HomeMy WebLinkAbout9-Construction Mitigation Description Bethany Corner
December 15, 2016
Project No. 16062
CITY OF RENTON
CONSTRUCTION MITIGATION REPORT
BETHANY CORNER
The following is a report of expected construction dates and times, as well as
proposed hauling/transportation routes, ESC measures and traffic control plan.
Proposed Construction Dates: Clearing, Grading, Utilities and Roads
Summer 2017-Spring 2018
Hours and Days of Operation: Normal site hours of operation will be in
compliance with the allowable working hours in the City of Renton which are as
follows:
For new single-family residences and non-residential construction, the permitted
work hours are 7:00am-8:00pm Monday through Friday, 9:00am-8:00pm Saturday,
and no work shall be permitted on Sunday.
Proposed Hauling/Transportation Routes: South on 111th Avenue SE, west
on SE 168th Street, south on 108th Avenue SE, north on Benson Drive S (SR-515)
which connects to Interstate 405.
ESC Measures: The Erosion and Sedimentation Control Design elements as listed
in SECTION VIII of the Technical Information Report shall be implemented to
minimize dust, traffic and transportation impacts, erosion, mud, noise, and other
noxious characteristics during Site construction.
Special hours: No special hours proposed for construction at this time.
Preliminary Traffic Control Plan: See attached
GRAPHIC SCALE
0 20 40 80
1 INCH = 40 FT.