AVANA RIDGE APARTMENTS
TRAFFIC IMPACT ANALYSIS
CITY OF RENTON
Prepared for
Avana Ridge, LLC
9675 SE 36th St Suite 105
Mercer Island, WA 98040
PPrreeppaarreedd bbyy
11410 N.E. 124th St., #590
Kirkland, Washington 98034
Telephone: 425.522.4118
December 21, 2015
Mr. Justin Lagers December 21, 2015
Avana Ridge, LLC
9675 SE 36th St. Suite 105
Mercer Island, WA 98040
Re: Avana Ridge Apartments – City of Renton
Traffic Impact Analysis
Dear Mr. Lagers:
We are pleased to submit this traffic impact analysis (TIA) for the proposed
Avana Ridge Apartments consisting of 74 apartment residential units. The proposed
project is located in the triangular area bordered by SR 515, Benson Rd S and SE 172nd
St. in the City of Renton. Access to the site is via proposed driveways to SE 172nd St.
and Benson Rd. South.
This TIA has been prepared per City of Renton guidelines and notes from the
pre-application meeting.
PROJECT DESCRIPTION
Figure 1 is a vicinity map showing the location of the site and the surrounding
major street network.
Figure 2 is the preliminary site plan of the proposed 74 unit apartment complex.
Vehicle access is provided by driveways to SE 172nd St. and Benson Rd. South. The
anticipated horizon year for development is 2017.
TRIP GENERATION
The 74 units in the proposed Avana Ridge Apartments are expected to generate
the vehicular trips during an average weekday and during the street traffic peak hours
as shown in the following table:
Avana Ridge, LLC
Page 3
TRIP GENERATION FOR 74 UNIT AVANA RIDGE APARTMENTS
Time Period Trip Rate Trips
Entering
Trips
Exiting Total
Average Weekday 6.65 246
50%
246
50% 492
AM Peak Hour 0.51 8
20%
30
80% 38
PM Peak Hour 0.62 30
65%
16
35% 46
A vehicle trip is defined as a single or one direction vehicle movement with either
the origin or destination (exiting or entering) inside the study site.
The trip generation is calculated using the average trip rates in the Institute of
Transportation Engineers (ITE) Trip Generation, Ninth Edition, for Apartment (ITE Land
Use Code 220). These trip generation values account for all site trips made by all
vehicles for all purposes, including resident, visitor, and service and delivery vehicle
trips.
TRIP DISTRIBUTION AND ASSIGNMENT
Figures 3 and 4 show the AM and PM peak hour site generated traffic volumes
and distribution for the Avana Ridge Apartments project. The trip distribution is based
on existing traffic volume count patterns, the characteristics of the street network, the
location of likely trip origins and destinations (employment, shopping, social and
recreational opportunities), expected travel times and previous traffic studies.
EXISTING PHYSICAL CONDITIONS
Street Facilities
The streets in the study area are classified per the City of Renton
Comprehensive Plan as follows:
Benson Dr. S. (SR 515) Principal Arterial
Benson Rd. S (108th Ave SE) Minor Arterial
SE 172nd St. Commercial Mixed Use
Frontage on SE 172nd St. has shoulders with no curb, gutter, landscape strip or
sidewalks. Frontage on SR 515 has curb, gutter and sidewalk. Frontage on Benson
Rd. has curb and partial sidewalk sections. Figure 5 shows the number of lanes and
traffic control at the study intersections and posted speed limit.
Avana Ridge, LLC
Page 4
Sight Distance
Sight distance requirements are met at the site access driveway onto SE 172nd
St. and also, with vegetation trimming within the street right of way, at the site access
driveway to Benson Rd. South.
SE 172nd St. has a posted speed limit of 25 mph. Per American Association of
State Highway and Transportation Officials (AASHTO) requirements, a design speed of
25 mph requires a stopping sight distance (SSD) of 155 feet and an intersection sight
distance (ISD) of 240 ft. (for a vehicle turning right from the side street), and 280 ft (for a
vehicle turning left from the side street). The SSD and ISD is >400 ft. to the west and all
the way to the 108th Ave. SE intersection to the east.
Benson Rd. S has a posted speed limit of 35 mph. Per AASHTO requirements, a
design speed of 35 mph requires a stopping sight distance (SSD) of 250 ft and an
intersection sight distance (ISD) of 335 ft. (for a vehicle turning right from the side
street), and 390 ft. (for a vehicle turning left from the side street). The SSD and ISD are
estimated to be 360 ft. to the north with vegetation trimming within the ROW. The ESD
and ISD to the south are all the way to the Benson Dr. S (SR 515) intersection.
EXISTING TRAFFIC CONDITIONS
Traffic Volumes
Figures 6 and 7 show the existing AM and PM peak hour traffic volumes at the
study intersections. Traffic volume turning movement counts were conducted on
September 7th and 24th, 2015 at the study intersections and are included in the technical
appendix.
Per the City of Renton Policy Guidelines for Traffic Impact Analysis for New
Development intersections and road segments that experience an increase of 5% in
traffic volumes require analysis.
Accident History
The latest three year accident history for the study intersections and streets in
the study area was obtained from WSDOT and are included in the technical appendix.
There were a total of 4 accidents recorded at the 108th Ave SE/SE 172nd intersection, 2
accidents at the Benson Rd. S/108th Ave SE intersection, 5 accidents on 108th Ave SE ,
2 accidents on Benson Rd. S and 1 accident on SE 172nd Street. Six of the accidents
were due to inattention, 3 were due to following to close, and the rest were due to other
miscellaneous driver errors and 1 operating a vehicle under the influence. Neither our
field observations nor the accident history identified any obvious safety deficiencies.
Avana Ridge, LLC
Page 5
Level of Service Analysis
LOS is a qualitative measure describing operational conditions within a traffic
flow, and the perception of these conditions by drivers or passengers. These conditions
include factors such as speed, delay, travel time, freedom to maneuver, traffic
interruptions, comfort, convenience, and safety. Levels of service are given letter
designations, from A to F, with LOS A representing the best operating conditions (free
flow, little delay) and LOS F the worst (congestion, long delays). Generally, LOS A and
B are high, LOS C and D are moderate and LOS E and F are low.
Table 1 shows calculated levels of service (LOS) for existing and future
conditions at the study intersection. The LOS’s were calculated using the procedures in
the Transportation Research Board Highway Capacity Manual. The LOS shown
indicates overall intersection operation. At intersections, LOS is determined by the
calculated average control delay per vehicle. The LOS and corresponding average
control delay in seconds are as follows:
TYPE OF
INTERSECTION A B C D E F
Signalized <
10.0
>10.0 and
<20.0
>20.0 and
<35.0
>35.0 and
<55.0
>55.0 and
<80.0
>80.
0
Stop Sign
Control
<10.
0 >10 and <15 >15 and <25 >25 and <35 >35 and <50 >50
LOS calculation worksheets are included in the technical appendix. The study
intersections are calculated to operate at an acceptable LOS for existing and future
conditions per City of Renton standards.
