HomeMy WebLinkAbout30_2016-02-24 WN Drainage Report
February 24, 2016
Weston Heights North
Technical Information Report
702 Nile Ave NE, Renton, WA
SDA Project #349-007-15
Prepared for:
Prospect Development, LLC
2913 5th Avenue NE, Ste. 201
Puyallup, WA 98372
CIVIL ENGINEERING | PROJECT MANAGEMENT | PLANNING
1724 W. Marine View Drive, Suite 140, Everett, WA 98201 | 425.486.6533 | www.sdaengineers.com
Weston Heights North
Technical Information Report
Weston Heights North
Technical Information Report
Prepared For:
Prospect Development, LLC
2913 5th Avenue NE, Ste. 201
Puyallup, WA 98372
Prepared By:
SDA Engineers
1724 West Marine View Drive, Ste 140
Everett, WA 98201
(425) 486-6533
Last save by: Jay Anderson on 2/23/16 R:\Projects\349 (prospect development)\007-15 (Weston North)\Technical\Reports\2016-02-24 TIR\2016-02-24 WN Drainage
Report.docm
02-24-16
Weston Heights North
Technical Information Report
TABLE OF CONTENTS
SECTION 1 PROJECT OVERVIEW
Project Overview
Figure 1 – TIR Worksheet
Figure 2 – Vicinity Map
SECTION 2 CONDITIONS AND REQUIREMENTS SUMMARY
SECTION 3 OFF-SITE ANALYSIS
Task 1 – Study Area Definition & Maps
Task 2 – Resource Review
Task 3 – Field Inspection
Task 4 – Drainage System Description and Problem Descriptions
Task 5 – Mitigation of Existing or Potential Problems
Appendix 3A – Downstream Analysis Map and Photos
Appendix 3B – Resource Review Documents
SECTION 4 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
Part A – Existing Site Hydrology
Part B – Developed Site Hydrology
Part C – Performance Standards
Part D – Flow Control System
Part E – Water Quality System
Part F – Wetland Hydrology
Appendix 4A – Flow Control Design Calculations
Appendix 4B – Treatment Design Calculations
Appendix 4C – Wetland Hydroperiod Calculations
SECTION 5 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
SECTION 6 SPECIAL REPORTS AND STUDIES
Appendix 6A – Geotechnical Report
Appendix 6B – Olympus Villa LUA 10-090
Appendix 6C – Olympus Villa As-Built Plans
SECTION 7 OTHER PERMITS
SECTION 8 CSWPPP ANALYSIS AND DESIGN
SECTION 9 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
SECTION 10 OPERATIONS AND MAINTENANCE MANUAL
Weston Heights North
Technical Information Report
SECTION 1
PROJECT OVERVIEW
Weston Heights North
Technical Information Report
Project Overview
The Weston North project proposes the construction of 6 single family lots (1 existing single family
residence to remain with 5 new lots) on two existing parcels totaling approximately 2.47 acres. Frontage
improvements along both Nile Ave NE and NE 7th Pl, as well utility connections to the site are also
proposed. The project occupies King County Tax Parcel Numbers 11230590002 and 947794TR-L, and is
situated in the southwest quarter of Section 11, Township 28 North, Range 5 East, W.M. More
specifically, the project is located on the east side of Nile Ave NE and south side of NE 7th Pl,
approximately 0.4 miles north of the intersection of Nile Ave and NE 4th Street. A vicinity map has been
provided as Figure 2 of this document.
A wetland is located in the southcentral region of the project. This wetland and its surrounding buffer will
remain undisturbed. As a result of these two separate projects, Weston North and Weston Heights,
predeveloped runoff will be directed away from the wetland in order to mitigate developed conditions. An
end goal of this project is to ensure the existing wetland hydroperiod is satisfied in the developed
condition.
The majority of land cover in the Weston North project limits has been developed. The western region
currently houses a single family residence, a detached Quonset hut, shed and garage. The surrounding
area features typical residential landscaping. The eastern region has been previously cleared of the
historic forested vegetation and is currently all grassed area with no tree canopy. The wetland and area
to the east of the wetland, outwards to the projects eastern border, remain forested. The topography of
the combined subject parcel slopes moderately from east to west, with the southcentral section sloping
inwards towards the wetland. The USDA Soil Survey for King county indicates that the site consists of
Alderwood gravelly sandy loam, which is generally characterized as glacial till, with moderate runoff rates
and low capacity for infiltration.
Surface runoff will be detained through three separate facilities in order to avoid concentration of flows.
Surface runoff will be directed to combined detention ponds, and/or a detention vault. Flow control
structures are included to match the historic release rates. A flow spreader will service the Weston
Heights detention pond on the east, spreading flows overland and ultimately into the wetland. New storm
sewer infrastructure will convey storm water from the Weston Heights western detention vault to an
existing roadside ditch along the eastern edge of Nile Ave NE. The Olympus Villa Pond ‘A’ flow control
structure will be reconfigured to satisfy the historic release rates. This meets the requirements for Full
Drainage Review, as described further in Section 4 of this report.
Weston Heights North
Technical Information Report
FIGURE 1
TIR WORKSHEET
Weston Heights North
Technical Information Report
FIGURE 2
VICINITY MAP
Weston Heights North
Technical Information Report
SECTION 2
CONDITIONS AND REQUIREMENTS SUMMARY
Weston Heights North
Technical Information Report
Conditions and Requirements Summary
The project proposes more than 2,000 square feet of new impervious surface area, and is subject to the
provisions for Full Drainage Review as outlined in the 2009 King County stormwater Design Manual
(KCSWDM). Full Drainage Review requires the accommodation of 8 core requirements in addition to 5
special requirements – all of which are listed and discussed below.
Core Requirement #1 – Discharge at Natural Location
The pre-developed drainage discharge locations will be maintained for post-developed
conditions. Drainage improvements consist of implementing additional storm sewer infrastructure
to utilize three separate facilities – the Weston Heights facility serving the eastern developments,
the Weston Heights facility serving the western developments, and the Olympus Villa Pond ‘A’
serving the NE 7th Pl frontage and impervious areas of Lots 2 and 3. The eastern detention
facility will discharge via level spreader into the existing wetland, maintaining the pre-developed
surface water discharge location. The western detention facility will discharge via a new
conveyance system into the existing roadside ditch along Nile Ave NE, maintaining the pre-
developed surface water discharge location. The northern detention facility will discharge via
improved conveyance system into the existing roadside ditch along Nile Ave NE, maintaining the
pre-developed surface water discharge location.
Core Requirement #2 – Offsite Analysis
A thorough off-site analysis is presented in Section 3 of this report.
Core Requirement #3 – Flow Control
Flow control of surface runoff for this site is provided via three detention facilities – the Weston
Heights facility serving the eastern developed area, the Weston Heights facility serving the
western developed area, and the Olympus Villa Pond ‘A’ serving the northern developed areas.
Design calculations for these facility are contained in Section 4 of this report.
Core Requirement #4 – Conveyance System
Stormwater conveyance has been analyzed in Section 5 of this report.
Core Requirement #5 – Erosion & Sediment Control
An erosion and sediment control analysis has been provided in Section 8 of this report.
Core Requirement #6 – Maintenance & Operations
Maintenance and operations of the proposed storm drainage facilities is addressed in Section 10
of this report.
Core Requirement #7 – Financial Guarantees & Liabilities
Financial guarantees and liabilities are addressed in Section 9 of this report.
Core Requirement #8 – Water Quality
The two Weston Heights detention facilities, and Olympus Villa Pond ‘A’ each house permanent
wetpools to allow for settling of solids that are suspended in the stormwater runoff. A discussion
Weston Heights North
Technical Information Report
of the design methodology and calculations for this feature are provided in Section 4 of this
document.
SUMMARY OF SPECIAL REQUIREMENTS
Special Requirement #1 – Other Adopted Area-Specific Requirements
There are no adopted basin plans or area-specific requirements affecting Parcel’s 1123059002
and 947794TR-L. Therefore, the project is exempt from this requirement.
Special Requirement #2 – Flood Hazard Area Delineation
The project site and surrounding area is shown on FEMA Flood Insurance Rate Map No.
53033C0982, and is not located within a flood hazard area. Therefore, the project is exempt from
this requirement. A portion of the FEMA map referenced above is included in Appendix 3-B of
this report.
Special Requirement #3 – Flood Protection Facilities
The project neither relies on an existing flood protection facility, nor proposes a new flood
protection facility, and therefore, is exempt from this requirement.
Special Requirement #4 – Source Control
This project does not require a commercial building or commercial site development permit, and
therefore, is exempt from this requirement.
Special Requirement #5 – Oil Control
This project does not have high-use site characteristics as defined in KCSWDM Section 1.3.5,
and therefore, is exempt from this requirement.
Weston Heights North
Technical Information Report
SECTION 3
OFFSITE ANALYSIS
Weston Heights North
Technical Information Report
Task 1 – Study Area Definitions and Maps
The project’s study area includes the subject parcels, and a flow path extending approximately 1-mile
downstream of the site. An off-site analysis map has been included in Appendix 3A.
Task 2 – Resource Review
The following documents were reviewed, as prescribed by the 2009 King County Surface Water Design
Manual:
Adopted Basin Plans
There are no adopted basin plans which affect the subject property.
Floodplain/Floodway Maps
The project site and surrounding area is shown on FEMA Flood Insurance Rate Map No.
53033C0982, and is not located within a flood hazard area. Therefore, the project is exempt from
this requirement. A portion of the FEMA map referenced above is included in Appendix 3-B of
this report.
Sensitive Areas Folio Maps
The King County Sensitive Areas Folio Maps are outdated, and were not consulted for this
project. However, a search for other sensitive area documents was performed, and the site was
not to contain or be near a coal mine hazard area, erosion hazard area, steep slope, or landslide
hazard area. A wetland area occupies the southcentral portion of the site, but will remain
undisturbed by the project.
Drainage Complaints
No documented downstream drainage complaints were located. The preliminary technical
information report (prepared by others) also found no relevant drainage complaints.
Road Drainage Problems
No road drainage problems were located that would be impacted by the project.
USDA Soil Survey for King County
The USDA Soil Survey for King County indicates that the site is underlain by Alderwood soils,
which are generally characterized as a consolidated till, with moderate runoff rates and little
capacity for infiltration. A portion of the USDA Soil Survey map is included in Appendix 3B.
Wetlands Inventory Mapping
A wetland exists near the middle of the project site.
Migrating River Studies
No migrating river studies were located which affect the subject property.
Weston Heights North
Technical Information Report
DOE 303(d) List of Polluted Waters
The DOE’s Water Quality Assessment Map tool does not identify any 303(d)-listed waterways in
the downstream flowpath within several miles of the site. The project is ultimately tributary to the
Cedar River, which is a 303(d) listed waterway at its discharge point to Lake Washington, but this
is a substantial distance from the site, and the flow contribution from the project site is expected
to be insignificant compared to the full capacity of the river at that point.
King County Designated Water Quality Problems
King County I-Map does not identify the project site as containing or being tributary to any
designated water quality problems.
Task 3 – Field Inspection
A Level 1 Downstream Analysis was prepared in the preliminary design phase by Core Design, and the
photos from that analysis have been provided in Appendix 3A. The project site and downstream flowpath
were visited on the afternoon of June 10, 2015 to verify the findings of that downstream analysis.
Conditions at the time of the visit were warm and sunny, with no significant precipitation having occurred
within the previous few days. No surface runoff was observed at the project site during the site visit.
The downstream flowpath for the west side of the project simply follows a road-side ditch which extends
southerly along the east side of Nile Ave NE. The ditch is primarily grassed, but has been stabilized with
quarry spalls in some locations, and contains a number of culvert crossings beneath various intersections
and driveways. The east half of the project falls to the central wetland area, then flows west where it is
intercepted by the public storm drainage system in Orcas Ave W. This storm system flows to NE 6th
Street, jogs westerly, and then discharges to the road-side ditch in Nile Ave NE.
Task 4 – Drainage System Description and Problem Description
The west half of the project generally falls toward the west, discharging to the road-side ditch along the
east side of Nile Ave NE. The east half of the project generally falls toward the west, and is collected in
the wetland area in the center of the project. Water from this wetland enters an overflow device just north
of Orcas Ave W, then is conveyed to the Nile Ave NE roadside ditch. There were no significant erosion or
sediment issues identified in the downstream system for the ¼-mile analysis distance.
Task 5 – Mitigation of Existing or Potential Problems
No significant hydraulic problems were observed at the project site or downstream. With routine
maintenance to keep debris clear of the ditch/culverts, the downstream system is expected to continue
functioning.
Weston Heights North
Technical Information Report
APPENDIX 3A
DOWNSTREAM ANALYSIS
MAP AND PHOTOS
Project Site
Core Design, Inc. WESTON HEIGHTS Page 6
Level 1 Downstream Analysis
Field Investigation A field investigation was completed on May 21, 2014. The temperature was approximately 60 degrees
and sunny.
The existing site has two residences with gravel driveways and a detached garage. The western quarter of
the site is covered in lawn (surrounding the residences and garage) and the remaining site is forested with
a wetland in the center of the site. The wetland drains south and overflows into a 12-inch storm drain in the Edenwood Plat which continues south to NE 6th Street. From NE 6th Street, the 12-inch storm drain
flows west where it has a confluence with the drainage system on the east side of Nile Avenue NE. Overland flow from the west portion of the site drains west to Nile Avenue NE and drains south in series
of grass or rock lined ditches and culverts on the east side of the street. The open channels range from a depth of 1 foot and a width of 4 feet with rock lining on the north end of the site (Picture 1) to a vegetated
channel with a depth of 2 feet and width of 3 feet just below the project’s south property line. The ditch
and culvert section continues south on the east side of Nile Avenue NE until approximately 300 feet north of NE 4th Pl, where it drains into an 18-inch storm drain and flows south. This is the quarter mile point downstream of the site.
The City of Renton provides current storm water information online, using a GIS based system called
COR Maps. COR Maps provides information on the type of pipes, manholes and catch basins in the city.
Following the pipe flow direction from COR Maps, the 18-inch diameter concrete pipe crosses over to the west side of Nile Avenue just before it intersects with NE 4th street. The pipe then heads west down NE
4th street and crosses to the south side just before Jericho Avenue. The storm water pipe parallels Jericho
Avenue running through private property until NE 2nd street. Picture 10 shows the manhole as the pipe crosses from the east side of Jericho Avenue and heads south down the center line of the road. Flow
continues south until NE 1st street, where the 36-inch pipe heads west and discharges into Maplewood Creek.
Core Design, Inc. WESTON HEIGHTS Page 7
1 – Looking south in drainage ditch along the east side of Nile Avenue next to the site
2 – Looking south along the east side of Nile Avenue into first culvert
3 – Looking south on the east side of Nile Avenue just downstream of site
4 – Looking south along the east side of Nile Avenue just before NE 6th Street
Core Design, Inc. WESTON HEIGHTS Page 8
5 – Looking at a concrete pipe junction with water flowing left to right (south) down Nile Avenue
6 – Looking south on the east side of Nile Avenue at the last drainage ditch before pipe flow
7 – Looking south on the east side of Nile Avenue before NE 4th Street
8 – Looking South at the intersection of 4th and Nile Avenue where pipe flow crosses Nile Avenue from left to right (east to west)
Core Design, Inc. WESTON HEIGHTS Page 9
9 – Existing man hole looking west on NE 4th
street
10 – Existing Man hole looking South down Jericho Avenue
11 – Storm water outlet into Maplewood stream next to Jericho Street
12 – Looking at the downstream flow from Maplewood just after outlet Looking south on
Weston Heights North
Technical Information Report
APPENDIX 3B
RESOURCE REVIEW DOCUMENTS
Soil Map—King County Area, Washington
(Weston North)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/4/2016
Page 1 of 35260210526028052603505260420526049052605605260630526028052603505260420526049052605605260630564330564400564470564540564610564680564750564820564890564960
564330 564400 564470 564540 564610 564680 564750 564820 564890 564960
47° 29' 45'' N 122° 8' 45'' W47° 29' 45'' N122° 8' 14'' W47° 29' 31'' N
122° 8' 45'' W47° 29' 31'' N
122° 8' 14'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84
0 100 200 400 600Feet
0 40 80 160 240Meters
Map Scale: 1:3,000 if printed on A landscape (11" x 8.5") sheet.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more accurate
calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area: King County Area, Washington
Survey Area Data: Version 11, Sep 14, 2015
Soil map units are labeled (as space allows) for map scales 1:50,000
or larger.
Date(s) aerial images were photographed: Jul 8, 2014—Jul 15,
2014
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
Soil Map—King County Area, Washington
(Weston North)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/4/2016
Page 2 of 3
Map Unit Legend
King County Area, Washington (WA633)
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
AgC Alderwood gravelly sandy loam,
8 to 15 percent slopes
3.6 100.0%
Totals for Area of Interest 3.6 100.0%
Soil Map—King County Area, Washington Weston North
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/4/2016
Page 3 of 3
Weston Heights North
Technical Information Report
SECTION 4
FLOW CONTROL AND WATER QUALITY FACILITY
ANALYSIS AND DESIGN
Weston Heights North
Technical Information Report
Part A – Existing Site Hydrology
The project site runoff is contributory to the Weston Heights basins and the Olympus Villa Pond ‘A’ basin.
This project utilizes the detention facilities constructed for those developments. The western portion of
the project is intercepted by Nile Ave NE. The eastern portion discharges to the central wetland area.
The central wetland area will be left undisturbed.
The majority of land cover in the Weston North project limits has been developed. The western region
currently houses a single family residence, a detached Quonset hut, shed and garage. The surrounding
area features typical residential landscaping. The eastern region has been previously cleared of the
historic forested vegetation and is currently all grassed area with no tree canopy. The wetland and area
to the east of the wetland, outwards to the projects eastern border, remain forested. The topography of
the combined subject parcel slopes moderately from east to west, with the southcentral section sloping
inwards towards the wetland. For purposes of the stormwater model, both basins are considered to be
forested in the historic condition, as prescribed by the 2009 King County Surface Water Design Manual
(KCSWDM).
Part B – Developed Site Hydrology
The project proposes 6 single family lots (1 lot to remain with 5 new lots proposed) with the associated
roadways and utilities. The 1 lot to remain will be undisturbed, but an interceptor ditch/swale will be
installed to collect surface runoff to distribute into the central wetland, thereby satisfying the hydroperiod.
The remaining 5 proposed lots (excluding the impervious areas for Lot 2 and Lot 3) will be collected and
mitigated by the east pond. The landscape/yard area in Lot 2 will be a bypass basin and will be mitigated
for by the west vault. The frontage improvements along Nile Ave NE will also be mitigated by the west
vault. The frontage improvements along NE 7th Pl will be mitigated by the Olympus Villa Pond ‘A’, to the
north. All three mitigation facilities downstream flow paths reconnect within ¼ mile of surface discharge.
Part C – Performance Standards
The project is subject to the “Conservation Flow Control” criteria outlined in Chapter 1 (Core Requirement
#3) of the 2009 King County Surface Water Design Manual (KCSWDM). This requires that the developed
discharge durations to predeveloped durations for the range of predeveloped discharge rates from 50% of
the 2-year peak flow up to the full 50-year peak flow.
The project is subject to the “Basic Treatment” criteria outlined in Chapter 1 (Core Requirement #8). The
goal of this requirement is 80% removal of total suspended solids for a typical rainfall year.
Part D – Flow Control System
The Weston Heights flow control facilities and the Olympus Villa Pond ‘A’ are utilized for this projects
separate basins (separate basins in one similar threshold discharge area). Flow control will be achieved
via an underground detention vault in the west basin, an open detention pond in the east basin, and an
open detention pond in the Olympus Villa development – Pond ‘A’, to the north. An equivalent area trade
has been utilized for a section of proposed target surface in Weston Heights that may not be feasibly
routed to the west underground detention vault. The equivalent area is the eastern side of crowned Nile
Ave NE roadway contributing offsite flow. This runoff will be collected in an underground conveyance
system and routed to the west underground detention vault. In addition to the equivalent area, the west
underground detention vault provides flow control for Weston Heights Lots 1-9. Weston North Lot 2
landscaping/yard area is not feasibly routed to the east pond, and there is not capacity in Olympus Villa
Pond ‘A’. Therefore, this area is considered bypass and is mitigated by oversizing the west underground
detention vault. The Olympus Villa LUA and as-built plans have been included in this report as
Weston Heights North
Technical Information Report
Appendices 6B, and 6C, respectively. The Olympus Villa Pond ‘A’ was constructed larger than designed,
thereby allowing this project’s utilization. The required detention volume of the original design was
36,042-CF. The constructed detention volume, as reported in the as-built plans, is 38,648-CF. This
project directs the frontage improvement area (sidewalk/roadway/planter area) along NE 7th Pl, as well as
the impervious areas of Lot 2 and Lot 3, to Olympus Villa Pond ‘A’. The ultimate discharge of Pond ‘A’ is
the same point as the discharge for the west underground detention vault. Lots 4, 5, and 6, as well as
Weston Heights Lots 10, 11, and 12 will be collected via underground conveyance and directed to the
east pond. Lot 3 landscape/yard area will also be collected and directed to the east pond. All facilities
have been designed using King County Runoff Time Series (KCRTS) stormwater runoff modeling
software. Refer to Appendix 4A for “Flow Control Design Calculations”.
Part E – Water Quality System
Basic treatment for all basins on this project will be provided via wetpool storage. The Weston Heights
project proposed a combined detention/treatment vault in the west basin. This vault will contain a
permanent wetpool in the bottom of the vault, and room for detention storage in the upper portion of the
vault. The Weston Heights project also proposed a combined detention/treatment pond in the east basin.
This facility will contain a permanent wetpool in the bottom of the pond, and room for detention storage in
the top portion of the pond. Olympus Villa Pond ‘A’ was constructed larger than designed. The required
water quality volume of the original design was 9,881-CF. The constructed water quality volume, as
reported in the as-built plans, is 15,479-CF. Refer to Appendix 4B for “Water Quality Design
Calculations”.
Part F – Wetland Hydrology
A wetland is located in the southcentral region of the project. This wetland and its surrounding 56.26-ft
buffer will remain undisturbed. This wetland area divides the Weston Heights development, immediately
south of Weston North, into two separate drainage basins. The separate drainage basins, named West
Basin and East Basin, are contained within one single threshold discharge area. The predeveloped
conditions would have runoff from the eastern most extents of the Weston North project, in addition to the
buffer area to the north and west, contributing flow to this wetland. The Weston Heights areas that
contribute flow to the wetland include the entire East basin and a portion of the West basin. As a result of
these two separate projects, Weston North and Weston Heights, predeveloped runoff will be directed
away from the wetland in order to satisfy flow control requirements. In order to satisfy the existing
wetland hydroperiod the runoff from the undisturbed Weston North Lot 1, will be redirected into the
wetland via an interceptor dike. Refer to Appendix 4C for “Wetland Hydroperiod Calculations”.
