Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNOA DNSM_Kiddie Acadamy_15-000021
If you would like to be made a party of record to receive further information on this proposed project, complete this
form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: Kiddie Academy of Renton/LUA15-000021, ECF, SA-A
NAME:
MAILING ADDRESS: City/State/Zip:
TELEPHONE NO.:
NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE-MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION: January 20, 2015
LAND USE NUMBER: LUA15-000021, ECF, SA-A
PROJECT NAME: Kiddie Academy of Renton
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and Administrative
Site Plan Review for a two-story building at the vacant property 353 Bremerton Ave NE within the Commercial Arterial
(CA) zone. The site is approximately 31,243 sf in area and the proposed building would contain 12,548 sf of commercial
space split between the two floors for the development of a child day care center. Approximately 170 children would be
served by the daycare. Associated site improvements include a children’s play area, additional vehicle parking, and
landscaping. Vehicle access to the site is already established and provided from both NE 4th St and Bremerton Ave NE.
Right-of-way dedication is not required and existing street improvements along Bremerton Ave NE would be retained as
they currently exist. Documents submitted for review include environmental checklist, traffic study, geotechnical and
drainage reports, and parking, landscape, and design district analysis. The site is within the City Aquifer Protection Area.
PROJECT LOCATION: 353 Bremerton Ave NE
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a
DNS-M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance-Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the
proposal. A 14-day appeal period will follow the issuance of the DNS-M.
PERMIT APPLICATION DATE: January 15, 2015
NOTICE OF COMPLETE APPLICATION: January 20, 2015
APPLICANT/PROJECT CONTACT PERSON: Paul Franks, Paul Franks Architecture/14711 NE 29th Pl, Ste
118/Bellevue, WA 98007/425-803-0792/paulfranks@frontier.com
Permits/Review Requested: Environmental (SEPA) Review, Administrative Site Plan Review
Other Permits which may be required: Building Permit, Construction Permit, Fire Permit, Sign Permit
Requested Studies: Drainage Report, Geotechnical Report, Traffic Analysis, Parking and
Landscaping Analysis, and Design District D Analysis.
Location where application may
be reviewed: Department of Community & Economic Development (CED) – Planning
Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton, WA
98057
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial Corridor (CC) on the City of Renton
Comprehensive Land Use Map and Commercial Arterial (CA) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project: Environmental (SEPA) Checklist
Development Regulations
Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, Renton Municipal Code
Sections 4-2-120A; 4-3-100; 4-4-070; 4-4-080; 4-4-130; 4-4-090; 4-6-060; 4-7-
060; 4-9-070; 4-9-200; and 4-9-250 and other applicable codes and regulations
as appropriate.
Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed
project. These recommended Mitigation Measures address project impacts not
covered by existing codes and regulations as cited above.
Follow geotechnical report recommendations including temporary and permanent erosion control
measures.
Any fill brought to the site would need a fill source statement as the area is within the Renton
Aquifer Protection Area.
Comments on the above application must be submitted in writing to Kris Sorensen, Associate Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 3, 2015. If you have questions about this
proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager.
Anyone who submits written comments will automatically become a party of record and will be notified of any decision
on this project. A copy of the subsequent threshold determination is available upon request.
CONTACT PERSON: Kris Sorensen, Associate Planner; Tel: (425) 430-6593; Eml:
ksorensen@rentonwa.gov
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION