HomeMy WebLinkAboutNOA DNSM_Renton Firestone 108th_16-000782
If you would like to be made a party of record to receive further information on this proposed project, complete this
form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: Renton Firestone on 108th / LUA16-000782, ECF, CU-A, SA-A, MOD, MOD, MOD, MOD
NAME:
MAILING ADDRESS: City/State/Zip:
TELEPHONE NO.:
NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION: October 17, 2016
LAND USE NUMBER: LUA16-000782, ECF, CU-A, SA-A, MOD, MOD, MOD, MOD
PROJECT NAME: Renton Firestone at 108th
PROJECT DESCRIPTION: The applicant is requesting Administrative Site Plan Review, Administrative
Conditional Use Permit, and Environmental Review of a proposed 7,700 square foot building to accommodate a new
vehicle service and repair business. Associated improvements include surface parking for 24 vehicles, stormwater
detention vault, and landscaping. The existing restaurant will be removed. Access to the site will remain in
approximately the same location as the former restaurant along the 108th Ave SE frontage. The applicant also requests
four (4) modifications to code requirements related to frontage improvements along 108th SE and 109 Ave SE, garbage
and recycling enclosure requirements, and loading space standards. The subject property is approximately 0.87 acres
with no critical areas mapped on-site.
PROJECT LOCATION: 17808 108th Ave SE
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined
that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under
the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be
issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There
will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may
be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow
the issuance of the DNS.
PERMIT APPLICATION DATE: October 6, 2016
NOTICE OF COMPLETE APPLICATION: October 17, 2016
APPLICANT/PROJECT CONTACT PERSON: Luke Randles, Pacland/ 1505 Westlake Ave N., Ste 305/ Seattle, WA
98117/ 206-522-9510/ lrandles@pacland.com
Permits/Review Requested: Environmental (SEPA) Review, Administrative Site Plan and
Conditional Use, Modifications
Other Permits which may be required: Building Permit, Construction Permit, Fire Permit, Sign Permit
Requested Studies: Arborist Report, Drainage Report, Geotechnical Report, Landscape
Analysis Traffic Impact Study,
Location where application may
be reviewed: Department of Community & Economic Development (CED) – Planning
Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton, WA
98057
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated COMP-CMU on the City of Renton Comprehensive
Land Use Map and Design-D, CA on the City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project: Environmental (SEPA) Checklist
Development Regulations
Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance RMC Title IV Chapters 2,
3, 4, 6, 8, 9, and 11 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Matthew Herrera, Senior Planner, CED –
Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on October 31, 2016. If you have questions
about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project
Manager. Anyone who submits written comments will automatically become a party of record and will be notified of
any decision on this project. A copy of the subsequent threshold determination is available upon request.
CONTACT PERSON: Matthew Herrera, Senior Planner; Tel: (425) 430-6593; Eml:
mherrera@rentonwa.gov
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION