Loading...
HomeMy WebLinkAboutMFP22001421.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22001421 IVR Number: 22001421 Permit Information Permit Name: Comcast Cable Franchise Permit CSG 350792 Address/Location:03/21/2022Application Date:7564600270Parcel Number: 207 GARDEN AVE N, LOT Permit Type:03/31/2022Issue Date:Franchise Permit Work Class:03/31/2023Expiration Date:Minor Utility Job Number: Comcast Job CSG 350792Franchise Type:Cable Description: Comcast Job CSG 350792 207 Garden Ave N Renton, WA 98057 Requesting to bore 62' and (3) 2 x 5 open cut in r/w and place 2" PVC. Begin at pole SE corner of 204's property 2 x 5 open cut, bore 12' then (2) 2 x 5 open cut and continue boring 50' to private property. Utility crossing to be potholed to ensure required separation is maintained, locations to be identified at pre con inspection. All substructures have a 36 inch cover. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Michele Moore Prince Telecom LLC 13701 24th St E, 24th St E Sumner, WA 98390 H: (206) 388-4316ApplicantX Fahm Saelee Prince Telecom Applicant Sandra Castro Comcast Cable Communications C: ((20) 9) -561-x4786 Contact Akisha Brown Prince Telecom Inc 551A Mews Dr New Castle, DE 19720 B: (302) 482-8893 C: (302) 482-8892 Contractor Business License Number: 29850Electrical Contractor: PRINCTL834BF Construction Contractor: PRINCTL862PS CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 11/25/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 11/25/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.☐ A copy of the Traffic Control Plan (TCP) Application form. 2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ☐Include map(s) showing the location of the project and work area. ☐Be legible lettering and clear, contrasting, symbols of viewing or printing. ☐Must indicate street names, and north arrow and scale. ☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ☐Types of plans required: ☐Work hour plan – show all mobility impacts during construction hours. ☐Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ☐Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ☐Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering Comcast Job 350792 207 Garden Ave N Renton,WA 98057 Monday Friday 8:00AM 3:00PM Bore 62'&(3)2 X 5 open cuts in r/w and place 2"PVC. Prince Telecom LLC 253 891 2899 Comcast Cable Communications Management, LLC rhonda_resnik@comcast.com 410 Valley Ave NW Ste:12 Bldg C Puyallup, WA 98371 MFP22001421 Scott Warlick CED 3/31/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 11/25/2019 APPLICANT AGREES TO ALL THE FOLLOWING: •TCP must be approved prior to commencing the work, and all permit conditions shall be met. •Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. •Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Approved Temporary TCP must be at the work site during work hours. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. •The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date Fahm Saelee 03/21/2022Fahm Saelee parking parking parking Prince telecom telecommunications installation Fahm Salee 206-743-2173 JOB # CSG350792 NORTH NOT TO SCALE Garden Ave N N 2nd StTYPICAL PROTECTIVEVEHICLE TYPEWITH TMA TYPICAL PROTECTIVE VEHICLE(WITH TMA) LOADED WEIGHT(LBS) STATIONARYOPERATION(ft) 30 MIN. 100 max. MINUMIM WEIGHT 16000 LBS(MAXIMUM WEIGHT SHALL BE IN ACCORDANCEWITH MANUFACTURER RECOMMENDATION 4 YARD DUMP TRUCKSERVICE TRUCKFLAT BED, ETC PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE LONGITUDINAL BUFFER SPACE = B ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE IF NO TMA IS USED,THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO SHIELD WORKERS ANDNO ROLL AHEAD DISTANCE IS SPECIFIED. REFER TO CHAPTER 1.5.5 FOR ADDITIONAL INFORMATION CHANNELIZING