FUTURE TRAFFIC CONDITIONS WITHOUT THE PROJECT
Figures 6 and 7 show projected future AM and PM peak hour traffic volumes
without the project. These volumes include the existing traffic volumes, plus
background traffic growth, plus pipeline project volumes from the Fieldbrook Apartments
development.
An annual growth factor of 2% per year was assumed per City of Renton
request. The 2% per year growth factor over a two year period (totaling 4%) was
added to 2015 existing traffic volumes.
In addition to the growth factor, trips generated by the nearby pipeline project
Fieldbrook Apartments were added to future volumes. Fieldbrook Apartments consists
of 162 apartment units. Trip generation was obtained from the Fieldbrook Apartments
TIA and is shown as pipeline volumes in Figures 6 and 7.
Avana Ridge, LLC
Page 6
FUTURE TRAFFIC CONDITIONS WITH PROJECT
Figures 6 and 7 show the projected future AM and PM peak hour traffic volumes
with the proposed project. The site generated traffic volumes were added to the 2017
future (without project) traffic volumes.
Tables 1 and 2 show that the AM and PM peak hour calculated LOS for future
conditions with and without the project meet the City of Renton intersection standards of
LOS D or better.
Signal Warrant Analysis
Traffic signal warrants for new signals are contained in the Manual on Uniform
Traffic Control Devices for Streets and Highways (MUTCD) FHWA. The warrants are
as follows:
Warrant Description
1 Eight Hour Vehicular Volume
2 Four Hour Vehicular Volumes
3 Peak Hour
4 Pedestrian Volume
5 School Crossings
6 Coordinated Signal System
7 Crash Experience
8 Roadway Network
The primary warrant used by agencies in determining whether a signal is needed
is warrant 1 (Conditions A and B). These warrants are satisfied when, for each of any 8
hours of an average day, certain minimum traffic volumes exist on the major and minor
approaches to an intersection.
Warrant 1 (Condition A) is met when the major roadway has at least 500 vehicles
per hour (total of both approaches, 1 lane in each direction) and 150 vehicles per hour
on the minor roadway for the same 8 hours. Warrant 1 (Condition B) is met when the
major roadway has at least 750 vehicles per hour (total of approaches, 1 lane in each
direction) and 75 vehicles per hour on the minor roadway for the same 8 hours.
The City has requested that the traffic volumes at the 108th Ave SE/SE 172nd St.
intersection be examined to determine if traffic signal warrants are met. The 2017
horizon year projected PM peak hour traffic volumes at the intersection is 717 vehicles
per hour on 108th Ave. SE (total of both approaches) and 118 vehicles per hour on SE
172nd Street. Typically, traffic volumes for the 8th highest hour are 60% of the PM peak
hour traffic volumes. Therefore, the 8th highest hour traffic volume on 108th Ave. SE is
430 vehicles per hour and on SE 172nd St. 71 vehicles per hour.
Avana Ridge, LLC
Page 7
The table below presents the traffic signal warrant analysis for warrant 1
(Condition A and Condition B) for future with project traffic volume conditions.
228th Ave. NE/NE 14th St. Traffic Signal Warrant 1
Movement Projected 8th
Highest Hour
Warrant 1A
Required
Min. Vol.
Warrant 1A
Met?
Warrant 1B
Required
Min. Vol.
Warrant 1B
Met?
Major 430 500 750
Minor 71 150
No
75
No
The 2017 future projected traffic volumes are not anticipated to exceed the
minimum traffic volumes for warrant 1A and warrant 1B on the major street (108th Ave.
SE) nor on the minor street (SE 172nd St.) for eight hours on an average day. Therefore
traffic signal warrant is not met and a signal is not warranted.
TRAFFIC MITIGATION
TRAFFIC MITIGATION REQUIREMENTS
The City of Renton requires a Transportation Mitigation Fee payment of
$1454.20 per apartment unit. The estimated Transportation Mitigation Fee for the 74
units of the Avana Ridge Apartments is estimated to be $107,611 (74 units x $1454.20
per unit).
Frontage improvements to City of Renton standards are required on SE 172nd St.
including curb, gutter, landscape strip, sidewalk and street lights. Landscape strip,
sidewalk and street lights are required on Benson Rd. S. frontage. As shown on the
site plan, the northern portion of the frontage on SR 515 will be improved to Renton
standards with new landscape strip, sidewalk and street lights.
Due to extreme slopes, a variance is requested for the southern portion of SR
515 frontage to be left as is with existing curb, gutter and sidewalk with no landscape
strip. The combination of new and existing street lights on SR 515 will be designed to
meet City of Renton lighting requirements.
Avana Ridge, LLC
Page 8
SUMMARY, CONCLUSIONS AND RECOMMENDATIONS
We recommend that the Avana Ridge Apartments be constructed as shown on
the site plan with the following traffic impact mitigation measures:
· Construct frontage improvements.
· Contribute the estimated Transportation Mitigation fee of approximately
$107,611 to City of Renton.
No other traffic mitigation should be necessary. If you have any questions,
please call 425-522-4118. You may also contact us via e-mail at vince@nwtraffex.com
or larry@nwtraffex.com.
Very truly yours,
Vincent J. Geglia Larry D. Hobbs, P.E.
Principal Principal
TraffEx TraffEx
Avana Ridge, LLC
Page 9
TABLE 1
AM PEAK HOUR LEVEL OF SERVICE SUMMARY
INTERSECTION
EXISTING
2011
FUTURE WITHOUT
PROJECT 2013
FUTURE WITH
PROJECT 2013
Site Access/
SE 172nd St. NA NA A 8.8 NB
108th Ave. SE/Benson Rd. S/
SE 172nd St. C 16.3 WB C 22.6 WB C 23.3 WB
Site Access/Benson Rd S/
108th Ave. SE B 14.7 WB C 15.5 WB C 17.1 WB
XX Number shown is the average control delay in seconds per vehicle for the minor
approach for unsignalized intersections, which determines the LOS for intersections
per the Transportation Research Board Highway Capacity Manual
A Indicates calculated level of service
WB (westbound) Indicates direction of the minor approach for unsignalized intersections
TABLE 2
PM PEAK HOUR LEVEL OF SERVICE SUMMARY
INTERSECTION
EXISTING
2011
FUTURE WITHOUT
PROJECT 2013
FUTURE WITH
PROJECT 2013
Site Access/
SE 172nd St. NA NA A 8.8 NB
108th Ave. SE/Benson Rd. S/
SE 172nd St. B 14.2 WB C 16.5 WB C 17.2 WB
Site Access/Benson Rd S/
108th Ave. SE B 14.3 WB C 15.4 WB C 18.0 WB
XX Number shown is the average control delay in seconds per vehicle for the minor
approach for unsignalized intersections, which determines the LOS for intersections
per the Transportation Research Board Highway Capacity Manual
A Indicates calculated level of service
WB (westbound) Indicates direction of the minor approach for unsignalized intersections
TECHNICAL APPENDIX
*
AvanaRidgeApartments-CityofRenton
VicinityMap
Figure
1
Project
Site
*
AvanaRidgeApartments-CityofRenton
SitePlan
Figure
2
Project
Site
1
3
2
2
31
25%
45%
6
442
2
Project
Site
Figure
3
AvanaRidgeApartments-CityofRenton
AMPeakHourTripGenerationandDistribution
Legend
15%PercentageofProject Traffic
AMPeakHour TrafficVolume
Enter8
Exit30
Total38
14%
65%
79%
AMPeakHour TrafficVolume53%10%
7%11633
4
3
1
34116417 2
0 0
Site Access/ S 55th St.37%31130%1320%
1
2
270%14870%32774
2
43NAccess/ 156th ave
274
1
33S Access/ 156th Ave
214
0
02SE142 Pl156thAve/724
8
SiteAccess
5%0000 0
0 0
1 5
3013SE 172ndSite Access/0503 0
0 0
11 0
220Site Access/Benson Rd
21
3SiteAccess
SiteAccess10%3110%
3
1
53%
4
16
3008 0
0 0
5 0
230SE 172nd108th Ave/
1
3
2
2
31
25%
45%
6
442
2
Project
Site
Figure
4
AvanaRidgeApartments-CityofRenton
PMPeakHourTripGenerationandDistribution
Legend
15%PercentageofProject Traffic
PMPeakHour TrafficVolume
Enter30
Exit16
Total46
14%
65%
79%
PMPeakHour TrafficVolume56%10%
7%11633
4
2
3
31719417 2
0 0
Site Access/ S 55th St.33%10530%1320%
1
2
270%14870%32774
2
43NAccess/ 156th ave
274
1
33S Access/ 156th Ave
214
0
02SE142 Pl156thAve/724
8
SiteAccess
5%
21
3SiteAccess
SiteAccess10%3110%
3
1
53%
4
16
0000 0
0 0
3 16
206SE 172ndSite Access/8203 0
0 0
3 0
820108th Ave/ SE 172nd 2302 0
0 0
6 0
980Site Access/Benson Rd
1
3
2
2
31
25%
45%
6
442
2
1
2 3 4 5
32
Legend
SpeedLimit
LaneUseandDirection
25MPH
StopSignControl35MPH
XXMPH
Project
Site
Figure
5
AvanaRidgeApartments-CityofRenton
ExistingConditions
Legend
15%PercentageofProject Traffic
PMPeakHour TrafficVolume
Enter8
Exit30
Total38
14%
65%
79%
PMPeakHour TrafficVolume
7%11633
4
31417 2
0 0
Site Access/ S 55th St.30%1320%
1
2
270%14870%32774
2
43NAccess/ 156th ave
274
1
33S Access/ 156th Ave
214
0
02SE142 Pl156thAve/724
8
SiteAccess
5%
21
3SiteAccess
SiteAccess10%3110%
3
1
53%
4
16
1
3
2
2
11
25%
45%
6
442
1
Pipeline
Projects
11
2 2
2
Project
Site
Figure
6
AvanaRidgeApartments-CityofRenton
AMPeakHourTrafficVolumes
14%
65%
79%
7%11633
4
1417 2
0 0
Site Access/ S 55th St.30%1320%
1
2
270%14870%32774
2
43NAccess/ 156th ave
274
1
33S Access/ 156th Ave
214
0
02SE142 Pl156thAve/724
8
SiteAccess
5%
21
3SiteAccess
SiteAccess10%3110%
3
1
53%
4
16
Project
TrafficExisting
Future
withProject
Future
withoutProject
33333
2 20000 0
50 48
0 0
0000000 0
2 6
0 0
0000000 0
54 56
0 0
0000000 0
0 0
1 5
30130000 0
54 56
1 5
301319215419 4
0 0
31 4
2941690070 30
2 6
0 30
007202241120 34
2 6
32 34
30433163008 0
0 0
5 0
230232241128 34
2 6
37 34
3243616028620 6
0 0
0 3
0511003000 0
0 0
0 0
070032820 6
0 0
0 3
053900503 0
0 0
11 0
220033323 6
0 0
11 3
25410
1
3
2
2
11
25%
45%
6
442
1
Pipeline
Projects
11
2 2
2
Project
Site
Figure
7
AvanaRidgeApartments-CityofRenton
PMPeakHourTrafficVolumes
14%
65%
79%
7%11633
4
1417 2
0 0
Site Access/ S 55th St.30%1320%
1
2
270%14870%32774
2
43NAccess/ 156th ave
274
1
33S Access/ 156th Ave
214
0
02SE142 Pl156thAve/724
8
SiteAccess
5%
21
3SiteAccess
SiteAccess10%3110%
3
1
53%
4
16
Project
TrafficExisting
Future
withProject
Future
withoutProject
33333
2 20000 0
41 48
0 0
0000000 0
7 3
0 0
0000000 0
50 53
0 0
0000000 0
0 0
3 16
2060000 0
50 53
3 16
20614283414 8
0 1
27 17
34272800290 16
7 3
0 16
0029152943315 24
7 4
28 34
35283378203 0
0 0
3 0
820232963318 24
7 4
31 34
4328537031950 3
0 0
0 11
0348401600 0
0 0
0 0
0290034850 3
0 0
0 11
039142302 0
0 0
6 0
980235152 3
0 0
6 11
93994
TECHNICAL APPENDIX
Prepared for: Traffex
Traffic Count Consultants, Inc.
Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Team@TC2inc.com
WBE/DBE
Intersection:108th Way SE (Benson Rd S) & SE 172nd St Date of Count:Thurs 9/17/2015
Location:Renton, Washington Checked By:Jess
Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval
Interval 108th Way SE (Benson) 108th Way SE (Benson) SE 172nd St SE 172nd St Total
Ending at T L S R T L S R T L S R T L S R
6:15 A1028206 32 1 0 1 0 1 0 2 06 79
6:30 A2035003 57 6 0 0 0 1 0 2 02 106
6:45 A2441413 73 5 0 0 0 0 0 0 08 138
7:00 A1037245 61 10 1 3 0 2 1 4 04 128
7:15 A4148246 87 3 3 2 0 1 0 3 08 161
7:30 A0246249 121 2 0 0 0 0 0 3 08 193
7:45 A 7 1 80 10 2 7 125 4 0 1 0 1 0 6 0 5 240
8:00 A4061537 83 0 1 1 0 2 2 7 010 176
8:15 A1238264 79 2 0 2 0 2 1 4 09 144
8:30 A1150453 95 2 0 2 0 1 0 2 05 165
8:45 A 3 1 68 6 4 12 60 2 0 2 0 1 1 5 0 7 164
9:00 A0046226 67 1 1 3 0 0 0 4 03 132
Total
Survey 26 12 578 41 35 71 940 38 6 17 0 12 5 42 0 75 1826
Peak Hour: 7:00 AM to 8:00 AM
Total 15 4 235 19 13 29 416 9 4 4 0 4 2 19 0 31 770
Approach 258 454 8 50 770
%HV 5.8% 2.9% 50.0% 4.0% 4.4%
PHF 0.71 0.83 0.67 0.74 0.80
108th Way SE (Benson)
697
258 439
0 Bike
SE 172nd St 19 235 4 2Ped SE 172nd St
4
48 Ped 0 08
Bike 0 4 21
98 19 0 Bike
50 0 7:00 AM to 8:00 AM 3Ped 13
31
PEDs
Across:NS EW Ped 5 29 416 9 960 1.0 PHF Peak Hour Volume
INT 01 11 2Bike3 PHF %HV
INT 02 0 EB 0.74 4.0%
INT 03 11270 454 Check WB 0.67 50.0%
INT 04 13 4 In:770 NB 0.83 2.9%
INT 05 11 1 3 724 Out:770 SB 0.71 5.8%
INT 06 11 1 3 108th Way SE (Benson)T Int.0.80 4.4%
INT 07 11Bicycles From: N S E W Conditions:
INT 08 21 3 INT 01 0
INT 09 22 4 INT 02 0
INT 10 213INT 03 11
INT 11 0 INT 04 11
INT 12 0 INT 05 0
911 3 124 INT 06 11
Special Notes INT 07 0
INT 08 22
INT 09 0
INT 10 0
INT 11 0
INT 12 11
06 0 06
TRA15106M_03a
Prepared for: Traffex
Traffic Count Consultants, Inc.
Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Team@TC2inc.com
WBE/DBE
Intersection:108th Way SE (Benson Rd S) & SE 172nd St Date of Count:Thurs 9/17/2015
Location:Renton, Washington Checked By:Jess
Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval
Interval 108th Way SE (Benson) 108th Way SE (Benson) SE 172nd St SE 172nd St Total
Ending at T L S R T L S R T L S R T L S R
3:15 P1055335 59 3 1 1 0 2 2 3 16 138
3:30 P5075213 76 1 1 6 1 2 1 3 04 173
3:45 P 1 1 72 1 2 13 60 2 0 3 0 4 1 0 0 6 162
4:00 P 0 0 66 5 1 12 70 5 2 5 0 1 2 5 0 4 173
4:15 P0370616 66 0 0 3 0 1 0 6 013 174
4:30 P1066608 63 1 2 2 0 0 0 3 09 158
4:45 P 2 2 55 6 1 10 59 2 0 2 0 0 0 9 0 6 151
5:00 P1164616 66 2 0 4 0 5 01107 172
5:15 P 0 0 52 6 1 13 57 0 1 2 0 2 0 7 0 9 148
5:30 P2259716 62 0 0 2 0 1 0 9 08 156
5:45 P1369317 86 1 1 2 0 1 0 7 07 186
6:00 P1160307 71 2 0 2 0 1 0 4 07 158
Total
Survey 15 13 763 54 13 96 795 19 8 34 1 20 6 67 1 86 1949
Peak Hour: 3:15 PM to 4:15 PM
Total 6 4 283 14 5 34 272 8 3 17 1 8 4 14 0 27 682
Approach 301 314 26 41 682
%HV 2.0% 1.6% 11.5% 9.8% 2.6%
PHF 0.95 0.90 0.72 0.54 0.98
108th Way SE (Benson)
595
301 294
0 Bike
SE 172nd St 14 283 4 4Ped SE 172nd St
8
49 Ped 0 126
Bike 0 17 38
90 14 0 Bike
41 0 3:15 PM to 4:15 PM 0Ped 12
27
PEDs
Across:NS EW Ped 6 34 272 8 744 1.0 PHF Peak Hour Volume
INT 01 516Bike1 PHF %HV
INT 02 0 EB 0.54 9.8%
INT 03 22 4 327 314 Check WB 0.72 11.5%
INT 04 21 3 In:682 NB 0.90 1.6%
INT 05 33 641 Out:682 SB 0.95 2.0%
INT 06 41 5 108th Way SE (Benson)T Int.0.98 2.6%
INT 07 0 Bicycles From: N S E W Conditions:
INT 08 22INT 01 0
INT 09 11 2 INT 02 0
INT 10 0 INT 03 0
INT 11 44INT 04 0
INT 12 0 INT 05 11
20 8 0 1 29 INT 06 0
Special Notes INT 07 0
INT 08 0
INT 09 11
INT 10 22
INT 11 22
INT 12 0
24 0 06
TRA15106M_03p
Prepared for: Traffex
Traffic Count Consultants, Inc.
Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Team@TC2inc.com
WBE/DBE
Intersection:Benson Rd S & Benson Dr S (SR 515)Date of Count:Thurs 9/24/2015
Location:Renton, Washington Checked By:Jess
Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval
Interval Benson Rd S 0 Benson Dr S (SR 515) Benson Dr S (SR 515)Total
Ending at TL S RTL S R T L S R T L SR
6:15 A 0 26 0 6 0 0 0 0 2 0 302 48 1 5 31 0 418
6:30 A 0 36 0 5 0 0 0 0 5 0 390 54 4 4 42 0 531
6:45 A 1 36 0 11 0 0 0 0 2 0 347 74 1 1 43 0 512
7:00 A 0 46 0 11 0 0 0 0 6 0 313 111 2 8 59 0 548
7:15 A 5 52 0 11 0 0 0 0 3 0 329 98 2 4 60 0 554
7:30 A 1 53 0 14 0 0 0 0 9 0 311 131 3 11 77 0 597
7:45 A 3 69 0 19 0 0 0 0 4 0 309 134 1 13 66 0 610
8:00 A 5 64 0 9 0 0 0 0 6 0 261 111 3 8 86 0 539
8:15 A 2 37 0 15 0 0 0 0 7 0 227 102 1 4 87 0 472
8:30 A 1 54 0 10 0 0 0 0 9 0 284 91 4 8 77 0 524
8:45 A 2 70 0 11 0 0 0 0 5 0 287 87 1 6 98 0 559
9:00 A 0 43 0 6 0 0 0 0 3 0 242 74 0 9 99 0 473
Total
Survey 20 586 0 128 0 0 0 0 61 0 3602 1115 23 81 825 0 6337
Peak Hour: 6:45 AM to 7:45 AM
Total 9 220 0 55 0 0 0 0 22 0 1262 474 8 36 262 0 2309
Approach 275 0 1736 298 2309
%HV 3.3% n/a 1.3% 2.7% 1.7%
PHF 0.78 n/a 0.98 0.85 0.95
Benson Rd S
785
275 510
0 Bike
Benson Dr S (SR 515)55 0 220 2Ped Benson Dr S (SR 515)
474
1317 Ped 0 1262 1736
Bike 0 0 2218
1615 36 0 Bike
298 262 6:45 AM to 7:45 AM 0Ped 482
0
PEDs
Across:NS EW Ped 3 00 0 2440 1.0 PHF Peak Hour Volume
INT 01 11Bike0 PHF %HV
INT 02 0 EB 0.85 2.7%
INT 03 11 00Check WB 0.98 1.3%
INT 04 11 In:2309 NB n/a n/a
INT 05 11 0 Out:2309 SB 0.78 3.3%
INT 06 11 2 0 T Int.0.95 1.7%
INT 07 11Bicycles From: N S E W N U's S U's E U's W U's
INT 08 224 INT 01 00
INT 09 112 INT 02 00
INT 10 0 INT 03 00
INT 11 11 INT 04 00
INT 12 0 INT 05 00
36 0514 INT 06 NO BIKES 0 1
Special Notes INT 07 00
INT 08 01
INT 09 00
INT 10 00
INT 11 00
INT 12 00
00 0 00 0020
TRA15106M_reset_01a
Prepared for: Traffex
Traffic Count Consultants, Inc.
Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Team@TC2inc.com
WBE/DBE
Intersection:Benson Rd S & Benson Dr S (SR 515)Date of Count:Thurs 9/24/2015
Location:Renton, Washington Checked By:Jess
Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval
Interval Benson Rd S 0 Benson Dr S (SR 515) Benson Dr S (SR 515)Total
Ending at TL S RTL S R T L S R T L SR
3:15 P 2 91 0 7 0 0 0 0 4 0 133 63 2 5 247 0 546
3:30 P 4 78 0 14 0 0 0 0 1 0 160 72 5 8 283 0 615
3:45 P 0 63 0 6 0 0 0 0 8 0 131 66 0 11 294 0 571
4:00 P 0 64 0 3 0 0 0 0 3 0 136 83 1 13 300 0 599
4:15 P 1 80 0 7 0 0 0 0 3 0 160 68 1 8 255 0 578
4:30 P 1 70 0 8 0 0 0 0 3 0 146 67 0 13 305 0 609
4:45 P 1 60 0 9 0 0 0 0 0 0 136 69 2 9 291 0 574
5:00 P 0 84 0 7 0 0 0 0 0 0 155 70 0 15 233 0 564
5:15 P 1 73 0 9 0 0 0 0 1 0 158 62 2 11 318 0 631
5:30 P 0 70 0 7 0 0 0 0 1 0 144 64 0 18 207 0 510
5:45 P 0 72 0 11 0 0 0 0 1 0 151 88 2 22 288 0 632
6:00 P 0 59 0 10 0 0 0 0 2 0 171 60 4 13 314 0 627
Total
Survey 10 864 0 98 0 0 0 0 27 0 1781 832 19 146 3335 0 7056
Peak Hour: 5:00 PM to 6:00 PM
Total 1 274 0 37 0 0 0 0 5 0 624 274 8 64 1127 0 2400
Approach 311 0 898 1191 2400
%HV 0.3% n/a 0.6% 0.7% 0.6%
PHF 0.94 n/a 0.94 0.91 0.95
Benson Rd S
649
311 338
0 Bike
Benson Dr S (SR 515)37 0 274 0Ped Benson Dr S (SR 515)
274
661 Ped 2 624 898
Bike 0 0 2299
1852 64 1 Bike
1191 1127 5:00 PM to 6:00 PM 0Ped 1401
0
PEDs
Across:NS EW Ped 1 00 0 2528 1.0 PHF Peak Hour Volume
INT 01 0 Bike 0 PHF %HV
INT 02 0 EB 0.91 0.7%
INT 03 0 00Check WB 0.94 0.6%
INT 04 11 In:2400 NB n/a n/a
INT 05 123 0 Out:2400 SB 0.94 0.3%
INT 06 235 0 T Int.0.95 0.6%
INT 07 0 Bicycles From: N S E W N U's S U's E U's W U's
INT 08 11 INT 01 00 0
INT 09 123 INT 02 00 0
INT 10 0 INT 03 00 0
INT 11 0 INT 04 00 1
INT 12 0 INT 05 00 0
14 1713 INT 06 00 0
Special Notes INT 07 00 0
INT 08 00 0
INT 09 00 0
INT 10 02 0
INT 11 00 0
INT 12 1100
00 1 01 2010
TRA15106M_reset_01p
Prepared for: Traffex
Traffic Count Consultants, Inc.
Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Team@TC2inc.com
WBE/DBE
Intersection:Benson Rd S & 108th Ave SE Date of Count:Thurs 9/24/2015
Location:Renton, Washington Checked By:Jess
Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval
Interval Benson Rd S Benson Rd S 108th Ave SE 0 Total
Ending at T L S R T L S R T L S R T L S R
6:15 A0032000 54 0 0 0 0 1 0 0 00 87
6:30 A0044010 56 2 0 2 0 0 0 0 00 104
6:45 A1041010 72 2 0 1 0 0 0 0 00 116
7:00 A0055030 120 0 0 2 0 3 0 0 00 180
7:15 A3262000 102 0 0 1 0 2 0 0 00 169
7:30 A2068070 142 0 0 0 0 0 0 0 00 210
7:45 A 3 0 101 0 1 0 147 0 0 0 0 1 0 0 0 0 249
8:00 A5258010 118 0 0 2 0 0 0 0 00 180
8:15 A1052070 99 0 0 0 0 0 0 0 00 151
8:30 A1164040 106 0 0 0 0 2 0 0 00 173
8:45 A2081020 93 0 0 0 0 0 0 0 00 174
9:00 A0050020 82 1 0 0 0 0 0 0 00 133
Total
Survey 18 5 708 0 29 0 1191 5 0 8 0 9 0 0 0 0 1926
Peak Hour: 6:45 AM to 7:45 AM
Total 8 2 286 0 11 0 511 0 0 3 0 6 0 0 0 0 808
Approach 288 511 9 0 808
%HV 2.8% 2.2% n/a n/a 2.4%
PHF 0.71 0.87 0.45 n/a 0.81
Benson Rd S
805
288 517
0 Bike
0 0 286 2 2Ped 108th Ave SE
6
0 Ped 1 0 9
Bike 0 3 11
0 0 3 Bike
0 0 6:45 AM to 7:45 AM 5Ped 2
0
PEDs
Across:NS EW Ped 0 0 511 0 996 1.0 PHF Peak Hour Volume
INT 01 22Bike0 PHF %HV
INT 02 0 EB n/a n/a
INT 03 112 289 511 Check WB 0.45 n/a
INT 04 0 In:808 NB 0.87 2.2%
INT 05 213 800 Out:808 SB 0.71 2.8%
INT 06 44 Benson Rd S T Int.0.81 2.4%
INT 07 11Bicycles From: N S E W Conditions:
INT 08 44 INT 01 11
INT 09 0 INT 02 0
INT 10 11 INT 03 0
INT 11 0 INT 04 11
INT 12 0 INT 05 11
20 8717 INT 06 11
Special Notes INT 07 0
INT 08 11
INT 09 0
INT 10 0
INT 11 0
INT 12 0
00 5 05
Prepared for: Traffex
Traffic Count Consultants, Inc.
Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Team@TC2inc.com
WBE/DBE
Intersection:Benson Rd S & 108th Ave SE Date of Count:Thurs 9/24/2015
Location:Renton, Washington Checked By:Jess
Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval
Interval Benson Rd S Benson Rd S 108th Ave SE 0 Total
Ending at T L S R T L S R T L S R T L S R
3:15 P0196020 68 0 0 2 0 1 0 0 00 168
3:30 P4290010 74 1 0 1 0 0 0 0 00 168
3:45 P0068040 82 0 0 1 0 0 0 0 00 151
4:00 P0168020 90 6 0 1 0 1 0 0 00 167
4:15 P0183020 75 1 0 2 0 0 0 0 00 162
4:30 P2178000 75 2 0 0 0 1 0 0 00 157
4:45 P0171010 79 2 0 1 0 0 0 0 00 154
5:00 P0087000 85 1 0 1 0 1 0 0 00 175
5:15 P1278000 71 2 0 5 0 1 0 0 00 159
5:30 P0172000 82 0 0 4 0 0 0 0 00 159
5:45 P0282010 110 1 0 1 0 1 0 0 00 197
6:00 P0269010 73 0 0 1 0 1 0 0 00 146
Total
Survey 7 14 942 0 14 0 964 16 0 20 0 7 0 0 0 0 1963
Peak Hour: 4:45 PM to 5:45 PM
Total 1 5 319 0 1 0 348 4 0 11 0 3 0 0 0 0 690
Approach 324 352 14 0 690
%HV 0.3% 0.3% n/a n/a 0.3%
PHF 0.93 0.79 0.58 n/a 0.88
Benson Rd S
675
324 351
0 Bike
0 0 319 5 0Ped 108th Ave SE
3
0 Ped 2 0 14
Bike 0 11 23
0 0 0 Bike
0 0 4:45 PM to 5:45 PM 1Ped 9
0
PEDs
Across:NS EW Ped 0 0 348 4 788 1.0 PHF Peak Hour Volume
INT 01 11Bike0 PHF %HV
INT 02 0 EB n/a n/a
INT 03 0 330 352 Check WB 0.58 n/a
INT 04 22 In:690 NB 0.79 0.3%
INT 05 22 682 Out:690 SB 0.93 0.3%
INT 06 145 Benson Rd S T Int.0.88 0.3%
INT 07 0 Bicycles From: N S E W Conditions:
INT 08 11 INT 01 0
INT 09 22 INT 02 0
INT 10 0 INT 03 0
INT 11 0 INT 04 112
INT 12 0 INT 05 11
00 31013 INT 06 0
Special Notes INT 07 0
INT 08 0
INT 09 0
INT 10 0
INT 11 0
INT 12 21 3
31 2 06
OFFICER REPORTED CRASHES THAT OCCURRED on OR in the vicinity of THE FOLLOWING ROAD SEGMENTS IN THE CITY OF RENTONSR 515 (aka BENSON DR, MP 5.27 - 5.32)@ BENSON RD / 108th AVEBENSON RD / 108th AVE FROM SR 515 (aka BENSON DR) TO 172nd ST172nd ST FROM 106th AVE TO 108th AVE9/1/2012 - available 2015 (2015 data is partial and preliminary)UNDER 23 UNITED STATES CODE – SECTION 409, THIS DATA CANNOT BE USED IN DISCOVERY OR AS EVIDENCEAT TRIAL IN ANY ACTION FOR DAMAGES AGAINST THE WSDOT, OR ANY JURISDICTIONS INVOLVED IN THE DATAJURISDICTIONPRIMARY TRAFFICWAYBLOCK NUMBERINTERSECTING TRAFFICWAYDIST FROM REF POINTMI or FTCOMP DIR FROM REF POINTREFERENCE POINT NAMEA/BREPORT NUMBER DATE TIMEMOST SEVERE INJURY TYPE# INJ#FAT#VEH#PEDS#PEDAL JUNCTION RELATIONSHIPROADWAY SURFACE CONDITIONSLIGHTING CONDITIONS MV DRIVER CONT CIRC 1 (UNIT 1)City Street108TH AVE SE17200BENSON RD SE2190211/7/201314:05Possible Injury10200At Intersection and RelatedWetDaylightInattentionCity Street108TH AVE SE17100SE 172ND STE2502916/13/201317:35Serious Injury10101At Intersection and RelatedDryDaylightFail to Yield Row to PedestrianCity Street108TH AVE SE17100SE 172ND STE2657128/26/201318:40No Injury00200At Intersection and RelatedWetDuskFollow Too CloselyCity Street108TH AVE SE17100SE 172ND STE28874911/24/201311:59Possible Injury10300At Intersection and RelatedDryDaylightInattentionCity Street108TH AVE SESE 172ND ST E3585939/19/201417:12Possible Injury10200At Intersection and RelatedDryDaylightDriver Operating Handheld DeviceCity Street108TH AVE SE50FSSE 172ND STE2532346/27/201322:49Evident Injury10200Not at Intersection and Not RelatedDryDark-Street Lights OnUnder Influence of AlcoholCity Street108TH AVE SE1710041FNSE 172ND STE2678339/3/20137:24Possible Injury10300Not at Intersection and Not RelatedWetDaylightInattentionCity Street108TH AVE SE1720076FSSE 172ND STE28094310/28/20138:07No Injury00200Not at Intersection and Not RelatedDryDaylightFollow Too CloselyCity Street108TH AVE SE1070024FSSE 172ND STE28683211/12/20139:50Possible Injury30300Intersection Related but Not at IntersectionWetDaylightInattentionCity Street108TH AVE SE1710082FSSE 172ND STE4520237/31/201518:45No Injury00200Not at Intersection and Not RelatedDryDaylightInattentionCity StreetBENSON RD S0108TH AVE SEE4104773/24/20159:10No Injury00200At Intersection and RelatedWetDaylightInattentionCity StreetBENSON RD S8100100FSW108TH AVE SEE38138311/30/20140:06Unknown00100Not at Intersection and Not RelatedIceDark-Street Lights OnOtherCity StreetBENSON RD S1700033FNSE 172ND STE4117483/28/201510:45No Injury00200Not at Intersection and Not RelatedDryDaylightFollow Too CloselyCity StreetSE 172ND ST10600141FW108TH AVE SEE2302912/28/201317:01No Injury00200At DrivewayWetDaylightDid Not Grant RW to VehicleWSDOT - CRASH DATA and REPORTING09/28/20151 of 1
AM EXISTING
3: Benson Rd S/108th Ave SE & SE 172nd St 10/6/2015
Baseline Synchro 8 Light Report
Page 1
Intersection
Int Delay, s/veh 1.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 19 0 31 4 0 4 29 416 9 4 215 19
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 24 0 39 5 0 5 36 520 11 5 269 24
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 892 895 281 908 901 526 293 0 0 531 0 0
Stage 1 291 291 - 598 598 - - - - - - -
Stage 2 601 604 - 310 303 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 263 280 758 256 278 552 1269 - - 1036 - -
Stage 1 717 672 - 489 491 - - - - - - -
Stage 2 487 488 - 700 664 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 252 267 758 234 265 552 1269 - - 1036 - -
Mov Cap-2 Maneuver 252 267 - 234 265 - - - - - - -
Stage 1 688 668 - 469 471 - - - - - - -
Stage 2 463 468 - 660 660 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 14.8 16.3 0.5 0.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1269 - - 430 329 1036 - -
HCM Lane V/C Ratio 0.029 - - 0.145 0.03 0.005 - -
HCM Control Delay (s) 7.9 0 - 14.8 16.3 8.5 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh) 0.1 - - 0.5 0.1 0 - -
AM EXISTING
6: Benson Rd S & 108th Ave SE 10/6/2015
Baseline Synchro 8 Light Report
Page 2
Intersection
Int Delay, s/veh 0.2
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 3 6 511 0 2 286
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 81 81 81 81 81 81
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 4 7 631 0 2 353
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 989 631 0 0 631 0
Stage 1 631 - - - - -
Stage 2 358 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 274 481 - - 951 -
Stage 1 530 - - - - -
Stage 2 707 - - - - -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 273 481 - - 951 -
Mov Cap-2 Maneuver 273 - - - - -
Stage 1 530 - - - - -
Stage 2 705 - - - - -
Approach WB NB SB
HCM Control Delay, s 14.7 0 0.1
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 384 951 -
HCM Lane V/C Ratio - - 0.029 0.003 -
HCM Control Delay (s) - - 14.7 8.8 0
HCM Lane LOS - - B A A
HCM 95th %tile Q(veh) - - 0.1 0 -
FUTURE WITHOUT PROJECT
3: Benson Rd S/108th Ave SE & SE 172nd St 10/6/2015
Baseline Synchro 8 Light Report
Page 1
Intersection
Int Delay, s/veh 3.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 20 2 32 34 6 34 30 433 16 11 224 20
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 25 2 40 42 8 42 38 541 20 14 280 25
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 971 956 293 967 959 551 305 0 0 561 0 0
Stage 1 320 320 - 626 626 - - - - - - -
Stage 2 651 636 - 341 333 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 232 258 746 234 257 534 1256 - - 1010 - -
Stage 1 692 652 - 472 477 - - - - - - -
Stage 2 457 472 - 674 644 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 199 242 746 210 242 534 1256 - - 1010 - -
Mov Cap-2 Maneuver 199 242 - 210 242 - - - - - - -
Stage 1 662 641 - 451 456 - - - - - - -
Stage 2 396 451 - 625 633 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 17.5 22.6 0.5 0.4
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1256 - - 356 296 1010 - -
HCM Lane V/C Ratio 0.03 - - 0.19 0.313 0.014 - -
HCM Control Delay (s) 8 0 - 17.5 22.6 8.6 0 -
HCM Lane LOS A A - C C A A -
HCM 95th %tile Q(veh) 0.1 - - 0.7 1.3 0 - -
FUTURE WITHOUT PROJECT
6: Benson Rd S & 108th Ave SE 10/6/2015
Baseline Synchro 8 Light Report
Page 2
Intersection
Int Delay, s/veh 0.2
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 3 6 539 0 2 328
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 81 81 81 81 81 81
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 4 7 665 0 2 405
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1075 665 0 0 665 0
Stage 1 665 - - - - -
Stage 2 410 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 243 460 - - 924 -
Stage 1 511 - - - - -
Stage 2 670 - - - - -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 242 460 - - 924 -
Mov Cap-2 Maneuver 242 - - - - -
Stage 1 511 - - - - -
Stage 2 668 - - - - -
Approach WB NB SB
HCM Control Delay, s 15.5 0 0.1
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 354 924 -
HCM Lane V/C Ratio - - 0.031 0.003 -
HCM Control Delay (s) - - 15.5 8.9 0
HCM Lane LOS - - C A A
HCM 95th %tile Q(veh) - - 0.1 0 -
AM FUTURE WITH PROJECT
3: Benson Rd S/108th Ave SE & SE 172nd St 10/9/2015
Baseline Synchro 8 Light Report
Page 1
Intersection
Int Delay, s/veh 3.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 28 2 37 34 6 34 32 436 16 11 224 23
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 35 2 46 42 8 42 40 545 20 14 280 29
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 982 967 294 981 971 555 309 0 0 565 0 0
Stage 1 322 322 - 635 635 - - - - - - -
Stage 2 660 645 - 346 336 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 228 254 745 229 253 531 1252 - - 1007 - -
Stage 1 690 651 - 467 472 - - - - - - -
Stage 2 452 467 - 670 642 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 195 238 745 203 237 531 1252 - - 1007 - -
Mov Cap-2 Maneuver 195 238 - 203 237 - - - - - - -
Stage 1 658 640 - 445 450 - - - - - - -
Stage 2 390 445 - 615 631 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 19.5 23.3 0.5 0.4
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1252 - - 332 288 1007 - -
HCM Lane V/C Ratio 0.032 - - 0.252 0.321 0.014 - -
HCM Control Delay (s) 8 0 - 19.5 23.3 8.6 0 -
HCM Lane LOS A A - C C A A -
HCM 95th %tile Q(veh) 0.1 - - 1 1.3 0 - -
AM FUTURE WITH PROJECT
6: Benson Rd S & Site Access/108th Ave SE 10/9/2015
Baseline Synchro 8 Light Report
Page 2
Intersection
Int Delay, s/veh 0.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 3 0 11 3 0 6 2 541 0 2 333 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 81 81 81 81 81 81 81 81 81 81 81 81
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 4 0 14 4 0 7 2 668 0 2 411 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1093 1089 411 1096 1089 668 411 0 0 668 0 0
Stage 1 416 416 - 673 673 - - - - - - -
Stage 2 677 673 - 423 416 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 192 215 641 191 215 458 1148 - - 922 - -
Stage 1 614 592 - 445 454 - - - - - - -
Stage 2 443 454 - 609 592 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 188 214 641 186 214 458 1148 - - 922 - -
Mov Cap-2 Maneuver 188 214 - 186 214 - - - - - - -
Stage 1 612 590 - 444 453 - - - - - - -
Stage 2 435 453 - 594 590 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 13.9 17.1 0 0.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1148 - - 423 308 922 - -
HCM Lane V/C Ratio 0.002 - - 0.041 0.036 0.003 - -
HCM Control Delay (s) 8.1 0 - 13.9 17.1 8.9 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh) 0 - - 0.1 0.1 0 - -
AM FUTURE WITH PROJECT
9: Site Access & SE 172nd St 10/9/2015
Baseline Synchro 8 Light Report
Page 3
Intersection
Int Delay, s/veh 1.3
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 54 1 5 56 3 13
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 80 80 80 80 80 80
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 68 1 6 70 4 16
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 69 0 151 68
Stage 1 - - - - 68 -
Stage 2 - - - - 83 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1532 - 841 995
Stage 1 - - - - 955 -
Stage 2 - - - - 940 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1532 - 838 995
Mov Cap-2 Maneuver - - - - 838 -
Stage 1 - - - - 955 -
Stage 2 - - - - 936 -
Approach EB WB NB
HCM Control Delay, s 0 0.6 8.8
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 961 - - 1532 -
HCM Lane V/C Ratio 0.021 - - 0.004 -
HCM Control Delay (s) 8.8 - - 7.4 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh) 0.1 - - 0 -
PM EXISTING
3: Benson Rd S/108th Ave SE & SE 172nd St 10/9/2015
Baseline Synchro 8 Light Report
Page 1
Intersection
Int Delay, s/veh 1.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 14 0 27 17 1 8 34 272 8 4 283 14
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 14 0 28 17 1 8 35 278 8 4 289 14
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 660 659 296 669 662 282 303 0 0 286 0 0
Stage 1 304 304 - 351 351 - - - - - - -
Stage 2 356 355 - 318 311 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 376 384 743 371 382 757 1258 - - 1276 - -
Stage 1 705 663 - 666 632 - - - - - - -
Stage 2 661 630 - 693 658 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 361 370 743 347 368 757 1258 - - 1276 - -
Mov Cap-2 Maneuver 361 370 - 347 368 - - - - - - -
Stage 1 682 660 - 644 611 - - - - - - -
Stage 2 631 609 - 665 655 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 12.1 14.2 0.9 0.1
