HomeMy WebLinkAboutEmail confirming approval of fire variance1
Clark Close
From:Corey W Thomas
Sent:Wednesday, June 22, 2016 10:54 AM
To:Clark Close
Subject:FW: Finley Short Plat, LUA16-000330, SHPL-A - Request for Driveway Width Variance
Sorry I did not copy you on this earlier. They shall sprinkler all three homes but do not have to provide a turnaround.
From: Corey W Thomas
Sent: Friday, June 03, 2016 07:55
To: 'Tom Redding'
Subject: RE: Finley Short Plat, LUA16-000330, SHPL-A - Request for Driveway Width Variance
Tom,
The Renton Fire Department finds this request acceptable. Fire sprinkler shall be installed as you stated in all three new
proposed homes. Place a note to that effect on the face of the first page of the plans when you submit these for
review. The requirement for a turnaround is also waived.
Corey Thomas
Fire Plans Reviewer/Inspector III
City of Renton Fire & Emergency Services Department
COMMUNITY RISK REDUCTION
Phone: 425-430-7024 Fax: 425-430-7022
Email: cthomas@rentonwa.gov
1055 South Grady Way
Renton, WA 98057-3232
Professionalism Integrity Leadership Accountability Respect
From: Tom Redding [mailto:tredding@encompasses.net]
Sent: Wednesday, June 01, 2016 13:18
To: Corey W Thomas
Subject: Re: Finley Short Plat, LUA16-000330, SHPL-A - Request for Driveway Width Variance
Cory
I forgot one thing: we would like to also like to request that we be allowed to construct this 16' wide road
without a turnaround. Again, we want to reduce the access tract width and impervious surfaces, and make the lots as big as possible
to make sure we meet minimum lot areas/dimensions.
Thanks,
Tom Redding
Design Engineer
2
Cle Elum | Issaquah * | Email | Website
Cle Elum | 407 Swiftwater Blvd. | Cle Elum, WA 98922 | Phone: (509) 674-7433 | Fax: (509) 674-7419
* My Office | 165 NE Juniper Street, Suite 201 | Issaquah, WA 98027 | Phone: (425) 392-0250 | Fax: (425) 391-3055
Please consider the environment before printing this email
Encompass Engineering & Surveying, its officers or agents shall not be responsible for the accuracy or completeness of electronic file copies.
Due to the potential that information exchanged by electronic media can deteriorate, be damaged, lost or modified, intentionally or otherwise,
use of this electronic data by anyone other than Encompass Engineering & Surveying shall be at the sole risk of such user and without liability
or legal exposure to Encompass Engineering & Surveying. The recipient is responsible for verifying the accuracy of data against governing hard
copy documentation. If there is a discrepancy between the hard copy and the electronic copy, the hard copy will govern. Recipient assumes all
risks in the changing or modification of data and revisions or updating of hard copy documents.
On Wed, Jun 1, 2016 at 12:56 PM, Tom Redding <tredding@encompasses.net> wrote:
Cory
Please consider this email a request for a variance for constructing a 16' driveway driveway for all three lots of the Finley Short Plat with a
sprinkler systems, rather than the required 20' driveway width. We want to reduce the access tract width and impervious surfaces, and make
the lots as big as possible to make sure we meet minimum lot areas/dimensions. I've attached a map of what we have in mind.
Thanks,
Tom Redding
Design Engineer
Cle Elum | Issaquah * | Email | Website
Cle Elum | 407 Swiftwater Blvd. | Cle Elum, WA 98922 | Phone: (509) 674-7433 | Fax: (509) 674-7419
* My Office | 165 NE Juniper Street, Suite 201 | Issaquah, WA 98027 | Phone: (425) 392-0250 | Fax: (425) 391-3055
Please consider the environment before printing this email
Encompass Engineering & Surveying, its officers or agents shall not be responsible for the accuracy or completeness of electronic file copies.
Due to the potential that information exchanged by electronic media can deteriorate, be damaged, lost or modified, intentionally or otherwise,
use of this electronic data by anyone other than Encompass Engineering & Surveying shall be at the sole risk of such user and without liability
or legal exposure to Encompass Engineering & Surveying. The recipient is responsible for verifying the accuracy of data against governing hard
copy documentation. If there is a discrepancy between the hard copy and the electronic copy, the hard copy will govern. Recipient assumes all
risks in the changing or modification of data and revisions or updating of hard copy documents.