HomeMy WebLinkAbout34 - Drainage Report
Firestone Complete Auto Care
17808 108th Ave SE
Renton, Washington, 98055
Technical Information Report
Commercial Redevelopment
1505 Westlake Ave. N T 206.522.9510
Suite 305 F 206.522.8344
Seattle, WA 98109 www.pacland.com
Prepared By: Luke Randles, P.E.
Reviewed By: Bill Fortunato, P.E.
Prepared: September 2016
Revised: January 2017
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 1
Section Page
EXECUTIVE SUMMARY ........................................................................................................................................... 2
SECTION 1- PROJECT OVERVIEW ............................................................................................................................ 4
SITE LOCATION .............................................................................................................................................................. 9
DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS ................................................................................................ 10
SOILS ......................................................................................................................................................................... 11
SECTION 2- CONDITIONS AND REQUIREMENTS SUMMARY ................................................................................. 13
SECTION 3- OFF-SITE ANALYSIS ............................................................................................................................ 17
SECTION 4- FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN .......................................... 19
HYDROLOGIC ANALYSIS ................................................................................................................................................. 19
EXISTING SITE HYDROLOGY ............................................................................................................................................ 19
DEVELOPED SITE HYDROLOGY ........................................................................................................................................ 20
FLOW CONTROL ANALYSIS ............................................................................................................................................. 20
WATER QUALITY SYSTEM .............................................................................................................................................. 21
SECTION 5- CONVEYANCE SYSTEM ANALYSIS AND DESIGN .................................................................................. 22
CONVEYANCE .............................................................................................................................................................. 22
100-YEAR FLOOD/OVERFLOW CONDITION ....................................................................................................................... 22
SECTION 6- SPECIAL REPORTS AND STUDIES ........................................................................................................ 23
SECTION 7- OTHER PERMITS ................................................................................................................................ 23
SECTION 8- CSWPPP ANALYSIS AND DESIGN ........................................................................................................ 23
SECTION 9- BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ................................ 23
SECTION 10- OPERATIONS AND MAINTENANCE MANUAL ................................................................................... 23
APPENDICES: A – EXHIBITS
B – PLANS
C – DESIGN CALCULATIONS
D – OPERATIONS AND MAINTENANCE MANUAL
E – WATER QUALITY DEPARTMENT OF ECOLOGY CERTIFICATION
F – GEOTECHNICAL REPORTS
G – BOND QUANTITIES WORKSHEET
Table of Contents
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 2
Site Location:
The project property is located at 17808 108th Ave SE in Renton, Washington. The site is
bordered by 108th Ave SE/WA 515 to the west, Jiffy Lube to the north, a vacant commercial
building to the south, and 109th Ave SE to the east. There is also a residential property to the NE
as well. The site is currently developed as the Skipper’s Seafood and Chowder House, which has
a building footprint of 2,552 square feet, with associated parking and landscaping. The entire lot
is approximately 0.88 acres in size. This project proposes to demolish the existing restaurant and
parking lot, then redevelop the site to become a Firestone Complete Auto Care.
The project site lies within the Lower Green River Subwatershed, which is part of the
Green/Duwamish Watershed. It is in the City of Renton Black River drainage basin.
The project site is located in the City of Renton Commercial Mixed Use Overlay District
(Community Planning area). The property is zoned CA (Commercial Arterial).
Design Criteria:
The City of Renton uses the King County Surface Water Management Design Manual
(KCSWDM), 2009 Edition, as adopted by the City of Renton and the City of Renton Amendments
to the King County Surface Water Design Manual, dated February 2010. The existing site is
developed and primarily impervious with the exception of landscape islands and an
undeveloped piece of land between the parking lot and 109th Ave SE. The proposed
development will lead to a slight increase in the amount of overall impervious area. Per the
requirements of KCSWDM, both flow control and water quality mitigation will be required as a
result of the proposed development.
Table 1
Jurisdictional Requirements
Peak Runoff Control:
Peak Rate Flow Control Standard
Matching Existing Site Conditions
2-year: Match existing site conditions
10-year: Match existing site conditions
100-year: Match existing site conditions
Water Quality:
Enhanced Basic WQ Treatment
Preceding detention
60% of the developed 2-year peak
flow rate
Downstream of detention The full 2-year release rate from
detention facility
Executive Summary
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 3
Proposed Drainage System:
This project proposes to utilize a detention vault for storage and modular wetland system for
water quality treatment. The proposed grading will generally direct water from the northeast
corner of the site toward the west side of the site. There is currently a storm pipe that runs west
from 109th Ave SE toward the building. The existing pipe will be relocated to the north edge of
the site, and will continue to receive and detain off-site runoff from the east.