DEVICE SPACING CHART (FEET) 50/70 35/45 20/30 mph *Half-Spacing*TAPER TANGENT 20 N/A 40 30 20 80 60 40N/A BUFFER DATALONGITUDINAL BUFFER SPACE = B SPEED (mph) LENGTH (ft) 25 30 35 40 45 50 55 60 65 70 155 200 250 305 360 425 495 570 645 730 MINIMUM TAPER LENGTH = L (feet) POSTED SPEED (mph) 25 30 35 40 45 50 55 60 65 70 LANEWIDTH(feet) 10 1112 105 115125 150165180 205 225245 270295 320 450495 540 500550 600 550605 660 660 720 -----780 840 SIGN SPACING = X (FEET) (1) FREEWAYS & EXPRESSWAYS RURAL HIGHWAYS RURAL ROADS RURAL ROADS and URBAN ARTERIALS RURAL ROAD, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED 55/70 mph 60/65 mph 45/55 mph 35/40 mph 25/30 mph 25mph or less 1500ft +/- 800ft +/- 500ft +/- 350ft +/- 200ft +/-(2) 100ft +/-(2) (1) All spacing may be adjusted to accomodate interchange ramps, at-grade intersections, and driveways.(2) This spacing may be reduced in urban areas to fit roadway conditions. MERGING, SHIFTING, and SHOULDER TAPER LENGTHSand NUMBER OF CHANNELIZATION DEVICES USED 10ft LANE 11ft LANE 12ft LANE L L L1/2L 1/2L 1/2L Lanewidth MPH Merging Merging MergingDevicesShiftingDevicesDevicesDevicesDevices DevicesShiftingShifting SHOULDER TAPERS(assume 10ft shoulders) 1/3L Devices(FT)LengthMPH 20253035 40455055606570 70105150205270 450500550600650700 6688101614 15161719 355575105135225 250275300325350 345569 8 89910 75115165225295495550605 660715770 679911181516181920 406085 115150250285305330370 385 3455698991011 80125180245320540600660720780840 6710912191618192122 406590125160270300330360390420 345561099101112 20253035 40455055606570 2535507090 150 170185200220235 3334466 6 677 Shoulder tapers equalsshoulder Width x Speed/3 parkingparking parking N 2nd St211 200 204Road bore<50'>Pole parking <12'> 207 sidewalk sidewalk planter stripROADWORKAHEAD W20-1W20-7bABBE PREPAREDTO STOP100'100'W20-7aC100'ROADWORKAHEADW20-1W20-7aW20-4100'ABC100'100'ONE LANEROADAHEADROADWORKAHEADW20-1W20-7bABBE PREPAREDTO STOP100'100'W20-7aC100'ROADWORKAHEADW20-1 W20-7aW20-4 100' A B C 100'100'ONE LANEROADAHEADKENNY'S TRAFFIC ZONE PLANSTRAFFIC CONTROL PLAN PREPARATION PH # 425-223-7689TRAFICPLAYR@AOL.COMLongview, Wa STOPKENNY STERTZTRAFFIC CONTROL SUPERVISORWashington Oregon((ID# WA016416 SJ833BD.O.E 11/21/2022 5/31/2024 SIDEWALKCLOSED R9-9 NOTES: -Sidewalk shall be closed -Flagger will be onsite to Guide any Pedestrians pass the work area cones - 2'x5'Open cut -flagger - www.invarion.com MFP22001421 Requesting to bore 62' and (3) 2 x 5 open cut in r/w and place 2" PVC. Begin at pole SE corner of 204's property 2 x 5 open cut, bore 12' then (2) 2 x 5 open cut and continue boring 50' to private property. Utility crossing to be potholed to ensure required separation is maintained, locations to be identified at pre con inspection. All substructures have a 36 inch cover. Date: ENGINEERED FOR:DROP BURY REVISION Comcast ESS Prepared By:Fahm Saelee 206-743-2173 Rev Date Place Large Photo Detail Here CSG 350792 0 207 Garden Ave N Renton, WA 98057 SOW Detail Overview POLE 2 X 5 OPEN CUT 12' ROW BORE 2 X 5 OPEN CUT 2 X 5 OPEN CUT 50' ROW BORE MFP22001421 RESTORATION PER CITY OF RENTON STANDARDS Requesting to bore 62' and (3) 2 x 5 open cut in r/w and place 2" PVC. Begin at pole SE corner of 204's property 2 x 5 open cut, bore 12' then (2) 2 x 5 open cut and continue boring 50' to private property. Utility crossing to be potholed to ensure required separation is maintained, locations to be identified at pre con inspection. All substructures have a 36 inch cover. Date: ENGINEERED FOR:DROP BURY REVISION Comcast ESS Prepared By:Fahm Saelee 206-743-2173 Rev Date Place Large Photo Detail Here CSG 350792 0 207 Garden Ave N Renton, WA 98057 SOW Detail Overview POLE 2 X 5 OPEN CUT 12' ROW BORE 2 X 5 OPEN CUT 2 X 5 OPEN CUT 50' ROW BORE MFP22001421