HomeMy WebLinkAboutAvana Ridge PUD TIR 151229© 2015 D. R. STRONG Consulting Engineers Inc.
Preliminary Technical Information Report
(TIR)
for
AVANA RIDGE PUD
17249 Benson Road S and 10615 SE 172nd Street Renton, Washington
____________________________________________________________________________
DRS Project No. 15088
Renton File No. PRE15-000611
Owner/Applicant
Avana Ridge, LLC
9725 SE 36th Street, Suite 214
Mercer Island, Washington 98040
Report Prepared by
D. R. STRONG Consulting Engineers, Inc.
620 7th Avenue
Kirkland WA 98033
(425) 827-3063
Report Issue Date
December 28, 2015
2015 D. R. STRONG Consulting Engineers Inc. i Avana Ridge
Technical Information Report Renton, Washington
PRELIMINARY TECHNICAL INFORMATION REPORT
AVANA RIDGE
TABLE OF CONTENTS
SECTION I .................................................................................................................................................... 1
PROJECT OVERVIEW: ............................................................................................................................ 1
PREDEVELOPED SITE CONDITIONS: ................................................................................................... 1
DEVELOPED SITE CONDITIONS: ........................................................................................................... 1
NATURAL DRAINAGE SYSTEM FUNCTIONS: ....................................................................................... 3
FIGURE 1. TIR WORKSHEET ............................................................................................................ 4
FIGURE 2. VICINITY MAP .................................................................................................................. 9
FIGURE 3. DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS ........................... 10
FIGURE 4. SOILS ............................................................................................................................. 11
SECTION II ................................................................................................................................................. 14
CONDITIONS AND REQUIREMENTS SUMMARY ................................................................................ 14
SECTION III ................................................................................................................................................ 16
OFF-SITE ANALYSIS ............................................................................................................................. 16
SECTION IV ................................................................................................................................................ 17
FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN .................................. 17
EXISTING SITE HYDROLOGY .............................................................................................................. 17
FIGURE 5. PREDEVELOPMENT AREA MAP .................................................................................. 18
DEVELOPED SITE HYDROLOGY ......................................................................................................... 19
BYPASS AREA HYDROLOGY ............................................................................................................... 20
FIGURE 6. POST DEVELOPMENT AREA MAP ............................................................................... 21
PERFORMANCE STANDARDS ............................................................................................................. 22
FLOW CONTROL SYSTEM ................................................................................................................... 22
FIGURE 7. DETENTION & WATER QUALITY FACILITY DETAILS ................................................ 28
SECTION V ................................................................................................................................................. 29
CONVEYANCE SYSTEM ANALYSIS AND DESIGN .............................................................................. 29
SECTION VI ................................................................................................................................................ 30
SPECIAL REPORTS AND STUDIES ...................................................................................................... 30
SECTION VII ............................................................................................................................................... 31
OTHER PERMITS, VARIANCES AND ADJUSTMENTS ........................................................................ 31
SECTION VIII .............................................................................................................................................. 32
ESC AND CSWPPP ANALYSIS AND DESIGN ...................................................................................... 32
SECTION IX ................................................................................................................................................ 33
BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ........................ 33
STORMWATER FACILITY SUMMARY SHEET ..................................................................................... 34
SECTION X ................................................................................................................................................. 35
OPERATIONS AND MAINTENANCE MANUAL ..................................................................................... 35
APPENDIX A ............................................................................................................................................... 36
2015 D. R. STRONG Consulting Engineers Inc. 1 Avana Ridge
Technical Information Report Renton, Washington
SECTION I
PROJECT OVERVIEW:
The applicant is seeking approval to construct 74 apartment units, surface parking, and
amenities on 3.78 acres (Parcel Numbers 292305900 and 292309148) (Project). The
Project is located at 17249 Benson Road S in Renton, Washington.
PREDEVELOPED SITE CONDITIONS:
Total site area is approximately 164,828 s.f. (3.78 acres) (Site). The Parcels are
currently undeveloped and are heavily forested with moderate underbrush.
The predeveloped Site is contained within one Threshold Discharge Area (TDA). The
TDA has two Natural Discharge Areas (NDAs), NDA 1 and NDA 2. Runoff from NDA 1
discharges at the Site’s western property line (south of NDA 2) and heads north through
the conveyance system in Benson Drive S, where it meets NDA 2. NDA 2 discharges
across the western property line (north of NDA1).
Flow from both NDAs eventually crosses under Benson Road S in a westerly direction.
Runoff outlets into a ditch between parcels 2923059150 and 2923059134, flowing west.
Before reaching Cedar Ave S, flow is conveyed into a system of pipes and catch basins
and continues west along S 36th Street. Runoff is conveyed south between parcels
1441000150 and 1441000170 before moving west – parallel to S 36th Street along the
south side of the parcels. Runoff crosses under Wells Ave S and outfalls into parcel
144100TRCT – a tract for an adjacent development. Based on available topography,
runoff sheet flows west through the tract into another tract (810630TRCT). Runoff
appears to continue into a pond in parcel 8106301170. Overflow from the pond travels
southwest to Morris Ave S, where it continues south. Runoff continues south, crossing
under S 38th Ct and eventually outfalling into Panther Creek. Panther Creek flows north
and eventually becomes a tributary for Black River and the Duwamish River.
DEVELOPED SITE CONDITIONS:
The applicant is seeking approval to construct a 74-unit apartment complex on 3.78
acres (Project). The developable area (Project Area) is approximately 159,574 s.f. (3.64
acres) (excludes right-of-way dedication area and area of the identified stream from the
gross Site area). A total of 66,438 S.F. of impervious area is proposed for the Site –
which is less than 75 percent of total Site Area (123,620 S.F.). The remainder of the
Project Area will consist of residential landscaping and other pervious surfaces.
Per Section 5.2.1 of the 2009 King County Surface Water Design Manual (Manual),
projects are required to mitigate for impervious surface by use of Flow Control Best
Management Practices (BMP’s). The Project falls within the “Large Lot High
Impervious” category, as the proposed impervious is approximately 40% of the total
Site area and the total project area is larger than 22,000 SF. However, to meet the
intent of the Manual, we have analyzed the impervious surface percentage based upon
the developable area as approximately one acre of the site is encumbered by sensitive
areas. With 1.53 acres of the 2.64 acres of developable area categorized as
impervious (58%), it would be prudent to analyze the Project as “Large Lot High
2015 D. R. STRONG Consulting Engineers Inc. 2 Avana Ridge
Technical Information Report Renton, Washington
Impervious”. For projects that will result in an impervious surface coverage of more
than 45% up to 65%, flow control BMPs must be applied to an impervious area equal to
at least 20% of the Site area or 40% of the target impervious surface, whichever is less.
Projects are required to first analyze the feasibility of dispersal and infiltration before
choosing another method.
The soils investigation summarized by the project geotechnical report are confined to
the upper layers (up to 12 feet deep) of Site soils. That report indicates the presence of
glacial till not conducive to infiltration. Further investigation may be conducted to
assess infiltration capacity of deeper soils. Until further evaluation occurs, alternative
BMPs must be considered.
The presence of a stream and buffers provide an opportunity to fully disperse runoff
from a portion of the Site. In other areas, rain gardens, Native Growth Retention Credit
and dry wells are also possible Flow Control BMP’s that may be utilized. These options
will be further analyzed at the time of engineering plan review.
The Project is located within a Conservation Flow Control and Basic Water Quality
Area. However due to the fact that the Project is a multifamily development, it shall be
required to adhere to the Enhanced Water Quality Treatment criteria. Runoff will be
collected and conveyed to a wet vault at the west end of the Site. The vault will be
followed by a media filtration system to accommodate the Enhanced Water Quality
Treatment requirements. Preliminary sizing is shown on the engineering plans and final
sizing will be performed at the time of engineering plan review.
2015 D. R. STRONG Consulting Engineers Inc. 3 Avana Ridge
Technical Information Report Renton, Washington
NATURAL DRAINAGE SYSTEM FUNCTIONS:
A portion of the Natural Resource Conservation Service (NRCS) soil survey of King
County is included as Figure 4 and indicates the presence of Alderwood gravelly sandy
loam with 8 to 15 percent slopes (AgC). Per the 2009 King County Surface Water
Design Manual, this soil type is classified as “Till” material. The Natural Re Soil series
descriptions follow Figure 4.
The upstream basin area was evaluated by examining the King County topographic
map, City of Renton Mapping Application and by conducting field reconnaissance on
December 15, 2015 under overcast conditions. Upstream runoff enters the Site in two
locations.
Portions of SE 172nd St and 106th Ave SE direct upstream runoff across the northern
property line. Runoff from 106th Ave SE and the north side of SE 172nd St. enters a
Type 1 catch basin at the intersection of these two streets. An 18-inch diameter
concrete pipe conveys runoff south under SE 172nd St. and outfalls onto the Site.
Runoff from the southern portion of SE 172nd St is intercepted by a ditch along the
south side of SE 172nd St. and enters the Site where the previously mentioned 18-inch
diameter concrete pipe outlets.
Upstream runoff from the west side of Benson Rd S flows west into a ditch along the
east property line. This ditch conveys upstream runoff southwest along the east
property line until it enters a stream about halfway down the property line. This stream
conveys water through the Site. The Project proposes to construct a conveyance
system to collect runoff from these two upstream tributary areas and bypass the
infiltration facility on Site.