Weston Heights North
Technical Information Report
APPENDIX 4A
FLOW CONTROL DESIGN CALCULATIONS
Weston Heights North
Technical Information Report
KCSWDM – SCALE FACTOR
Weston Heights North
Technical Information Report
Predeveloped West Basin
Flow Frequency Analysis
Time Series File:west-pre.tsf
Project Location:Landsburg
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.139 2 2/09/01 18:00 0.167 1 100.00 0.990
0.024 7 1/05/02 16:00 0.139 2 25.00 0.960
0.089 4 2/28/03 16:00 0.113 3 10.00 0.900
0.016 8 3/03/04 2:00 0.089 4 5.00 0.800
0.081 5 1/05/05 10:00 0.081 5 3.00 0.667
0.066 6 1/18/06 21:00 0.066 6 2.00 0.500
0.113 3 11/24/06 5:00 0.024 7 1.30 0.231
0.167 1 1/09/08 7:00 0.016 8 1.10 0.091
Computed Peaks 0.157 50.00 0.980
Weston Heights North
Technical Information Report
Predeveloped Bypass Basin
Flow Frequency Analysis
Time Series File:bypass-pre.tsf
Project Location:Landsburg
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.007 2 2/09/01 14:00 0.009 1 100.00 0.990
0.001 7 1/05/02 17:00 0.007 2 25.00 0.960
0.005 4 2/28/03 16:00 0.006 3 10.00 0.900
0.001 8 3/03/04 1:00 0.005 4 5.00 0.800
0.004 5 1/05/05 10:00 0.004 5 3.00 0.667
0.004 6 1/18/06 21:00 0.004 6 2.00 0.500
0.006 3 11/24/06 5:00 0.001 7 1.30 0.231
0.009 1 1/09/08 7:00 0.001 8 1.10 0.091
Computed Peaks 0.008 50.00 0.980
Weston Heights North
Technical Information Report
Combined Predeveloped Time-Series & Peaks – West Basin, Bypass Basin, East Basin
Flow Frequency Analysis
Time Series File:combined-pre.tsf
Project Location:Landsburg
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.146 2 2/09/01 18:00 0.175 1 100.00 0.990
0.024 7 1/05/02 16:00 0.146 2 25.00 0.960
0.093 4 2/28/03 16:00 0.119 3 10.00 0.900
0.017 8 3/03/04 2:00 0.093 4 5.00 0.800
0.086 5 1/05/05 10:00 0.086 5 3.00 0.667
0.070 6 1/18/06 21:00 0.070 6 2.00 0.500
0.119 3 11/24/06 5:00 0.024 7 1.30 0.231
0.175 1 1/09/08 7:00 0.017 8 1.10 0.091
Computed Peaks 0.166 50.00 0.980
Weston Heights North
Technical Information Report
Developed West Basin
Flow Frequency Analysis
Time Series File:west-dev.tsf
Project Location:Landsburg
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.389 6 2/09/01 2:00 0.700 1 100.00 0.990
0.239 8 12/03/01 17:00 0.470 2 25.00 0.960
0.407 4 9/10/03 15:00 0.463 3 10.00 0.900
0.463 3 8/26/04 1:00 0.407 4 5.00 0.800
0.382 7 10/28/04 18:00 0.397 5 3.00 0.667
0.397 5 10/22/05 17:00 0.389 6 2.00 0.500
0.470 2 11/21/06 9:00 0.382 7 1.30 0.231
0.700 1 1/09/08 7:00 0.239 8 1.10 0.091
Computed Peaks 0.623 50.00 0.980
Weston Heights North
Technical Information Report
Developed Bypass Basin
Flow Frequency Analysis
Time Series File:bypass-dev.tsf
Project Location:Landsburg
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.013 3 2/09/01 2:00 0.028 1 100.00 0.990
0.004 8 12/03/01 17:00 0.015 2 25.00 0.960
0.007 5 2/28/03 16:00 0.013 3 10.00 0.900
0.009 4 8/26/04 1:00 0.009 4 5.00 0.800
0.007 6 1/05/05 10:00 0.007 5 3.00 0.667
0.006 7 10/22/05 17:00 0.007 6 2.00 0.500
0.015 2 11/21/06 9:00 0.006 7 1.30 0.231
0.028 1 1/09/08 7:00 0.004 8 1.10 0.091
Computed Peaks 0.023 50.00 0.980
Weston Heights North
Technical Information Report
West Vault Design
Retention/Detention Facility
Type of Facility: Detention Vault
Facility Length: 62.00 ft
Facility Width: 48.00 ft
Facility Area: 2976. sq. ft
Effective Storage Depth: 7.51 ft
Stage 0 Elevation: 505.79 ft
Storage Volume: 22350. cu. ft
Riser Head: 7.51 ft
Riser Diameter: 12.00 inches
Number of orifices: 3
Full Head Pipe
Orifice # Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 0.78 0.045
2 4.10 1.00 0.050 4.0
3 6.40 1.00 0.029 4.0
Top Notch Weir: None
Outflow Rating Curve: None
Stage Elevation Storage Discharge Percolation
(ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs)
0.00 505.79 0. 0.000 0.000 0.00
0.01 505.80 30. 0.001 0.001 0.00
0.02 505.81 60. 0.001 0.003 0.00
0.03 505.82 89. 0.002 0.003 0.00
0.04 505.83 119. 0.003 0.003 0.00
0.05 505.84 149. 0.003 0.004 0.00
0.06 505.85 179. 0.004 0.004 0.00
0.07 505.86 208. 0.005 0.004 0.00
0.21 506.00 625. 0.014 0.008 0.00
0.36 506.15 1071. 0.025 0.010 0.00
0.51 506.30 1518. 0.035 0.012 0.00
0.65 506.44 1934. 0.044 0.013 0.00
0.80 506.59 2381. 0.055 0.015 0.00
0.95 506.74 2827. 0.065 0.016 0.00
1.10 506.89 3274. 0.075 0.017 0.00
1.24 507.03 3690. 0.085 0.018 0.00
1.39 507.18 4137. 0.095 0.020 0.00
1.54 507.33 4583. 0.105 0.021 0.00
1.68 507.47 5000. 0.115 0.021 0.00
1.83 507.62 5446. 0.125 0.022 0.00
1.98 507.77 5893. 0.135 0.023 0.00
2.13 507.92 6339. 0.146 0.024 0.00
2.27 508.06 6756. 0.155 0.025 0.00
2.42 508.21 7202. 0.165 0.026 0.00
2.57 508.36 7648. 0.176 0.027 0.00
2.72 508.51 8095. 0.186 0.027 0.00
2.86 508.65 8511. 0.195 0.028 0.00
3.01 508.80 8958. 0.206 0.029 0.00
3.16 508.95 9404. 0.216 0.029 0.00
3.30 509.09 9821. 0.225 0.030 0.00
3.45 509.24 10267. 0.236 0.031 0.00
3.60 509.39 10714. 0.246 0.031 0.00
3.75 509.54 11160. 0.256 0.032 0.00
3.89 509.68 11577. 0.266 0.033 0.00
4.04 509.83 12023. 0.276 0.033 0.00
Weston Heights North
Technical Information Report
4.10 509.89 12202. 0.280 0.034 0.00
4.11 509.90 12231. 0.281 0.034 0.00
4.12 509.91 12261. 0.281 0.034 0.00
4.13 509.92 12291. 0.282 0.035 0.00
4.14 509.93 12321. 0.283 0.037 0.00
4.15 509.94 12350. 0.284 0.039 0.00
4.16 509.95 12380. 0.284 0.041 0.00
4.17 509.96 12410. 0.285 0.041 0.00
4.18 509.97 12440. 0.286 0.042 0.00
4.19 509.98 12469. 0.286 0.042 0.00
4.34 510.13 12916. 0.297 0.048 0.00
4.49 510.28 13362. 0.307 0.052 0.00
4.64 510.43 13809. 0.317 0.055 0.00
4.78 510.57 14225. 0.327 0.059 0.00
4.93 510.72 14672. 0.337 0.061 0.00
5.08 510.87 15118. 0.347 0.064 0.00
5.22 511.01 15535. 0.357 0.067 0.00
5.37 511.16 15981. 0.367 0.069 0.00
5.52 511.31 16428. 0.377 0.071 0.00
5.67 511.46 16874. 0.387 0.073 0.00
5.81 511.60 17291. 0.397 0.075 0.00
5.96 511.75 17737. 0.407 0.077 0.00
6.11 511.90 18183. 0.417 0.079 0.00
6.26 512.05 18630. 0.428 0.081 0.00
6.40 512.19 19046. 0.437 0.083 0.00
6.41 512.20 19076. 0.438 0.083 0.00
6.42 512.21 19106. 0.439 0.084 0.00
6.43 512.22 19136. 0.439 0.085 0.00
6.44 512.23 19165. 0.440 0.087 0.00
6.45 512.24 19195. 0.441 0.089 0.00
6.46 512.25 19225. 0.441 0.091 0.00
6.47 512.26 19255. 0.442 0.091 0.00
6.48 512.27 19284. 0.443 0.092 0.00
6.49 512.28 19314. 0.443 0.092 0.00
6.64 512.43 19761. 0.454 0.099 0.00
6.79 512.58 20207. 0.464 0.105 0.00
6.94 512.73 20653. 0.474 0.109 0.00
7.08 512.87 21070. 0.484 0.113 0.00
7.23 513.02 21516. 0.494 0.117 0.00
7.38 513.17 21963. 0.504 0.121 0.00
7.51 513.30 22350. 0.513 0.124 0.00
7.61 513.40 22647. 0.520 0.434 0.00
7.71 513.50 22945. 0.527 1.000 0.00
7.81 513.60 23243. 0.534 1.730 0.00
7.91 513.70 23540. 0.540 2.520 0.00
8.01 513.80 23838. 0.547 2.810 0.00
8.11 513.90 24135. 0.554 3.070 0.00
8.21 514.00 24433. 0.561 3.300 0.00
8.31 514.10 24731. 0.568 3.520 0.00
8.41 514.20 25028. 0.575 3.730 0.00
8.51 514.30 25326. 0.581 3.930 0.00
8.61 514.40 25623. 0.588 4.110 0.00
8.71 514.50 25921. 0.595 4.290 0.00
8.81 514.60 26219. 0.602 4.460 0.00
8.91 514.70 26516. 0.609 4.630 0.00
9.01 514.80 26814. 0.616 4.790 0.00
9.11 514.90 27111. 0.622 4.940 0.00
9.21 515.00 27409. 0.629 5.090 0.00
9.31 515.10 27707. 0.636 5.230 0.00
Weston Heights North
Technical Information Report
Hyd Inflow Outflow Peak Storage
Stage Elev (Cu-Ft) (Ac-Ft)
1 0.70 0.65 7.65 513.44 22761. 0.523
2 0.39 0.12 7.44 513.23 22136. 0.508
3 0.47 0.12 7.50 513.29 22327. 0.513
4 0.23 0.06 5.02 510.81 14929. 0.343
5 0.27 0.06 5.02 510.81 14946. 0.343
6 0.23 0.03 3.85 509.64 11463. 0.263
7 0.46 0.03 2.99 508.78 8903. 0.204
8 0.22 0.02 2.08 507.87 6192. 0.142
Hyd R/D Facility Tributary Reservoir POC Outflow
Outflow Inflow Inflow Target Calc
1 0.65 0.03 ******** 0.17 0.67
2 0.12 0.01 ******** ******* 0.13
3 0.12 0.02 ******** ******* 0.13
4 0.06 0.01 ******** ******* 0.07
5 0.06 0.01 ******** ******* 0.07
6 0.03 0.01 ******** ******* 0.04
7 0.03 0.01 ******** ******* 0.03
8 0.02 0.00 ******** ******* 0.03
----------------------------------
Route Time Series through Facility
Inflow Time Series File:west-dev.tsf
Outflow Time Series File:WV_rdout.tsf
POC Time Series File:WV_dsout
Inflow/Outflow Analysis
Peak Inflow Discharge: 0.700 CFS at 7:00 on Jan 9 in Year 8
Peak Outflow Discharge: 0.649 CFS at 8:00 on Jan 9 in Year 8
Peak Reservoir Stage: 7.65 Ft
Peak Reservoir Elev: 513.44 Ft
Peak Reservoir Storage: 22761. Cu-Ft
: 0.523 Ac-Ft
Duration Comparison Anaylsis
Base File: combined-pre.tsf
New File: wv_dsout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time----- ---------Check of Tolerance-------
Cutoff Base New %Change Probability Base New %Change
0.035 | 0.98E-02 0.87E-02 -11.6 | 0.98E-02 0.035 0.034 -1.4
0.043 | 0.67E-02 0.65E-02 -2.9 | 0.67E-02 0.043 0.040 -8.6
0.052 | 0.45E-02 0.48E-02 8.4 | 0.45E-02 0.052 0.054 3.1
0.061 | 0.30E-02 0.33E-02 9.9 | 0.30E-02 0.061 0.062 1.8
0.069 | 0.20E-02 0.18E-02 -9.8 | 0.20E-02 0.069 0.066 -4.4
0.078 | 0.14E-02 0.14E-02 -2.3 | 0.14E-02 0.078 0.077 -0.3
0.086 | 0.10E-02 0.99E-03 -1.6 | 0.10E-02 0.086 0.086 -0.3
0.095 | 0.75E-03 0.75E-03 0.0 | 0.75E-03 0.095 0.095 0.6
0.103 | 0.55E-03 0.60E-03 8.8 | 0.55E-03 0.103 0.106 2.8
0.112 | 0.31E-03 0.47E-03 52.6 | 0.31E-03 0.112 0.119 6.1
0.120 | 0.20E-03 0.26E-03 33.3 | 0.20E-03 0.120 0.125 3.9
0.129 | 0.13E-03 0.82E-04 -37.5 | 0.13E-03 0.129 0.127 -1.4
0.137 | 0.82E-04 0.00E+00 -100.0 | 0.82E-04 0.137 0.129 -6.2
0.146 | 0.16E-04 0.00E+00 -100.0 | 0.16E-04 0.146 0.130 -10.6
Maximum positive excursion = 0.007 cfs ( 6.7%)
occurring at 0.112 cfs on the Base Data:combined-pre.tsf
and at 0.120 cfs on the New Data:wv_dsout.tsf
Maximum negative excursion = 0.006 cfs (-13.1%)
Weston Heights North
Technical Information Report
occurring at 0.042 cfs on the Base Data:combined-pre.tsf
and at 0.037 cfs on the New Data:wv_dsout.tsf
Duration Comparison Anaylsis
Weston Heights North
Technical Information Report
Predeveloped East Basin
Flow Frequency Analysis
Time Series File:east-pre.tsf
Project Location:Landsburg
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.139 2 2/09/01 18:00 0.164 1 100.00 0.990
0.022 7 1/05/02 16:00 0.139 2 25.00 0.960
0.088 4 2/28/03 16:00 0.113 3 10.00 0.900
0.016 8 3/03/04 2:00 0.088 4 5.00 0.800
0.081 5 1/05/05 10:00 0.081 5 3.00 0.667
0.065 6 1/18/06 21:00 0.065 6 2.00 0.500
0.113 3 11/24/06 5:00 0.022 7 1.30 0.231
0.164 1 1/09/08 7:00 0.016 8 1.10 0.091
Computed Peaks 0.156 50.00 0.980
Weston Heights North
Technical Information Report
Developed East Basin
Flow Frequency Analysis
Time Series File:east-dev.tsf
Project Location:Landsburg
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.340 4 2/09/01 2:00 0.641 1 100.00 0.990
0.183 8 12/03/01 17:00 0.411 2 25.00 0.960
0.295 7 9/10/03 15:00 0.366 3 10.00 0.900
0.366 3 8/26/04 1:00 0.340 4 5.00 0.800
0.298 6 10/28/04 18:00 0.308 5 3.00 0.667
0.308 5 10/22/05 17:00 0.298 6 2.00 0.500
0.411 2 11/21/06 9:00 0.295 7 1.30 0.231
0.641 1 1/09/08 7:00 0.183 8 1.10 0.091
Computed Peaks 0.564 50.00 0.980
Weston Heights North
Technical Information Report
East Pond Design
Retention/Detention Facility
Type of Facility: Detention Pond
Side Slope: 3.30 H:1V
Pond Bottom Length: 70.00 ft
Pond Bottom Width: 39.00 ft
Pond Bottom Area: 2730. sq. ft
Top Area at 1 ft. FB: 7416. sq. ft
0.170 acres
Effective Storage Depth: 4.00 ft
Stage 0 Elevation: 518.00 ft
Storage Volume: 17604. cu. ft
0.404 ac-ft
Riser Head: 4.00 ft
Riser Diameter: 12.00 inches
Number of orifices: 2
Full Head Pipe
Orifice # Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 0.88 0.042
2 2.40 1.13 0.043 4.0
Top Notch Weir: Rectangular
Length: 1.00 in
Weir Height: 3.50 ft
Outflow Rating Curve: None
Stage Elevation Storage Discharge Percolation Surf Area
(ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) (sq. ft)
0.00 518.00 0. 0.000 0.000 0.00 2730.
0.01 518.01 27. 0.001 0.002 0.00 2737.
0.02 518.02 55. 0.001 0.003 0.00 2744.
0.03 518.03 82. 0.002 0.003 0.00 2752.
0.04 518.04 110. 0.003 0.004 0.00 2759.
0.05 518.05 137. 0.003 0.005 0.00 2766.
0.06 518.06 165. 0.004 0.005 0.00 2773.
0.07 518.07 193. 0.004 0.006 0.00 2781.
0.17 518.17 475. 0.011 0.009 0.00 2854.
0.27 518.27 764. 0.018 0.011 0.00 2927.
0.37 518.37 1060. 0.024 0.013 0.00 3002.
0.47 518.47 1364. 0.031 0.014 0.00 3078.
0.57 518.57 1676. 0.038 0.016 0.00 3154.
0.67 518.67 1995. 0.046 0.017 0.00 3232.
0.77 518.77 2322. 0.053 0.018 0.00 3310.
0.87 518.87 2657. 0.061 0.019 0.00 3389.
0.97 518.97 3000. 0.069 0.020 0.00 3469.
1.07 519.07 3351. 0.077 0.022 0.00 3550.
1.17 519.17 3710. 0.085 0.022 0.00 3631.
1.27 519.27 4077. 0.094 0.023 0.00 3714.
1.37 519.37 4453. 0.102 0.024 0.00 3797.
1.47 519.47 4837. 0.111 0.025 0.00 3882.
1.57 519.57 5229. 0.120 0.026 0.00 3967.
1.67 519.67 5630. 0.129 0.027 0.00 4053.
1.77 519.77 6040. 0.139 0.028 0.00 4140.
1.87 519.87 6458. 0.148 0.028 0.00 4228.
1.97 519.97 6885. 0.158 0.029 0.00 4316.
2.07 520.07 7321. 0.168 0.030 0.00 4406.
2.17 520.17 7766. 0.178 0.031 0.00 4496.
2.27 520.27 8220. 0.189 0.031 0.00 4587.
Weston Heights North
Technical Information Report
2.37 520.37 8684. 0.199 0.032 0.00 4680.
2.40 520.40 8825. 0.203 0.032 0.00 4707.
2.41 520.41 8872. 0.204 0.032 0.00 4717.
2.42 520.42 8919. 0.205 0.033 0.00 4726.
2.44 520.44 9014. 0.207 0.035 0.00 4745.
2.45 520.45 9061. 0.208 0.037 0.00 4754.
2.46 520.46 9109. 0.209 0.039 0.00 4763.
2.47 520.47 9156. 0.210 0.042 0.00 4773.
2.48 520.48 9204. 0.211 0.043 0.00 4782.
2.49 520.49 9252. 0.212 0.043 0.00 4791.
2.59 520.59 9736. 0.224 0.049 0.00 4885.
2.69 520.69 10229. 0.235 0.053 0.00 4980.
2.79 520.79 10732. 0.246 0.056 0.00 5076.
2.89 520.89 11244. 0.258 0.059 0.00 5173.
2.99 520.99 11767. 0.270 0.062 0.00 5270.
3.09 521.09 12299. 0.282 0.065 0.00 5369.
3.19 521.19 12840. 0.295 0.068 0.00 5468.
3.29 521.29 13392. 0.307 0.070 0.00 5568.
3.39 521.39 13954. 0.320 0.072 0.00 5669.
3.49 521.49 14526. 0.333 0.075 0.00 5771.
3.50 521.50 14584. 0.335 0.075 0.00 5782.
3.56 521.56 14933. 0.343 0.080 0.00 5843.
3.63 521.63 15344. 0.352 0.086 0.00 5915.
3.69 521.69 15701. 0.360 0.092 0.00 5978.
3.75 521.75 16061. 0.369 0.101 0.00 6040.
3.81 521.81 16426. 0.377 0.110 0.00 6103.
3.88 521.88 16856. 0.387 0.121 0.00 6177.
3.94 521.94 17228. 0.396 0.132 0.00 6241.
4.00 522.00 17604. 0.404 0.144 0.00 6305.
4.10 522.10 18240. 0.419 0.454 0.00 6412.
4.20 522.20 18887. 0.434 1.020 0.00 6520.
4.30 522.30 19544. 0.449 1.750 0.00 6629.
4.40 522.40 20213. 0.464 2.540 0.00 6739.
4.50 522.50 20892. 0.480 2.830 0.00 6849.
4.60 522.60 21583. 0.495 3.080 0.00 6961.
4.70 522.70 22284. 0.512 3.320 0.00 7073.
4.80 522.80 22997. 0.528 3.540 0.00 7187.
4.90 522.90 23722. 0.545 3.750 0.00 7301.
5.00 523.00 24458. 0.561 3.940 0.00 7416.
5.10 523.10 25205. 0.579 4.130 0.00 7532.
5.20 523.20 25964. 0.596 4.310 0.00 7649.
5.30 523.30 26735. 0.614 4.480 0.00 7766.
5.40 523.40 27517. 0.632 4.640 0.00 7885.
5.50 523.50 28312. 0.650 4.800 0.00 8004.
5.60 523.60 29118. 0.668 4.950 0.00 8125.
5.70 523.70 29937. 0.687 5.100 0.00 8246.
5.80 523.80 30767. 0.706 5.250 0.00 8368.
5.90 523.90 31610. 0.726 5.390 0.00 8491.
6.00 524.00 32466. 0.745 5.520 0.00 8615.
Hyd Inflow Outflow Peak Storage
Target Calc Stage Elev (Cu-Ft) (Ac-Ft)
1 0.64 0.16 0.60 4.13 522.13 18403. 0.422
2 0.34 ******* 0.14 3.97 521.97 17430. 0.400
3 0.41 ******* 0.13 3.94 521.94 17212. 0.395
4 0.30 ******* 0.06 3.02 521.02 11940. 0.274
5 0.30 ******* 0.06 2.95 520.95 11560. 0.265
6 0.31 ******* 0.03 2.42 520.42 8914. 0.205
7 0.37 ******* 0.03 1.68 519.68 5670. 0.130
8 0.18 ******* 0.02 1.33 519.33 4301. 0.099
Weston Heights North
Technical Information Report
----------------------------------
Route Time Series through Facility
Inflow Time Series File:east-dev.tsf
Outflow Time Series File:EP_rdout
Inflow/Outflow Analysis
Peak Inflow Discharge: 0.641 CFS at 7:00 on Jan 9 in Year 8
Peak Outflow Discharge: 0.597 CFS at 8:00 on Jan 9 in Year 8
Peak Reservoir Stage: 4.13 Ft
Peak Reservoir Elev: 522.13 Ft
Peak Reservoir Storage: 18403. Cu-Ft
: 0.422 Ac-Ft
Duration Comparison Anaylsis
Base File: east-pre.tsf
New File: ep_rdout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time----- ---------Check of Tolerance-------
Cutoff Base New %Change Probability Base New %Change
0.032 | 0.10E-01 0.84E-02 -17.3 | 0.10E-01 0.032 0.032 -1.5
0.041 | 0.70E-02 0.73E-02 4.9 | 0.70E-02 0.041 0.043 6.9
0.049 | 0.47E-02 0.58E-02 24.8 | 0.47E-02 0.049 0.052 6.8
0.057 | 0.31E-02 0.36E-02 14.7 | 0.31E-02 0.057 0.059 3.0
0.065 | 0.20E-02 0.18E-02 -8.9 | 0.20E-02 0.065 0.063 -3.3
0.073 | 0.15E-02 0.12E-02 -17.4 | 0.15E-02 0.073 0.070 -4.1
0.081 | 0.10E-02 0.90E-03 -12.7 | 0.10E-02 0.081 0.077 -5.3
0.089 | 0.78E-03 0.62E-03 -20.8 | 0.78E-03 0.089 0.084 -5.7
0.098 | 0.55E-03 0.47E-03 -14.7 | 0.55E-03 0.098 0.091 -6.5
0.106 | 0.33E-03 0.34E-03 5.0 | 0.33E-03 0.106 0.110 3.6
0.114 | 0.20E-03 0.26E-03 33.3 | 0.20E-03 0.114 0.120 5.6
0.122 | 0.15E-03 0.18E-03 22.2 | 0.15E-03 0.122 0.126 2.9
0.130 | 0.98E-04 0.82E-04 -16.7 | 0.98E-04 0.130 0.130 -0.2
0.138 | 0.16E-04 0.16E-04 0.0 | 0.16E-04 0.138 0.138 0.0
Maximum positive excursion = 0.005 cfs ( 10.6%)
occurring at 0.044 cfs on the Base Data:east-pre.tsf
and at 0.048 cfs on the New Data:ep_rdout.tsf
Maximum negative excursion = 0.004 cfs (-11.3%)
occurring at 0.036 cfs on the Base Data:east-pre.tsf
and at 0.032 cfs on the New Data:ep_rdout.tsf
Weston Heights North
Technical Information Report
Weston Heights North
Technical Information Report
Equivalent East Pond Water Quality Storage
Equivalent East Pond Detention Storage
Equivalent Pond Sizing Calculation
Pond Length =43 ft
Pond Width =65 ft
Actual Measured Pond Side Slope =3.3 :1
Contour
Elev.
