Loading...
HomeMy WebLinkAbout12567-P-SEPA MDNS-2015-06-15-AddendumDEPARTMENTOFCOMMUNITYCftyofANDECONOMICDEVELOPMENT..:.JJ)ADDENDUMTOENVIRONMENTAL(SEPA)DETERMINATIONOFNON-SIGNIFICANCE(DNS-M)-MITIGATEDPursuanttoWAC197-11-600(4)(c)andWAC197-11-625AddendumtothePaccarPartsDistributionBuildingasAddendedbytheCityofRenton(LUAO6-139)DeterminationofNon-Significance-Mitigated(DNS-M)DateofAddendum:June15,2015DateofOriginalIssuanceofSEPAThresholdDetermination:December18,2006Proponent:PACCARInc.ProjectNumbers:LUAO6-139,ECFProjectName:PaccarPartsDistributionBuildingProposal/PurposeofAddendum:TheoriginalSEPAthresholddeterminationforthePaccarPartsDistributionBuildingswasissuedonDecember18,2006.Theoriginalapplicationincludedaproposalfortheconstructionofanew255,000squarefootpartsdistributioncenter,whichincluded5,000squarefeetofofficespace.TheEnvironmentalReviewCommitteeStaffReport,projectdescriptionandtheapplicationmaterialsdidnotexplicitlydisclosethesitepre-loadamountanddistributionofthe139,000cubicyardsofpre-loadsurchargesoils.TheintendedpurposeofthesubjectSEPAAddendumistodisclosetheintendedretentionandgradingof139,000cubicyardsoffillonthesite.BasedontheinformationsubmittedbytheapplicantonJune8,2015;thelocationofthedistributionbuildingpre-loadsurchargesoilswouldberelocatedfromthenewbuildingvicinityinthesoutheastcornerofthePaccarcomplextothewesternportionofthesite.Thegradedsoilswouldbehydroseeded.PursuanttotheCityofRenton’sEnvironmentalOrdinanceandSEPA(RCW43.21C,1971asamended),onDecember18,2006,theEnvironmentalReviewCommitteeissuedaDeterminationofNon-Significance-Mitigated(DNS-M)forthePaccarPartsDistributionBuilding.TheDNS-Mincludedfivemitigationmeasuresrelatedtogeotechnicalrecommendations,drainageanderosioncontrol,trucktrafficandmitigationfees.A14-dayappealperiodcommencedonDecember18,2006andendedonJanuary5,2007.AnappealwasreceivedonJanuary5,2007fromtheprojectproponents,requestingamendingthemitigationmeasurethatlimitedthehoursofoperationfortrucktraffic.ThedecisionoftheERCwasaffirmedbytheHearingExamineronMarch19,2007,resultinginnochangestothe AddendumtoEnvironmental(SEPA)ReviewPage2of3June12,2015originalDNS-M.Assuch,trucktrafficwouldremainlimitedtothehoursof7:00amto10:00pm.AnAddendumtotheoriginalSEPAdeterminationwasissuedonAugust26,2013toclarifythatanexisting28,500squarefootbuildingwastobedemolishedaspartoftheprojectaspartofsitedevelopmentforthedistributioncenter.IthasbeendeterminedthattheenvironmentalimpactsoftheproposalwereadequatelyaddressedundertheanalysisofsignificantimpactscontainedwithinthepreviouslyadoptedDNS-M.BasedonWAC197-11-600(4)c,theaddendumprocessmaybeusedifanalysisorinformationisaddedthatdoesnotsubstantiallychangetheanalysisofsignificantimpactsandalternativesintheexistingenvironmentaldocument.Theretentionofthepre-loadsurchargematerialsforthedistributionfacilitytothewesternareaofthesite,alongwithproposedmitigation,wouldnotchangetheanalysisorimpactsintheStateEnvironmentalPolicyAct(SEPA)Review.TheCityofRentonisherebyissuingaSEPAAddendumpursuanttoWAC197-11-600.ThisAddendumisappropriatebecauseitcontainsonlyminorinformationnotincludedintheoriginalDeterminationandtherearenoenvironmentalimpactsrelatedtoinclusionofthenewinformation.Location:1400N4thStreetLeadAgency:CityofRenton,DepartmentofCommunity&EconomicDevelopmentReviewProcess:AddendumtopreviouslyissuedDeterminationofNon-Significance-Mitigated(DNS-M)AdditionalInformation:Ifyouwouldlikeadditionalinformation,pleasecontactKrisSorensen,AssociatePlanner,CityofRentonPlanningDivision,DepartmentofCommunity&EconomicDevelopmentat(425)430-6593.ThereisnocommentperiodforthisAddendum,datedJune15,2015issuedbytheCityofRentonEnvironmentalReviewCommittee. AddendumtoEnvironmental(SEPA)ReviewPage3of3June12,2015ENVIRONMENTALREVIEWCOMMITIEESIGNATURES:A%GreggZlmmermar!,ApministrorPublicWorksDeprt4ienii/c_ _C.E.“Chip”Vincent,Administr’*t’orDepartmentofCommunity&EconomicDevelopmentöatec/is/IDateJL5LLTerryHigashiyama,AdministratorDateCommunityServicesDepartment9//dMarkPeterso,AdministratorDateFire&EmergencyServicesDepartment1I/I