No preview available
HomeMy WebLinkAboutR-419533L0 TOM LU I— w LLJ D 5, M Q cD CV N 0 CV CST Q i M I 0 Q 00 Ih N 00 U 00 0 i MATCHLINE ---- GRID 2 ---- SEE SHEET El.2 6' CHN LNK FNC PORTION OF THE NORTHEAST 1/4 OF SECTION 9, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., KIN \\ I -o�R =6 3 I I I0r rn 3 a 6' CHN LNK FNC CONC WALL s ss _ vNi — o o— o o= o o— o------- - ss- ----- i J82 JB2 -� I UP I ' 3 c6a I d I I O UP S S I i 3 �+ I I I II I , I I J J I , ' I WW a 3 0I N \ III 3 I 3 F \ ' 0 - (2)#6, (16)#8, (1)#6 GND - SPAN \ y 1 E2.0 (2)2"C - FUTUf 4 2"C - (4)#10, (1)#10 G �♦ j�i� �� ' i 2"C r (2)#8, (1)#8 GN[ 4"C - (4)#350KCMI 2"C - (2)#6, (16)#8, (1)#6 GND " 2 C - (2)#8, (1)#10 GND 2„C - SPARE ? P 2 C -FUTURE CAMERA 2"C - SPARE 2 C -SPARE �; � I \ •I I I 1 I o ` I III I N I I UNTY, WASHINGTON STATE ii 4 TYP / I CA E2.0 I I Y—I J W1 -- -- - — • • — . . 3 I CAI WWI 2"C 4)#10, (1)#10 GND 9. I I I J J I 13011 N W `` _ w \�\` 2"C - (2)# (1)#8 GND I CAI LU (n Rerouted Electrical Line `� L % �� 2"C FUTU - CAME ♦\ I I 3 I N ♦ IW 2"C - (2)#6, (4)#8, (6 #10 GND #8, #8, W 2"C -SPARE ` " ( 1 1)#6 ' '� ��\ \ 3 I a J , '- C S RE 2"C - FU CAM ♦` ♦ \ i 3 0 �' Cn 2"C FUTU AM �B BOOSTER ' 1 ��♦ `� \ PUMP I I I I I . \`♦ J I I I I I �y 31100N a Deleted Electrical Line\`J , t--------J-� I _ a. 2"C - (2)#81(1)#8,GND I o I ss ss ss i (4) 0 (1)#10 I I I I Rerouted Electrical Conduits JJ ss ss ss — M___� ,, I � Top of Conduit 411.55 1 ® 2"C FUTURE CAMERA - _--- -- �--------JI'I I i0 N / ---- --- IV l ��� i "R - — - - _T___ 11 P �� 2" C - (2)#10, (1)#10 GND I I I I 3 LUMI ® _ I r� `11 In / PICNIC SHELTER 3 ���1 / E2.0 \ 2 C - (4)#10, (1)#10 GND �,; I 1 a N sa n. z \ , II I �o, I 19-\_ so O E2.01 2"C -FUTURE CAMERA \ 1\ \� a �j ; II I cn 3" RP=3 Deleted Electrical Lines \\ \\ 6 TYP ,n \ \ E2.0' l I so U 31 N H N I I p < N CP \y I 2"C - (2i,1 1)#10 I I 3 2 C (2)#10, 10 GND ; I I as o I 31 131 1 1 I • I I I i_ N I I I I I ! a J Uin I I r I I 8" RP=7 2" (2),#10, ( #10 G i o BP BP < 3' (10Cn " I I ,• i 1 o N 6 RP-6.5 3 I I I < 3 J J J / / I W W W JJ I 1 3 vNi I I III I to / II I a c� V) 3 \I ' ' 3 J J RP-6.5 M Cn I I I I I 3 (2)4"C - FUTURE PSE POWER I I 3 fn I I I I 3 (2)4"C - FU E COMM ' ' 3 ri In I In r 3 IIII I � 4k 3 � I < 8" RP-10 I I I 1 I.. I (n I I 3 i c l 3 I I I I J J 6" J,r 3 `�' 3 �RP-10 Ix W I I I 1 1 r� �+ JJ ;wVAZ" I I. _ III i W =o = n— n — n n 6 CHN LNK FNC — i I —O = O n— O— O O O GL--Q —O� I i Vl 3 3 _O = O n Z U) LUI SHED J LU� - V 1 Q' 5 � G TL 0923059115 ELECTRICAL SITE PLAN — GRID'3' Q� 0 10 20 40 60 SCALE: AS INDICATED