Actual
Contour
Area
Actual
Incremental
Volume
Actual
Cumulative
Volume
Contour
Elev.
Calculated
Contour
Area
Calculated
Incremental
Volume
Calculated
Cumulative
Volume
Volume
Difference
(Calculated -
Actual)
(ft)(ft2)(ft3)(ft3)(ft)(ft2)(ft3)(ft3)(ft3)
514.00 674 0.00 0 514.00 641 0 0 0
514.50 875 387.13 387 514.50 834 369 369 -18
515.00 1075 487.38 875 515.00 1049 471 839 -35
515.50 1315 597.50 1,472 515.50 1285 583 1,423 -49
516.00 1555 717.50 2,190 516.00 1544 707 2,130 -60
516.50 1831 846.50 3,036 516.50 1824 842 2,972 -64
517.00 2107 984.50 4,021 517.00 2126 987 3,959 -61
517.50 2420 1,131.63 5,152 517.50 2449 1,144 5,103 -49
518.00 2732 1,287.88 6,440 518.00 2795 1,311 6,414 -26
Project:
Project No:
Sheet No:
Made by:
Checked by:
Backchecked by:
Date:
2/4/2016
Date:
Date:
Weston Heights
349-004-14
JDA
Equivalent Pond Sizing Calculation
Pond Length =70 ft
Pond Width =39 ft
Actual Measured Pond Side Slope =3.3 :1
Contour
Elev.
Actual
Contour
Area
Actual
Incremental
Volume
Actual
Cumulative
Volume
Contour
Elev.
Calculated
Contour
Area
Calculated
Incremental
Volume
Calculated
Cumulative
Volume
Volume
Difference
(Calculated -
Actual)
(ft)(ft2)(ft3)(ft3)(ft)(ft2)(ft3)(ft3)(ft3)
518.00 2732 0.00 0 518.00 2730 0 0 0
518.50 3107 1,459.75 1,460 518.50 3101 1,458 1,458 -2
519.00 3506 1,653.25 3,113 519.00 3493 1,648 3,106 -7
519.50 3932 1,859.50 4,973 519.50 3907 1,850 4,956 -16
520.00 4386 2,079.50 7,052 520.00 4343 2,063 7,019 -33
520.50 4866 2,313.00 9,365 520.50 4801 2,286 9,305 -60
521.00 5373 2,559.75 11,925 521.00 5280 2,520 11,825 -100
521.50 5907 2,820.00 14,745 521.50 5782 2,765 14,590 -155
522.00 6468 3,093.75 17,839 522.00 6305 3,022 17,612 -227
522.50 7055 3,380.75 21,219 522.50 6849 3,288 20,900 -319
523.00 7656 3,677.75 24,897 523.00 7416 3,566 24,467 -430
JDZ
Project:
Project No:
Sheet No:
Made by:
Checked by:
Backchecked by:
Date:
12/21/2015
Date:
Date:
Weston Heights
349-004-14
Weston Heights North
Technical Information Report
Predeveloped Olympus Villa Pond ‘A’ Basin
Flow Frequency Analysis
Time Series File:predev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.222 2 2/09/01 18:00 0.303 1 100.00 0.990
0.075 7 1/05/02 16:00 0.222 2 25.00 0.960
0.178 3 2/28/03 3:00 0.178 3 10.00 0.900
0.025 8 8/26/04 2:00 0.176 4 5.00 0.800
0.107 6 1/05/05 8:00 0.157 5 3.00 0.667
0.176 4 1/18/06 20:00 0.107 6 2.00 0.500
0.157 5 11/24/06 4:00 0.075 7 1.30 0.231
0.303 1 1/09/08 9:00 0.025 8 1.10 0.091
Computed Peaks 0.276 50.00 0.980
*The original design information for Olympus Villa Pond ‘A’ may be found in the provided “Olympus Villa
LUA 10-090” report included in Appendix 6C. The original predeveloped areas for Olympus Villa were:
- 2.78 ac Till Forest
- 0.10 ac Existing Wetland (modeled as impervious)
The Weston North project added the following values to the predeveloped conditions:
- 0.40 ac Till Forest
Weston Heights North
Technical Information Report
Developed Olympus Village Basin
Flow Frequency Analysis
Time Series File:dev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.633 6 2/09/01 2:00 1.29 1 100.00 0.990
0.510 8 1/05/02 16:00 0.792 2 25.00 0.960
0.763 3 2/27/03 7:00 0.763 3 10.00 0.900
0.545 7 8/26/04 2:00 0.671 4 5.00 0.800
0.658 5 10/28/04 16:00 0.658 5 3.00 0.667
0.671 4 1/18/06 16:00 0.633 6 2.00 0.500
0.792 2 10/26/06 0:00 0.545 7 1.30 0.231
1.29 1 1/09/08 6:00 0.510 8 1.10 0.091
Computed Peaks 1.12 50.00 0.980
*The original design information for Olympus Villa Pond ‘A’ may be found in the provided “Olympus Villa
LUA 10-090” report included in Appendix 6C. The original developed areas for Olympus Villa were:
- 1.35 ac Till Grass
- 1.77 ac Impervious
The Weston North project added the following values to the predeveloped conditions:
- 0.09 ac Till Grass
- 0.31 ac Impervious
Weston Heights North
Technical Information Report
Olympus Village Pond ‘A’ Revised Riser Design & Equivalent Area/Volume
Retention/Detention Facility
Type of Facility: Detention Pond
Side Slope: 2.35 H:1V
Pond Bottom Length: 96.36 ft
Pond Bottom Width: 60.51 ft
Pond Bottom Area: 5831. sq. ft
Top Area at 1 ft. FB: 10980. sq. ft
0.252 acres
Effective Storage Depth: 4.93 ft
Stage 0 Elevation: 0.00 ft
Storage Volume: 38588. cu. ft
0.886 ac-ft
Riser Head: 4.93 ft
Riser Diameter: 12.00 inches
Number of orifices: 3
Full Head Pipe
Orifice # Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 1.04 0.065
2 3.27 1.63 0.092 4.0
3 3.90 1.04 0.030 4.0
Top Notch Weir: None
Outflow Rating Curve: None
Stage Elevation Storage Discharge Percolation Surf Area
(ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) (sq. ft)
0.00 0.00 0. 0.000 0.000 0.00 5831.
0.01 0.01 58. 0.001 0.003 0.00 5838.
0.02 0.02 117. 0.003 0.004 0.00 5846.
0.03 0.03 175. 0.004 0.005 0.00 5853.
0.04 0.04 234. 0.005 0.006 0.00 5860.
0.05 0.05 293. 0.007 0.007 0.00 5868.
0.06 0.06 351. 0.008 0.007 0.00 5875.
0.08 0.08 469. 0.011 0.008 0.00 5890.
0.09 0.09 528. 0.012 0.009 0.00 5897.
0.10 0.10 587. 0.013 0.009 0.00 5905.
0.20 0.20 1181. 0.027 0.013 0.00 5979.
0.30 0.30 1783. 0.041 0.016 0.00 6054.
0.40 0.40 2392. 0.055 0.018 0.00 6129.
0.50 0.50 3009. 0.069 0.021 0.00 6205.
0.60 0.60 3633. 0.083 0.023 0.00 6281.
0.70 0.70 4265. 0.098 0.024 0.00 6358.
0.80 0.80 4904. 0.113 0.026 0.00 6435.
0.90 0.90 5552. 0.127 0.028 0.00 6512.
1.00 1.00 6207. 0.142 0.029 0.00 6590.
1.10 1.10 6870. 0.158 0.031 0.00 6669.
1.20 1.20 7541. 0.173 0.032 0.00 6747.
1.30 1.30 8219. 0.189 0.033 0.00 6827.
1.40 1.40 8906. 0.204 0.035 0.00 6906.
1.50 1.50 9601. 0.220 0.036 0.00 6986.
1.60 1.60 10303. 0.237 0.037 0.00 7067.
1.70 1.70 11014. 0.253 0.038 0.00 7148.
1.80 1.80 11733. 0.269 0.039 0.00 7230.
1.90 1.90 12460. 0.286 0.040 0.00 7311.
2.00 2.00 13195. 0.303 0.041 0.00 7394.
2.10 2.10 13939. 0.320 0.042 0.00 7477.
2.20 2.20 14691. 0.337 0.043 0.00 7560.
2.30 2.30 15451. 0.355 0.044 0.00 7643.
Weston Heights North
Technical Information Report
2.40 2.40 16219. 0.372 0.045 0.00 7728.
2.50 2.50 16996. 0.390 0.046 0.00 7812.
2.60 2.60 17782. 0.408 0.047 0.00 7897.
2.70 2.70 18576. 0.426 0.048 0.00 7983.
2.80 2.80 19378. 0.445 0.049 0.00 8068.
2.90 2.90 20189. 0.463 0.050 0.00 8155.
3.00 3.00 21009. 0.482 0.051 0.00 8242.
3.10 3.10 21838. 0.501 0.052 0.00 8329.
3.20 3.20 22675. 0.521 0.052 0.00 8416.
3.27 3.27 23266. 0.534 0.053 0.00 8478.
3.29 3.29 23436. 0.538 0.054 0.00 8496.
3.30 3.30 23521. 0.540 0.055 0.00 8504.
3.32 3.32 23691. 0.544 0.058 0.00 8522.
3.34 3.34 23862. 0.548 0.062 0.00 8540.
3.35 3.35 23947. 0.550 0.067 0.00 8549.
3.37 3.37 24118. 0.554 0.073 0.00 8566.
3.39 3.39 24290. 0.558 0.079 0.00 8584.
3.41 3.41 24462. 0.562 0.080 0.00 8602.
3.42 3.42 24548. 0.564 0.082 0.00 8611.
3.52 3.52 25413. 0.583 0.091 0.00 8700.
3.62 3.62 26288. 0.603 0.098 0.00 8789.
3.72 3.72 27171. 0.624 0.105 0.00 8879.
3.82 3.82 28064. 0.644 0.110 0.00 8970.
3.90 3.90 28784. 0.661 0.115 0.00 9042.
3.91 3.91 28875. 0.663 0.115 0.00 9051.
3.92 3.92 28965. 0.665 0.117 0.00 9060.
3.93 3.93 29056. 0.667 0.118 0.00 9070.
3.94 3.94 29147. 0.669 0.120 0.00 9079.
3.95 3.95 29237. 0.671 0.123 0.00 9088.
3.96 3.96 29328. 0.673 0.125 0.00 9097.
3.98 3.98 29510. 0.677 0.127 0.00 9115.
3.99 3.99 29602. 0.680 0.128 0.00 9124.
4.09 4.09 30519. 0.701 0.137 0.00 9216.
4.19 4.19 31445. 0.722 0.144 0.00 9308.
4.29 4.29 32380. 0.743 0.151 0.00 9400.
4.39 4.39 33325. 0.765 0.157 0.00 9493.
4.49 4.49 34279. 0.787 0.163 0.00 9587.
4.59 4.59 35242. 0.809 0.169 0.00 9680.
4.69 4.69 36215. 0.831 0.175 0.00 9775.
4.79 4.79 37197. 0.854 0.180 0.00 9869.
4.89 4.89 38189. 0.877 0.185 0.00 9964.
4.93 4.93 38588. 0.886 0.187 0.00 10003.
5.03 5.03 39593. 0.909 0.500 0.00 10098.
5.13 5.13 40608. 0.932 1.070 0.00 10194.
5.23 5.23 41632. 0.956 1.800 0.00 10291.
5.33 5.33 42666. 0.979 2.600 0.00 10388.
5.43 5.43 43710. 1.003 2.880 0.00 10486.
5.53 5.53 44763. 1.028 3.140 0.00 10584.
5.63 5.63 45827. 1.052 3.380 0.00 10682.
5.73 5.73 46900. 1.077 3.600 0.00 10781.
5.83 5.83 47983. 1.102 3.810 0.00 10880.
5.93 5.93 49076. 1.127 4.010 0.00 10980.
6.03 6.03 50179. 1.152 4.200 0.00 11080.
6.13 6.13 51292. 1.177 4.380 0.00 11181.
6.23 6.23 52415. 1.203 4.550 0.00 11282.
6.33 6.33 53548. 1.229 4.720 0.00 11383.
6.43 6.43 54691. 1.256 4.880 0.00 11485.
6.53 6.53 55845. 1.282 5.040 0.00 11587.
6.63 6.63 57009. 1.309 5.190 0.00 11690.
6.73 6.73 58183. 1.336 5.330 0.00 11793.
6.83 6.83 59368. 1.363 5.470 0.00 11897.
6.93 6.93 60563. 1.390 5.610 0.00 12001.
Weston Heights North
Technical Information Report
Hyd Inflow Outflow Peak Storage
Target Calc Stage Elev (Cu-Ft) (Ac-Ft)
1 1.29 0.30 0.83 5.09 5.09 40178. 0.922
2 0.79 ******* 0.05 3.01 3.01 21125. 0.485
3 0.76 ******* 0.15 4.31 4.31 32548. 0.747
4 0.67 ******* 0.11 3.82 3.82 28033. 0.644
5 0.66 ******* 0.04 1.60 1.60 10319. 0.237
6 0.63 ******* 0.19 4.93 4.93 38544. 0.885
7 0.54 ******* 0.04 2.14 2.14 14214. 0.326
8 0.51 ******* 0.05 2.86 2.86 19900. 0.457
----------------------------------
Route Time Series through Facility
Inflow Time Series File:dev.tsf
Outflow Time Series File:OV_rdout.tsf
Inflow/Outflow Analysis
Peak Inflow Discharge: 1.29 CFS at 6:00 on Jan 9 in Year 8
Peak Outflow Discharge: 0.828 CFS at 10:00 on Jan 9 in Year 8
Peak Reservoir Stage: 5.09 Ft
Peak Reservoir Elev: 5.09 Ft
Peak Reservoir Storage: 40179. Cu-Ft
: 0.922 Ac-Ft
Duration Comparison Anaylsis
Base File: predev.tsf
New File: ov_rdout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time----- ---------Check of Tolerance-------
Cutoff Base New %Change Probability Base New %Change
0.053 | 0.76E-02 0.66E-02 -12.3 | 0.76E-02 0.053 0.052 -1.2
0.066 | 0.56E-02 0.53E-02 -4.1 | 0.56E-02 0.066 0.061 -7.6
0.078 | 0.43E-02 0.49E-02 14.8 | 0.43E-02 0.078 0.085 8.9
0.091 | 0.32E-02 0.38E-02 17.6 | 0.32E-02 0.091 0.096 5.5
0.103 | 0.25E-02 0.28E-02 12.6 | 0.25E-02 0.103 0.107 3.7
0.116 | 0.18E-02 0.16E-02 -10.9 | 0.18E-02 0.116 0.113 -2.5
0.128 | 0.12E-02 0.14E-02 18.9 | 0.12E-02 0.128 0.137 6.9
0.141 | 0.91E-03 0.11E-02 19.6 | 0.91E-03 0.141 0.147 4.7
0.153 | 0.59E-03 0.67E-03 13.9 | 0.59E-03 0.153 0.157 2.3
0.166 | 0.36E-03 0.34E-03 -4.5 | 0.36E-03 0.166 0.165 -0.4
0.178 | 0.18E-03 0.16E-03 -9.1 | 0.18E-03 0.178 0.177 -0.4
0.191 | 0.13E-03 0.33E-04 -75.0 | 0.13E-03 0.191 0.181 -5.1
0.203 | 0.82E-04 0.00E+00 -100.0 | 0.82E-04 0.203 0.185 -9.0
0.216 | 0.16E-04 0.00E+00 -100.0 | 0.16E-04 0.216 0.199 -7.8
Maximum positive excursion = 0.007 cfs ( 9.5%)
occurring at 0.073 cfs on the Base Data:predev.tsf
and at 0.080 cfs on the New Data:ov_rdout.tsf
Maximum negative excursion = 0.006 cfs (-10.4%)
occurring at 0.061 cfs on the Base Data:predev.tsf
and at 0.054 cfs on the New Data:ov_rdout.tsf
Weston Heights North
Technical Information Report
Equivalent Olympus Villa Pond ‘A’ Dimensions/Side Slope
Equivalent Pond Sizing Calculation
Pond Length =96.35721918 ft
Pond Width =60.51331798 ft
Actual Measured Pond Side Slope =2.354987615 :1
Contour
Elev.
Actual
Contour
Area
Actual
Incremental
Volume
Actual
Cumulative
Volume
Contour
Elev.
Calculated
Contour
Area
Calculated
Incremental
Volume
Calculated
Cumulative
Volume
Volume
Difference
(Calculated -
Actual)
(ft)(ft2)(ft3)(ft3)(ft)(ft2)(ft3)(ft3)(ft3)
512.10 6370 0.00 0 512.10 5831 0 0 0
514.00 7198 12,889.60 12,890 514.00 7315 12,488 12,488 -401
516.00 8872 16,070.00 28,960 516.00 9050 16,365 28,853 -107
517.03 10115 9,778.30 38,738 517.03 10013 9,817 38,670 -68
518.00 10720 10,104.98 48,843 518.00 10962 10,173 48,843 0
JDA
Project:
Project No:
Sheet No:
Made by:
Checked by:
Backchecked by:
Date:
2/24/2016
Date:
Date:
Weston Heights North
349-007-15
Weston Heights North
Technical Information Report
APPENDIX 4B
WATER QUALITY DESIGN CALCULATIONS
Weston Heights North
Technical Information Report
KCSWDM – SCALE FACTOR
Weston Heights North
Technical Information Report
Date:
2/5/2016
Date:
Date:
Wetpool Description:
Step 1: Identify the required wetpool volume factor (f)
f =3 Fixed value per KCSWDM Section 6.4.1.1 (P. 6-70)
Step 2: Determine rainfall (R) for the mean annual storm
R =0.47 ft Per KCSWDM Figure 6.4.1.A
Step 3: Calculate runoff from the mean annual storm (V r) for the developed site
A i =52,272 ft2 Area of impervious surface
A tg =29,185 ft2 Area of till soil covered with grass
A tf =0 ft2 Area of till soil covered with forest
A o =0 ft2 Area of outwash soil covered with grass or forest
R =0.47 in Rainfall from mean annual storm (from Step 2)
V r =2,128 ft2
[KCSWDM Eq. 6-13]
Step 4: Calculate required wetpool volume (V b)
VB =6,385 ft3
[KCSWDM Equation 6-14]
Step 5: Calculate minimum required wetpool depth (DREQ)
Z1 =0.00 H:1V Side Slope #1
Z2 =0.00 H:1V Side Slope #2
Z3 =0.00 H:1V End Slope #3
Z4 =0.00 H:1V End Slope #4
LPOND =62 ft Pond length at top of wetpool
WPOND =24 ft Pond width at top of wetpool
DREQ =4.29 ft Minimum required pond depth
Weston Heights - West Vault
Wetpool Sizing Calculation
(Per KCSWDM Section 6.4.1.1)
Made by:
Checked by:
Backchecked by:
Project:
Project No:
Weston Heights
349-004
JDA
Weston Heights North
Technical Information Report
Date:
2/23/2016
Date:
Date:
Wetpool Description:
Step 1: Identify the required wetpool volume factor (f)
f =3 Fixed value per KCSWDM Section 6.4.1.1 (P. 6-70)
Step 2: Determine rainfall (R) for the mean annual storm
R =0.47 ft Per KCSWDM Figure 6.4.1.A
Step 3: Calculate runoff from the mean annual storm (V r) for the developed site
A i =52,272 ft2 Area of impervious surface
A tg =29,185 ft2 Area of till soil covered with grass
A tf =0 ft2 Area of till soil covered with forest
A o =0 ft2 Area of outwash soil covered with grass or forest
R =0.47 in Rainfall from mean annual storm (from Step 2)
V r =2,128 ft2
[KCSWDM Eq. 6-13]
Step 4: Calculate required wetpool volume (V b)
VB =6,385 ft3
[KCSWDM Equation 6-14]
Step 5: Calculate minimum required wetpool depth (DREQ)
Z1 =0.00 H:1V Side Slope #1
Z2 =0.00 H:1V Side Slope #2
Z3 =0.00 H:1V End Slope #3
Z4 =0.00 H:1V End Slope #4
LPOND =64 ft Pond length at top of wetpool
WPOND =24 ft Pond width at top of wetpool
DREQ =4.16 ft Minimum required pond depth
Made by:
Checked by:
Backchecked by:
Project:
Project No:
Weston Heights
349-004
JDA
Weston Heights - West Vault
Wetpool Sizing Calculation
(Per KCSWDM Section 6.4.1.1)
Weston Heights North
Technical Information Report
*This is the original design required volume for water quality in the Olympus Villa Pond ‘A’. The
as-built facility provides 15,479-CF of volume, for a difference of 5,598-CF in additional wetpool
storage capacity.
Weston Heights North
Technical Information Report
*This is the required wetpool volume resulting from the addition of the Weston North basin area
to Olympus Villa Pond ‘A’ (depicted as North Basin in the basin figures). This volume is below
the as-built facility’s 15,479-CF of useable wetpool storage. The additional areas from Weston
North leaves a remainder of 4,055-CF in wetpool storage capacity.
Date:
2/24/2016
Date:
Date:
Wetpool Description:
Step 1: Identify the required wetpool volume factor (f)
f =3 Fixed value per KCSWDM Section 6.4.1.1 (P. 6-70)
Step 2: Determine rainfall (R) for the mean annual storm
R =0.47 ft Per KCSWDM Figure 6.4.1.A
Step 3: Calculate runoff from the mean annual storm (V r) for the developed site
A i =90,605 ft2 Area of impervious surface
A tg =62,726 ft2 Area of till soil covered with grass
A tf =0 ft2 Area of till soil covered with forest
A o =0 ft2 Area of outwash soil covered with grass or forest
R =0.47 in Rainfall from mean annual storm (from Step 2)
V r =3,808 ft2
[KCSWDM Eq. 6-13]
Step 4: Calculate required wetpool volume (V b)
VB =11,424 ft3
[KCSWDM Equation 6-14]
Made by:
Checked by:
Backchecked by:
Project:
Project No:
Weston Heights North
349-007
JDA
Olympus Villa Pond 'A' - Proposed Design Req'd Volume
Wetpool Sizing Calculation
(Per KCSWDM Section 6.4.1.1)
Weston Heights North
Technical Information Report
APPENDIX 4C
WETLAND HYDROPERIOD CALCULATIONS
Weston Heights North
Technical Information Report
WWHM2012 – Wetland Fluctuation Report
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: Wetland Hydroperiod_160127
Site Name: Weston Heights
Site Address: Nile Ave
City : Renton
Report Date: 2/2/2016
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.17
Version : 2015/02/16
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Predeveloped
Bypass: No
GroundWater: No
Pervious Land Use Acres
C, Forest, Mod 2.39
C, Lawn, Flat 1.64
Pervious Total 4.03
Impervious Land Use Acres
ROADS FLAT 0.12
Impervious Total 0.12
Basin Total 4.15
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Developed
Bypass: No
GroundWater: No
Pervious Land Use Acres
C, Forest, Mod 3.01
C, Lawn, Flat 1.14
Pervious Total 4.15
Impervious Land Use Acres
ROADS FLAT 0.2
Weston Heights North
Technical Information Report
Impervious Total 0.2
Basin Total 4.35
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Wetland Hydroperiod
___________________________________________________________________
Wetlands Fluctuation for POC 1
Average Annual Volume (acft)
Month Predevel Mitigated Percent Pass/Fail
Jan 83.5601 86.9170 104.0 Pass
Feb 63.2200 66.2666 104.8 Pass
Mar 54.1575 56.9560 105.2 Pass
Apr 33.8289 35.8210 105.9 Pass
May 18.5240 19.7525 106.6 Pass
Jun 14.2424 15.0048 105.4 Pass
Jul 9.8981 10.6035 107.1 Pass
Aug 9.1697 9.6184 104.9 Pass
Sep 9.0665 9.3872 103.5 Pass
Oct 17.9055 17.3633 97.0 Pass
Nov 53.2741 52.4182 98.4 Pass
Dec 75.5175 77.4050 102.5 Pass
Day Predevel Mitigated Percent Pass/Fail
Jan1 2.7430 2.8534 104.0 Pass
2 2.7092 2.7884 102.9 Pass
3 2.5126 2.6107 103.9 Pass
4 2.8627 2.9740 103.9 Pass
5 2.9059 3.0093 103.6 Pass
6 3.0584 3.1707 103.7 Pass
7 2.8224 2.9184 103.4 Pass
8 2.8327 2.9262 103.3 Pass
9 2.4328 2.5347 104.2 Pass
10 2.2725 2.3652 104.1 Pass
11 2.4503 2.5511 104.1 Pass
12 2.5436 2.6594 104.6 Pass
13 3.0111 3.1398 104.3 Pass
14 3.0505 3.1595 103.6 Pass
15 2.7660 2.8722 103.8 Pass
16 2.7902 2.8977 103.9 Pass
17 2.7323 2.8478 104.2 Pass
18 2.9999 3.1201 104.0 Pass
19 2.8991 3.0167 104.1 Pass
20 2.6959 2.8032 104.0 Pass
21 2.4794 2.5859 104.3 Pass
22 2.6825 2.8027 104.5 Pass
23 3.0014 3.1211 104.0 Pass
24 2.7711 2.8702 103.6 Pass
Weston Heights North
Technical Information Report
25 2.4305 2.5326 104.2 Pass
26 2.4197 2.5290 104.5 Pass
27 2.3875 2.5004 104.7 Pass
28 2.5203 2.6423 104.8 Pass
29 2.7496 2.8666 104.3 Pass
30 2.6812 2.8084 104.7 Pass
31 2.6590 2.7690 104.1 Pass
Feb1 2.4262 2.5359 104.5 Pass
2 2.1887 2.2876 104.5 Pass
3 2.1662 2.2711 104.8 Pass
4 1.8991 1.9977 105.2 Pass
5 2.0356 2.1533 105.8 Pass
6 2.1972 2.3083 105.1 Pass
7 2.6078 2.7387 105.0 Pass
8 2.6145 2.7341 104.6 Pass
9 2.2087 2.3179 104.9 Pass
10 1.9356 2.0377 105.3 Pass
11 2.1449 2.2598 105.4 Pass
12 2.2049 2.3058 104.6 Pass
13 2.0175 2.1154 104.9 Pass
14 2.1635 2.2767 105.2 Pass
15 2.3941 2.5015 104.5 Pass
16 2.3948 2.5049 104.6 Pass
17 2.3224 2.4363 104.9 Pass
18 2.7174 2.8362 104.4 Pass
19 2.4868 2.5887 104.1 Pass
20 2.2243 2.3342 104.9 Pass
21 2.0803 2.1826 104.9 Pass
22 2.0157 2.1201 105.2 Pass
23 2.1781 2.2843 104.9 Pass
24 2.1322 2.2339 104.8 Pass
25 1.9896 2.0836 104.7 Pass
26 2.1143 2.2143 104.7 Pass
27 2.1150 2.2224 105.1 Pass
28 2.2285 2.3415 105.1 Pass
29 1.9059 2.0044 105.2 Pass
Mar1 1.8695 1.9637 105.0 Pass
2 2.1162 2.2193 104.9 Pass
3 2.1276 2.2285 104.7 Pass
4 2.2343 2.3427 104.9 Pass
5 1.8870 1.9784 104.8 Pass
6 1.7340 1.8280 105.4 Pass
7 1.6571 1.7591 106.2 Pass
8 1.9223 2.0242 105.3 Pass
9 1.9731 2.0676 104.8 Pass
10 1.9524 2.0541 105.2 Pass
11 2.1620 2.2708 105.0 Pass
12 1.9730 2.0618 104.5 Pass
13 1.8341 1.9234 104.9 Pass
14 1.8731 1.9703 105.2 Pass
15 1.7426 1.8322 105.1 Pass
16 1.7716 1.8597 105.0 Pass
17 1.7369 1.8329 105.5 Pass
18 1.6771 1.7601 105.0 Pass
19 1.5238 1.6050 105.3 Pass
20 1.3688 1.4434 105.5 Pass
21 1.5437 1.6436 106.5 Pass
22 1.7103 1.8065 105.6 Pass
23 1.6897 1.7777 105.2 Pass
24 1.6292 1.7066 104.7 Pass
25 1.5146 1.5882 104.9 Pass
26 1.4484 1.5233 105.2 Pass
27 1.3629 1.4393 105.6 Pass
Weston Heights North
Technical Information Report
28 1.4321 1.5121 105.6 Pass
29 1.4413 1.5171 105.3 Pass
30 1.3416 1.4118 105.2 Pass
31 1.2912 1.3637 105.6 Pass
Apr1 1.2031 1.2743 105.9 Pass
2 1.2292 1.2982 105.6 Pass
3 1.4703 1.5584 106.0 Pass
4 1.5932 1.6776 105.3 Pass
5 1.4277 1.5050 105.4 Pass
6 1.2210 1.2883 105.5 Pass
7 1.2380 1.3139 106.1 Pass
8 1.3309 1.4079 105.8 Pass
9 1.2034 1.2700 105.5 Pass
10 1.1577 1.2253 105.8 Pass
11 1.1392 1.2042 105.7 Pass
12 1.1922 1.2654 106.1 Pass
13 1.1368 1.2038 105.9 Pass
14 1.0513 1.1166 106.2 Pass
15 1.2047 1.2791 106.2 Pass
16 1.2644 1.3280 105.0 Pass
17 0.9998 1.0551 105.5 Pass
18 1.1756 1.2543 106.7 Pass
19 1.2570 1.3122 104.4 Pass
20 0.9942 1.0472 105.3 Pass
21 0.9451 1.0103 106.9 Pass
22 1.1374 1.2077 106.2 Pass
23 0.9987 1.0579 105.9 Pass
24 0.8788 0.9316 106.0 Pass
25 0.7714 0.8228 106.7 Pass
26 0.8072 0.8689 107.6 Pass
27 0.7815 0.8327 106.6 Pass
28 0.8216 0.8813 107.3 Pass
29 0.9064 0.9602 105.9 Pass
30 0.8834 0.9340 105.7 Pass
May1 0.8146 0.8594 105.5 Pass
2 0.7234 0.7672 106.1 Pass
3 0.7039 0.7546 107.2 Pass
4 0.7335 0.7820 106.6 Pass
5 0.7237 0.7734 106.9 Pass
6 0.6674 0.7119 106.7 Pass
7 0.6067 0.6482 106.8 Pass
8 0.5894 0.6303 106.9 Pass
9 0.5948 0.6358 106.9 Pass
10 0.6170 0.6672 108.1 Pass
11 0.5564 0.5989 107.6 Pass
12 0.5951 0.6374 107.1 Pass
13 0.6041 0.6489 107.4 Pass
14 0.5836 0.6227 106.7 Pass
15 0.5778 0.6119 105.9 Pass
16 0.5337 0.5718 107.1 Pass
17 0.5369 0.5784 107.7 Pass
18 0.5724 0.6180 108.0 Pass
19 0.5710 0.6071 106.3 Pass
20 0.5182 0.5539 106.9 Pass
21 0.5125 0.5471 106.8 Pass
22 0.5033 0.5448 108.3 Pass
23 0.4946 0.5343 108.0 Pass
24 0.4706 0.5038 107.1 Pass
25 0.4739 0.5185 109.4 Pass
26 0.4951 0.5241 105.9 Pass
27 0.5079 0.5349 105.3 Pass
28 0.5618 0.5888 104.8 Pass
29 0.5996 0.6263 104.5 Pass
Weston Heights North
Technical Information Report
30 0.5979 0.6163 103.1 Pass
31 0.5806 0.5976 102.9 Pass
Jun1 0.6004 0.6172 102.8 Pass
2 0.5982 0.6274 104.9 Pass
3 0.5865 0.6154 104.9 Pass
4 0.5109 0.5358 104.9 Pass
5 0.5241 0.5587 106.6 Pass
6 0.6303 0.6477 102.8 Pass
7 0.5774 0.5972 103.4 Pass
8 0.5766 0.6013 104.3 Pass
9 0.5866 0.6113 104.2 Pass
10 0.5274 0.5552 105.3 Pass
11 0.5057 0.5314 105.1 Pass
12 0.4584 0.4785 104.4 Pass
13 0.4170 0.4425 106.1 Pass
14 0.4063 0.4375 107.7 Pass
15 0.4152 0.4464 107.5 Pass
16 0.4373 0.4724 108.0 Pass
17 0.4199 0.4459 106.2 Pass
18 0.3956 0.4247 107.4 Pass
19 0.3964 0.4291 108.3 Pass
20 0.4374 0.4605 105.3 Pass
21 0.4318 0.4480 103.8 Pass
22 0.4067 0.4312 106.0 Pass
23 0.4853 0.5189 106.9 Pass
24 0.4480 0.4598 102.6 Pass
25 0.3991 0.4185 104.9 Pass
26 0.3748 0.4001 106.8 Pass
27 0.3709 0.4006 108.0 Pass
28 0.3681 0.3962 107.6 Pass
29 0.3693 0.3977 107.7 Pass
30 0.3923 0.4172 106.4 Pass
Jul1 0.3715 0.3955 106.5 Pass
2 0.3610 0.3851 106.7 Pass
3 0.3479 0.3709 106.6 Pass
4 0.3485 0.3757 107.8 Pass
5 0.3339 0.3571 107.0 Pass
6 0.3323 0.3599 108.3 Pass
7 0.3402 0.3676 108.1 Pass
8 0.3416 0.3708 108.6 Pass
9 0.3339 0.3588 107.5 Pass
10 0.3199 0.3419 106.9 Pass
11 0.3344 0.3629 108.5 Pass
12 0.3449 0.3654 105.9 Pass
13 0.3392 0.3601 106.1 Pass
14 0.3227 0.3387 105.0 Pass
15 0.3399 0.3708 109.1 Pass
16 0.3213 0.3408 106.1 Pass
17 0.3107 0.3297 106.1 Pass
18 0.3072 0.3298 107.4 Pass
19 0.3010 0.3230 107.3 Pass
20 0.2948 0.3157 107.1 Pass
21 0.2980 0.3207 107.6 Pass
22 0.2921 0.3132 107.2 Pass
23 0.2869 0.3069 107.0 Pass
24 0.2856 0.3063 107.2 Pass
25 0.2988 0.3269 109.4 Pass
26 0.2873 0.3070 106.9 Pass
27 0.2835 0.3032 106.9 Pass
28 0.2769 0.2951 106.6 Pass
29 0.2751 0.2941 106.9 Pass
30 0.2745 0.2926 106.6 Pass
31 0.2818 0.3025 107.3 Pass
Weston Heights North
Technical Information Report
Aug1 0.2813 0.3042 108.2 Pass
2 0.3049 0.3226 105.8 Pass
3 0.2855 0.3021 105.8 Pass
4 0.2758 0.2904 105.3 Pass
5 0.2902 0.3117 107.4 Pass
6 0.2885 0.3115 108.0 Pass
7 0.2744 0.2880 105.0 Pass
8 0.2818 0.3032 107.6 Pass
9 0.2690 0.2837 105.5 Pass
10 0.2651 0.2833 106.8 Pass
11 0.2607 0.2792 107.1 Pass
12 0.2557 0.2731 106.8 Pass
13 0.2935 0.3143 107.1 Pass
14 0.3247 0.3377 104.0 Pass
15 0.2920 0.3008 103.0 Pass
16 0.2925 0.3040 103.9 Pass
17 0.3120 0.3270 104.8 Pass
18 0.2945 0.3112 105.7 Pass
19 0.2755 0.2881 104.6 Pass
20 0.2755 0.2965 107.6 Pass
21 0.2855 0.3098 108.5 Pass
22 0.3410 0.3609 105.8 Pass
23 0.3444 0.3501 101.7 Pass
24 0.3414 0.3409 99.9 Pass
25 0.3505 0.3513 100.2 Pass
26 0.3272 0.3359 102.6 Pass
27 0.2986 0.3082 103.2 Pass
28 0.3044 0.3168 104.1 Pass
29 0.3133 0.3128 99.8 Pass
30 0.2885 0.2968 102.9 Pass
31 0.2829 0.2972 105.1 Pass
Sep1 0.2818 0.2979 105.7 Pass
2 0.2649 0.2800 105.7 Pass
3 0.2810 0.2997 106.7 Pass
4 0.2587 0.2722 105.2 Pass
5 0.2713 0.2908 107.2 Pass
6 0.2465 0.2570 104.3 Pass
7 0.2661 0.2854 107.3 Pass
8 0.2659 0.2772 104.3 Pass
9 0.2721 0.2949 108.4 Pass
10 0.2597 0.2759 106.2 Pass
11 0.2652 0.2706 102.0 Pass
12 0.2525 0.2652 105.0 Pass
13 0.2644 0.2894 109.5 Pass
14 0.2478 0.2658 107.3 Pass
15 0.2569 0.2762 107.5 Pass
16 0.3463 0.3755 108.4 Pass
17 0.3285 0.3301 100.5 Pass
18 0.3278 0.3360 102.5 Pass
19 0.3146 0.3221 102.4 Pass
20 0.3152 0.3166 100.4 Pass
21 0.3942 0.3991 101.2 Pass
22 0.4552 0.4377 96.2 Pass
23 0.3714 0.3707 99.8 Pass
24 0.3180 0.3269 102.8 Pass
25 0.3202 0.3270 102.1 Pass
26 0.3047 0.3161 103.7 Pass
27 0.3497 0.3484 99.6 Pass
28 0.3116 0.3119 100.1 Pass
29 0.3716 0.3736 100.6 Pass
30 0.3468 0.3376 97.3 Pass
Oct1 0.3370 0.3322 98.6 Pass
2 0.3294 0.3376 102.5 Pass
Weston Heights North
Technical Information Report
3 0.3590 0.3714 103.5 Pass
4 0.3794 0.3717 98.0 Pass
5 0.6622 0.6694 101.1 Pass
6 0.5517 0.5501 99.7 Pass
7 0.5764 0.5836 101.2 Pass
8 0.6355 0.6100 96.0 Pass
9 0.6238 0.5983 95.9 Pass
10 0.4975 0.4661 93.7 Pass
11 0.3969 0.3927 98.9 Pass
12 0.3829 0.3864 100.9 Pass
13 0.3533 0.3641 103.1 Pass
14 0.3660 0.3652 99.8 Pass
15 0.3655 0.3683 100.7 Pass
16 0.4480 0.4502 100.5 Pass
17 0.5083 0.4877 95.9 Pass
18 0.5993 0.5724 95.5 Pass
19 0.9120 0.8832 96.8 Pass
20 0.9762 0.9332 95.6 Pass
21 0.7848 0.7455 95.0 Pass
22 0.6761 0.6374 94.3 Pass
23 0.6093 0.5795 95.1 Pass
24 0.5887 0.5680 96.5 Pass
25 0.6908 0.6507 94.2 Pass
26 0.7488 0.7118 95.1 Pass
27 0.7848 0.7261 92.5 Pass
28 0.8381 0.7874 93.9 Pass
29 0.8031 0.7701 95.9 Pass
30 0.7731 0.7555 97.7 Pass
31 0.7833 0.7544 96.3 Pass
Nov1 0.8828 0.8560 97.0 Pass
2 1.1326 1.0864 95.9 Pass
3 1.3244 1.2282 92.7 Pass
4 1.1448 1.0417 91.0 Pass
5 1.3206 1.2589 95.3 Pass
6 1.3471 1.2806 95.1 Pass
7 1.1443 1.0887 95.1 Pass
8 1.2744 1.2302 96.5 Pass
9 1.4212 1.3733 96.6 Pass
10 1.6837 1.6439 97.6 Pass
11 1.8512 1.7812 96.2 Pass
12 1.7836 1.7170 96.3 Pass
13 1.8537 1.7787 96.0 Pass
14 1.5832 1.5346 96.9 Pass
15 1.5666 1.5344 97.9 Pass
16 1.6178 1.5823 97.8 Pass
17 1.6998 1.6613 97.7 Pass
18 2.0576 2.0667 100.4 Pass
19 2.3915 2.3789 99.5 Pass
20 2.2344 2.2116 99.0 Pass
21 1.9792 1.9702 99.5 Pass
22 2.0826 2.1103 101.3 Pass
23 2.9019 2.9154 100.5 Pass
24 2.9612 2.9930 101.1 Pass
25 2.6232 2.6335 100.4 Pass
26 2.3597 2.3573 99.9 Pass
27 1.9725 1.9817 100.5 Pass
28 2.0196 2.0490 101.5 Pass
29 2.2769 2.3194 101.9 Pass
30 2.1939 2.2162 101.0 Pass
Dec1 2.3079 2.3272 100.8 Pass
2 2.8916 2.9337 101.5 Pass
3 2.6311 2.6640 101.3 Pass
4 2.3432 2.3947 102.2 Pass
Weston Heights North
Technical Information Report
5 2.3360 2.3678 101.4 Pass
6 2.0890 2.1250 101.7 Pass
7 2.0435 2.0847 102.0 Pass
8 2.1148 2.1701 102.6 Pass
9 2.3573 2.4166 102.5 Pass
10 2.4178 2.4762 102.4 Pass
11 2.5444 2.5989 102.1 Pass
12 2.5694 2.6223 102.1 Pass
13 2.6401 2.6939 102.0 Pass
14 3.0557 3.1354 102.6 Pass
15 2.7431 2.8105 102.5 Pass
16 2.4663 2.5182 102.1 Pass
17 2.2397 2.2970 102.6 Pass
18 2.0809 2.1458 103.1 Pass
19 2.4036 2.4877 103.5 Pass
20 2.4839 2.5477 102.6 Pass
21 2.3052 2.3657 102.6 Pass
22 2.3251 2.3955 103.0 Pass
23 2.2466 2.3116 102.9 Pass
24 2.1462 2.2270 103.8 Pass
25 2.5632 2.6587 103.7 Pass
26 2.9059 2.9964 103.1 Pass
27 2.3743 2.4429 102.9 Pass
28 2.3438 2.4457 104.3 Pass
29 2.9308 3.0287 103.3 Pass
30 2.4225 2.5019 103.3 Pass
31 2.3459 2.4386 104.0 Pass
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of
any kind. The entire risk regarding the performance and results of this program is
assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or
sublicensees disclaim all warranties, either expressed or implied, including but not
limited to implied warranties of program and accompanying documentation. In no event
shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including
without limitation to damages for loss of business profits, loss of business
information, business interruption, and the like) arising out of the use of, or
inability to use this program even if Clear Creek Solutions Inc. or their authorized
representatives have been advised of the possibility of such damages. Software
Copyright © by : Clear Creek Solutions, Inc. 2005-2016; All Rights Reserved.
Weston Heights North
Technical Information Report
WWHM2012 – Site Information
WWHM2012 – Predeveloped Scenario
Weston Heights North
Technical Information Report
WWHM2012 – Developed Scenario
WWHM2012 – Fluctuation Analysis
Weston Heights North
Technical Information Report
SECTION 5
CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Weston Heights North
Technical Information Report
Conveyance System Analysis and Design
The project is proposing to tie into the Weston Heights conveyance systems. A new conveyance system
will be installed beneath the sidewalk along the Nile Ave NE frontage improvements. An existing
conveyance system is located at the curb line, restricting the location of the proposed conveyance
system. Shallow inlets will be installed at the curb line and will tightlined back to catch basins beneath the
sidewalk. The system will tie into the Weston Heights system at the intersection of the Weston Heights
developments’ roadway and Nile Ave NE. Yard drains, installed in Lots 3 – 6 will be tightlined to a
conveyance system along the private drive on the east basin. The new conveyance system will then tie
into the Weston Heights conveyance system, also along the private drive. Yard drains will be installed on
Lot 2, and the roof downspout of Lot 3 will be connected to an existing conveyance system along NE 7th
Pl. This conveyance will tie into the Olympus Villa conveyance system, directing this runoff into Pond ‘A’.
The KCSWDM requires that the conveyance flows tributary to each catch basin be calculated with
KCRTS using 15-minute timesteps. The KCRTS also requires that the 25-year peak design flows be
contained within the conveyance system with no surcharge. The 100-year peak design flows must also
be analyzed, and it must be demonstrated that any surcharge during the 100-year peak design event
must not cause or aggravate a flooding problem.
Conveyance calculations for this project are provided in Appendix 5A. For simplicity of the calculation,
and in order to provide a conservative design, the calculations only analyze the 100-year storm event,
and show that there is no surcharge during that event.
Weston Heights North
Technical Information Report
APPENDIX 5A
CONVEYANCE CALCULATIONS
Weston Heights North
Technical Information Report
Conveyance Calculations to be provided for final review.
Weston Heights North
Technical Information Report
SECTION 6
SPECIAL REPORTS AND STUDIES
Weston Heights North
Technical Information Report
Special Reports and Studies
A geotechnical report was prepared by The Riley Group, Inc. for the project on January 29th, 2015. A
copy of this report is included in Appendix 6A.
A copy of the Olympus Villa LUA 10-090 TIR has been attached as Appendix 6B. The Olympus Villa
Pond ‘A’ was utilized as part of this project.
A copy of the Olympus Villa original design and As-Built plans has been attached as Appendix 6C. The
Olympus Villa Pond ‘A’ was utilized as part of this project.
Weston Heights North
Technical Information Report
APPENDIX 6A
GEOTECHNICAL REPORT
Corporate Office 17522 Bothell Way Northeast
Bothell, Washington 98011
Phone 425.415.0551 ♦ Fax 425.415.0311
www.riley-group.com
GEOTECHNICAL ENGINEERING REPORT
PREPARED BY:
THE RILEY GROUP, INC.
