Loading...
HomeMy WebLinkAbout24th St Short Plat - CB1 Change Request from Type 1 to Type 2 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: We have found that CB1, see attached, needs to be deeper and therefore, revised to a Type 2 catch basin for the connection to the storm vault inlet, see email thread with concurrance from the Engineer of Record. Please approve changing CB1 from a Type 1 to a Type 2. The revision can be picked up and recorded during the as-built survey. Thanks If a formal change request is required, please advise. Thanks Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: Sheri H. Murata <shm@coredesigninc.com> Sent: Monday, March 28, 2022 12:41 PM To: cliff sitedme.com <cliff@sitedme.com> Cc: Bob Wenzl <bob@tuscanywa.com> Subject: RE: 24th St Short Plat - CB1 Revise to Type 2 Hi Cliff, I got your voicemail as well - yes we can change that structure to a Type 2 so we can lower the upstream IE of the pipe into the vault. Do we need to submit do a plan change and submit this to Michael? Or do you just need an email confirmation email from me? Thanks, Sheri Sheri Murata, P.E. Project Manager Core Design Inc. O 425.885.7877 From: cliff sitedme.com <cliff@sitedme.com> Sent: Monday, March 28, 2022 11:56 AM To: Sheri H. Murata <shm@coredesigninc.com> Cc: Bob Wenzl <bob@tuscanywa.com> Subject: 24th St Short Plat - CB1 Revise to Type 2 Importance: High Sheri: CB1 is as a Type 1 located essentially up against the Storm Vault, see attached detail. The CB IE=423.06. The vault inlet IE=419.50. We need to change to a Type 2 CB so the CB IE can approximate the vault inlet. Please confirm. I will forward your confirmation to Michael Sippo for approval. Thanks Cliff Williams, PE Development Management Engineers, LLC 206 714-7161