Stormwater will collect into catch basins along the valley on the east and north side of the
building and be conveyed via pipe to the northwest corner of the site to the stormwater
treatment structure. After treatment, stormwater will be directed to a detention vault, which in
conjunction with a flow control structure, will provide flow control as required by the
jurisdictional requirements identified in Table 1. After detention, stormwater will be released
existing stormwater system in 108th Ave. SE.
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 4
Figure 1 - TIR Worksheet (KCSWDM 2009)
Section 1- Project Overview
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 5
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 6
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 7
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 8
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 9
Site Location
Figure 2 - Site Location
Location: 17808 108th Ave SE, Renton, WA 98055
Section/Township/Range: NE Quarter of Section 32, Township 23, Range 05
Parcel/Tax Lot(s): 3223059104
Size: 0.88 acres
City, County, State: Renton, King County, Washington
Governing Agency: City of Renton
Design Criteria: 2009 King County Surface Water Design Manual (KCSWDM), and the City of
Renton Amendments to the KCSWDM (February 2010)
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 10
Drainage Basins, Subbasins, and Site Characteristics
Drainage Basin
The project site is located in the Lower Green River Subwatershed, which is part of the
Green/Duwamish Watershed. It is in the City of Renton Black River drainage basin.
Existing Subbasins
The design of the existing site used a single basin with an area of 0.88 acres. The southeast
portion of the site of the highest in elevation at 410’. The area gradually sloped west until the
finished floor of the building about 402’. The northeast side of the site starts at an elevation of
408’ and slopes downward toward the west side of the site where it has an elevation of 400’.
This whole subbasin creates a drainage system that allows water to flow from east to west. The
northwest corner of the site has a catch basin that conveyed water into the municipal
stormwater system. There is another discharge at the southwest corner of the site due to the
valley that runs east to west along the southern part of the site.
Proposed Subbasins
The proposed storm drainage system will be comprised of one subbasin. The north subbasin is
about 0.88 acres in size. Stormwater that lands north of the ridge follows the grading toward
the valley just north of the proposed building footprint and drains north to the detention
system. Water that lands in the south of the ridge drains into the valley and into a catch basin
which leads to the same stormwater pipe water that lands north of the ridge. Stormwater that
falls south of the retaining wall follows the grading below the proposed footprint and out
toward 108th Ave SE.
Table 2 – Site Areas
Surface Existing Area (SF) Proposed Area (SF)
Roof 2,552 7,700
Landscaping
(Pervious)
15,228 11,095
Pavement
(PGIS)
18,085 17,710
Wood Deck 522 0
Sidewalk
(NPGIS)
1,756 1,602
Total 38,107 38,107
Site Characteristics
The property is located at 17808 108th Ave SE in Renton, Washington. The site is bordered by
108th Ave SE/WA 515 to the west, Jiffy Lube to the north, a residential area to the northeast, a
vacant commercial building to the south, and 109th Ave SE to the east. The site is currently
developed as the Skipper’s Seafood and Chowder House, which has a building footprint of 2,552
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 11
square feet, with associated parking and landscaping. The entire lot is approximately 0.88 acres
in size. This project proposes to demolish the existing restaurant and parking lot, then redevelop
the site to become a Firestone Complete Auto Care.
The proposed project will include the construction of an approximately 7,700 SF Firestone
Complete Auto Care building. The overall paved area will be approximately 0.30 AC, and the
overall change in impervious surfaces (roof and pavement) is approximately 0.10 AC. Water
quality treatment will be provided for an area equivalent to the pollution generating impervious
surface on site.
Soils
Websoil Survey
Figure 3 - Site Soils (USDA Web Soil Survey Map)
The site is mapped as Alderwood gravelly sandy loam 0 to 8 percent slopes (AgB) and
Alderwood gravelly sandy loam 8 to 15 percent slopes (AgC) according to the USDA Natural
Resource Conservation Service, Web Soil Survey for King County Area, Washington.