17522 BOTHELL WAY NORTHEAST
BOTHELL, WASHINGTON 98011
PREPARED FOR:
WESTON HEIGHTS, LLC
15 LAKE BELLEVUE DRIVE, SUITE 102
BELLEVUE, WASHINGTON 98005
RGI PROJECT NO. 2016-009
WESTON NORTH
702 NILE AVENUE NORTHEAST
RENTON, WASHINGTON
JANUARY 29, 2016
Geotechnical Engineering Report i January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
TABLE OF CONTENTS
1.0 INTRODUCTION ............................................................................................................................... 1
2.0 PROJECT DESCRIPTION ............................................................................................................... 1
3.0 FIELD EXPLORATION AND LABORATORY TESTING .......................................................... 1
3.1 FIELD EXPLORATION ................................................................................................................................... 1
3.2 LABORATORY TESTING ................................................................................................................................ 2
4.0 SITE CONDITIONS ........................................................................................................................... 2
4.1 SURFACE .................................................................................................................................................. 2
4.2 GEOLOGY ................................................................................................................................................. 2
4.3 SOILS ....................................................................................................................................................... 3
4.4 GROUNDWATER ........................................................................................................................................ 3
4.5 SEISMIC CONSIDERATIONS ........................................................................................................................... 3
4.6 GEOLOGIC HAZARD AREAS .......................................................................................................................... 4
5.0 DISCUSSION AND RECOMMENDATIONS ................................................................................. 4
5.1 GEOTECHNICAL CONSIDERATIONS ................................................................................................................. 4
5.2 EARTHWORK ............................................................................................................................................. 4
5.2.1 Erosion and Sediment Control ..................................................................................................... 4
5.2.2 Stripping ....................................................................................................................................... 5
5.2.3 Excavations................................................................................................................................... 6
5.2.4 Site Preparation ........................................................................................................................... 6
5.2.5 Structural Fill ................................................................................................................................ 7
5.2.6 Cut and Fill Slopes ........................................................................................................................ 8
5.2.7 Wet Weather Construction Considerations ................................................................................. 8
5.3 FOUNDATIONS .......................................................................................................................................... 9
5.4 RETAINING WALLS ................................................................................................................................... 10
5.5 SLAB-ON-GRADE CONSTRUCTION ............................................................................................................... 10
5.6 DRAINAGE .............................................................................................................................................. 11
5.6.1 Surface ....................................................................................................................................... 11
5.6.2 Subsurface .................................................................................................................................. 11
5.6.3 Infiltration .................................................................................................................................. 11
5.7 UTILITIES ................................................................................................................................................ 11
5.8 PAVEMENTS ............................................................................................................................................ 11
6.0 ADDITIONAL SERVICES .............................................................................................................. 12
7.0 LIMITATIONS ................................................................................................................................. 12
LIST OF FIGURES AND APPENDICES
Figure 1 ..................................................................................................................... Site Vicinity Map
Figure 2 ............................................................................................... Geotechnical Exploration Plan
Figure 3 ...................................................................................Typical Retaining Wall Drainage Detail
Figure 4 ....................................................................................................Typical Footing Drain Detail
Appendix A .......................................................................... Field Exploration and Laboratory Testing
Geotechnical Engineering Report ii January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
Executive Summary
This Executive Summary should be used in conjunction with the entire Geotechnical
Engineering Report (GER) for design and/or construction purposes. It should be
recognized that specific details were not included or fully developed in this section, and
the GER must be read in its entirety for a comprehensive understanding of the items
contained herein. Section 7.0 should be read for an understanding of limitations.
RGI’s geotechnical scope of work included the advancement of 3 hand augers to a
maximum depth of 3.5 feet below existing site grades.
Based on the information obtained from our subsurface exploration, the site is suitable
for development of the proposed project. The following geotechnical considerations were
identified:
Soil Conditions: The soils encountered during field exploration includes soft to medium
stiff silt with some sand and medium dense silty sand with some gravel .
Groundwater: Light groundwater seepage was encountered between depths of 8 to 18
inches bgs during our subsurface exploration.
Foundations: Foundations for the proposed building may be supported on conventional
spread footings bearing on medium dense to dense native soil or structural fill.
Slab-on-grade: Slab-on-grade floors and slabs for the proposed building can be supported
on medium dense to dense native soil or structural fill.
Pavements: The following pavement sections are recommended:
For heavy truck traffic areas: 3 inches of Hot Mix Asphalt (HMA) over 6 inches of
crushed rock base (CRB)
For general parking areas: 2 inches of HMA over 4 inches of CRB
Geotechnical Engineering Report 1 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
1.0 Introduction
This Geotechnical Engineering Report (GER) presents the results of the geotechnical
engineering services provided for the Weston North short plat in Renton, Washington.
The purpose of this evaluation is to assess subsurface conditions and provide
geotechnical recommendations for the construction of single family residences. Our
scope of services included field explorations, laboratory testing, engineering analyses, and
preparation of this GER.
The recommendations in the following sections of this GER are based upon our current
understanding of the proposed site development as outlined below. If actual features
vary or changes are made, RGI should review them in order to modify our
recommendations as required. In addition, RGI requests to review the site grading plan,
final design drawings and specifications when available to verify that our project
understanding is correct and that our recommendations have been properly interpreted
and incorporated into the project design and construction.
2.0 Project description
The project site is located at 702 Nile Avenue Northeast in Renton, Washington. The
approximate location of the site is shown on Figure 1. The site is currently occupied by a
single family residence with a shop to the west and a grass field to the east of the
residence.
RGI understands that the parcel will be subdivided into six lots with construction of five
new single family residences. The existing residence and shop will remain on Lot 1. Our
understanding of the project is based on conversations with the client, and a site plan
that was forwarded to us by SDA dated October 24, 2015.
At the time of preparing this GER, building plans were not available for our review. Based
on our experience with similar construction, RGI anticipates that the proposed building
will be supported on perimeter walls with bearing loads of two to four kips per linear
foot, and a series of columns with a maximum load up to 20 kips. Slab-on-grade floor
loading of 250 pounds per square foot (psf) are expected.
3.0 Field Exploration and Laboratory Testing
3.1 FIELD EXPLORATION
On January 22, 2016, RGI excavated three hand augers. The approximate exploration
locations are shown on Figure 2.
Field logs of each exploration were prepared by the geologist that completed the
excavation. These logs included visual classifications of the materials encountered during
excavation. The hand augers logs included in Appendix A represent an interpretation of
Geotechnical Engineering Report 2 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
the field logs and include modifications based on laboratory observation and analysis of
the samples.
3.2 LABORATORY TESTING
During the field exploration, a representative portion of each recovered sample was
sealed in containers and transported to our laboratory for further visual and laboratory
examination. Selected samples retrieved from the hand augers were tested for moisture
content and grain size analysis, to aid in soil classification and provide input for the
recommendations provided in this GER. The results and descriptions of the laboratory
tests are enclosed in Appendix A.
4.0 Site Conditions
4.1 SURFACE
The subject site is a rectangular-shaped parcel of land approximately 2.3 acres in size. The
site is bound to the north by Northeast 7th Place, to the east by residential property and
a private road, to the south by a wetland and residential properties, and to the west by
Nile Avenue Northeast.
The existing site houses a shop and a single family residence that are located within the
western section of the site. A handful of trees are located along the western portion of
the south property line with a cluster of 20 foot tall bamboo stalks to the northeast of the
house. The remaining area (central to eastern portion of the site) is occupied by a large
grassy field, where the proposed new single family residences would be constructed. The
site is relatively flat with an overall elevation difference of approximately 6 feet,
increasing in elevation towards the east.
4.2 GEOLOGY
Review of the Geologic Map of the Renton Quadrangle King County, Washington, by D.R.
Mullineaux, (1965) indicates that the soil in the project vicinity is mapped as Ground
moraine deposits (Qgt), which is mostly thin ablation till over lodgment till, deposited by
Puget glacial lobe. Lodgment till generally compact, coherent, unsorted mixture of sand,
silt, clay and gravel: commonly termed hardpan. Ablation till similar, but much less
compact and coherent. Highly variable in thickness and in relative proportion of lodgment
to ablation till; lodgment till generally 5 to 30 feet thick, ablation till 2 to 10 feet. North of
Cedar River, till is mostly sand, is relatively friable and locally less than 5 feet thick.
Between Renton and Lake Youngs, lodgment till locally is thin, but ablation till is relatively
thick and grades to stratified drift. Moderately drumlinized, forms undulating, locally
irregular surface characterized by southeast-ward-trending hills and swales, commonly
overlain by thin sand, clay or peat. Surface drainage is locally poor. Lodgment till is
nearly impermeable and relatively difficult to excavate, but relatively stable in cut slopes.
These descriptions are generally similar to the findings in our field explorations.
Geotechnical Engineering Report 3 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
4.3 SOILS
The soils encountered during field exploration include silt with some sand to silty sand
with some gravel. Hand auger locations HA-2 and HA-3 encountered dense to very dense
soils that contained large gravels and cobbles that prevented further advancement in
depth.
More detailed descriptions of the subsurface conditions encountered are presented in
the hand auger logs included in Appendix A. Sieve analysis was performed on two
selected soil samples. Grain size distribution curves are included in Appendix A.
4.4 GROUNDWATER
Light groundwater seepage was encountered between 8 to 18 inches bgs during our
subsurface exploration. The groundwater appears to be perched over the top of a
medium stiff SILT layer. Surface water was also observed in the grassy field during the
exploration.
It should be recognized that fluctuations of the groundwater table will occur due to
seasonal variations in the amount of rainfall, runoff, and other factors not evident at the
time the explorations were performed. In addition, perched water can develop within
seams and layers contained in fill soils or higher permeability soils overlying less
permeable soils following periods of heavy or prolonged precipitation. Therefore,
groundwater levels during construction or at other times in the future may be higher or
lower than the levels indicated on the logs. Groundwater level fluctuations should be
considered when developing the design and construction plans for the project.
4.5 SEISMIC CONSIDERATIONS
Based on the 2012 International Building Code (IBC), RGI recommends the follow seismic
parameters for design.
Table 1 2012 IBC
Parameter Value
Site Soil Class1 C2
Site Latitude 47.494016o N
Site Longitude 122.141161o W
Short Period Spectral Response Acceleration, SS (g) 1.387
1-Second Period Spectral Response Acceleration, S1 (g) 0.521
Adjusted Short Period Spectral Response Acceleration, SMS (g) 1.387
Adjusted 1-Second Period Spectral Response Acceleration, SM1 (g) 0.677
1. Note: In general accordance with Chapter 20 of ASCE 7. The Site Class is based on the average characteristics of the upper 100 feet
of the subsurface profile.
Geotechnical Engineering Report 4 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
2. Note: The 2012 IBC and ASCE 7 require a site soil profile determination extending to a depth of 100 feet for seismic site
classification. The current scope of our services does not include the required 100 foot soil profile determination. Hand augers
extended to a maximum depth of 3.5 feet, and this seismic site class definition considers that very dense soil continues below the
maximum depth of the subsurface exploration. Additional exploration to deeper depths would be required to confirm the conditions
below the current depth of exploration.
Liquefaction is a phenomenon where there is a reduction or complete loss of soil strength
due to an increase in water pressure induced by vibrations from a seismic event.
Liquefaction mainly affects geologically recent deposits of fine-grained sands that are
below the groundwater table. Soils of this nature derive their strength from intergranular
friction. The generated water pressure or pore pressure essentially separates the soil
grains and eliminates this intergranular friction, thus reducing or eliminating the soil’s
strength.
RGI reviewed the results of the field and laboratory testing and assessed the potential for
liquefaction of the site’s soil during an earthquake. Since the site is underlain by glacial
till, RGI considers that the possibility of liquefaction during an earthquake is minimal.
4.6 GEOLOGIC HAZARD AREAS
Regulated geologically hazardous areas include erosion, landslide, earthquake, or other
geological hazards. Based on the definitions in the Renton Municipal Code, the site does
not contain geologically hazardous areas. There are not mapped coal mine hazards, steep
slopes or landslide hazard on the site or in the near vicinity of the site. A wetland is
mapped on the parcel to the south of the site and appears to extend slightly into the site.
5.0 Discussion and Recommendations
5.1 GEOTECHNICAL CONSIDERATIONS
Based on our study, the site is suitable for the proposed construction from a geotechnical
standpoint. Foundations for the proposed building can be supported on conventional
spread footings bearing on medium dense to dense native soil or structural fill. Slab-on-
grade and pavements can be similarly supported.
Detailed recommendations regarding the above issues and other geotechnical design
considerations are provided in the following sections. These recommendations should be
incorporated into the final design drawings and construction specifications.
5.2 EARTHWORK
The earthwork is expected to include installing underground utilities excavating and
backfilling the residence foundations and preparing sidewalk, driveway and frontage
improvement roadway subgrades.
5.2.1 EROSION AND SEDIMENT CONTROL
Potential sources or causes of erosion and sedimentation depend on construction
methods, slope length and gradient, amount of soil exposed and/or disturbed, soil type,
Geotechnical Engineering Report 5 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
construction sequencing and weather. The impacts on erosion-prone areas can be
reduced by implementing an erosion and sedimentation control plan. The plan should be
designed in accordance with applicable city and/or county standards.
RGI recommends the following erosion control Best Management Practices (BMPs):
Scheduling site preparation and grading for the drier summer and early fall
months and undertaking activities that expose soil during periods of little or no
rainfall
Retaining existing vegetation whenever feasible
Establishing a quarry spall construction entrance
Installing siltation control fencing or anchored straw or coir wattles on the
downhill side of work areas
Covering soil stockpiles with anchored plastic sheeting
Revegetating or mulching exposed soils with a minimum 3-inch thickness of straw
if surfaces will be left undisturbed for more than one day during wet weather or
one week in dry weather
Directing runoff away from exposed soils and slopes
Minimizing the length and steepness of slopes with exposed soils and cover
excavation surfaces with anchored plastic sheeting (Graded and disturbed slopes
should be tracked in place with the equipment running perpendicular to the slope
contours so that the track marks provide a texture to help resist erosion and
channeling. Some sloughing and raveling of slopes with exposed or disturbed soil
should be expected.)
Decreasing runoff velocities with check dams, straw bales or coir wattles
Confining sediment to the project site
Inspecting and maintaining erosion and sediment control measures frequently
(The contractor should be aware that inspection and maintenance of erosion
control BMPs is critical toward their satisfactory performance. Repair and/or
replacement of dysfunctional erosion control elements should be anticipated.)
Permanent erosion protection should be provided by reestablishing vegetation using
hydroseeding and/or landscape planting. Until the permanent erosion protection is
established, site monitoring should be performed by qualified personnel to evaluate the
effectiveness of the erosion control measures. Provisions for modifications to the erosion
control system based on monitoring observations should be included in the erosion and
sedimentation control plan.
5.2.2 STRIPPING
Stripping efforts should include removal of pavements, vegetation, organic materials, and
deleterious debris from areas slated for building, pavement, and utility construction. The
hand augers encountered eight to 14 inches of topsoil and rootmass. Deeper areas of
stripping may be required in forested or heavily vegetated areas of the site.
Geotechnical Engineering Report 6 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
5.2.3 EXCAVATIONS
All temporary cut slopes associated with the site and utility excavations should be
adequately inclined to prevent sloughing and collapse. The site soils consist of dense
native soils.
Accordingly, for excavations more than 4 feet but less than 20 feet in depth, the
temporary side slopes should be laid back with a minimum slope inclination of 1.5H:1V
(Horizontal:Vertical) where groundwater seepage is encountered and 3/4H:1V in the
underlying dense soils. If there is insufficient room to complete the excavations in this
manner, or excavations greater than 20 feet in depth are planned, using temporary
shoring to support the excavations should be considered. For open cuts at the site, RGI
recommends:
No traffic, construction equipment, stockpiles or building supplies are allowed at
the top of cut slopes within a distance of at least five feet from the top of the cut
Exposed soil along the slope is protected from surface erosion using waterproof
tarps and/or plastic sheeting
Construction activities are scheduled so that the length of time the temporary cut
is left open is minimized
Surface water is diverted away from the excavation
The general condition of slopes should be observed periodically by a geotechnical
engineer to confirm adequate stability and erosion control measures
In all cases, however, appropriate inclinations will depend on the actual soil and
groundwater conditions encountered during earthwork. Ultimately, the site contractor
must be responsible for maintaining safe excavation slopes that comply with applicable
OSHA or WISHA guidelines.
5.2.4 SITE PREPARATION
Once stripping, clearing and other preparing operations are complete, the footings should
be excavated into the native soils. Subgrade soils that become disturbed due to elevated
moisture conditions should be overexcavated to reveal firm, non-yielding, non-organic
soils and backfilled with compacted structural fill. In order to maximize utilization of site
soils as structural fill, RGI recommends that the earthwork portion of this project be
completed during extended periods of warm and dry weather if possible. If earthwork is
completed during the wet season (typically November through May) it will be necessary
to take extra precautionary measures to protect subgrade soils. Wet season earthwork
will require additional mitigative measures beyond that which would be expected during
the drier summer and fall months.
Geotechnical Engineering Report 7 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
5.2.5 STRUCTURAL FILL
RGI recommends fill below the foundation and floor slab, behind retaining walls, and
below pavement and hardscape surfaces be placed in accordance with the following
recommendations for structural fill.
The suitability of excavated site soils and import soils for compacted structural fill use will
depend on the gradation and moisture content of the soil when it is placed. As the
amount of fines (that portion passing the U.S. No. 200 sieve) increases, soil becomes
increasingly sensitive to small changes in moisture content and adequate compaction
becomes more difficult or impossible to achieve. Soils containing more than about 5
percent fines cannot be consistently compacted to a dense, non-yielding condition when
the moisture content is more than 2 percent above or below optimum. Optimum
moisture content is that moisture that results in the greatest compacted dry density with
a specified compactive effort.
Non-organic site soils are only considered suitable for structural fill provided that their
moisture content is within about two percent of the optimum moisture level as
determined by ASTM D1557. Excavated site soils may not be suitable for re-use as
structural fill depending on the moisture content and weather conditions at the time of
construction. If soils are stockpiled for future reuse and wet weather is anticipated, the
stockpile should be protected with plastic sheeting that is securely anchored. Even during
dry weather, moisture conditioning (such as, windrowing and drying) of site soils to be
reused as structural fill may be required. Even during the summer, delays in grading can
occur due to excessively high moisture conditions of the soils or due to precipitation. If
wet weather occurs, the upper wetted portion of the site soils may need to be scarified
and allowed to dry prior to further earthwork, or may need to be wasted from the site.
The native soils were over the optimum moisture content during our explorations. The
native soils may require moisture conditioning even in the drier summer months. If on-
site soils are or become unusable or earthwork will be completed in wet weather, it may
become necessary to import clean, granular soils to complete site work that meet the
grading requirements listed in Table 2 to be used as structural fill.
Table 2 Structural Fill Gradation
U.S. Sieve Size Percent Passing
4 inches 100
No. 4 sieve 75 percent
No. 200 sieve 5 percent *
*Based on minus 3/4 inch fraction.
Geotechnical Engineering Report 8 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
Prior to use, an RGI representative should observe and test all materials imported to the
site for use as structural fill. Structural fill materials should be placed in uniform loose
layers not exceeding 12 inches and compacted as specified in Table 2. The soil’s maximum
density and optimum moisture should be determined by ASTM D1557.
Table 3 Structural Fill Compaction ASTM D1557
Location Material Type
Minimum
Compaction
Percentage
Moisture Content
Range
Foundations On-site granular or approved
imported fill soils: 95 +2 -2
Retaining Wall Backfill On-site granular or approved
imported fill soils: 92 +2 -2
Slab-on-grade On-site granular or approved
imported fill soils: 95 +2 -2
General Fill (non-
structural areas)
On-site soils or approved
imported fill soils: 90 +3 -2
Pavement – Subgrade
and Base Course
On-site granular or approved
imported fill soils: 95 +2 -2
Placement and compaction of structural fill should be observed by RGI. A representative
number of in-place density tests should be performed as the fill is being placed to confirm
that the recommended level of compaction is achieved.
5.2.6 CUT AND FILL SLOPES
All permanent cut and fill slopes (except interior slopes of detention pond) should be
graded with a finished inclination no greater than 2H:1V. The interior slopes of the
detention pond must be graded with a slope gradient no steeper than 3H:1V. Upon
completion of construction, the slope face should be trackwalked, compacted and
vegetated, or provided with other physical means to guard against erosion.
Final grades at the top of the slopes must promote surface drainage away from the slope
crest. Water must not be allowed to flow in an uncontrolled fashion over the slope face. If
it is necessary to direct surface runoff towards the slope, it should be controlled at the
top of the slope, piped in a closed conduit installed on the slope face, and taken to an
appropriate point of discharge beyond the toe of the slope. All fill placed for slope
construction should meet the structural fill requirements as described in Section 5.2.5.
5.2.7 WET WEATHER CONSTRUCTION CONSIDERATIONS
RGI recommends that preparation for site grading and construction include procedures
intended to drain ponded water, control surface water runoff, and to collect shallow
subsurface seepage zones in excavations where encountered. It will not be possible to
Geotechnical Engineering Report 9 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
successfully compact the subgrade or utilize on-site soils as structural fill if accumulated
water is not drained prior to grading or if drainage is not controlled during construction.
Attempting to grade the site without adequate drainage control measures will reduce the
amount of on-site soil effectively available for use, increase the amount of select import
fill materials required, and ultimately increase the cost of the earthwork phases of the
project. Free water should not be allowed to pond on the subgrade soils. RGI anticipates
that the use of berms and shallow drainage ditches, with sumps and pumps in utility
trenches, will be required for surface water control during wet weather and/or wet site
conditions.
5.3 FOUNDATIONS
Following site preparation and grading, the proposed residence foundations can be
supported on conventional spread footings bearing on medium dense to dense native soil
or structural fill. Loose, organic, or other unsuitable soils may be encountered in the
proposed building footprint. If unsuitable soils are encountered, they should be
overexcavated and backfilled with structural fill.
Perimeter foundations exposed to weather should be at a minimum depth of 18 inches
below final exterior grades. Interior foundations can be constructed at any convenient
depth below the floor slab. Finished grade is defined as the lowest adjacent grade within
5 feet of the foundation for perimeter (or exterior) footings and finished floor level for
interior footings.
Table 4 Foundation Design
Design Parameter Value
Allowable Bearing Capacity - Structural Fill
Dense native soils
2,500 psf1
4,000 psf
Friction Coefficient 0.30
Passive pressure (equivalent fluid pressure) 250 pcf2
Minimum foundation dimensions Columns: 24 inches
Walls: 16 inches
1. psf = pounds per square foot
2. pcf = pounds per cubic foot
The allowable foundation bearing pressures apply to dead loads plus design live load
conditions. For short-term loads, such as wind and seismic, a 1/3 increase in this
allowable capacity may be used. At perimeter locations, RGI recommends not including
the upper 12 inches of soil in the computation of passive pressures because they can be
affected by weather or disturbed by future grading activity. The passive pressure value
assumes the foundation will be constructed neat against competent soil or backfilled with
Geotechnical Engineering Report 10 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
structural fill as described in Section 5.2.5. The recommended base friction and passive
resistance value includes a safety factor of about 1.5.
With spread footing foundations designed in accordance with the recommendations in
this section, maximum total and differential post-construction settlements of 1 inch and
1/2 inch, respectively, should be expected.
5.4 RETAINING WALLS
If retaining walls are needed for the residences, RGI recommends cast-in-place concrete
walls be used. The magnitude of earth pressure development on retaining walls will partly
depend on the quality of the wall backfill. RGI recommends placing and compacting wall
backfill as structural fill. Wall drainage will be needed behind the wall face. A typical
retaining wall drainage detail is shown in Figure 3.