2015 D. R. STRONG Consulting Engineers Inc. 4 Avana Ridge
Technical Information Report Renton, Washington
FIGURE 1. TIR WORKSHEET
King County Department of Development and Environmental Services
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner: Avana Ridge, LLC
Phone: (425) 588-1147
Address: 9675 SE 36th Street, Suite 105
Mercer Island, WA 98040
Project Engineer: Toby Coenen, P.E.
Company: D. R. STRONG Consulting
Engineers Inc.
Phone: (425) 827-3063
Project Name: Avana Ridge
DDES Permit#: N/A
Location:
Township: 23 North
Range: 05 East
Section: 29
Site Address: 17249 Benson Road S
10615 SE 172nd Street
Renton, Washington
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Landuse Services
Subdivision/ Short Subd. PUD
Building Services
M/F / Commercial / SFR
Clearing and Grading
Right-of-Way
Other:
DFW HPA Shoreline
Management
COE 404 Structural
DOE Dam Safety Rockery/Vault/Wall
FEMA Floodplain ESA Section 7
COE Wetlands
Other:
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report
Drainage Review Type Full / Targeted / Large
(circle one): Site
Date (include revision December 29, 2015
dates):
Date of Final:
Site Improvement Plan (Engr. Plans)
Type Full / Targeted / Small
(circle one): Site
Date (include revision December 29, 2015
dates):
Date of Final:
Part 6 ADJUSTMENT APPROVALS
Type (circle one): Standard / Complex / Preapplication / Experimental / Blanket
Description: (include conditions in TIR Section 2)
_____________________________________________________________________________________
_____________________________________________________________________________________
____________________________________________________________________________________
Date of Approval:
2015 D. R. STRONG Consulting Engineers Inc. 5 Avana Ridge
Technical Information Report Renton, Washington
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes/ No
Start Date:
Completion Date
Describe: __________________________
___________________________________
___________________________________
___________________________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: Soos Creek
Special District Overlays: N/A
Drainage Basin: Black River, Panther Creek Sub-Basin
Stormwater Requirements: Conservation Flow Control, Enhanced WQ Treatment Menu
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/ Stream Unnamed Type Ns stream
Lake
Wetlands:
Closed Depression
Floodplain
Other
Steep Slope
Erosion Hazard
Landslide Hazard
Coal Mine Hazard (High)
Seismic Hazard
Habitat Protection
Part 10 SOILS
Soil Type
_________AGC____
_________________
_________________
Slopes
________8-15%____
_________________
_________________
Erosion Potential
Slight to Moderate
_________________
_________________
High Groundwater Table (within 5 feet) Sole Source Aquifer
other Low infiltration rate Seeps/Springs
Additional Sheets Attached
2015 D. R. STRONG Consulting Engineers Inc. 6 Avana Ridge
Technical Information Report Renton, Washington
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis
Sensitive / Critical Area
SEPA
Other
LIMITATION / SITE CONSTRAINT
None
Stream and associated buffers through Site
T/B/D
Additional Sheet attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area: Site comprised of single, unnamed TDA
(name or description)
Core Requirements (all 8 apply)
Discharge of Natural Location yes Number of Natural Discharge Locations: 2
Offsite Analysis Level: 1 / 2 / 3 dated: 12/15/2015
Flow Control Level: 1 / 2 / 3 or Exemption Number
(incl. facility summary sheet Small Site BMPS N/A
Conveyance System Spill containment located at: Detention facilities
Erosion and Sediment Control ESC Site Supervisor: T/B/D
Contact Phone: T/B/D
After Hours Phone: T/B/D
Maintenance and Operation Responsibility: Private / Public (Both)
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and Provided: Yes / No
Liability
Water Quality Type: Basic / Sens Lake / Enhanced Basic / Bog
(include facility summary sheet) or exemption No.
Landscape Management Plan: Yes / No
Special Requirements (as applicable)
Area Specific Drainage Type: CDA / SDO / MDP / BP / LMP / Shared / None
Requirements Name:
Floodplain/Floodway Delineation Type: Major / Minor / Exemption / None
100-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities Describe: N/A
Source Control Describe Landuse: Multi Family
(comm. / industrial landuse) Describe any structural controls:
covered trash storage,
Oil Control High-use Site: Yes / No
Treatment BMP:
Maintenance Agreement: Yes / No
with whom?
Other Drainage Structures
Describe: N/A
2015 D. R. STRONG Consulting Engineers Inc. 7 Avana Ridge
Technical Information Report Renton, Washington
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust control
Flow Control
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize Exposed Surfaces
Remove and Restore Temporary ESC
Facilities
Clean and Remove All Silt and Debris,
Ensure Operations of Permanent
Facilities
Flag Limits of SAO and open space
Preservation areas
Other
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch
Flow Control Type/Description Water Quality Type/Description
Detention
Infiltration
Regional
Facility
Shared Facility
Flow Control
BMPs
Other
Vault
Dispersion, Dry well
Biofiltration
Wetpool
Media Filtration
Oil Control
Spill Control
Flow Control
BMPs
Other
Wet vault
Contech StormFilter
See flow control
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other:
Cast in Place Vault
Retaining Wall
Rockery > 4’ High
Structural on Steep Slope
Other:
2015 D. R. STRONG Consulting Engineers Inc. 8 Avana Ridge
Technical Information Report Renton, Washington
Part 13 SIGNATURE OF PROFESSIONAL ENGINEER
I or a civil engineer under my supervision have visited the site. Actual site conditions
as observed were incorporated into this worksheet and the attachments. To the best
of my knowledge the information provided here is accurate.
Signed/Date
2015 D. R. STRONG Consulting Engineers Inc. 9 Avana Ridge
Technical Information Report Renton, Washington
FIGURE 2. VICINITY MAP
SITE
2015 D. R. STRONG Consulting Engineers Inc. 10 Avana Ridge
Technical Information Report Renton, Washington
FIGURE 3. DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS
GRAPHIC SCALE
0 40 80 120
1 INCH = 80 FT.
2015 D. R. STRONG Consulting Engineers Inc. 11 Avana Ridge
Technical Information Report Renton, Washington
FIGURE 4. SOILS
King County Area, Washington
AgC—Alderwood gravelly sandy loam, 8 to 15 percent slopes
Map Unit Setting
• National map unit symbol: 2t626
• Elevation: 50 to 800 feet
• Mean annual precipitation: 20 to 60 inches
• Mean annual air temperature: 46 to 52 degrees F
• Frost-free period: 160 to 240 days
• Farmland classification: Prime farmland if irrigated
Map Unit Composition
• Alderwood and similar soils: 85 percent
• Minor components: 15 percent
• Estimates are based on observations, descriptions, and transects of the mapunit.
SITE
2015 D. R. STRONG Consulting Engineers Inc. 12 Avana Ridge
Technical Information Report Renton, Washington
Description of Alderwood
Setting
• Landform: Ridges, hills
• Landform position (two-dimensional): Shoulder
• Landform position (three-dimensional): Nose slope, talf
• Down-slope shape: Linear, convex
• Across-slope shape: Convex
• Parent material: Glacial drift and/or glacial outwash over dense glaciomarine deposits
Typical profile
• A - 0 to 7 inches: gravelly sandy loam
• Bw1 - 7 to 21 inches: very gravelly sandy loam
• Bw2 - 21 to 30 inches: very gravelly sandy loam
• Bg - 30 to 35 inches: very gravelly sandy loam
• 2Cd1 - 35 to 43 inches: very gravelly sandy loam
• 2Cd2 - 43 to 59 inches: very gravelly sandy loam
Properties and qualities
• Slope: 8 to 15 percent
• Depth to restrictive feature: 20 to 39 inches to densic material
• Natural drainage class: Moderately well drained
• Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately low (0.00 to
0.06 in/hr)
• Depth to water table: About 18 to 37 inches
• Frequency of flooding: None
• Frequency of ponding: None
• Available water storage in profile: Very low (about 2.7 inches)
Interpretive groups
• Land capability classification (irrigated): None specified
• Land capability classification (nonirrigated): 4s
• Hydrologic Soil Group: B
• Other vegetative classification: Limited Depth Soils (G002XN302WA), Limited Depth Soils
(G002XS301WA), Limited Depth Soils (G002XF303WA)
Minor Components
Everett
• Percent of map unit: 5 percent
• Landform: Eskers, kames, moraines
• Landform position (two-dimensional): Shoulder, footslope
• Landform position (three-dimensional): Crest, base slope
• Down-slope shape: Convex
• Across-slope shape: Convex
Indianola
• Percent of map unit: 5 percent
• Landform: Eskers, kames, terraces
• Landform position (three-dimensional): Tread
• Down-slope shape: Linear
• Across-slope shape: Linear
2015 D. R. STRONG Consulting Engineers Inc. 13 Avana Ridge
Technical Information Report Renton, Washington
Shalcar
• Percent of map unit: 3 percent
• Landform: Depressions
• Landform position (three-dimensional): Dip
• Down-slope shape: Concave
• Across-slope shape: Concave
Norma
• Percent of map unit: 2 percent
• Landform: Depressions, drainageways
• Landform position (three-dimensional): Dip
• Down-slope shape: Concave, linear
• Across-slope shape: Concave
2015 D. R. STRONG Consulting Engineers Inc. 14 Avana Ridge
Technical Information Report Renton, Washington
SECTION II
CONDITIONS AND REQUIREMENTS SUMMARY
The Project must comply with the following Core and Special Requirements:
• C.R. #1 – Discharge at the Natural Location: Runoff from the Site will discharge at
the natural location.