Geotechnical Report
The following information was gathered from a report created by Zipper Geo Associates, LLC. on
August 29, 2016. 4 feet deep under the surface, ZGA’s infiltration test recorded that the soil
observed was glacial till with medium dense, light brown with some oxidation, sandy loam with
gravel. Underneath this soil was unweathered glacial till consisting of dense, tan, sandy loam
with gravel. The bottom of the infiltration test was at 8 feet. The report showed dense, tan,
unweathered glacial till at this depth.
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 12
No groundwater was observed during the infiltration test. There were also no signs that the
seasonal groundwater may be higher than when observed.
ZGA performed a single small-scale Pilot Infiltration Test per standard of the Storm Water
Manual. The results of the test were that the infiltration test was approximately 0.21
inches/hour. According to Table 3.7 in the City of Renton’s Amendments to the King County
Storm Water Design Manual, a correction factor of 4 must be used to derive the design
infiltration rate from the observed short term infiltration rate. After applying this correction
factor, the site has a design infiltration rate of 0.05 in/hr. The geotechnical report, along with a
previous report performed by Professional Service Industries, Inc., (PSI) are presented in
Appendix F.
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 13
As required by the 2009 King County Surface Water Design Manual (KCSWDM) and City of
Renton Amendment, this project is subject to a full drainage review. Therefore, the storm
drainage design for this project is required to comply with all eight (8) Core Requirements, and
six (6) Special Requirements. The requirements have been met as follows:
Core Requirement #1: Discharge at Natural Location
All surface and storm water runoff from a project must be discharged at the natural location so
as not to be diverted onto or away from downstream properties. The manner in which runoff is
discharged from the project site must not create a significant adverse impact to downhill
properties or drainage systems.
Response: Onsite runoff will be collected, conveyed, and when necessary, treated. All onsite runoff
is subsequently conveyed to the City of Renton stormwater system. The city system discharges
northwest of the site into Panther Creek. No downstream impacts are anticipated as a result of the
proposed improvements as the impervious area will remain approximately the same.
Core Requirement #2: Off-site Analysis
All proposed projects must submit an offsite analysis report that assesses potential offsite
drainage and water quality impacts associated with development of the project site and propose
appropriate mitigation of those impacts. The initial permit submittal shall include, at minimum, a
Level 1 downstream analysis.
Response: See Section 3 of this report for a complete off-site analysis. A Level 1 downstream
analysis will be submitted upon civil plan submittal.
Core Requirement #3: Flow Control
All proposed projects, including redevelopment projects, must provide onsite flow control
facilities or flow control BMPs or both to mitigate the impacts of storm and surface runoff
generated by new impervious surface, new pervious surface, and replaced impervious surface
targeted for flow mitigation.
Response:
Per KCSWDM and the City of Renton amendments, flow control will be provided for Peak Rate
Flow Control Standard Matching Existing Site Conditions. A stormwater detention system and flow
control structure will be put in place to match pre-development conditions for the 2, 10, and 100-
year design storm events. A detailed summary and analysis of the existing and proposed
conditions is provided in Section 4 of this report.
Section 2- Conditions and Requirements
Summary
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 14
Core Requirement #4: Conveyance System
All engineered conveyance system elements for proposed projects must be analyzed, designed,
and constructed to provide a minimum level of protection against overtopping, flooding,
erosion, and structural failure.
Response: Portions of the existing conveyance system will be reused as part of this project with
additional conveyance added to accommodate the new building configuration and site layout. The
proposed conveyance system has been designed to convey the 100-year peak flow.
Core Requirement #5: Erosion and Sediment Control
All proposed projects that will clear, grade, or otherwise disturb the site must provide erosion
and sediment controls to prevent, to the maximum extent practicable, the transport of sediment
from the project site to downstream drainage facilities, water resources, and adjacent properties.
Both temporary and permanent ESC measures shall be implemented.
Response: Erosion and sediment control requirements will be an integral part of the project
construction documents. These measures will include methods to reduce erosion of onsite site soils
and to prevent sediments from inadvertently leaving the project site. Additionally, the ESC
measures will prevent sediment-laden discharge from entering the wetland or existing stormwater
water quality or flow control facilities.
Core Requirement #6: Maintenance and Operations
Maintenance and operation of all drainage facilities is the responsibility of the property owner,
except those facilities for which the City of Renton assumes maintenance and operation, and
must be maintained and operated in accordance with King County or other maintenance
standards as approved by the City of Renton.
Response: An Operations and Maintenance Manual is included in this report- see Section 10.
Core Requirement #7: Financial Guarantees and Liability
In accordance with RMC 4-6-030J, RDSD shall require all persons constructing any surface water
facilities (including flow control/water quality facilities, conveyance systems, erosion control, and
road drainage), to post with the City of Renton a bond, assignment of funds or certified check.
The applicant must also maintain liability insurance.
Response: See Section 9- Bond Quantities, Facility Summaries, and Declaration of Covenant. The
Site Improvement Bond Quantity Worksheet and Declarations of Covenants will be submitted
upon approval of the Building Permit plans.
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 15
Core Requirement #8: Water Quality
All proposed projects, including redevelopment projects, must provide water quality (WQ)
facilities to treat the runoff from those new and replaced pollution-generating impervious
surfaces and new pollution-generating pervious surfaces targeted for treatment.
Response: Enhanced Basic Treatment is required, as more than 50% of the runoff that drains to
the proposed treatment facility is from commercial land use. Additionally, an oil/water separator,
which will discharge to the sanitary sewer system, will be provided for discharges from the
building. A detailed summary and analysis of the water quality basin and design is provided in
Section 4 of this report.
Special Requirement #1: Other Adopted Area-Specific Requirements
The City of Renton may apply requirements for controlling drainage on an area-specific basis.
Potential other adopted area-specific requirements may include: Master Drainage Plans, Basin
Plans, Stormwater Compliance Plans, etc.
Response: The project site is within Washington State Water Resource Inventory Area 9:
Green/Duwamish and Central Puget Sound Watershed Salmon Habitat Recovery. However, the
proposed project will have no effect on any salmon habitats. The project site does not lie within
any City of Renton Master Drainage or Basin Plans.
Special Requirement #2: Flood Hazard Area Delineation
If a proposed project contains or is adjacent to a flood hazard area as determined by the Renton
Department of Storm Drainage, the project must determine those components that are
applicable and delineate them on the project’s site improvement plans and recorded maps.
Response: The project site does not lie within or adjacent to a City of Renton Flood Hazard Area
(determined by FEMA FIRM Panel 53033C0979F dated May 16, 1995) and therefore does not need
to apply the provisions of this requirement.
Special Requirement #3: Flood Protection Facilities
Proper analysis, design, and construction are necessary to protect against the potentially
catastrophic consequences if flood protection facilities such as levees and revetments should
fail.
Response: The proposed project will not rely on an existing flood protection facility, or modify or
construct a new flood protection facility.
Special Requirement #4: Source Control
If a proposed project requires a commercial building or commercial site development permit
then the water quality source controls applicable to the proposed project shall be applied in
accordance with the King County Stormwater Pollution Prevention Manual and Renton Municipal
Code IV.
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 16
Response: Water quality source controls will be applied in accordance with the KCSWDM and
Renton Municipal Code IV. A pollution prevention plan has been included in section 8 of this
report.
Special Requirement #5: Oil Control
Projects proposing to develop or redevelop a high-use site must provide oil control in addition
to other water quality controls required.
Response: High use sites area defined as a commercial or industrial site that (1) has an expected
average daily traffic count equal to or greater than 100 vehicles/1,000 SF of gross building area:
(2) is subject to petroleum storage in excess of 1,500 gallons per year; (3) is subject to use, storage,
or maintenance of a fleet of 25 or more diesel vehicles. The proposed development does not exceed
any of these thresholds, and is therefore not required to provide oil control.
Special Requirement #6: Aquifer Protection Area
If a proposed project is located within the Aquifer Protection Area as identified in the RMC 4-3-
050, this special requirement requires the project to determine those components that are
applicable and delineate them on the project’s site improvement plans.
Response: The project is not located within an Aquifer Protection Area, and therefore this
requirement does not apply.
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 17
Upstream Analysis
The municipal storm system coming from 109th Ave SE ties into the existing private storm
system on the East side of the site. There is minimal tributary area attributes water to the site.
Stormwater runoff flows from the nearby residential streets and is guided by curbs into catch
basins before it reaches this site.
Downstream Analysis
After the runoff passes through the existing stormwater detention/treatment facilities, runoff
enters the municipal stormwater system at 108th Ave SE. After crossing over 108th Ave SE, the
system travels northwest about 2500 feet until discharge into Panther Creek. As discussed
earlier in the report, the storm runoff leaves the site at the northwest corner and enters into the
Renton Municipal storm system. The system runs underneath the Fred Meyer strip mall and
across SE Carr Rd until feeding into Panther Creek. A map of the downstream analysis can be
seen in Figure 4.
Figure 4 - Downstream Area (Renton COR Maps)
Section 3- Off-Site Analysis
DISCHARGE
POINT
PROJECT
SITE
POINT OF
ENTRY TO CITY
OF RENTON
STORM SYSTEM
PANTHER
CREEK
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 18
Conclusion:
The proposed stormwater management system for this project has been designed in accordance
with regulatory criteria described above and is consistent with sound engineering practice. The
site has been analyzed to determine the requirements for detention and water quality treatment,
and no significant adverse impacts to the stormwater management system are expected as a
result of the proposed development.
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 19
The City of Renton Amendment to the KCSWDM applies flow control standards based on
geographic areas as determined by the Flow Control Application Map. The project site lies
within a Conservation Flow Control Area. This requires a level 2 downstream analysis. This area
requires peak runoff control within the Flow Control Duration Standard Matching Existing Site
Conditions area such that it matches the flow duration of predeveloped rates for the existing
site conditions over the range of flows extending from 50% of 2-year up to the full 50-year flow.
This matches the flow duration of predeveloped rates for the existing site conditions over the
range of flows extending from 50% of 2-year up to the full 50-year flow.
Hydrologic Analysis
The existing and proposed site conditions were evaluated using both the King County Runoff
Time Series (KCRTS) The detailed KCRTS output has been included in Appendix C.
The historic 1-hour duration in the Sea-Tac rainfall region (location scale factor ST-1.0) was used
to model runoff in KCRTS.
Existing Site Hydrology
The existing site consists primarily of a single sub-basin. The site generally flows from east to
west, ranging from an elevation of 410 in the southeast corner to 400 at the western edge,
where a catch basin collects runoff and conveys it to the existing City of Renton municipal storm
drainage system in 108th Ave. SE. The municipal stormwater system routes to a discharge point
of Panther Creek across SE Carr Rd. Adjacent properties to the north and south do not drain
toward the project, and therefore do not contribute any runoff to the drainage basin. A drainage
swale in the northeast corner of the site accepts runoff from 109th Ave. SE prior to being
collected in a 36” detention pipe, then released to the existing storm drainage system in 108th
Ave. SE. The pre-developed conditions and existing peak runoff rates for the project site area are
shown in Tables 4 and 5 below. An exhibit showing the existing conditions is provided in
Appendix A. Existing peak runoff rates were determined using the King County Runoff Time
Series modeling software and the calculations can be found in Appendix C.
Table 4
Pre-Developed (Existing) Conditions
Area Condition
0.44 AC Pavement (PGIS)
0.37 AC Landscape/Wetland
0.059 AC Roof
*For KCRTS analysis, a fully forested condition
was assumed per City of Renton requirements.
Section 4- Flow Control and Water Quality Facility Analysis
and Design
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 20
Table 5
Existing Peak Runoff Rate
Event Rate (cfs)
2-year 0.028
10-year 0.044
100-year 0.097
Developed Site Hydrology
The developed site will preserve the general configuration of the site, with runoff generally
flowing from east to west, being collected in catch basins located throughout the site prior to
being conveyed to a treatment structure and a detention facility, then released into the existing
system in 108th Ave. SE. Therefore, existing drainage pattern and discharge locations will be
maintained. The existing detention pipe will be relocated to the northern portion of the site, and
will continue to receive and detain runoff from 109th Ave. SE. The post-developed conditions
and un-detained peak runoff rates for the entire basin area are shown in Tables 6 and 7 below.
An exhibit showing the developed conditions is provided in Appendix A. The proposed grading
and drainage plan is included in Appendix B. Developed peak runoff rates were determined
using the King County Runoff Time Series modeling software and the calculations can be found
in Appendix C.