With wall backfill placed and compacted as recommended, and drainage properly
installed, RGI recommends using the values in the following table for design.
Table 5 Retaining Wall Design
Design Parameter Value
Allowable Bearing Capacity - Structural Fill
Dense native soils
2,500 psf
4,000 psf
Active Earth Pressure (unrestrained walls) 35 pcf
At-rest Earth Pressure (restrained walls) 50 pcf
For seismic design, an additional uniform load of 7 times the wall height (H) for
unrestrained walls and 14H in psf for restrained walls should be applied to the wall
surface.
Friction at the base of foundations and passive earth pressure will provide resistance to
these lateral loads. Values for these parameters are provided in Section 5.3.
5.5 SLAB-ON-GRADE CONSTRUCTION
Once site preparation has been completed as described in Section 5.2, suitable support
for slab-on-grade construction should be provided. RGI recommends that the concrete
slab be placed on top of medium dense native soil or structural fill. Immediately below
the floor slab, RGI recommends placing a four-inch thick capillary break layer of clean,
free-draining sand or gravel that has less than five percent passing the U.S. No. 200 sieve.
This material will reduce the potential for upward capillary movement of water through
the underlying soil and subsequent wetting of the floor slab. Where moisture by vapor
transmission is undesirable, an 8- to 10-millimeter thick plastic membrane should be
placed on a 4-inch thick layer of clean gravel.
Geotechnical Engineering Report 11 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
For the anticipated floor slab loading, we estimate post-construction floor settlements of
1/4- to 1/2-inch. For thickness design of the slab subjected to point loading from storage
racks, RGI recommends using a subgrade modulus (KS) of 150 pounds per square inch per
inch of deflection.
5.6 DRAINAGE
5.6.1 SURFACE
Final exterior grades should promote free and positive drainage away from the
residences. Water must not be allowed to pond or collect adjacent to foundations or
within the immediate building area. For non-pavement locations, RGI recommends
providing a minimum drainage gradient of 3 percent for a minimum distance of 10 feet
from the building perimeter. In paved locations, a minimum gradient of 1 percent should
be provided unless provisions are included for collection and disposal of surface water
adjacent to the structure.
5.6.2 SUBSURFACE
RGI recommends installing perimeter foundation drains. A typical footing drain detail is
shown on Figure 4. The foundation drains and roof downspouts should be tightlined
separately to an approved discharge facility. Subsurface drains must be laid with a
gradient sufficient to promote positive flow to a controlled point of approved discharge.
5.6.3 INFILTRATION
Infiltration is not feasible on the site due to the presence of nearly impermeable soils and
shallow groundwater conditions.
5.7 UTILITIES
Utility pipes should be bedded and backfilled in accordance with American Public Works
Association (APWA) specifications. For site utilities located within the right-of-ways,
bedding and backfill should be completed in accordance with City of Renton
specifications. At a minimum, trench backfill should be placed and compacted as
structural fill, as described in Section 5.2.5. Where utilities occur below unimproved
areas, the degree of compaction can be reduced to a minimum of 90 percent of the soil’s
maximum density as determined by the referenced ASTM D1557. As noted, soils
excavated on site may not be suitable for use as backfill material. Imported structural fill
meeting the gradation provided in Table 2 may be necessary for trench backfill.
5.8 PAVEMENTS
Pavement subgrades should be prepared as described in Section 5.2 and as discussed
below. Regardless of the relative compaction achieved, the subgrade must be firm and
relatively unyielding before paving. The subgrade should be proofrolled with heavy
construction equipment to verify this condition.
Geotechnical Engineering Report 12 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
With the pavement subgrade prepared as described above, RGI recommends the
following pavement sections for parking and drive areas paved with flexible asphalt
concrete surfacing.
For heavy truck traffic areas: 3 inches of Hot Mix Asphalt (HMA) over 6 inches of
crushed rock base (CRB)
For general parking areas: 2 inches of HMA over 4 inches of CRB
The asphalt paving materials used should conform to the Washington State Department
of Transportation (WSDOT) specifications for HMA and CRB surfacing.
Long-term pavement performance will depend on surface drainage. A poorly-drained
pavement section will be subject to premature failure as a result of surface water
infiltrating into the subgrade soils and reducing their supporting capability.
For optimum pavement performance, surface drainage gradients of no less than 2
percent are recommended. Also, some degree of longitudinal and transverse cracking of
the pavement surface should be expected over time. Regular maintenance should be
planned to seal cracks when they occur.
6.0 Additional Services
RGI is available to provide further geotechnical consultation throughout the design phase
of the project. RGI should review the final design and specifications in order to verify that
earthwork and foundation recommendations have been properly interpreted and
incorporated into project design and construction.
RGI is also available to provide geotechnical engineering and construction monitoring
services during construction. The integrity of the earthwork and construction depends on
proper site preparation and procedures. In addition, engineering decisions may arise in
the field in the event that variations in subsurface conditions become apparent.
Construction monitoring services are not part of this scope of work. If these services are
desired, please let us know and we will prepare a cost proposal.
7.0 Limitations
This GER is the property of RGI, Weston Heights, LLC, and its designated agents. Within
the limits of the scope and budget, this GER was prepared in accordance with generally
accepted geotechnical engineering practices in the area at the time this GER was issued.
This GER is intended for specific application to the Weston North project in Renton,
Washington, and for the exclusive use of Weston Heights, LLC and its authorized
representatives. No other warranty, expressed or implied, is made. Site safety, excavation
support, and dewatering requirements are the responsibility of others.
The scope of services for this project does not include either specifically or by implication
any environmental or biological (for example, mold, fungi, bacteria) assessment of the
Geotechnical Engineering Report 13 January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
site or identification or prevention of pollutants, hazardous materials or conditions. If the
owner is concerned about the potential for such contamination or pollution, we can
provide a proposal for these services.
The analyses and recommendations presented in this GER are based upon data obtained
from the test exploration performed on site. Variations in soil conditions can occur, the
nature and extent of which may not become evident until construction. If variations
appear evident, RGI should be requested to reevaluate the recommendations in this GER
prior to proceeding with construction.
It is the client’s responsibility to see that all parties to the project, including the designers,
contractors, subcontractors, are made aware of this GER in its entirety. The use of
information contained in this GER for bidding purposes should be done at the contractor’s
option and risk.
USGS, 2014, Mercer Island, Washington
USGS, 2014, Renton, Washington
7.5-Minute Quadrangle
Approximate Scale: 1"=1000'
0 500 1000 2000 N
Site Vicinity Map
Figure 1
01/2016
Corporate Office
17522 Bothell Way Northeast
Bothell, Washington 98011
Phone: 425.415.0551
Fax: 425.415.0311
Weston North
RGI Project Number
2016-009
Date Drawn:
Address: 702 Nile Avenue Northeast, Renton, Washington 98059
SITE
HA-1HA-2HA-301/2016Corporate Office17522 Bothell Way NortheastBothell, Washington 98011Phone: 425.415.0551Fax: 425.415.0311Weston NorthRGI Project Number2016-009Date Drawn:Address: 702 Nile Avenue Northeast, Renton, Washington 98059Geotechnical Exploration PlanFigure 2Approximate Scale: 1"=80'04080160N = HA-1 to HA-3 excavated by RGI, 1/22/16Drawn from Roadway and Drainage Plan by SDA, Civil Engineers
Incliniations)
12" Over the Pipe
3" Below the Pipe
Perforated Pipe
4" Diameter PVC
Compacted Structural
Backfill (Native or Import)
12" min.
Filter Fabric Material
12" Minimum Wide
Free-Draining Gravel
Slope to Drain
(See Report for
Appropriate
Excavated Slope
01/2016
Corporate Office
17522 Bothell Way Northeast
Bothell, Washington 98011
Phone: 425.415.0551
Fax: 425.415.0311
Weston North
RGI Project Number
2016-009
Date Drawn:
Address: 702 Nile Avenue Northeast, Renton, Washington 98059
Retaining Wall Drainage Detail
Figure 3
Not to Scale
3/4" Washed Rock or Pea Gravel
4" Perforated Pipe
Building Slab
Structural
Backfill
Compacted
Filter Fabric
01/2016
Corporate Office
17522 Bothell Way Northeast
Bothell, Washington 98011
Phone: 425.415.0551
Fax: 425.415.0311
Weston North
RGI Project Number
2016-009
Date Drawn:
Address: 702 Nile Avenue Northeast, Renton, Washington 98059
Typical Footing Drain Detail
Figure 4
Not to Scale
Geotechnical Engineering Report January 29, 2016
Weston North, Renton, Washington RGI Project No. 2016-009
APPENDIX A
FIELD EXPLORATION AND LABORATORY TESTING
On January 22, 2016, RGI performed field explorations using a hand auger. We explored
subsurface soil conditions at the site by excavating three hand augers to a maximum
depth of 3.5 feet below existing grade. The hand augers locations are shown on Figure 2.
The hand augers locations were approximately determined by measurements from
existing property lines and paved roads.
A geologist from our office conducted the field exploration and classified the soil
conditions encountered, maintained a log of each test exploration, obtained
representative soil samples, and observed pertinent site features. All soil samples were
visually classified in accordance with the Unified Soil Classification System (USCS).
Representative soil samples obtained from the explorations were placed in closed
containers and taken to our laboratory for further examination and testing. As a part of
the laboratory testing program, the soil samples were classified in our in house laboratory
based on visual observation, texture, plasticity, and the limited laboratory testing
described below.
Moisture Content Determinations
Moisture content determinations were performed in accordance with ASTM D2216-10
Standard Test Methods for Laboratory Determination of Water (Moisture) Content of Soil
and Rock by Mass (ASTM D2216) on representative samples obtained from the
exploration in order to aid in identification and correlation of soil types. The moisture
content of typical sample was measured and is reported on the hand augers logs.
Grain Size Analysis
A grain size analysis indicates the range in diameter of soil particles included in a
particular sample. Grain size analyses was determined using D6913-04(2009) Standard
Test Methods for Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis (ASTM
D6913) on two of the samples.
THE RILEY GROUP, INC.
17522 Bothell Way NE
Bothell, WA 98011
PHONE: (425) 415-0551
FAX: (425) 415-0311
GRAIN SIZE ANALYSIS
ASTM D421, D422, D1140, D2487, D6913
PROJECT TITLE Weston North SAMPLE ID/TYPE HA-1 S-3
PROJECT NO.2016-009 SAMPLE DEPTH 3.5'
TECH/TEST DATE PL 1/22/2106 DATE RECEIVED 1/22/2016
WATER CONTENT (Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture
Wt Wet Soil & Tare (gm) (w1)347.8 Weight Of Sample (gm)268.5
Wt Dry Soil & Tare (gm)(w2)268.5 Tare Weight (gm) 8.5
Weight of Tare (gm)(w3)8.5 (W6) Total Dry Weight (gm)260.0
Weight of Water (gm)(w4=w1-w2)79.3 SIEVE ANALYSIS
Weight of Dry Soil (gm) (w5=w2-w3)260.0 Cumulative
Moisture Content (%) (w4/w5)*100 31 Wt Ret (Wt-Tare) (%Retained)% PASS
+Tare {(wt ret/w6)*100}(100-%ret)
% COBBLES 0.0 12.0"8.5 0.00 0.00 100.00 cobbles
% C GRAVEL 0.0 3.0"8.5 0.00 0.00 100.00 coarse gravel
% F GRAVEL 1.3 2.5" coarse gravel
% C SAND 2.7 2.0" coarse gravel
% M SAND 6.7 1.5"8.5 0.00 0.00 100.00 coarse gravel
% F SAND 6.5 1.0" coarse gravel
% FINES 82.8 0.75"8.5 0.00 0.00 100.00 fine gravel
% TOTAL 100.0 0.50" fine gravel
0.375"8.5 0.00 0.00 100.00 fine gravel
D10 (mm)#4 11.8 3.30 1.27 98.73 coarse sand
D30 (mm)#10 18.8 10.30 3.96 96.04 medium sand
D60 (mm)#20 medium sand
Cu #40 36.1 27.60 10.62 89.38 fine sand
Cc #60 fine sand
#100 47.4 38.90 14.96 85.04 fine sand
#200 53.1 44.60 17.15 82.85 fines
PAN 268.5 260.00 100.00 0.00 silt/clay
DESCRIPTION SILT with some sand
USCS ML
Prepared For:Reviewed By:KMW
Weston Heights, LLC
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.11101001000
%
P
A
S
S
I
N
G
Grain size in millimeters
12"3"2"1".75".375"#4 #10 #20 #40 #60 #100 #200
THE RILEY GROUP, INC.
17522 Bothell Way NE
Bothell, WA 98011
PHONE: (425) 415-0551
FAX: (425) 415-0311
GRAIN SIZE ANALYSIS
ASTM D421, D422, D1140, D2487, D6913
PROJECT TITLE Weston North SAMPLE ID/TYPE HA-2 S-2
PROJECT NO.2016-009 SAMPLE DEPTH 2'
TECH/TEST DATE PL 1/22/2106 DATE RECEIVED 1/22/2016
WATER CONTENT (Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture
Wt Wet Soil & Tare (gm) (w1)322.0 Weight Of Sample (gm)238.0
Wt Dry Soil & Tare (gm)(w2)238.0 Tare Weight (gm) 8.4
Weight of Tare (gm)(w3)8.4 (W6) Total Dry Weight (gm)229.6
Weight of Water (gm)(w4=w1-w2)84.0 SIEVE ANALYSIS
Weight of Dry Soil (gm) (w5=w2-w3)229.6 Cumulative
Moisture Content (%) (w4/w5)*100 37 Wt Ret (Wt-Tare) (%Retained)% PASS
+Tare {(wt ret/w6)*100}(100-%ret)
% COBBLES 0.0 12.0"8.4 0.00 0.00 100.00 cobbles
% C GRAVEL 0.0 3.0"8.4 0.00 0.00 100.00 coarse gravel
% F GRAVEL 15.4 2.5" coarse gravel
% C SAND 11.7 2.0" coarse gravel
% M SAND 13.9 1.5"8.4 0.00 0.00 100.00 coarse gravel
% F SAND 21.6 1.0" coarse gravel
% FINES 37.4 0.75"8.4 0.00 0.00 100.00 fine gravel
% TOTAL 100.0 0.50" fine gravel
0.375"17.6 9.20 4.01 95.99 fine gravel
D10 (mm)#4 43.8 35.40 15.42 84.58 coarse sand
D30 (mm)#10 70.7 62.30 27.13 72.87 medium sand
D60 (mm)#20 medium sand
Cu #40 102.6 94.20 41.03 58.97 fine sand
Cc #60 fine sand
#100 133.2 124.80 54.36 45.64 fine sand
#200 152.1 143.70 62.59 37.41 fines
PAN 238.0 229.60 100.00 0.00 silt/clay
DESCRIPTION Silty SAND with some gravel
USCS SM
Prepared For:Reviewed By:KMW
Weston Heights, LLC
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.11101001000
%
P
A
S
S
I
N
G
Grain size in millimeters
12"3"2"1".75".375"#4 #10 #20 #40 #60 #100 #200
Weston Heights North
Technical Information Report
APPENDIX 6B
OLYMPUS VILLA LUA 10-090
Weston Heights North
Technical Information Report
APPENDIX 6C
OLYMPUS VILLA AS-BUILT PLANS
Weston Heights North
Technical Information Report
SECTION 7
OTHER PERMITS
Weston Heights North
Technical Information Report
Other Permits
This project will require the following permits:
Grading Permit - City of Renton
Right-of-Way Use Permit - City of Renton
Construction Stormwater Permit - WA Dept. of Ecology
Weston Heights North
Technical Information Report
SECTION 8
CSWPPP ANALYSIS AND DESIGN
Weston Heights North
Technical Information Report
ESC Plan Analysis and Design
This section, along with the Temporary Erosion and Sediment Control (TESC) Plan contained in the
engineering drawings, is intended to serve as the construction Stormwater Pollution Prevention Plan
(SWPPP) for the project. The SWPPP is outlined in conformance with the 2005 edition of the
Washington State Department of Ecology’s Stormwater Management Manual for Western Washington
(DOE Manual).
1.0 – INTRODUCTION
An introductory overview of the project has been provided in the Project Overview section of this
report.
2.0 – SITE DESCRIPTION
A general site description has been provided in the Project Overview section of this report. Additional
detailed information is provided through the rest of this report.
3.0 – CONSTRUCTION STORMWATER BMPs
3.1 – 12 BMP ELEMENTS
Element #1 – Mark Clearing Limits
To protect adjacent properties and to reduce the area of soil exposed to construction, the
limits of construction will be clearly marked before land-disturbing activities begin. Trees that
are to be preserved, as well as all sensitive areas and their buffers, shall be clearly
delineated, both in the field and on the plans. In general, natural vegetation and native
topsoil shall be retained in an undisturbed state to the maximum extent possible. The BMPs
relevant to marking the clearing limits are identified in Appendix 8B.
Alternate BMPs for marking clearing limits are included in Appendix 8C as a quick reference
tool for the onsite inspector in the event the primary BMP(s) are deemed ineffective or
inappropriate during construction to satisfy the requirements set forth in the General NPDES
Permit (Appendix 8D). To avoid potential erosion and sediment control issues that may
cause a violation of the NPDES Construction Stormwater permit, the Certified Erosion and
Sediment Control Lead will promptly initiate the implementation of one or more of the
alternative BMPs after the first sign that existing BMPs are ineffective or failing.
Element #2 – Establish Construction Access
Construction access or activities occurring on unpaved areas shall be minimized, yet where
necessary, access points shall be stabilized to minimize the tracking of sediment onto public
roads, and wheel washing, street sweeping, and street cleaning shall be employed to prevent
sediment from entering state waters. All wash wastewater shall be controlled on site. The
specific BMPs related to establishing construction access that will be used on this project are
identified in Appendix 8B.
Alternate construction access BMPs are included in Appendix 8C as a quick reference tool
for the onsite inspector in the event the primary BMP(s) are deemed ineffective or
inappropriate during construction to satisfy the requirements set forth in the General NPDES
Permit (Appendix 8D). To avoid potential erosion and sediment control issues that may
cause a violation of the NPDES Construction Stormwater permit, the Certified Erosion and
Sediment Control Lead will promptly initiate the implementation of one or more of the
alternative BMPs after the first sign that existing BMPs are ineffective or failing.
Weston Heights North
Technical Information Report
Element #3 - Control Flow Rates
In order to protect the properties and waterways downstream of the project site, stormwater
discharges from the site will be controlled. The specific BMPs for flow control that shall be
used on this project are identified in Appendix 8B.
Alternate flow control BMPs are included in Appendix 8C as a quick reference tool for the
onsite inspector in the event the primary BMP(s) are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit. To
avoid potential erosion and sediment control issues that may cause a violation of the NPDES
Construction Stormwater permit, the Certified Erosion and Sediment Control Lead will
promptly initiate the implementation of one or more of the alternative BMPs after the first sign
that existing BMPs are ineffective or failing.
In general, discharge rates of stormwater from the site will be controlled where increases in
impervious area or soil compaction during construction could lead to downstream erosion, or
where necessary to meet local agency stormwater discharge requirements (e.g. discharge to
combined sewer systems).
Element #4 - Install Sediment Controls
All stormwater runoff from disturbed areas shall pass through an appropriate sediment
removal BMP before leaving the construction site or prior to being discharged to an infiltration
facility. The specific BMPs to be used for controlling sediment on this project are identified in
Appendix 8B.
Alternate sediment control BMPs are included in Appendix 8C as a quick reference tool for
the onsite inspector in the event the primary BMP(s) are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit
(Appendix 8D). To avoid potential erosion and sediment control issues that may cause a
violation of the NPDES Construction Stormwater permit, the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
at the first sign that existing BMPs are ineffective or failing.
In addition, sediment will be removed from paved areas in and adjacent to construction work
areas manually or using mechanical sweepers, as needed, to minimize tracking of sediments
on vehicle tires away from the site and to minimize wash off of sediments from adjacent
streets in runoff.
Whenever possible, sediment laden water shall be discharged into onsite, relatively level,
vegetated areas (BMP C240 paragraph 4, Volume II page 116).
In some cases, sediment discharge in concentrated runoff can be controlled using permanent
stormwater BMPs (e.g., infiltration swales, ponds, trenches). Sediment loads can limit the
effectiveness of some permanent stormwater BMPs, such as those used for infiltration or
biofiltration; however, those BMPs designed to remove solids by settling (wet ponds or
detention ponds) can be used during the construction phase. When permanent stormwater
BMPs will be used to control sediment discharge during construction, the structure will be
protected from excessive sedimentation with adequate erosion and sediment control BMPs.
Any accumulated sediment shall be removed after construction is complete and the
permanent stormwater BMP will be restabilized with vegetation per applicable design
requirements once the remainder of the site has been stabilized.
Weston Heights North
Technical Information Report
Element #5 - Stabilize Soils
Exposed and unworked soils shall be stabilized with the application of effective BMPs to
prevent erosion throughout the life of the project. The specific BMPs for soil stabilization that
shall be used on this project are identified in Appendix 8B.
Seeding will be used on disturbed areas that have reached final grade or that will remain
unworked for more than thirty days. Plastic Covering will be used on the temporary stock pile
areas and elsewhere on the site as needed. Dust control will be implemented as needed, to
prevent it being required all roadways and driveways to be paved will receive early
application of gravel base.
Alternate soil stabilization BMPs are included in Appendix 8C as a quick reference tool for the
onsite inspector in the event the primary BMP(s) are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit
(Appendix 8D). To avoid potential erosion and sediment control issues that may cause a
violation of the NPDES Construction Stormwater permit, the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
after the first sign that existing BMPs are ineffective or failing.
The project site is located west of the Cascade Mountain Crest. As such, no soils shall
remain exposed and unworked for more than 7 days during the dry season (May 1 to
September 30) and 2 days during the wet season (October 1 to April 30). Regardless of the
time of year, all soils shall be stabilized at the end of the shift before a holiday or weekend if
needed based on weather forecasts.
In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be
temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion,
protected with sediment trapping measures, and where possible, be located away from storm
drain inlets, waterways, and drainage channels.
Element #6 - Protect Slopes
All cut and fill slopes will be designed, constructed, and protected in a manner than minimizes
erosion. The specific BMPs that will be used to protect slopes for this project are identified in
Appendix 8B.
Alternate slope protection BMPs are included in Appendix 8C as a quick reference tool for the
onsite inspector in the event the primary BMP(s) are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit
(Appendix 8D). To avoid potential erosion and sediment control issues that may cause a
violation of the NPDES Construction Stormwater permit, the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
after the first sign that existing BMPs are ineffective or failing.
Element #7 - Protect Drain Inlets
All storm drain inlets and culverts made operable during construction shall be protected to
prevent unfiltered or untreated water from entering the drainage conveyance system.
However, the first priority is to keep all access roads clean of sediment and keep street wash
water separate from entering storm drains until treatment can be provided. Storm Drain Inlet
Protection (BMP C220) will be implemented for all drainage inlets and culverts that could
potentially be impacted by sediment-laden runoff on and near the project site. The inlet
protection measures to be applied on this project are identified in Appendix 8B.
Weston Heights North
Technical Information Report
If the primary BMP options are deemed ineffective or inappropriate during construction to
satisfy the requirements set forth in the General NPDES Permit (Appendix 8D), or if no BMPs
are listed above but deemed necessary during construction, the Certified Erosion and
Sediment Control Lead shall implement one or more of the alternative BMP inlet protection
options.
Element #8 - Stabilize Channels and Outlets
Where site runoff is to be conveyed in channels, or discharged to a stream or some other
natural drainage point, efforts will be taken to prevent downstream erosion. The specific
BMPs for channel and outlet stabilization that shall be used on this project are identified in
Appendix 8B.
Alternate channel and outlet stabilization BMPs are included in Appendix 8C as a quick
reference tool for the onsite inspector in the event the primary BMP(s) are deemed ineffective
or inappropriate during construction to satisfy the requirements set forth in the General
NPDES Permit (Appendix 8D). To avoid potential erosion and sediment control issues that
may cause a violation(s) of the NPDES Construction Stormwater permit, the Certified Erosion
and Sediment Control Lead will promptly initiate the implementation of one or more of the
alternative BMPs after the first sign that existing BMPs are ineffective or failing.
The project site is located west of the Cascade Mountain Crest. As such, all temporary on-
site conveyance channels shall be designed, constructed, and stabilized to prevent erosion
from the expected peak 10 minute velocity of flow from a Type 1A, 10-year, 24-hour
recurrence interval storm for the developed condition. Alternatively, the 10-year, 1-hour peak
flow rate indicated by an approved continuous runoff simulation model, increased by a factor
of 1.6, shall be used. Stabilization, including armoring material, adequate to prevent erosion
of outlets, adjacent stream banks, slopes, and downstream reaches shall be provided at the
outlets of all conveyance systems.
Element #9 - Control Pollutants
All pollutants, including waste materials and demolition debris, that occur onsite shall be
handled and disposed of in a manner that does not cause contamination of stormwater.
Good housekeeping and preventative measures will be taken to ensure that the site will be
kept clean, well-organized, and free of debris. Any required BMPs to be implemented to
control specific sources of pollutants are identified in Appendix 8B.
The contractor shall implement the following measures as much as is practicable, in order to
mitigate pollutant impacts from vehicles, construction equipment, and/or petroleum product
storage/dispensing:
All vehicles, equipment, and petroleum product storage/dispensing areas will be
inspected regularly to detect any leaks or spills, and to identify maintenance needs to
prevent leaks or spills.
On-site fueling tanks and petroleum product storage containers shall include
secondary containment.
Spill prevention measures, such as drip pans, will be used when conducting
maintenance and repair of vehicles or equipment.
In order to perform emergency repairs on site, temporary plastic will be placed
beneath and, if raining, over the vehicle.
Weston Heights North
Technical Information Report
Contaminated surfaces shall be cleaned immediately following any discharge or spill
incident.
The contractor shall implement the following concrete and grout pollution control
measures:
Process water and slurry resulting from concrete work will be prevented from entering
the waters of the State by implementing Concrete Handling measures (BMP C151).
The contractor shall implement the following Solid Waste pollution control measures:
Solid waste will be stored in secure, clearly marked containers.
Element #10 - Control Dewatering
Foundation, vault, and trench de-watering water, which shall have similar characteristics to
stormwater runoff at the site, shall be discharged into a controlled conveyance system prior to
discharge to a sediment trap, pond, or other specified facility. Channels must be stabilized as
specified in Element #8.
Clean, non-turbid de-watering water, such as well-point groundwater, can be discharged to
systems tributary to state surface waters, provided the de-watering flow does not cause
erosion or flooding of receiving waters. These clean waters should not be routed through
stormwater sediment ponds.
Highly turbid or contaminated dewatering water shall be handled separately from
stormwater.
Element #11 - Maintain BMPs
All BMPs should be monitored and maintained regularly to ensure adequate operation. A
TESC supervisor shall be identified at the beginning of the project to provide monitoring and
direct the appropriate maintenance activity. As site conditions change, all BMPs shall be
updated as necessary to maintain compliance with local regulations.
Temporary BMPs can be removed when they are no longer needed. All temporary erosion
and sediment control BMPs shall be removed within 30 days after construction is completed
and the site is stabilized.
Element #12 - Manage the Project
Erosion and sediment control BMPs for this project have been designed based on the
following principles:
Design the project to fit the existing topography, soils, and drainage patterns.
Emphasize erosion control rather than sediment control.
Minimize the extent and duration of the area exposed.
Keep runoff velocities low.
Retain sediment on site.
Thoroughly monitor site and maintain all ESC measures.
Weston Heights North
Technical Information Report
Schedule major earthwork during the dry season.
As this project site is located west of the Cascade Mountain Crest, the project will be
managed according to the following key project components:
Phasing of Construction
The construction project is being phased to the extent practicable in order to prevent soil
erosion, and, to the maximum extent possible, the transport of sediment from the site during
construction.
Revegetation of exposed areas and maintenance of that vegetation shall be an integral
part of the clearing activities during each phase of construction, per the Scheduling BMP (C
162).
Seasonal Work Limitations
From October 1 through April 30, clearing, grading, and other soil disturbing activities
shall only be permitted if shown to the satisfaction of the local permitting authority that silt-
laden runoff will be prevented from leaving the site through a combination of the following:
o Site conditions including existing vegetative coverage, slope, soil type, and proximity to
receiving waters; and
o Limitations on activities and the extent of disturbed areas; and
o Proposed erosion and sediment control measures.
Based on the information provided and/or local weather conditions, the local permitting
authority may expand or restrict the seasonal limitation on site disturbance.
The following activities are exempt from the seasonal clearing and grading limitations:
o Routine maintenance and necessary repair of erosion and sediment control BMPs;
o Routine maintenance of public facilities or existing utility structures that do not expose the
soil or result in the removal of the vegetative cover to soil; and
o Activities where there is 100 percent infiltration of surface water runoff within the site in
approved and installed erosion and sediment control facilities.
Coordination with Utilities and Other Jurisdictions
Care has been taken to coordinate with utilities, other construction projects, and the local
jurisdiction in preparing this SWPPP and scheduling the construction work.
Inspection and Monitoring
All BMPs shall be inspected, maintained, and repaired as needed to assure continued
performance of their intended function. Site inspections shall be conducted by a person who
is knowledgeable in the principles and practices of erosion and sediment control. This
person has the necessary skills to:
o Assess the site conditions and construction activities that could impact the quality of
stormwater, and
o Assess the effectiveness of erosion and sediment control measures used to control the
quality of stormwater discharges.
Weston Heights North
Technical Information Report
A Certified Erosion and Sediment Control Lead shall be on-site or on-call at all times.
Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP
are inadequate, due to the actual discharge of or potential to discharge a significant amount
of any pollutant, appropriate BMPs or design changes shall be implemented as soon as
possible.
Maintaining an Updated Construction SWPPP
This SWPPP shall be retained on-site or within reasonable access to the site.
The SWPPP shall be modified whenever there is a change in the design, construction,
operation, or maintenance at the construction site that has, or could have, a significant effect
on the discharge of pollutants to waters of the state.
The SWPPP shall be modified if, during inspections or investigations conducted by the
owner/operator, or the applicable local or state regulatory authority, it is determined that the
SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater
discharges from the site. The SWPPP shall be modified as necessary to include additional or
modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be
completed within seven (7) days following the inspection.
3.2 – SITE SPECIFIC BMPs
Site specific BMPs are shown on the TESC plan sheet(s) in Appendix 8A.
4.0 – CONSTRUCTION PHASING AND BMP IMPLEMENTATION
The BMP implementation schedule will be driven by the construction schedule. The list below provides
an estimate of the anticipated construction schedule. The project site is located west of the Cascade
Mountain Crest. As such, the dry season is considered to be from May 1 to September 30, and the wet
season is considered to be from October 1 to April 30.
5.0 – POLLUTION PREVENTION TEAM
5.1 ROLES AND RESPONSIBILITIES
The pollution prevention team consists of personnel responsible for implementation of the
SWPPP, including the following:
Certified Erosion and Sediment Control Lead (CESCL) – primary contractor contact,
responsible for site inspections (BMPs, visual monitoring, sampling, etc.); to be called
upon in case of failure of any ESC measures.
Resident Engineer – For projects with engineered structures only (sediment
ponds/traps, sand filters, etc.): Site representative for the owner that is the project’s
supervising engineer responsible for inspections and issuing instructions and
drawings to the contractor’s site supervisor or representative.
Emergency Ecology Contact – Individual to be contacted at Ecology in case of
emergency.
Emergency Owner Contact – Individual that is the site owner or representative of the
site owner to be contacted in the case of an emergency.
Non-Emergency Ecology Contact – Individual that is the site owner or representative
of the site owner that can be contacted if required.
Weston Heights North
Technical Information Report
Monitoring Personnel – Personnel responsible for conducting water quality
monitoring; for most sites this person is also the CESCL.
5.2 TEAM MEMBERS
Names and contact information for those identified as members of the pollution prevention team
are provided in the project summary in Appendix 8B.
6.0 – SITE INSPECTIONS AND MONITORING
Monitoring includes visual inspection, monitoring for water quality parameters of concern, and
documentation of the inspection and monitoring findings in a site log book. A site log book will be
maintained for all on-site construction activities and will include:
A record of the implementation of the SWPPP and other permit requirements;
Site inspections; and,
Stormwater quality monitoring.
For convenience, the inspection forma and water quality monitoring forms included in Appendix 8E of this
report include the required information for the site log book. This SWPPP may function as the site log
book, if desired, or the forms may be separated and included in a separate site log book. However, if
separated, the site log book must be maintained on-site or within reasonable access to the site and be
made available upon request to Ecology or the local jurisdiction.
6.1 SITE INSPECTION
All BMPs will be inspected, maintained, and repaired as needed to assure continued performance
of their intended function. The inspector will be a Certified Erosion and Sediment Control Lead
(CESCL) per BMP C160. The name and contact information for the CESCL is provided in
Section 5 of this SWPPP.
Site inspection will occur in all areas disturbed by construction activities and at all stormwater
discharge points. Stormwater will be examined for the presence of suspended sediment,
turbidity, discoloration, and oily sheen. The site inspector will evaluate and document the
effectiveness of the installed BMPs and determine if it is necessary to repair or replace any of the
BMPs to improve the quality of stormwater discharges. All maintenance and repairs will be
documented in the site log book or forms provided in this document. All new BMPs or design
changes will be documented in the SWPPP as soon as possible.
6.1.1 Site Inspection Frequency
Site inspections will be conducted at least once a week and within 24 hours following any
rainfall event which causes a discharge of stormwater from the site. For sites with
temporary stabilization measures, the site inspection frequency can be reduced to once
every month.
6.1.2 Site Inspection Documentation
The site inspector will record each site inspection using the site log inspection forms
provided in Appendix 8E. The site inspection log forms may be separated from this
SWPPP document, but will be maintained on-site or within reasonable access to the site
and be made available upon request to Ecology or the local jurisdiction.
Weston Heights North
Technical Information Report
6.2 Stormwater Quality Monitoring
6.2.1 Turbidity Sampling
Monitoring requirements for the proposed project will include turbidity sampling to monitor
site discharges for water quality compliance with the 2010 Snohomish County Drainage
manual and Snohomish County Code Title 30.63A NPDES Construction Stormwater
General Permit (Appendix 8D). Sampling will be conducted at all site discharge points at
least once per calendar week.
Turbidity monitoring will follow the analytical methodologies described in Section S4 of
the 2005 Construction Stormwater General Permit (Appendix 8D). The key benchmark
values that require action include 25 NTU and 250 NTU for turbidity. If the 25 NTU
benchmark for turbidity is exceeded, the following steps will be conducted:
1. Ensure all BMPs specified in this SWPPP are installed and functioning as
intended.
2. Assess whether additional BMPs should be implemented and make revisions to
the SWPPP as necessary.
3. Sample the discharge location daily until the analysis results are less than 25
NTU (turbidity) or 32 cm (transparency).
If the turbidity is greater than 25 NTU but less than 250 NTU for more than 3 days,
additional treatment BMPs will be implemented within 24 hours of the third consecutive
sample that exceeded the benchmark value. Additional treatment BMPs will include, but
are not limited to, off-site treatment, infiltration, filtration and chemical treatment.
If the 250 NTU benchmark for turbidity is exceeded at any time, the following steps will be
conducted:
1. Notify Ecology by phone within 24 hours of analysis.
2. Continue daily sampling until the turbidity is less than 25 NTU.
3. Initiate additional treatment BMPs such as off-site treatment, infiltration, filtration
and chemical treatment within 24 hours of the first 250 NTU exceedance.
4. Implement additional treatment BMPs as soon as possible, but within 7 days of
the first 250 NTU exceedance.
5. Describe inspection results and remedial actions that are taken in the site log
book and in monthly discharge monitoring reports.
6.2.2 pH Sampling
Stormwater runoff will be monitored for pH starting on the first day of any activity that
includes more than 40 yards of poured or recycled concrete, or after the application of
“Engineered Soils” such as, Portland cement treated base, cement kiln dust, or fly ash.
This does not include fertilizers. For concrete work, pH monitoring will start the first day
concrete is poured and continue until 3 weeks after the last pour. For engineered soils,
the pH monitoring period begins when engineered soils are first exposed to precipitation
and continue until the area is fully stabilized.
Weston Heights North
Technical Information Report
Stormwater samples will be collected daily from all points of discharge from the site and
measured for pH using a calibrated pH meter, pH test kit, or wide range pH indicator
paper. If the measured pH is 8.5 or greater, the following steps will be conducted:
1. Prevent the high pH water from entering storm drains or surface water.
2. Adjust or neutralize the high pH water if necessary using appropriate technology
such as CO2 sparging (liquid or dry ice).
3. Contact Ecology if chemical treatment other than CO2 sparging is planned.
7.0 – REPORTING AND RECORDKEEPING
7.1 RECORDKEEPING
7.1.1 Site Log Book
A site log book will be maintained for all on-site construction activities and will include:
A record of the implementation of the SWPPP and other permit requirements;
Site inspections; and,
Stormwater quality monitoring.
For convenience, the inspection form and water quality monitoring forms included in
Appendix 8E of this report include the required information for the site log book.
7.1.2 Records Retention
Records of all monitoring information (site log book, inspection reports/checklists, etc.),
this Stormwater Pollution Prevention Plan, and any other documentation of compliance
with permit requirements will be retained during the life of the construction project and for
a minimum of three years following the termination of permit coverage in accordance with
permit condition S5.C.
7.1.3 Access to Plans and Records
The SWPPP, General Permit, Notice of Authorization letter, and Site Log Book will be
retained on site or within reasonable access to the site and will be made immediately
available upon request to Ecology or the local jurisdiction. A copy of this SWPPP will be
provided to Ecology within 14 days of receipt of a written request for the SWPPP from
Ecology. Any other information requested by Ecology will be submitted within a
reasonable time. A copy of the SWPPP or access to the SWPPP will be provided to the
public when requested in writing in accordance with permit condition S5.G.
7.1.4 Updating the SWPPP
In accordance with Conditions S3, S4.B, and S9.B.3 of the General Permit, this SWPPP
will be modified if the SWPPP is ineffective in eliminating or significantly minimizing
pollutants in stormwater discharges from the site or there has been a change in design,
construction, operation, or maintenance at the site that has a significant effect on the
discharge, or potential for discharge, of pollutants to the waters of the State. The
SWPPP will be modified within seven days of determination based on inspection(s) that
Weston Heights North
Technical Information Report
additional or modified BMPs are necessary to correct problems identified, and an
updated timeline for BMP implementation will be prepared.
7.2 REPORTING
7.2.1 Discharge Monitoring Reports
Discharge Monitoring Report (DMR) forms will not be submitted to Ecology because
water quality sampling is not being conducted at the site.
7.2.2 Notification of Noncompliance
If any of the terms and conditions of the permit are not met, and it causes a threat to
human health of the environment, the following steps will be taken in accordance with
permit section S5.F:
1. Ecology will be immediately notified of the failure to comply.
2. Immediate action will be taken to control the noncompliance issue and to correct
the problem. If applicable, sampling and analysis of any noncompliance will be
repeated immediately and the results submitted to Ecology within five (5) days of
becoming aware of the violation.
3. A detailed written report describing the noncompliance will be submitted to
Ecology within five (5) days, unless requested earlier by Ecology.
In accordance with permit condition S2.A, a complete application form will be submitted
to Ecology and the appropriate local jurisdiction (if applicable) to be covered by the
General Permit.
Weston Heights North
Technical Information Report
APPENDIX 8A
SITE PLAN WITH BMP MEASURES
Weston Heights North
Technical Information Report
APPENDIX 8B
SWPPP PROJECT SUMMARY
Weston Heights North
Technical Information Report
PROJECT TEAM MEMBERS:
Title Name(s) Phone Number
Certified Erosion & Sediment Control Lead To be provided
Resident Engineer To be provided
Emergency Ecology Contact Puget Sound Office (425) 649-7000
Emergency Owner Contact To be provided
Non-Emergency Ecology Contact Northwest Region (425) 649-7000
Monitoring Personnel To be provided
ESTIMATED CONSTRUCTION SCHEDULE:
Construction Start Date July 2016
Install ESC Measures July 2016
Construction End Date October 2016
CONSTRUCTION BMP LIST:
Silt Fence (BMP C233)
Storm Drain Inlet Protection (BMP C220)
Materials on Hand (BMP C150) may also be applicable
Detention Pond Or Vault
Temporary and Permanent Seeding (BMP C120)
Plastic Covering (BMP C123)
Interceptor Dike and Swale (BMP C200)
Check Dams (BMP C207)
Weston Heights North
Technical Information Report
APPENDIX 8C
ALTERNATIVE BMPs
Weston Heights North
Technical Information Report
The following includes a list of possible alternative BMPs for each of the 12 elements not described in the
main SWPPP text. This list can be referenced in the event a BMP for a specific element is not
functioning as designed and an alternative BMP needs to be implemented.
Element #1 - Mark Clearing Limits
High Visibility Plastic or Metal Fence (BMP C103)
Element #2 - Establish Construction Access
Wheel Wash (BMP C106)
Element #3 - Control Flow Rates
(none)
Element #4 - Install Sediment Controls
Straw Bale Barrier (BMP C230)
Vegetated Strip (BMP C234)
Materials on Hand (BMP C150)
Element #5 - Stabilize Soils
Dust Control (BMP C140)
Topsoiling (BMP C125)
Sodding (BMP C124)
Element #6 - Protect Slopes
Straw Wattles (BMP C235)
Grass-Lined Channels (BMP C201)
Element #7 - Protect Drain Inlets
(none)
Element #8 - Stabilize Channels and Outlets
Level Spreader (BMP C206)
Element #10 - Control Dewatering
(none)
Weston Heights North
Technical Information Report
APPENDIX 8D
GENERAL PERMIT
Weston Heights North
Technical Information Report
Construction Stormwater General Permit
A copy of the construction stormwater general permit will be added to this appendix once it is obtained.
Weston Heights North
Technical Information Report
APPENDIX 8E
SITE LOG & INSPECTION FORMS
Weston Heights North
Technical Information Report
Site Inspection Forms (and Site Log)
The results of each inspection shall be summarized in an inspection report or checklist that is entered into
or attached to the site log book. It is suggested that the inspection report or checklist be included in this
appendix to keep monitoring and inspection information in one document, but this is optional. However, it
is mandatory that this SWPPP and the site inspection forms be kept onsite at all times during
construction, and that inspections be performed and documented as outlined below.
At a minimum, each inspection report or checklist shall include:
a. Inspection date/times
b. Weather information: general conditions during inspection, approximate amount of precipitation
since the last inspection, and approximate amount of precipitation within the last 24 hours.
c. A summary or list of all BMPs that have been implemented, including observations of all
erosion/sediment control structures or practices.
d. The following shall be noted:
i. Locations of BMPs inspected,
ii. Locations of BMPs that need maintenance,
iii. The reason maintenance is needed
iv. Locations of BMPs that failed to operate as designed or intended, and
v. Locations where additional or different BMPs are needed, and the reason(s) why.
e. A description of stormwater discharged from the site. The presence of suspended sediment,
turbid water, discoloration, and/or oil sheen shall be noted, as applicable.
f. A description of any water quality monitoring performed during inspection, and the results of that
monitoring.
g. General comments and notes, including a brief description of any BMP r repairs, maintenance or
installations made as a result of the inspection.
h. A statement that, in the judgment of the person conducting the site inspection, the site is either in
compliance or out of compliance with the terms and conditions of the SWPPP and the NPDES
permit. If the site inspection indicates that the site is out of compliance, the inspection report shall
include a summary of the remedial actions required to bring the site back into compliance, as well
as a schedule of implementation.
i. Name, title, and signature of person conducting the site inspection; and the following statement: “I
certify under penalty of law that this report is true, accurate, and complete, to the best of my
knowledge and belief”.
When the site inspection indicates that the site is not in compliance with any terms and conditions of the
NPDES permit, the Permittee shall take immediate action(s) to: stop, contain, and clean up the
unauthorized discharges, or otherwise stop the noncompliance; correct the problem(s); implement
appropriate Best Management Practices (BMPs), and/or conduct maintenance of existing BMPs; and
achieve compliance with all applicable standards and permit conditions. In addition, if the noncompliance
causes a threat to human health or the environment, the Permittee shall comply with the Noncompliance
Notification requirements in Special Condition S5.F of the permit.
Weston Heights North
Technical Information Report
Site Inspection Form
General Information
Project Name:
Inspector Name: Title:
CESCL # :
Date: Time:
Inspection Type: □ After a rain event
□ Weekly
□ Turbidity/transparency benchmark exceedance
□ Other
Weather
Precipitation Since last inspection In last 24 hours
Description of General Site Conditions:
Inspection of BMPs
Element 1: Mark Clearing Limits
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Element 2: Establish Construction Access
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Weston Heights North
Technical Information Report
Element 3: Control Flowrates
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Element 4: Install Sediment Controls
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Element 5: Stabilize Soils
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Weston Heights North
Technical Information Report
Element 6: Protect Slopes
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Element 7: Protect Drain Inlets
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Element 8: Stabilize Channels and Outlets
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Weston Heights North
Technical Information Report
Element 9: Control Pollutants
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Element 10: Control Dewatering
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Stormwater Discharges From the Site
Observed? Problem/Corrective Action Y N
Location
Turbidity
Discoloration
Sheen
Location
Turbidity
Discoloration
Sheen
Weston Heights North
Technical Information Report
Water Quality Monitoring
Was any water quality monitoring conducted? □ Yes □ No
If water quality monitoring was conducted, record results here:
If water quality monitoring indicated turbidity 250 NTU or greater; or transparency 6
cm or less, was Ecology notified by phone within 24 hrs?
□ Yes □ No
If Ecology was notified, indicate the date, time, contact name and phone number
below:
Date:
Time:
Contact Name:
Phone #:
General Comments and Notes
Include BMP repairs, maintenance, or installations made as a result of the inspection.
Were Photos Taken? □ Yes □ No
If photos taken, describe photos below:
Weston Heights North
Technical Information Report
SECTION 9
BOND QUANTITIES, FACILITY SUMMARIES,
AND DECLARATION OF COVENANT
Weston Heights North
Technical Information Report
Bond Quantities, Facilities Summaries, and Declaration of Covenant
Bond Quantities can be provided to the City upon request
Storm drainage facilities are detailed on the engineering plans
A declaration of covenant can be provide as part of the homeowner’s association documentation if
required.
Weston Heights North
Technical Information Report
SECTION 10
OPERATIONS AND MAINTENANCE MANUAL
Weston Heights North
Technical Information Report
Operations and Maintenance Manual
The following pages are selections from Appendix A of the 2009 King County Stormwater Design Manual,
applicable to this project:
Weston Heights North
Technical Information Report
NO. 1 – DETENTION PONDS
Maintenance
Component Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Maintenance Is Performed
Site Trash and debris Any trash and debris which exceed 1 cubic foot
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Trash and debris cleared from site.
Noxious weeds Any noxious or nuisance vegetation which may
constitute a hazard to County personnel or the
public.
Noxious and nuisance vegetation
removed according to applicable
regulations. No danger of noxious
vegetation where County personnel or the public might normally be.
Contaminants and
pollution Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint. Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in
height. Grass or groundcover mowed to a
height no greater than 6 inches.
Top or Side Slopes
of Dam, Berm or
Embankment
Rodent holes Any evidence of rodent holes if facility is acting
as a dam or berm, or any evidence of water
piping through dam or berm via rodent holes.
Rodents removed or destroyed and
dam or berm repaired.
Tree growth Tree growth threatens integrity of slopes, does not allow maintenance access, or interferes with
maintenance activity. If trees are not a threat or
not interfering with access or maintenance, they
do not need to be removed.
Trees do not hinder facility performance or maintenance
activities.
Erosion Eroded damage over 2 inches deep where cause
of damage is still present or where there is
potential for continued erosion. Any erosion
observed on a compacted slope.
Slopes stabilized using appropriate
erosion control measures. If erosion
is occurring on compacted slope, a
licensed civil engineer should be
consulted to resolve source of
erosion.
Settlement Any part of a dam, berm or embankment that has settled 4 inches lower than the design elevation. Top or side slope restored to design dimensions. If settlement is
significant, a licensed civil engineer
should be consulted to determine
the cause of the settlement.
Storage Area Sediment
accumulation Accumulated sediment that exceeds 10% of the
designed pond depth. Sediment cleaned out to designed
pond shape and depth; pond
reseeded if necessary to control
erosion.
Liner damaged
(If Applicable) Liner is visible or pond does not hold water as
designed. Liner repaired or replaced.
Inlet/Outlet Pipe. Sediment
accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables). No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
Emergency
Overflow/Spillway Tree growth Tree growth impedes flow or threatens stability of
spillway. Trees removed.
Rock missing Only one layer of rock exists above native soil in area five square feet or larger or any exposure of
native soil on the spillway.
Spillway restored to design standards.
Weston Heights North
Technical Information Report
NO. 3 – DETENTION TANKS AND VAULTS
Maintenance
Component Defect or Problem Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Site Trash and debris Any trash and debris which exceed 1 cubic foot
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Trash and debris cleared from site.
Noxious weeds Any noxious or nuisance vegetation which may
constitute a hazard to County personnel or the
public.
Noxious and nuisance vegetation
removed according to applicable
regulations. No danger of noxious
vegetation where County personnel or the public might normally be.
Contaminants and
pollution Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint. Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in
height. Grass or groundcover mowed to a
height no greater than 6 inches.
Tank or Vault
Storage Area Trash and debris Any trash and debris accumulated in vault or tank
(includes floatables and non-floatables). No trash or debris in vault.
Sediment accumulation Accumulated sediment depth exceeds 10% of the
diameter of the storage area for ½ length of
storage vault or any point depth exceeds 15% of
diameter. Example: 72-inch storage tank would
require cleaning when sediment reaches depth of
7 inches for more than ½ length of tank.
All sediment removed from storage area.
Tank Structure Plugged air vent Any blockage of the vent. Tank or vault freely vents.
Tank bent out of shape Any part of tank/pipe is bent out of shape more than 10% of its design shape. Tank repaired or replaced to design.
Gaps between
sections, damaged
joints or cracks or
tears in wall
A gap wider than ½-inch at the joint of any tank
sections or any evidence of soil particles entering
the tank at a joint or through a wall.
No water or soil entering tank
through joints or walls.
Vault Structure Damage to wall,
frame, bottom, and/or
top slab
Cracks wider than ½-inch, any evidence of soil
entering the structure through cracks or qualified
inspection personnel determines that the vault is
not structurally sound.
Vault is sealed and structurally
sound.
Inlet/Outlet Pipes Sediment
accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables). No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
Weston Heights North
Technical Information Report
NO. 3 – DETENTION TANKS AND VAULTS
Maintenance
Component Defect or Problem Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place.
Any open manhole requires immediate
maintenance.
Manhole access covered.
Locking mechanism
not working Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
remove One maintenance person cannot remove
cover/lid after applying 80 lbs of lift. Cover/lid can be removed and
reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access
doors/plate Damaged or difficult
to open Large access doors or plates cannot be
opened/removed using normal equipment. Replace or repair access door so it
can opened as designed.
Gaps, doesn't cover
completely Large access doors not flat and/or access
opening not completely covered. Doors close flat and covers access
opening completely.
Lifting Rings missing,
rusted Lifting rings not capable of lifting weight of door
or plate. Lifting rings sufficient to lift or
remove door or plate.
Weston Heights North
Technical Information Report
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance
Component Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Structure Trash and debris Trash or debris of more than ½ cubic foot which is
located immediately in front of the structure
opening or is blocking capacity of the structure by
more than 10%.
No Trash or debris blocking or
potentially blocking entrance to
structure.
Trash or debris in the structure that exceeds 1/ 3 the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
No trash or debris in the structure.
Deposits of garbage exceeding 1 cubic foot in
volume. No condition present which would
attract or support the breeding of
insects or rodents.
Sediment Sediment exceeds 60% of the depth from the
bottom of the structure to the invert of the lowest
pipe into or out of the structure or the bottom of
the FROP-T section or is within 6 inches of the
invert of the lowest pipe into or out of the
structure or the bottom of the FROP-T section.
Sump of structure contains no
sediment.
Damage to frame
and/or top slab Corner of frame extends more than ¾ inch past
curb face into the street (If applicable). Frame is even with curb.
Top slab has holes larger than 2 square inches or
cracks wider than ¼ inch. Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e.,
separation of more than ¾ inch of the frame from
the top slab.
Frame is sitting flush on top slab.
Cracks in walls or
bottom Cracks wider than ½ inch and longer than 3 feet,
any evidence of soil particles entering structure
through cracks, or maintenance person judges
that structure is unsound.
Structure is sealed and structurally
sound.
Cracks wider than ½ inch and longer than 1 foot
at the joint of any inlet/outlet pipe or any evidence
of soil particles entering structure through cracks.
No cracks more than 1/ inch wide at 4 the joint of inlet/outlet pipe.
Settlement/
misalignment Structure has settled more than 1 inch or has
rotated more than 2 inches out of alignment. Basin replaced or repaired to design
standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
the structure at the joint of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of inlet/outlet pipes.
Contaminants and
pollution Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint. Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Ladder rungs missing
or unsafe Ladder is unsafe due to missing rungs,
misalignment, rust, cracks, or sharp edges. Ladder meets design standards and
allows maintenance person safe
access.
FROP-T Section Damage T section is not securely attached to structure
wall and outlet pipe structure should support at
least 1,000 lbs of up or down pressure.
T section securely attached to wall
and outlet pipe.
Structure is not in upright position (allow up to
10% from plumb). Structure in correct position.
Connections to outlet pipe are not watertight or
show signs of deteriorated grout. Connections to outlet pipe are water
tight; structure repaired or replaced and works as designed.
Any holes—other than designed holes—in the
structure. Structure has no holes other than
designed holes.
Weston Heights North
Technical Information Report
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
person.
Maintenance
Component Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Cleanout gate is not watertight. Gate is watertight and works as
designed.
Gate cannot be moved up and down by one
maintenance person. Gate moves up and down easily and
is watertight.
Chain/rod leading to gate is missing or damaged. Chain is in place and works as
designed.
Orifice Plate Damaged or missing Control device is not working properly due to
missing, out of place, or bent orifice plate. Plate is in place and works as
designed.
Obstructions Any trash, debris, sediment, or vegetation
blocking the plate. Plate is free of all obstructions and
works as designed.
Overflow Pipe Obstructions Any trash or debris blocking (or having the
potential of blocking) the overflow pipe. Pipe is free of all obstructions and
works as designed.
Deformed or damaged
lip Lip of overflow pipe is bent or deformed. Overflow pipe does not allow
overflow at an elevation lower than
design
Inlet/Outlet Pipe Sediment
accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables). No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
Metal Grates
(If Applicable) Unsafe grate opening Grate with opening wider than 7/ inch. 8 Grate opening meets design
standards.
Trash and debris Trash and debris that is blocking more than 20%
of grate surface. Grate free of trash and debris. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design
standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place.
Any open structure requires urgent
maintenance.
Cover/lid protects opening to
structure.
Locking mechanism Not Working Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
Remove One maintenance person cannot remove
cover/lid after applying 80 lbs. of lift. Cover/lid can be removed and
reinstalled by one maintenance
Weston Heights North
Technical Information Report
NO. 5 – CATCH BASINS AND MANHOLES
Maintenance
Component Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Structure Sediment Sediment exceeds 60% of the depth from the
bottom of the catch basin to the invert of the
lowest pipe into or out of the catch basin or is
within 6 inches of the invert of the lowest pipe
into or out of the catch basin.
Sump of catch basin contains no
sediment.
Trash and debris Trash or debris of more than ½ cubic foot which is
located immediately in front of the catch basin
opening or is blocking capacity of the catch basin
by more than 10%.
No Trash or debris blocking or
potentially blocking entrance to
catch basin.
Trash or debris in the catch basin that exceeds 1/ the depth from the bottom of basin to invert the 3 lowest pipe into or out of the basin.
No trash or debris in the catch basin.
Dead animals or vegetation that could generate
odors that could cause complaints or dangerous
gases (e.g., methane).
No dead animals or vegetation
present within catch basin.
Deposits of garbage exceeding 1 cubic foot in
volume. No condition present which would
attract or support the breeding of
insects or rodents.
Damage to frame
and/or top slab Corner of frame extends more than ¾ inch past
curb face into the street (If applicable). Frame is even with curb.
Top slab has holes larger than 2 square inches or
cracks wider than ¼ inch. Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e.,
separation of more than ¾ inch of the frame from
the top slab.
Frame is sitting flush on top slab.
Cracks in walls or
bottom Cracks wider than ½ inch and longer than 3 feet,
any evidence of soil particles entering catch
basin through cracks, or maintenance person
judges that catch basin is unsound.
Catch basin is sealed and
structurally sound.
Cracks wider than ½ inch and longer than 1 foot
at the joint of any inlet/outlet pipe or any evidence
of soil particles entering catch basin through
cracks.
No cracks more than 1/ inch wide at 4 the joint of inlet/outlet pipe.
Settlement/
misalignment Catch basin has settled more than 1 inch or has
rotated more than 2 inches out of alignment. Basin replaced or repaired to design
standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
the catch basin at the joint of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of inlet/outlet pipes.
Contaminants and
pollution Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint. Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Inlet/Outlet Pipe Sediment
accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables). No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe.
Weston Heights North
Technical Information Report
NO. 5 – CATCH BASINS AND MANHOLES
person.
Maintenance
Component Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Metal Grates (Catch Basins) Unsafe grate opening Grate with opening wider than 7/ inch. 8 Grate opening meets design
standards.
Trash and debris Trash and debris that is blocking more than 20%
of grate surface. Grate free of trash and debris.
footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate.
Any open structure requires urgent
maintenance.
Grate is in place and meets design
standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place.
Any open structure requires urgent
maintenance.
Cover/lid protects opening to
structure.
Locking mechanism
Not Working Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
Remove One maintenance person cannot remove
cover/lid after applying 80 lbs. of lift. Cover/lid can be removed and
reinstalled by one maintenance
Weston Heights North
Technical Information Report
NO. 6 – CONVEYANCE PIPES AND DITCHES
Maintenance
Component Defect or Problem Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Pipes Sediment & debris
accumulation Accumulated sediment or debris that exceeds
20% of the diameter of the pipe. Water flows freely through pipes.
Vegetation/roots Vegetation/roots that reduce free movement of
water through pipes. Water flows freely through pipes.
Contaminants and
pollution Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint. Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if appropriate. No contaminants
present other than a surface oil film.
Damage to protective
coating or corrosion Protective coating is damaged; rust or corrosion is
weakening the structural integrity of any part of
pipe.
Pipe repaired or replaced.
Damaged Any dent that decreases the cross section area of
pipe by more than 20% or is determined to have
weakened structural integrity of the pipe.
Pipe repaired or replaced.
Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000
square feet of ditch and slopes. Trash and debris cleared from
ditches.
Sediment accumulation Accumulated sediment that exceeds 20% of the design depth. Ditch cleaned/flushed of all sediment and debris so that it matches design.
Noxious weeds Any noxious or nuisance vegetation which may
constitute a hazard to County personnel or the
public.
Noxious and nuisance vegetation
removed according to applicable
regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and
pollution Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint. Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vegetation Vegetation that reduces free movement of water
through ditches. Water flows freely through ditches.
Erosion damage to
slopes Any erosion observed on a ditch slope. Slopes are not eroding.
Rock lining out of
place or missing (If
Applicable)
One layer or less of rock exists above native soil
area 5 square feet or more, any exposed native
soil.
Replace rocks to design standards.
Weston Heights North
Technical Information Report
NO. 9 – FENCING
Maintenance
Component Defect or Problem Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed.
Site Erosion or holes under
fence Erosion or holes more than 4 inches high and 12-
18 inches wide permitting access through an
opening under a fence.
No access under the fence.
Wood Posts, Boards
and Cross Members
Missing or damaged
parts
Missing or broken boards, post out of plumb by
more than 6 inches or cross members broken. No gaps on fence due to
missing or broken boards, post
plumb to within 1 ½ inches,
cross members sound.
Weakened by rotting or
insects
Any part showing structural deterioration due to
rotting or insect damage. All parts of fence are
structurally sound.
Damaged or failed post
foundation
Concrete or metal attachments deteriorated or
unable to support posts. Post foundation capable of
supporting posts even in strong
wind.
Metal Posts, Rails and
Fabric Damaged parts Post out of plumb more than 6 inches. Post plumb to within 1 ½
inches.
Top rails bent more than 6 inches. Top rail free of bends greatyer
than 1 inch.
Any part of fence (including post, top rails, and
fabric) more than 1 foot out of design alignment. Fence is aligned and meets design standards.
Missing or loose tension wire. Tension wire in place and holding fabric.
Deteriorated point or protective coating Part or parts that have a rusting or scaling condition that has affected
structural adequacy.
Structurally adequate posts or parts
with a uniform protective coating.
Openings in fabric Openings in fabric are such that an 8-
inch diameter ball could fit through. Fabric mesh openings within 50% of
grid size.
Weston Heights North
Technical Information Report
NO. 10 – GATES/BOLLARDS/ACCESS BARRIERS
Maintenance
Component Defect or Problem Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Chain Link Fencing
Gate Damaged or missing
members Missing gate. Gates in place.
Broken or missing hinges such that gate cannot
be easily opened and closed by a maintenance
person.
Hinges intact and lubed. Gate is
working freely.
Gate is out of plumb more than 6 inches and
more than 1 foot out of design alignment. Gate is aligned and vertical.
Missing stretcher bar, stretcher bands, and ties. Stretcher bar, bands, and ties in
place.
Locking mechanism
does not lock gate Locking device missing, no-functioning or does
not link to all parts. Locking mechanism prevents
opening of gate.
Openings in fabric Openings in fabric are such that an 8-inch
diameter ball could fit through. Fabric mesh openings within 50% of
grid size.
Bar Gate Damaged or missing
cross bar Cross bar does not swing open or closed, is
missing or is bent to where it does not prevent
vehicle access.
Cross bar swings fully open and
closed and prevents vehicle access.
Locking mechanism does not lock gate Locking device missing, no-functioning or does not link to all parts. Locking mechanism prevents opening of gate.
Support post
damaged Support post does not hold cross bar up. Cross bar held up preventing vehicle
access into facility.
Bollards Damaged or missing Bollard broken, missing, does not fit into support
hole or hinge broken or missing. No access for motorized vehicles to
get into facility.
Does not lock Locking assembly or lock missing or cannot be
attached to lock bollard in place. No access for motorized vehicles to
get into facility.
Boulders Dislodged Boulders not located to prevent motorized vehicle
access. No access for motorized vehicles to
get into facility.
Circumvented Motorized vehicles going around or between
boulders. No access for motorized vehicles to
get into facility.
Weston Heights North
Technical Information Report
NO. 11 – GROUNDS (LANDSCAPING)
Maintenance
Component Defect or Problem Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Site Trash or litter Any trash and debris which exceed 1 cubic foot
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Trash and debris cleared from site.
Noxious weeds Any noxious or nuisance vegetation which may
constitute a hazard to County personnel or the
public.
Noxious and nuisance vegetation
removed according to applicable
regulations. No danger of noxious
vegetation where County personnel or the public might normally be.
Contaminants and
pollution Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint. Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in
height. Grass or groundcover mowed to a
height no greater than 6 inches.
Trees and Shrubs Hazard Any tree or limb of a tree identified as having a
potential to fall and cause property damage or
threaten human life. A hazard tree identified by
a qualified arborist must be removed as soon
as possible.
No hazard trees in facility.
Damaged Limbs or parts of trees or shrubs that are split or
broken which affect more than 25% of the total
foliage of the tree or shrub.
Trees and shrubs with less than 5%
of total foliage with split or broken
limbs.
Trees or shrubs that have been blown down or
knocked over. No blown down vegetation or
knocked over vegetation. Trees or
shrubs free of injury.
Trees or shrubs which are not adequately
supported or are leaning over, causing exposure
of the roots.
Tree or shrub in place and
adequately supported; dead or
diseased trees removed.
Weston Heights North
Technical Information Report
NO. 12 – ACCESS ROADS
Maintenance
Component Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Site Trash and debris Trash and debris exceeds 1 cubic foot per 1,000
square feet (i.e., trash and debris would fill up
one standards size garbage can).
Roadway drivable by maintenance
vehicles.
Debris which could damage vehicle tires or prohibit use of road. Roadway drivable by maintenance vehicles.
Contaminants and
pollution Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint. Materials removed and disposed of
according to applicable regulations. Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Blocked roadway Any obstruction which reduces clearance above
road surface to less than 14 feet. Roadway overhead clear to 14 feet
high.
Any obstruction restricting the access to a 10- to
12 foot width for a distance of more than 12 feet
or any point restricting access to less than a 10
foot width.
At least 12-foot of width on access
road.
Road Surface Erosion, settlement,
potholes, soft spots,
ruts
Any surface defect which hinders or prevents
maintenance access. Road drivable by maintenance
vehicles.
Vegetation on road
surface Trees or other vegetation prevent access to
facility by maintenance vehicles. Maintenance vehicles can access
facility.
Shoulders and
Ditches Erosion Erosion within 1 foot of the roadway more than 8
inches wide and 6 inches deep. Shoulder free of erosion and
matching the surrounding road.
Weeds and brush Weeds and brush exceed 18 inches in height or hinder maintenance access. Weeds and brush cut to 2 inches in height or cleared in such a way as to
allow maintenance access.
Modular Grid
Pavement Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Damaged or missing Access surface compacted because of broken on
missing modular block. Access road surface restored so
road infiltrates.
Weston Heights North
Technical Information Report
NO. 16 – WETPOND
Maintenance
Component Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance Is Performed
Site Trash and debris Any trash and debris accumulated on the
wetpond site. Wetpond site free of any trash or
debris.
Noxious weeds Any noxious or nuisance vegetation which may
constitute a hazard to County personnel or the public.
Noxious and nuisance vegetation
removed according to applicable regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and
pollution Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint. Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in
height. Grass or groundcover mowed to a
height no greater than 6 inches.
Side Slopes of Dam,
Berm, internal berm
or Embankment
Rodent holes Any evidence of rodent holes if facility is acting
as a dam or berm, or any evidence of water
piping through dam or berm via rodent holes.
Rodents removed or destroyed and
dam or berm repaired.
Tree growth Tree growth threatens integrity of dams, berms or
slopes, does not allow maintenance access, or
interferes with maintenance activity. If trees are
not a threat to dam, berm or embankment
integrity, are not interfering with access or
maintenance or leaves do not cause a plugging
problem they do not need to be removed.
Trees do not hinder facility
performance or maintenance
activities.
Erosion Eroded damage over 2 inches deep where cause
of damage is still present or where there is
potential for continued erosion. Any erosion
observed on a compacted slope.
Slopes stabilized using appropriate
erosion control measures. If erosion
is occurring on compacted slope, a
licensed civil engineer should be
consulted to resolve source of
erosion.
Top or Side Slopes
of Dam, Berm, internal berm or
Embankment
Settlement Any part of a dam, berm or embankment that has
settled 4 inches lower than the design elevation. Top or side slope restored to design
dimensions. If settlement is significant, a licensed civil engineer
should be consulted to determine
the cause of the settlement.
Irregular surface on
internal berm Top of berm not uniform and level. Top of berm graded to design
elevation.
Pond Areas Sediment
accumulation (except
first wetpool cell)
Accumulated sediment that exceeds 10% of the
designed pond depth. Sediment cleaned out to designed
pond shape and depth.
Sediment accumulation (first
wetpool cell)
Sediment accumulations in pond bottom that exceeds the depth of sediment storage (1 foot)
plus 6 inches.
Sediment storage contains no sediment.
Liner damaged (If
Applicable) Liner is visible or pond does not hold water as designed. Liner repaired or replaced.
Water level (first
wetpool cell) First cell empty, doesn't hold water. Water retained in first cell for most of
the year.
Algae mats (first
wetpool cell) Algae mats develop over more than 10% of the
water surface should be removed. Algae mats removed (usually in the
late summer before Fall rains, especially in Sensitive Lake
Protection Areas.)
Gravity Drain Inoperable valve Valve will not open and close. Valve opens and closes normally.
Valve won’t seal Valve does not seal completely. Valve completely seals closed.
Weston Heights North
Technical Information Report
NO. 16 – WETPOND
Maintenance
Component Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance Is Performed
Emergency Overflow
Spillway Tree growth Tree growth impedes flow or threatens
stability of spillway. Trees removed.
Rock Missing Only one layer of rock exists above
native soil in area five square feet or larger, or any exposure of native soil at
the top of out flow path of spillway. Rip-
rap on inside slopes need not be
replaced.
Spillway restored to design
standards.
Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet pipes
(includes floatables and non-floatables). No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
Weston Heights North
Technical Information Report
NO. 17 – WETVAULT
access.
Maintenance
Component Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Site Trash and debris Trash and debris accumulated on facility site. Trash and debris removed from
facility site.
Treatment Area Trash and debris Any trash and debris accumulated in vault (includes floatables and non-floatables). No trash or debris in vault.
Sediment accumulation Sediment accumulation in vault bottom exceeds the depth of the sediment zone plus 6 inches. No sediment in vault.
Contaminants and
pollution Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint. Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vault Structure Damage to wall,
frame, bottom, and/or
top slab
Cracks wider than ½-inch, any evidence of soil
entering the structure through cracks, vault does
not retain water or qualified inspection personnel
determines that the vault is not structurally
sound.
Vault is sealed and structurally
sound.
Baffles damaged Baffles corroding, cracking, warping and/or
showing signs of failure or baffle cannot be
removed.
Repair or replace baffles or walls to
specifications.
Ventilation Ventilation area blocked or plugged. No reduction of ventilation area
exists.
Inlet/Outlet Pipe Sediment
accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables). No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
Gravity Drain Inoperable valve Valve will not open and close. Valve opens and closes normally.
Valve won’t seal Valve does not seal completely. Valve completely seals closed.
Access Manhole Access cover/lid
damaged or difficult to
open
Access cover/lid cannot be easily opened by one
person. Corrosion/deformation of cover/lid. Access cover/lid can be opened by
one person.
Locking mechanism
not working Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
remove One maintenance person cannot remove
cover/lid after applying 80 lbs of lift. Cover/lid can be removed and
reinstalled by one maintenance
person.
Access doors/plate
has gaps, doesn't cover completely
Large access doors not flat and/or access
opening not completely covered. Doors close flat and covers access
opening completely.
Lifting Rings missing,
rusted Lifting rings not capable of lifting weight of door
or plate. Lifting rings sufficient to lift or
remove door or plate.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe