Major Franchise Permit: MFP21006121
IVR Number: 21006121
Permit Information
Permit Name: Comcast Cable Franchise Permit -JB0000759426
Address/Location:12/22/2021Application Date:0423059142Parcel Number: 2611 UNION AVE NE
Permit Type:03/28/2022Issue Date:Franchise
Permit Work Class:03/28/2023Expiration Date:Major Utility
Job Number: JB0000759426Franchise Type:Cable
Description: Comcast JB0000759426
EXTEND (1) HARDLINE COAX ON EXISTING AERIAL STRAND. INSTALL (1) NEW 1/4" STRAND TO NEW POLE &
LASH (1) HARDLINE COAX. INSTALL (2) NEW RISERS ON NEW POLES & PULL (1) HARDLINE COAX THROUGH
PER DETAILS 1 & 2 ON SHEET 4 TRENCH (1) 4" CONDUIT & PULL (1) HARDLINE COAX THROUGH PER DETAILS
# 3 & 4 ON SHEET 4. SET (4) NEW VAULTS. WRECK OUT EXISTING AERIAL STRAND & COAX & RELOCATE COAX
UNDERGROUND. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Rhonda Resnik
Comcast
410 Valley Ave NW, Suite 12, Bldg C
Puyallup, WA 98371
B: (253) 864-4246Applicant
Andrew Parker
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (253) 225-0596Applicant
Annie Robertson
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
ApplicantX
Michael Cannon
Cannon Construction Inc
406 Porter Way
Milton, WA 98354-9638
B: (253) 922-2787
C: (253) 588-4034
Contractor
Business License Number: 20838Electrical Contractor: CANNOCI873CL
Construction Contractor: CANNOCL791JK
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 11/25/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 11/25/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.☐ A copy of the Traffic Control Plan (TCP) Application form.
2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
☐Include map(s) showing the location of the project and work area.
☐Be legible lettering and clear, contrasting, symbols of viewing or printing.
☐Must indicate street names, and north arrow and scale.
☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
☐Types of plans required:
☐Work hour plan – show all mobility impacts during construction hours.
☐Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
☐Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
☐Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
Forest Terrace
2611 Union Ave NE Renton, WA 98059
Monday Friday 8:00am 3:00pm
OVERLASH NEW COAX,
INSTALL NEW STRAND, TRENCH IN SOFT & HARD SURFACES & PLACE
4" & 2" CONDUITS, SET 4 NEW VAULTS IN SOFT SURFACE
Cannon Construction LLC 253 922 2787
Annie Robertson arobertson@cannonconstructioninc.com
406 Milton Way Milton, WA 98354
Scott Warlick CED
MFP21006121
3/28/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 11/25/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
•TCP must be approved prior to commencing the work, and all permit conditions shall be met.
•Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
•Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
•TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Approved Temporary TCP must be at the work site during work hours.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
•The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
Annie Robertson 12/20/2021
41014100954726239546NE 27TH PLFL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOP
EOP EOP EOP EOP EOP EOP EOP EOP EOPNE 27TH PLEOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPV
R25'W21-7W21-7W21-7W20-4W20-4W20-4W20-7aW20-7aW20-7aFLAGGER
FLAGGER
FLAGGER WTR2-1WORK AREAW21-7W20-4W20-7aFLAGGER
R2-1WTR2-1UNDERCONSTRUCTIONTHE DESIGNED TRAFFIC CONTROLS CONTAINED WITHINTHIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVEDBY THE PUBLIC AUTHORITY HAVING JURISDICTIONSITE SPECIFIC TRAFFIC CONTROL PLAN[AERIAL/UG WORK] CONTROL TYPE: SINGLE LANE CLOSURE 2-LANE ROADSIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)RURAL HIGHWAYS 60/65 MPH 800' +/-RURAL ROADS 45/55 MPH 500' +/-RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-RURAL ROADS & URBAN ARTERIALSRESIDENTAL & BUSINESS DISTRICTSURBAN STREETS 25 MPH OR LESS 100' +/-25/30 MPH 200' +/-ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADEINTERSECTIONS AND DRIVEWAYS.(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.10105150205270450500550---11115160225295495550605660--12125180245320540600660720780840LANEWIDTH25303540455055606570MINIMUM TAPER LENGTH IN FEET = LPOSTED SPEED LIMIT (MPH)SPEED253035455055155200250360425495570LONGITUDINAL BUFFER SPACE = BLENGTH40305606570780840DISCLAIMERAll traffic control setups, sign spacing, and procedures will conformto the specifications stated in the federal Manual on Uniform TrafficControl Devices (M.U.T.C.D)Cities and various municipalities may have also adopted specializedguidelines for traffic control within their jurisdiction. It is theresponsibility of the on-site traffic control personnel to verify if anyspecial conditions exist.TRAFFIC CONTROL ADDITIONAL NOTES-For aerial work, there will be a moving traffic control setup-Will coordinate with businesses that will be affected byconstruction-Will have spotter on site to escort pedestrians throughwork zone-All work will stop while pedestrians are escorted throughwork zones-Will have no more than two work areas active at a timeSITE NOTES-Maintain driveway access at all times-Place temporary "NO PARKING" signs at least72 hours prior to work-Sidewalks to remain open during road workunless noted otherwiseFLAGGERSPOTTER WTLEGENDWork Vehicle Work AreaFlagger SpotterNOFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC
TCPSDU
JB0000759426
00041AGTH11/24/2021NTSRenton, WA 98059
2611 Union Ave NE
Forest Terrace
17-050PLACE STEEL PLATES OVER OPEN TRENCHTO ALLOW ACCESS TO DRIVEWAYS.COORDINATE WITH CIVIL CONSTRUCTIONCREW TO ALLOW CONSTRUCTION VEHICLESTO ACCESS JOB SITE ON NE 27TH PLCONTACT PROPERTY OWNER(S) 72 HOURS PRIOR TOSTART OF WORK TO ALERT OWNER TO POSSIBLEDRIVEWAY CLOSURE AND ALTERNATE ACCESSWILL COORDINATE WORKHOURS WITH LOCAL SCHOOLADMINISTRATIONUNION AVE NEUNION AVE NEMFP21006121KING COUNTY ROW. ADDITIONALAPPROVAL MAY BE NEEDED FROM KINGCOUNTY FOR WORK IN THEIR ROW
410141002623NE 27TH PLFL FL FL FL FL FL FL FL FL FL FL FLEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEO
P
EOPEOPEOPEO
P
EOP EOP EOP EOP EOP EOPNE 27TH PLEOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPV
V
257225782562FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFL FL FL FL FL FL FL FL
V W21-7W21-7W21-7W20-4W20-4W20-4W20-7aW20-7aW20-7aFLAGGER
FLAGGER
FLAGGER
R2-1WORK AREAW21-7W20-4W20-7aFLAGGER
R2-1WTUNDERCONSTRUCTIONWTR2-1THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHINTHIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVEDBY THE PUBLIC AUTHORITY HAVING JURISDICTIONSITE SPECIFIC TRAFFIC CONTROL PLAN[AERIAL/UG WORK] CONTROL TYPE: SINGLE LANE CLOSURE 2-LANE ROADSIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)RURAL HIGHWAYS 60/65 MPH 800' +/-RURAL ROADS 45/55 MPH 500' +/-RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-RURAL ROADS & URBAN ARTERIALSRESIDENTAL & BUSINESS DISTRICTSURBAN STREETS 25 MPH OR LESS 100' +/-25/30 MPH 200' +/-ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADEINTERSECTIONS AND DRIVEWAYS.(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.10105150205270450500550---11115160225295495550605660--12125180245320540600660720780840LANEWIDTH25303540455055606570MINIMUM TAPER LENGTH IN FEET = LPOSTED SPEED LIMIT (MPH)SPEED253035455055155200250360425495570LONGITUDINAL BUFFER SPACE = BLENGTH40305606570780840DISCLAIMERAll traffic control setups, sign spacing, and procedures will conformto the specifications stated in the federal Manual on Uniform TrafficControl Devices (M.U.T.C.D)Cities and various municipalities may have also adopted specializedguidelines for traffic control within their jurisdiction. It is theresponsibility of the on-site traffic control personnel to verify if anyspecial conditions exist.TRAFFIC CONTROL ADDITIONAL NOTES-For aerial work, there will be a moving traffic control setup-Will coordinate with businesses that will be affected byconstruction-Will have spotter on site to escort pedestrians throughwork zone-All work will stop while pedestrians are escorted throughwork zones-Will have no more than two work areas active at a timeSITE NOTES-Maintain driveway access at all times-Place temporary "NO PARKING" signs at least72 hours prior to work-Sidewalks to remain open during road workunless noted otherwiseFLAGGERSPOTTER WTLEGENDWork Vehicle Work AreaFlagger SpotterNOFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC
TCPSDU
JB0000759426
00042AGTH11/24/2021NTSRenton, WA 98059
2611 Union Ave NE
Forest Terrace
17-050PLACE STEEL PLATES OVER OPEN TRENCHTO ALLOW ACCESS TO DRIVEWAYS.COORDINATE WITH CIVIL CONSTRUCTIONCREW TO ALLOW CONSTRUCTION VEHICLESTO ACCESS JOB SITE ON NE 27TH PLCONTACT PROPERTY OWNER(S) 72 HOURS PRIOR TOSTART OF WORK TO ALERT OWNER TO POSSIBLEDRIVEWAY CLOSURE AND ALTERNATE ACCESSWILL COORDINATE WORKHOURS WITH LOCAL SCHOOLADMINISTRATIONUNION AVE NEUNION AVE NEMFP21006121KING COUNTY ROW. ADDITIONALAPPROVAL MAY BE NEEDED FROM KINGCOUNTY FOR WORK IN THEIR ROW
41012623FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP25722556257825624118FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFL FL FL FL FL FL FL FL FL FL FL FL FL
W21-7W21-7W20-4W20-4W20-7aW20-7aFLAGGER
FLAGGER
WORK AREAWT
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWR2-1THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHINTHIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVEDBY THE PUBLIC AUTHORITY HAVING JURISDICTIONSITE SPECIFIC TRAFFIC CONTROL PLAN[UG WORK] CONTROL TYPE: SINGLE LANE CLOSURE 2-LANE ROADSIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)RURAL HIGHWAYS 60/65 MPH 800' +/-RURAL ROADS 45/55 MPH 500' +/-RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-RURAL ROADS & URBAN ARTERIALSRESIDENTAL & BUSINESS DISTRICTSURBAN STREETS 25 MPH OR LESS 100' +/-25/30 MPH 200' +/-ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADEINTERSECTIONS AND DRIVEWAYS.(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.10105150205270450500550---11115160225295495550605660--12125180245320540600660720780840LANEWIDTH25303540455055606570MINIMUM TAPER LENGTH IN FEET = LPOSTED SPEED LIMIT (MPH)SPEED253035455055155200250360425495570LONGITUDINAL BUFFER SPACE = BLENGTH40305606570780840DISCLAIMERAll traffic control setups, sign spacing, and procedures will conformto the specifications stated in the federal Manual on Uniform TrafficControl Devices (M.U.T.C.D)Cities and various municipalities may have also adopted specializedguidelines for traffic control within their jurisdiction. It is theresponsibility of the on-site traffic control personnel to verify if anyspecial conditions exist.TRAFFIC CONTROL ADDITIONAL NOTES-For aerial work, there will be a moving traffic control setup-Will coordinate with businesses that will be affected byconstruction-Will have spotter on site to escort pedestrians throughwork zone-All work will stop while pedestrians are escorted throughwork zones-Will have no more than two work areas active at a timeSITE NOTES-Maintain driveway access at all times-Place temporary "NO PARKING" signs at least72 hours prior to work-Sidewalks to remain open during road workunless noted otherwiseFLAGGERSPOTTER WTLEGENDWork Vehicle Work AreaFlagger SpotterNOFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC
TCPSDU
JB0000759426
00043AGTH11/24/2021NTSRenton, WA 98059
2611 Union Ave NE
Forest Terrace
17-050PLACE STEEL PLATES OVER OPEN TRENCHTO ALLOW ACCESS TO DRIVEWAYS.CONTACT PROPERTY OWNER(S) 72 HOURS PRIOR TOSTART OF WORK TO ALERT OWNER TO POSSIBLEDRIVEWAY CLOSURE AND ALTERNATE ACCESSWILL COORDINATE WORKHOURS WITH LOCAL SCHOOLADMINISTRATIONUNION AVE NEUNION AVE NEMFP21006121
2572410125042556257841062562410026110NE 25TH PLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
FL FL FL FL FL FL FL FL FL FL FL FL FL FL
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPVR25'UNION AVE NEUNION AVE NEW21-7W21-7W20-4W20-4W20-7aW20-7aFLAGGER
FLAGGER WORK AREAW21-7W20-4W20-7aFLAGGERWTWT
WTFLAGGER
R2-1R2-1WORK AREATHE DESIGNED TRAFFIC CONTROLS CONTAINED WITHINTHIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVEDBY THE PUBLIC AUTHORITY HAVING JURISDICTIONSITE SPECIFIC TRAFFIC CONTROL PLAN[AERIAL/UG WORK] CONTROL TYPE: SINGLE LANE CLOSURE 3-LANE ROADSIGN SPACING = X (FEET)FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)RURAL HIGHWAYS 60/65 MPH 800' +/-RURAL ROADS 45/55 MPH 500' +/-RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-RURAL ROADS & URBAN ARTERIALSRESIDENTAL & BUSINESS DISTRICTSURBAN STREETS 25 MPH OR LESS 100' +/-25/30 MPH 200' +/-ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADEINTERSECTIONS AND DRIVEWAYS.(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.10105150205270450500550---11115160225295495550605660--12125180245320540600660720780840LANEWIDTH25303540455055606570MINIMUM TAPER LENGTH IN FEET = LPOSTED SPEED LIMIT (MPH)SPEED253035455055155200250360425495570LONGITUDINAL BUFFER SPACE = BLENGTH40305606570780840DISCLAIMERAll traffic control setups, sign spacing, and procedures will conformto the specifications stated in the federal Manual on Uniform TrafficControl Devices (M.U.T.C.D)Cities and various municipalities may have also adopted specializedguidelines for traffic control within their jurisdiction. It is theresponsibility of the on-site traffic control personnel to verify if anyspecial conditions exist.TRAFFIC CONTROL ADDITIONAL NOTES-For aerial work, there will be a moving traffic control setup-Will coordinate with businesses that will be affected byconstruction-Will have spotter on site to escort pedestrians throughwork zone-All work will stop while pedestrians are escorted throughwork zones-Will have no more than two work areas active at a timeSITE NOTES-Maintain driveway access at all times-Place temporary "NO PARKING" signs at least72 hours prior to work-Sidewalks to remain open during road workunless noted otherwiseFLAGGERSPOTTER WTLEGENDWork Vehicle Work AreaFlagger SpotterNOFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC
TCPSDU
JB0000759426
00044AGTH11/24/2021NTSRenton, WA 98059
2611 Union Ave NE
Forest Terrace
17-050PLACE STEEL PLATES OVER OPEN TRENCHTO ALLOW ACCESS TO DRIVEWAYS.CONTACT PROPERTY OWNER(S) 72 HOURS PRIOR TOSTART OF WORK TO ALERT OWNER TO POSSIBLEDRIVEWAY CLOSURE AND ALTERNATE ACCESSWILL COORDINATE WORKHOURS WITH LOCAL SCHOOLADMINISTRATIONUNION AVE NEMFP21006121
SHEET INDEX:
1 - COVER SHEET
2 -LEGEND
3 -GENERAL NOTES
4 -DETAILS
5-8 -DESIGN
9-12 -RESTORATION
THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED BY CANNON COMPANIES
HARDLINE COAX: 858 FT
CONTACTS:
PROJECT MAP:
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
N
SCOPE OF WORK:
- EXTEND (1) HARDLINE COAX ON EXISTING AERIAL STRAND.
- INSTALL (2) NEW RISERS ON NEW POLES & PULL (1) HARDLINE COAX THROUGH PER DETAILS 1 & 2
ON SHEET 4
- TRENCH (1) 4" CONDUIT & PULL (1) HARDLINE COAX THROUGH PER DETAILS # 3 & 4 ON SHEET 4
- SET (4) NEW VAULTS
- WRECK OUT EXISTING AERIAL STRAND & COAX & RELOCATE COAX UNDERGROUND
BILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER (2)=
TOTAL ROW FOOTAGE =
0 FT.
88 FT.
745 FT.
0 FT.
25 FT.
858 FT.
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
Business/Job Contact
POC: Pat Carter - (425)-420-3468 - patc@hosbros.com
2611 Union Ave NE
Renton, WA 98059Forest Terrace
JB0000759426
SDU
ROW FOOTAGES*:
NEW BUILDING PATHWAY =
EXISTING BUILDING PATHWAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL SITE FOOTAGE =
0 FT.
0 FT.
0 FT.
0 FT.
0 FT.
SITE FOOTAGES*:
TOTAL PROJECT FOOTAGE =858 FT.
POLE INFORMATION:
POLE COUNT =
POLES THAT NEED PERMIT =
POLES THAT NEED MAKE READY =
TRANSMISSION = 0
DISTRIBUTION = 2
2
2
0
CANNON COMPANIES
Alex Gaunt - (206)-856-3583 - agaunt@cannonconstructioninc.com
COMCAST COMMUNICATION
Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com
This permit is for Major construction work in the ROW and will be billed at an additional
$60/HR for inspections. After hours and weekend work will be billed at $125/HR
RESTORATION PER CITY OF RENTON STANDARDS
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000759426
Forest Terrace
2611 Union Ave NE
Renton, WA 98059
SDU17-05011/24/2021THAGNTS0002121 3/25/22 Revised SOW per Renton's commnets.TH AG
