Michael: We have found that CB1, see attached, needs to be deeper and therefore, revised to a Type 2 catch basin for the connection to the storm vault inlet, see email thread with concurrance
from the Engineer of Record.
Please approve changing CB1 from a Type 1 to a Type 2. The revision can be picked up and recorded during the as-built survey. Thanks
If a formal change request is required, please advise. Thanks
Cliff Williams, PE
Development Management Engineers, LLC
206 714-7161
________________________________
From: Sheri H. Murata <shm@coredesigninc.com>
Sent: Monday, March 28, 2022 12:41 PM
To: cliff sitedme.com <cliff@sitedme.com>
Cc: Bob Wenzl <bob@tuscanywa.com>
Subject: RE: 24th St Short Plat - CB1 Revise to Type 2
Hi Cliff,
I got your voicemail as well - yes we can change that structure to a Type 2 so we can lower the upstream IE of the pipe into the vault. Do we need to submit do a plan change and submit
this to Michael? Or do you just need an email confirmation email from me?
Thanks,
Sheri
Sheri Murata, P.E.
Project Manager
Core Design Inc.
O 425.885.7877
From: cliff sitedme.com <cliff@sitedme.com>
Sent: Monday, March 28, 2022 11:56 AM
To: Sheri H. Murata <shm@coredesigninc.com>
Cc: Bob Wenzl <bob@tuscanywa.com>
Subject: 24th St Short Plat - CB1 Revise to Type 2
Importance: High
Sheri: CB1 is as a Type 1 located essentially up against the Storm Vault, see attached detail. The CB IE=423.06. The vault inlet IE=419.50. We need to change to a Type 2 CB so the
CB IE can approximate the vault inlet. Please confirm.
I will forward your confirmation to Michael Sippo for approval. Thanks