a D 1 inch7plotted����Feel If measurement is other than 1 inch then the plot is reduced. TL 0923059235 } M I 1 C4 Im 3 I N 31 I CnI 3 En I I - III 7P-7 111 µJj ,,I � F. 1- n 1 GENERAL NOTES: 1. JUNCTION BOX LOCATIONS AND CONDUIT ROUTING ARE SCHEMATIC. ALIGN JUNCTION BOXES WITH PAVEMENT EDGES. CONDUIT ROUTING SHALL AVOID TREES. SUBMIT CONDUIT AND JUNCTION BOX LAYOUT PLAN TO ENGINEER PRIOR TO INSTALLATION. 2. MAINTAIN AND PROTECT ALL EXISTING UNDERGROUND UTILITIES. CONTRACTOR TO LOCATE PRIOR TO ANY EXCAVATION. PRIOR TO STARTING CONSTRUCTION, CONTRACTOR SHALL CALL 811 LOCATES FOR UTILITY LOCATIONS. 3. ALL SPARE/EMPTY CONDUIT TO BE PROVIDED WITH NYLON PULL STRINGS. 4. ALL JUNCTION BOXES AND CONDUITS ARE SHOWN IN APPROXIMATE LOCATIONS. VERIFY LOCATION OF PROPERTY LINE, EASEMENTS AND UTILITIES PRIOR TO PLACEMENT. 5. CAP ALL UNUSED CONDUITS. WHERE CONDUITS ARE CAPPED MARK LOCATION WITH AN ELECTRICAL MARKER. 6. FIELD BENDING OF STRAIGHT CONDUIT SECTIONS INTO LONG RADIUS SWEEPS IS PREFERRED. 7. GROUND ALL IN -GROUND JUNCTION BOXES, HAND HOLES, AND PULL BOXES PER MOST CURRENT VERSION OF THE NEC. FLAG NOTES: ROUTE RIGID STEEL CONDUIT STRAIGHT UP THROUGH FOUNDATION TIGHT TO SUPPORT COLUMN (NO BENDS). SURFACE MOUNT RECEPTACLE IN CAST ALUMINUM FS BOX 18 INCHES ABOVE GRADE. COORDINATE RECEPTACLE CUTOUT WITH BUILDING MANUFACTURER. RECEPTACLE LOCATED IN NEMA 3R ENCLOSURE THAT INCLUDES CIRCUIT BREAKERS. REFER TO SHEET E2.0 FOR FURTHER INFORMATION. BURY CONDUIT 36" DEEP WITH 24" SEPARATION BETWEEN CONDUITS. COORDINATE WITH OWNER FOR APPROVAL OF CONDUIT AND BOXES PRIOR TO CONSTRUCTION. ® INTERCEPT EXISTING PSE SECONDARY HANDHOLE. PROVIDE SECONDARY CONDUIT AND CONDUCTORS TO NEW PEDESTAL PER PSE REQUIREMENTS. LEGEND PATHWAY LIGHT POST TOP, 240 VOLT, 40 WATT LED, 3,000K CCT ON 14, STRAIGHT STEEL POLE 0-❑ PARKING LOT LIGHT, 240 VOLT, 70 WATT LED, 3,000K CCT ON 20' STRAIGHT STEEL POLE O� SIGN ACCENT LIGHT, 240 VOLT, 16 WATT LED, 3,000K CCT, NARROW FLOOD, KIM LIGHTVAULT 8 PICNIC SHELTER LUMINAIRE, 120 VOLT, 25 WATT LED, 3,000K CCT, LUMINAIRE LED #FFW-1212 JB2 JUNCTION BOX, WSDOT TYPE II WITH NON-SKID COVER > DUPLEX RECEPTACLE, GFCI WITH WEATHERPROOF COVER, 120 VOLT, 20 AMP WP C ]kJ FUTURE CAMERA KEY PLAN. 0 1/16 1/8 GRAPHIC SCALE (MILES) CONSTRUCTION SET CoWght@2020 — &%m Dees & Msxiatw (Al fttft ftnr. d) BID #: �o 2 m o N y 0 ID � ID 9 - w w o D M •� o Q (D 0) - 0U U Y° �W(�a° 0E z El�Li-IU) a N wa 3 m LL_ Lrj 6 U U O O HZ Y Q 3 = a Q 0 C) U Q 011111 M +� - 0 n� W O � bt Z J J� a. ~ W C0 � o J N C� ?-� I— U LU •� J W El m3 R-419533 Sheet 33 of 40