LEGENDEDGE OF PAVEMENTFOGLINEPOWERCOMMUNICATIONSEWERDRAINDRAINAGE DITCHGASWATERTRAFFIC SIGNALTELCOMSTEAMUNKNOWN UTILITYRIGHT OF WAYTRAFFIC CONESPROPOSED NEW CONDUITSTRAW WATTLESPLTCWRUTILITY POLEVAULT - SMALLPEDESTALSTREET LIGHTCROSSWALK LIGHTUTILITY RISERVVAULT - SMALL444LA MANHOLEVAULT - 25TACATCH BASINCATCH BASIN WITH SOCKGLULAM UTILITY POLECENTER LINELANE LINEFENCEHIGH VISIBILITY FENCE SSEWER MANHOLEDDRAIN MANHOLEWWATER MANHOLEVUTILITY VALVESHRUBBERYBORE PITVAULT - LARGEVAULT - 25TACCOMMUNICATION MANHOLEFIRE HYDRANTDISTANCE STATIONSTA 0+00CONSTRUCTION NOTE CALLOUT#X.XDISTANCE DIMENSIONASPHALT SURFACECONCRETE PANELSHFH-FRAMEVAULT - LARGECABCABINETLEGENDLANE DIRECTION INDICATORPROPOSEDMARK-UP NOTATIONSRESTORATION TYPESEXISTING FEATURESLINE TYPESA7LANDSCAPECROSS SECTION SYMBOLCROSS SECTION NAMECROSS SECTION SHOWN ON PAGESUKCBCBPPVVVVVVWORK BEING DONE1LOCATIONPHOTO NOTE CALLOUT#PHOTO LOCATOR SYMBOLEXISTING CONDUITPROPOSED NEW AERIAL STRANDEXISTING AERIAL PATHWAYEXISTING SPLICE CASEPROPOSED SPLICE CASEEXISTING FIBER/COAX STORAGEPROPOSED FIBER/COAX STORAGETREEVVAULT - SMALL444LA MANHOLEVAULT - 25TAVAULT - LARGEEXISTING - CONTINUED233LA MANHOLELIMITS OF PANELWRECK OUT EXISTING AERIAL STRAND & COAX
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000759426
Forest Terrace
2611 Union Ave NE
Renton, WA 98059
SDU17-05011/24/2021THAGNTS0003121 3/25/22 Revised SOW per Renton's commnets.TH AGGENERAL NOTESGENERAL NOTESSTANDARD1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TOCONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, ASNECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THATTHERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARENOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD.THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUNDIMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBEIN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICHMAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL,ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESEOCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREESTO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGESAND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS.2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 8113. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TODEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TOPREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETYOF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLYAND NOT BE LIMITED TO NORMAL WORKING HOURS.10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIORWRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENTPROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND ASOTHERWISE REQUIRED.12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERALMOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.TRAFFIC CONTROL1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVEONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH ASPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURINGNON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEESAND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.SITE PREPARATION1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BEEITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKEMATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.TRENCH EXCAVATION AND BACKFILL1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALLBACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED INTRAFFIC-BEARING LOCATIONS.2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.UTILITY DUCT1. BURIED DUCT SHALL BE (1) 4" SCHEDULE 40 PVC, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH AMINIMUM SLOPE OF 1/2 % TO VAULT.2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED,PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEPCONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULLROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRESIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE.4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULLROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.CEMENT CONCRETE PAVEMENT1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARDSPECIFICATIONS OF EACH JURISDICTION.ASPHALT CONCRETE PAVEMENT1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALTCONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.GRAVEL AREAS1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE INACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION.SITE RESTORATION1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTEDPRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES.2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTEDAND WATERED IN TO ENSURE ITS SURVIVAL.3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTEDPRIOR TO CONSTRUCTION.WATER QUALITY1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OFWASHINGTON'S WATER QUALITY STANDARDS2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.DIRECTIONAL BORING1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTINGUTILITIES.FIRE PROTECTION1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BEREPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT.AERIAL INSTALLATION1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TOPOWER MAIN WHERE APPLICABLE.4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL ANDREGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITSIS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000759426
Forest Terrace
2611 Union Ave NE
Renton, WA 98059
SDU17-05011/24/2021THAGNTS0004121 3/25/22 Revised SOW per Renton's commnets.TH AG
