  possible;  however,  the  consultant/arborist  can  neither   guarantee  nor  be  responsible  for  the  accuracy  of  information  provided  by  others.     3) The  consultant/appraiser  shall  not  be  required  to  give  testimony  or  to  attend   court  by  reason  of  this  report  unless  subsequent  contractual  arrangements  are  made.     4) Loss  or  alteration  of  any  part  of  this  report  invalidates  the  entire  report.       5) Unless  required  by  law  otherwise,  possession  of  this  report  or  a  copy  thereof   does  not  imply  right  of  publication  or  use  for  any  purpose  by  any  other  than  the  person   to  whom  it  is  addressed,  without  the  prior  expressed  written  or  verbal  consent  of  the   consultant/appraiser.     6) This  report  and  any  values/opinions  expressed  herein  represent  the  opinion  of   the  consultant/appraiser,  and  the  consultant’s/appraiser’s  fee  is  in  no  way  contingent   upon  the  reporting  of  a  specified  value,  a  stipulated  result,  the  occurrence  of  a   subsequent  event,  nor  upon  any  finding  to  be  reported.     7) Construction  activities  can  impact  trees  in  unpredictable  ways.    All  retained  trees   should  be  inspected  at  the  competition  of  construction,  and  regularly  thereafter  as  part   of  ongoing  maintenance.                             Kent  Khnor   RE:  Arborist  Report,  Boun  Short  Plat,  Parcel  No.  1023059139   October  14,  2015   Page  6  of  7     Greenforest    Registered  Consulting  Arborist       Attachment  No.  2  –   Color  Images  of   Site                                                                           BOUN SHORT PLAT BOUN SHORT PLATKent KhnorRE: Arborist Report, Boun Short Plat, Parcel No. 1023059139 October 14, 2015Page 7 of 7Attachment No. 3 – Site Plan Tab 7.0 17625.002.doc 7.0 OTHER PERMITS Postmaster / Mailbox Locations Approval Fire Marshal / Fire Hydrant Locations Approval Street Name Approval King County Metro Transit Approval Construction Stormwater General Permit (Department of Ecology) Hydraulic Project Approval (Department of Fish and Wildlife) Forest Practices Permit (Department of Natural Resources) Tab 8.0 17625.002.doc 8.0 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN ANALYSIS AND DESIGN A. Erosion and Sediment Control (ESC) Plan Analysis and Design An ESC plan will be provided during final engineering. B. Stormwater Pollution Prevention and Spill (SWPPS) Plan Design A SWPPS plan will be provided during final engineering. Tab 9.0 17625.002.doc 9.0 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT This section will be provided during final engineering. Tab 10.0 17625.002.doc 10.0 OPERATIONS AND MAINTENANCE MANUAL This section will be provided during final engineering.