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1258 - - 546 417 1276 - -
HCM Lane V/C Ratio 0.028 - - 0.077 0.064 0.003 - -
HCM Control Delay (s) 7.9 0 - 12.1 14.2 7.8 0 -
HCM Lane LOS A A - B B A A -
HCM 95th %tile Q(veh) 0.1 - - 0.2 0.2 0 - -
PM EXISTING
6: Benson Rd S & 108th Ave SE 10/9/2015
Baseline Synchro 8 Light Report
Page 2
Intersection
Int Delay, s/veh 0.3
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 11 3 348 4 5 319
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 12 3 395 5 6 362
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 772 398 0 0 400 0
Stage 1 398 - - - - -
Stage 2 374 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 368 652 - - 1159 -
Stage 1 678 - - - - -
Stage 2 696 - - - - -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 366 652 - - 1159 -
Mov Cap-2 Maneuver 366 - - - - -
Stage 1 678 - - - - -
Stage 2 692 - - - - -
Approach WB NB SB
HCM Control Delay, s 14.3 0 0.1
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 404 1159 -
HCM Lane V/C Ratio - - 0.039 0.005 -
HCM Control Delay (s) - - 14.3 8.1 0
HCM Lane LOS - - B A A
HCM 95th %tile Q(veh) - - 0.1 0 -
PM FUTURE WITHOUT PROJECT
3: Benson Rd S/108th Ave SE & SE 172nd St 10/6/2015
Baseline Synchro 8 Light Report
Page 1
Intersection
Int Delay, s/veh 2.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 15 7 28 34 4 24 35 283 37 33 294 15
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 15 7 29 35 4 24 36 289 38 34 300 15
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 768 773 308 772 762 308 315 0 0 327 0 0
Stage 1 375 375 - 379 379 - - - - - - -
Stage 2 393 398 - 393 383 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 319 330 732 317 335 732 1245 - - 1233 - -
Stage 1 646 617 - 643 615 - - - - - - -
Stage 2 632 603 - 632 612 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 289 307 732 284 312 732 1245 - - 1233 - -
Mov Cap-2 Maneuver 289 307 - 284 312 - - - - - - -
Stage 1 623 596 - 620 593 - - - - - - -
Stage 2 585 581 - 580 591 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 14.2 16.5 0.8 0.8
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1245 - - 443 375 1233 - -
HCM Lane V/C Ratio 0.029 - - 0.115 0.169 0.027 - -
HCM Control Delay (s) 8 0 - 14.2 16.5 8 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh) 0.1 - - 0.4 0.6 0.1 - -
PM FUTURE WITHOUT PROJECT
6: Benson Rd S & 108th Ave SE 10/6/2015
Baseline Synchro 8 Light Report
Page 2
Intersection
Int Delay, s/veh 0.3
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 11 3 391 4 5 348
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 12 3 444 5 6 395
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 854 447 0 0 449 0
Stage 1 447 - - - - -
Stage 2 407 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 329 612 - - 1111 -
Stage 1 644 - - - - -
Stage 2 672 - - - - -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 327 612 - - 1111 -
Mov Cap-2 Maneuver 327 - - - - -
Stage 1 644 - - - - -
Stage 2 667 - - - - -
Approach WB NB SB
HCM Control Delay, s 15.4 0 0.1
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 363 1111 -
HCM Lane V/C Ratio - - 0.044 0.005 -
HCM Control Delay (s) - - 15.4 8.3 0
HCM Lane LOS - - C A A
HCM 95th %tile Q(veh) - - 0.1 0 -
PM FUTURE WITH PROJECT
3: Benson Rd S/108th Ave SE & SE 172nd St 10/6/2015
Baseline Synchro 8 Light Report
Page 1
Intersection
Int Delay, s/veh 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 18 7 31 34 4 24 43 285 37 33 296 23
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 18 7 32 35 4 24 44 291 38 34 302 23
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 793 797 314 798 790 310 326 0 0 329 0 0
Stage 1 381 381 - 397 397 - - - - - - -
Stage 2 412 416 - 401 393 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 306 319 726 304 322 730 1234 - - 1231 - -
Stage 1 641 613 - 629 603 - - - - - - -
Stage 2 617 592 - 626 606 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 276 295 726 269 297 730 1234 - - 1231 - -
Mov Cap-2 Maneuver 276 295 - 269 297 - - - - - - -
Stage 1 613 592 - 601 576 - - - - - - -
Stage 2 566 566 - 571 585 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 14.8 17.2 0.9 0.8
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1234 - - 425 359 1231 - -
HCM Lane V/C Ratio 0.036 - - 0.134 0.176 0.027 - -
HCM Control Delay (s) 8 0 - 14.8 17.2 8 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh) 0.1 - - 0.5 0.6 0.1 - -
PM FUTURE WITH PROJECT
6: Benson Rd S & Site Access/108th Ave SE 10/6/2015
Baseline Synchro 8 Light Report
Page 2
Intersection
Int Delay, s/veh 0.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 2 0 6 11 0 3 9 399 4 5 351 2
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 2 0 7 12 0 3 10 453 5 6 399 2
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 889 889 400 891 889 456 401 0 0 458 0 0
Stage 1 411 411 - 476 476 - - - - - - -
Stage 2 478 478 - 415 413 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 264 282 650 263 282 604 1158 - - 1103 - -
Stage 1 618 595 - 570 557 - - - - - - -
Stage 2 568 556 - 615 594 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 259 277 650 256 277 604 1158 - - 1103 - -
Mov Cap-2 Maneuver 259 277 - 256 277 - - - - - - -
Stage 1 611 591 - 563 550 - - - - - - -
Stage 2 558 549 - 604 590 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 12.8 18 0.2 0.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1158 - - 472 292 1103 - -
HCM Lane V/C Ratio 0.009 - - 0.019 0.054 0.005 - -
HCM Control Delay (s) 8.1 0 - 12.8 18 8.3 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh) 0 - - 0.1 0.2 0 - -
PM FUTURE WITH PROJECT
9: Site Access & SE 172nd St 10/6/2015
Baseline Synchro 8 Light Report
Page 3
Intersection
Int Delay, s/veh 1.4
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 50 3 16 53 2 6
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 54 3 17 58 2 7
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 58 0 148 56
Stage 1 - - - - 56 -
Stage 2 - - - - 92 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1546 - 844 1011
Stage 1 - - - - 967 -
Stage 2 - - - - 932 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1546 - 835 1011
Mov Cap-2 Maneuver - - - - 835 -
Stage 1 - - - - 967 -
Stage 2 - - - - 922 -
Approach EB WB NB
HCM Control Delay, s 0 1.7 8.8
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 960 - - 1546 -
HCM Lane V/C Ratio 0.009 - - 0.011 -
HCM Control Delay (s) 8.8 - - 7.4 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh) 0 - - 0 -