DETAILSUTILITY POLE RISER -STANDARD DETAIL(1) 10' PVC CONDUITSECTIONS15" HDG POLE BRACKET W/PIPE CLAMP (B2017 BYPOWER-STRUT OR EQUAL)4" MIN OFFSET FROM POLE.22' (TYP)(1) 10' PVC CONDUITSECTIONSEXISTING SURFACE24' (TYP)PROPOSED CABLEEXISTING AERIALPOWEREXISTING UTILITY POLEVARIES2#RISER PLACEMENTSTANDARD DETAILLOCATION1CONDUITUP TO 2 CONDUITSSTANDOFF BRACKET15" MIN LENGTH℄℄DIRECTION OF VEHICULAR TRAFFICPLAN VIEWLOCATION2LOCATION4LOCATION3CONDUIT CLAMP5" MIN1TRENCH - SOFT SURFACESTANDARD DETAIL3TRENCH - HARD SURFACESTANDARD DETAIL4
41064100NE 27TH PLFL FL FL FL FL FL FL FL FL FL FL
EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOP EOP EOP
EOP EOPWWWWWWWWW
W W W W
W W W WWWWWWWW
CBDDCBDDDDDDDDDDDDDDDDDDGGGGGGGGGGGGGGSSSSSSSSSSS SS SS SS SS SS
SSSSSSSS
SS
SS
SS
SS
SS
SSCB
DDDDDDD
D
SS SS SS SS SS SS SS SSSS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSS
SS
SS SS SS SSCBSSSS
SS
SSPP
PPPPPPFH
CBDDDD
DCBDDDDD
132ND AVE SENE 27TH PLPPPPPPPPPNEW DEVELOPMENT INCONSTRUCTION. ROADWAY NOTCURRENTLY IN USE FOR PUBLIC.ROWROWROWROWROWROWROWROWROWROW ROW
ROWSTA 17+00STA 18+00STA 16+50STA 17+50STA 18+23STA 16+91STA 16+3556' OVERLASH
157' TRENCH
R25'OWNER:POLE#:- ATTACHMENTS - HEIGHTCLASS/HT:POLE TYPE:- MAKE READY - VIOLATIONMID SPAN:1PSE319156-167130NEUTRAL274N/ACOMM #1191N/ACOMCAST #11711N/ACOMM #21611N/ATELCO #1161N/ADNNNNNOWNER:POLE#:- ATTACHMENTS - HEIGHTCLASS/HT:POLE TYPE:- MAKE READY - VIOLATIONMID SPAN:2PSE319151-167130NEUTRAL2511N/ACOMM #11910N/ACOMCAST #1189N/ACOMM #2176N/ATELCO #11611N/ADNNNNN123345V
KING COUNTY R.O.W.CITY OF RENTON R.O.W.WORK TO BE SUBMITTED TOKING COUNTY FOR APPROVALOFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000759426
Forest Terrace
2611 Union Ave NE
Renton, WA 98059
SDU17-05011/24/2021THAG1:200'10'20'5121 3/25/22 Revised SOW per Renton's commnets.TH AG
DESIGNNPROPOSED PATH DISCLAIMERS1.PROPOSED PATH MAY CHANGE AT TIME OFCONSTRUCTION DUE TO UTILITY LOCATIONSAND INSPECTOR REQUIREMENTS2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED INFIELD DURING TIME OF CONSTRUCTIONUTILITY DISCLAIMERALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIES TO BEVERIFIED PRIOR TO CONSTRUCTION. CALL UTILITYUNDERGROUND LOCATION CENTER AT1-800-424-5555DRAINAGE SYSTEM DISCLAIMEREXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THECONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM AREIMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BERESTORED TO THE ORIGINAL CONDITIONS.STATION STARTSTATIONING STARTS AT 10+00 AT THE INTERSECTIONOF SE 95TH WAY & UNION AVE NE321CONSTRUCTION NOTES:EXTEND (1) HARDLINE COAX ON EXISTING AERIALSTRAND.INSTALL (1) NEW RISER ON NEW POLE & PULL (1)HARDLINE COAX THROUGH PER DETAILS 1 & 2 ONSHEET 4TRENCH (1) 4" CONDUIT & PULL (1) HARDLINE COAXTHROUGH PER DETAILS # 3 & 4 ON SHEET 4SET (1) NEW VAULT IN FUTURE VAULT FARM LOCATION.WRECK OUT EXISTING AERIAL STRAND & COAX &RELOCATE COAX UNDERGROUND4*UTILITY NOTE*WHEN CROSSING EXISTING SIDE SEWER,STORM MAIN, AND WATER UTILITIES, PROPOSEDCONDUIT MUST MAINTAIN A MINIMUM OF 12"VERTICAL CLEARANCE (MEASURED FROMOUTSIDE EDGE TO OUTSIDE EDGE)5
4101410726162623FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOP EOP
EOPEOPEOPEOPEOPEOPEOPWWWWWWWWWWWWWCBCBDDDDGGGGGGGGGGGGGSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS CBSSSSSSSSSSSSSSSSSSSSSSSSS
WWP P P P P P P P P P PPPPSSSSSSSSSSFHCBDDPPP132ND AVE SE
EOP EOP EOP EOP EOP
EOP EOPEOPEOPPPPPPPPDDDDDDDDDDDROWROWROWROWROWROWROW ROW ROW ROW
ROWROWROWROWPOLE TO BE REMOVED PLACENEW VAULT NEAR POLE LOCATIONNEW DEVELOPMENT INCONSTRUCTION. ROADWAY NOTCURRENTLY IN USE FOR PUBLIC.STA 19+00STA 20+00STA 18+50STA 19+50STA 20+50STA 19+55STA 18+83154' TRENCH
102' TRENCH 5' JOINTTRENCH124431V
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000759426
Forest Terrace
2611 Union Ave NE
Renton, WA 98059
SDU17-05011/24/2021THAG1:200'10'20'6121 3/25/22 Revised SOW per Renton's commnets.TH AG
DESIGNNPROPOSED PATH DISCLAIMERS1.PROPOSED PATH MAY CHANGE AT TIME OFCONSTRUCTION DUE TO UTILITY LOCATIONSAND INSPECTOR REQUIREMENTS2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED INFIELD DURING TIME OF CONSTRUCTIONUTILITY DISCLAIMERALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIES TO BEVERIFIED PRIOR TO CONSTRUCTION. CALL UTILITYUNDERGROUND LOCATION CENTER AT1-800-424-5555DRAINAGE SYSTEM DISCLAIMEREXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THECONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM AREIMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BERESTORED TO THE ORIGINAL CONDITIONS.STATION STARTSTATIONING STARTS AT 10+00 AT THE INTERSECTIONOF SE 95TH WAY & UNION AVE NE*UTILITY NOTE*WHEN CROSSING EXISTING SIDE SEWER,STORM MAIN, AND WATER UTILITIES, PROPOSEDCONDUIT MUST MAINTAIN A MINIMUM OF 12"VERTICAL CLEARANCE (MEASURED FROMOUTSIDE EDGE TO OUTSIDE EDGE)321CONSTRUCTION NOTES:TRENCH (1) 4" CONDUIT & PULL (1) HARDLINE COAXTHROUGH PER DETAILS # 3 & 4 ON SHEET 4SET (1) NEW VAULT IN NEAR POLES TO BE REMOVED.SPLICE IN (1) NEW TAPPLACE (1) NEW 2" CONDUIT IN JOINT TRENCH WITHPOWER.WRECK OUT EXISTING AERIAL STRAND & COAX &RELOCATE COAX UNDERGROUND4
257225782562FLFLFLFLFLFLEOPEOPEOPEOPEOPEOPWWGGSS SS
SSSS
WP P P
132ND AVE SE
EOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFL
SSS
SS
SS
SS
SS
SS
SSSSSS
GGGGGGGGGGGVVWWWWWWWWWWWCBDDDDDDDDDDDDDPOLE TO BE REMOVED PLACE NEWVAULT NEAR POLE LOCATIONROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROWPOLE TO BE REMOVED PLACE NEWVAULT NEAR POLE LOCATIONSTA 21+00STA 22+00STA 21+50STA 22+50STA 21+83STA 20+60STA 20+8455' JOINTTRENCH122' TRENCH
150' TRENCH
213114555V
V
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000759426
Forest Terrace
2611 Union Ave NE
Renton, WA 98059
SDU17-05011/24/2021THAG1:200'10'20'7121 3/25/22 Revised SOW per Renton's commnets.TH AG
DESIGNNPROPOSED PATH DISCLAIMERS1.PROPOSED PATH MAY CHANGE AT TIME OFCONSTRUCTION DUE TO UTILITY LOCATIONSAND INSPECTOR REQUIREMENTS2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED INFIELD DURING TIME OF CONSTRUCTIONUTILITY DISCLAIMERALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIES TO BEVERIFIED PRIOR TO CONSTRUCTION. CALL UTILITYUNDERGROUND LOCATION CENTER AT1-800-424-5555DRAINAGE SYSTEM DISCLAIMEREXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THECONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM AREIMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BERESTORED TO THE ORIGINAL CONDITIONS.STATION STARTSTATIONING STARTS AT 10+00 AT THE INTERSECTIONOF SE 95TH WAY & UNION AVE NE*UTILITY NOTE*WHEN CROSSING EXISTING SIDE SEWER,STORM MAIN, AND WATER UTILITIES, PROPOSEDCONDUIT MUST MAINTAIN A MINIMUM OF 12"VERTICAL CLEARANCE (MEASURED FROMOUTSIDE EDGE TO OUTSIDE EDGE)321CONSTRUCTION NOTES:TRENCH (1) 4" CONDUIT & PULL (1) HARDLINE COAXTHROUGH PER DETAILS # 3 & 4 ON SHEET 4SET (1) NEW VAULT IN NEAR POLES TO BE REMOVEDPLACE (1) NEW 2" CONDUIT IN JOINT TRENCH WITHPOWER.SET (1) NEW VAULT IN NEAR POLES TO BE REMOVED.SPLICE IN (1) NEW TAPWRECK OUT EXISTING AERIAL STRAND & COAX &RELOCATE COAX UNDERGROUND45
255641064100NE 25TH PLEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP EOPEOPEOPFL FL FL FL FL FL
EOPEOPEOPSDVVDCB
CB
SSSSSSSSSSSSSSSSSSSSSSS
SSGGGGGGGGGWWWWWWWWWWWWWDDDDDDDDDDD D D ROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROWTRANSFER ATTACHMENTS FROM EXISTINGPOLE TO NEW POLE ONCE PLACEDSTA 23+00STA 24+00STA 23+50STA 24+50STA 24+20STA 23+31150' TRENCH
88' OVERLASH
R25'OWNER:POLE#:- ATTACHMENTS - HEIGHTCLASS/HT:POLE TYPE:- MAKE READY - VIOLATIONMID SPAN:3PSE319075-167131NEUTRAL301N/ACOMM #12511N/ACOMCAST #1247N/ATELCO #1236N/ACOMM #2204N/ADNNNNNOWNER:POLE#:- ATTACHMENTS - HEIGHTCLASS/HT:POLE TYPE:- MAKE READY - VIOLATIONMID SPAN:4PSE319062-167131NEUTRAL3010N/ASTREET LIGHT291N/ACOMM #1263N/ACOMCAST #1251N/ATELCO #1230N/ACOMM #2222N/ADNNNNNN3421OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000759426
Forest Terrace
2611 Union Ave NE
Renton, WA 98059
SDU17-05011/24/2021THAG1:200'10'20'8121 3/25/22 Revised SOW per Renton's commnets.TH AG
DESIGNNPROPOSED PATH DISCLAIMERS1.PROPOSED PATH MAY CHANGE AT TIME OFCONSTRUCTION DUE TO UTILITY LOCATIONSAND INSPECTOR REQUIREMENTS2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED INFIELD DURING TIME OF CONSTRUCTIONUTILITY DISCLAIMERALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIES TO BEVERIFIED PRIOR TO CONSTRUCTION. CALL UTILITYUNDERGROUND LOCATION CENTER AT1-800-424-5555DRAINAGE SYSTEM DISCLAIMEREXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THECONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM AREIMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BERESTORED TO THE ORIGINAL CONDITIONS.STATION STARTSTATIONING STARTS AT 10+00 AT THE INTERSECTIONOF SE 95TH WAY & UNION AVE NE*UTILITY NOTE*WHEN CROSSING EXISTING SIDE SEWER,STORM MAIN, AND WATER UTILITIES, PROPOSEDCONDUIT MUST MAINTAIN A MINIMUM OF 12"VERTICAL CLEARANCE (MEASURED FROMOUTSIDE EDGE TO OUTSIDE EDGE)321CONSTRUCTION NOTES:TRENCH (1) 4" CONDUIT & PULL (1) HARDLINE COAXTHROUGH PER DETAILS # 3 & 4 ON SHEET 4INSTALL (1) NEW RISER ON NEW POLE & PULL (1)HARDLINE COAX THROUGH PER DETAILS 1 & 2 ONSHEET 4EXTEND (1) HARDLINE COAX ON EXISTING AERIALSTRAND.WRECK OUT EXISTING AERIAL STRAND & COAX &RELOCATE COAX UNDERGROUND4
41064100NE 27TH PLFL FL FL FL FL FL FL FL FL FL FL
EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOP EOP EOP
EOP EOPWWWWWWWWW
W W W W
W W W WWWWWWWW
CBDDCBDDDDDDDDDDDDDDDDDDGGGGGGGGGGGGGGSSSSSSSSSSS SS SS SS SS SS
SSSSSSSS
SS
SS
SS
SS
SS
SSCB
DDDDDDD
D
SS SS SS SS SS SS SS SSSS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSS
SS
SS SS SS SSCBSSSS
SS
SSFH
CBDDDD
DCBDDDDD
132ND AVE SENE 27TH PLNEW DEVELOPMENT INCONSTRUCTION. ROADWAY NOTCURRENTLY IN USE FOR PUBLIC.ROWROWROWROWROWROWROWROWROWROW ROW
ROWSTA 17+00STA 18+00STA 16+50STA 17+50STA 18+23STA 17+52STA 16+91STA 16+35100' TRENCH R25'112'5'5'2'CURRENT STATE OF ROADWAY AT TIME OF WALKOUT. RESTORATIONWILL BE LANDSCAPE/GRAVEL2V
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000759426
Forest Terrace
2611 Union Ave NE
Renton, WA 98059
SDU17-05011/24/2021THAG1:200'10'20'9121 3/25/22 Revised SOW per Renton's commnets.TH AG
DESIGNNPROPOSED PATH DISCLAIMERS1.PROPOSED PATH MAY CHANGE AT TIME OFCONSTRUCTION DUE TO UTILITY LOCATIONSAND INSPECTOR REQUIREMENTS2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED INFIELD DURING TIME OF CONSTRUCTIONUTILITY DISCLAIMERALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIES TO BEVERIFIED PRIOR TO CONSTRUCTION. CALL UTILITYUNDERGROUND LOCATION CENTER AT1-800-424-5555DRAINAGE SYSTEM DISCLAIMEREXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THECONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM AREIMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BERESTORED TO THE ORIGINAL CONDITIONS.STATION STARTSTATIONING STARTS AT 10+00 AT THE INTERSECTIONOF SE 95TH WAY & UNION AVE NE*UTILITY NOTE*WHEN CROSSING EXISTING SIDE SEWER,STORM MAIN, AND WATER UTILITIES, PROPOSEDCONDUIT MUST MAINTAIN A MINIMUM OF 12"VERTICAL CLEARANCE (MEASURED FROMOUTSIDE EDGE TO OUTSIDE EDGE)21CONSTRUCTION NOTES:RESTORE LANDSCAPE PER CITY OF RENTONSPECIFICATIONS.RESTORE LANDSCAPE/GRAVEL PER CITY OF RENTONSPECIFICATIONS.
4101410726162623FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOP EOP
EOPEOPEOPEOPEOPEOPEOPWWWWWWWWWWWWWCBCBDDDDGGGGGGGGGGGGGSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS CBSSSSSSSSSSSSSSSSSSSSSSSSS
WWSSSSSSSSSSFHCBDD132ND AVE SE
EOP EOP EOP EOP EOP
EOP EOPEOPEOPDDDDDDDDDDDROWROWROWROWROWROWROW ROW ROW ROW
ROWROWROWROWNEW DEVELOPMENT INCONSTRUCTION. ROADWAY NOTCURRENTLY IN USE FOR PUBLIC.STA 19+00STA 20+00STA 18+50STA 19+50STA 20+50STA 19+55STA 18+83154' TRENCH
102' TRENCH 5' JOINTTRENCH22122'2'5'5'2'V
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000759426
Forest Terrace
2611 Union Ave NE
Renton, WA 98059
SDU17-05011/24/2021THAG1:200'10'20'10121 3/25/22 Revised SOW per Renton's commnets.TH AG
DESIGNNPROPOSED PATH DISCLAIMERS1.PROPOSED PATH MAY CHANGE AT TIME OFCONSTRUCTION DUE TO UTILITY LOCATIONSAND INSPECTOR REQUIREMENTS2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED INFIELD DURING TIME OF CONSTRUCTIONUTILITY DISCLAIMERALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIES TO BEVERIFIED PRIOR TO CONSTRUCTION. CALL UTILITYUNDERGROUND LOCATION CENTER AT1-800-424-5555DRAINAGE SYSTEM DISCLAIMEREXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THECONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM AREIMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BERESTORED TO THE ORIGINAL CONDITIONS.STATION STARTSTATIONING STARTS AT 10+00 AT THE INTERSECTIONOF SE 95TH WAY & UNION AVE NE*UTILITY NOTE*WHEN CROSSING EXISTING SIDE SEWER,STORM MAIN, AND WATER UTILITIES, PROPOSEDCONDUIT MUST MAINTAIN A MINIMUM OF 12"VERTICAL CLEARANCE (MEASURED FROMOUTSIDE EDGE TO OUTSIDE EDGE)21CONSTRUCTION NOTES:RESTORE LANDSCAPE/GRAVEL PER CITY OF RENTONSPECIFICATIONS.RESTORE LANDSCAPE PER CITY OF RENTONSPECIFICATIONS.
257225782562FLFLFLFLFLFLEOPEOPEOPEOPEOPEOPWWGGSS SS
SSSS
W132ND AVE SE
EOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFL
SSS
SS
SS
SS
SS
SS
SSSSSS
GGGGGGGGGGGVVWWWWWWWWWWWCBDDDDDDDDDDDDDPOLE TO BE REMOVED PLACE NEWVAULT NEAR POLE LOCATIONROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROWSTA 21+00STA 22+00STA 21+50STA 22+50STA 21+83STA 20+60STA 20+8455' JOINTTRENCH122' TRENCH
150' TRENCH 1115'5'2'5'5'2'12'2V
V
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000759426
Forest Terrace
2611 Union Ave NE
Renton, WA 98059
SDU17-05011/24/2021THAG1:200'10'20'11121 3/25/22 Revised SOW per Renton's commnets.TH AG
DESIGNNPROPOSED PATH DISCLAIMERS1.PROPOSED PATH MAY CHANGE AT TIME OFCONSTRUCTION DUE TO UTILITY LOCATIONSAND INSPECTOR REQUIREMENTS2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED INFIELD DURING TIME OF CONSTRUCTIONUTILITY DISCLAIMERALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIES TO BEVERIFIED PRIOR TO CONSTRUCTION. CALL UTILITYUNDERGROUND LOCATION CENTER AT1-800-424-5555DRAINAGE SYSTEM DISCLAIMEREXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THECONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM AREIMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BERESTORED TO THE ORIGINAL CONDITIONS.STATION STARTSTATIONING STARTS AT 10+00 AT THE INTERSECTIONOF SE 95TH WAY & UNION AVE NE*UTILITY NOTE*WHEN CROSSING EXISTING SIDE SEWER,STORM MAIN, AND WATER UTILITIES, PROPOSEDCONDUIT MUST MAINTAIN A MINIMUM OF 12"VERTICAL CLEARANCE (MEASURED FROMOUTSIDE EDGE TO OUTSIDE EDGE)21CONSTRUCTION NOTES:RESTORE LANDSCAPE PER CITY OF RENTONSPECIFICATIONS.RESTORE ASPHALT ROADWAY PER CITY OF RENTONSPECIFICATIONS.
255641064100NE 25TH PLEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP EOPEOPEOPFL FL FL FL FL FL
EOPEOPEOPSDVVDCB
CB
SSSSSSSSSSSSSSSSSSSSSSS
SSGGGGGGGGGWWWWWWWWWWWWWDDDDDDDDDDD D D ROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROWSTA 23+00STA 24+00STA 23+50STA 24+50STA 24+20STA 23+31150' TRENCHR25'1OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000759426
Forest Terrace
2611 Union Ave NE
Renton, WA 98059
SDU17-05011/24/2021THAG1:200'10'20'12121 3/25/22 Revised SOW per Renton's commnets.TH AG
DESIGNNPROPOSED PATH DISCLAIMERS1.PROPOSED PATH MAY CHANGE AT TIME OFCONSTRUCTION DUE TO UTILITY LOCATIONSAND INSPECTOR REQUIREMENTS2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED INFIELD DURING TIME OF CONSTRUCTIONUTILITY DISCLAIMERALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIES TO BEVERIFIED PRIOR TO CONSTRUCTION. CALL UTILITYUNDERGROUND LOCATION CENTER AT1-800-424-5555DRAINAGE SYSTEM DISCLAIMEREXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THECONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM AREIMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BERESTORED TO THE ORIGINAL CONDITIONS.STATION STARTSTATIONING STARTS AT 10+00 AT THE INTERSECTIONOF SE 95TH WAY & UNION AVE NE*UTILITY NOTE*WHEN CROSSING EXISTING SIDE SEWER,STORM MAIN, AND WATER UTILITIES, PROPOSEDCONDUIT MUST MAINTAIN A MINIMUM OF 12"VERTICAL CLEARANCE (MEASURED FROMOUTSIDE EDGE TO OUTSIDE EDGE)21CONSTRUCTION NOTES:RESTORE LANDSCAPE PER CITY OF RENTONSPECIFICATIONS.RESTORE ASPHALT ROADWAY PER CITY OF RENTONSPECIFICATIONS.
Comcast Cable Communications Management
410 Valley Ave NW
Suite 12 Bldg C
Puyallup, WA 98371
1/24/2022
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for JB0000759426
To whom it may concern:
Cannon Construction has been contracted to design and engineer this project on behalf of
Comcast Cable Communications Management. Comcast is applying for a variance request in
order to upgrade their existing facilities.
Comcast proposes to EXTEND (1) HARDLINE COAX ON EXISTING AERIAL STRAND. INSTALL (1)
NEW 1/4" STRAND TO NEW POLE & LASH (1) HARDLINE COAX. INSTALL (2) NEW RISERS ON
NEW POLES & PULL (1) HARDLINE COAX THROUGH PER DETAILS 1 & 2 ON SHEET 4. TRENCH (1)
4" CONDUIT & PULL (1) HARDLINE COAX THROUGH PER DETAILS # 3 & 4 ON SHEET 4. SET (4)
NEW VAULTS. WRECK OUT EXISTING AERIAL STRAND & COAX & RELOCATE COAX
UNDERGROUND.
Comcast is requesting that the City of Renton approve this variance request based on the fact
that the requirements for undergrounding this proposed over-lash on existing plant will cause
undue hardship.
1. Installation of undergrounding facilities will increase the total cost of construction
roughly 15-25 times the amount of an aerial over-lash on the existing Comcast strand.
2. Risk of potential damage to underground facilities will be increased.
3. Over-lash will not cause substantial adverse impact to other persons or entities in the
immediate area. Over-lashing the cable will be accomplished in a few days, and the
residents will not notice any impact. Comcast will clean up the over-lashed spans as
necessary and identify and remove any existing dead cables along this route.
4. The variance is necessary to prevent any undue hardship due to the increased
construction costs if forced to install the proposed extension underground.
5. The granting of the variance will not be materially detrimental to the public welfare.
Comcast does agree to participate in future underground improvements for its
proportionate share of the undergrounding costs, waiving the obligation into the future
when all other utilities are undergrounded to prevent an undue hardship against
Comcast currently.
MFP21006121
Upon the granting of the variance, Comcast will coordinate construction and traffic control as
per your requirements. Comcast and their contractors want to cooperate at the highest level
and agree to adhere to all provisions and requirements set forth by the City of Renton to insure
safe installation and maintenance of the proposed facilities.
If you have any further questions regarding this project, please contact Rhonda Resnik.
Thank you for your consideration in this matter.
Rhonda Resnik
Permit Coordinator
Comcast Cable Communications Management
o 253-864-4246 | e Rhonda_Resnik@comcast.com
March 28, 2022
Rhonda Resnik
Comcast Cable Communications Management
410 Valley Ave NW
Puyallup, WA 98371
Via Email: Rhonda_Resnik@comcast.com
SUBJECT: Request for Undergrounding Exemption (JB#759426, MFP21006121, 2611 Union Ave NE)
Dear Ms. Resnik:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have Cannon Construction overlash Coax for a total of approximately 88 lineal feet
to existing Puget Sound Energy (PSE) poles along Union Ave NE within the City. See the enclosed Site Plan
showing the proposed overlashing limits.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720
grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below,
through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton.
Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service
providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service
provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are
underground, Grantee shall place its Cable System’s distribution cables underground within that area;
provided that such underground locations are actually capable of accommodating Grantee’s cable and
other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and
overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need
to be provided for, any existing obsolete cable will need to be removed; staff recommends these as
conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast
franchise agreement which allows new overhead facilities to be placed overhead provided there are other
similar providers overhead as well. Comcast is required to obtain all necessary private utility easements
for work on private property.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with the Comcast Franchise Agreement.
Comcast Job JB#759426
Page 2 of 2
March 28, 2022
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical clearance
of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in
the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other
utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a
franchisee within the Project Reach, in which case the Applicant shall participate in the joint use
trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made
available within the Project Reach that will accommodate the aerial lines. The new aerial lines
must be undergrounded within one year, or approved otherwise by the City of Renton Community
and Economic Development Administrator or designee, from the first event triggering the
requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, April 11, 2022. Due to the ongoing
state of emergency enacted by Governor’s Proclamation 20-05, the City Clerk’s Office is working remotely.
For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or
delivered to City Hall 1st floor Lobby Hub only on Tuesdays and/or Wednesdays. The appeal fee, normally
due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted
electronically. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information
regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Vanessa Dolbee, Planning Director
Justin Johnson, Assistant Development Engineering Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Permit Technician
Franchise Permits
Enclosures: Site Plan
255641064100NE 25TH PLEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP EOPEOPEOPFL FL FL FL FL FL
EOPEOPEOPSDVVDCB
CB
SSSSSSSSSSSSSSSSSSSSSSS
SSGGGGGGGGGWWWWWWWWWWWWWDDDDDDDDDDD D D ROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROWTRANSFER ATTACHMENTS FROM EXISTINGPOLE TO NEW POLE ONCE PLACEDSTA 23+00STA 24+00STA 23+50STA 24+50STA 24+20STA 23+31150' TRENCH
88' OVERLASH
R25'OWNER:POLE#:- ATTACHMENTS - HEIGHTCLASS/HT:POLE TYPE:- MAKE READY - VIOLATIONMID SPAN:3PSE319075-167131NEUTRAL301N/ACOMM #12511N/ACOMCAST #1247N/ATELCO #1236N/ACOMM #2204N/ADNNNNNOWNER:POLE#:- ATTACHMENTS - HEIGHTCLASS/HT:POLE TYPE:- MAKE READY - VIOLATIONMID SPAN:4PSE319062-167131NEUTRAL3010N/ASTREET LIGHT291N/ACOMM #1263N/ACOMCAST #1251N/ATELCO #1230N/ACOMM #2222N/ADNNNNNN3421OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000759426
Forest Terrace
2611 Union Ave NE
Renton, WA 98059
SDU17-05011/24/2021THAG1:200'10'20'8121 3/25/22 Revised SOW per Renton's commnets.TH AG
DESIGNNPROPOSED PATH DISCLAIMERS1.PROPOSED PATH MAY CHANGE AT TIME OFCONSTRUCTION DUE TO UTILITY LOCATIONSAND INSPECTOR REQUIREMENTS2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED INFIELD DURING TIME OF CONSTRUCTIONUTILITY DISCLAIMERALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIES TO BEVERIFIED PRIOR TO CONSTRUCTION. CALL UTILITYUNDERGROUND LOCATION CENTER AT1-800-424-5555DRAINAGE SYSTEM DISCLAIMEREXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THECONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM AREIMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BERESTORED TO THE ORIGINAL CONDITIONS.STATION STARTSTATIONING STARTS AT 10+00 AT THE INTERSECTIONOF SE 95TH WAY & UNION AVE NE*UTILITY NOTE*WHEN CROSSING EXISTING SIDE SEWER,STORM MAIN, AND WATER UTILITIES, PROPOSEDCONDUIT MUST MAINTAIN A MINIMUM OF 12"VERTICAL CLEARANCE (MEASURED FROMOUTSIDE EDGE TO OUTSIDE EDGE)321CONSTRUCTION NOTES:TRENCH (1) 4" CONDUIT & PULL (1) HARDLINE COAXTHROUGH PER DETAILS # 3 & 4 ON SHEET 4INSTALL (1) NEW RISER ON NEW POLE & PULL (1)HARDLINE COAX THROUGH PER DETAILS 1 & 2 ONSHEET 4EXTEND (1) HARDLINE COAX ON EXISTING AERIALSTRAND.WRECK OUT EXISTING AERIAL STRAND & COAX &RELOCATE COAX UNDERGROUND4
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP21006121
Engineering
1 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15'-6".
2 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
3 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the
Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the
Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
4 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
Page 1 of 1