• C.R. #2 – Offsite Analysis: An Offsite Analysis is included in Section III. The
Analysis describes the Site’s runoff patterns in detail.
• C.R. #3 – Flow Control: The Project is located in a Conservation Flow Control Area
and will therefore adhere to Level 2 Flow Control Standards, forested conditions. A
combined detention/wet vault will provide flow control consistent with that standard.
The Project is required to “match developed discharge durations to predeveloped
durations for the range of predeveloped discharge rates from 50% of the two-year
peak flow up to the full 50-year peak flow. Also match developed peak discharge
rates to predeveloped peak discharge rates for the 2- and the 10-year return
periods. Assum(ing) historic conditions as the predeveloped condition.” (KCSWDM,
Sec. 1.2)
Preliminary flow control calculations were conducted at this time. Final sizing will be
completed at time of final engineering.
• C.R. #4 – Conveyance System: New pipe systems and ditches/channels are
required to be designed with sufficient capacity to convey and contain (at minimum)
the 25-year peak flow, assuming developed conditions for onsite tributary areas and
existing conditions for any offsite tributary areas. Pipe system structures and
ditches/channels may overtop for runoff events that exceed the 25-year design
capacity, provided the overflow from a 100-year runoff event does not create or
aggravate a “severe flooding problem” or “severe erosion problem” as defined in
C.R. #2. Any overflow occurring onsite for runoff events up to and including the
100-year event must discharge at the natural location for the project site. In
residential subdivisions, such overflow must be contained within an onsite drainage
easement, tract, covenant or public right-of-way. The proposed conveyance system
will be analyzed using the KCBW program to determine if the proposed conveyance
system is capable of conveying the 100-year peak storm without overtopping any
structures or channels. This analysis will be performed at time of construction plan
preparation.
• C.R. #5 – Erosion and Sediment Control: The Project provides the seven minimum
ESC measures. A temporary erosion and sedimentation control plan will be
prepared at time of construction plan preparation.
• C.R. #6 – Maintenance and Operations: Maintenance of the proposed storm
drainage facilities will be the responsibility of the City. An Operation and
Maintenance Manual will be included in Section X at the time of construction plan
preparation.
2015 D. R. STRONG Consulting Engineers Inc. 15 Avana Ridge
Technical Information Report Renton, Washington
• C.R. #7 – Financial Guarantees: Prior to commencing construction, the Applicant
must post a drainage facilities restoration and site stabilization financial guarantee.
For any constructed or modified drainage facilities to be maintained and operated by
the City, the Applicant must: 1) Post a drainage defect and maintenance financial
guarantee for a period of two years, and 2) Maintain the drainage facilities during the
two-year period following posting of the drainage defect and maintenance financial
guarantee.
• C.R. #8 - The Project is located in the Enhanced Water Quality Treatment area. A
combined detention/wet vault will be followed by a StormFilter media filtration
system to meet water quality requirements.
• S.R. #1 – Other Adopted Area-Specific Requirements: Not applicable for this
Project.
• S.R. #2 – Floodplain/Floodway Delineation: Not applicable for this Project.
• S.R. #3 – Flood Protection Facilities: Not applicable for this Project.
• S.R. #4 – Source Control: The project shall comply with the 2009 Stormwater
Pollution Prevention Manual with such measures as cleaning of the storm drain
system, prohibiting illicit connections to the storm drainage system and stenciling the
site storm drains among other BMP’s.
• S.R. #5 – Oil Control: Not applicable to this project.
2015 D. R. STRONG Consulting Engineers Inc. 16 Avana Ridge
Technical Information Report Renton, Washington
SECTION III
OFF-SITE ANALYSIS
A Level One Downstream Analysis was prepared by D.R. STRONG Consulting
Engineers Inc. and is included in Appendix A.
2015 D. R. STRONG Consulting Engineers Inc. 17 Avana Ridge
Technical Information Report Renton, Washington
SECTION IV
FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
The continuous simulation model, the King County Runoff Time Series, KCRTS, was
used to analyze the pre and post developed runoff rates. Per Table 3.2.2.b of the
Manual, the soil type is modeled as “Till” for the Alderwood gravelly sandy loam SCS
classification as shown in Figure 4. Soils. Results of the KCRTS analysis are included
in this section.
EXISTING SITE HYDROLOGY
Modeling input
Hourly
Time Series Predev.tsf
Impervious 0.035
Till Grass 0.000
Pre-Developed Conditions
2.905
Till Forest 2.870
Wetland 0.000
Time Step:
Scale Factor: 1.000
Rainfall Gage Seatac
Total Area:
Land cover Acres
Data Type: Reduced
Modeling results
Flow Frequency Analysis
Time Series File:predev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.186 2 2/09/01 18:00 0.245 1 100.00 0.990
0.054 7 1/05/02 16:00 0.186 2 25.00 0.960
0.143 4 2/28/03 3:00 0.145 3 10.00 0.900
0.009 8 8/26/04 2:00 0.143 4 5.00 0.800
0.085 6 1/05/05 8:00 0.125 5 3.00 0.667
0.145 3 1/18/06 20:00 0.085 6 2.00 0.500
0.125 5 11/24/06 4:00 0.054 7 1.30 0.231
0.245 1 1/09/08 9:00 0.009 8 1.10 0.091
Computed Peaks 0.225 50.00 0.980
2015 D. R. STRONG Consulting Engineers Inc. 18 Avana Ridge
Technical Information Report Renton, Washington
FIGURE 5. PREDEVELOPMENT AREA MAP
GRAPHIC SCALE040801201 INCH = 80 FT.
2015 D. R. STRONG Consulting Engineers Inc. 19 Avana Ridge
Technical Information Report Renton, Washington
DEVELOPED SITE HYDROLOGY
Soil type
The soil types are unchanged from pre-developed conditions.
Land covers
KCRTS was used to model the developed peak runoff from the Site. The portions of
the Site within the proposed clearing limits tributary to the proposed detention vault
were modeled as “Till Grass” and Impervious as appropriate. Results of the KCRTS
analysis are included in this section.
Modeling input
Time Step: Hourly
Time Series Rdin.tsf
Impervious 1.861
2.550
Till Grass 0.689
Wetland 0.000
Till Forest 0.000
Reduced
Post-Developed Conditions
Scale Factor: 1.000
Rainfall Gage Seatac
Total Area:
Land cover Acres
Data Type:
Modeling results
Flow Frequency Analysis
Time Series File:rdin.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.513 6 2/09/01 2:00 1.03 1 100.00 0.990
0.429 8 1/05/02 16:00 0.693 2 25.00 0.960
0.614 3 2/27/03 7:00 0.614 3 10.00 0.900
0.476 7 8/26/04 2:00 0.571 4 5.00 0.800
0.571 4 10/28/04 16:00 0.546 5 3.00 0.667
0.546 5 1/18/06 16:00 0.513 6 2.00 0.500
0.693 2 10/26/06 0:00 0.476 7 1.30 0.231
1.03 1 1/09/08 6:00 0.429 8 1.10 0.091
Computed Peaks 0.915 50.00 0.980
2015 D. R. STRONG Consulting Engineers Inc. 20 Avana Ridge
Technical Information Report Renton, Washington
BYPASS AREA HYDROLOGY
Modeling input
0.355
Impervious 0.000
Data Type: Reduced
Wetland 0.000
Till Grass 0.355
Bypass Area
Time Step: Hourly
Scale Factor: 1.000
Rainfall Gage Seatac
Time Series Bypass.tsf
Total Area:
Till Forest 0.000
Land cover Acres
Modeling results
Flow Frequency Analysis
Time Series File:bypass.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.032 4 2/09/01 2:00 0.075 1 100.00 0.990
0.016 7 1/05/02 16:00 0.040 2 25.00 0.960
0.040 2 2/27/03 7:00 0.032 3 10.00 0.900
0.007 8 3/24/04 19:00 0.032 4 5.00 0.800
0.017 6 1/05/05 8:00 0.029 5 3.00 0.667
0.032 3 1/18/06 16:00 0.017 6 2.00 0.500
0.029 5 11/24/06 3:00 0.016 7 1.30 0.231
0.075 1 1/09/08 6:00 0.007 8 1.10 0.091
Computed Peaks 0.063 50.00 0.980
2015 D. R. STRONG Consulting Engineers Inc. 21 Avana Ridge
Technical Information Report Renton, Washington
FIGURE 6. POST DEVELOPMENT AREA MAP
XX XGRAPHIC SCALE040801201 INCH = 80 FT.
2015 D. R. STRONG Consulting Engineers Inc. 22 Avana Ridge
Technical Information Report Renton, Washington
PERFORMANCE STANDARDS
The Project is located in a Conservation Flow Control Area and will therefore adhere to
Level 2 Flow Control Standards, forested conditions. A detention vault will provide flow
control as required. The Project is required to “match developed discharge durations to
predeveloped durations for the range of predeveloped discharge rates from 50% of the
two-year peak flow up to the full 50-year peak flow. Also match developed peak
discharge rates to predeveloped peak discharge rates for the 2 and the 10 year return
periods. Assum(ing) historic conditions as the predeveloped condition.” (KCSWDM,
Sec. 1.2).
FLOW CONTROL SYSTEM
Retention/Detention Facility
Type of Facility: Detention Vault
Facility Length: 158.00 ft
Facility Width: 30.00 ft
Facility Area: 4740. sq. ft
Effective Storage Depth: 8.00 ft
Stage 0 Elevation: 352.00 ft
Storage Volume: 37920. cu. ft
Riser Head: 8.00 ft
Riser Diameter: 18.00 inches
Number of orifices: 2
Full Head Pipe
Orifice # Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 0.75 0.043
2 5.50 1.60 0.110 4.0
Top Notch Weir: None
Outflow Rating Curve: None
Stage Elevation Storage Discharge Percolation
(ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs)
0.00 352.00 0. 0.000 0.000 0.00
0.01 352.01 47. 0.001 0.001 0.00
0.02 352.02 95. 0.002 0.002 0.00
0.03 352.03 142. 0.003 0.003 0.00
0.04 352.04 190. 0.004 0.003 0.00
0.05 352.05 237. 0.005 0.004 0.00
0.06 352.06 284. 0.007 0.004 0.00
0.20 352.20 948. 0.022 0.007 0.00
0.33 352.33 1564. 0.036 0.009 0.00
0.47 352.47 2228. 0.051 0.010 0.00
0.60 352.60 2844. 0.065 0.012 0.00
0.74 352.74 3508. 0.081 0.013 0.00
0.88 352.88 4171. 0.096 0.014 0.00
1.01 353.01 4787. 0.110 0.015 0.00
1.15 353.15 5451. 0.125 0.016 0.00
1.28 353.28 6067. 0.139 0.017 0.00
1.42 353.42 6731. 0.155 0.018 0.00
1.55 353.55 7347. 0.169 0.019 0.00
1.69 353.69 8011. 0.184 0.020 0.00
1.83 353.83 8674. 0.199 0.021 0.00
2015 D. R. STRONG Consulting Engineers Inc. 23 Avana Ridge
Technical Information Report Renton, Washington
1.96 353.96 9290. 0.213 0.021 0.00
2.10 354.10 9954. 0.229 0.022 0.00
2.23 354.23 10570. 0.243 0.023 0.00
2.37 354.37 11234. 0.258 0.023 0.00
2.50 354.50 11850. 0.272 0.024 0.00
2.64 354.64 12514. 0.287 0.025 0.00
2.77 354.77 13130. 0.301 0.025 0.00
2.91 354.91 13793. 0.317 0.026 0.00
3.05 355.05 14457. 0.332 0.027 0.00
3.18 355.18 15073. 0.346 0.027 0.00
3.32 355.32 15737. 0.361 0.028 0.00
3.45 355.45 16353. 0.375 0.028 0.00
3.59 355.59 17017. 0.391 0.029 0.00
3.72 355.72 17633. 0.405 0.029 0.00
3.86 355.86 18296. 0.420 0.030 0.00
3.99 355.99 18913. 0.434 0.030 0.00
4.13 356.13 19576. 0.449 0.031 0.00
4.27 356.27 20240. 0.465 0.032 0.00
4.40 356.40 20856. 0.479 0.032 0.00
4.54 356.54 21520. 0.494 0.032 0.00
4.67 356.67 22136. 0.508 0.033 0.00
4.81 356.81 22799. 0.523 0.033 0.00
4.94 356.94 23416. 0.538 0.034 0.00
5.08 357.08 24079. 0.553 0.034 0.00
5.22 357.22 24743. 0.568 0.035 0.00
5.35 357.35 25359. 0.582 0.035 0.00
5.49 357.49 26023. 0.597 0.036 0.00
5.50 357.50 26070. 0.598 0.036 0.00
5.52 357.52 26165. 0.601 0.036 0.00
5.53 357.53 26212. 0.602 0.038 0.00
5.55 357.55 26307. 0.604 0.041 0.00
5.57 357.57 26402. 0.606 0.044 0.00
5.58 357.58 26449. 0.607 0.049 0.00
5.60 357.60 26544. 0.609 0.055 0.00
5.62 357.62 26639. 0.612 0.060 0.00
5.63 357.63 26686. 0.613 0.062 0.00
5.77 357.77 27350. 0.628 0.073 0.00
5.90 357.90 27966. 0.642 0.081 0.00
6.04 358.04 28630. 0.657 0.089 0.00
6.18 358.18 29293. 0.672 0.095 0.00
6.31 358.31 29909. 0.687 0.101 0.00
6.45 358.45 30573. 0.702 0.106 0.00
6.58 358.58 31189. 0.716 0.111 0.00
6.72 358.72 31853. 0.731 0.116 0.00
6.85 358.85 32469. 0.745 0.121 0.00
6.99 358.99 33133. 0.761 0.125 0.00
7.12 359.12 33749. 0.775 0.129 0.00
7.26 359.26 34412. 0.790 0.133 0.00
7.40 359.40 35076. 0.805 0.137 0.00
7.53 359.53 35692. 0.819 0.141 0.00
7.67 359.67 36356. 0.835 0.144 0.00
7.80 359.80 36972. 0.849 0.148 0.00
7.94 359.94 37636. 0.864 0.151 0.00
8.00 360.00 37920. 0.871 0.153 0.00
8.10 360.10 38394. 0.881 0.617 0.00
8.20 360.20 38868. 0.892 1.460 0.00
2015 D. R. STRONG Consulting Engineers Inc. 24 Avana Ridge
Technical Information Report Renton, Washington
8.30 360.30 39342. 0.903 2.560 0.00
8.40 360.40 39816. 0.914 3.860 0.00
8.50 360.50 40290. 0.925 5.330 0.00
8.60 360.60 40764. 0.936 6.760 0.00
8.70 360.70 41238. 0.947 7.290 0.00
8.80 360.80 41712. 0.958 7.780 0.00
8.90 360.90 42186. 0.968 8.250 0.00
9.00 361.00 42660. 0.979 8.690 0.00
9.10 361.10 43134. 0.990 9.100 0.00
9.20 361.20 43608. 1.001 9.500 0.00
9.30 361.30 44082. 1.012 9.880 0.00
9.40 361.40 44556. 1.023 10.250 0.00
9.50 361.50 45030. 1.034 10.610 0.00
9.60 361.60 45504. 1.045 10.950 0.00
9.70 361.70 45978. 1.056 11.280 0.00
9.80 361.80 46452. 1.066 11.610 0.00
9.90 361.90 46926. 1.077 11.920 0.00
Hyd Inflow Outflow Peak Storage
Stage Elev (Cu-Ft) (Ac-Ft)
1 1.03 0.30 8.03 360.03 38073. 0.874
2 0.51 0.15 7.72 359.72 36616. 0.841
3 0.61 0.13 7.04 359.04 33377. 0.766
4 0.69 0.11 6.60 358.60 31304. 0.719
5 0.55 0.04 5.43 357.43 25738. 0.591
6 0.37 0.03 4.73 356.73 22443. 0.515
7 0.43 0.03 4.70 356.70 22287. 0.512
8 0.48 0.03 3.13 355.13 14830. 0.340
Hyd R/D Facility Tributary Reservoir POC Outflow
Outflow Inflow Inflow Target Calc
1 0.30 0.08 ******** ******* 0.33
2 0.15 0.03 ******** 0.19 0.17
3 0.13 0.04 ******** ******* 0.14
4 0.11 0.03 ******** ******* 0.13
5 0.04 0.03 ******** ******* 0.06
6 0.03 0.02 ******** ******* 0.05
7 0.03 0.02 ******** ******* 0.04
8 0.03 0.01 ******** ******* 0.03
----------------------------------
Route Time Series through Facility
Inflow Time Series File:rdin.tsf
Outflow Time Series File:rdout
POC Time Series File:dsout
Inflow/Outflow Analysis
Peak Inflow Discharge: 1.03 CFS at 6:00 on Jan 9 in Year 8
Peak Outflow Discharge: 0.303 CFS at 11:00 on Jan 9 in Year 8
Peak Reservoir Stage: 8.03 Ft
Peak Reservoir Elev: 360.03 Ft
Peak Reservoir Storage: 38073. Cu-Ft
: 0.874 Ac-Ft
Add Time Series:bypass.tsf
Peak Summed Discharge: 0.326 CFS at 11:00 on Jan 9 in Year 8
2015 D. R. STRONG Consulting Engineers Inc. 25 Avana Ridge
Technical Information Report Renton, Washington
Point of Compliance File:dsout.tsf
Flow Frequency Analysis
Time Series File:rdout.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) (ft) Period
0.146 2 2/09/01 20:00 0.303 8.03 1 100.00 0.990
0.033 7 1/07/02 4:00 0.146 7.73 2 25.00 0.960
0.127 3 3/06/03 22:00 0.127 7.04 3 10.00 0.900
0.027 8 8/26/04 8:00 0.112 6.60 4 5.00 0.800
0.033 6 1/08/05 5:00 0.036 5.43 5 3.00 0.667
0.036 5 1/19/06 5:00 0.033 4.74 6 2.00 0.500
0.112 4 11/24/06 8:00 0.033 4.70 7 1.30 0.231
0.303 1 1/09/08 11:00 0.027 3.13 8 1.10 0.091
Computed Peaks 0.251 8.02 50.00 0.980
Flow Frequency Analysis
Time Series File:dsout.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.170 2 2/09/01 20:00 0.326 1 100.00 0.990
0.044 7 1/05/02 16:00 0.170 2 25.00 0.960
0.144 3 3/06/03 22:00 0.144 3 10.00 0.900
0.031 8 8/26/04 2:00 0.132 4 5.00 0.800
0.046 6 1/05/05 8:00 0.062 5 3.00 0.667
0.062 5 1/18/06 16:00 0.046 6 2.00 0.500
0.132 4 11/24/06 7:00 0.044 7 1.30 0.231
0.326 1 1/09/08 11:00 0.031 8 1.10 0.091
Computed Peaks 0.274 50.00 0.980
Flow Duration from Time Series File:rdout.tsf
Cutoff Count Frequency CDF Exceedence_Probability
CFS % % %
0.002 27332 44.573 44.573 55.427 0.554E+00
0.006 6675 10.886 55.458 44.542 0.445E+00
0.010 7340 11.970 67.428 32.572 0.326E+00
0.014 5847 9.535 76.963 23.037 0.230E+00
0.018 4961 8.090 85.054 14.946 0.149E+00
0.023 3595 5.863 90.917 9.083 0.908E-01
0.027 2060 3.359 94.276 5.724 0.572E-01
0.031 2038 3.324 97.599 2.401 0.240E-01
0.035 1022 1.667 99.266 0.734 0.734E-02
0.039 232 0.378 99.644 0.356 0.356E-02
0.043 12 0.020 99.664 0.336 0.336E-02
0.047 5 0.008 99.672 0.328 0.328E-02
0.051 5 0.008 99.680 0.320 0.320E-02
0.055 7 0.011 99.692 0.308 0.308E-02
0.059 7 0.011 99.703 0.297 0.297E-02
0.063 10 0.016 99.720 0.280 0.280E-02
0.067 17 0.028 99.747 0.253 0.253E-02
0.072 23 0.038 99.785 0.215 0.215E-02
0.076 10 0.016 99.801 0.199 0.199E-02
2015 D. R. STRONG Consulting Engineers Inc. 26 Avana Ridge
Technical Information Report Renton, Washington
0.080 11 0.018 99.819 0.181 0.181E-02
0.084 6 0.010 99.829 0.171 0.171E-02
0.088 5 0.008 99.837 0.163 0.163E-02
0.092 7 0.011 99.848 0.152 0.152E-02
0.096 9 0.015 99.863 0.137 0.137E-02
0.100 8 0.013 99.876 0.124 0.124E-02
0.104 11 0.018 99.894 0.106 0.106E-02
0.108 7 0.011 99.905 0.095 0.946E-03
0.112 11 0.018 99.923 0.077 0.766E-03
0.116 7 0.011 99.935 0.065 0.652E-03
0.120 9 0.015 99.949 0.051 0.506E-03
0.125 10 0.016 99.966 0.034 0.342E-03
0.129 5 0.008 99.974 0.026 0.261E-03
0.133 3 0.005 99.979 0.021 0.212E-03
0.137 3 0.005 99.984 0.016 0.163E-03
0.141 3 0.005 99.989 0.011 0.114E-03
0.145 5 0.008 99.997 0.003 0.326E-04
Flow Duration from Time Series File:dsout.tsf
Cutoff Count Frequency CDF Exceedence_Probability
CFS % % %
0.002 27637 45.070 45.070 54.930 0.549E+00
0.007 7531 12.281 57.352 42.648 0.426E+00
0.012 7290 11.888 69.240 30.760 0.308E+00
0.017 6628 10.809 80.049 19.951 0.200E+00
0.021 4370 7.127 87.175 12.825 0.128E+00
0.026 3365 5.488 92.663 7.337 0.734E-01
0.031 1978 3.226 95.889 4.111 0.411E-01
0.036 1259 2.053 97.942 2.058 0.206E-01
0.041 738 1.204 99.145 0.855 0.855E-02
0.045 229 0.373 99.519 0.481 0.481E-02
0.050 44 0.072 99.591 0.409 0.409E-02
0.055 38 0.062 99.653 0.347 0.347E-02
0.060 8 0.013 99.666 0.334 0.334E-02
0.064 16 0.026 99.692 0.308 0.308E-02
0.069 12 0.020 99.711 0.289 0.289E-02
0.074 15 0.024 99.736 0.264 0.264E-02
0.079 14 0.023 99.759 0.241 0.241E-02
0.083 17 0.028 99.786 0.214 0.214E-02
0.088 8 0.013 99.799 0.201 0.201E-02
0.093 12 0.020 99.819 0.181 0.181E-02
0.098 7 0.011 99.830 0.170 0.170E-02
0.102 7 0.011 99.842 0.158 0.158E-02
0.107 8 0.013 99.855 0.145 0.145E-02
0.112 6 0.010 99.865 0.135 0.135E-02
0.117 10 0.016 99.881 0.119 0.119E-02
0.122 10 0.016 99.897 0.103 0.103E-02
0.126 6 0.010 99.907 0.093 0.930E-03
0.131 11 0.018 99.925 0.075 0.750E-03
0.136 10 0.016 99.941 0.059 0.587E-03
0.141 10 0.016 99.958 0.042 0.424E-03
0.145 8 0.013 99.971 0.029 0.294E-03
0.150 2 0.003 99.974 0.026 0.261E-03
0.155 3 0.005 99.979 0.021 0.212E-03
0.160 4 0.007 99.985 0.015 0.147E-03
0.164 3 0.005 99.990 0.010 0.978E-04
2015 D. R. STRONG Consulting Engineers Inc. 27 Avana Ridge
Technical Information Report Renton, Washington
0.169 3 0.005 99.995 0.005 0.489E-04
Duration Comparison Anaylsis
Base File: predev.tsf
New File: dsout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time----- ---------Check of Tolerance-------
Cutoff Base New %Change Probability Base New %Change
0.043 | 0.88E-02 0.64E-02 -27.2 | 0.88E-02 0.043 0.040 -5.2
0.054 | 0.61E-02 0.36E-02 -40.9 | 0.61E-02 0.054 0.043 -20.2
0.065 | 0.47E-02 0.31E-02 -34.6 | 0.47E-02 0.065 0.046 -29.5
0.076 | 0.36E-02 0.26E-02 -29.0 | 0.36E-02 0.076 0.054 -29.2
0.087 | 0.27E-02 0.20E-02 -25.1 | 0.27E-02 0.087 0.073 -15.9
0.098 | 0.21E-02 0.17E-02 -17.5 | 0.21E-02 0.098 0.086 -11.7
0.109 | 0.14E-02 0.14E-02 2.4 | 0.14E-02 0.109 0.111 1.9
0.120 | 0.99E-03 0.11E-02 8.2 | 0.99E-03 0.120 0.122 2.2
0.131 | 0.60E-03 0.75E-03 24.3 | 0.60E-03 0.131 0.135 3.4
0.142 | 0.34E-03 0.39E-03 14.3 | 0.34E-03 0.142 0.143 0.5
0.153 | 0.20E-03 0.24E-03 25.0 | 0.20E-03 0.153 0.159 3.6
0.164 | 0.15E-03 0.98E-04 -33.3 | 0.15E-03 0.164 0.161 -1.7
0.175 | 0.82E-04 0.00E+00 -100.0 | 0.82E-04 0.175 0.167 -4.7
0.186 | 0.16E-04 0.00E+00 -100.0 | 0.16E-04 0.186 0.170 -8.7
Maximum positive excursion = 0.006 cfs ( 5.2%)
occurring at 0.121 cfs on the Base Data:predev.tsf
and at 0.127 cfs on the New Data:dsout.tsf
Maximum negative excursion = 0.020 cfs (-29.9%)
occurring at 0.067 cfs on the Base Data:predev.tsf
and at 0.047 cfs on the New Data:dsout.tsf
Water Quality Treatment
The Project is located in the Enhanced Water Quality Treatment area. A wet vault
followed by a media filtration system will be utilized.
Rainfall (R) of the mean annual storm =0.52 in. From KCSWDM Fig. 6.4.1.A
Area of impervious surface (Ai) =81,054 s.f.
Area of till soil covered with till grass (Atg) =30,026 s.f.
Area of till soil covered with till forest (Atf) =0 s.f.
Area of outwash soil covered with grass or forest (Ao) =0 s.f.
Volume factor (f) =3 N/A From KCSWDM Sec. 6.4.1.1
Calculations Units Notes
Volume of runoff from mean annual storm (Vr) =3486 c.f. =(0.9Ai + 0.25Atg + 0.10Atf + 0.01Ao) * R/12
Minimum Wetpool volume required (Vb) =10,459 c.f. =f * Vr
A 72” Stormfilter manhole will be installed downstream of the detention facility with 6
ZPG cartridges.
2015 D. R. STRONG Consulting Engineers Inc. 28 Avana Ridge
Technical Information Report Renton, Washington
FIGURE 7. DETENTION & WATER QUALITY FACILITY DETAILS
To be completed at time of final engineering
2015 D. R. STRONG Consulting Engineers Inc. 29 Avana Ridge
Technical Information Report Renton, Washington
SECTION V
CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Per Core Requirement, #4 of the KCSWDM, the conveyance system must be analyzed
and designed for existing tributary and developed onsite runoff from the proposed
project. Pipe systems shall be designed to convey the 100-year design storm. The
Rational Method will be used to calculate the Q-Ratio for each pipe node.
A conveyance system consisting primarily of pipes and catch basins will be designed
for the Project. Onsite runoff from PGIS will be collected by the multiple catch basins.
Pipes are typically twelve-inch diameter LCPE material.
A backwater analysis will be provided at time of final engineering.
2015 D. R. STRONG Consulting Engineers Inc. 30 Avana Ridge
Technical Information Report Renton, Washington
SECTION VI
SPECIAL REPORTS AND STUDIES
A number of reports have been prepared for the project as well as an earlier
development proposal (Springbrook Ridge) on this parcel. These include:
• Geological Engineering Services, Coal Mine Hazard Assessment, Cugini
Property; Icicle Creek Engineers, Inc.; June 24, 1999.
• Geological Engineering Services, Coal Mine Hazard Assessment, Cugini
Property – Northwest Parcel; Icicle Creek Engineers, Inc.; March 22, 2004.
• Geological Engineering Services, Proposed Property Development, Springbrook
Ridge; Icicle Creek Engineers, Inc.; January 26, 2009.
• Cugini Property wetland and stream delineation study – TWC Ref# 080109, The
Watershed Company, January 25, 2009.
• Environmental Checklist, Springbrook Ridge PUD; Century Pacific, LP;
February 4, 2009.
• Geotechnical Engineering Study – Avana Ridge Apartments; Earth Solutions
NW, LLC; December 21, 2015.
• Tree Inspection, Avana Ridge PPUD, Parcel Numbers 292305-9148, -9009,
Renton, WA; Greenforest Incorporated; December 16, 2015
• Wetland and Supplemental Stream Study – Avana Ridge PUD; Sewall Wetland
Consulting, Inc.; December 22, 2015.
• Habitat Data Report – Avana Ridge; Sewall Wetland Consulting, Inc.; December
22, 2015.
• Avana Ridge Apartments, Traffic Impact Analysis; TraffEx; December 21, 2015.
2015 D. R. STRONG Consulting Engineers Inc. 31 Avana Ridge
Technical Information Report Renton, Washington
SECTION VII
OTHER PERMITS, VARIANCES AND ADJUSTMENTS
No other permits have been required as part of this development, as of the date of this
report.
2015 D. R. STRONG Consulting Engineers Inc. 32 Avana Ridge
Technical Information Report Renton, Washington
SECTION VIII
ESC AND CSWPPP ANALYSIS AND DESIGN
The Erosion and Sedimentation Control Design meets the seven minimum King County
requirements:
1. Areas to remain undisturbed shall be delineated with a high visibility plastic fence
prior to any site clearing or grading.
2. Site disturbed areas shall be covered with mulch and seeded, as appropriate, for
temporary or permanent measures.
3. Perimeter protection shall consist of a silt fence down slope of any disturbed areas
or stockpiles.
4. A stabilized construction entrance will be located at the point of ingress/egress (i.e.
onsite access road).
5. A sediment pond will be utilized for sediment retention (see calculations below).
Perimeter silt fences will provide sediment retention within the bypass areas.
6. Surface water from disturbed areas will sheet flow to the sediment pond for
treatment.
7. Dust control shall be provided by spraying exposed soils with water until wet. This is
required when exposed soils are dry to the point that wind transport is possible
which would impact roadways, drainage ways, surface waters, or neighboring
residences.
The complete CSWPPP will be completed and submitted at time of final engineering.
2015 D. R. STRONG Consulting Engineers Inc. 33 Avana Ridge
Technical Information Report Renton, Washington
SECTION IX
BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
1. Bond Quantity Worksheet – will be submitted at time of final engineering.
2. Facility Summary – will be submitted at time of final engineering.
2015 D. R. STRONG Consulting Engineers Inc. 34 Avana Ridge
Technical Information Report Renton, Washington
STORMWATER FACILITY SUMMARY SHEET
Number 1 (Detention Vault)
(provide one Stormwater Facility Summary Sheet per Natural Discharge Location)
Overview:
Avana Ridge December 29, 2015
Project Name Date
Downstream Drainage Basins
Black River Panther Creek
Major Basin Name Minor Basin Name
Flow Control:
Detention Vault Private Parking Lot
Flow Control Facility Name/Number Facility Location
If none,
Flow control provided in regional/shared facility (give location) N/A
No flow control required Exemption number
General Facility Information:
Type/Number of detention facilities Type/Number of infiltration facilities:
Ponds Ponds
1 Vaults Tanks
Tanks Trenches
Control Structure Location Located inside proposed vault
Type of Control Structure FROP-T Number of Orifices/Restrictions 2
Size of Orifice/Restriction: No. 1 0.75” No. 2 1.60”
No. 3 No. 4
Flow Control Performance Standard: Level 2
Live Storage Volume 37,920 cf Depth 8 feet
Volume Factor of Safety 1.0
Number of Acres Served 2.55 Number of Lots N/A
Dam Safety Regulations (Washington State Department of Ecology)
Reservoir Volume above natural grade N/A
Depth of Reservoir above natural grade N/A
Facility Summary Sheet Sketch
All detention, infiltration and water quality facilities must include a detailed sketch.
2015 D. R. STRONG Consulting Engineers Inc. 35 Avana Ridge
Technical Information Report Renton, Washington
SECTION X
OPERATIONS AND MAINTENANCE MANUAL
To be completed at time of final engineering
2015 D. R. STRONG Consulting Engineers Inc. 36 Avana Ridge
Technical Information Report Renton, Washington
APPENDIX A
____________________________________________________________________________
LEVEL ONE DOWNSTREAM ANALYSIS
AVANA RIDGE
17249 Benson Road S and 10615 SE 172nd Street Renton, Washington
____________________________________________________________________________
DRS Project No. 15088
City Of Renton File No. XXXX
Owner/Applicant
Avana Ridge, LLC
9675 SE 36th Street, Suite 105
Mercer Island, Washington 98040
Report Prepared by
D. R. STRONG Consulting Engineers, Inc.
620 7th Avenue
Kirkland, WA 98033
(425) 827-3063
Report Issue Date
December 28, 2015
2015 D. R. STRONG Consulting Engineers Inc. Avana Ridge
Level One Downstream Analysis Renton, Washington
AVANA RIDGE
LEVEL ONE DOWNSTREAM ANALYSIS
DISCLAIMER: ........................................................................................................................... 1
TASK 1: DEFINE AND MAP STUDY AREA ........................................................................ 1
TASK 2: RESOURCE REVIEW ............................................................................................. 1
FIGURE 1. Vicinity Map................................................................................. 2
FIGURE 2: Site Map ....................................................................................... 3
FIGURE 3. King County iMap Topography .............................................. 4
FIGURE 4. King County Sensitive Area Map .......................................... 5
FIGURE 5. City of Renton Erosion Hazards Map ................................... 6
FIGURE 6. City of Renton Landslide Hazards Map ............................... 7
FIGURE 7. City of Renton Coal Mine Hazards Map ............................... 8
FIGURE 8. City of Renton Steep Slopes .................................................. 9
FIGURE 9. City of Renton Flood Hazard ................................................ 10
FIGURE 10. City of Renton Seismic Hazards ....................................... 11
FIGURE 11. City of Renton Liquefaction Hazards ............................... 12
FIGURE 12. City of Renton Aquifer Protection Zones........................ 13
FIGURE 13. USDA King County Soils Survey Map ............................. 14
FIGURE 14. FEMA Map ............................................................................... 17
TASK 3: FIELD INSPECTION ............................................................................................. 18
Upstream Tributary Area ........................................................................................... 18
General Onsite and Offsite Drainage Description ................................................ 18
TASK 4: DRAINAGE SYSTEM DESCRIPTION AND PROBLEM
DESCRIPTIONS ........................................................................................................ 18
Drainage System Description ................................................................................... 18
TASK 5: MITIGATION OF EXISTING OR POTENTIAL PROBLEMS .......................... 20
APPENDIX A. OFFSITE ANALYSIS DRAINAGE SYSTEM TABLE &
DOWNSTREAM MAP ............................................................................................... 21
2015 D. R. STRONG Consulting Engineers Inc 1 Avana Ridge
Level One Downstream Analysis Renton, Washington
LEVEL ONE DOWNSTREAM ANALYSIS
DISCLAIMER:
THIS REPORT WAS PREPARED AT THE REQUEST OF PNW HOLDINGS, LLC FOR
THE 3.78 ACRE PARCELS KNOWN AS A PORTION OF THE SOUTHEAST
QUARTER OF SECTION 29, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., IN
KING COUNTY, TAX PARCEL NUMBERS 292305900 AND 292309148 (SITE). D. R.
STRONG CONSULTING ENGINEERS INC. (DRS) HAS PREPARED THIS REPORT
FOR THE EXCLUSIVE USE OF DRS, THE OWNER, AND THEIR AGENTS, FOR
SPECIFIC APPLICATION TO THE DEVELOPMENT PROJECT AS DESCRIBED
HEREIN. USE OR RELIANCE ON THIS REPORT, OR ANY OF ITS CONTENTS FOR
ANY REVISIONS OF THIS PROJECT, OR ANY OTHER PROJECT, OR BY OTHERS
NOT DESCRIBED ABOVE, IS FORBIDDEN WITHOUT THE EXPRESSED
PERMISSION BY DRS.
TASK 1: DEFINE AND MAP STUDY AREA
This Offsite Analysis was prepared in accordance with Core Requirement #2, Section
1.2.2 of the 2009 King County Surface Water Design Manual and Section 2.3 of the
2010 City of Renton Amendments to the King County Surface Water Design Manual
(Manual). The Site is located at 17249 Benson Road S and 10615 SE 172nd Street
Renton, Washington. The Project is the development of two parcels into a 74 unit
apartment complex.
See Figures 1, 2 and 3 for maps of the study area.
TASK 2: RESOURCE REVIEW
Adopted Basin Plans: None at this time
Finalized Drainage Studies: None available
Basin Reconnaissance Summary Reports: The Green-Duwamish and Puget Sound
Water Resource Inventory Area 9 Habitat Limiting Factors And Reconnaissance
Assessment Report is available for the Basin.
Floodplain/Floodway (FEMA) Map: No floodplains exist on site, See Figure 14
Other Offsite Analysis Reports: Technical Information Report (TIR) for Fieldbrook
Commons, dated December 2nd, 2013 by D.R. Strong Consulting Engineers
Sensitive Areas Map: See Figures 4-12
DNRP Drainage Complaints and Studies: Per King County Water and Land
Resources Division, there are no complaints within the downstream path, 1 mile
from the Site within the last 10 years.
USDA King County Soils Survey: See Figure 13
Wetlands Inventory: Vol. 2 East (1990) – The wetland inventory revealed no
additional wetlands within one mile along the downstream path, see Appendix C.
Migrating River Studies: None Applicable
King County Designated Water Quality Problems: None at this time
2015 D. R. STRONG Consulting Engineers Inc 2 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 1 - Vicinity Map
SITE
2015 D. R. STRONG Consulting Engineers Inc 3 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 2 - Site Map
GRAPHIC SCALE
0 40 80 120
1 INCH = 80 FT.
2015 D. R. STRONG Consulting Engineers Inc 4 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 3 - King County iMap Topography
SITE
2015 D. R. STRONG Consulting Engineers Inc 5 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 4 - King County Sensitive Area Map
SITE
2015 D. R. STRONG Consulting Engineers Inc 6 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 5 - City of Renton Erosion Hazards Map
NTS
SITE
2015 D. R. STRONG Consulting Engineers Inc 7 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 6 - City of Renton Landslide Hazards Map
NTS
SITE
2015 D. R. STRONG Consulting Engineers Inc 8 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 7 - City of Renton Coal Mine Hazards Map
NTS
SITE
2015 D. R. STRONG Consulting Engineers Inc 9 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 8 - City of Renton Steep Slopes
NTS
SITE
2015 D. R. STRONG Consulting Engineers Inc 10 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 9 - City of Renton Flood Hazard
NTS
SITE
2015 D. R. STRONG Consulting Engineers Inc 11 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 10 - City of Renton Seismic Hazards
NTS
SITE
2015 D. R. STRONG Consulting Engineers Inc 12 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 11 - City of Renton Liquefaction Hazards
NTS
SITE
2015 D. R. STRONG Consulting Engineers Inc 13 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 12 - City of Renton Aquifer Protection Zones
NTS
SITE
2015 D. R. STRONG Consulting Engineers Inc 14 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 13 - USDA King County Soils Survey Map
King County Area, Washington
AgC—Alderwood gravelly sandy loam, 8 to 15 percent slopes
Map Unit Setting
National map unit symbol: 2t626
Elevation: 50 to 800 feet
Mean annual precipitation: 20 to 60 inches
Mean annual air temperature: 46 to 52 degrees F
Frost-free period: 160 to 240 days
Farmland classification: Prime farmland if irrigated
Map Unit Composition
Alderwood and similar soils: 85 percent
Minor components: 15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Alderwood
SITE
2015 D. R. STRONG Consulting Engineers Inc 15 Avana Ridge
Level One Downstream Analysis Renton, Washington
Setting
Landform: Ridges, hills
Landform position (two-dimensional): Shoulder
Landform position (three-dimensional): Nose slope, talf
Down-slope shape: Linear, convex
Across-slope shape: Convex
Parent material: Glacial drift and/or glacial outwash over dense glaciomarine deposits
Typical profile
A - 0 to 7 inches: gravelly sandy loam
Bw1 - 7 to 21 inches: very gravelly sandy loam
Bw2 - 21 to 30 inches: very gravelly sandy loam
Bg - 30 to 35 inches: very gravelly sandy loam
2Cd1 - 35 to 43 inches: very gravelly sandy loam
2Cd2 - 43 to 59 inches: very gravelly sandy loam
Properties and qualities
Slope: 8 to 15 percent
Depth to restrictive feature: 20 to 39 inches to densic material
Natural drainage class: Moderately well drained
Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately low (0.00 to
0.06 in/hr)
Depth to water table: About 18 to 37 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Very low (about 2.7 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4s
Hydrologic Soil Group: B
Other vegetative classification: Limited Depth Soils (G002XN302WA), Limited Depth Soils
(G002XS301WA), Limited Depth Soils (G002XF303WA)
Minor Components
Everett
Percent of map unit: 5 percent
Landform: Eskers, kames, moraines
Landform position (two-dimensional): Shoulder, footslope
Landform position (three-dimensional): Crest, base slope
Down-slope shape: Convex
Across-slope shape: Convex
Indianola
Percent of map unit: 5 percent
Landform: Eskers, kames, terraces
Landform position (three-dimensional): Tread
Down-slope shape: Linear
Across-slope shape: Linear
Shalcar
2015 D. R. STRONG Consulting Engineers Inc 16 Avana Ridge
Level One Downstream Analysis Renton, Washington
Percent of map unit: 3 percent
Landform: Depressions
Landform position (three-dimensional): Dip
Down-slope shape: Concave
Across-slope shape: Concave
Norma
Percent of map unit: 2 percent
Landform: Depressions, drainageways
Landform position (three-dimensional): Dip
Down-slope shape: Concave, linear
Across-slope shape: Concave
2015 D. R. STRONG Consulting Engineers Inc 17 Avana Ridge
Level One Downstream Analysis Renton, Washington
FIGURE 14 - FEMA Map
NTS
SITE
2015 D. R. STRONG Consulting Engineers Inc 18 Avana Ridge
Level One Downstream Analysis Renton, Washington
TASK 3: FIELD INSPECTION
Upstream Tributary Area
The upstream basin area was evaluated by examining the King County topographic
map (see Figure 3), City of Renton Mapping Application and by conducting field
reconnaissance on December 15, 2015 under overcast conditions. Upstream runoff
enters the Site in two locations.
Portions of SE 172nd St and 106th Ave SE direct upstream runoff across the northern
property line. Runoff from 106th Ave SE and the north side of SE 172nd St. enters a
Type 1 catch basin at the intersection of these two streets. An 18-inch diameter
concrete pipe conveys runoff south under SE 172nd St. and outfalls onto the Site.
Runoff from the southern portion of SE 172nd St is intercepted by a ditch along the
south side of SE 172nd St. and enters the Site where the previously mentioned 18-inch
diameter concrete pipe outlets.
Upstream runoff from the west side of Benson Rd S flows west into a ditch along the
east property line. This ditch conveys upstream runoff southwest along the east
property line until it enters a stream about halfway down the property line. This stream
conveys water through the Site. The Project proposes to construct a conveyance
system to collect runoff from these two upstream tributary areas and bypass the
infiltration facility on Site.
General Onsite and Offsite Drainage Description
The Site is contained within one Threshold Discharge Area (TDA) but is divided into two
distinct Natural Discharge Areas (NDA’s), NDA 1 and NDA 2. See Downstream
Analysis Map for the location of each NDA. Natural Discharge Point 1 (NDP 1) is
located at approximately the midpoint of the southwestern property line. NDP 2 is
northwest of NDP 1. See Appendix A for a map of the NDAs and downstream paths.
Runoff exits the Site via an onsite ditch from both NDAs. NDA 1 is approximately 2.65
acres (115,449 SF) and NDA 2 is approximately 1.13 acres (49,378 SF). The flow
paths were observed and appear to converge at points D1 and C2.
TASK 4: DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS
Drainage System Description
The downstream area was evaluated by reviewing available resources and by
conducting a field reconnaissance on December 15, 2015 under overcast conditions.
The analysis is illustrated and detailed in the Downstream Map and Downstream Table
located in Appendix A. The downstream path is located within the Black River Drainage
Basin; more specifically the Panther Creek Subbasin. For point-to-point descriptions of
downstream flow, see Appendix A. Runoff exits the Site via channel flow from an
onsite ditch in two locations – NDP 1 and NDP 2. Both NDPs are located along the
western property line. Runoff enters box culverts on the northeast side of SR 515,
eventually crossing under the road to the southwest. Flows from each NDA converge
at a Type 2 catch basin on the southwest side of SR 515, just east of parcel
2015 D. R. STRONG Consulting Engineers Inc 19 Avana Ridge
Level One Downstream Analysis Renton, Washington
2923059150. Runoff continues west through a ditch between parcels 2923059150 and
2923059134 and is conveyed west through a series of catch basins and PVC pipes.
Runoff outlets west of Wells Ave S and continues west, eventually outfalling into
Panther Creek.
A review of the King County Water and Land Resources Division – Drainage Services
Section Documented Drainage Complaints within one mile of the downstream flow
paths revealed no complaints within the last ten years along all downstream paths for
the Site.
2015 D. R. STRONG Consulting Engineers Inc 20 Avana Ridge
Level One Downstream Analysis Renton, Washington
TASK 5: MITIGATION OF EXISTING OR POTENTIAL PROBLEMS
No drainage complaints were found in Task 4, and therefore no mitigation is required by
this Project. All potential maintenance issues should be resolved by either City
Maintenance (public systems) or the respective property owners (private systems). No
further analysis should be required of this Project.
The Project should not create any problems as specified in Section 1.2.2.1 of the
Manual and therefore is not required to provide Drainage Problem Impact Mitigation
subject to the requirements of Section 1.2.2.2.
Project runoff will be collected and released per the Manual’s requirements to
accommodate Flow Control Duration Standard – Matching Forested Site Conditions
(Level 2 Flow Control). The Project is located within a Basic Water Quality Area, but
since the Project is a multifamily development, it will adhere to Enhanced Basic Water
Quality requirements. During construction, standard sediment and erosion control
methods will be utilized. This will include the use of a stabilized construction entrance,
perimeter silt fencing, and other necessary measures to minimize soil erosion during
construction.
2015 D. R. STRONG Consulting Engineers Inc. 21 Avana Ridge
Level One Downstream Analysis Renton, Washington
APPENDIX A. OFFSITE ANALYSIS DRAINAGE SYSTEM TABLE & DOWNSTREAM MAP
OFFSITE ANALYSIS DRAINAGE SYSTEM TABLE
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
TDA 1: NDA 1
Basin: Black River Subbasin Name: Panther Creek Subbasin Number: N/A
Symbol Drainage
Component Type,
Name, and Size
Drainage Component
Description
Slope Distance
From site
Discharge
Existing
Problems
Potential
Problems
Observations of field inspector
resource reviewer, or resident
See map
Type: sheet flow,
swale, Stream,
channel, pipe,
Pond; Size: diameter
Surface area
drainage basin, vegetation, cover,
depth, type of sensitive area, volume
%
1/4 mi=1,320 ft
Constrictions, under capacity, ponding,
overtopping, flooding, habitat or organism
destruction, scouring, bank sloughing,
sedimentation, incision, other erosion
tributary area, likelihood of problem,
overflow pathways, potential impacts.
A1 2’ x 4’ Concrete Box
Culvert
Northeast side of SR 515, approximate
midpoint of western property line.
0’ None Observed Slight potential for
blockage from
debris/foliage
Light flow observed
A1-B1 Southwesterly Pipe
Flow
18” Concrete Pipe 0’-19’ None Observed None Anticipated
B1 Type 2 Catch Basin Slightly southwest of box culvert on the
northeast side of SR 515. 18” Conc.
(NE,SW)
19’ None Observed None Anticipated Light flow observed
B1-C1 Southwesterly Pipe
Flow
18” Concrete Pipe, travels southwest
under SR515
19’-74’ None Observed None Anticipated
C1 Type 2 Catch Basin On the southwest side of SR 515,
across the street from CB at point B1.
12” Conc. (SE), 18” Conc. (NE, NW)
74’ None Observed None Anticipated Light flow observed
C1-D1 Northwesterly Pipe
Flow
18” Concrete Pipe, travels northwest
along the southwestern side of SR 515.
74’-358’ None Observed None Anticipated
D1 Type 2 Catch Basin Southwestern side of SR 515, just east
of parcel 2923059150. 18” Conc.
(NE,SE), 24” Conc. (SW)
358’ None Observed None Anticipated Moderate flow observed
D1-E1 Southwesterly Pipe
Flow
24” Concrete Pipe, travels southwest
under the sidewalk and outfalls into
ditch.
358’-378’ None Observed None Anticipated
2015 D. R. STRONG Consulting Engineers Inc. 22 Avana Ridge
Level One Downstream Analysis Renton, Washington
E1 Pipe Outlet 24” Concrete Pipe outfalls into ditch on
the southwest side of SR 515, heading
southwest between parcels
2923059150 and 2923059134
378’ None Observed None Anticipated Moderate flow observed
E1-F1 Channel Flow Runoff flows southwesterly between the
parcels through a moderately vegetated
ditch, approximately 2’ wide
378’-791’ None Observed General
maintenance and
clearing may be
necessary in the
future
F1 Culvert Inlet Runoff flows into 30” CMP with trash
rack. Flow is separated from the
sidewalk by a ~2’ high concrete wall
and chainlink fence. Inlet is custom
designed and transitions from 30” to
18” pipe.
791’ None Observed Heavy flow may
erode subgrade of
wooden fence near
inlet and cause
problems
Moderate flow observed
F1-G1 Southwesterly Pipe
Flow
18” PVC Pipe 791’-856’ None Observed None Anticipated
G1 Type 1 Catch Basin South side of S 36th St. 18” (NE, SE,
W)
856’ None Observed None Anticipated Moderate flow observed
G1-H1 Westerly Pipe Flow 18” PVC Pipe 856’-954’ None Observed None Anticipated
H1 Type 2 Catch Basin Solid lid in south side of S 36th St. 18”
PVC (E, NW)
954’ None Observed None Anticipated Moderate flow observed
H1-I1 Northwesterly Pipe
Flow
18” PVC Pipe 954’-1127’ None Observed None Anticipated
I1 Type 2 Catch Basin Solid lid in south side of S 36th St. 18”
PVC (SE, W)
1127’’ None Observed None Anticipated Moderate flow observed
I1-J1 Westerly Pipe Flow 18” PVC Pipe 1127’-1264’ None Observed None Anticipated
J1 Type 2 Catch Basin Solid lid in south side of S 36th St. 18”
PVC (E, SW)
1264’ None Observed None Anticipated Moderate flow observed
J1-K1 Southwesterly Pipe
Flow
18” PVC Pipe 1264’-1377’ None Observed None Anticipated
2015 D. R. STRONG Consulting Engineers Inc. 23 Avana Ridge
Level One Downstream Analysis Renton, Washington
K1 Type 2 Catch Basin Solid lid in south side of S 36th St. 18”
PVC (NE, S). Over ¼ mile downstream
- end of field reconnaissance. Runoff
continues south between parcels
1441000150 and 1441000160.
According to record drawings from the
City of Renton, flow enters a CB at the
back of parcel 1441000150, moves to
another CB at the back of parcel
8106300980, and then moves west
towards a CB at the front of parcel
8106300890, 1866’ along the
downstream path. This Type 2 CB was
observed during field reconnaissance.
Moderate flow was observed. 18” pipe
(E,W). Runoff outlets to the west.
1377’ None Observed None Anticipated Moderate flow observed
2015 D. R. STRONG Consulting Engineers Inc. 24 Avana Ridge
Level One Downstream Analysis Renton, Washington
OFFSITE ANALYSIS DRAINAGE SYSTEM TABLE
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
TDA 1: NDA 2
Basin: Black River Subbasin Name: Panther Creek Subbasin Number: N/A
Symbol Drainage
Component Type,
Name, and Size
Drainage Component
Description
Slope Distance
From site
Discharge
Existing
Problems
Potential
Problems
Observations of field inspector
resource reviewer, or resident
See map
Type: sheet flow,
swale, Stream,
channel, pipe,
Pond; Size: diameter
Surface area
drainage basin, vegetation, cover,
depth, type of sensitive area, volume
%
1/4 mi=1,320 ft
Constrictions, under capacity, ponding,
overtopping, flooding, habitat or organism
destruction, scouring, bank sloughing,
sedimentation, incision, other erosion
tributary area, likelihood of problem,
overflow pathways, potential impacts.
A2 2’ x 4’ Concrete Box
Culvert
Northeast side of SR 515, just
southeast of the northwest property
corner.
0’ None Observed
Slight potential for
blockage from
debris/foliage
Light Flow Observed
A2-B2 Southwesterly Pipe
Flow
18” Concrete Pipe 0’-16’ None Observed None Anticipated
B2 Type 2 Catch Basin Slightly southwest of box culvert on the
northeast side of SR 515. 18” Conc.
(NE,W)
16’ None Observed None Anticipated Light Flow Observed
B2-C2 Westerly Pipe Flow 18” Concrete Pipe, travels west under
SR515
16’-84’ None Observed None Anticipated
C2 (D1) Type 1 CB Southwestern side of SR 515, just east
of parcel 2923059150. 18” Conc.
(NE,SE), 24” Conc. (SW). Flow
combines at point D1 and continues
along path for NDA 1
84’ None Observed None Anticipated Moderate Flow Observed
GRAPHIC SCALE
0 75 150 225
1 INCH =150 FT.