Table 6
Post-Developed Conditions
Area Condition
0.44 AC Pavement (PGIS)
0.26 AC Landscape/Wetland
0.18 AC Roof
Table 7
Developed Peak Runoff Rate
Event Rate (cfs)
2-year 0.409
10-year 0.615
100-year 0.863
Flow Control Analysis
The post developed 100-year peak runoff rate for the overall site increases by 0.767 cfs from the
existing condition. Because the project is located in the Peak Rate Flow Control Standard area
and it does increase its developed 100-year peak runoff rate, additional flow control facilities are
required.
The proposed project includes installation of a subsurface open-bottom modular detention
vault system. A small amount of infiltration, based on the geotechnical information provided in
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 21
Appendix F, was taken into consideration in the design calculations. The total storage provided
by the vault system is 9,975 cubic feet, which is in excess of the required volume of 9,750 cf.
Water Quality System
In order to provide enhanced basic treatment as required by KCSWDM and the City of Renton
amendments, a modular wetland will be installed upstream of detention. The modular wetland is
intended to collect and treat runoff generated by the pollutant-generating impervious areas on
the site, mimicking the treatment effects of a wetland by utilizing a combination of pre-
treatment using separation and pre-treatment cartridges and treatment utilizing biofiltration.
The modular wetland systems have been granted General Use Level Designation (GULD) by the
Washington State Department of Ecology (DOE) for Basic, Enhanced, and Phosphorous
treatment. The approval documentation has been included in Appendix E.
Table 8
Water Quality Flow Rates and Facility Sizing
Basin Design Event Rate
(cfs)
MWS-L-4-8-V Treatment
Flow Rate (cfs)
A 2-year
(Downstream of Detention) 0.190
A 60% of 2-year
(Upstream of Detention) 0.114 0.115
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 22
Conveyance
Per the 2009 King County Surface Water Design Manual, Section 4.2.1.2, the on-site stormwater
conveyance can be calculated based on gravity flow analysis of the piping network. Peak run-off
associated with and up to a 25-year storm event has been determined to be adequate. Uniform
flow analysis utilizing Manning’s equation, shown below, was employed with a Manning’s
Roughness Coefficient (n) of 0.012.
Manning’s equation - Q=n49.1 xAxR2/3xS1/2
With: Q = Flow (CFS)
n = Manning’s Roughness Coefficient (0.012)
A = Flow Area (SF)
R = Hydraulic Radius = Area /Wetted Perimeter (LF)
S = Slope of the pipe (ft/ft)
Based on the revised basin areas and existing pipe sizes, the existing conveyance system is
adequate for the 25-year storm event. All new conveyance pipes will also be designed to convey
the 25-year storm event. Additionally, the overflow from a 100-year storm event will not create
or aggravate a severe flooding problem or severe erosion problem. See Appendix C for
conveyance design calculations.
100-Year Flood/Overflow Condition
Review of the current FEMA FIRM maps (Panel 0979 F) indicates that the project site lies within
the Zone X, which is determined to be outside of the 100-year flood plain. If the existing storm
system were to experience a major storm event, the stormwater detention area would overflow
in to the front access and drain out toward 108th Ave SE.
The stormwater system for this project has been designed to address the storm events in
accordance with design criteria described previously. In the event of a larger storm, it is unlikely
that the system would fail. Based on a review of the site and immediate surroundings, the
overflow of the stormwater conveyance system would allow surface water to sheet flow to the
public storm system in 108th Ave SE.
Section 5- Conveyance System Analysis and Design
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 23
The following Special Reports and Studies were used or have been completed for this project:
Field Infiltration Testing- by Zipper Geo Associates
FEMA FIRM Panels 0979F dated May 16, 1995
Section 6- Special Reports and Studies
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 24
The following governmental approvals or permits will likely be required for this project: City of Renton SEPA Determination City of Renton Site Plan Review City of Renton Building Permit City of Renton Construction Permit City of Renton Demolition Permit These permits will require approval by the City of Renton Planning Division or the Department of Ecology.
Section 7- Other Permits
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 25
All erosion and sediment control measures shall be governed by the requirements of the City of
Renton and the Washington State Department of Ecology. A temporary erosion and
sedimentation control plan will be prepared to assist the contractor in complying with these
requirements. The Erosion and Sediment Control (ESC) plan will be included with the
construction plans.
1. Erosion Risk Assessment
The degree of erosion risk on the proposed project site is minimal. Slope across the site is
minimal. Runoff will not travel at high velocities across the site and, therefore, will not cause
noticeable erosion impacts.
2. Construction Sequence and Procedure
The proposed development will include an erosion/sedimentation control plan designed to
prevent sediment-laden run-off from leaving the site during construction. The erosion potential
of the site is influenced by four major factors: soil characteristics, vegetative cover, topography,
and climate. Erosion/sedimentation control is achieved by a combination of structural
measures, cover measures, and construction practices that are tailored to fit the specific site.
Prior to the start of any grading activity upon the site, all erosion control measures, including
stabilized construction entrances, shall be installed in accordance with the construction
documents.
The best construction practice will be employed to properly clear and grade the site and to
schedule construction activities. The planned construction sequence for the construction of the
site is as follows:
1. Attend a pre-construction meeting with the City of Renton.
2. Install temporary erosion control features.
3. Demolish existing structure(s).
4. Clear and grub site.
5. Grade site.
6. Construct buildings.
7. Pave site and install landscaping.
8. Remove temporary erosion control features once site is fully stabilized.
Section 8- CSWPPP Analysis and Design
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 26
3. Trapping Sediment
Structural control measures will be used to reduce erosion and retain sediment on the
construction site. The control measures will be selected to fit specific site and seasonal
conditions.
The following structural items will be used to control erosion and sedimentation processes:
Stabilized construction entrances
Filter fabric fences
Catch Basin Inlet Sediment Protection
Proper Cover measures
Weekly inspection of the erosion control measures will be required during construction. Any
sediment buildup shall be removed and disposed of off-site.
A stabilized construction entrance will be installed at the site entrance to avoid vehicle tracking
off mud off-site. The entrances are a minimum requirement and may be supplemented if
tracking of mud onto public streets becomes excessive. In the event that mud is tracked off site,
it shall be swept up and disposed of off site on a daily basis. Depending on the amount of
tracked mud, a vehicle road sweeper may be required.
Because vegetative cover is the most important form of erosion control, construction practices
must adhere to stringent cover requirements. More specifically, the contractor will not be allowed
to leave soils open for more than 14 days and, in some cases, immediate seeding will be required.
4. Wet Season TESC Operating Plan
Work between October 1st and April 30th must adhere to the Wet Season Special Provisions
noted in the 2009 KCSWDM.
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 27
The following items will be submitted upon application for the civil permits:
Declaration of Covenant for Privately Maintained Flow Control BMPs
Declaration of Covenant for Privately Maintained Flow Control and WQ Facilities
See Appendix G for a copy of the Bond Quantities Worksheet.
Section 9- Bond Quantities, Facility Summaries, and Declaration of
Covenant
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10439013 Page 28
A manual detailing the operations and maintenance for all privately-maintained flow control and
water quality facilities has been prepared and can be found in Appendix D.
Section 10- Operations and Maintenance Manual
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Appendix A – Exhibits
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Appendix B – Plans
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Appendix C – Design Calculations
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Historic Time Series
Historic Peak Flow Rates
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Developed Time Series
Developed Peak Flow Rates
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Retention/Detention Facility Design
Retention/Detention Facility Information
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Historic vs. Developed Duration Analysis
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Developed Time Series - WQ
Water Quality Flow Rates
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Conveyance Design Calculations
Manning’s equation: Q=n49.1 xAxR2/3xS1/2
With: Q = Flow (CFS)
n = Manning’s Roughness Coefficient (0.012)
A = Flow Area (SF)
R = Hydraulic Radius = Area /Wetted Perimeter (LF)
S = Slope of the pipe (ft/ft)
12” Pipe @ 0.5% slope:
Q=n49.1 xAxR2/3xS1/2 = 2.94 CFS
n = 0.012
A = 0.771 (SF)
R = 0.286 @ 95% full
S = 0.005
Pipe capacity exceeds peak flows generated by development.
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Appendix D – Operations and Maintenance Manual
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Maintain Stormwater Facilities
The owner or operator of the project shall be responsible for maintaining the stormwater
facilities in accordance with local requirements. Proper maintenance is important for adequate
functioning of the stormwater facilities. The following maintenance program is recommended
for this project:
King County Surface Water Design Manual
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Appendix E – Water Quality Department of Ecology
Certification
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Appendix F – Geotechnical Reports
(Presented Without Appendices)
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Appendix G – Bond Quantities Worksheet
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003
Firestone Complete Auto Care Technical Information Report Renton, Washington
PACLAND Project #10507003