Loading...
HomeMy WebLinkAbout38 - Traffic Study TENW Transportation Engineering NorthWest Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th Street Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 MEMORANDUM DATE: September 26, 2016 TO: Ann Fowler City of Renton Public Works Plan Reviewer FROM: Chris Forster, P.E. TENW SUBJECT: Renton Firestone – Trip Generation PRE16-000342 TENW Project No. 5313 This memorandum summarizes the preliminary traffic information for the proposed Firestone Complete Auto Care project located at 17808 108th Ave SE in Renton, Washington. This memo includes a project description and trip generation estimate. We are requesting your review and approval of this information and confirmation that a traffic impact analysis will not be required for this project. Project Description The Renton Firestone site is located on the east side of 108th Ave SE (17808 108th Ave SE, see site vicinity map in Attachment A). The existing site includes a fast-food restaurant with drive-through window (Skippers) totaling 2,200 square feet, which would be removed. The proposed Firestone Complete Auto Care project would include up to 7,700 square feet of tire sales/auto care use. Access to the Firestone project is proposed to be provided via one right-in, right-out only driveway on 108th Ave SE in approximately the same location as the existing driveway to Skippers. A preliminary site plan is provided in Attachment B. The project is expected to be occupied in 2017. Trip Generation The trip generation estimates for the proposed Firestone project were based on methodology in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9th edition, for Tire Store (LUC 848) and Fast-Food Restaurant with Drive-Through Window (LUC 934). The net new trip generation was calculated by subtracting the trips from the restaurant to be removed from the trips generated by the proposed Firestone. The resulting net new weekday daily, AM and PM peak hour trips are summarized in Table 1. A detailed trip generation estimate is included in Attachment C. Table 1 Renton Firestone Trip Generation Summary Trips Generated Time Period In Out Total Weekday Daily -203 -204 -407 Weekday AM Peak Hour 10 6 16 Weekday PM Peak Hour -9 -4 -13 Renton Firestone – Trip Generation TENW September 26, 2016 Page 2 As shown in Table 1, the proposed Firestone project is estimated to result in a net reduction in weekday daily trips (-407 trips) with 16 net new trips occurring during the weekday AM peak hour (10 entering, 6 exiting), and a net reduction of net new trips (-13 trips) occurring during the weekday PM peak hour (-9 entering, -4 exiting). As a conservative assumption, no credit was taken for trips from the existing restaurant during the AM peak hour as the current restaurant (Skippers) opens after 9 AM. Next Steps The proposed Renton Firestone project would generate less than 20 net new trips during the weekday AM and PM peak hours. Therefore, based on the City’s guidelines, no additional traffic analysis is required for this development. We look forward to your review and approval of our trip generation estimates and consensus that no additional traffic analysis is necessary. If you have any questions, please feel free to contact me at (206) 498-5897 or forster@tenw.com. cc: Luke Randals, P.E., Pacland Attachments Renton Firestone – Trip Generation ATTACHMENT A Vicinity Map Renton Firestone – Trip Generation ATTACHMENT B Preliminary Site Plan Renton Firestone – Trip Generation ATTACHMENT C Trip Generation Estimate ITE Land Use LUC 2 In Out Trip Rate In Out Total DAILY Proposed Use: Tire Store 7,700 sf 848 50%50%24.87 95 96 191 Passby 3 28%-26 -27 -53 69 69 138 Less Existing Use:Fast-Food Restaurant with Drive-Through Window 2,200 sf 934 50%50%496.12 545 546 1,091 Passby 3 50%-273 -273 -546 272 273 545 TOTAL NET NEW DAILY TRIP GENERATION -203 -204 -407 AM PEAK HOUR Proposed Use: Tire Store 7,700 sf 848 63%37%2.89 14 8 22 Passby 3 28%-4 -2 -6 10 6 16 Less Existing Use: Fast-Food Restaurant with Drive-Through Window 4 2,200 sf 934 51%49%0.00 0 0 0 Passby 3 49%0 0 0 0 0 0 TOTAL NET NEW AM PEAK HOUR TRIP GENERATION 10 6 16 PM PEAK HOUR Proposed Use:Tire Store 7,700 sf 848 43%57%4.15 14 18 32 Passby 3 28%-4 -5 -9 10 13 23 Less Existing Use: Fast-Food Restaurant with Drive-Through Window 2,200 sf 934 52%48%32.65 37 35 72 Passby 3 50%-18 -18 -36 19 17 36 TOTAL NET NEW PM PEAK HOUR TRIP GENERATION -9 -4 -13 Notes: 1 sf GFA 2 Institute of Transportation Engineers, Trip Generation Manual, 9th Edition, 2012 Land Use Codes. 3 Passby percent based on studies documented in the ITE Trip Generation Handbook, 3rd Edition, August 2014. Daily is average of AM and PM.4 Restaurant was conservatively assumed to not be open during the AM peak hour and therefore generate no trips. ATTACHMENT C Renton Firestone Trip Generation Directional Split Trips Generated Units 1